HomeMy WebLinkAbout20 Electric Master Plan Agenda Item # 20 �s E , DONNER Public Utility District Action To: Board of Directors From: Joe Horvath Date: June 4, 2008 Subject: Award Electric System Master Plan Contract 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can approve bid awards over$15,000. 2. HISTORY At the March 13, 2008 Board meeting, a workshop was presented to discuss the Electric System Master Plan study and the proposed RFP process. The last comprehensive Master Plan study was prepared in 1993 with an update completed in 2002. The updated study formed the basis for recent modifications to electric facility fees. District policy is to update the Master Plan every five years, therefore funds were budgeted and the RFP process was started to retain a consultant. The RFP period began on March 22, 2008 and ended on April 25, 2008. The District received 5 proposals by the deadline from the following consultants: CVO Electrical Systems, Electrical Consultants, Inc., HDR Engineering, R.W. Beck, and Stanley Consultants. 3. NEW INFORMATION After receipt of the Proposals, a review committee was formed composed of the following District staff: Sanna Schlosser, Steve Hollabaugh, Neil Kaufman, Steve Trevino and Joe Horvath. The committee members scored the Technical Proposals using specific criteria to maintain consistency among members. The Technical Proposal was worth 85 percent of the overall score. The Cost Proposals were opened after the committee completed the review and ranking process of the Technical Proposals. The Cost Proposal was worth 15 percent of the overall score. The committee members were unanimous in their ranking of RW Beck as the most technically qualified consultant. The Cost Proposals were then opened and ranked assigning the full 15 points to the lowest price consultant and assigning zero points to the highest price consultant. The remaining consultants were assigned points by prorating their costs compared to the lowest and highest prices. The ranking of the consultants including technical, cost, and total scores are as follows: 1 Consultant Tech. Score Cost Score Total Score RW Beck 69 6 75 Electrical Consultants 63 15 78 CVO Electrical Systems 59 4 63 HDR Consultants 52 8 60 Stanley Consultants 46 0 46 RW Beck was the highest ranked consultant on a technical basis, and their price to perform the work was $113,936. Electrical Consultants was the next highest technically ranked consultant but with a price of $69,868. After the costs were converted to scores based on a 15 point scale, Electrical Consultants had the highest overall score (see attached Proposal Cost Estimate). 4. FISCAL IMPACT The source of funding for the Electric System Master Plan study is Facilities Fees for those portions of the study which lead to the development of capital improvement plans. The remainder must be paid from Rates. If the Board approves retaining Electrical Consultants Inc. as the consultant, the cost breakdown for engineering services for the Master Plan study would be as follows: Facility Fees $51,914 Rates $17,954 Total Cost $69,868 Funding for the Master Plan study in the approved FY 2008 budget is $71,900. 5. RECOMMENDATION: That the Board approve the selection of Electrical Consultants Inc. to provide professional engineering services to the District for the Electric System Master Plan study and authorize the Board President to sign the consulting services agreement for an amount not to exceed $69,868 with the funding sources as noted above. 4;Z114 - /".a, Stephen Hollabaugh, Assistant General Michael D. Holley, General Manager Manager 2 TDPUD-Fffteen 95 Year Electrical Master Plan Study Ect/EngineBring Estimate DM RH PB HV SF Be PROJECTTASKS Billing Project Project Project Planning Group Supervisor Manager Engineer Technician Dre Stano Section Summary P1 Initial Data Collection and Historical Review $6,566 4 30 a 36 0 14 P2 Planning Criteria $1,040 2 8 0 0 0 0 3 Analysis of the Existing System and hnniediate Improvement Plan $12,322 4 56 30 74 0 0 P4 Prepare Load Forecast $7,756 4 40 0 60 0 0 Ps Long Range System Planning $12,552 12 80 12 40 0 0 P8 Protective Device Coordination Study $5,632 16 16 32 0 0 0 Py Comprehensive,Master Phan Report $16,300 a 60 0 56 80 60 TOTALS-ALL SECTIONS $62.15316o 290 _82 1 266 1 0 74 RATE FOR PERSONNEL CLASSIFICATION $104.00 $104.00 $72.00 s83.00 $49,00 $39.00 TOTAL COSTS Sy PERSONNEL CLASSIFICATION i#S.00 530180 t5,904 S14 088 t3 920 tllt6 Total Engineering and No $62,168 Travel Motel Meals Rentals Copies Software Estimated Direct Expenses $3,600 $900 $600 $00 $500 S1,ao0 Total Direct Casts: $7,700 Estimated Fees: $69,868.00 Contingency: 0% $0.00 Total Estimated Fees: $49,868.00 i k f i l P;1Project ManagementtEngineering Estimates12008 Electrical Master Plan Proposal Cost Esumate.x)sx 3 013