Loading...
HomeMy WebLinkAbout11 Activity Report TDPUD Monthly Activity Report April 15,1999 To: Board of Directors From: Bob Quinn, Electric Superintendent Subject: March ‘99 Activity Report Agenda #11 Truckee experienced heavy snows during this reporting month and as a consequence, electric department crews spent considerable time working on maintenance projects related to the weather conditions. No major widespread power occurred during this period. Additionally, electric crews work on the following projects during the month of March: The service crew installed 24 overhead and 8 underground electrical services and responded to 31 requests for underground facility locates (USA’s). Crews continued to replace or add additional transformers to transformers that were overloaded because of new construction and growth. Crews worked in the alley downtown installing padmount transformers in preparation of converting the area to underground. In the Donner Lake area, primary lines were converted from delta configuration to wye configuration. By changing configuration, when a tap fuse opens for whatever reason, (birds, squirrels, weather, etc.), brownouts are eliminated along with consumer claims for damages. A large percentage of Donner Lake needs to be converted and will be done as time, scheduling, and monies permit. During March, interviews were held and a new lineman, Ralph Ercolin, was hired to replace Mike Camara who moved to Hawaii. During this same period, Pat Waite was awarded the substation position vacated by Wayne Cummings, who also moved to Hawaii. Pat’s movement to the substation position leaves the line crew one lineman short. We are attempting to fill that vacancy. I was on vacation for the first two weeks of March.