Loading...
HomeMy WebLinkAbout13 Purchase Power Ag enda Item # 13 ANIMEMPT Public Utility District FF WORKSHOP To: Board of Directors From: Stephen Hollabaugh Date: February 03, 2010 Subject: Discussion of 2009 Purchase Power Load, Resources, Peaks, Comparison to 2009 Budget Forecast 1. WHY THIS MATTER IS BEFORE THE BOARD This item involves a summary of the 2009 Purchase Power including Load, Resources, Peak and comparison of Budget Forecast to Actual. 2. HISTORY On September 3, 2008 the Board was presented the "Purchase Power Plan - 2009 Budget Review". This included the Mission Statement and Objectives, Renewable Portfolio Standard (RPS) Target, Conservation as First Resource, Diversified Power Supply Plan, Future Renewable Resources, Proposed Resources for 2009, Risk to Budget and 2009 forecast cost. The Purchase Power Plan 2009 Budget was approved by the Board on November 5, 2008. The Purchase Power Budget by category and $/MWh is listed in the table below: 2009 BUDGET BUDGET Purchased Power Costs 2009 1$/MWh Total Energy Supply-Various $ 10,307,465 $ 63.2 Transmission -Sierra Pacific Power Company $ 1,043,766 $ 6.4 Scheduling - NCPA $ 61,200 $ 0.4 Power Supply Costs from Market Purchases (NCPA) $ - $ - WAPA cost/(credit)toward MWh $ (130,396) $ (0.8) Total Delivered Cost$/MWh $ 69.1 Total Bulk Power Costs $ 11,282,034 Total Annual MWh 163,220 When reviewing purchased power/budget actuals the following terms are used to define where the KWh are being measured: MWh Sold: This is the amount measured and sold at the customers meter. This is the cash register of the Electric Utility. MWh Received: This is the amount of MWh measured at the District's substations. Transmission Losses (TX Losses): This is the amount of MWh the transmission provider (NV Energy) requires by tariff as loss. This is usually a percentage of KWh received. Total Bulk Power: The amount of MWh received plus transmission losses. This is the amount if MWh that is within the Purchase Power Budget. Distribution System Losses: This is the percent difference between MWh Sold and MWh received. Historically this has been just under 5%. Purchased Power, Historical Actual Data: Year MWh Received TX Losses (MWh) Total Bulk Power MWh 2011 157,873 4,127 162,000 Forecast 2010 155,924 4,076 160,000 Forecast 2009 153,677 4,018 157,695 Actuals 2008 156,113 4,076 160,189 Actuals 2007 154,342 4,042 158,384 Actuals 2006 153,210 4,018 1571228 Actuals 2005 142,852 3,767 146,619 Actuals Total Bulk Power, Actual vs Budget MWh Year Actual MWh Budget MWh % Difference 2009 157,695 163,220 3.4% 2008 160,189 161,604 0.9% 2007 158,384 156,963 -0.9% 2006 1571228 150,168 -4.7% 2005 146,619 145,382 -0.9% % Distribution System Losses % Distribution Year MWh Sold System Losses 2009 146,875 4.6% 2008 148,305 5.3% 2007 147,091 4.9% 2006 1441269 6.2% 2005 136,339 4.8% MWh Sold, Cash Register of Electric Utility Year MWh Sold %Change 2009 146,875 -0.97% 2008 148,305 0.82% 2007 147,091 1.92% 2006 144,269 5.50% 2005 136,339 ----- 3. NEW INFORMATION All actuals for December 2009 have not been received. Preliminary data for December 2009 is being used but will be verified prior to Board meeting. The 2009 comparison of Budget vs Actual is shown in the table below: Truckee Donner Public Utility District 2009 Budget vs Actual Purchased Power 2009 2009 Actual Budget Load Data Total Load -MWH (including transmission losses) 157,695 163,220 Peak MW 35.9 Total Load -MWH %Actual ---Above or(below)Budget -3.4% I Purchases (All in MW) Total Schedule All MWH Purchases-from All Suppliers 157,695 163,220 Expenditures Total Energy Supply-UAMPS,WAPA,Geo, etc $9,016,433 $10,307,465 Transmission -SPPCo. $871,818 $1,043,766 Scheduling -NCPA $67,879 $61,200 NC PA Power Supply(MWh) - Pd from WAPA NCPA WAPA cost/(credit)toward MWh's $160,749 ($130,3%) WAPA(credit)used toward purchased power Total Expenditures $10,116,879 $11,282,034 $over/(Under) Budget ($1,165,155) %over/(Under) Budget . 3.tF, Total Unit Cost of Purchased Power$/MWh $64.15 $69.12 %over/(Under) Budget(Unit Cost) -.7.19% The two major factors that affect Purchased Power are consumption and cost. The consumption of MWh in 2009 was 3.4% less than budgeted. The total unit cost of the power purchased was 7.19% less than budgeted. This was due to the actual resource mix vs. budgeted resource mix and the lower than forecasted natural gas prices. The natural gas prices also reflected in a lower market price and a lower UAMPS pool price. These items taken together make up the most of the 7.19% lower unit cost compared to the forecast budget. 4. FISCAL IMPACT This is a workshop and there is no financial impact for this item. 5. RECOMMENDATION Receive and comment on this report. P,-2, Cam, Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager