Loading...
HomeMy WebLinkAbout15 Purchase Portable Backup Generator-ms 011 TRUCKEE DONNE - AGENDA ITEM #15 Public MEETING DATE: July 6, 2022 TO: Board of Directors FROM: Chad J. Reed, Water Utility Director SUBJECT: Consideration to Purchase Emergency Backup Generator APPROVED BY Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a purchase agreement with Holt of California to purchase a 400kW portable emergency backup generator in the amount of $287,765.00 plus any additional taxes and fees. BACKGROUND: The Truckee Donner Public Utility District is solely fed by 11 active groundwater wells. These wells require electrical power to pump water and this power can be interrupted at any time. Historically these interruptions have occurred primarily during extreme winter snow events. However this has recently changed with the introduction of NV Energy's Public Safety Outage Management (PSOM) protocols, creating the potential for prolonged outages triggered by high fire risk weather conditions (temperature, winds, humidity, and fuel moisture). When the power is interrupted, ground water is only produced at well locations equipped with backup generation. Currently the District has backup generation installed at 3 of the 11 District wells. Reliability in the water system is extremely important in preserving public health and safety. One key component in system reliability is maintaining sufficient water storage levels for potable water service and adequate fire flow protection. Equipping additional groundwater wells with emergency backup generation will further enhance the District's ability to maintain sufficient water storage levels during a prolonged power outage event. The District has rented a backup generator for the past two summers with this year's cost estimated at nearly $30,000 for the three months that a PSOM event is most likely to occur. Staff is recommending a rental unit be secured for the 2022 fire season. Page 1 of 3 ANALYSIS/BODY Staff has been informed by several vendors that procurements for large generators are experiencing relatively long lead times. In most cases, the availability of a 400kW generator includes lead times in excess of 72 weeks. These long lead times are due to the shortages being experienced across several different industries. Holt of California CAT recently advised staff that a 400kW generator meeting District specifications has been made available. Since this equipment is already in production due to an order cancelled by another agency, the District has been presented the opportunity to significantly reduce lead times with an estimated delivery in December of 2022. One of the fundamental tenets of the District's mission statement is to "provide reliable, high quality utility and customer service." This generator will increase the water department's reliability by being able to pump more ground water during power interruptions. The available generator unit is in a mobile configuration, adding potential flexibility and redundancy to the District's current generator inventory. Sourcewell has identified Caterpillar Inc. as a competitive bidder for diesel & natural gas generators, parts and maintenance, through an RFP process. Section 3.08.060 of the District Code states: "The District may purchase materials, equipment, supplies, information technology products and services through the State of California procurement program and jointly with other public agencies"... By utilizing a joint procurement, staff believes we can achieve an overall price that is lower than the District can obtain through other purchasing channels. The overall savings to the District comes in the form of reduced administrative and advertising costs associated with the bidding process and by Sourcewell having negotiated a price relative to the market. Goals and Objectives: This item is in support of the following goals and objectives: District Codel.05.020 Objectives: 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. Strategic Goals: 1.Manage for Financial Stability and Resiliency. FISCAL IMPACT: The generator purchase of $287,765.00 plus any additional taxes and fees is not in the current Budget for FY22/FY23. Staff estimates $94,437 in grant funds can be utilized Page 2 of 3 from the current generator grant of $300,000. The remaining $193,328 plus additional taxes and fees are recommended to funded from water operating reserves. The water operating reserve as of December 31, 2021 was $5.24 million and exceeded policy target 2021 balance by $340,000. Including this use of operating reserves in 2022, the forecasted 2022 year-end operating reserve balance is $5.7 million and would exceed policy target 2022 balance by $170,000. Utilizing operating reserve excess balance is simplified recommended option, as compared to essentially the same similar option of: transferring the excess balance to capital reserve and then utilizing capital reserves for this expenditure. ATTACHMENTS: None. Page 3 of 3