HomeMy WebLinkAbout8 Transformer Bid Agenda Item #
Public Utility District
ACTION
To: Board of Directors
From: Sanna Schlosser
Date: Wednesday, March 19, 2008
Subject: Transformer Bid Award Recommendation
1. WHY THIS MATTER IS BEFORE THE BOARD
The amount of this award is in excess of$15,000 therefore Board approval is
necessary.
2. HISTORY
The District's annual purchase of transformers is required to meet customer
obligations and the purchase also includes for routine replacements. Vendors were
asked to bid on transformers with options for two different types of dielectric fluid:
petroleum-based mineral oil and seed-based biodegradable oil. The Board
previously reviewed the differences between these two types of dielectric fluids. The
Board approved the purchase of biodegradable oil in all transformers for the 2007
contract. In order to enter into year-long contracts, vendors have requested the use
of a quarterly materials escalation clause which the District has included in
transformer contracts since 2006.
The following factors were used in determining the successful bidder: price,
adherence to our contract and specifications, and delivery time. The lowest bid price
is determined by the Total Owning Cost (TOC) formula calculation. The TOC is equal
to the sum of the Unit Price (initial purchase price) plus the cost of losses over the
expected life of the unit. The TOC calculation allows the District to determine the
transformers with lowest overall ownership costs, which may not correspond to the
lowest initial purchase or contract prices. The low bidder for a category type is
determined by the summation of the TOCs for all transformers within that category,
based on a quantity of one (1) for each transformer.
3. NEW INFORMATION
Bids have been opened and analyzed for the District's purchase of transformers. The
Total Owning Cost (TOC) calculation was used to determine the low bidders as
depicted in Table 1.
Attached are summaries of the bid information received. The bid results show the
description and quantity of transformers required, vendor name, dielectric fluid type,
quoted price, and delivery time. District contracts specify that bids must be awarded
by entire category. These categories are Single Phase Pole Mounted Transformers
(Schedule A), Single Phase Pad Mounted Transformers (Schedule B) and Three
Phase Pad Mounted Transformers (Schedules C and D).
The apparent low bidder for Schedules C and D is Cooper, however the transformers
bid do not comply with District Specifications. The bid from Cooper was therefore
found to be non-compliant with the District specifications. The other bidders were
found to in compliance with the District specifications.
4. FISCAL IMPACT
Sufficient funds exist for the purchase of new transformers within the approved FY
2008 capital budget. This award will be limited to the approved FY 2008 capital
budget.
5. RECOMMENDATION
The recommendations are based on TOC evaluations and are as follows:
1. Find Cooper non-compliant with District Standards for schedules C &D.
2. Award Schedule A, Pole Mounted Single Phase Transformers with Biodegradable
Dielectric Fluid to Cooper with the contract prices as listed on the 2008 Transformer
Bid Award Recommendation Table, to be effective until 6/30/08.
3. Award Schedule B, Pad Mounted Single Phase Transformers with Biodegradable
Dielectric Fluid to General Pacific with the contract prices as listed on the 2008
Transformer Bid Award Recommendation Table, to be effective until 6/30/08.
4. Award Schedules C and D, Pad Mounted Three Phase Transformers with
Biodegradable Dielectric Fluid to Howard with the contract prices as listed on the
2008 Transformer Bid Award Recommendation Table, to be effective until 6/30/08.
Sanna Schlosser, Electrical Engineer Michael D. Holley, Gene I Manager
TABLE 1 - TRANSFORMER BID RESULTS
Evaluated Price Comparison - Total Owning Cost (TOC)
(TOC=Initial Purchase Price + Cost of losses over transformer life)
Schedule A- Single Phase Pole Mount Trans. 120/240V
Mineral Oil
Sched Cooper GE Gen Pac Howard Moloney WESCO
Al $2,019.20 $1,969.27 $1,986.23 $2,279.53 $2,231.90 $2,259.76
A2 $2,598.57 $2,576.40 $2,537.08 $2,638.63 $2,932.79 $2,851.47
A3 $2,610.44 $2,521.24 $2,485.18 $2,958.86 $2,985.17 $2,759.84
A4 $3,367.42 $3,078.57 $3,108.18 $3,593.40 $3,454.50 $3,514.90
A5 $2,152.23 $2,099.07 $2,145.33 $2,421.69 $2,220.70 $2,464.51
A6 $2,862.19 $2,741.83 $2,688.05 $3,180.30 $2,982.01 $2,981.87
A7 $3,218.47 $3,195.99 $3,352.45 $3,797.83 $3,500.31 $3,582.13
$18,828.52 $18,182.36 $18,302.49 $20,870.24 $20,307.38 $20,414.47
Schedule B - Single Phase Padmount Trans. 120/240V
Mineral Oil
Sched Cooper GE Gen Pac Howard Moloney WESCO
61 $2,917.21 $0.00 $2,369.07 $2,610.29 $0.00 $2,882.46
132 $4,103.54 $0.00 $3,378.96 $3,935.04 $0.00 $3,846.94
133 $5,105.58 $0.00 $4,532.23 $5,601.51 $0.00 $4,740.67
134 $6,036.81 $0.00 $5,655.73 $6,613.04 $0.00 $5,644.74
135 $3,281.85 $0.00 $2,684.14 $3,614.50 $0.00 $3,282.44
136 $4,371.17 $0.00 $3,726.02 $4,950.15 $0.00 $4,151.28
$25,816.16 $0.00 $22,346.15 $27,324.54 $0.00 $24,548.52
Schedule C -Three Phase Padmount Trans. 120/208V
Mineral Oil
Sched Cooper GE Gen Pac Howard Moloney WESCO
C1 $9,047.82 $0.00 $7,966.82 $7,130.91 $0.00 $8,332.62
C2 $10,367.27 $0.00 $9,326.97 $8,762.36 $0.00 $9,417.52
C3 $11,962.91 $0.00 $11,110.01 $10,384.16 $0.00 $11,113.36
C4 $13,447.56 $0.00 $12,858.27 $12,074.08 $0.00 $12,591.06
C5 $16,660.40 $0.00 $15,798.28 $15,254.99 $0.00 $15,874.78
C6 $19,435.66 $0.00 $18,707.91 $18,243.69 $0.00 $18,766.52
C7 $27,244.69 $0.00 $25,901.78 $25,560.33 $0.00 $23,344.42
C8 $37,328.23 $0.00 $35,091.92 $34,175.73 $0.00 $36,556.06
$145,494.53 $0.00 $136,761.96 $131,586.25 $0.00 $135,996.34
Schedule D -Three Phase Padmount Trans. 277/480V
Mineral Oil
Sched Cooper GE Gen Pac Howard Moloney Pauwels
D1 $9,179.83 $0.00 $7,911.92 $7,343.59 $0.00 $8,056.16
D2 $10,470.88 $0.00 $9,144.76 $8,685.29 $0.00 $9,444.38
D3 $11,892.50 $0.00 $11,211.82 $10,460.65 $0.00 $10,965.28
D4 $13,293.77 $0.00 $12,494.98 $12,004.28 $0.00 $12,342.71
D5 $16,318.88 $0.00 $15,272.05 $15,118.50 $0.00 $15,701.54
D6 $18,964.51 $0.00 $17,956.75 $18,238.89 $0.00 $18,390.30
D7 $25,776.74 $0.00 $24,197.45 $24,747.69 $0.00 $22,472.65
D8 $35,092.43 $0.00 $33,206.43 $32,007.51 $0.00 $35,211.90
D9 $42,571.52 $0.00 $40,774.67 $39,830.44 $0.00 $42,834.11
$183,561.05 $0.00 $172,170.82 $168,436.84 $0.00 $175,419.02
6/22/06 Page 1 of 2
Indicates low bidder for each schedule
Indicates recommended bidder
Schedule A- Single Phase Pole Mount Trans. 120/240V
Biodegradable Fluid
Sched Cooper GE Gen Pac Howard Moloney WESCO
Al $2,095.20 $0.00 $2,246.27 $2,444.40 $2,371.90 $2,665.82
A2 $2,653.20 $0.00 $2,795.08 $2,823.40 $3,162.79 $3,417.66
A3 $2,701.44 $0.00 $2,719.18 $3,180.27 $3,235.17 $3,321.26
A4 $3,277.96 $0.00 $3,416.18 $3,939.45 $3,719.50 $4,119.33
A5 $2,095.70 $0.00 $2,554.67 $2,791.12 $3,235.17 $2,872.08
A6 $2,700.96 $0.00 $2,962.05 $3,454.30 $3,719.50 $3,828.40
A7 $3,279.79 $0.00 $3,686.00 $4,188.84 $2,365.70 $4,329.01
$18,804.24 $0.00 $20,379.42 $22,821.79 $21,809.74 $24,553.57
Schedule B - Single Phase Padmount Trans. 120/240V
Biodegradable Fluid
Sched Cooper GE Gen Pac Howard Moloney WESCO
B1 $3,116.93 $0.00 $2,662.07 $3,061.23 $0.00 $0.00
B2 $4,287.23 $0.00 $3,707.96 $4,516.35 $0.00 $0.00
B3 $5,332.50 $0.00 $5,034.23 $6,336.21 $0.00 $0.00
B4 $6,343.24 $0.00 $6,345.73 $7,256.67 $0.00 $0.00
B5 $3,443.85 $0.00 $3,227.14 $4,452.50 $0.00 $0.00
B6 $4,588.17 $0.00 $4,359.02 $5,959.15 $0.00 $0.00
$27,111.91 $0.00 $25,336.15 $31,582.11 $0.00 $0.00
Schedule C -Three Phase Padmount Trans. 120/208V
Biodegradable Fluid
Scheq Cooper GE Gen Pac Howard Moloney WESCO
C1 X82
$11,827.46 $9,686.82 $8,808.91 $0.00 $0.00
C21. $13,134.26 $10,907.04 $10,686.36 $0.00 $0.00
C3 4 $15,219.51 $12,937.27 $12,360.16 $0.00 $0.00
C4 $18,375.48 $14,760.71 $14,399.08 $0.00 $0.00
C5 1� $21,879.15 $17,957.28 $18,171.99 $0.00 $0.00
C6 ' $24,087.23 $21,413.01 $21,231.69 $0.00 $0.00
C74 $34,654.57 $28,622.23 $29,166.33 $0.00 $0.00
C8 8 $48,215.98 $39,062.92 $38,006.73 $0.00 $0.00
7S1
143. 7 $187,393.63 $155,347.28 $152,831.25 $0.00 $0.00
chedu e D -Three Phase Padmount Trans. 2771480V
Biodegradable Fluid
Sched Cooper GE Gen Pac Howard Moloney WESCO
D1 $9,661. $12,063.75 $9,427.99 $9,219.59 $0.00 $0.00
D2 $10,945 5 $12,458.69 $10,699.52 $10,723.29 $0.00 $0.00
D3 12,41 .36 $14,144.10 $12,962.27 $12,636.65 $0.00 $0.00
D4 3 $ 7 1.03 $17,767.93 $14,242.87 $14,289.28 $0.00 $0.00
D5 $16 17.59 $21,573.82 $17,201.05 $17,845.50 $0.00 $0.00
D6 , $1 9.85 $23,930.14 $20,360.10 $21,504.89 $0.00 $0.00
D7 $ 6,49 51 $33,256.35 $26,692.44 $28,337.69 $0.00 $0.00
Z D8 36,048. 7 $43,982.79 $38,390.43 $36,208.51 $0.00 $0.00
D9 $44,217.2 $53,876.28 $45,566.67 $44,656.44 $0.00 $0.00
$190,055.68 $233,053.85 $195,543.33 $195,421.84 $0.00 $0.00
6/22/06 Page 2 of 2