HomeMy WebLinkAbout13 Substation Transformers Agenda Item # 13 -M IONNER r: Public Utility District ACTION To: Board of Directors From: Sanna Schlosser Date: December 17, 2014 Subject: Consideration of the Award of a Contract for Substation Transformers 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of$15,000. 2. HISTORY The District is rebuilding the Donner Lake Substation to increase station capacity and reliability, add another feeder, improve coordination with the adjacent transmission line, improve protection of substation equipment, and provide compliance with current code requirements. The initial engineering work began on this project in 2007. Since that time, there has been ongoing work associated with the design and permitting of the improvements associated with this project. In July 2014, the Board awarded the electrical design work to Trisage Consulting, and the civil improvement construction project to Longo Inc. The civil improvements were accepted as complete by the Board on November 19, 2014. 3. NEW INFORMATION The engineering design work associated with the electrical rebuild is on-going. In anticipation of performing the electrical rebuild during the summer of 2015, staff is proposing to purchase long lead time materials this winter. A specification for a substation transformer was prepared and a request for bids was sent out on November 14, 2014 and advertised on November 19, 2014. A total of ten bids were received and opened on December 8, 2014. A summary of bids received is shown below: Vendor Unit price W/freight Responsive Fortune Electric $250,600 n CG Power Systems $268,500 n WEG Electric $281,400 y Uptegraff Transformer $309,867 n/e * Virginia Transformer $315,900 n/e * Pacific Utilities $335,350 n/e * Delta Star $339,084 n/e * General Pacific $367,414 n/e * Howard Industries $377,820 We* Gexpro 1$532,565 n/e * Bids with n/e * in the responsive column were not evaluated for compliance with the spec, due to number of bids received. The apparent low bidder, Fortune Electric, failed to meet the technical requirements of the specification, hence their bid is non-responsive to District contract requirements. The next lowest bidder, CG Power Systems, took exception to our standard contract terms and conditions, hence their bid is also non-responsive to District requirements. The lowest responsive bidder was determined to be WEG Electric with a unit price including freight of $281,400. Due to the number of bids received, only the top 3 bids were evaluated for compliance with the Contract. 4. FISCAL IMPACT The FYI Budget includes funding for this project. 5. RECOMMENDATION a) Find Fortune Electric's bid and CG Power System's bid non-responsive. b) Award the bid for a substation transformer to WEG Electric in the amount of $281,400, plus a 10 percent change order allowance in the amount of $28,140 for an amount not to exceed $309,540 plus tax. *1b Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager