Loading...
HomeMy WebLinkAbout8 Tahoe Donner Enclosure bid Agenda Item # 8- x?� DistrictPublic Utility CONSENT To: Board of Directors From: Sanna Schlosser Date: December 03, 2008 Subject: Award Control Enclosure Bid for Tahoe Donner Substation. 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can approve bid awards over $15,000. 2. HISTORY This material purchase is required for the Tahoe Donner Substation Rebuild Project. The Control Enclosure is an integral part of these substation improvements. The Board of Directors awarded the engineering contract for this project in November 2007. The bid period began on October 20, and ended on November 20, 2008. 3. NEW INFORMATION The District received 3 bids by the deadline. A summary of the bid information is attached. Electrical Power Products (EP2) submitted the lowest responsive bid. Our consultants have confirmed that the materials specified comply with District requirements. 4. FISCAL IMPACT The FY08 Capital Budget includes $193,081 for this project, funded by rates. 5. RECOMMENDATION Award the bid for one Control Enclosure assmbly to Electrical Power Products in the amount of $162,254, not including taxes. b. Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager Control Enclosure Bid Opening 20-Nov 1400 Manufacturer Bid Bond Non-Collusion Price Delivery Date Exceptions Electrical Power Products yes yes $162,254.00 22-24 weeks Keystone Electrical yes yes $179,536.34 July 15, 2009 AZZ/Carter and Crawley es no $180,510.88 July 15, 2009 a 10% Exceptions: a. No non-collusion affidavit Bid is non-responsive