HomeMy WebLinkAbout9 Re-Roof Project Agenda Item #DONNER 9 Public ACTION To: Board of Directors From: Kathleen Neus Date: October 05, 2010 Subject: Consideration of Increasing the Change Order Amount for the District Re-Roof Project. 1. WHY THIS MATTER IS BEFORE THE BOARD Only the Board can authorize an increase in the change order authorization. 2. HISTORY Construction of the District complex began in 1986 with staff moving into the building in August of 1987. The roof is 23 years old and is at the end of its useful life. At the May 19, 2010 meeting, the Board awarded Alpine Roofing Company of Sparks, Nevada the District Re-roof Project. Alpine Roofing began work in mid-June. 3. NEW INFORMATION In the process of re-roofing the District complex there have been various change orders for installing items including adding extra insulation over heated spaces; adding heated gutters to prevent ice build up over garage doors; replacing existing skylights with OSHA approved units in the warehouse area; replacing rotted roof decking; and rusted out exhaust stacks. Thirty-one sheets of plywood roof deck required replacement due to rot from physical damage. The areas requiring replacement were located at all the roof penetrations for exhaust stacks. When the exhaust stacks were removed it was observed that the stacks were rusted through and required replacement. The heated gutters were installed to stop ice build up over the doors and to prevent the roof from shedding over doorways. The original skylights were dual pane glass and were no longer OSHA compliant. The skylights were replaced with OSHA approved skylights. There was a large sag in a portion of the roof deck that prevented the new roof panels from being installed properly. The deflection was noted in the bid documents but the sag was much more severe than expected. 4. FISCAL IMPACT The fiscal impact associated with this item is to increase the District Re-roof Project Change Order authorization from $38,316.00 to $48,316.00 for a new contract value not to exceed of $431,477.00. Sufficient funds exist within the Electric and Water Reserve Funds for this increase. 5. RECOMMENDATION 1) Increase the change order authorization from $38,316.00 to $48,316.00. 2) Authorize the transfer of funds from the Electric and Water Capital Reserve Funds to the Electric General Fund. Michael D. Holley General Manager