Loading...
HomeMy WebLinkAbout8 Davos and Zermatt Drive CEQA Agenda Item # 8 Public Utility District CONSENT To: Board of Directors From: Neil Kaufman Date: January 20, 2010 Subject: Approval of the CEQA Mitigated Negative Declaration for the Northwoods Boulevard, Davos Drive and Zermatt Drive portion of the District Pipeline Replacement- 2010 Project 1. WHY THIS MATTER IS BEFORE THE BOARD The District is proposing construction of the District Pipeline Replacement - 2010 project. Prior to starting construction activities, the District is required to complete an environmental review of the proposed project in compliance with CEQA. 2. HISTORY In 2005 and 2006, the Water Department made Board presentations regarding the condition of existing water pipelines and the need to pursue a pipeline replacement program. The District subsequently issued a COP in 2006 and dedicated a portion of those funds for the pipeline replacement program. Pipeline construction projects have been undertaken during 2006, 2007, 2008 and 2009 as part of this program. The planned 2010 pipeline construction currently covers about 10,800 feet of pipeline, the majority of which is located in the Tahoe Donner area. These pipeline alignments are shown on Figure 1. A number of these pipeline alignments involve replacement of the existing pipe with a new pipe of the same size. These pipelines are Categorically Exempt from review under CEQA. However, some of the existing pipelines are too small and need to be upsized. These pipelines require a CEQA review. On September 141 2009, the General Manager approved a Task Order with Inland Ecosystems to prepare the CEQA Initial Study for a cost of$3,950. On December 2, 2009, the CEQA Initial Study was approved by the Board of Directors for circulation, review and public comment. 3. NEW INFORMATION The 30 day public review period is complete. A public hearing is scheduled for January 20, 2010. The public was advertised in the Sierra Sun on January 13, 2010. To date, the District has not received any comments regarding the project and there is no new information regarding the CEQA review at this time. The current project schedule is given below: December 2, 2009 - Board Approval of CEQA Initial Study January 20, 2010 - Public Hearing on CEQA Initial Study January 20, 2010 -Adoption of Final CEQA Document January 2010 - Begin Advertising for Bids March 2010 - Open Bids & Award Contract May 2010 - Begin Construction Attachments: Figure 1 Final Mitigated Negative Declaration 4. FISCAL IMPACT There is no direct cost associated with approval of the CEQA study. Funding of the CEQA preparation was addressed when the contract with Inland Ecosystems was approved. Additional funding is not needed. 5. RECOMMENDATION Recommend that the Board take the following actions regarding the environmental review for the Northwoods Boulevard, Davos Drive and Zermatt Drive portion of the 2010 Pipeline Replacement Project. 1. Adopt the Final Mitigated Negative Declaration 2. Approve the project for purposes of CEQA 3. Approve the Mitigated Monitoring Plan 4. Authorize the filing of the Notice of Determination with the Office of the Nevada County Clerk and the Governor's Office of Planning and Research 5. Adopt a finding that the draft documents as circulated and the negative declaration reflect the District's independent judgment Michael D. Holley General Manager N0"RTHWO0D BL S .._...., 5 F 1, wbP X ITZBUHEL ROAD Wx r. z� s LEGEND Categorically CEQA Review Figure 1 CEQA Reviewlanned 2010 Pipeline Construction TRUCKEE ONNER PUBLIC UT I L I T T R I T California Environmental Quality Act Initial Study/Proposed Mitigated Negative Declaration for ` Northwoods Boulevard/Zermatt Drive/Davos Drive Pipeline Project fr ) °2 M > i E+A� b Y• YF 2' bY���^ �k� tt . Generalized pipeline alignment ��s between Davos Drive and Ski Slope Way. 2 r r "o k:xwe':•l Prepared For Prepared By Board of Directors Inland Ecosystems, Inc. Truckee Donner Public Utility District 3239 Reno Vista Drive 11570 Donner Pass Road Reno, NV 89512 Truckee, CA 96160 January 2010