Loading...
HomeMy WebLinkAbout11 Building Energy Audit Agenda Item # I I TRUCKEE DONNER I PUblic Utility District WORKSHOP To: Board of Directors From: Kathleen Neus Date: January 19, 2011 Subject: Discussion Regarding the District Headquarters Building Energy Audit 1. WHY THIS MATTER IS BEFORE THE BOARD The Board of Directors receives and reviews District reports. The Board has requested that this item be reviewed with the Board. 2. HISTORY In October of 2009 the District issued a Request for Proposal (RFP) for the TDPUD Building Energy Use Assessment and Improvement Study. Subsequently the Board awarded the contract to Enovity Inc. at the November 4, 2009 meeting. The purpose of the study was to determine opportunities to save energy through both operational/maintenance improvements and cost-effective capital investments. The outcome of the assessment is to have a prioritized list by cost-effectiveness of opportunities to save energy and money. Enovity Inc completed the study, attached, in January 2010. 3. NEW INFORMATION The Enovity Report provided the District staff with a prioritized list of improvements and capital investments. This information has been summarized in Table E.1, page 4 of the report (Attachment 1). Measures identified in the report are being evaluated for feasibility, have been completed or are scheduled for completion this summer. The following Energy Efficiency Measures have been identified as being strongly advantageous to the District: EEM 1-3 Correct Boiler Deficiencies Due to the age of the boilers and appurtenances, there have been some failures of one or the other of the boilers. For this reason it is not been the opportune time to isolate one of the boilers. Currently waiting on pricing for the automatic stack dampers. EEM 4 Insulate Garage Doors Currently out for quotes on the cost to insulate all garage doors including a metal skin. EEM 5-8 Install Occupancy Lighting Controls Many occupancy sensors and bi-pass timers have been installed throughout the building. New areas are continuously identified that either a occupancy sensor or bi-pass timer would be appropriate. EEM 9-10 Implement Scheduled Operation of heaters in the warehouse, electric and water garages Programmable thermostats are on order and should be installed by the end of February. EEM 11 Install Circulation Fans in the Warehouse This project requires evaluation as to the location of the fans. The fans need to be places where the location will not obstruct the ability to place material on the higher shelves and can be easily serviced. CAPITAL MEASURES CM 1 Install Condensing Boilers Currently working on developing specifications for the purchase and installation of new condensing boilers. CM 2 Install Direct Digital Control (DDC) System Installation This measure would be integrated into the boiler replacement OPERATIONAL & MAINTENANCE MEASURES O&M 1-6 Fan Coils All items related to fan coils have either been completed or are in the process O&M 7 Boiler Controls Due to boiler failures this has been put on hold until the situation stabilizes O&M 8 Repair Damper in Warehouse On the list, should be completed before summer O&M 9 Re-enable CO Sensors This project has been completed OCCUPANT COMFORT MEASURES OCM 1-2 Ventilation These measures are part of a bigger picture. There is inadequate ventilation throughout the building but this is not a quick fix and will require. OCM 3-5 Cooling As part of the Re-roof project the Board approved the installation of additional insulation (R12) on the roofs over the office areas. The insulation has improved the comfort in the summer and the winter months. This project is on the list but there is many other items that need to be completed prior to installing a whole building evaporative cooler. Building Maintenance recently purchased a Computerized Maintenance Management System (CMMS), a windows based program to schedule and track all building preventative maintenance and repairs. Facilities continues to chip away at the items that can be handled in house and are contacting vendors to assist in the other areas. 4. FISCAL IMPACT There is no fiscal impact associated with this workshop item. 5. RECOMMENDATION Review the report and provide comment. Michael D. Holley General Manager