HomeMy WebLinkAbout10 Sierra Pacific Power Agreement Agenda Item # 10
Public Utility District
CONSENT
To: Board of Directors
From: Stephen Hollabaugh
Date: November 03, 2010
Subject: Consideration of an Amendment to the Fringe Agreement with
Sierra Pacific Power
1. WHY THIS MATTER IS BEFORE THE BOARD
This matter is before the Board for possible approval of the Sierra Pacific Power
Company (SPPC) and Truckee Donner PUD First Amendment to Fringe Agreement.
2. HISTORY
Sierra and CalPeco entered into an Asset Purchase Agreement dated April 22, 2009
pursuant to which Sierra agreed to sell, and CalPeco agreed to purchase, certain
electric distribution and generation assets located in California. On October 16, 2009,
Sierra and CalPeco filed with the California Public Utilities Commission ("CPUC") a
Joint Application for Transfer of Control and Additional Requests Relating to the
Proposed Transaction.
On November 23, 2009, TDPUD filed with the CPUC a protest to the application, in
which it made claims related to Sierra, CalPeco, and the transaction.
On January 19, 2010, the three parties executed a term sheet outlining the principal
terms and conditions to be memorialized in the final agreement, and in which the three
parties agreed to negotiate in good faith with the intent to execute a binding settlement
agreement.
On February 17, 2010, the Board approved the final settlement agreement with Sierra
and CalPeco. This settlement agreement described the "Fringe Area Agreement" and
the "Reliability Support Agreement" that would follow the final settlement.
On April 7, 2010, the Board approved the Fringe Agreement with Sierra Pacific Power
Company.
3. NEW INFORMATION
The Union Pacific Rail Road Company (UPRR) has requested electric distribution
service to certain of its facilities located within Sierra's service territory. Sierra and
TDPUD have agreed that based on the location of the load that the most cost effective
way to provide service to UPRR would be to have TDPUD build the facilities
necessary to serve them. Sierra and TDPUD desire to amend the Fringe Agreement
so that TDPUD can provide the service requested by UPRR.
Sierra and TDPUD have agreed to amend the Fringe Agreement to include "Schedule
B" which the lists the UPRR parcels where the service is requested. The "First
Amendment to Fringe Agreement" is attached and includes a map and a list of parcels
in Schedule B.
UPRR will pay for all needed facilities associated with these new services per our
application for construction and new service.
In order to serve UPRR, an "Out of Territory Service Agreement" or annexation of the
subject properties into the District's service territory will be required. These steps will
be part of a future action and are not part of this action item.
4. FISCAL IMPACT
There is no financial impact for this item.
5. RECOMMENDATION
Authorize the Board President to sign the "First Amendment to Fringe Agreement for
Electric Service between Sierra Pacific Power Company and Truckee Donner Public
Utility District.
S ephen Hollabaugh Mic ael D. Holley
Assistant General Manager General Manager
FIRST AMENDMENT
TO
FRINGE AGREEMENT FOR ELECTRIC SERVICE
BETWEEN
SIERRA PACIFIC POWER COMPANY
AND
TRUCKEE-DONNER PUBLIC UTILITY DISTICT
This First Amendment to Fringe Agreement for Electric Service Between Sierra
Pacific Power Company And Truckee-Donner Public Utility District, dated April 7, 2010
("Agreement"), made by and between Sierra Pacific Power Company("Sierra") and Truckee-
Donner Public Utility District ("TDPUD") collectively referred to as the "Parties" is made
October , 2010 as follows:
RECITALS
A. WHEREAS, Union Pacific Rail Road Company ("UPRR") has requested
electric distribution service to certain of its facilities located within Sierra's service territory;
and
B. WHEREAS, the Parties agree that based on the location of the load that the
most cost effective way to provide UPRR service would be to have TDPUD build the
facilities necessary to serve them; and
C. WHEREAS Sierra and TDPUD desire to amend the Agreement so that
TDPUD can provide the service requested by UPRR.
AGREEMENT
NOW,THEREFORE, the Sierra and TDPUD agree as follows:
1. Section 2.1(a) of the Agreement is hereby amended to read in its entirety as
follows:
"During the term of this Agreement, each Serving Utility will provide electric
distribution service to its Fringe Customers (as set forth on Schedule "A" and
Schedule "B" attached hereto) upon the terms and conditions set forth in this
Agreement. The provision of electric distribution service under this Agreement
includes the provision of electrical energy."
2. A new Schedule ''B," in the form attached hereto, is hereby added to the
Agreement.
3. Except as specifically amended by this First Amendment, all terms and conditions
of the Agreement shall remain in full force and effect.
4. This First Amendment may be executed in one or more counterparts (including by
facsimile or similar electronic transmission), all of which shall be considered one and the
same agreement, and shall become effective when one or more counterparts have been signed
by each of the parties and delivered to the other patty.
SIERRA APAF POWER MPANYd/b/a NYBy:
Name:
Title:
Date:
TRUCKEE-DONNER PUBLIC UTILITY
DISTRICT
By:
Name:
Title: Board President
Date:
2
Schedule "B" attached hereto) upon the terms and conditions set forth in this
Agreement. The provision of electric distribution service under this Agreement
includes the provision of electrical energy."
2. A new Schedule "B," in the form attached hereto, is hereby added to the
Agreement.
3. Except as specifically amended by this First Amendment, all terms and conditions
of the Agreement shall remain in full force and effect.
4. This First Amendment may be executed in one or more counterparts (including by
facsimile or similar electronic transmission), all of which shall be considered one and the
same agreement, and shall become effective when one or more counterparts have been signed
by each of the parties and delivered to the other party.
SIERRA PACIFIC POWER COMPANY
d/b/a NV ENERGY
By:
Name:
Title:
Date:
TRUCKEE-DONNER PUBLIC UTILITY
DISTRICT
By:
Name:
Title: Board President
Date:
2
Schedule"B" and Schedule"B"Mau
Legend
Requested Service Locations
Existing Service Locations ;
1
Requested Service Parcels
# W tti s
Parcels Serviced by TC?PUQ
ns,
Existing Service Boundary Border
�a
Existing Servloe Locations21
r A
?ate,mi11A Rd-
3
\` `��, 4' � � r` 'rf£ .�• u�i`�%X*%k y�Jrc �w�,s' �t�Y i :r¢�+ rWr k
�-
\��
Requested Service Locatlarrs
TRUCKEE DONNER PUBLIC UTILITY MFFRICI
a `F kI TRUCKEE
�a Y DO ER— Schedule'U Ma
$ ro s sr l r
'"'°E"°° Fringe Agreement
r'' f �-=jai ..«.,... m+.+» La so
Schedule"B"to
Fringe Agreement for Electric Service
Between Sierra Pacific Power Company
And Truckee-Donner Public Utility District
TDPUD Service to UPRR Pursuant to First Amendment
Parcel Number Classification In-Service
080 010 028 000 Railroad Improved
080 010 029 000 Railroad Improved
080 070 008 000 Railroad Improved
069 190 Ol l 000 Railroad Improved
069 190 009 000 Railroad Improved
069 130 027 000 Railroad Improved
080 010 027 000 Railroad Improved
080 010 026 000 Railroad Improved
069 130 055 000 Railroad Improved
069 130 005 000 Railroad Improved