HomeMy WebLinkAbout11 Replacement radio systemAgenda Item # 11
WORKSHOP
To: Board of Directors
From: Ian Fitzgerald
Date: August 20, 2014
Subject: Discussion Regarding the Purchase of a Replacement Radio System
1. WHY THIS MATTER IS BEFORE THE BOARD
The purpose of this workshop is to provide the Board with an overview of the plan to
replace the District's radio communication technology
2. HISTORY
The District's radio communication technology is well beyond its useful life. Existing
radio technology is 20 years old and are unreliable to the point where field employees
have to use cell phones due to reliability issues. The importance of reliable, clear,
uninterrupted communication in a dangerous work environment like high voltage
electricity, and in a regional environment where natural disasters like earthquakes and
forest fires are prevalent, cannot be undervalued. New technology exists today that will
improve communications and integrate disparate systems seamlessly.
The District has been building a foundation of technology that is now capable of
supporting a Digital Mobile Radio (DMR) system. The new radio system will greatly
improve the way District staff communicates with employees, community partners, and
the public.
A history of the District's communication technology is as follows:
• 2011 (fall) -District replaced network infrastructure with new switches, wireless
access points, and firewalls. System standards of checks and balances for
technology failover were put in place. This allowed for high bandwidth traffic
required for DMR radio communications
• 2011 (winter) -District began optic communication installation, providing fast
network access to District owned remote sites. This allowed for placement of
radio transmitters at multiple locations throughout the District for optimal
coverage.
• 2012 (spring) -District implemented data center technology to support servers
and applications. This allowed for the computing power and storage required
for communication servers and unified communications integration.
• 2013 (spring) -District implemented disaster recovery technology to allow for
server and data failover offsite. This ensured technology failure at District
offices would not cause loss of communications.
• 2014 (summer) -
hub platform that
communications.
3. NEW INFORMATION
District implement aVoice-Over-IP (VOIP) communication
has improved phone, chat, email and employee presence
The District is looking at a Tait Digital Mobile Radio (DMR) system that will replace our
existing Motorola analog radio system. This system uses computer network
technology and provides crystal clear radio communication, allowing for advanced
technology like voip phone operations, global positioning (GPS) location, text
messaging, and email. Replacement of the radio system will allow for a reduction of
cell phones and associated costs from the field operations.
The initial design will place two radio repeaters on top of existing water tanks at
Donner View and Old Greenwood. Both repeaters will have network communications
back to both the District data center, and to the new disaster recovery building at on
Trails End Road. Each repeater will allow for 3 separate radio communication
channels. At any time, the District will have between 3 and 6 channels available for
talk paths. A select number of vehicles will have radios installed, and every employee
in the field will carry a personal radio.
Employee field safety will be improved in a number of areas with the new technology.
In the past, employees could be out of communication range if in a trench, in a vault,
or on top of a tank or pole. All existing radios are inside District vehicles with a limited
number of load speakers, and old analog technology has an abundance of static
interference. With employees having radios on their persons at all times, not only can
every employee hear radio communication clearly, but they will also be able to
respond immediately if needed. Team communication will also be improved. Today,
many water crew only carry cell phones, which limits communication to only two
personnel. Radio communications will ensure all employees will be aware of
operations, whether between two employees or communications between the entire
team.
An estimated radio coverage map is included as Attachment 1.
The quote (Attachment 2) from Tait on a Western States Contract Agreement (WSCA)
is $262,000. This includes repeaters for 3 to 6 channels, 13 vehicle radios, 40
personal radios, licenses, and professional services.
The next step is to receive a final quote from Tait Radio, and bring to the Board of
Directors for approval in September.
4. FISCAL IMPACT
There is no fiscal impact at this time.
5. RECOMMENDATION
Review and receive this report.
Stephen Hollabaugh
Assistant General Manager
Michael D. Holley
General Manager
{ E
2 |§ ; E e
2 MOO> ;
'Cop 3
'{M{R§\
0 E E QL/ ,
{\)\k)) ;
'k¥f §ik _ &)
£rlfaE -
& } \ \ 2\
I �
�
r �
�•Jrw
. r •�
� ® 2
�
}
#
d
a!!«hmm!]
Attachment 2
Customer:
Truckee Donner PUD
TO PUD
Date Quote issued:
June 25, 2014
DMR
Date file last saved:
June 25, 2014
Band: 440-480M
Days valid
from issue date:
Supply voltage: AC
aux 12
tait
Currency:
U SD
Base Format: T69300
Delivery (from design acceptance):
12 weeks
100W Watts
communications
Document Type:
Firm Quotation
Link Medium: IP
Project Number:
50-01110
Racking: Customer
supplied
Tait Communications
Customer:
Truckee Donner PUD
Spares Level: Minimum
15342 Park Row
Contact Name:
Ian Fitzgerald
Total number of site:
2
Houston Texas, 77084
Regional
Sales Manager:
Bob Kmetz
2 Physical channels
across
USA
System
Sales Engineer:
RF
all sites
Discount Applied:
WSCA
Quotation #: 50-01110 TDPUD DMR Quotation v2 rkf2014-06-25.xlsm
System Description
This is a Firm Quotation valid for
45 days for a DMR system at 440-480M. with 2 TX/RX Sites and
a total of 2 channels per site. Base station format
is T89300. Rack
system is
Customer supplied. Powersupply
is AC aux 12
System Building Blocks
BB3
BB3 Node
Main Node
Item
Description
Qty
TN9300-1001-0000-0000-10
DMR Node Controller 110-230VAC
1
109830,00
10,830,00
TNAS320
License TaltNet DMR - DMR Express
1
61375,00
6,375.00
TNAS304
License TaltNet DMR - Digital Dispatch and Teleco (AIS)
4
11200,00
41800,00
(SIP)
TN8271-00
TailNet Network Gateway
4
927,00
3,708.00
T809-10-97C2
T800 PSU 30A 1 OD-240V AC 2U Black Dual with Diode
1
1,352.25
11352,25
Combininn
T-1-001
Factory test, build to specifications
16
100,00
11600.00
M-Int-Panel
Intra-, Inter System Connection Panel, Hardware and cables 1
625,00
625,00
Total BB3
29 290,25
BB7
BB7 DMR Remote Sites
Sites
Item
Description
Qty
TB9335-H2MO-0000-A400-10
DMR BsWRptr 440-480M 10OW ACaux12 USC
4
11,844,75
47,379.00
TBAS302
SFE Key - DMR Express SFE License with TDMA operation
4
637,50
29550,00
(93)
T-1_001
Factory test, build to specifications
10
100.00
12000,00
Total BB7
50 929,00
BB21
BB21 Antenna Equipment
Sites
Item
Description
Qty
DS4C06F36D-N
dbSpectra Antenna 450-470MHz Dual Omni 6 dB N Type
2
29488,33
48976,66
WS-S300
Stand-off Bracket, 3 Foot (1-7/8"x24')
2
207,55
415,10
RFS-916132
RFS Universal Wrap Weatherproofing kit 1/4" up to 3"
4
22,97
91,88
(19333)
RFS-15566070
RFS N/M 1/2" hardline (486060)
4
29.17
116.68
LCF12-50J
RFS 1/2" Foam Cable (70393)
700
1,73
13211,00
RFS-15566170
RFS N/Fem 1/2" hardline (495590)
4
29,38
117,52
RFS921231-012
Groundkit 1/2" Coax
4
23,58
94,32
IS-50NX-C2-MA
Polyphaser N/F Equip., N/M Antenna
4
70,87
283,48
14US3406
Comprod Combiner 450-470MHz 2-ch
2
11,116.67
22,233.34
SCF12-50J
RFS 1/2" Superflex Cable (41666)
110
2,47
271.70
RFS-15566070
RFS N/M 1/2" hardline (486060)
16
29,17
466.72
RFS-734769
RFS N/Male 1/4" Superflex (59867)
4
59,35
237,40
SCF14-50J
RFS 1/4" Superflex Cable (30426)
20
1,35
27,00
RFS-734778
RFS BNC/Male 1/4" Superflex (59476)
4
153,00
612,00
Total BB21
31 154.80
BB30
BB30 Mobiles
Mobiles
Item
Description
Qty
TM9355-H5AO-ABUO-OOAA-10
Mbl DMR 400-470M 25W BNC K-Mic U-Crdl
13
936.75
12,177.75
MUF4500
UHF Unity Mobile Antenna Max
13
13,60
176,80
NMO58AU-NC
PCTEL Ant kit- NMO58AU-NC -17 Feet NC (362768)
13
15,77
205,01
Total BB30
12 559,56
BB31
BB31 Portables
Portables
Item
Description
Qty
TP9360-H5AA-OACE-ODAA-10
Port DMR Trk 16Key 16pos 188OmAh Ant:400-470M US
40
11012.50
40t5OO,OO
Chgr
Total BB31
40 500,00
BB32
BB32 Control Stations
Control Stations
Item
Description
Qty
TM9355-H5AO-ABUO-OOAA-10
Mbl DMR 400-470M 25W BNC K-Mic U-Crdl
2
936,75
1,873,50
TMAA03-12
Install Kit Desktop Power Supply Plinth 30-50W Radio
2
99,00
198.00
TMAA13-22
Desktop Power Supply 23A DC 120V AC US/CAN
2
174,00
348MO
FG4500
Laird 380-512MHz Omni Antenna Unity Gain N Female
2
121,63
243,26
SCF14-50J
RFS 1/4" Superflex Cable (30426)
100
1,35
135.00
RFS-734769
RFS N/Male 1/4" Superflex(59867)
2
59.35
118.70
RFS-734778
RFS BNC/Male 1/4" Superflex (59476)
2
153.00
306.00
Total BB32
3 222.46
50-07110 TOPUO DMR Ouolation J2 rk2014-06-25 1 of3
Attachment 2
Customer:
Truckee Donner PUD
TD PUD
Date Quote issued:
June 25, 2014
DMR
t (') Date file last saved:
June 25, 2014
Band: 440-480M
Days valid from issue date:
Supply voltage: AC aux 12
Currency:
tait
U SD
Base Format: T89300
Delivery (from design acceptance):
12 weeks
100W Watts
communications Document Type:
Firm Quotation
Link Medium:IP
Project Number:
50-01110
Racking: Customer supplied
Tait Communications Customer:
Truckee Donner PUD
Spares Level: Minimum
15342 Park Row Contact Name:
Ian Fitzgerald
Total number of site: 2
Houston Texas, 77084 Regional Sales Manager.
Bob Kmetz
2 Physical channels across
USA System Sales Engineer:
RF
all sites
Discount Applied: WSCA
Quotation #: 50-01110 TDPUD DMR Quotation v2 rkf2014-06-25.xlsm
System Description
This is a Finn Quotation valid for 45 days for a DMR system at 440-480M. with 2 TX/RX Sites and a total of 2 channels
per site. Base station format
is T69300. Rack system is
Customer supplied. Powersupply is AC aux 12
BB37
BB37 DMR Spares
Item Description Qty
TN9300-1 001 -0000-0000-10 DMR Node Controller 110-230VAC 1
109830,00
10,830.00
TB9335-B3M0-0000-A400-10 DMR Bstn/Rptr 148-174M 10OW ACaux12 USC 1
11,844.75
11,844.75
TBAS302 SFE Key - DMR Express SFE License with TDMA operation 1
637.50
637,50
(93)
Total BB37
23 312,25
BB38
BB38 Freight
Item Description Qty
Misc-06 Estimated Freight Charges (See Note Terms and 1
21100,00
2,100.00
Conditions)
Total BB38
2100,00
BB39
BB39A System Support and Maintenance
Item Description Qty
DMR-Support-TAIT TAIT Service Advantage Support Agreement 1
11,097,00
11,097.00
BB39A Subtotal
11 097.00
BB40
BB40 Project works and services
Item Description Qty
M-DMR-SYS-MH DMR Custom Documentation and Manuals (2 copies) 1
3,000.00
31000,00
L-004A System Design Services, Planning and Engineering of 10
1,319.00
13,190.00
Network Remote
L-005 System Commissioning 5
1,346.00
69730,00
L-PM Project Management 1
17,000,00
170000,00
DMR-TI DMR Trunking Technicial Introduction Course (3 Days) 5
31450,00
17,250.00
Total BB40
57 170.00
Buildincl Block Summary
B83 Node
BB3 Total:
29,290.25
BB7 DMR Remote Sites
BB7 Total:
503929.00
BB21 Antenna Equipment
BB21 Total:
31,154.80
BB30 Mobiles
BB30 Total:
12,559.56
BB31 Portables
BB31 Total:
40,500,00
BB32 Control Stations
BB32 Total:
31222,46
BB37 DMR Spares
BB37 Total:
23,312,25
BB38 Freight
BB38 Total:
23100,00
BB39A System Support and Maintenance
BB39 Total:
112097,00
BB40 Project works and services
BB40 Total:
572170,00
Total USD
261,335.32
Options (See terms and Conditions)
Option 1 Transportable Repeater (Analog)
T68108-1-12RB-0000-Z400-10 Transportable Anlg w/LA 440-480MHz ACDC12 US 1
92391,50
9$91.50
Option 1 Total
91391,50
In
addition
to Tait America Inc, standard terms and conditions, the following special terms and conditions apply:
Special payment terms will
be required,
Stated delivery is an estimate only and subject
to confirmation following receipt of order.
This is a package price offer. The components of this package may not be available separately from Tait. Pricing for components may be different from the package price if sold
separately.
Order confirmation is contingent
upon Tait
receiving
a signed
Customer Requirement Spec CRS .
Order confirmation is contingent upon Tait receiving the required deposit with order.
Items
not included
in this
quote include
racks, linking eMc ulpment, and dispatch console equipment —_-
Tait assume suitable
fre uencies will
•___A______—_
be available for the system.
Tait
banking
details for payment by electronic
transfer of funds:
HSBC Bank USA 021001088
Delivery EXW Tait Office Houston, Texas, USA.
Support Agreement pricing presented in this quote is based upon this unique list of hardware and software. The Support Agreement pricing for the final system to be purchased
Will be calculated oer the final aareed hardware and software list mutuallyaoreed uoon by TAIT and the customer.
Project works and services DO NOT include: System Site Acquisition, Development and/or Preparation (Including Towers); System Radio Frequency Acquisition, Licensing, Re -
Licensing, etc.; System Interfaces and/or Back Haul (Ti, Fiber, Microwave, etc.) Unless specifically listed in this proposal; In Building Coverage
and/or Enhancements to Existing
In Building Coverage; Removal and Disposal of Existing Wireles's Communication System Equipment & Hardware;
System Warehousing & Project
Office; Services Related to
any Customer Supplied Equipment, Hardware & Software.
50-011107DP11D DA4R DwbGon JL rk12074-06-25 2of3
Attachment 2
••
tait
communications
Tait Communications
15342 Park Row
Houston Texas,77084
USA
Customer: Truckee Donner PUD
Date Quote issued: June 25, 2014
Date file last saved: June 25, 2014
Days valid from issue date: 45
Currency: USD
Delivery (from design acceptance): 12 weeks
Document Type: Firm Quotation
Project Number: 50-01110
Customer: Truckee Donner PUD
Contact Name: Ian Fitzgerald
Regional Sales Manager: Bob Kmetz
System Sales Engineer: RF
Quotation #: 50-01110 TDPUD DMR Quotation v2 rkf2014-06-25.xlsm
TD PUD
DMR
Band: 440-480M
Supply voltage: AC aux 12
Base Format: TB9300
100W Watts
Link Medium: IP
Racking: Customer supplied
Spares Level: Minimum
Total number of site: 2
2 Physicalchannels across
all sites
Discount Applied: WSCA
em Description
is a Firm Quotation valid for 45 days for a DMR system at 440-480M. with 2 TX/RX Sites and a total of 2 channels per site. Base station format is TB9300. Rack system is
Omer supplied. Powersupply is AC aux 12
50-01110 TDPUD DMR UuotaEan Y2 rld2014-0G25 3of3
Agenda Item # 9
CONSENT
To: Board of Directors
From. Kathleen Neus
Date: February 20, 2013
Subject: Consideration of a Resolution Accepting Completion of the District
High Efficiency Boilers and Authorize the Filing of a Notice of
Completion
1. WHY THIS MATTER IS BEFORE THE BOARD
The District High Efficiency Boiler Replacement project is complete. A resolution
accepting the project requires Board approval.
2. HISTORY
Besides being old and deficient, the District's current boilers were identified in the
TDPUD Building Energy Use Assessment and Improvement Study prepared by
Enovity Inc. as one area that could use significant improvement.
This project includes the removal and demolition of the boilers, pumps, plumbing as it
relates to the boilers and the local control panel. In addition, the contractor will be
required to protect all other equipment within the boiler room and the new carpeting.
• The Board awarded the project to Efficient Energy Concepts (EEC) of Chico,
California at the August 1, 2012 Board meeting. The contract was for the
amount of $86,924 plus a 20% change order authorization for a total amount
not to exceed $104,309,
3. NEW INFORMATION
The Boiler Replacement Project is now complete.
There were three change orders:
1) Increase the efficiency of the boilers
2) Time extension of two weeks
3) Reduce the amount of the project by $1,180.88
Total price of the Boiler Replacement Project including change orders is $90,443.12.
The resolution accepting the project as complete is included as Attachment 1.
4. FISCAL IMPACT
There is sufficient funds in the approved FY12 for this project.
Increasing the overall efficiency of the boiler will result in a lifetime savings of
approximately $150,000,
5. RECOMMENDATION
Adopt the resolution accepting the District High Efficiency Boiler Replacement project
as complete and authorize the filing of a Notice of Completion.
Michael D. Holley
General Manager
Attachment 1
Resolution No. 2013 = 03
AUTHORIZING THE ACCEPTANCE OF
THE DISTRICT BOILER PROJECT
AND DIRECTING FILING OF THE NOTIC COMPLETION
WHEREAS, the Board of Directors of the Truckee Donner Publ
undertake the District High Efficiency Boiler Project; and
WHEREAS, Efficient Energy Concepts, Inc. was
WHEREAS, Efficient Energy Concepts, Inc
WHEREAS,
project; and
The District's Technical Programs Admin
WHEREAS, the District's General Manager,
the District;
NOW THEREFORE BE IT RES
1
That the District here
2. That the Clerk of
which is attached he
3. That 35
payment
PASS
20th d
AYES:
NOES:
ABSTAIN:
ABSENT:
D ADOPTED I
:)vember 2013
TRUCKEE DONNER P
ade the determination to
to perform
uded in the
and
; and
now certifies the completion of the
nded that the work be accepted by
as follows:
Boiler Project as complete.
unty of Nevada the Notice of Completion, a copy of
npletion, the monies retained from the contractor
been made to the District by material suppliers or
irectors at a meeting duly called and held within the District on the
III call vote:
UTILITY DISTRICT
By
Jeff Bender, President of the Board
ATTEST:
Michael D. Holley, Clerk of the Board
RECORDING REQUESTED BY:
Truckee Donner Public Utility District
WHEN RECORDED, RETURN TO:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
11570 Donner Pass Road
Truckee, CA 961601
THE UNDERSIGNED DECLARES
DOCUMENTARY TRANSFER TAX - NONE
NOTICE OF COMPL
NOTICE IS HEREBY GIVEN:
1. That the name and address of the public entity for lffithe
thereof, is the Truckee Donner Public Utility District,
tl
2. Nature of interest or estate of owner:
3. That on February 20'h1 2013 the here
pursuant to Resolution 2013-03 of the Truc
4. That the subject im
District High Efficien
5. That the name an
Three Sevens Lane
interest of
invent project was`dne, as owner
Pass Road Truckee, CA 96161.
utility of electric and water facilities.
were accepted as complete
the awarding authority.
and identified as follows:
project was: Efficient Energy Concepts, Inc. 7
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Michael D. Holley, General Manager
MAIL TAX STATEMENTS TO:
SAME AS ABOVE
Legal References: CC-3093,CCP-2003 (oath), 2015.5 (unsworn statement)