Loading...
HomeMy WebLinkAbout7 Tahoe Donner Sub Retrofit Agenda Item # 7 Public Utility District CONSENT To: Board of Directors From: Jim Wilson Date: August 04, 2010 Subject: Consideration of the Award of a Contract to Retrofit the Tahoe Donner Substation Transformers 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of$15,000. 2. HISTORY The Tahoe Donner Substation was constructed in 1972. Due to the increased home size and new homes, the Tahoe Donner electric system has seen a substantial increase in electric load. Two of the transformers were rebuilt in the mid '90s following faults which caused the original transformers to fail. 3. NEW INFORMATION The Retrofit Project Request for Bid (RFB) was advertised in the Sierra Sun on June 25, 2010. The bid opening was held at 2:00 on July 26, 2010. The District received two bids, both were found to be responsive. When the RFB was originally written, it was broken down into three bid items in anticipation of the possible need to replace the primary bushings on one or both transformers, pending transformer and bushing test results. Alternate A would replace the two bushings, and Alternate B would replace all four transformer bushings. Subsequent to the RFB being issued, staff was made aware of similar transformers that have failed in other systems. Staff is now recommending that Alternate B be awarded in anticipation of needing to replace all of the primary bushings. If in fact the bushings are tested and found to be usable, a deduction change order will be written reducing the overall scope and budget for this project. Totals are shown in the table below for this proposed award: Bidder Base Bid Alternate A Alternate B Hart High Voltage $46,266.10 $59,202.46 $71,472.82 ABB, Inc. $101,478.00 $109,728.00 $117,978.00 4. FISCAL IMPACT Sufficient funds exist in the approved FY10 budget for this project. 5. RECOMMENDATION A) Award of the Tahoe Donner Substation Retrofit Project Contract to H.A.R.T. High- voltage Apparatus Repair & Testing Co., Inc. in the amount of $71,472,82, for a total not to exceed the amount of $75,046 which includes a 5% change order allowance. B) Authorize transfer of up to $75,046 from the Electric Capital Reserve to the Electric Operation Fund. Al- Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager