HomeMy WebLinkAbout6 SCADA Consultant Agenda Item # 6 DONNERubllc Utility District I ACTION To: Board of Directors From: Ed Taylor Date: July 15, 2009 Subject: Consideration of the Award of a Contract for Consultant Services to Design a New Water SCADA System 1. WHY THIS MATTER IS BEFORE THE BOARD Board authorization is required for expenditures in excess of$15,000. 2. HISTORY At the February 4, 2009 Board meeting, a workshop on the Water System Supervisory Control And Data Acquisition (SCADA) system was held. Discussed at the workshop was the need for one new Water SCADA system to replace the current three completely different SCADA systems. All three old SCADA systems were built in the early 90's, and do not meet current industry standards. The current systems are unreliable and repair parts are becoming unavailable. The new SCADA system will control the delivery of water and operate in the most energy efficient manner. On June 5, 2009, the District issued a Request for Proposals (RFP) for a consultant to evaluate the District needs and design a new system. 3. NEW INFORMATION The RFP is structured in 3 phases. Phase 1 is the collection of system information of District needs, evaluation of communication system for a new water SCADA system, and investigation into the use of the existing Electric system SCADA servers and software as a possible option. Phase 2 is to design and prepare specifications and cost estimates for a new Water SCADA system to include Remote Terminal Unit's (RTU) software, main system, and communication equipment. Phase 3 is to manage and/or perform the installation, programming, integration and training of District staff to include RTU's, software, main system, and communication equipment. The District received 5 proposaIs in response to the RFP. The firms are Carollo Engineering ECO:LOGIC DLT&V Westin Engineering JSP Auto A staff review committee of four met and evaluated the proposals. Based on the technical proposals Carollo Engineering was ranked highest, ahead of (in order) ECO:LOGIC, DLT&V, Westin Engineering, and JSP Automation. The conclusion from the review is Carollo Engineering has the expertise in SCADA systems and communication systems that meet the needs of the District. FIRM SCORE COST (Phase 1, 2 & 3) Carollo Engineering 84.3 $384,930 ECO:LOGIC 72 $340,000 DLT&V 68.3 $363,862 Westin Engineering 68 $430,093 JSP Auto 53.6 $188,530 Staff is recommending the award of Phases 1 and 2 at this time. The need for Phase 3 will depend on the outcome of Phases 1 and 2. 4. FISCAL IMPACT This project is funded with the 2006 COP. Sufficient funds exist for the project. 5. RECOMMENDATION Award a contract to perform the SCADA Study for Phases 1 and 2 to Carollo Systems LLC in an amount not to exceed $335,500 which includes a change order allowance of 10%, r $30,5 Ed Taylor Michael D. Holley Water Utility Manager General Manager