To: Board of Directors
From: Steven Poncelet
Date: July 01, 2009
Subject: Update on the TDPUD Water Wise Demonstration Garden
1. WHY THIS MATTER IS BEFORE THE BOARD
This workshop item is a review of the draft design and bid specifications of the
TDPUD Water Wise Demonstration Garden.
2. HISTORY
Landscaping and irrigation water use are becoming increasingly important as the
District moves from a flat water rate to a new rate structure where customers pay for
the water that they use. The impact on irrigation use on water bills has been
discussed often during the Water Meter Project and during the water rate workshops.
To help customers manage their irrigation water use, and to provide 'water-wise'
alternatives, the District in FY08 began the TDPUD Water Wise Demonstration
Garden project. This garden, located at the District's main office, will include a lawn
replacement with a bunch grass/dry stream bed design, native and drought tolerant
vegetation, and water-efficient irrigation. The project include informational signage on-
site and the full garden design, plant lists, and where to source these items will be
posted on the TDPUD website.
3. NEW INFORMATION
The preliminary design of the demonstration garden and the information required to
procure the plants, materials, irrigation equipment, and installation of the garden is
complete and attached for review and comment. The attached information includes:
Sheet 1 shows a site reference which defines the four areas of the garden (Areas 1, 2,
3, & 4); Sheet 2 is a Demolition Plan to be completed prior to the installation of the
garden; Sheets 3, 4, & 5 are the Planting Plans and a Plant List is also attached;
Sheets 6, 7, & 8 are the Hardscape and Grading Plans; Sheet 9 is the Irrigation Plan
and we do plan to include a smart water controller in this project; and Sheet 10 is the
Planting Details. Not included in this package is the detailed material lists (other than
the plant lists) and the full installation specifications which will be finalized after Board
feedback and direction.
The current plan is for the District to procure the plants, materials, and irrigation
equipment as per our purchasing requirements. The installation of the garden will go
through a public works bid process and is anticipated to be brought to the Board for
approval at the regularly scheduled August 5th Board meeting.
4. FISCAL IMPACT
Sufficient funds existing within the approved FY09 budget for this project. There is no
fiscal impact associated with this workshop item.
5. RECOMMENDATION
Receive this report and provide comments and direction.
Steven Poncelet Michael D. Holley
Public Information & Conservation Manager General Manager
MICHAEL BOTTO
LANDSCAPE DESIGN & INSTALLATION
10280 Donner Pass Rd. ■ TRUCKEE, CA 96161
530.913.8498 ■ FAX 831.620.0105
CLIENT Truckee Donner PUD 6/25/2009
11570 Donner Pass Rd
Truckee, CA 96161
TDPUD Demonstration Garden
PLANT LIST
Quantity Size Botanical Name Common Name
9 15G Acer ginnala Amure Ma le
1 15G Acer glabrum Rocky Mountain Maple
1 15G Acer grandidentatum Big tooth Maple
7 1 G Alcea rosea Hollyhocks
1 15G Amelanchier alnifolia Serviceberry
14 5G Amelanchier alnifolia'Re ent's' Regent's Serviceberry
29 1G Antennaria Pussy Toes
49 1G Arctosta h los uva ursi Manzanita
34 1G Artemisia schmidtiana Silver Mound
12 1G Artemisia spp. Artemisia
48 1G Calamagrostis 'Karl Forester' Feather Reed Grass
30 1G Centaurea montana Bachelor Buttons
1 15G Cercocarpus Mountain Mahogany
19 4" Colombine spp. Colombine
35 1G Descham sia ces itosa Tufted Hair Grass
24 1G Echinacea purpurea Purple Coneflower
7 4" Echino s Globe Thistle
11 1G Epilobium canum California Fuchsia
11 1G Ericameria Rabbitbrush
53 1G Eriogonum umbellatum Sulfer Flower
23 4" Eschscholzia californica California Poppy
22 1G Euphorbia pol chroma Cushion Spurge
159 4" Festuca glauca Blue Fescue
38 4" Fra eria ver iniana Mountain Strawberry
28 1G Gaillardia aristata Blanket Flower
8 5G Holodiscus discolor Rocks pray
12 1G Iris Mountain Iris
22 1G Kniphofia spp. Torch Lille
9 1G Limonium Statice
26 1G Linum perenne Blue Flax
5 5G Lonicera involucrata Twinberry
25 1G Lupin spp. Lupin
2 15G Malus spp. Crabapple
Quantity Size Botanical Name Common Name
2 5G Malus spp. Crabapple
36 4" Ne eta spp. Catmint
62 1 G Penstemen spp. Penstemen
2 15G Pinus contorta Lodgepole Pine
2 5G Pinus contorta Lodgepole Pine
2 15G Pinus jeffre i Jeffrey Pine
3 5G Pinus mugo Mugo Pine
10 4" Popp spp. Popp
42 1G Potentilla spp. Cinquifoil
5 15G Prunus verginiana demissa Chokecherry
21 1 G Ribes roezlii Gooseberry
25 5G Rosa glauca Red Leaf Rose
22 1 G Rosa woodsii Wood's Rose
10 1 G Rubus pariflorus Thimbleberry
41 1 G Rudbeckia hirta Blacke ed Susan
9 4" Salvia spp. Salvia
1 5G Sambucus Elderberry
17 4" Sedum spp
43 1 G Spirea densiflora Mountain Spirea
28 1 G Stach s b zantine Lamb's Ear
10 5G S mphoricarpos millis Snowberry
44 5G S m horicar os x chenaultii Hancock Coralberr
5 1 G S rin a me eri dwf. Dwarf Lilac
4 5G S rin a spp. Lilac
21 1 G Tanacetum densum Partridge feather
12 1 G Thymus pseudolanuginosus Wooly Thyme
16 1 G W thia mollis Mule's Ear
10 1 G Yucca spp. IYucca
....................
Michael Botto
Landscape Design
Build
E*ftr.6%L. Truckee Donner P U D oxsoD�•+P.sRd
j T-6—G.9616,
Demonstration Cjarden r•s3o.9 5a+9.
P•ssosaz«fir
Site Reference
Da T-AKA 5 6._,•
A
� � o
o L
� qr- bUI DING Q c
Area'2 U E
EA-sP.6naL� V Q
.5�•••5d..s. M.mb�d:sP� 1
0 Area •3
p Area •+
I $6e�Tsk.
E �•`�` Site Reference
A)A+-
D—6/25/-9
Do,--F—Rd. D--•6y M6
R�
Sheep 1
�,o
i
Michael Bono
Landscape Design
Build
I rear.�s�
Truckee Donner P U D o:sop—P—Rd
T:&_C.96161
Demonstration Garden F33o.Y15A"a
F=ssosez»�+
Demolition Plan
D—TradRa 5a6 vo6r-r
A -
Raoowb L.�,T—..Shruba
V V F
AodA�Od— g C p
PI.n<►ui.trc.l��Ab..i-t 0
Ar• BUILDING Q
cFsG ^s Arca •2 u
ToN--Gr-diogF6-I-AllA— G:•�sF«M:sl� V Q
0
T.-p6oti4F-aeogAT—AIo%F-- R�AUE>—W-6K ob,AodPob66s That DoNot5o"Rota:ogWall❑ Area •+ 56a�Td�:
Demolitoin Plan
AJAtia
(jxc 6/ii/iro9
$rah t/i6••i•
DonnerPaaa Rd
5h-et: 2
d 10
l=w°ting P.,6%Lot
d
,
a>ar�M- Michael Botto
t , �) Landscape Design C
Donn.rTra)i Rd. .51F F>UILDING
r" ^� n�""" Build
r
O Sdwpp 6)
N•u•6^ds.••M..d•.(r1r.a -R--(f) .:d.dwed..)besne•.
: V
M(0
Ch
'^\
H
V C
E
tf( sti�ria--:
TrucLee Donner P U D \ -�� (a ,._j'U7 6 ) Planting('Ian
�, :�:�(f� � •(tq Ate(
Demonstration Cjarden -n•...—o) --rw "c � p—6/17/2009
Area • 1 flanting Plan
Donner Pass Rd. R�
Sleet: '3
A 10
Truckee Donner P U D
]demonstration Garden
Area •2 Planting Plan
,-jrld
Michael Botto
Landscape Design
Build
/�
ArctostapkBlos Suva umi'(ZL)).... �"��
iozsoD��P...Rd
I1 r : TN&-CAW S,
.,_ DGSCIIamOSIa CGSPitOsa(14) - �. �, p.g3o.g,s.s+gs
Calal dgrosti5-Ka l Forester(5) p gpgsa++7+
i stac6ys 69—ntine(13)
rrageria verginiana(16) _
Rubus PariFlorus(5)
{ Alcea roaea(7) >
L-Pin sPP.(7) c
Malus 5pp.(1) u 0
5ym 6orica os minis(3) 0
o
irea ensiAora(7) L U' r 2
PIm-
enst—n sPP.(17) - U
Eriogonum um6ellatum(12) C 0
colom6inesPP.(13) -,- -- /-0IN
15UILDIN6 D E_xistingrarkingLot u o
4.
2
0
Main Building Ent y 56� Tit6
Planting Plan
Arm i
c.Xa1�i�r-i•
D—By M5
sheet 9-
Fjdating F-leckic boxes A 10
f
TrucLee Donner P U D
Demonstration Garden (:
Area •3 Planting Plan 6UILDING Exi•r•gF.r6gL
f•... .dw.ohl
lNfichael Botto
I•andscape Design
+
Build
Donner Pass Rd. b/ PA)O.p24sJ4
s,�,•,a,o h�. ..
sr=•�..ib.W
c ` a
k Truc ee Donner U D '(,,, m o a
1-
Demonstration Gardens e c
i
Area •+ Plantin p (�n O �+
Plan e��wro kn
Q
Existtns P.k��g Lit .+6 v.•-r -sy^ri,.,•.,p,..a:aupr>
5 p
CJ. �en Kx6r�••w(ifl V C
w ui° U E
t M.t 6 L;a
I�
ryasCJ•a�6ar -, .,. _.. ' .• . ' 1 -: ,�' P�antinR� fan
•,}... Qyess 3+4
i
D-6y M6
R�..�
jwnner Pass Rd.
sheep 5
10
i
dating r.,L.g Lot
SY'iy.
V
�5
.e k1�+►•�e,-d(T e re...w IV1.chael Botto
O Q Landscape Design
'O
Denn�rT��i Rd. ^r BUILDING +
•�o B,fla
TP:s3.A 2e rcr 96161�
jD•eG�.kw ��, a�a. `� ' a�s.e.9e
.o Fasasaz..�+
C € V
o-yw,y ate..•'-'- Rs m 20
V c
\`' V 0
E
Et �'. •* u
Ew.a�a`.sde..k
TrucLee Donner P U D �r ei
I Harda�ap�. -ding
,qua i
Demonstration Garden D.m 6 i,s—9
I Area•1 Hardscape+Grading Plan
5-6 D--:.By Md
Donner Pass Rd.
shut: 6
A10
i
Truckee Donner P U D
Demonstration Garden
Area •2 HardscaPe+Grading Plan
1-6 v�-
Michael Botto
Landscape Design
Build
T-6-C.96,61
P=ssa9�>.ss9e
F�55aseztryr
f
E
H _
U � U
"0
G o
G
0 R
EUILDING rxisting Far-Ling Lot � a
u
2
6
Main E)uilding F,ntry 56-tTld
hard—pe+Grading
A—z
D—6/i5/-9
D—NP M6
R�
56eet: 7
of 1 O
Truckee Donner (I D
Demonstration Garden
Area Hardscape+Grading Flan E>UILDING F—.i cng r.r6g L
M."Lj-
0 Michael Botto
r,.ftrj-6— El Landscape Design
D-p4cw- +
El
Build
ou.D—r—R4
TN&—C+96161
Donner Pass Rd.
Truckee I)onner F(A D rZ. -02
Demonstration Garden U n
C C
r- ,0
Area HarJscape+Grading FI.n 0 -P
0
E
M.t.1,Li- 2
H-,J.-P.+G�ji.g
A-5++
D.rt 61231-9
5-6/r-"
Donner Pala R&
Sheet
10
I Michael BOttO
i Landscape Design
Build
TrucLee Donner P U D
io:sop.anuPa..Rd
T—$—C.96,6i
j Demonstration Garden R»af,�.9fs
P:93Q3siM74
Irrigation Plan
D--T-ARd 5-6 V,P-r
Q i -
G6,+eS3.+
v � u
u V
C c
c .0
o �
Area • BUILDING Q
Area .2 u 0
p�w^sP.esta� U Q
sus 2
€ 0 � ::...
Area •3 :o°'..� �'— ❑ ;o.._o Area •+
j 5�T�
WsS,.
Imeation Phan
AIA
pate 6A21-9
' $tale i/i 6•-�.
R�
9
,�l o
TREE RANTING DETAIL
5HKU6RANTING DETAIL RUGRANTING0N5LOrEDETAIL __..... -_......_.-
NOTES.
1. CONTRACTOR SHALL DGUBLE STAKE ALL
15 GAL,4 24"BOX 517E TREES, 5'LAYER MACH OF STAKING. SLOP.CONTRACTOR SHALL REMOVE NURSERY SLOPE`LESS THAN Do
Do2
PREVAILING WIND FROM TREES UPON ' NOT REO'JIRE TEMPCRARY
STAKE(W AND TASS F
WIDTH OF PLW BERMS
COMPLETION 3` EH TEMPORARY
HATER—BASIN
,�\ 0X2'DTA $NOT .^.LE PINE STAKES;PEELER ROOT-BNA PLUG
1FJ W � LORE STAGES AN ACCEPTABLE.REFER TO FINISH 6RgpE , EXISTING GRADE
M MM NOTE ADOVE AND LESEIO. DO NOT FVT
4J L4
"1.� STAKES T S rolII 4'BOX L!. S-. SHALL \ 2'HIGH TEMPORARY
BE 10'LONG FOR 26'BOX TREES. BACKFlLL Mlx §_ '� WATERING BERM
S - M TAMPED FRIABLE NATIVE
-L REINFORCED RUBBER TREE STRAP`NAILED TO T—-SGARIF'AND TAMP NATIVE O� SOIL TO COMPLETELY
� STAKEGURE IN FI H FASHION. LOCATE HIGHE51 C SOIL ONLY UNDER NOOTBALL. x h SURRO1,11D AND
STAKE THIS SIDE- LOVER
j STRAP BELOW LOWEST BRANCH. NO SHOOT.EWE`OR ROOT SYSTEM AND POTTING
a
WH SINGi.F �\ PIT 2 TIME BLAZED SURFACES
STAKING //' SET TOP OF ROOTBALL 2'ABOVE FINISH SPADE RoaTBALL WIDTH O SOIL MIX
/ b'HIGH BERM ARgRO INSIDE EDGE OF NATIVE SOIL NATIVE SOIL
TREE PIT WITH X LATER OF M"H NO SMOOTH EWES Ok
OL / GLAZED S FACES
06s--FINISH 6.3ADE y,,�
BALKFILL nix 5hKU5r ANTINGON5L0rEDETAIL Nfichael BOltO
FERnuZER TABLET5:2I s M ACRIFOR WITH I rW6RANMNG DETAIL
X/���i. 2.0-10-5 BY SIERRA CHEMICAL GU.OR LBIIdSC DPSIp�
EA5E SLOPE BALK Design
APPRIFY A D TAMP
-O PREVENT SLIPPING
SCARIFY AND TAMP NATIVE SOIL WIDTH OF PLUli }
PLANT PIT i0 BE UNDER GRP.Dr RoO S SLOE BOTTOM WN OF R—TH I'
�F_`, OR CELL
2 11 ROOTBALL WIDTH. OF PIT TO ONE
SIpE ABODE EXISTING p�..1J
\-NATIVE SOIL 5'LAYER MULCH j PLANT UN114
_ TAMPED FRIABLE NATIVE- IOZGODOOIR+Pw Rd
11?+ b' 6H GERM ON DO'WNNILL SOIL TO COMPLETELY
TREERANTINGON51DE5LCMDETAIL =1 —, j SIDE-TAPER INTO z i n 51,RRDurm AND 0o T�Ndle�.C.96161
i 71 I1M n$ �TT[NS SO;!-n X. P`77R.y173H/
_
THE ROO BALL
E WELL INTO SLOPE SO
EXIST SITE IL A5 BALKFILLO NATIVE SOIL SOIL NO r`770.S41MJ1
LEANT STAKE AND TIE TRFF —� �� 1_SHOOTH FDSES OR
PER -OETAII.al,THIS SHEET. �I i �—FINISH GRPDE GLAZED 51JRFALES.
Irt
\T 9F SLO�PE�BFINS
BVSEIi i'ilii ��i ill, 1= FOOT TATHB BAL LL
X UNDER ROOTBAI I ONLY,
6 ASZETSHED6E�OP.
SLIPPING. - - `� NATIVE 50I_
\\ \ BALKMLL Mlx PIT 2 TIMES
ROOTBALL'NIDTH
SCARIFY AND TAMP NATIVE Q
I \S\\ ! SOIL W ROOTpALL.Y 1
BOTTOM OF PIT TO ONE SIDE.
NATIVE wII- IRIUGATI0NTRENCHlNGINRAN=AREA5
SLOPES LOSS THAN 3:I W NOI SftEAL NOTES:
( aEwlaE rEMPoaART BFaHS. .4wNTRALTnR Is Rc-BOe51%E FoR p—
OBTA NINS ANY AND ALL PERMITS
kp� REGU.TO CAM%ETE THIS WORK. C
E 2.ALL—11 IMDERNEAIII,PAVING ILL CO m
Eff($ W BE INSTALL SL ED IN I-SO-0 WITH
THE TOP OF SLEEVE5 BELOW PREPARED ^
-RA OR AT ELEVATION OF
IRRIGATION PIPE WHILIIF.VER IS DECPER_ U
B.N.L PRESSI.RE LINE WILL BE U c U
PREYENO E55TED PER S KFIILFv1 I.
( NO IRENUIES WILL BE DAGKFILLED UN-1L U
TESTING INSPECTION 15 COMPLETED.
IF BA(.KPIL LED BEFORE INSPECTION IT -y11
FINSHED 64ApE WILL BE UNCOVERED AT THE INSFELTOR5 R _
DISCRETION. J
4.ALL IRRIGATION INSTALLATION SHALL c�
DL IN ALLORDAHCE WITH PLGEPIFD �ncekTille:
LA PAL STANDARDS,�LATEST EDITION OF THE
1 FOR DRIP'TNIFORM PLUMBING LODE-,
LATERAL LII
_NNS MANIFALTURERS REGOHMFNDATION,CITY Details
Cl. ice COJN' DEPARTMENT OF FUBLIC
MAIN WORKREGIJIREMENIS AND THE
LONSTRLGTIONDOLUMENIS. D—`1.ALL MATERIALUSEDSHALL BE NEW
MAIN LINEAND FREE FROM INFERFELTIO!5. 5rabMAIN
b.SEE LONSTRL I—DOURIENI5 FOR
1P 1U MLDEL ND.SIm,I-ANT", DI.•*6y M5
MANJFALTURER AND PERFORMANCE OF
nfNLC� ITEMS. Rerie�
NE1LCf10CALMCQdIT
T.HALKFILL ALL TRENCHES AGLO`WINS
O CONSTRUCTION DOCId-ENTS.
Sh��x i O
d 10