HomeMy WebLinkAboutGeneral Fund TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
POST OFFICE BOX 309 _
TRUCKEE, CALIFORNIA 95734
TELEPHONE 587-3896
AUDIENCE ATTENDANCE FOR THE MEETING OF -
PLEASE PRINT YOUR NAME:
2. `
3.
4,
5.
6 Lr ��Ll=
7
8.
9.
10.
11 . f
�^ 12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
£9£•locp sz zb£om 59£6• 'l- Le" O�h
£G e
-n6r/ QZ 9S '/1E Ss19$2° Oo06
os'2SZ So, 040$
966 or'zo QS'Lhr Ss 'szz OOOL
Qs •z(r. so•56/ 000'
OIL.. oz 'Ss7 h OS'LL I SS oOoS
ohhf QL b oft o�'bhr ooSh
4, 81 Lf+1 So 'arc! 000}4
$OS
QZ 'SL}, !_�! OS '811 OOS� ✓
SOS[ 04L •bfh( .L hl OS"LOI SS"col Ovoi:
oSbl o�'Zh61 ILI zz •01 so•88 ooSr
os"ZS'f S}+'LS% T b QS 'eL So•£L oo9r
106 'Z:Lft,l T zr OS 'S1I 5b'�� v081
0h•!Etiz' 41 (, os'ss 58'00) o0-ft
'Sbh 07 'QzfS A- 6 001sS OS'LS ovg[
oS ob1: ► 05 'ILh[ T LZ O51IS OS '17S oohl
to8 OZ 'L7$ -t 61 os 't f, ob 'Lh ooZ1
OSE I 06 11'ah1 OS 'L£ 0,;- • I h coo 1
OS'hLl+ o�. 'ZfE �1` � os'vE OL•h�• 008
•bLi✓ o� b£h fi hl Ov -L-C L
os '8ZL os Oo •Gz Oo%
OS '-s 1 0 h '61ZI /r L'f OS Oz •$1
9s.'b2z oa'ss� Lz os 8 01, •b ooz
h /C oaf y %S qo qo'S oQ l
2£I Oil y ZZ oo % oo'S O
�i NOJ N! �(./07 n1/ ,{� 2(D � S"/719 f-S,9 (-S'✓ YM
Q[aasodoad t�e.aS-vJ I �o # c�asod o?Jd cJ
I I D
BILLS FOR BOARD APPROVAL: Electric Water General Total
Ace Hardware Miscellaneous hardware 42.93 7.34 6.23 56.50
Allied Automotive Chain tightener 9.21 9.21
Alpha Hardware Pipe threader, shovels, hip waders 48.40 153.02 201.42
Aetna Life Insurance Life insurance premiums, 2/78 58.55 58.55
Alexander, Moire Transcription of Board meeting tapes 415.00 415.00
A & II Restaurant Overtime meals 5.10 5.10
American Water Works Assoc. One year membership dues in A14WA 100.00 100.00
Armanko Office Supply Office supplies 395.39 395.39
Atlantic Richfield Gasoline and diesel fuel 1299.83 1299.83
R.!d. Beck and Associates Work done on power regrements study, 2 year work
plan and financial forecast 1459.40 1459.40
Blue Cross Health plan premiums, 2/78 1470.72 1470.72
Builder's Service Center Refrigerator and range unit for lunchroom 430.36 430.36
Cal Western Life Pension plan premiums, 2/78 1621.20 1621.20
Camellia Valley Supply Meter idlers, meters 1208.40 1208.40
Consolidated Electrical Coupling 18.49 18.49
Continental Couriers Water analyses transportation service 36.00 36.00
Cook Associates Consulting services - Dart billed $671.03 5778.38 5778.38
Crown Life Insurance Long term disability, 2/78 237.50 237.50
D & D Agencies Greyhound bus charges 3.85 3.85
Davis Auto Parts Misc. vehicle parts 48.65 48.65
W.W. Grainger Thermostat for lunch room air considioner 9.37 9.37
Graybar Electric Service sleeves, grounding bushings 743.56 743.56
Steven Grumer Legal services 1553.00 1553.00
Jack's Tow Service Tow unit 3 and backhoe 155.00 155.00
Ken's Tire Center Maint. tire for generator trailer 3.00 3.00
Mission Linen Service Linen service 44.16 44.16
Nevada Safety Supply Misc. safety supplies 61.80 61.80
OB's Board Overtime meals 20.83 20.83
Osburn's Garage Vehicle repairs 262.27 262.27
Pacific Telephone Co. Monthly hone charges, 11 71 1 78 574.33 574.33'
aci c p Y P 9 � / � /
Pacific Telephone Co. Telemetry charges, 11/77, 1/78 325.50 325.50
Pallet Pullers Pallet pulling tool 51.17 21.91 73.08
Pejo's Overtime meals 26.92 26.92
Pizza Shack Overtime meals 54.37 54.37
RTE Corp. One 75 kva transformer 1154.34 1154.34
Ruralite Safety training, 11/77, 12/77 212.00 212.00
Sierra Pacific Power Co. Power usage 136970.90 136970.90
Sierra Sun Publications 109.20 109.20
Specialty Tool Mfg. Meter box lid lifter, meter base spreader 36.71 36.71
Standard Oil Motor oil 154.09 154.09
BILLS FOR BOARD APPROVAL: (Cont) Electric Water General Total
Steinhart, Goldberg, Feigenbaum
& Ladar Legal services, 9/21-12/31/77 14928.55 14928.55
Sun Printing Office supplies 97.56 97.56
Tahoe Chemical Lab Water analyses, 12/77 78.00 78.00
Tamietti, William Reimburse mileage to S.F. - check out utility
body for new truck 65.95 65.95
Teichert Aggregates Cold patch asphalt 10.91 10.91
Tippecanoe Press Inventory meterial cards 16.63 16.63
Toggery Rain gear 28.57 28.57
Tom's T.V. Cassette head cleaner, repair tape, cable rent 37.63 37.63
Truckee Donner Disposal Garbage service, 1/78, 2/78 70.00 70.00
Truckee Donner Glass Glass for Tonini pump house 3.68 3.68
Truckee Hotel Overtime meals 14.73 14.73
Truckee Tahoe Lumber Misc. paint and supplies for lunchroom 255.62 255.62
T.T.S.A. Maintenance and operation of plant, 1/l/78-6/30/78 139.50 139.50
Universal Engineered Systems Balance owing on extender card - previous pmt short 7.34 7.34
Vartron Corporation Programming services 555.00 555.00
Wedco Recording charts, wire, circuit breakers, service deadends 1389.65 1389.65
Phil Willard Enterprises Janitorial services, 12/77, 1/78 325.00 325.00
Wray Rentals Materials needed to repair the Stihl cut off saw 17.52 17.52
Xerox Copy machine 217.71 217.71
Zellerbach Paper Co. Plastic coffee cups 70.04 70.04
141946.74 22793.57 10987.66 175727.97
I I I
177
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
STATEMENT OF GENERAL FUND - February 2, 1978
Bank Balance - January 12, 1978 $ 148,327.00
Truckee Electric and Water Revenue 110,305.42
Donner Lake Electric Revenue 16,546.72
Standby Revenue 2,979. 18
Electric Connection Fees 1 ,400.00
Water Connection Fees 430.00
r^ Miscellaneous Billings Revenue 538.81
Miscellaneous Revenue 4,858.87 $ 285,386.00
Approved Billings $ 5,141 .59
Bank of America:
Federal tax deposits 9,364.84
Truck loan payment 474.02
George Cattan - Pension plan payment 258.75
Directors - Board meeting attendance 450.00
Dept. of Benefit Payments - Quarterly deposit for
disability insurance, state income tax and
unemployment insurance 2,539.98
Deposits for January, 1978 1 ,363. 78
Palm Springs International Hotel - Hotel accom-
modations for Pat Sutton while attending training
program for Special Districts 78.44
Petty Cash - replenish fund 91 .85
Regents of Univ. of California - Registration fees
for above training session 135.00
Refunds :
Credit balances on closed accounts :
David D. Decker 13-038-02 20.64
Tahoe Sierra Meadows 8-182-01 15.00
Credit balances on line extensions :
Vicki Tepper 201 .36
Sierra Building Supply 413.23
Credit balance on tapping fee:
Steffanie Erber, Truckee Hotel 1 ,913.28
Social Security Division - Public Employees
Retirement System - Quarterly deposit 6,627.94
State Board of Equalization - Quarterly deposit
of state sales tax and energy surcharge 1 ,881 .23
State Compensation Insurance Fund - Quarterly deposit 2,083.87
Tahoe National Bank - Computer loan payment 356.44
William Tamietti - Travel expenses to S.F. to look at
utility truck bodies - first trip 50.00
West River Street Assessment District - Temporary
transfer to cover deficiency in account 1 ,300.00
I.B.E.W. - Union dues, 1/78 172.50 ( 34,933.74)
PAYROLL
1-15-78 OT DT z Standby" _. Gross- - Net
Barry 572.00 443.63
Chapman 569.60 424.51
Connell 620.00 456.34
Craig 500.00 378.38
Grow 795.20 590. 15
Jones , N. 294.48 236.32
Marsh 544.80 408.40
Lopez 269.98 193.83 1211 .21 784.68
Pomponio 42.60 5.68 502.68 382.20
Reynolds 176.63 197.82 1141 .55 798.96
Rose 131.06 90.87 794.63 503.26
Rully 48.84 769.66 505.08
Seymour 1250.00 848.18
Silva 268. 38 268. 38 1513.97 964.18
Slattery 750.00 560.62
Straub 186.91 203.06 138.45 1284.82 819. 24
Tamietti 42. 74 698.44 569.43
Waltrip 492.00 385. 55
Wiser 34.08 488.48 343.90
1201 . 22 959.64 138.45 14793.52 10403.01
Temporary and Part time Employees :
OT - -'DT Standby Gross Net
Hayes 30.00 27:88
Jones , T. 27.50 25.56
McLeod 22.50 20.91
Painter 294.48 229.64
Samuel 53.75 49.96
Shapiro 294.48 250.47
722.71 604.42
Totals 1201 .22 959.64 138.45 15516.23 11007.43 $ ( 11 ,007.43)
PAYROLL
1-31-78 OT DT Standby Gross Net
Barry 686.40 51:7.87
Chapman 683.52 496.36
Connell 744.00 516. 18
Craig 500.00 364.59
Grow 954.24 688.55
Jones , N. 73.62 466.26 335.32
Lopez 6.92 893.00 621 .43
Pomponio 545.28 407.26
Reynolds 63.59 75. 36 94.20 1132.21 797.00
Rose 5.24 676.28 444.48
Rully 716.32 460.07
Seymour 1250.00 848.18
Silva 126.74 129.22 1200. 26 821 .60
Slattery 750.00 544.49
Straub 27.69 46. 15 92. 30 1052.22 708.60
Tamietti 36.63 822.57 630.52
Waltrip 590.40 437.28
Wiser 59.64 604.92 406.44
400.07 250.73 186.50 14267.88 10046.22
Temporary and Part time Employees :
Jones, T. 22.50 20.91
Samuel 66. 25 61 .58
Shapiro 392.64 321 .48
481 .39 40 3.9 7
Totals 400.07 250.73 186.50 14749. 27 10450. 19 ( 10,450.19)
Bank Balance - February 2, 1978 $ 228,994.64
Bills for Board Approval - See attached (175,727.97)
Bank Balance after Payment of Above $ 53,266.67
i
i
i
TRUCKEE-DONNER PUBLIC,UTILITY DISTRICT
BALANCE SHEET
ASSETS MARGINS AND LIABILITIES
Facilities, Buildings, Land: Margins:
Plant in Service Operating margins - Cumulative 1 ,003,099
Electric plant 2,163,784 since 1927
Water plant 932,463 Other equities - Profit on sale 600,108
General plant 347,655 of non-utility property
Less accumulated depreciation (1 ,767,824) Year to date margins 239,415
Net Plant in Service 1 ,676,078 Total Margins 1 ,842,622
Construction work in progress 46,762
Acquired plant 4,129 Long-Term Debt:
Net Utility Plant 1 ,726,969 REA bonds payable 367,573
Note payable to Sierra Pacific 74,055
Power Company
Real Property - PUD House, 24,925 Sewer assessments payable 15,797
Land not in use Other - Computer loan, truck loan 26,954
Total Long-Term Debt 484,379
Restricted Funds 365,894
Current Liabilities:
Current Assets: Accounts payable 214,812
Cash 412,330 Consumer deposits payable 27,850
Payroll taxes, 26,868
1 ,500 Accrued liabilities - Pa
Notes receivable - Van Wetter Y
Accounts receivable - Electric 170,061 interest on notes
and water usage,billings Total Current Liabilities 329,530
Accounts receivable, Other - Line 46,228
extensions, connection fees, misc.
Materials and supplies 197,085 Customer Advances For Specific Improve- 295,450
Other current assets - Insurance 6,989 ments to System (Restricted Funds)
prepmt, interest receivable, future
line extension costs
Total Current Assets 834,193
TOTAL ASSETS 2,951 ,981 TOTAL MARGINS AND LIABILITIES 2,951 ,981
�4
i
DONNER PUBLIC UTILITY DISTRICT
WATER SOURCE AUGMENTATION & ELIMINATION OF SYSTEM LOSSES
PROJECT 77-1
SUMMARY OF PROJECT COST
1/ 2/ 3/
Schedule A, Deerfield Line Replacement $120,000 $129,000 $165,000
Schedule B, Spring Development Work - Tonini 12,000 14,850 5,000
McGlashen 8,000 9,000 8,000
Schedule C, Well Development Work - Southside Well No.l 10,000 10,000 0
Southside Well No.2 43,500 70,000 15,000
Schedule D, Refitting Prosser Heights Well 4,000 5,000 0
Relocate Prosser Heights Booster 8,000 102000 17,000
SUB TOTAL $205,500 $247,850 $210,000
Engineering Design Fees 22,000 22,060 18,700
Resident Inspection Cost 8,000 80000 6,800
Project Contingency 0 27,090 0
Legal Fees 2,500 2,500 2,500
TOTAL ESTIMATED COST $238,000 $307,500 $238,000
1/ Revised estimate to force fit Fm.H,A. Application 7/27/77.
2/ DJC Estimate based on units of work and cost.
3/ Values from L.P,W, Application & C.A. letter of mandatory needs 1/18/77
Agenda Item No.5
CA 2/2/78
77315
DJC
2/2/78
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
ENGINEER'S ESTIMATE
FOR
WATER SOURCE AUGMENTATION & ELIMINATION OF SYSTEM LOSSES
PROJECT 77-1
SCHEDULE "A"
Unit Total
Item Description Quantity Cost Cost
IA 8" Diameter A.C. P. Class 150 6150 IF 17.50 $107 ,625
2A 8" Diameter Welded Steel Pipe, C1. 200 250 IF 25.00 6,250
3A 8" Gate Valves with Valve Boxes 3 Ea 450 1,350
4A 8" Butterfly Valves with Valve Boxes 11 Ea 375 4,125
5A Air Release Valves 3 Ea 600 1,800
6A Blow Off Valves 2 Ea 600 1,200
7A Connect Existing Services 30 Ea 17.5 5,250
8A Connect Existing Fire Hydrants 7 Ea 200 1,400
Total Bid Schedule "A"
Items lA through 8A $129,000
SCHEDULE "B"
1B Semicircular Pipe Drains 625 IF 16.00 10,000
2B 1-1/2" Perforated Plastic Pipe 325 IF 10.00 3,250
3B 6" Galy. Steel Collector Pipe 60 IF 15.00 900
4B 6" Welded Steel Underdrain Col. Pipe 75 IF 16.00 1,200
5B Cleanout Boxes 7 Ea 500 3,500
6B Collector Boxes 4 Ea 700 2,800
7B Water Meters & Meter Boxes 2 Ea 800 1,600
8B Vent Piping Complete 2 Ea 200 400
9B Sample Taps Complete 2 Ea 100 200
Total Bid Schedule "B" $23,850
Items 1B through 9B
SCHEDULE "C"
1C So.Side Well #2 Pump & Appurtenances , Job L.S. 70,000
So.Side Well #1 Sanitary Seal Job L.S. 10,000
Total Bid Schedule "C" $80,000
SCHEDULE "D"
1D Reconstruct Prosser Heights Pump & Job L.S . 5,000
Relocate Booster Pump Job L.S. 10,000
Total Bid Schedule "D" $15,000
TOTAL SCHEDULES A THROUGH D $247 ,850
r
I ,
TRUCKEE INNER PUBLIC UTILITY DISTRICT
WATER SOURCE AUGMENTATION & ELIMINATION OF SYSTEM LOSSES
PROJECT 77-1
PROJECTED CASH FLOW ANALYSIS
Element Feb. March April May June July_ Aug. Sept.
SCHEDULE "A"
Deerfield 10,000 402000 602000 10,000
SCHEDULE "B"
Tonnini Springs 4,000 6,000 22000
McGlashan Springs 4,000 4,000
SCHEDULE "C"
South Side No. 1 3,000 7,000
South Side No. 2 2,000 30,000 11,500
SCHEDULE "D"
,Prosser Heights Well 2,000 2,000
Prosser Heights Booster 8,000
ENGINEERING 4,400 1,000 1,000 1,000 '15000 12000 1,000
INSPECTION 1,000 3,000 3,000 1,000
LEGAL FEES 2,500
TRANSFER TO G.A. 12,000
MONTHLY PAYMENTS 4,400 15000 3,500 23,000 101,000 81,500 12,000 12,000
PAYMENTS FROM Fm.H,A. 132,900 81,100 24,000
CASH REQUIRED 4,400 5,400 8,900 31,900 132,900 813500 125400 -0-
-I
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
PROJECT 77-1 RELATIONSHIP TO THE 1976 L.P.W. APPLICATIONS
76329 76334 76335 76336
EDA Pre-Design Pre-Design Pre-Design Total
Date Paid Application App. "A" App. "B" App. Received
t
'November 9, 1976 $1, �62.50 $1 462.50
December 27, 1976 1,037.50 2,633.19 311.68 2,196.18 63178.55
January 10, 1977 2,724.16 327.00 2,005.02 5,056.18
February 7, 1977 1,993.65 308.15 861.75 3,163.55
March 7, 1977 247.88 84.70 332.58
$22500.00 $7$ 98.88 $946.83 $52147.65 $16,193.36
Proposed 77-1 Work
McGlashen Springs 7,500 71500 rz
Tonini Springs 4,625 4,625
South Side Pump 15,000 15,000
Deerfield 213,000
$240,125 $27,125
Application Value 1,190,125 407,925 1,067,900
% of Value 20.18% 6.65% 0
Fee Credit 1,533.18 62.96
Total Fee Credit to Project 77-1 $13596.14
Project 77-1 Total Fee 8.9%(246,850)= 22,058.65
Adjusted Total Fee $20,462.51
QO
Exh ' hit II-B-3 ��rp
s> enc°ral System Upgrading-
In addition to the major line item work listed above, system
rupgrading proposed under this application would include the
T
construction of a 6" diameter. loop around the hospital area to . provide
T 4 adequate Tire flow. , The connection of water distribution system
.x grid in Sierra Meadows Subdivision and the grid system of the
` Ponderosa Palisades Subdivision is proposed also. Looping the
4 long deadend lines in the Meadow Lake Park area is proposed as
a portion of this work and the replacement of the Deerfield
deteriorated line and constructing the looping facilities in the
westward portion of the sub-service area is also proposed.
;rx Armstrong Area
An area of grossly inadequate water service and non existent fire
flows exists in the Armstrong sub-service area of the Truckee Donner
Public Utility District system . Service to the area at this time
' does not comply with the minimum requirements of the Safe Drinking
!-later Act and the total lack of fire protection in the area is of
- concern to the entire region . An uncontrolled fire in this wooded
area could result in a fire storm that would soon be beyond the
;..-
'�' limits of the local and regional fire protection agencies to contain.
gyp. -
n_.__ the Installation of a
The work proposed in the ,- rmstrong area ; s ins
-'' 100, 000 gallon surface mounted steel reservoir connecting lines and
controls to a new booster system pumping from pressure zone No . 2.
The total estimated construction cost of the work proposed is as
listed :
Project Cost
Rework McGlashan 57, 500-r--
Rework Tonini 4 , 625=--
Install Prosser Tank 181, 000
l-u Install Prosser Pump 146, 000
Install 267 Inter Tie 163, 000
ODD
-,--. Relocate Prosser Booster 41,
' Construct Hospital Loop 25 , 000
Loop Sierra Meadows 18,750
Relocate Prosser P .R _V . 4 , 700
Loop Meadow Lake Park 10,000
_ Fill Donner Creek 1, 000
=� Install 1-lydrants 1-1 Mill Line 1,200
Armstrong System 175,000
Replace 4" Cable Line 59 ,700
Install Production Meter 10,000
Cement Mortar Lining 140, 000
�.. =T R1:1)1.aec E. Loop Deerfield 213 , 300—
---Y `luuth Side Pump S Control 1 .;, 0011 -
- 1, 190, 12ti
�9l
Tonini Springs
The construction of a new spring box and the installation of
r3 sU b-surface perforated piping in a gravel envelope will increase
the yield of the Tonini Spring substantially beyond its current
estimated value of 80 gallons per minute. Additional work required
9
at the Tonini Spring is -
the installation of adequate pressu-re.
E1
sensing controls so that the centrifugal booster located at the
spring box can respond effectively to the lOO,000 gallon tank that
is located above the springs and balances on the Town system.
The total estimated construction cost of the work proposed is
as listed.
Pro_j ect Cost
District Wide Meter Program S290 700
art Insta-ll Production Meters lO� D00
,
install integrated Controls 60,100
`a-Install South Side Pump No.2 15, 000 - ----
- Rework McGlashan 7,500`"
-,.. Rework Tonini 4 625`
r $407, 925
d
�-7
r any one of the seven sources as the lead source. As the demand on the
?*i
tem continue to climb the supplemental sources
total integrated sys
would come on line . Such an integrated control system will allow the
more nearly matching of consumptive load and available pumping rate.
Such a system will also provide for the systematic utilization or all
of the Wells in the area and provide the necessary exercise that is
f required to maintain the Well in top production farm . There will e
less energy consumed in providing the water necessary to meet the
.;. -
:-,¢< <y: demands on the water distribution system. The results of the inte-
rE
` grated control system will. be a reduced operating cost and extended
life of the .individual Wells throughout the District.
ut 4.
The total Estimated Construction Cost
of the work proposed is as listed.
Protect Element Cost
r Loop Olympic Hghts_ &. Fairway plater Main $237 , 500
Install 267 Inter-Tie
163 ,000
' Loop 267 Main & Fairway Main 03 ,50O .
i Loop Mortis Valley with South Side Source 1 ,500
Extend Airport Line 149 , 300
Complet 307,000
e West River Street
90
Install Integrated Source Cont.
000
961 , 067 , 900
Total Construction Cost
U DA-17m I iA
Furni FmlIA 442-19 ' Z-Ir
(1zev. 2-17-76) AGREEMENT FOR ENGINEERING SERVICES
7111S AGREEMENT,made this ---------%Z/�-Sf------------------- day of
by and between --------Truckee Donner Public Utility District ______,hereafter
referred to as the OWNER,and ____Cook-Associates -Engineering Consultants
hereinafter referred to as the ENGINEER:
The OWNER intends to construct a Water----S-ouree- ---Augmentati-
on-.and the_Elimipatiort-of
- ---- ------------ -----
,-. System Losses, 'Project 77-1, as defined in the FHA Application and
f Environmental Documents accompanying the Application.
Nevada California
to ---- ---------- - - --- - County, State of ------------— - - —------------------------
---> which
may be paid for in part with financial assistance from the United States of America, acting through the Farmers Horne
Administration of the United States .Department of Agriculture, hereinafter referred to as FmHA, pursuant to the
Consolidated Farm and Rural Development Act, (7 U-S.C. 1921 et seq.) and the ENGINEER agrees to perform the various
professional engineering services required for the design and construction of said system.
WITNESSETH:
That for and in consideration of the mutual covenants and promises between the parties hereto, it is hereby agreed:
SECTION A — ENGINEERING SERVICES
The ENGINEER shall furnish�basic engineering services as follows:
1. The ENGINEER will conduct preliminary investigations required to determine project feasibility.
2. The ENGINEER will prepare preliminary drawings and cost estimates.
3. The ENGINEER will prepare a preliminary engineering report following FmHA instructions and guides.
4. The ENGINEER will furnish 10 copies of the preliminary engineering report, cost estimates, and layout maps to the
OWNER.
5. The ENGINEER will attend conferences with the OWNER and representatives of the FmHA and other interested
parties_
6. After the preliminary engineering report has been reviewed by FmHA and, the OWNER directs the ENGINEER to
proceed, the ENGINEER will perform the necessary design surveys, accomplish the detailed design of the project,
prepare detailed drawings, specifications and contract documents, and make a final cost estimate based on the final
design for the entire system. It is also understood that if subsurface explorations such as borings,soil tests and the like
are required to determine amounts of rock excavation or foundation conditions, the ENGINEER will furnish
supervision of said explorations without additional charge, but the costs incident to such explorations, no matter
whether they are performed by the ENGINEER or by others, shall be paid for by the OWNER as set out in Section D
hereof.
7. The contract documents furnished by the ENGINEER under Section A-6 above shall utilize FinHA-endorsed standard
construction contract documents, including FmHA Supplemental General Conditions, Contract Change Orders and
partial payment estimates.All of these documents shall be subject to FmHA approval.
8. Prior to the advertisement for bids, the ENGINEER for each contract will provide not to exceed 10 copies of detailed
drawings, specifications, and contract documents for use of the OV,'NER, FmHA, and the appropriate Federal,State,
and local agencies from whom approval of the project must be obtained.The cost of such drawings,specifications,and
contract documents shall be included in the basic compensation paid to the ENGINEER.
9. -The ENGINEER will furnish additional copies of the drawings, specifications and contract documentsas required by
prospective bidders, material suppliers, and other interested parties,but may charge for the actual cost of such copies.
Upon award of each contract, the ENGINEER will furnish to the OWNER five sets of the drawings,specifications and
contract documents for execution. The cost of these sets shall be included in the basic-compensation paid to the
ENGINEER. Original documents, survey notes, tracings,and the like,except those furnished to the ENGINEER by the
OWNER,are and shall remain the property l e ENGINEER.
10. The drawings prepared by the ENGINEER under ti:c prvvi.i•a-s :a Section A-6 above shall be in sufficient detail to
permit the actual location of the proposed improvements on the ground.The ENGINEER shaii prepare and furnish to
the OWNER without any additional compensation, three copies of a map slioNving the needed construction easements
and permanent easements and the land to be acquired. Property surveys, property plats, legal descriptions, and
negotiations for land rights shall be accomplished by the OWNER, unless the OWNER requests the ENGINEER to
perform these services. In the event the ENGINEER is requested to perform such services and make detailed surveys,
the ENGINEER shall be additionally compensated as set out in Section D hereof.
Position 6 FmHA 4-42-19 (Rev_2-17-76)
I'1
1.I The ENGINEER will attend the bid opening and tabulate the bid proposals, make an analysis of the bids, andMal.e
recommendations for awarding contracts for construction.
12. The ENGINEER will check and approve any necessaryy shop and working drawings furnished by contractors.
13. The ENGINEER will interpret the intent of the drawings and specifications to piotect the OWNER against defects and
deficiencies in construction on the part of the contractors. The ENGINEER will not,.however, guarantee the
performance by any contractor.
14. The ENGINEER will provide horizontal and vertical control in the form of bench mark circuit and two baselines for
vertical control to be used by the contractor in staking the construction. Server lines shall be staked for laser beam
construction by the ENGINEER.
15. The ENGINEER will provide general engineering inspection of the work of the contractors as construction progresses.
Unless notified by the OV,rNER in writing that the OWNER will provide for such inspection, the ENGINEER will
provide detailed resident construction inspection (RESIDENT INSPECTOR)for the additional compensation set forth'-
in Section C. The ENGINEER does not guarantee the performance of the contractor(s) by the ENGINEER'S
performance of such detailed construction inspection. The ENGINEER'S undertaking hereunder shall not relieve the
�-+ the contractor of his 'obligation to perform the work in conformity with the drawings and specifications and
in a workmanlike manner; shall not make the ENGINEER an insurer of the contractor's performance; and shall not
impose upon the ENGINEER any obligation to see that the work is performed in a safe manner.
16. The ENGINEER will cooperate and work closely with FmHA representatives_
17. The ENGINEER will review and approve estimates for progress and final payments.
18_ The ENGINEER will make final inspection of all construction and a written certification of final inspection to the
OXVNER and FmHA.
19. The ENGINEER will provide the OWNER with one set of reproducible record (as-built) drawings, and two sets of
prints at no additional cost to the OWNER.Such drawings will be based upon information provided by the RESIDENT
INSPECTOR.
20. The ENGINEER will prepare notices and advertisement of final payments if required by state statutes.
21 . The ENGINEER will be available to furnish engineering service and consultations necessary to correct all unforeseen
project operating difficulties for a period of 1 year after the date of final inspection and acceptance of the facility by
the OWNER and FmHA. This service will include instruction of the OWNER in initial project operation and
maintenance but will not include supervision of normal operation of the system. Such consultation and advice shall be
furnished without additional charge except for travel and subsistance costs.
22. The ENGINEER further agrees to obtain and maintain, at the ENGINEER'S expense,such insurance as will protect
him and the 0N1INrER from claims under the Workman's Compensation Act and from all claims for bodily injury,death,
or property damage which may arise from the negligent performance by the ENGINEER or by the ENGINEER'S
employees of the ENGINEER'S functions and services required under this Agreement.
23. The ENGINEER further agrees to provide the operation and maintenance manual for waste treatment facilities when
- required by the Environmental Protection Agency or FmHA for $ __-------------—_�______—__________.
24. The services called for in Section A-1 through A-4 of this Agreement shall be completed and the report submitted by
291 -1977
--
flJareJ -----—--------------. .
After acceptance by the OWNER and FmHA of the Preliminary Engineering Report and upon written authorization
from the 01,1'NER, the ENGINEER will complete final plans, specifications and contract documents and submit for
approval of the ONVNER,FmHA and all State regulatory agencies by-------- t 29._19 7 7_____ -
unless otherwise agreed to by both parties. (DO1el
If the above is not accomplished within the time period specified,this Agreement may be terminated bythe4DWNER.
i
— 2 —
SECTION B — COMPENSATION FOR BASIC ENGINEERING SERVICES
The OWNER shall compensate the ENGINEER fog h::sic triSineering serviceS not to exceed percentages of the.Tolal
Actual Construction Costs shown in Attachment 1 ,.vhick is attached herelo'and made a part hereof-
The construction costs on which the compensation for basic engineering services is determined shall exclude legal fees,
administrative costs, engineering fees, land rights acquisition costs, waler costs, and interest expense incurred during the
construction period. The compensation for basic engineering services shall be payable as follows:
1. The sum of--------_----_----__----—___ _________________________Dollars (S__ 21.4a0 t00_____) after the review of the
preliminary engineering report by the FmHA and acceptance by the OIVNER-
2. A sum which together with the specific sum set forth in Section B-1 above equals seventy percent (70%) of the total -
compensation based on the final cost estimate payable after completion and submission of the final drawings,
specifications, cost estimates, and contract documents, and the acceptance of the same by the OWNER and FmHA.
3. A sum equal to ten percent (10%)of the total compensation based on construction contract costs payable immediately
after the construction contracts are awarded.
f 4. A sum equal to twenty percent (307o)of the total compensation based on the actual construction costs will be paid on
a monthly basis for general engineering inspection of the contractor's work during the construction period on
percentage ratios identical to those approved by the ENGINEER as a basis upon which to make partial payments to.the
contractor(s). However, final payment under this paragraph and of such additional sums as are due the ENGINEER by
reason of any necessary adjustments in the payment computations will be in an amount so that the aggregate of all
sums paid to the ENGINEER will equal one hundred percent (100%)of the basic compensation determined on actual
total construction costs. Final payments shall not be made until it is determined that all services required by this
Agreement have been completed except for the services set forth in Section A-21 hereof_If the total actual construction
cost is less than the lowest total actual construction cost figure shown on Attachment I and the fee to be paid to the
ENGINEER is a specific amount as set forth above, the percentage payments due the ENGINEER under Section B-2
through B-4 inclusive,shall be computed by applying the applicable percentage to the specified total fee.
SECTION C —COMPENSATION FOR DETAILED RESIDENT CONSTRUCTION INSPECTION
AS SET FORTH IN SECTION A-15
When the engineer provides detailed resident construction inspection, he will,prior to the preconstruction conference,
submit a resume of the construction inspectors' qualifications--anticipated duties and responsibilities for approval by the
OWNER and FmHA. The OIVNER agrees to pay the ENGINEER for such service in accordance with the schedule set out in
Attachment I. The ENGINEER will render to OWNER for such services an itemized bill,separate from any other billing,at
the end of each month, for compensation for such services performed hereunder during such month,the same to be due and
payable by OWNER to the ENGINEER on or before the 1 Oth day of the following month.
—3 —
SECTION D — ADDITIONAL ENGINEERING SERVICES
In addition to the foregoing being performed,the following services may be provided UT'O\' %\'RITTEN AUTHORIZA-
TION' 01: THE OWNER and approval of the FnMA:
1. Site surveys for water treatment pl.,
sewage treatment works,daibs and reservoirs.
2. Laboratory tests,well tests,borings,specialized geological,hydraulic or other studies recommended by the ENGINEER.
3. Property surveys, detailed descriptions of sites, maps, drawings, or estimates related thereto;assistance in negotiating
for land and easement rights-
4- Necessary data and filing maps for water rights,water adjudication,and litigation.
5_ Redesigns ordered by the OWNER after final plans have been accepted by the OWNER and FmHA.
6. Appearances before courts or boards on matters of litigation related to the project. r
Payment for the services specified in this Section D shall be as agreed between the OWNER and ENGINEER and
approved by FmHA prior to cpmmeneemeni of the work,barring unforeseen circumstances,such payment should not exceed
* S ________ __ _ _ _. The engineer will render to owner for such services an itemized bill,separate from
any other billing, at the end of each month for compensation for services performed hereunder during such month,the same
to be due and payable by OWNER to the ENGINEER on or before the l Oth day of the following month.
SECTION E — APPROVAL BY FmHA
This agreement shall not become effective until approved by FmHA.Such approval shall be evidenced by the signature
of a duly authorized representative of FmHA in the space provided at the end of this Agreement.The approval so evidenced
by FnIHA shall in no way commit FmHA to Tender financial assistance to the OWNER, but in the event such assistance is
provided, the approval shall signify that the provisions of this Agreement are consistent with the requirements of FmHA.
r - -
—4 —
IN WITNESS \WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorised
officials,this Agreement in duplicate un the respective dates indicated below.
(SEAL)
OIWNER.
." By— t —
-----------
ATTEST _
---- =�G --- --��-��-- ��s�s-t�—------ Type Name--------
Title -----------------------q--------------- •-
Type Narne — -------------- ----- -- — — — Date --
�'. Title —-- -- --- -------- ---- ------ ---
(SEAL) _
ENG[E
ATTEST:
By—= - ---- - - — -----------------—
Type Name ----Dan-----J. Cook------------
Tvpe Name--- --------- ---—.......-- Title— ----- -------
Title —----- ---—----- — —--------- --—— — - Date --------------- -------- —------ --
APPROVED:
FARJNIERS HOME ADMINISTRATION
By---------------- -- -------- -- -- -—-- - — --
Type Name-------------------- -----—-- — ---
Title------------ --------- — — — -------- - —
�1
• —5 — "
INTERIM AGREEMENT
(For'use only when OWNER is not legally organized on the date the Agreement for Engineering Services is executed)
In lieu of the execution of the foregoing Agreement for Engineering Services dated the ----_----—
-------------------------dal'of
--------------------------—-----------—--------—----_ , 19 by the party designated as OWNER therein, the undersigned, hereinafter
referred to as INTERIM PARTIES, have executed this Interim Agreement in consideration of the services described in
Section A-I through A-5, inclusive, of said Agreement for Engineering Services to be performed by the ENGINEER,and the
ENGINEER agrees to accept this Interim Agreement as evidence by ENGINEER'S execution liereof contemporaneously with
the execution of the Agreement for Engineering Services. The ENGINEER also agrees to perform the services set forth in said
Section A-1 through A-5, inclusive,of said Agreement in consideration of the sure stated in Section B-1 of said Agreement to
be paid in the manner set forth-therein.
It is anticipated that the OWNER shall promptly become a legal entity with full authority to accept and execute said
i Agreement for Engineering Services and that the OWNER, after becoming so qualified, shall promptly take such action as
necessary to adopt, ratify, execute, and become bound by the Agreement for Engineering Services. The ENGINEER agrees
that upon such due execution of the Agreement for Engineering Services by the OWNER, the Ih'TERIAI PARTIES auto-
matically will be relieved of any responsibility or of liability assumed by their execution of this Interim Agreement,and that
the ENGINEER will hold the OWNER solely responsible for performance of the terms and conditions imposed upon the
OWNER by the Agreement for Engineering Services, including the payment.of all sums specified in Section B-1 of said
Agreement.
If the OWNER is not legally organized, or if after being duly organized it fails or refuses to adopt,ratify,and execute
the Agreement for Engineering Services within 30 days from the date it becomes legally organized and qualified to do so,or
if for any other reason the project fails to proceed beyond the preliminary stage described in Section A-1 through A-5,
inclusive, of said Agreement, the INTERIM PARTIES agree to pay ENGINEER for such preliminary engineering services an
amount not to exceed the sum specified therefor in Section B-I of said Agreement.
IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials,
this Agreement in duplicate this ____-------------------------------------------------day of------------- _ 19----
I
f
I
i
n U.S. GOVERNMENT PPINTING OFFIcE: 1��6EEygt/
— 6 —
Form FmHA 442-19
Attachment I
_ California and Hawaii
Truckee Donner Public
OWNER: Utilit District
' - B y'
ENGINEER•
By: Da J. Cook Date:
FEES FOR BASIC ENGINEERING SERVICES
AS A PERCENTAGE OF TOTAL CONSTRUCTION COSTS
The following fee schedule will be applicable to this project as
provided for in Section B of the Agreement. Table II will apply to
all items of the project except those specific items listed in
Section B to which Table I will apply. Compensation under Table -I
will normally be reserved for projects or portions of a project
which are unusually complex and require more extensive design con-
siderations and project supervision than normally encountered on
basic water and sewer projects. Such items might include mechanical
and electrical equipment encountered in complex water or sewage
treatment plants, *intake'structures, complicated control systems,
complex pumping plants and extensive hydraulic revisions to existing
systems..
Total Actual Table I Table II
0^ Construction Cost
. / Fee q Fee
$ 100,Ooo 72.9
200,000 l0_3
77 .4
300,000 9.2
10.1 8.6
400,000
500,000 9-48.2
600,000 9.0 7-8
700,000 8.6 7-3.
8.2 7_1
800,000 8.o
6.7 -
900,000 7.9 6.5
7 , 000,000 7.7 6.3
2,000,000 7.0
5.8 - -
The fee for project .costs falling between the figures shown on
Tables I and II will be interpolated to the nearest one-tenth--of
of one percent.' -
Compensation may be negotiated on a lump-sum basis for all projects
costing $100,000 or less_
�9
Pa/y e sT
ATC Co"pR is 1 S o l -s
RS OP MRRCr+ / � /y78 Ilvc u.o Inc Fu��L
CH/g ice Gc? E'X C tJp �/u� STATCr ENC-- )eqy C 6MHSSICN T14k
S.dr-+e It n PA C I 0-1 G P o�t--rr
. � NON— Y'n
Kw��/
USED "TDPUD t.IPE a.,,odr W16 WT! W'TR W/WTR HTR w�SPACE Nr.
moo io.gy Il. "38 'i. !•i C: % 7. c• '
300
you !8, os ao. Y7
600 ,2/. GS as. O! 2c;. 71
GOD .ZS',ZZ �9,SS ��, s .:�. � •i, i i
700 al.79 3N. 1) 79 25, y:1
8'04 32,3fo 39. 4 3y. 33 =r =
M 906 35, 93 q3. 18 39. 87
/660 39.s0 g7.72. y3, 1/2 yD, 7 Y �.
,56,96 s 2. so q8, 70
.- - /Aloes 53,79 loS,8y G/,SS S7. 7 8 �T
/6ca 6a,92 7Y.97 70, 67 44, 97
/Sa6 68,0 E SY.OG 74,75 7 5. 9 S =
.- .2060 75•20 93,/5/ gel. eq 8s, oq
.2SOD 93.as / 3.ss ! //. t S /a7, 7S
/30,
iz9.75' 1,56 97 /53, I7 113/. S
yaao i'yG.Go /7Y, Gfe
Ai Tn t�U D
P 1..' fl�lEaL RECORDS ;mt*rl
ATSNOV 2 1971 ,.J� !
Atit�_ PASTa'Ctf?fK _[ M.
Ket
1 Z CUIF'at'.CAT Mai GF L e; 'i�` L RECORDER
2
;-'.is ;:'cdi;ication of Lease made and Entered into in �'�p�@~@�
on- Septembrer 23 1971. by and bctm men the
�--" 4 .I'l:DL.IC UTIZ.I f Y 11IS-rr.-ICT. (successor to
.
1'tiIity P'<_:1,r if.-"). a .a-.' `="•�••, licreinaft-rr referred to
6
3.. _as_•�^, •.. s? i3:CIC i :f: - 3TtiIv: .T; .�" f '.1:�, 'I,7«d A D
7 a u�c'Y E'?i,:ic, �, e.a t F:��r refer.=ed to s.c
8
I3" NI"SI SETA _
9
t;r li F A S, the parties hereto ez-.tered into a cerbt.4n
10
c'rtcd nice r1fr 1, 19CO. concerning, cer::ain real property describc;d
11
V-)�3reln in rx%¢ Yit "A" and E_•:T4xibit "L" for r_ term endireg on I3cce-r be r
12
Z5, 2065. said Lease being recorded January 12, II' 67
13
3.4 in Volume 414 Official Pecords, 11,,evada County, at Ira-e 107 z
*:d -
15
16 VMET-EA'33. the p 3ri.3c s TiQrE•:o der-ire to srodifg said L.eiase by
cla-'un;in cG';lt7inc;d in tiac:reof. cald to ;-c-+.r`-. to
17 . :e lea.T.se'.told 4t-s real fre-crty $cs` 'T_ f in Z1:i. __ 1-,it "I"
18
hereto.
19 y [ V R R l L �+ t
St? YY= ^R.E.'. �L =F 3?`':`S•T?, i A ACi',1 l-3.''.i.7 is
20
A14I3 I_ti::= F;Ia AS ?ICI VOWS:
21
C�
22 (1) Th_t r ar-a;,raph 9 of that cc-rtain I.ea.se dated Decexx=;:•: r 1.
CLD • " by a..d i c c n Truckee Danner Public Utility District (rest. r� cd
23
t� Utility
*f�e'k ucl:cc i ublic til ty 1:4-..'t`riet}s�� as Lessor,.. and 1 ri cl ee
30
24 s-Ciiiti[i FtGti�'•:�'C`1 t. :cl Park I�1£?e"1Ct :3 Z.t /',
25is hereby arle-3a:,d and
26 _ .,� '��"•.�:i r.o r•:. .;-i �..:; f• ?Ion:•^:
•� t?. s':''sI�- L.I.S1?T_i'iY 27 O sJ', - rJ Z.
28 T.= .., i r-t -.11 tin :c.��. r t —1 �.f cf�ea -,,nd eY_:z„n-- t,f
I.LS�'. . l:i _': E•::if'i lE .ld .._` f31`r.• •_1 }?TC::'li::cs E:3 '1C
t:zcs e *f, free zznr.': c2_ter of :'tl IFI-n_=, andc
r 29 zrd 4.-, .?1 z_.t alt tire_. n_vL °•rld car.:c:.d said Le,;�, -G.,z;i r i,-;G •
ZT-d Lold Lcsc3r ha:rr.Ae:ss of ine fronx all claims, Zer,3ares,
30 char-cs, --nd liabilities arising rjut of or in any ma;-inF>r
ever connected with Lessee's �-, ::tter or thing -cormcct-ed t_-le:'ewith
31 In the event said lease hold premises shall at any tirne br- -ub-
jeet to taxes, assess.-nests, or ar�y c{her onli�-ation. all s:ich
32 tuxes. sretsments. or any oblirpzr_txcr s shrtll be the respor-sib?ltty
of and pc-id by Lessee, at the sc4e c^et and e."ense of Less.-e.
- 1 -
a�a
RESOLUTION NO. 78 06
r�
OF THE
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
READVERTISING FOR BIDS ON PLAIN PAPER COPIER
WHEREAS, the Board of Directors of the Truckee-Donner Public
Utility District has determined the need to purchase a new plain paper
copier for the District office; and,
WHEREAS the Board has rejected bids previously received for
non-compliance with specifications as described in Exhibit "A";
NOW THEREFORE BE IT RESOLVED as follows:
The President is hereby directed to
readvertise for bids on a plain paper copier based on speci-
fications as described in Exhibit "A" attached hereto and made
a part hereof, and that the date and time established for the
bid opening is February 21 1978 at 2:30
o'clock P.M.
r--- PASSED AND ADOPTED by the Board of Directors of the Truckee-
Donner Public Utility District at a regular meeting thereof duly called
and held in the District on the 6th day of February 1978,
by the following roll call vote:
AYES: Huber Kuttel Maass ,
Sutton ,
NOES: None ,
ABSENT: None ,
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
By:
PAT SU President
ATTEST:
L�
A. ilton Seymour
Clerk Thereof
smc
EXHIBIT "A"
S P E C I F 1 C A T 1 0 N S
PLAIN PAPER COPIER
r-r TYPE Desk top book copier with document feed
First Copy Speed Less than 5 seconds
Subsequent Speed 20 cpm minimum
Original Size Maximum 10'' x 14''
Copy Paper Supply Switchable cassettes for legal and
letter size with lever
Power 115 volts, single phase, 60 hz, less
than 15 amps
Magnification 1 : 1
Must copy full width and length of letter or legal sized original
Optional Stand required
f
EXHIBIT "A"
RESOLUTION NO. 78 07
i r
OF THE
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
DECLARING CERTAIN WATER PIPE SURPLUS
WHEREAS, the Board of Directors of the Truckee-Donner Public
Utility District has determined that certain tarred and wrapped steel
water pipe as described in Exhibit "A" attached hereto does not meet
District specifications,
NOW THEREFORE BE IT RESOLVED as follows:
The Board of Directors of the Truckee-Donner Public Utility
District hereby declares the certain water pipe as described
in Exhibit "A" attached hereto surplus.
PASSED AND ADOPTED by the Board of Directors of the Truckee-
Donner Public Utility District at a regular meeting thereof duly called
and held in the District on the 6th day of February 1978,
by the following roll call vote:
AYES: Huber Kuttel Maass ,
Sutton ,
NOES : None ,
ABSENT: None ,
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
By:
PAT S/JrTTON, President
ATTEST:
^" A. Milton Seymo r
Clerk Thereof
smc
RESOLUTION NO. 78 08
r--
OF THE
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
CALLING FOR BIDS ON SURPLUS WATER PIPE
WHEREAS, the Board of Directors of the Truckee-Donner Public
Utility District has declared certain water pipe, described in Exhibit
"A" attached hereto, to be surplus,
NOW THEREFORE BE IT RESOLVED as follows:
The President of the Board of Directors of the Truckee-Donner
Public Utility District is hereby directed to issue a call for
bids on surplus water pipe as described in Exhibit "A" attached
hereto, and that the date and time established for the bid open-
ing is Monday March 6, 1978, at 4:00 o'clock
P. M.
PASSED AND ADOPTED by the Board of Directors of the Truckee-
Donner Public Utility District at a regular meeting thereof duly called
and held in the District on the 6th day of February 1978,
by the following roll call vote:
AYES: Huber Kuttel Maass ,
Sutton ,
NOES: None ,
ABSENT: None ,
TRUCKEE-DONNER PUBLIC UTILITY DISTRICT
By:
PAT SU ON, President
ATTEST:
A. Milton Seymour
Clerk Thereof
smc
a.?�S
EXHIBIT "A"
r—
SURPLUS PIPE
Steel , double dipped, wrapped, water pipe
932 feet. . . . . . . . . . . . . . . . . . . . . . . . . . . .4" pipe
2618 feet. . . . . . . . . . . . . . . . . . . . . . . . . . . .6" pipe
1 . . . . . . . . . . . . . . . . . . . . . . . . . .
2200 feet. .8" pipe
CONDITION OF SURPLUS MATERIAL- This steel , double dipped, wrapped water
pipe is unused, but generally in poor condition. Numerous pipe ends are
bent; the covering is scraped and shows deterioration. The estimated
I usability of the pipe is 95%.
IBids may be offered on any one, or all of the three size pipes but must be
for the total linear feet of that size.
1
EXHIBIT "A"