Loading...
HomeMy WebLinkAbout2008-12-17 Agenda Packet - Board (21) Agenda Item # 7 Public Utility District PUBLIC HEARING To: Board of Directors From: Neil Kaufman Date: December 17, 2008 Subject: Public Hearing of CEQA Initial Study for 2009 Pipeline Replacement Project: Tahoe Donner 1. WHY THIS MATTER IS BEFORE THE BOARD This matter involves conducting a public hearing to receive written and oral input from members of the public regarding adoption of an environmental study and mitigated negative declaration for the proposed 2009 Pipeline Replacement Project: Tahoe Donner. 2. HISTORY In 2005 and 2006, the Water Department made Board presentations regarding the condition of existing water pipelines and the need to pursue a pipeline replacement program. The District subsequently issued a COP in 2006 and dedicated a portion of those funds for the pipeline replacement program. Pipeline construction projects have been undertaken during 2006, 2007 and 2008 as part of this program. The planned 2009 pipeline construction covers about 17,400 feet of pipeline, all of which is located in the Tahoe Donner area. These pipeline alignments are shown on Figure 1. A number of these pipeline alignments involve replacement of the existing pipe with a new pipe of the same size. These pipelines are Categorically Exempt from review under CEQA. However, some of the existing pipelines are too small and need to be upsized. These pipelines require a CEQA review. On September 17, 2008, the Board approved a contract with Inland Ecosystems to perform the CEQA Initial Study. The Water Department made a presentation to the Board regarding the need to conduct an environmental review of the Initial Study for the 2009 Pipeline Replacement Project. The Board reviewed the CEQA documents and scheduled this public hearing at the November 19, 2008 regular meeting. The current project schedule is given below: January 7, 2009 -Adoption of Final CEQA Document January 2009 - Begin Advertising for Bids February 2009 - Open Bids & Award Contract May 2009 - Begin Construction 3. NEW INFORMATION The public hearing has been noticed as required by law. The thirty day comment period will expire on January 1, 2009. 4. FISCAL IMPACT There is no fiscal impact associated with this item. 5. RECOMMENDATION C c th p blic hearing and receive comment from the public. Ed Taylor Michael D. Holley Water Utility Manager General Manager