Loading...
HomeMy WebLinkAbout11 Payment to the Town of Truckee for Water Infrastructure Associated with the Town's 2021 Paving and Drainage Project AGENDA ITEM #11 Public Utility District m MEETING DATE: December 6, 2023 TO: Board of Directors FROM: Earl Smith, Water Operations Manager Chad Reed, Water Utility Director SUBJECT: Consideration of Payment to the Town of Truckee for Water Infrastructure Associated with the Town's 2021 Paving and Drainage Project. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to remit payment to the Town of Truckee for the total District expenditure of$111,700.00 plus a ten percent change order allowance for a total authorization not to exceed $122,870.00. BACKGROUND: Each year, the Town of Truckee Public Works conducts annual paving projects in select areas throughout the Town limits. The Town engages in a publicly advertised bidding process and awards the annual paving contracts to the lowest responsive bidder. For the 2021 Paving and Drainage Project, the Town of Truckee awarded a contract to Sierra Nevada Construction. The scope of work included paving and drainage improvements along sections of the following town right-of-ways: Central Truckee: • Donner Pass Road • Truckee Way • Comstock Drive • Brockway Road Glenshire : • Donnington Lane • Woodbridge Court • Wiltshire Lane • Somerset Drive Page 1 of 3 Page 14 of 85 Tahoe Donner: • Hillside Drive • Alder Creek Road • Ski Slope Way • Slalom Way • Snowpeak Way • Rhineland Avenue • Davos Drive ANALYSIS AND BODY: Included as an option in the scope of work and itemized in the Town of Truckee 2021 Paving and Drainage Project bid package, is the repair and resetting to grade of the District's water utility valves and utility boxes that lie within the Town's right-of-way and project boundaries. Following the public bidding process, the Town of Truckee Department of Public Works provided the District with the option of assigning to the awarded contractor the responsibility of resetting water utility valves and utility boxes to grade, at the District's expense, or utilizing District labor to perform the work. After evaluating the associated costs and availability of water department labor, staff determined it to be in the best interest of the District to execute the option in the contract to have Sierra Nevada Construction perform the task of resetting District water valves and utility boxes to grade in the 2021 Paving and Drainage Project at the District's expense. The 2021 Paving and Drainage Project items to be expensed to the District include: Bid Item Description Qty Unit Cost Total Item #12 Adjust water valve cover to 143 $700.00 $100,100.00 grade Item #15 Adjust utility box cover (4'x6') 4 $2000.00 $8000.00 Item #16 Adjust utility box cover (2'x3') 3 $1,200.00 $3,600.00 GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Take the best of private sector thinking to modernize the utility and add value to our communities. Page 2 of 3 Page 15 of 85 FISCAL IMPACT: This project is in response to the District's responsibility to maintain utility infrastructure within the public right of way and is dependent upon the execution of roadway maintenance projects managed by the Town of Truckee. For this reason, the project costs for the District were largely unknown until the Town fully executed the competitive bidding process. This procurement was not included in the Board's approved FY21 Water Operations Budget, however sufficient funds for this project are available in the Water Utility's operating reserve. The Water Utility operating reserve balance as of 12/31/2022 is $7.68M. ATTACHMENTS: None Page 3 of 3 Page 16 of 85