Loading...
HomeMy WebLinkAbout8 District Pipeline Replacement Materials Agenda Item # 8 RUCKEE DONNER Public Utility District ACTION To: Board of Directors From: Ed Taylor Date: September 10, 2009 Subject: Consideration of the Purchase of Materials for the District Pipeline Replacement— 2009 — Contract C 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for purchases in excess of$15,000. 2. HISTORY In 2005 and 2006, the Water Department made Board presentations regarding the condition of existing water pipelines and the need to pursue a pipeline replacement program. The District subsequently issued a COP in 2006 and dedicated a portion of those funds for the pipeline replacement program. Pipeline construction projects have been undertaken during 2006, 2007 and 2008 as part of this program. The construction for 2009 entails about 18,000 feet of pipeline and has been broken into three separate construction contracts. • Contract A - Hillside Drive, Solvang Way, Staghorn Road & St. Croix Way • Contract B - Oslo Drive, Sierra Glen Way, Skiview Loop, Snowpeak Way & Tyrol Road • Contract C - Chamonix Road, Donner View Tank site, Innsbruck Tank site, Rhineland Avenue, Skislope Way, & West Reed Avenue The Board awarded Contract C to Cruz Excavating on March 4, 2009 in an amount not to exceed $656,993.00 plus a 10% change order allowance of$65,000. 3. NEW INFORMATION Cruz Excavating has been experiencing significant cash flow issues and has been unable to purchase the materials necessary to complete the work on Chamonix Road. The District has held a number of discussions with Cruz regarding this issue. At this point, it has been determined that the best course of action would be to have Cruz complete the work on Chamonix Road and delete the work on Skislope Way and West Reed Avenue from the contract. In order to complete the work on Chamonix Road, it will be necessary for the District to directly purchase the needed materials from the supplier. The estimated cost of this material is $23,000, including sales tax. Cruz has been purchasing piping materials for the project from Western Nevada Supply. Western Nevada Supply can supply the necessary piping materials and they are available for delivery to the project site once the financial considerations have been addressed. It should also be noted that of the $23,000 total, about $19,000 accounts for the purchase of meter boxes. The meter box specified by the District is manufactured by the Mueller Company and Western Nevada Supply holds exclusive distribution rights for Mueller meter boxes in the Truckee area. Therefore, this is a sole source purchase of materials from Western Nevada Supply. 4. FISCAL IMPACT The estimated cost of the materials necessary to complete the work on Chamonix Road is $23,000, including sales tax. 5. RECOMMENDATION 1) Authorize the purchase of piping materials as needed to complete the work on Chamonix Road from Western Nevada Supply in an amount not to exceed $23,000. 2) Authorize the transfer of funds from the 2006 COP to the Water Department General Fund to cover the cost of the materials. 01 " Ed Taylor Michael D. Holley Water Utility Manager General Manager