HomeMy WebLinkAbout9 Sierra Pacific Agreements Agenda Item # 9 Public Utl ACTION To: Board of Directors From: Joe Horvath Date: October 15, 2008 Subject: Authorize Agreements with Sierra Pacific for Underbuild Circuit Design and Pole Contacts 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required to enter into a Pole Contact Agreement with Sierra Pacific Power Company (Sierra Pacific) for the District's planned Donner Lake Circuit No. 3 feeder, the majority of which will be underbuilt on Sierra Pacifies transmission line. Board approval is also required for Sierra Pacific to provide engineering design services to the District for the section of Sierra Pacific's transmission line containing the District's underbuilt circuit. 2. HISTORY The approved FY08 budget includes capital projects necessary for the improvement of the District's electrical system. One of these capital projects is the new Donner Lake Circuit No. 3 feeder. The Donner Lake Circuit No. 3 feeder is a new 12.47kV distribution feeder that will originate at the District's Donner Lake Substation and connect to the Tahoe Donner area. This new feeder will be approximately 12,000 feet long and is planned to be underbuilt on 2,000 feet of the District's existing 60kV transmission line and 10,000 feet of Sierra Pacifies existing 60kV transmission line. Design efforts are in progress for the District-owner portion of this new feeder. For the portion to be underbuilt on Sierra Pacific's transmission line, the District has been in discussions with Sierra Pacific since November, 2007. The attached Pole Contact and Engineering Services Agreements are the result of those discussions. 3. NEW INFORMATION The right for the District to construct a 10,000 foot long District-owned underbuild circuit on Sierra Pacific's transmission line has been approved by Sierra Pacific subject to the attached Pole Contact and Engineering Services Agreements. Costs to the District include a one-time payment of $5,000 to Sierra Pacific for the right to use their facilities, engineering fees estimated to be $31,939 payable to Sierra Pacific, and construction costs estimated to be approximately $600,000. Construction of this new circuit is anticipated to occur in 2009. Authorization for construction is not included as part of this action. In addition, the District must also make payment to Sierra Pacific for a tax liability incurred by Sierra Pacific in allowing joint use of their facilities by the District. The act of constructing, upgrading and/or improving Sierra Pacific-owned facilities for the purpose of accommodating their joint use by the District results in a non-cash contribution to Sierra Pacific. The value of this non-cash contribution triqqers an income tax liability to Sierra Pacific under the 1986 Federal Tax Reform Act and is thus subject to a tax "gross up" in accordance with California Public Utilities Decision No. 87-09-026 issued in Investigation No. 86-11-019. The 2009 California tax "gross up" rate for distribution facilities (less than 69kV) is 28% of construction costs. Therefore if construction costs for this new underbuild circuit total $600,000, then a payment of $168,000 will be due to Sierra Pacific after construction is complete. 4. FISCAL IMPACT The source of funding for the new Donner Lake Circuit No. 3 feeder is Facilities Fees as this is an approved Electric System Master Plan Project for providing increased electrical capacity and improved reliability. Sufficient funds exist in the Electric Facilities Fees account to cover the monies due Sierra Pacific and future construction costs. The cost breakdown for the Pole Contact Agreement and the Engineering Services Proposal with Sierra Pacific is as follows: Pole Contact Agreement Fee $5,000 (Facility Fees) Engineering Services Agreement $31,939 (Facility Fees) Tax Liability Payable to Sierra Pacific - 28% of Construction Costs (Facility Fees) Authorization to construct this new distribution feeder is anticipated to be brought to the Board for action in the spring of 2009. Authorization to make payment to Sierra Pacific for the tax liability issue is anticipated to be brought to the Board for action in the fall of 2009 after actual construction costs are known. 5. RECOMMENDATION That the Board approve the Pole Contact Agreement with Sierra Pacific and authorize the Board President to sign the Agreement including payment of a one-time charge of $5,000 for use of Sierra Pacific's facilities with the funding sources as noted above. That the Board approve the Engineering Services Agreement with Sierra Pacific and authorize the Board President to sign the Agreement including a payment of $31,939 for estimated engineering and design fees with the funding sources as noted above. Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager POLE CONTACT AGREEMENT BETWEEN SIERRA PACIFIC POWER COMPANY AND TRUCKEE DONNER PUBLIC UTILITY DISTRICT This Pole Contact Agreement("Agreement") is entered into as of the date of execution by and between Sierra Pacific Power Company, a public utility organized and existing under the laws of the State of Nevada ("Sierra"), and Truckee Donner Public Utility District, a public utility organized and existing under the laws of the State of California ("TDPUD"), each being a "Party" hereto and said entities collectively being sometimes referred to as "the Parties"; RECITALS WHEREAS Sierra owns and controls power poles, overhead power lines, easements and related personal and real property which is suitable for the placement of TDPUD distribution facilities. WHEREAS TDPUD and Sierra are electric utilities providing similar electric services to customers in their respective service territories. WHEREAS the Parties recognize there to be economic, environmental, and aesthetic benefits for TDPUD to underbuild(attach distribution circuits under Sierra's transmission circuits)on Sierra's power poles in lieu of purchasing and installing new power poles. WHEREAS TDPUD shall not serve customers in Sierra's service territory through the use of any right granted to TDPUD by this Agreement. WHEREAS the Parties are entering into and desire to execute an Agreement in which Sierra shall grant to TDPUD a license to use Sierra's power poles, or the replacements thereof, for the installation and maintenance of the wires and necessary equipment for a 3 phase 12.47kV distribution feeder along Sierra's#607 60kV transmission line that connects TDPUD's Donner Lake and Tahoe Donner Substations. 1 the section of Sierra's #607 60kV transmission line described below and as shown on Exhibit "A"attached to and made part of this Agreement, or the replacements thereof, that connects TDPUD's Donner Lake and Tahoe Donner Substations. Begin: First wood pole on the east side of Donner Lake Road, Bearings 39' 19' 46.93"N 1200 17' 08.48"W Elevation 6293 ft. End: First wood pole on the east side of Ski Slope Way, Bearings 39' 20' 21.44"N 1200 15' 12.59"W Elevation 6769ft. Section 2.2. Term of Agreement: This Agreement shall be effective from the date of its execution by both Parties and shall continue for forty (40) years thereafter. Upon expiration of forty(40) years from the date of execution, this Agreement shall remain in effect and may be terminated by either Party, its successors in interest or assigns, one-hundred-eighty(180) days after written notice of termination is given to the other Party. Section 2.3. Payment for Use of Facilities: TDPUD shall pay to Sierra, within thirty (30) days of full execution of this Agreement and prior to TDPUD installing its power circuits and attachments, a one time charge in the amount of five thousand dollars ($5,000) for the use of Sierra's power poles shown on Exhibit A. Sierra shall remain sole owner of the Joint Poles throughout the term of this Agreement. Section 2.4. Installation and Use of Circuit: TDPUD is responsible for all costs for engineering, designing and installing any distribution Power Circuit to be attached to the Joint Poles. TDPUD may elect to contract the installation of the distribution Power Circuit to Sierra or to an otherwise qualified electrical contractor acceptable to Sierra. TDPUD shall own and operate the distribution Power Circuit so installed. TDPUD shall reimburse Sierra within thirty (30) days of receipt of invoice for any actual and direct costs Sierra incurs for work approved in writing in advance by TDPUD pursuant to this section, including labor and overhead expenses. Section 2.9. Removal of Equipment: Within sixty(60)days after the effective date of termination pursuant to Section 2.2, TDPUD shall remove all Power Circuits and Attachments. In the event of TDPUD's failure to remove Power Circuits and Attachments within said period, Sierra may remove the same at the sole expense of TDPUD. Section 2.10. Upgrade, Replacement or other Required Modifications of Power Poles and Associated Facilities: TDPUD and Sierra acknowledge that power poles and related facilities to which TDPUD desires to attach its distribution Power Circuits as an"underbuild" may require modification, improvement and/or replacement to accommodate the additional distribution Power Circuits. The Parties also acknowledge that changes or improvements in Sierra's facilities may be required in the future to accommodate modifications that might be made by TDPUD at some future date to the distribution Power Circuits TDPUD desires to attach to Sierra's power poles. Any such upgrades, modifications or replacement of facilities will be made in accordance with the following provisions: Section 2.10.1. Facility Standards: All facilities owned by Sierra and jointly used by TDPUD as a result of this Agreement will be designed, constructed, operated and maintained in accordance with Sierra's standards and be consistent with all applicable rules and regulations of the State of California. Section 2.10.2. Cost Responsibilities: In the event Sierra-owned facilities that are to be jointly used by TDPUD require upgrades or replacements to accommodate such use, the cost of such upgrades or replacements will be borne solely by TDPUD. TDPUD shall also obtain and is responsible for, at its own expense, any and all necessary rights of way(easements), permits, fees, rents, or otherwise, required for TDPUD to access, mobilize, demolish, change, construct, attach, repair, modify, maintain and de-mobilize as required to complete the purposes of this Agreement. TDPUD shall indemnify, defend and hold harmless Sierra from any and all claims asserted against Sierra related to the acquisition or non-acquisition of such rights of way(easements), permits, fees, rents or otherwise. Such indemnity includes all legal fees and costs incurred by Sierra to defend any such claims. in TDPUD's total cost and shall be collected by Sierra. The current tax gross up rates for California depreciable property are .15 (151/0) for Transmission (greater than 69 kV) and .17 (17%) for Distribution (less than 69 kV). The current tax gross up rate for California non-depreciable property is .538 (53.80NO). These rates will change January. 1, 2009. Section 2.11. CPUC Governance: This Agreement is subject to any changes or modifications the California Public Utilities Commission may require. ARTICLE THREE: INSURANCE Section 3.1. The Parties agree to maintain insurance sufficient to cover any risk created by this Agreement including but not limited to Commercial General Liability containing a contractual liability endorsement, Auto Liability, Workers Compensation and Employers Liability. The above insurance policies shall provide such limits as are carried by similarly situated electric utilities. This Section (Section 3) of this Agreement may be opened for re- negotiation by either Party at any time. ARTICLE FOUR: LIABILITY Section 4.1. Personal Iniury or Death of Employee: Liability for injury to or death of an employee of either Party arising out of the field inventory, installation, maintenance, use, relocation, dismantling, abandonment, or removal of Joint Poles or Attachments will be borne by the Party-employer. The Party-employer will defend, indemnify, and hold harmless the other Party against liability. Section 4.2. Personal Injury or Death of Non-Employee; Property Damage: Subject to Section 4.1 above, any liability for the death or personal injury of a non-employee of either Party, and for loss, destruction, or damage to property, including the property of the Parties, arising out of the field inventory, installation, maintenance, use, relocation, dismantling, t performed in accordance with Sierra's Switching and Operating Procedures and prevailing industry standards. Section 5.2. Maintenance: TDPUD at its own risk and expense shall place, maintain, and keep in good condition, its own Power Circuits and Attachments upon Joint Poles. TDPUD shall be responsible for tree trimming necessary for the operation of its own Power Circuits. TDPUD and Sierra will share equally the cost of maintaining(which includes operating, repairing and replacing as necessary)and testing Joint Poles. Section 5.3. Repair: Section 5.3.1. TDPUD, at its own risk and expense, shall repair its own Power Circuits and Attachments upon Joint Poles, and will promptly replace or repair any of its defective Power Circuits and Attachments when notified to do so by Sierra. Upon written notification from Sierra, TDPUD shall have fourteen (14) days to perform the necessary repairs or replacements to its Power Circuits and Attachments. Section 5.3.2. When, in the course of operations, Sierra must make repairs to Joint Poles or to its own Attachments on the Joint Poles, and TDPUD's Power Circuits and Attachments also require repairs, which Sierra performs on an emergency basis or because TDPUD failed to perform the repairs within fourteen(14)days after written notice, TDPUD will be responsible for the cost associated with repair of the Power Circuits or Attachments owned by TDPUD. Section 5.3.3. If repair to Power Circuits or Attachments on Joint Poles is necessary due to damage caused by neither Party, the cost of repair will be borne solely by the Party owning the Power Circuits or Attachments in need of repair. Section 5.3.4. If repair to Joint Poles or Attachments is necessary due to damage caused by either Party, the cost of repairs shall be borne solely by the Party responsible for the damage. Section 5.3.5. If repair to Joint Poles is necessary due to damage caused by neither Party, each Party will share equally in the cost of the repairs. y Section 7.2. Assignment Of Agreement This Agreement is made for the benefit of the successors and assigns of the Parties, and will bind the successors in interest and assigns of Sierra and TDPUD. Neither Party will assign any or all rights under this Agreement without the prior written consent of the other. Such consent will not be unreasonably withheld. Section 7.3. Entire Agreement. Together with the Exhibits, this Agreement constitutes the entire agreement between the Parties with respect to the subject matter of the Agreement. All prior agreements, representations, statements, negotiations, and understandings with respect to the subject matter of this Agreement are superseded by this Agreement. Section 7.4. Modification. This Agreement may be modified only by a written agreement executed by both Parties. Section 7.5. Severability. If any part of this Agreement is held invalid by a regulatory body or court of competent jurisdiction, the remainder will remain in full effect if and to the extent that continued enforcement of the remainder will not frustrate the Parties' essential objectives as expressed herein, and will not deny one Party a material benefit bargained for in this Agreement. Section 7.6. Choice of Law. This Agreement will be governed by, construed and enforced in accordance with the laws of the State of California, without regard to the conflict of law rules of that state. Section 7.7. Survival of Indemnities. All indemnities in this Agreement will survive the expiration or other termination of this Agreement for any reason and any investigation made by any Party. Section 7.8. No Waivers. Failure by either Party to object to or to exercise its rights with respect to a default by the other Party shall not constitute a waiver of the right to later object to or exercise its rights with respect to the same default, and shall not be deemed to amend the provisions of this agreement. Section 7.9. Multiple Originals. Two (2) originals of this Agreement will be executed by the Parties. Counterparts shall constitute the same, single instrument. 11 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement on this day of 12008. TRUCKEE DONNER PUBLIC UTILITY DISTRICT SIERRA PACIFIC POWER COMPANY By: By: Name: Name: Title: Title: Date: Date: 13 Erl y CEP 2 3 Sierra Pacific POWER COMPANY www.sieffapacific.com Gregory P.Lambert Major Accormtr Executive 6100 Neil Road,P.O.Box 10100'Mail Code S2A41 Reap,Nevada 89520-0024•Phone:775.834.5247•Fax:775.834.5778•E-Mail:glamben@ sppc.com September 22, 2008 Mr. Joe Horvath Electric System Engineer Truckee Donner PUD P.O. Box 309 Truckee, CA 96160 Re: Truckee Donner PUD 607 Line 60kV Rebuild Project Dear Steve: Sierra Pacific is prepared to begin work on the project to (1) construct approximately two miles of Sierra owned 60kV transmission line connecting TDPUD's Donner Lake and Tahoe Donner Substations and (2) install the District's 3 phase 12.47kV distribution feeder as an underbuild circuit along Sierra's line. This work is being requested by TDPUD to accommodate its plans to upgrade the District's electric system in the area. Based on the information provided by TDPUD regarding the project's requirements and scheduling needs, Sierra is prepared to begin the planning, design and engineering phase of the project after it has received your authorization to proceed and your advance payment in the amount of$31,939 to cover the costs associated with these activities. An overview of the proposed project is provided in the sections that follow. Scope of Project The project involves the planning, design and construction of approximately two miles of Sierra's 60kV transmission line that connects TDPUD's Donner Lake and Tahoe Donner Substations and the installation of TDPUD's 3 phase 12.47kV distribution feeder as an underbuild circuit along Sierra's line. The starting point for the underbuild on the 607 line is to be the tap pole for the District's Donner Lake Substation tap line {just south of I-80 next to Donner Lake Rd) and the end point is where the 607 line crosses Ski Slope Way in the Tahoe Donner Subdivision, a distance of approximately 10,000 feet. The exact extent of the work to be performed, as well as the cost and project schedule, will be known with a greater degree of certainty and will be reviewed with you, after the planning, design and engineering phases of the project have been completed. c Taxability The act of constructing, upgrading and/or improving Sierra-owned facilities for the purpose of accommodating their joint use by TDPUD has been determined to result in a non-cash contribution to Sierra, the value of which triggers an income tax liability to Sierra under the 1986 Federal Tax Reform Act and is thus subject to a tax gross up in accordance with California Public Utilities Decision No. 87-09-026 issued in Investigation No. 86-11-019. This tax gross up shall be included in TDPUD's total cost and shall be collected by Sierra. The current tax gross up rates for California depreciable property are .15 (15%) for Transmission (greater than 69 kV) and .17 (17%) for Distribution (less than 69 W). These rates will change effective January 1, 2009, to .24 (24%) for Transmission(greater than 69 kV) and to .28 (28%) for Distribution(less than 69 W). The tax gross- up rate applied will be the one in effect at the time the project is completed. Invoicing and Payment Procedures Regarding the process of paying for costs incurred by Sierra as a result of its activities on this project, TDPUD will be asked to submit to Sierra an advance payment in the amount of$31,939 to be applied against expenses incurred by Sierra during the planning, design, and engineering phases of the project. These expenses are listed on page 2 of 2 of the accompanying Project Estimate and are identified as shown below. Drafting $ 2,904 Civil Engineering $ 22,399 Surveying $ 3,318 Lands 3,318 TOTAL $ 313939 Should any portion of this advance not be spent, the amount remaining will either be refunded to TDPUD,or will be applied against other expenses incurred by Sierra during the construction phase. If TDPUD chooses to have Sierra construct the new line, prior to the purchasing of materials and the actual start of construction, a second payment will be requested to pay for"total stores" and/or other "voucher"or material costs that will be incurred by Sierra. Should TDPUD choose to construct the new line, Sierra will require that one of its inspectors be on- site to view the construction activities and ensure the line is built to Sierra's standards. The cost associated with this function, which is to be borne by TDPUD, is estimated to be$14,518 and will be billed to TDPUD after the project is completed. As discussed earlier, after the project has been completed, estimated costs will be adjusted to reflect actual costs incurred and an invoice will be submitted to TDPUD for payment within 30 days after the date of the invoice. The net amount due will be calculated based on all available cost information and invoices at the time the project is completed and will be subject to a final adjustment after Sierra has finished its normal internal audit and review of the project's cost components, a process that takes approximately ninety(90) days to complete. Once this process has been concluded and approval has been given to the project and all of its costs, the final result will be compared against the total amount paid by TDPUD. If necessary, an adjustment will be made in the form of either a refund to TDPUD or a request for payment of the additional charge due. 3 PROJECT ESTIMATE PAGE 1 OF 2 ("4/4 PROJECT TITLE: Truckee Donner PLED 607 Line 60kV Rebuild DESCRIPTION: =':;onstr uct approx. 2 miles of new 6ukV line;pith d ist, underbLdd. JOB LENGTH: 1.89 Flex ESTIMATOR: 1`01k_e Braithwaite SPPCO STOCK MATERIAL OUANTITY REO'D UNIT PRICE TOTAL COST J197.5 AA Cantina Corduc*or 30,900 ft. $0.92 $28,514 60kV Target Structure 25 ea. $9,000 $225,000 60kV Dead End Structure 9 ea. $10,500 $94,500 Material contingency 10% $34,801 TOTAL STORES COST: ' ' „i,,,, ov.r,..,, ., ,y<,. .s,!„,,,mow,,, r,,,,..!i..,, „, ,. ✓/,,.,,.,..i.✓ni ;,. ,,„ !;� .i,r,c VOUCHERS: MATERIALS QUANTITY REO'D UNIT PRICE TOTAL COST None 0 ea. $0 $0 TOTAL MATERIAL VOUCHERS: CONTR LABOR & MISC QUANTITY REO'D UNIT PRICE TOTAL COST "Jew Expenses $0 $0 Equipment rr:ntai t 3, $0 $0 Misc vouchers 1 -`�• $0 $5fi9 TOTAL MISCELLANEOUS VOUCHERS: TOTAL VOUCHERS 69