HomeMy WebLinkAbout11 SCADA Agenda Item # I I TRUCKEE DONNER ACTION To: Board of Directors From: Joe Horvath Date: October 05, 2011 Subject: Consideration of the Award of a Contrac t for Phase 1 of the SCADA Reliability Improvement Project 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of 1$ 5,000. 2. HISTORY The District has 5 electric and 55 water facilities located throughout our service territory. These facilities include electric substations, pump stations, wells, stora e facilities tanks and control valves. We communicate to these faci ' ' g media including leased data circuits, l over several types of dial-up telephone lines, cellular modems and a variety of radio systems. These communications stems w and water SCADA systems, are Y which are integral to electric Y antiquated, difficult to maintain, exhibit overall low reliability and have very limited bandwidth. The District round electric has installed communication conduit with underground tric and water system extensions since approximately 2000. This conduit system allows the District to install p Y improve communication reliabilityto our electric new communication media to tric and water facilities. 3. NEW INFORMATION Transitioning to optical cable technologyallows the communications infrastructure District to future proof' our and is the best option for communication cable media. Staff prepared bid documents for a contractor to r cables in a proposed Phase 1 project procure, install, and test optical Substation Martis p � to connect the District office and Truckee Valley Substation, 6170 Tank, and Glenshire Drive Remaining District facilities will be connected with Well areas. over the next several ears. optical cables in a phased approach y Bids were sent out on August 29, 2011. The bid o e was held at 2:OOPM on September 26 and two bids were r p Wing bids is shown below: received A summary of the Bidder Amount Res onsive Valle Communications, Inc. $359,940 Yes Curtis & Sons Construction, Inc. 1 $279,653.50 Yes 4. FISCAL IMPACT Sufficient funds exist within the approved FY11 District capital budgets udgets for this project. Project benefits will accrue to the Electric and Water departments, therefore it is proposed to split costs equally between the departments. 5. RECOMMENDATION Award the SCADA Reliability Improvement Project to Curtis & S in the amount of $279,653.50 plus a Sons Construction, Inc. p 10 percent change order allowance for an amount not to exceed $307,653.50. /— k 45�1--- -- /I Stephen Hollab p augh Michael D. Holley Assistant General Manager General Manager