Loading...
HomeMy WebLinkAboutGeneral Fund 1 BILLS FOR BOARD APPROVAL: Electric Water General Total Ace Hardware Misc. hardware, fork lift rental 55.82 55.82 Aetna Life Insurance Life insurance premiums 47.86 47.86 Atlantic Richfield Diesel fuel 205.32 205.32 R.W. Beck Charges related to Feeder F - billed to TTSA 218.42 218.42 Blue Cross Health plan premiums 1470.72 1470.72 Cal Western Life Pension plan premiums 1621.20 1621.20 Camellia Valley Supply Water meters, meter couplings, adaptors, bell reducer 1202.78 1202.78 Chamberlain Equipment Co. Head, check body, check valve, washer, nipples, ferrules 100.94 100.94 Consolidated Electrical Dist. 6000' triplex, flourescent tubes, wall plates 1431.42 34.64 1466.06 Continental Courier Service Water analysis pickup and delivery charges 30.00 30.00 Cook Associates Engineering services - Billed Dart $19.01 5762.95 5762.95 Crown Life Long term disability premiums 12177, 1/78 447.28 447.28 D & D Agencies Shipping charges 10.30 10.30 Davis Auto Parts Windshield wiper, weatherhead, windshield towels 31.52 31.52 Digital Equipment Corp. Maintenance agreement on computer 11/77, 12/77 278.00 278.00 Forms Management Office supplies 206.52 206.52 Graybar Pulling lubricant, pole clevis 356.11 356.11 IBM Office supplies 42.40 42.40 Jarome !4ire & Cable Conductor shielded wire 74.92 74.92 Larse Corporation Sen unit, Rede unit, DC tech manuel 1124.43 1124.43 M & R Paving Repave road crossings 1126.12 1126.12 Martin McDonough Legal services 243.95 243.95 Maai Chem Paint, cutting and tapping fluid 49.18 50.88 100.06 Milmar Tractor Tractor parts 346.86 346.86 Mission Linen Linen service 24.00 24.00 P.E. O'Hair Ells, tees, valves 422.94 422.94 011ie's Texaco Vehicle maintenance 40.55 40.55 Osburn's Garage Vehicle maintenance 198.54 198.54 Pacific Telephone Monthly phone charge 492.91 492.91 Peerless Pump Pump, mechanical seal , gasket for case 387.11 387.11 Pitney Bowes Annual lease payment - mailing machine 114.00 114.00 Pizza Shack Meals due to overtime 53.69 53.69 Radar Engineers Ground wire moulding 677.81 677.81 RTE Corporation Transformers, 1-150 kva, 4-50 kva, 6-25 kva, 1-15 kva 7088.22 7088.22 Ruralite Safety training 106.00 106.00 The Saw Shop Hand saws sharpened 14.00 14.00 S & C Electric Power fuse 879.30 879.30 Sanaamo Electric Meters 1535.94 1535.94 Sierra Electronics Radio repairs 120.00 120.00 Sierra Pacific Power Co. Power usage, 11/77 128926.50 128926.50 Sierra Sun Bonanza Printing of bid notices 42.76 42.76 BILLS FOR BOARD APPROVAL (Cont) Electric Water General Total Tahoe Chemical Laboratories Water analyses 78.00 78.00 Tahoe Daily Tribune Secretary advertisement 16.25 16.25 Taylor's Tires Tire tubes, recaps, tire mounting 321.98 321.98 Teichert Aggregates Gravel for installation of circulating pump, Tahoe Donner 16.67 16.67 The Toggery Rain gear 113.32 113.32 Truckee Donner Glass Glass for warehouse desk top 12.90 12.90 Truckee Hotel Meals due to overtime 61.42 61.42 Truckee Tahoe Lumber Co. Insulation, screws, saw horses, sheetrock 550.35 550.35 USDA-REA Interest payment, REA loan 2256.27 2256.27 [IS Leasina Quarterly lease payment - postage meter 25.26 25.26 Wedco, Inc. Vapor lamps, meter box, hub, weatherhead, straps, conduit, 1014.88 1014.88 service dead ends Xerox Corp. Copy machine lease payment 174.90 174.90 143808.92 11180.42 7347.67 162337.01 K TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND December 28, 1977 Bank Balance - December 15, 1977 $ 385,639.46 Truckee Electric and Water Revenue 50,479.26 Donner Lake Electric Revenue 17,595-75 Standby Revenue 3,639.01 Electric Connection Fees 350.00 Water Connection Fees 140.00 .- Miscellaneous Billings Revenue 170.34 Miscellaneous Revenue 3.38 Sierra Pacific Power Company Refund 166,303.85 $ 624,321 .05 Approved Billings $ 967.00 Bank of America: Federal Tax Deposit 2,182.40 Truck Loan Payment 474.02 Transfer of SPPC Refund to LAIF 166,000.00 George Cattan - Pension Plan Payment 258.75 Directors - Board Meeting Compensation 500.00 IBEW - Union Dues 172.50 Tahoe National Bank - Computer Loan Payment 356.44 Refund of Credit Balance on Closed Accounts : Vernon L. Rose, Jr. 6-073-01 35.43 $(170,946.54) PAYROLL 12/15/77 OT DT Standby Gross Net Barry 629.20 489.20 Chapman 48.06 674.62 501 .26 Connell 38. 75 720. 75 548.60 Grow 29.82 904.54 718.94 Jones, N. 49.08 409.00 333.89 Marsh 107.25 711 .03 524.04 Lopez 46. 15 92. 30 950.69 723. 19 Pomponio 51 . 12 11 . 36 562. 32 426.93 Reynolds 141 .30 970. 26 809.56 Rose 615. 12 463.24 Rully 18. 31 65. 12 791 .61 633.01 Seymour 1250.00 921 .45 Silva 29.82 149. 10 1058. 14 820.64 Slattery 750.00 599.33 Strauh 27.69 36.92 92.30 969. 15 729.35 Tamietti 6. 11 722.43 584.55 Waltrip 541 .20 417.33 Wiser 34.08 533.92 410.59 401 . 34 488. 70 184.60 13763.98 10655.10 Temporary and Part time Employees : Boscarello 3.75 3.50 Hayes 47.50 44.25 Jones, T. 40.00 37.26 McLeod 26.25 24.46 Samuel 63. 75 59.39 Shapiro 333.34 280.01 Toste 45.00 41 .92 559.59 490.79 Totals 401.,34 488.70 184.60 14323.57 11145.89 $( 11 ,145.89) Bank Balance -December 28, 1977 442,228.62 Bills for Board Approval - See Attached (162,337.01 ) Bank Balance After Payment of Above $ 279,891 .61 ,._.� TRUCKEE-DONNER PUBLI;JJTJLITY DISTRICT 1 BALANCE SHEET October 31 , 1977 ASSETS MARGINS AND LIABILITIES Facilities, Buildings, Land: Margins: Plant in Service Operating margins - Cumulative 1 ,003,099 Electric plant 2,164,074 since 1927 Water plant 932,409 Other equities - Profit on sale 600,108 General plant 347,582 of non-utility property Less accumulated depreciation (1 ,757,054) Year to date margins 225,510 Net Plant in Service 1 ,687,011 Total Margins 1,828,717 Construction work in progress 38,098 Acquired plant 4,193 Long-Term Debt: Net Utility Plant 1 ,729,302 REA bonds payable 367,574 Note payable to Sierra Pacific 74,055 Power Company Real Property - PUD House 24,959 Sewer assessments payable 16,423 P Y Land not in use Other - Computer loan, truck loan 27,678- Total Long-Term Debt 485,730 Restricted Funds 368,310 Current Liabilities: Current Assets: Accounts payable 242,828 Cash 250,477 Consumer deposits payable 25,598 Notes receivable - Van Wetter 1 11500 Accrued liabilities - Payroll taxes, 20,467 Accounts receivable - Electric 204,767 interest on notes and water usage billings Total Current Liabilities 288,893 Accounts receivable, Other - Line 112,892 extensions, connection fees, misc. 295,450 Materials and supplies 198,331 Customer Advances For Specific Improve- Other current assets - Insurance 8,252 ments to System (Restricted Funds) prepmt, interest receivable, future line extension costs Total Current Assets 776,219 TOTAL ASSETS 2,898,790 TOTAL MARGINS AND LIABILITIES 2,898,790 'I TRUCKEE DONNER PUBLIC UTILITY U.151R1U1 STATEMENT OF iEUENUES AND EXPENSES For the month of and r„ i months ended October, 1977 ELECTRIC DEPARTMENT WATER DEPARTMENT ELECTRIC AND WATER TOTAL Current Month Year to Date Current Month Year to Date Current Month Year to Date 1976 1977 1977 1976 1977 1977 1977 1976 1977 Net Revenues 136,541 151,751 1 ,695,605 15,799 17,250 195,974 169,001 1,765,669 1 ,891,579 Purchased Power 104,863 100,945 1 ,120,480 - - - 100,945 1 ,117,127 1 ,120,480 Operating Expenses 1 ,680 4,394 49,774 6,324 7,531 72,783 11 ,925 102,906 122,557 Maintenance Expenses 2,832 4,497 38,743 1 ,262 10,381- 30,173 14,878 49,711 68,916 Customer Accounts Expenses - 4,210 8,655 68,020 992 2,351 15,737 11 ,006 80,205 83,757 Meter reading, billing, customer services General and Administrative Expenses 9,214 6,330 73,018 3,949 2,713 31 ,971 9,043 72,908 104,989 Outside Services 4,276 656 53,530 ( 5,988) ( 519) 21,526 137 96,854 75,056 Depreciation 6,852 6,997 69,358 2,548 2,588 25,839 9,585 93,469 95,197 Interest Expense on Loans 1,379 920 10,020 98 288 2,795 1 ,208 21,386 12,815 Unallocated Overhead 2,319 ( 3,391) ( 6,855) - - - ( 3,391) 5,642 ( 6,85� Total Operating Expenses 137,625 130,003 1 ,476,088 9,185 25,333 200,824 155,336 1 ,640,208 1 ,676,912 Total Operating Margins ( 1 ,084) 21 ,748 219,517 6,614 ( 8,083) ( 4,850) 13,665 125,461 214,667 Other Income and Expenses - - - - - - 977 1 ,407 10,843 Net Margins - - - - - - 14,642 126,868 225,510 () Indicates loss in margins �; ORDINANCE NO. 7801 OF TRUCKEE-DONNER PUBLIC UTILITY DISTRICT r- CHANGING DOMESTIC ELECTRIC RATES BE IT ENACTED by the Board of Directors of the Truckee-Donner Public Utility District as follows: Effective with the effective date of this Ordinance, those pro- visions of Resolution No. 7601 and any and all prior ordinances or resolutions that conflict with the provisions of this Ordinance are hereby revoked. BE IT FURTHER ENACTED that the following electric rates be charged to all domestic customers, the distinction between the former D-1-A and D-1-13 schedules being hereby established as Schedule D: Energy Charge: $6.00 per month for the first 100 kwhrs, or less, and all kwhrs thereafter shall be billed at the rate of $0.022. The existing fuel charge and California energy surcharge provisions shall remain the same. This Ordinance shall become effective thirty (30) days from the ,.�. date of adoption. The clerk of the District shall immediately cause a copy of this Ordinance to be published once in the local newspaper and copies shall be posted in at least three (3) public places within the District. PASSED AND ADOPTED by the Board of Directors of the Truckee-Donner Public Utility District at a regular meeting thereof duly called and held in the District on the fourth day of January, 1978, by the following roll call vote: AYES: Alexander, Huber, Kuttel , Maass, and Sutton. NOES: None ABSENT: None TRUCKEE-DONNER PUBLIC UTILITY DISTRICT By PAT SUTTON, President +� ATTE A. Milton Seymo Clerk Thereof CERTIFICATE OF POSTING ORDINANCE NO. 7801 AN ORDINANCE CHANGING DOMESTIC ELECTRIC RATES TRUCKEE-DONNER PUBLIC UTILITY DISTRICT STATE OF CALIFORNIA ) County of Nevada ) The undersigned, Susan M. Craig, Under penalty of perjury, certifies as follows: That for and on behalf of the Secretary of the Truckee-Donner Public Utility District, I caused copies of Ordinance No. 7801 , an Ordinance Chang- ing Domestic Electric Rates, adopted by the Board of Directors of said District on January 4, 1978, to be posted within thirty (30) days following adoption in �. four public places within said District, to wit: 1 . Truckee-Donner Public Utility District Office 2. Nevada County Government Center 3. Nevada County Library 4. United States Postal Service Office Said posting was completed on the 16th day of January, 1978. Executed on the 16th day of January, 1978. --"Z - Susan M. Craig TRUCKEE-DONNER PUBLIC UTILITY DISTRICT POST OFFICE HOX 309 TRUCKEE. CALIFORNIA 95734 TELEPHONE 587-3896 AUDIENCE ATTENDANCE FOR THE MEETING OF `A PLEASE PRINT YOUR NAME: ' 1 `'j 2. ) 3. 4. 5. 6. i 7. 8. 9. 10. 11 . ,.. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21 . 22. 23. K December 30, 1977 REPORT FROM WATER COT31ITTEE The Committee met with all members present on Wednesday, December 28 . The main item of business was consideration of problems related to the Dart request to begin the environmental on two new well sites , which c hih had been RegulareMeeting•rred to the Cor-:mittee by the Board at the December 19 The Committee did not attempt to evaluate the Dart proposal, but specific concerns about the proposal, including those expressed individually by Directors since December 19 , were reviewed. The Committee concluded, early in the discussion, that the specific concerns about the Dart proposal are related to a more basic vroblems the lack of a suitably revised water agreement to provide iqui_delines for the development of additional water source and transmission facilities to serve Tahoe-Donner' s requirements . The Committee discussed criteria which could be incorporated in a. revised water agreement in order to accomplish objectives related to specific concerns about the Dart proposal. The objectives which the Committee has tentatively defined are: 1. The District will participate in the selection of sites for well development. a) Wells sunplyin,_- total demand will be located in ?core than one general area. b) Wells will be located so that they are non-related. c) Wells will be located as near to the point of use as possible . 2. The District will require more than one transmission route to deliver total supTly to the subdivision. 3. The District will require proposed well sites to be evaluated by an independent hydrology consultant responsible to the District� before approval is given to development. All- �7 Water Committee Report D'ecerrber 30, 1977 page 2 These tentative objectives are subject to further review, refinement, and expansion through the Committee and subsequently by the Board, and they are being reported to ,you at this time t as an informational item. The Committee recommends the followin actions related to well site develo ment for the Board's consideration at the January ' . 1 8 Regular Meetings A. THAT THE REQUEST FROM DART TC BEGIN THE ENVIROliIVIENTAL REVIEW OF 2 NEW WELL SITES BE DELAYED UI'ITIL A TvEW AGREETI-'ENT TO PROVIDE WATER SOURCE AND TRANSMISSION FACILITIES HAS BEEN COJiSUT,ATED BY DART AND THE DISTRICT. B , THAT THE BOARD. AUTHORIZE THE RETEITTI ON OF WILLIAIE'I NORK TO ADVISE THE DISTRICT REGARDITiG CRITERIA FOR WATER SOURCE DEVELOPV'ET1T TO BE INCLUDED IN A NEW WATER AGREE,"ENT WITH DART C. THAT THE BOARD REQUEST ADVICE AI;D ASSISTANCE FROM PIKE P"ARRCN OF STEINHART, GOLDBERG , FEIGENBATil, & LADAR. SPECIAL CCUi`:SEL TO THE DISTRICT ON TAHOE-DONNER n"ATTERS , IT THE DEVELOPMENT AND CONSIDERATIOII OF A NEW WATER AGREEMENT WITH DART. II In another matter related to Tahoe-Donner water matters , the Committee also recommends -the followin action for Board consideration at the January4 1078 Meetings A. THAT THE BOARD AUTHORIZE MIKE MARROT , SPECIAL COUNSEL, TO OBTAIN A STAT D7ENT FRC1V'I GEORGE CATTAN, FCRMER MANAGER OF THE DISTRICT, REGARDING THE DRILLING OF THE PROSSER WELL WilICH WAS PROVIDED FOR IN THE 1970 AGREET�:ENT AND WHICH HAS RECENTLY BEEN DETERMINED TO BE UNSUITABLE FOR PUBLIC WATER SUPPLY. R /�11„r submitted, conies to PAT SUTTON All Directors Milt Seymour Dan Coop Steve Grumer, MANAGER'S REPORT JANUARY 4, 1978 1 . REPORT ON FEEDER "F" REBUILD FIELD INSPECTION BY R. W- BECK ild ield nspection by Preparation Of te overhtor Bob eporSlatteryt on d and ' Per 1eteeS�ilva;f their l report is at- W. Beck wa ched. STATUS OF CUSTOMER REFUNDS DUE TO S.P.P. Co. REBATE Work is progressing on calculating the consumption by each customer for the rebate period. This is being done in conjunction with the preparation pages. The calculations are taking longer than anticipated with of new meter approximately 12 books being completed per day. We are finding that because o complete a book is longer than anticipated. It may be the o of numerous changes in customers on the same meter and meter change-outs, the time required t P process is completed. end of January before this p a Meanwhile, the computer programming company is at work writing new program that will make it Possible for the refund cisPthet promised ions to bdelidvery on the computer. Relating to this particular problem, of the high-speed printer this week. 3. REVIEW OF SEPTEMBER FINANCIAL REPORT The Board has asked for clarification of an at valueem sof' $24,959-bed as In- This asset is listed as havingcon ured by our auditors property - PUD house. renly vestigation reveals that this amount m unthe va s aofathetPUD house plus other prop- three years ago, erties that are not part of plant-in-service. clarify this matter, 1 recommend that research be under- To truly =aken to determine the facts and develop a list of all PUD property, manner n which such property was acquired, acquisition cost, and of which depart- ient it is an asset. This can perhaps be included in the workshop sessions scheduled with the auditors prior to the issuance of the final audit report. s to est The second item on SepteTheresshouldcbelaR$98-00eport r item eshown' for rthe charged to t this interest is shows the amount as current month for interest charged to the Water Depart en ; interest on sewer assessments. The report erroneously to $288.00. The reason eas tnforratteudkfloannwasce 'mistakenlyhat s techargedrest atoetheeylaterhDe- Electric Dep partment. 4. UPDATE ON STORM DAMAGE rom December 15 through December 30, During the recent storm period f 1977, 18 distribution fuses were blown and one 60,000 volt primary fuse was se is on the high side of the transformer bank serving blown. The primary fu -1- �"1 MANAGER'S REPORT January 4, 1978 Page 2 UPDATE ON STORM DAMAGE - continued Tahoe Donner. It appears that the fuse is improperly sized for the trans- former and circuit breaker installation. The distribution fuses that were blown were located in various areas of Donner Lake, down town, and Prosser ��-_ights. All blown fuses were caused by short circuits from wind and trees filling across the lines. Four poles were lost due to falling trees; some istomers were without service for up to two days. The total outage time .as approximately 400 customer hours; an estimated labor and material cost to repair damage is $7,000. 5. ALTERNATIVES FOR AFTER-HOURS CALL-OUT PROCEDURES The first customer that calls in with a power outage or water problem is connected to the tape recorder and is informed of the after hour emergency numbers to call ; if a second customer calls in while the first caller is on the line, he is switched to a line without a recording and is unable to get an answer. This causes extreme frustration on the part of the customer. A second problem occurs after the service man has left his home. Subsequent calls are answered by his wife or are unanswered. This creates a burden on the employee's wife and dissatisfaction on the part of the customer. To alleviate this situation, I have looked into the following pos- sibilities: a) Increasing the number of answering devices; b) Employing an answering service; or c) Employing a local shut-in resident to answer all service calls. The first alternative can be accomplished through the telephone company for a $90 installation charge on each additional line and $24.40 per month on each line for the answering equipment. To utilize the services of a company such as the North Shore Answer- ing Service, the cost per month would be $43.50 for the first line and $33.50 per month for each additional line that they answer. Each line would have an allowance of 150 calls per month with a 20o� per call charge for each call in addition to the basic allowance. The third alternative is more of an idea that a firm suggestion. However, if a suitable individual could be found in the Truckee area, we could arrange with the telephone company to have a line extension to their house so that after hours all calls would be switched to a telephone in the answering party's house. They could then contact the appropriate lineman or serviceman if necessary. Additionally, a line could be obtained from the tele- phone company to extend the calls from our radio base station to the answering party' s house so contact with the trucks in the field would be possible. A � vice such as this might be very worthwhile if a reliable person could be id. -2- MANAGER'S REPORT January 4, 1978 Page 3 ALTERNATIVES FOR AFTER-HOURS CALL-OUT PROCEDUREScontinued prior alternatives Prior to making a commitment, I recommend receive further study. UPDATE ON WATER CONSUMPTION approximately 50% of the winter months , we do not keep daily records Water consumption for the month of December was keep consumption that of August, 1977. During basis. consumption; records are kept on a monthly gallons in of water consume Was 25,770,000 gallons compared with 54,900,000 g for December, 1977 roximately 1/3 of the August con- August. Normal December consumption is app sumption, which indicateseksaoftthee was monthan increase in use due to the tourist influx in the last two we 7• SUMMARY OF COST TO INSTALL SECURITY LIGHTS seurity light on a tree Material and installation cost to instals required, an additional if aapproximately $157•00" cost to provide the elec or building is energy tricity for aPP $1tes for security .50 per month. Current ra $160.00 in cost is involved. The a security light is estimated at lights are as follows: $4.00 per month a) With no pole involved b) With pole required $6.00 per month. wires approximately 63 months to recover approximately months tion cost it requires or tree, and app of a security light mounted on a building mounted on a pole. Our current rates the customer which is not suf- to recover the amount of a security ""require that a 48 month contract be signed by Ficient to cover the initial installation cost- 80 per month for Based on current costs, we would have to charge $4. or tree in order to recover our initial a security light mounted on a building ear period. For a securitylight cost plus the cost of energy over a four-year charge $g 10 per month to recover mounted on a utility pole, we would have to our costs over a four-year period. 1 recommend that the matter be thatrWedltenableo the Eusctol recover tour to costs plus cover our overhead and determine a new rate for securitylights itial construction costs and monthly operating expense. -3- 3s TRUCKEE-DONNER PUBLIC UTILITY DISTRICT POST OFFICE BOX 309 TRUCKEE, CAL►FORN►A 95734 TELEPHONE 587 3896 January 4, 1978 1EMO TO: A. MILTON SEYMOUR EMO FROM: ROBERT E. SLATTERY .,OBJECT: REVIEW OF FEEDER "F" REBUILD Follow-up inspection by Engineering Contractor Review by District personnel ITEM #1 Parallel Groove Connectors I have left a message for the contractor to contact me and will ask him to supply the requested information. I also agree with engineer that compression connectors make up a lot better and should be utilized in the future. This would re- quire the purchase of a larger machine than we have. ITEM #2 The Sags & Tensions of Conductors The line was visually checked for sag and conductor clearances on January 3, 1978; no problems related to ruling span changes were noted. Temperature was 30 degrees F and minor snow loading at some locations. District has no mechanical means of checking with lines energized. ITEM #3 Pole F-7 Line Angle in Excess of 30 Degrees (approximately 32 degrees) r- This was part of the negotiated settlement and material to complete has been furnished by the contractor. Will be completed by District as time permits. ITEM #4 Pole F-8 Possible Uplift This pole was checked from all angles and under all weather con- ditions (no transit available) . There appears to be no notice- able uplift strain on pole. Will recheck when survey instruments are available and correct to engineer' s recommendations if war- ranted. ITEM #5 Pole F-23 Possible Tension Unbalance Visually checked and no excessive unbalance tension was noted - Sag, clearance and unbalance okay. �J MEMO TO: A. MILTON SEYMOUR MEMO FROM: ROBERT E. SLATTERY January 4, 1978 Page 2 ITEM #6 Pole F-28 Ruling span change - same east and west. Sags and clearances checked and found to be okay. No work required. TEM #7 Pole F-32 Uplift Condition Will install clamp top post type insulators to correct uplift problem. Will resag at that time. ITEM #8 Pole F-34 Same as Item #2. This pole dead-ended during construction to enable the customers in the Olympic Heights area to remain on service and will be utilized as an opening point in the future. RES/smc �.� -2- TR KEE-DONNER PUBLIC UTILITY DI_ AICT POST OFFICE BOX 309 TRUCKEE. CALIFORNIA 95734 TELEPHONE 587-3896 January 3, 1978 'r`MORANDUM . J: Board of Directors FROM: Mary Chapman SUBJECT: September, 1977 Financial Statement As requested by Pat Sutton, I have been asked to explain a $19 ,260 interdepartmental adjustment which appears on the September financial statement. Each year, when we prepare the Standby Revenue bills , a percentage is assigned to the portion of the total billed for electric standby and for water standby. This percentage is applied to the revenue received and credited to the proper department. The percentage breakdown was applied incorrectly for the revenues received from January through August, 1977. Therefore, after correcting the error, an adjustment was necessary to transfer revenues that appeared in the water department over to the electric department. Should you have any further questions , please do not hesitate to �"sk. 0 to Cis T�'Irr- r;,t i- _ �na- rr L Counsel �._ er ^ , Pat +ltton re Cor-e-ction s to Drp`.'t 11,ir:utes of Re-ulcer r"eetir_c- of January- t , 1978 Fine 1 of Draft OTHERS PRESENT% Degir_nin- with th-ese minutes , please ]-i!:-t the na-lres of, those present in the bodir of the D"inutes . (The sheet should also be attached to the Finutes , t-ot v,-i th any -newer than 20 -ccr•le or so there ' no reason not to includie t.-.e names, & i ,'ertific-tion of .those havir-,Ig 'hu-sineS` . '�efore Board, to i,Ier this heading in t`,e . inute� . ) Fa. ee 1 2 of Draft „1TI` FrR ECARD APF'RCVA.L: REVISION REQUESTED% corrections needed and' additional informati( from tares necessary. (Among the needed corrections are% misstatement of -,;6w: motions, misplacement of an arrendment and misplacement of a roll call vote , omission of pertinent in- formation & stptem_ents & responsibility for statements . Also, the r+ir_utes should not be written in a personalized form using "we , " " our, " etc . but should instead refer to "the District," "the Board, " etc. ) Revise entire item as follows% "Director Huber questioned the uneven denomination listed in Standby Charges under Revenues ; the General t4Tanarrer stated that he would report on this :natter at the next regular meeting. President Sutton made ouery reFardin v,hether charges �..� of Cook Associates IX X,,zf y�� ,t` ,� , for Farmers Nome Administration loan -oro_jectt shotild be. billed find paid separately because they will be reimbursed by the loan. r'r. Seymour reported that the District has alrea.d1r raid=578. 51 on their Job i` 7 02 $_-19. 0 on their Job, ?7 05, and ,'. ,912 . 58 and ! 2 , ' 5o .87 on Project. .,o.77-01 . Dan Cook arrived du-in? this discussion and indicated that part of the loan .fund include s en~ir_eering expenses which /F_I X are based on a percentage of the construction contract for the basic services as defined by / the En�ineerina Agreer-.ent k for the Fm-HA 1_11,eX XyfXJY,Jproject. Mr. Cook said that the a-reement has to d'o with all the design i�,ark, preparation of the contract specifications , bidding documents and tans . He said that the basic enpineerin¢ services x do3KX not include the survey work. He said that the contract provides for additional services which are billed at the regular hourly rate% ins ection, survey, property descriptions , and acquisitions . He said either ca.tepor-r of. service is elir-ible under -the loan agree-went with Fm?-:A.- Corrections to 0.raft I.'ir_utes f/ of J^nu=�r�* 1' , 107`, from Sutton �" pa<-e. 2 President Sutton asked t'_at the Cook Associates billin7 not be raid at this time so the ouestion-_of how it should be raid can be resolved, which wo+ald involve looking ur the En¢i neering A,-reement for the loan_, YVfx and it can be put on the a-er_da in two weeks . Mr. Seymour pointed out that , in August of 19?7 , // the Boa r Board ageed that regardless' r n of whether oot }+� the District gets the F:rrHA loan, ls2( IpsXXX IXY the engineering costs would be .raid. Director K_uttel concurred. President Sutton ouestioned , at this roint, when Cook Assooi-, :es shoal^ be paid, by what r!oney, how payment is to be accounted for if raid out of General Fund when it should be ra-id out of loan rroceeds ; she felt it may not be leg-al to reimburse General Fund with loan proceeds and that it eras not rrorer N%rhen an assessment district was - involved. Mr. Seymour advised that �"/ the bookkeeper, Fary Chapman, XXY is collecting all Cook Associatesy chary-es on Work Orders , entitled "Deerfield Line ," so that they Would be properly earmarked. President Sutton stated that she was not challenging whether or not }+` the District owes r"r. Cook the money, or whether or not the District has the obligation to pay the money, but rather what money should be used to pay the obligation. It 1rras moved by Director Kuttel and seconded by Director Alexander that the Board �xRr �1^ y I-XX the bills Director Huber auestioned the RTE bill for transformers in excess of the arount that should Fo to bid. Director Sutton said that she had c'r_ecked the bills and that there were three different in-voices. each for about 02�00 R;r. _Seymour cor_firr"ed that he intends = for the District �- to :o to bid_ on tr?.n_sformers in 1r=78_,_ a.nd that usually clzotes are obtpined. For the record, President Sutton noted that she 311�XpY XXX felt that the ey-r:ense for meals at the Truckee Hotel in the ar:,ount of $10 per employee for three employees on two different days, due to overtire was exceccive . She � ��`/ lT!i� 3'� / / X�/➢rJ�I� // 9� s ug g-e s t e d tha t t h e t'ana4er and General Foreman should remind the employees , and that perhaps a limitption on meal expenses should be back in the YfJE16eVY1XX negotiations ^iith the Union. She did not feel this was a dishonorable action by. the.persons involved, just more money than the District should be spending. C orrecti or_�- to cr=f't I•.-inutes fL,� o-f Janu,ry 4 , -10-78 from Sutton rare 3 . Director I.-a.ass ,7` ;'¢� rerte,.,!ed his request '-from several months a.p-o that, in the future ,: the Pacific Telephone Cor^rany bil lin -_ 't(1Ytele-nhone-and �i 0151yf shown on the 'list of bills as serna_ra.te ;0/1 telemetry exrenses . Other Board members conurred. President a +on advised that $166, 000 {w160, 000? ) , from the Sierra Pacific Po�,!er Company refund, was trans- f-erred .to the .Local AILerev Investment Fund account a few days after it ,,,ter received on the , basis of her sSFnat1_?re in the bcE'i�Ce of T. r. Uey'roizr. .� . `eymc r- sa. d that the_Di�=t-r_ ict currentlly has almost_three- c, uarters cif million doi ? r�s an del�)o: it in t-_is account. President Sutton steered dovrn from the Chair in order . to amend the notion to nav the bills. She coved that the motion be arrended to -delete (.�. , �S,P •� : ` he bi 11 from Cook Associates/ )�iTs�x in the amount of5, 7 2.P'5 �n ,t` yZ December dated bill, which includes a-rrroxim=a.tel-y $4,500 worth of /j+f er.gineerinF, fees for the FmHA loan project. i`"o second forthcoming, the amendment to the motion failed. The Chair asked for a Ro11 Call Vote on the roticn to pav the bills . RGTT.__CALL: Alexander, aye ; Huber, aye ; Kuttel , aye ; F'Pass , afire ; Sutton, no. SO MCVED. " Pa-e 2 , continued F%F CIAL BUSIVESS e REQUEST FOR AD DITIC1 AL IP FC:Rr"ATIC'IS TO SHOV.1 IN THE I;IIvUTES s The draft contains no inform ti.on of any value regarding the rate chan-e or its effect . Revise items: as rresented n on ra-e 2 as follovss "Steve Crumer ore-ented co_r.ies of the rropose-d ordinance 17.,jX changi_r_g Dor-estic Electric Ratan,;, to the Board-. The ordinance eliminates the present D-1=A and D-1LB rc edules ar_d est:-.t:'ri-sr:es one cto^ estic rate for all rest .ential custorr.ers . It establishes a basis - cha.rF-e o�6.00 which includes 100 kilowatt-flours of usage , witT all d o*aa1. . s_lowa -?fours charged at 2.2 cents . V'r. Seymour made a presentation to demonstrate that- 75% of the residential customers will ray less under the 'oronosed 100—.kwh .or less - '-. will 'Ua __ill nay �; 1. 00 a month more for the basic cnar,­e ; those usin�-_� betwwen 100-2 , 500 kvrh will pay less ; there is little char,-e for customers in the 2, 500-3, 50C kwh category; and those who use ? , 5n0 kwh or more 1,7.1 e pay?n&r a h-i s-her bill than under current rates gases on a declinin5r block. to --aft 1-i-utes 71 of Januarir h , 1`-78 from `:utton page 4 A core of information nresented to the Board x,?hi ch shows the effect of the rroposed rate change on customers in different ranFes of usage is attached to these Minutes . Dar. Selrmour indicated that District r enues will decrease by aprroximately $50 , 000, Ade the proposed rate . He said that. th'L—revenue decrease is compatiol with t?-)e aFrroxirate .=crease of $60, 000 for the cost oI cursed moo.er 1_�-ch sYiould rest?1t from the new Sierra Facific Resale Rate char-ed the District. The change in the resale rate resin ed Tro��ie pr cee iri�s before the Fe era ovier Commission. After the. P--e.sentation by ,C/�F 'a't`fdpf Mr. Seymour and discussion by the Directors , at 7252 P."'". , the Public ?iearing., was opened. PUBLIC HEARIP?Gt Miar�e Adkerson, an interested member of the community, had -1uestions relating- to whether lid the District wotvld be sending information regarding the new rate alon.- i,.rith &/ the billin.ccs . After some discussion, it was sus-g;ested that at least a hand- stamr,ed messa-c-e be rl.aced on bi.11in-­: envelopes." Page 3 of Draft: SPECIAL BUSINESS , continued ADDITIONAL CORRECTIC'JIS on this page re electric rate change '..)econd ngraP'raDh from top of page: Strike out "and tr Regular Meetinff ,-,,as reconvened." (A public hearing i. Decial Crders item of business which is -conducted during the meeting- at a particular time . The Board doesn' t adjourn into and reconvene from a public hearing; it is opened, and either closed or continued... At least that' s my assessment, which , of course , may be in error. ) Fourth r)a.ra-ra-r_ht The Board does not assign numbers to resolutions or ordinances until adoption. first sentence , revises "Followina- Board discussion regarding changes to the draft of the ordinance Mr. Se?rmou.r elaborated, ' etc ." fourth sentence , revises I'The draft i6 ordinance -�: was ar"ended to include , etc." I'C.TE: Lumbers last sentence before Roll Call Vote ; revise : "It was of resolutions & roved bv Director P� aa.sr: andse c ded by Director ordinances ire huber ,-hat the ordinance j.)61 �',� be ret.vred feflect- yj:henated , the in- the cr_ange-s , and that Ordinance first 2 diFits INTO. 78-01, C_ian-in.' Domestic Electric Rates , be indic^te the year a_dorted on this -date ." of 2donti on & the a�t 2 'denote ^ery i,.e, ce of action on sip i1ar docu!-ents . Correcti-)ns to 'D—a t "inittes T� of Jpnua z,.... ro: C uttcn �e 5 Pa c-e IY of d-raft r'7ATER CCT„I:"_ITTE : RECCi.'I:1?.P4D"�TIC'i>` CC-FLRECTIONS ," REF1'T F,T"�_:T, CI A DITI AL II:FO?I'ATIGN RE'ZUESTuDt I believe an error has been made in transcribing this item v'i th a st-zter:ent by .'•:r. Thom,.so.n interpreted as a motion. I ' ve reviewed my tape of this tv,7ice ; my tape slows no indication of 6ny omission in recording. , but there is no motion re a committee meeting or a, roll call vote on such a motion. I believe that the for third of n?s—e L" , prior to motion to a.dort certain ^ecor: crendations fro:^ the Committee , sho>>ld be revised to read as follows " . . .wished to rake it clear that the Doard �1 has not dela-ed a new sutirle-ental agreement from being drafted, revie,•jea, -and adopted. ?'r. Thorrpcon indicated that a_ new a-reerrent would ^rzcific the respective rights and obligations , and would rrovide for the orderly and con-plete development of rroiind water sources , and would form a. basis for e irrinating the rump in Donner La?-e . It was agreed that a meeting between the Hater Cor^t:.ittee and Dart rerresentatiyes will be held on January 12 , JC'78 at 9100 A.I,,-. It w-as also a=-reed that a workshop --eetlnrg of the Board will be held as the ner-otiations progress . It was also agreed that Mr. Grumer will. contact T\,icnael T.:arron, Special Counsel, rega.rdin _ the degree to which he feels he 'should. be involved during this st-ge of the disco lions with Dart ." Pa.e 5 of draft n P."AP:AGERS REPORT C=TEI%rBER FII'AI;CIAL 71EPUFT •aII,.>YT __Eyl,_ICiV •.t • D: Torre N o_C9.i_n_ , ;_n first part of this item is a little more absolute than the verbal pre- sen+- :iti on; revise as fo11owsst "The Bo==rd ha_d reo uested clarification of the item on the rer_or_t described as "Real Property - PUD. Houpe ." This asset is listed as having; a value of $24,959 11;d1X1,YX r'r. Seymour indicated that he believes that this arroe?nt was a_eparently conjured by the auditors . Arthur Youns A& Comranv-, three years ?.go, and maV represent the value of the PT house plus ather properties that are not part of Plant-in-Service . Etc Corrections to dra4 't T:mutes _57 of Ja r,z^r.,, L. 1 076 from S .:tton I e 6 Fa-Ke 5 of dr=..ft . continued AP'AGER'S I(EFORT', continued SEFTET'3h;R FII•?AT CIA.L REFCJRT, continu.id AnDITICNAL• INFORMATION PE<,UESTED s add additional sentence at the beginning off' the next :to last paragraph on page width be,-iris "A review of sewer as.-essments . . . Add: �► "The D ana�-er rerort- --,at the District is na-,rin-97 sewer asses-scents or l3 rarcel -nclw.)ding the '111*e?dow Park' rarcel 1;1,hi ch-is I-ased formal rer year to the Trt)ekee Donner Recreation -,- Park DiE-trict. " Page 6 of dr?ft I''AI ArER' P; ' ORT , continued c•ml RT.I ..�.. A.T.'n GE L IP?OP. `tICPD ADDITIGPIS REQUESTED i n second sentence of item: "The primary fuse is on the hi7h voltage side of the transformer bank serving the tahoe Donner Substation." AFTER-IIGURS CALL-G VT PROCEDURES ADDI^1IONA.L IP,FGR?:ATION REC;VESTED: the three alternatives should be listed in minutes instead of referring reader to Lana-F,er' s Report to discover them. Revises "I--'r. Se:jmour reported reaarding _rroblems v ith fdXl the after-hours call-out procedures . ?Ie is looking into three alternative nrocedilres � 'tYX V7(XY.,9WYP( P(EWIe 1�°11)KY�11 : 1) increasin oo_` the number of nns,rerinA devices . 2) employinp� a regular a-nswerinp, service , and 3 creatint- the District' s own answerin_- service . Etc ." COST TC Ii'?TALL SEC-JRITY LIGH']'S A-=,ITIC,I'• AL II`+FGRT'ATIO 7 E VESTED: The particular information resorted to the Board should shove in the Minutes ; "add--after first -entente under this item: "He explained that there are . 2 rates for securit li hts $4.00 per month without pole installation, and 7, .00 rer month if role installation is reg ui red. He said that it costs v157 to install the light without a pole plus $160 for a new role for a total of $317 when a •pole is necessary. The coritr�7-et with the customer is f-or tt years . At the FLL.00 monthly rate , it ta'_res 63 Months to recover the installation cccts : at the " 6. 00 r onthly rate , it takes 71 r•onths to cover the costs ." Corrections to cram -mutes of Jsnuary 4, !S'78 -Prom Sutton S3 7ta.-e 7 F-s-e 6 & 7 of draft " DT_?AFT PGLICY re LEASIT:G LAAID and -DECIARIPIG 267 PARCEL SURPLUS Number of resolution is not assigned until ado_-ted. ChanE_ e first sentences under each itemi "Provisions ofpS '�Cf,L`�'�yf� ,(� ' �1,{ the drafresolution) entitled Esta._bl.ishin- Dist--Pict Policy Re--ar i nF110-1 the Lease of District Land. were -'iscussed by the Board and T.7r. Grumer. " "The Board discus-ed the Proposed resolution Pa-e 7 continued Ffr-HA LGAii/GRAI,;T REQUIRED RESOLUTION etc. CHAI`dGE: identify Per-gy McElligott as "Eond Counsel" instead of "Esa ." Pa.-e 8 of draft CEQA REQUIRET="ENTS (at tom^ cf rapre) YISIIJTERPRETATION OF EXPRESSED INTENT: Last sentence in para-raph should be revised as follows: "Action on the ordinance ,- 1 ,t` f p� rr.av be on F3Fenda for the next regular Board meetir_¢." BIDS CH I:"ATvAG-ER'S VEHICLE ERRORS throughout: "Subaru" is the correct spellinl- not "Suburu" and the amount of the bid, including the figure audible on the tape , is 1r0" not "w4, 150." Correct both of these wherever they arpear -under this item. AISG, SLIGI-_T REVISION REQUESTED: last sentence omits some of Mr. Seymour' s choice of words and Frives a different impression that what he actually said. Revise: "Mr. Seymour noted that the �(XYXXA Subaru would not be his personal choice as an individual but indicated that he would acce t whatever the Board decide a.nd that he had driven a Subaru in snow conditions and had no problems with the vehicle ." Cori-ections to dr�rt "inutee �s or u a.nu-ry 4, 1='?e from C utton r_ -e 8 .. 7,--e 8 of draft , continued %: IDS FCR RE". OVAL: CF PUD -X'0U SE • SL.ICHT REVISIONS s add "of Marysville" to end of first sentence so Kv�,itcherkikin is better identified. Also: change "that we direct Han Cook of Cook Associates to prepare" so it says "that Dan Cook of Cook Associates be directed to pren!7tr.'e , etc;" -ITS F(.R CUPIER S`LIGET F.,EVISIC:Ss chanEe "which may not be considered" to "which cannot be considered, etc." Also change "our specifi- cations" to "the specifications ." Page 9 of draft TRUCKEE RIVER WATER LINE REVISE THIS PARAGRAPH: "D':r. Grumer recommended that the Bonrd authorize the President to sign the documents that have been -prepared in comnlia.nce with the Truckee River Crossin�/iiFhwav 267 Intertie Agreement with Dart . A motion was made by Director Huber to authorize the President of the Board to siP-n the documents rrenared on title insurance standard forms . Potion seconded by Director Maass . ALL AYE BY VOICE VOTE. SO LrOVED." ,1ITHAM/FEELPR LETTER REVI`O'E VOTEs last sentence under item (to indicate vote was actually taken) "ALL AYE BY VCICE VOTE. SO P"C'VP;D." Page 10 of draft UN,PEEDED WATER PIPE RE UEST FOR ADDITIONAL INFER"•'ATIOP�s add a sentence after first sentence in the paragraphs "Mr Kuttel had reservations about disposing of the pi rye which mi.-ht be needed in an emerp,ency." Ccrrecti ons to drf- 't r,-inutes S7 of J�3_r.uary L. , 1'7178 frorr Sutton pare 9 Fa.r e 10 of dra-'t , continued DISTRICT COUNSEL'S REPGRT ADDITIGN RE^UESTEDs A Director complaint was brought up un3er this item and another Da.raFrarh should be addeds "Dir�-c-t.9r .Alexander indicated that she was not recei_vi_n her a�-enda until the day of or the day before the meetin--s , �.. and that she felt this was not sufficient tire to prepare for the meeting. President .:utton said that efforts are being made to get the a-en a out earlier." PLAT-NII'G DEPT NC;TICES PEVISI6N REQ-LrESTED: The second sentence under this item is difficult to comprehend and should be revised: "President Sutton stated that she had concerns regarding the continued- do-,.relorrent beyond the !"est River Street Assessment District Sauter 1i ne, since it was constructE32F, and fol.lourin,- the refusal of landowners to participate " GENERAL CCRRECTIONSs all ty o�-rarhical errors should be corrected in final approved copy of Minutes kI didn' t call attention to isolated tv-nos ,:but there are some) , ,and personalization of Board o� District should be corrected wherever not specifically called to attention, including on pages 5 & 6 of draft. NOTE: I think that for her first draft , Susan did a creditable job of composing F.'inutes with content. I do not wish to continue spending this much time a effort on 11inute corrections ; I thought the feedback would be helpful on this draft, however. Hopefully, some technicalities called to attention in these corrections will not rrerert problems in subsequent drafts. Ui� PAT SUTTON cosy to Dan Cook r RESOLUTION NO. 7801 of TRUCKEE-DONNER PUBLIC UTILITY DISTRICT ESTABLISHING DISTRICT POLICY REGARDING THE LEASE OF DISTRICT LAND f The Board of Directors of the Truckee-Donner Public Utility District shall observe the following steps as part of its determination to lease Dis- trict-owned land: 1 . It must determine that a potential lessee exists for the parcel in question; 2. It shall evaluate the parcel and obtain the opinions of both the Manager and District Engineer regarding the size of the parcel and the desir- ability to obtain long-term revenues from the lease thereof; 3. An independent appraisal shall be obtained from a qualified M.A. I . appraiser relating to the value of the parcel or any part thereof and to its best possible use; 4. The Board shall comply with the terms of Public Utilities Code Section 16431 et seq. and Government Code Section 54221 et seq. and make the findings required pursuant to said sections. In the event that any doubt ex- ists, the Truckee Donner Recreation and Park District shall be contacted to render its opinion. After a finding is made, the Board shall adopt a resolu- tion affirming these findings; r- 5. The Board shall conduct a public hearing and determine the desirability of leasing the parcel ; 6. Due notice shall be given by advertising at least four (4) times in the local newspaper, and in such other publications and journals as the Board feels just and reasonable; 7. The Board shall advertise its minimum requirements and shall award the lease only by competitive bidding. All bidders must submit a certificate of deposit, certified check, or bid bond in a sum equal to ten percent (10%) of the bid. Said deposit, check, or bond shall be forfeited in the event that they are awarded the lease and fail to accept the same with- in a reasonable period of time; 8. The Board shall award the lease in an ordinance, and said lease shall be conditioned upon the following: a. A minimum annual rent of one percent (1%) of the fair market value; b. Cost of living increases every five (5) years; C. Term of thirty (30) years (not to exceed 55 years) ; d. The District shall retain control over the use of the parcel and the design of the structures to be construct- ed thereon; e. The lessee shall reimburse the District for all costs expended in connection with the lease of the parcel in- cluding legal , engineering, appraisal , advertising and supervisory costs; f. The District shall provide and the lessee shall pay for a title policy evidencing District ownership of the parcel ; -1- g. The lessee shall be responsible for the taxes to levied upon the parcel ; and h. Lessee shall indemnify the District so that the District shall not be liable for any damage or liability of any kind or for any injury to or death of persons or damage to property of Lessee or any other person during the term of the lease, from any cause whatsoever, by reason of the use, occupancy and enjoyment of the parcel by the lessee or any person thereon or holding under said lessee, and that lessee will indemnify and save harmless the District from all liability whatso- ever, on account of any such real or claimed dam- age or injury and from all liens, claims and de- mands arising out of the use of the parcel and its facilities, or any repairs or alterations which the lessee may make upon the parcel . Lessee will carry and maintain, at its sole cost and ex- pense, bodily injury liability insurance with limits of not less than $500,000.00 per person and $1 ,000,000.00 per occurrence insuring against any and all liability of the insured with respect to said premises or arising out of the maintenance, use or occupancy thereof, and property damage lia- bility insurance with a limit of not less than $200,000.00 per accident or occurrence. All such bodily injury liability insurance and property damage liability insurance shall specifically in- sure the performance by lessee of the indemnity agreement as to liability for injury to or death of persons and injury or damage to property as r--- set forth above. As evidence of the foregoing insurance, lessee shall provide District with a certificate of insurance indicating the District as a co-insured; 1 . The Board shall make any findings made necessary by the California Environmental Quality Act. PASSED AND ADOPTED by the Board of Directors of the Truckee-Donner Public Utility District at a meeting held within said District on the fourth (4th) day of January, 1978, by the following roll call vote: AYES: Peggy Alexander Roberta Huber Karl Kuttel , James Maass Pat Sutton NOES : , ABSENT: , TRUCKEE-DONNER PUBLIC UTILITY DISTRICT r� By yL_ PAT SUTTqfl, President ATTEST: A. Milton Seymour Clerk Thereof -2- 63 RESOLUTION NO. 7802 OF TRUCKEE-DONNER PUBLIC UTILITY DISTRICT DECLARING A PARCEL UNNECESSARY FOR DISTRICT USE WHEREAS, on January 4 , 1978 , the Board of Directors of the Truckee-Donner Public Utility District adopted Resolution No. 7801 Establishing District. Policy Regarding the Lease of District Land; and WHEREAS, a potential lessee exists for the parcel referred to herein; and WHEREAS, the Manager and District Engineer have concurred in the size of the parcel and the desirability to obtain long-term revenues from the lease thereof; and WHEREAS , an independent appraisal has been obtained from Roger N. Bonnett, M.A. I. relating to the value of the parcel; and WHEREAS, appropriate findings have been made pursuant to the Public Utilities Code §16431 et. seq. and Government Code S54221 et. seq. ; NOW, THEREFORE, BE IT RESOLVED by the Board of �-- Directors of the Truckee-Donner Public Utility District as follows: That the Board of Directors does hereby find the 10,000 square foot parcel located on Highway 267 , as described in Exhibit "A" and "B" , to be unnecessary for District use and available for lease pursuant to the terms of the current District policy. PASSED AND ADOPTED by the Board of Directors of the Truckee-Donner Public Utility District at a meeting held within said District on the 4th day of January, 1978 , by the following roll call vote: AYES: Peggy Alexander, Roberta Huber, Karl Kuttel, James Maass, Patricia Sutton NOES: None ABSENT: None TRUCKEE-DONNER PUBLIC UTILITY DISTRICT By A RIC UTTON, President ATT T: A. Milton eymo Clerk Thereof �s DESCRIPTION OF PARCEL PROPOSED TO BE LEASED BY THE TRUCKEE DONNER PUBLIC UTILITY DISTRICT All that real property described as follows within the unincorporated territory of Nevada County, State of California, being a portion of the Northwest Quarter of Section 14, Township 17 North, Range 16 East, M.D.B.&M. being more particularly described as follows : Beginning at the West Quarter corner of said Section 14; thence running Easterly North 87" 59 ' 55" East, 952. 55 feet to a 1-1/4" iron pipe tagged R.C .E. 8850; thence continuing Easterly on the East-West centerline of said Section 14, North 87' 55 ' 55" East, 1430.61 feet; thence North 27' 43' 45" East, 396. 35 feet; thence North 00' 34' 45"East, 138.85 feet; thence South 89' 25 ' 15" East, 28. 31 feet; thence North 2" 00' 05" West, 242.63 feet to an iron bar tagged L.S. 2712; thence South 87' 59 ' 55" West, 210.49 feet; thence North 2' 00 ' 05" West, 77.59 feet; thence along a curve concave to the Southeast a distance of 97 . 74 feet through a central angle of 32' 56 ' 34" ; thence North 30' 56' 29" East, 100.00 feet to a point on the Southwest Right-of-Way line of State Highway 267 ; thence along said Southwest Right-of-Way A line North 59' 3' 31" West, 90.00 feet to the true point of, beginning of the property being described herein; thence continuing along said Southwest Right-of-Way line of State Highway 267 North 59' 3' 31" West, 70.96' ; thence South 30' 56 ' 29" West, 100.96 feet; thence South 59' 3' 31" East, 100. 96 feet; thence North 30' 56 ' 29" East, 70.96 feet; thence along the curve concave to the Southwest a distance of 47 . 12 feet through a central angle of 90' to the true point of beginning of the property herein described containing 10,000 sq,ft. more or less . EXHIBIT "A" L --------------------- all R s z tew 267 Jill, e c I atrtZa GOLF ce- Park 124 C= 00 L OCA 7-10N MAP S1 7-E L OCA 7-10AI STATE HIGHW- Ay 267 40 CA CA Lu :5rA 14'0 EXHISI r A—I rRUCKEE DONNER PUBLIC UTILITY DISTRICT PROPOSED EASE- L EXHIBIT "B"