Loading...
HomeMy WebLinkAboutGeneral Fund TRUCKEE-DOPTITER Pt?BT IC UTILITY DISTRICT CONTRACT NO. 1 POWER TRANSFORMERS, VOLTAGE REGULATORS AND RECLOSERS Four Power Transformers WEDCO BUCKLEY-GORE SIEMENS-ALLIS GENERAL ELECTRIC 4' 1- Bid Item 1-AI Total Evaluated $2?8.659 (1) $261,874 (2) NO BID $218,266 (2) Delivery Price i, I Three Voltage Regulators Bid Item 1-B1 Quoted Price NO BID (3) $493671 (4) $49,050 (2) Spare Parts 1,200 N.A. Six Reclosers i Bid Item 1-Cl i, Quoted Price $43,452 (2) NO BID NO BID NO BID i (1) Bid price escalated per contract documents. (2) Firm price through delivery. (3) Did not quote a separate price for regulators. (4) 6% Sales tax added to bid price in accordance with Siemens-Allis quoted contract conditions. l/9/79 ' �S3 INTER-OFFICE MEMO DATE: January 29, 1979 TO: Milt Seymour, General Manager FROM: Bob Slattery„,'General Foreman SUBJECT : . Proposed Substation loading: Summer 1979 . TRUCi:EE SUBSTATION Capacity: 3-2500 KVA, 'IQ1 ,60-7200/12470'V Transformers ; 1 spare Capability: 7500 KVA Fan Capability: (Assuming the windings are in good condition) 9066 KVA 1978 Sunv-ner Load Peak, July - August 7920 KW @ .92 PF 8608 KVA 1979 Estimated Requirements , assuming 10% load growth: 8712 KW @ .92 PF: 947_0 KVA 414 KVA TAhOE--DCNNER SUBSTATION Capacity: 3-1250 KVA, 10 60-7200/12470V Transformers ; 1 spare Capability : 3750 KVA- Fan Capability: Not practical conductor capacity limits 'load transfer 3750 KVA 1978 Summer Load Peak, July - August 2000 KW @ .97 PF 2060 KVA_ 1979 Estimated Requirements, assuming 20% load growth : 2400 KW @ .97 PF: 24?4 KVA +1276 KVA AREA CAPABILITY Truckee SUbt.ation (Fans 'Included) : 9056 KVA Tahoe-Dorner- Substation : 3750 KVA. TOTAL: 12806 KVA Capability ,.t 95% Utilization: 12165 KVA ESTIMATED 1979 LOADIN(, Truckee Substation : 9470 KVA Tahoe-Donner Substation'. 2474 KVA TOTAL: 11944 KVA To meet the 1979 area power requirements :and stay within the allowaV e loading limits of the station transforuer, banks, it will be necessary to install Fans on the Truckee Substation bank and transfer approximately 1250 KVA from the y� t ti PAGE Two ,January 29, 1979 Inter-Office Mpr;;o, Bob Slattery to Milt Seymour Truckee Substation to the Tahoe-Donner Substation. This can be accomplished by picking up a section of the Truckee Substation load (Feeder "B" ) on the Tahoe-Danner #2 circuit.. Existing switches will be — utilized for the transfer. When the above load transfer and fans are installed at the Truckee Substation, the Station I-aadings for 1979 will be as follows : Truckee Substation; 8220 KVA Tahoe-Donner Substation: 3724 KVA Total toad 1979 11944 KVA Area Capability at 95% Utilization : 12165 KVA The proposed loading and transfers (additional transfers from Tahoe-Donner prohibited due to the conductor size of the Tahoe-Donner circuit) will provide adequate area service through the 1979 summer. ;r 3�7 TRUCKEE-DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL. FUND - January 29, 1979 Bank Balance - January 11 , 1979 $ 2,788.82 'Truckee-Electric & Water Revenue 110,779.35 Donner Lake Electric Revenue 36,115.05 Electric Connection Fees 1 ,400.00 Water Connection Fees 280.00 Standby Revenue 28,167.50 Interest received from LAYF 18,517.24 Miscellaneous Billings Revenue 5,849.15 Miscellaneous Revenue 126.32 _ $ 204,023.43 Approved Billings: Bank of America - Truck Loan Payment 474.02 - Federal Tax Deposit 2,645.56 George Cattan - Pension Plan Payment 258.75 Directors - Board Meeting Attendance 500.00 Employment Development Dept. - SDI and State Withholding Tax for quarter ended 12/31/78 1 ,150.82 IBEW - Union dues, 1/79 183.00 Public Employees Retirement System - social security contribution for quarter ended 12/31/78 8,840.74 Refunds: Credit balances on closed accounts William H. Brichell 17.87 Daniel Fingerhutt 2.33 Larry Harloff 37.04 Jerry Kempf 8.91 Paul B. Lucas 33.13 Peters Construction 2.05 Edward L. Purvis 6.68 Pete Slaiuter 17.42 125.43 State Board of Equalization Sales tax deposit for the quarter ended 12/31/78 129.50 State Compensation Insurance Fund - workmen's compensation insurance for quarter ended 12/31/78 2,191 .71 State Treasurer - State of California - contribution of Local Public Entity Employee's wages under Unemployment Insurance Code 859.80 TDPUD - Interest on Consumer Deposits 3.79 Tahoe National Bank - Computer Loan Payment 356.44 U. S. Postmaster - Postage Permit #1 525.00 West River Street Assessment District - temporary transfer to pay interest due 11000.00 Void refund check #1.3921 - Gordon Cuzick _ (7.50� _ (19,237.06) PAYROLL 1/15/79 OT DT Standby_Gross Net Baker 385.44 333.89 Boone 385.44 288.77 Chapman 729.17 538.33 Connell 729.52 522.55 Craig 232.12 794.62 547.89 Grow 936.32 682.96 Hossack 534.16 439.27 Marsh 125.75 767.27 547.94 Layton 711 .36 478.24 Lopez 98.80 968.24 662.11 Reed 641 .52 426.66 Reynolds 887.04 663.96 Rose 628.32 420.06 Rully 52.26 34.84 853.58 576.35 Seymour 1 ,250.00 862.41 Silva 47.88 63.84 106.4.0 1 ,154.44 806.26 Slattery 750.00 562.60 Straub 128.44 918.84 633.52 Tamietti 26.13 792.61 641 .78 Waltrip 5.36 633.68 463.34 Bennett _ _ 378.35 308.52 489.50 98.68 333.64 15829.92 11407.41 Temporary and Part-Time Employees 1/15/79 OT DT Standby Gross Net Lyson 350.40 275.12 McCarthy 280.32 245.79 Moore 105.12 96.86 735.84 617.77 489.50 98.68 333.64 16565.76 12025.18 (12,025.18) Bank Balance - January 29, 1979 $ 172,761 .19 Bills for Board Approval (See Attached) (219,312.70) Bank Balance after Payment of Above (46,551 .51 ) LAIF transfer to cover above bills-transfer to be 47,000.00 made February 5, 1979. General Fund balance in LAIF after transfer will be $588,124.38. ($102,415.43 SPPC refund was transferred to restricted funds since last Statement of General Fund. ) Balance of account after LAIF transfer $ 448.49 BILLS FOR BOARD APPROVAL: Electric Water General Total Ace Hardware Miscellaneous hardware 100.13 34.54 13.39 148.06 Aetna Life & Casualty Life insurance, 1/79 68.31 68.31 Airsignal of California, Inc. Monthly service charge, 1/79 15.00 15.00 Allied Automotive Miscellaneous vehicle parts 1.57 .68 54.16 56.41 Allied Business Forms Office supplies 19.08 19.08 Alpha Hardware Company Miscellaneous hardware 72.73 28.05 66.71 167.49 American Public Power Association Service fee for 12 months - October 1 , 1978 - October 694.56 694.56 31, 1979 Atlantic Richfield Gasoline and diesel 427.14 427.14 Avery Engineering Engineering services for October, November, December 1978 5,540.14 5,540.14 61 R. W. Beck and Associates Engineering services - Substation planning and design 3,190.61 3,125.3 Beginning Restaurant Three dinners, Connell , Waltrip & Grow - inventory 05.00 05.00 John Blevins Snow removal 419.34 419.34 Blue Cross Insurance premium, 2/79 2,419.34 2,510.28 Camellia Valley Supply Hardware & meter couplings 510.28 565.54 A. Carlisle and Co. of Nevada Office supplies 65.54 65.54 Cook Associates Consulting services, 12/78 - Billed Dart $330.18 71 .40 4,561.46 4,632.86 - Billed Beavers $288.91 Crown Life Long term disability, 1/79 448.89 448.89 D & D Agencies Freight charges 6.75 6.75 G. W. Dahl Co., Inc. Air freight charges 61.61 61 .61 Department of General Services Radio maintenance - November 573.75 573.75 Digital Equipment Corporation Maintenance coverage on computer, 1/79 99.00 99.00 Forms Management Standby invoices, applications & utility bills 5,195.99 5,195.99 General Pacific Pole Clevises 392.67 392.67 Graybar Electric Company Pole clevises, service sleeves, watt hour meter with Texan cover 2,646.00 2,646.00 W. W. Grainger, Inc. Tool cabinet 80.61 48.61 Steve Grumer, Attorney Legal fees 144.00 224.00 386.91 786.91 Havas Motors Subaru Vehicle service 48.91 48.91 High Country Answering Service Answering service, 1/79 07.02 07.02 Ken's Tire Centers, Inc. Vehicle and backhoe tires 228.02 228.02 L & V Fuel, Inc. Gasoline 282.57 282.57 82.57 82.51 Linjac Supply Batteries 264.45 McDonough, Holland, Schwartz & Allen Legal services, 12/78 264.45 Motorola, Inc. Reeds for pagers 767.40 767.40 National Controls, Inc. Radio transceivers with charger & case 2,741.67 2,741.67 Nevada Safety & Supply, Inc. Safety glasses 41.67 41 .67 W �3 BILLS FOR BOARD APPROVAL: (Page Two) Electric Water General Total William E. Nork, Inc. Consulting services, 11/78 & 12/78 1 ,094.10 1 ,094.10 North American Register of Business Listing in register - 1/8 page 145.00 145.00 and Industry 371 .80 371 .80 Northstate Equipment Inc. Starter for backhoe 160.95 160.95 Osburn's Garage Vehicle repairs Pacific Telephone Monthly telemetry charges 169.15 600.02 Pacific Telephone Monthly telephone charges - December & January 642.93 642.93 Pitney Bowes Postage meter 42.93 48.00 Placer County Assessor's Office Assessor's maps 8.00 6.51 Poole Fire Equipment Co. Fire extinguisher refills 08.51 08.51 Public Employers Personnel Consultants Employee relation service - 12/78 608.78 636.32 Qualitrol Corporation Transformer pressure relief valves 36.32 36.32 Record Supply Company Pump control valve, bushings, unions & rebuilt kit for cla-val pump control valve 2,080.43 2,099.20 Red Star Industrial Linen service - 11/78, 12/78 & 1/79 99.20 28.10 RFL Industries, Inc. Air freight charges 28.10 18.10 Rosebud News Office supplies 28.88 24.88 RTE Corporation Transformer 3,193.50 3,193.50 Ruralite Services, Inc. Safety training, 11/78 23.50 23.53 Sangamo Energy Management Division Substation amp meter & glass covers 223.53 265.21 Sha-Neva, Inc. Backfill sand 65.21 77.21 Sierra Pacific Power Company Power usage, 12/78 174,517.06 171,937.68 Sierra Power Sport Snow mobile & cover 1 ,937.68 1 ,937.68 Sierra Sun Bonanza Publication of Ordinance 7901 , non-discrimination 27.00 20.26 47.26 statement, invitation to bid - 1 .9 acre parcel 26.50 Sinclair Radionics, Inc. Repair of digital multimeter 26.50 Sir Speedy Instant Printing Center Office supplies .3 .3 2 11 .32 . 2 211 .74 211.74 Specialty Oxygen Service Cylinder of oxygen . Sun Printing Company Office supplies Tahoe Instant Press Office supplies 14.61 15.61 Tahoe Office Systems Office supplies 214.61 114.61 Taylor's Tires Vehicle tires & tire repairs 214.24 214.43 Teichert Aggregates Fill sand 18.43 18.84 Tom's TV Cassette tapes 19.00 19.00 Truckee-Donner Disposal, Inc. Garbage service, 12/78 70.10 70.10 Tahoe-Truckee Sanitation Agency Sewage fee - l/l/79 - 6/30/79 110.65 123.46 Truckee-Tahoe Lumber Miscellaneous hardware 12.81 25.26 23.26 US Leasing Lease of postage meter machine 25.26 25.72 Wedco, Inc. Meter recording rolls & multimeter 228.72 214.86 Western Hardware & Tool Co. Miscellaneous hardware 14.86 14.86 W 185,922.39 14,464.59 18,925.72 219,312.70 3 1 TRUCKEE-DONNER PUBLIC UTILITY DISTRICT FmHA Construction Fund Status Report - January 31 , 1979 Bank Balance - October 13, 1978 $ 74,641 .13 Approved Billings: Jetco Underground Construction Progress Payment #5 $ 6,109.10 Progress Payment #6 5,971 .70 C. W. Roen Construction Progress Payment #5 5,666.40 Progress Payment #6 19,706.30 (37,453.50) Bank Balance - January 31 , 1979 37 ,187.63 Bills for Board Approval : Cook Associates: Survey & inspection services through 9/28/78 2,036.18 Inspection by Wm. E. Nork 7/77 through 7/78 951 .54 Wilson, Morton, Assaf & McElligott Preparation of promissory note 1/l/78 through 9/18/78 1 ,280.75 (4,268.47) Balance of account after payment of above $ 32,919.16