HomeMy WebLinkAbout#10 Amend District Code Agenda Item # 10
-' TRUCKEE
Public Utility District
ACTION
To: Board of Directors
From: Stephen Hollabaugh
Date: December 02, 2009
Subject: Consideration of Adopting an Ordinance to Amend Schedule NM,
Net Metering and Resolution to Amend District Code, Title
7.64.020.3 (B).
1. WHY THIS MATTER IS BEFORE THE BOARD
The Board must adopt an ordinance to revise the Net Metering and a resolution to
revise District Code, Title 7 Electric Services.
2. HISTORY
The Board of Directors has set Goal 5.3 in its Mission Statement that states the
District will support a program of distributed generation within its service area.
Staff presented to the Board, at the October 21, 2009 meeting a change in the
language of the ordinance from the month of May to the month of March.
On June 4, 2008, the Board adopted a Resolution to change Net Metering from
Domestic-NM to NM. When the ordinance was revised, the following language was
also included:
This evaluation and reconciliation for electricity used or generated may be
standardized by the District for the 12 month billing period ending with the May billing,
rather than using each customer's respective anniversary month."
As part of the District code review, a Net Metering Chapter was added to Title 7,
Electric Service. This chapter also included the statement above.
3. NEW INFORMATION
This action item to consider authorizing the change to the ordinance, Schedule NM,
Net Metering is scheduled for after the public hearing.
The following language is proposed to be changed in the Net Metering and the District
code Title 7, Electric Services:
This evaluation and reconciliation for electricity used or generated may be
standardized by the District for the 12 month billing period ending with the March
billing, rather than using each customer's respective anniversary month."
Attachment 1 is an Ordinance amending the current Net Metering Ordinance, and
Attachment 2 is the Resolution adopting the amendment to District Code Title 7,
Electric Service.
4. FISCAL IMPACT
There is limited fiscal impact, expected to be less than $1,000 annually to the District
due to the proposed change.
5. RECOMMENDATION
a) Adopt Schedule NM and approve Ordinance No. 2009-xx rescinding Ordinance No.
2008-06.
b) Approve a Resolution to adopt the same language as approved in the ordinance
within the Net Metering Chapter in Title 7, Electric Service.
Stephen Hollabaugh Michael D. Holley
Assistant General Manager General Manager
Attachment 1
3v
RUC
DONNER
Public Utility District J
399&� a
Ordinance No. 2009 - XX
Adopting Schedule NM, - Net Metering and
Rescinding Ordinance No. 2008-06
APPLICABILITY
Applicable to residential or commercial customers eligible for service where a part or all of the
electrical requirements of the customer can be supplied from a solar or wind power production source
owned and operated by the customer, where such source is connected for parallel operation with the
service of the District and where such source is located on the customers premises and is intended to
offset part or all of the customers electrical requirements.
This schedule provides rates, terms and conditions for the sale of energy by the District. Prices, terms
and conditions for the purchase of net energy transmitted by the customer to the District are included
herein for reference only. Such prices, terms and conditions and the terms of inter-connection and
parallel operation are outlined in the generation agreement required for service under this tariff. The
purpose of this tariff is to facilitate terms of service to customers with solar or wind power production
systems of not more than one megawatt.
Applicability of this tariff does not extend to customers whose solar or wind power production source
exceeds 1000 kilowatts or one megawatt.
TERRITORY
The entire area served by the Truckee Donner Public Utility District electric system.
RATES
Customer charge Same as applicable residential or commercial customer charge.
Energy charge On the residential or commercial energy rate applicable to that customer.
Net energy credit All kilowatt-hours, per kilowatt-hour—the net energy credit will be computed at
a rate for payment equal to the monthly average non-firm energy price the
District pays during the applicable billing month.
SPECIAL CONDITIONS
(a) Generation agreement: A generation agreement with the customer is required for service
under the schedule.
For eligible residential and small commercial customer-generators, the net energy metering
calculation shall be made by measuring the difference between the electricity supplied to the eligible
customer-generator and the electricity generated by the eligible customer-generator and fed back to
the electric grid over a 12-month period. The following rules shall apply to the annualized net
metering calculation:
1. The eligible customer-generator account shall, at the end of the 12-month period following the
date of final interconnection of the customer-generator's system with the District, and at each
anniversary month thereafter, be evaluated and reconciled for electricity used or generated
Ordinance 2009-XX
during that period. The District will determine if the customer-generator was a net consumer
or a net producer of electricity during that period.
A. This evaluation and reconciliation for electricity used or generated may be
standardized by the District for the 12 month billing period ending with the March
billing, rather than using each customer's respective anniversary month.
2. At the end of each 12-month period, where the electricity supplied during the period by the
District exceeds the electricity generated by the customer-generator during that same period,
the customer-generator is a net electricity consumer and the District shall be owed
compensation for the customer-generator's net kilowatt-hour consumption over that same
period. The compensation owed for the customer-generator's shall be calculated as follows:
The net balance of moneys owed to the District shall be paid in accordance with the
normal billing cycle. If the customer-generator is a net producer over a normal billing cycle,
any excess kilowatt-hours generated during the billing cycle shall be carried over to the
following billing period as kilowatt-hour credits according to the procedures set forth in this
section, and appear as a credit on the customer-generator's account. This credit may be
utilized in the following billing cycle if the customer is a net consumer during that cycle. If
the customer is a net generator at the end of each 12-month period, then (3) shall apply.
3. At the end of each 12-month period, where the electricity generated by the customer-generator
during that 12-month period exceeds the electricity supplied during that same period, the
customer-generator is a net electricity producer and the District shall retain any excess
kilowatt-hours generated during the prior 12-month period. The customer-generator shall be
compensated by the District for the excess kilowatt-hours generated at its annual average
non-firm energy price the District pays during the prior 12-month period.
4. If a customer-generator terminates the customer relationship with the District, the District shall
reconcile the customer-generator's consumption and production of electricity during any part of
a 12-month period following the last reconciliation and shall apply only the months since the
most recent 12-month reconciliation.
NOW THEREFORE, BE IT ENACTED by the Board of Directors that effective 30 days from the date
of passage of this ordinance, the District's Schedule Net Metering Tariff, shall become effective and
that Ordinance No. 2008-06 be rescinded.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the
District on the 2"d day of December 2009 by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
President
ATTEST:
Michael Holley, P.E. District Clerk
2 Ordinance 2009-XX
' Amendment 2
I III II IIII II
F f TRUCKEE
DONNER
Public Utility District
UPF
e�. PO :.
0
Resolution No. 2009 - XX
ADOPTING AN AMENDMENT TO THE DISTRICT CODE
TITLE 7, ELECTRIC SERVICE
WHEREAS, the Board of Directors of the Truckee Donner Public Utility District wishes to amend a
Section in District Code Title 7, Electric Service; and
WHEREAS, the District Code provides rules and regulations intended to convey a comprehensive
description of the manner in which the District provides and administers the distribution of electricity to
its customers; and
WHEREAS, the Board adopted a Resolution amending the entire Title 7 on November 5, 2008; and
WHEREAS, on October 21, 2009, the Board scheduled a Public Hearing for December 2, 2009 to
accept public review and comment regarding the month change in the net metering process; and
NOW THEREFORE, BE IT RESOLVED, that the Board of Directors does hereby adopt the amended
language in Section 7.64.020.3(B, Net Metering, Special Conditions:
7.64.020.3(B) This evaluation and reconciliation for electricity used or generated may be standardized
by the District for the 12 month billing period ending with the March billing, rather than using each
customer's respective anniversary month.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District in a
meeting duly called and held within said District on the second day of December 2009 by the following
roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
, President
ATTEST:
Michael D. Holley, Clerk of the Board