HomeMy WebLinkAbout7 CEQA Agenda Item # 7 Public Utility District I PUBLIC HEARING To: Board of Directors From: Neil Kaufman Date: January 20, 2010 Subject: CEQA Public Hearing for the Northwoods Boulevard, Davos Drive and Zermatt Drive portion of the District Pipeline Replacement - 2010 Project 1. WHY THIS MATTER IS BEFORE THE BOARD The District is proposing construction of the District Pipeline Replacement - 2010 project. Prior to starting construction activities, the District is required to complete an environmental review of the proposed project in compliance with CEQA. 2. HISTORY In 2005 and 2006, the Water Department made Board presentations regarding the condition of existing water pipelines and the need to pursue a pipeline replacement program. The District subsequently issued a COP in 2006 and dedicated a portion of those funds for the pipeline replacement program. Pipeline construction projects have been undertaken during 2006, 2007, 2008 and 2009 as part of this program. The planned 2010 pipeline construction currently covers about 10,800 feet of pipeline, the majority of which is located in the Tahoe Donner area. These pipeline alignments are shown on Figure 1. A number of these pipeline alignments involve replacement of the existing pipe with a new pipe of the same size. These pipelines are Categorically Exempt from review under CEQA. However, some of the existing pipelines are too small and need to be upsized. These pipelines require a CEQA review. On September 14, 2009, the General Manager approved a Task Order with Inland Ecosystems to prepare the CEQA Initial Study for a cost of$3,950. On December 2, 2009, the CEQA Initial Study was approved by the Board of Directors for circulation, review and public comment. 3. NEW INFORMATION CEQA requires that the District hold a public hearing to receive comment regarding the proposed project. The Public Hearing has been scheduled for January 20, 2010 and was advertised in the Sierra Sun on January 13, 2010. 4. FISCAL IMPACT There is no direct cost associated with conducting the public hearing. 5. RECOMMENDATION Conduct a public hearing to receive comment regarding the proposed pipeline project. Michael D. Hol y General Manager ' OTHER WORK FOR 2010 " WEST REED AVENUE SERVICE LATERAL REPLACEMENTS SNOC NPEAK WAY NOR—rHWC}'ODS BLVD �: ,. �Z BSI{,11EW COOP SIERRA GLEN WAY r70- . '` .« _ _ b ztanri DRIVE- EASEM ENT KITZBUHEL ROAD x - _ 'NORTHWOODS BLVD DAVOS DRIVE : LEGEND — Categorically Exempt under CEQA — - CEQA Review Previously Completed (Carry-over from 2009) TRUCKEE DONNER Figure 1 CEQA Review Discussed in this Initial Study Public Utility District Planned 2010 Pipeline Construction