Loading...
HomeMy WebLinkAbout7 FY12 and FY13 Budget Agenda Item ## 7 TRUCKEE DONNER CTION To: Board of Directors From: Robert Mescher Date: November 16, 2011 Subject: Consideration of Approving Action Items Related to the FY12 and FY13 Budget a) Approve a Resolution Adopting the FY12 and FY13 Budget and Overhead Allocation Rates b) Approve the Related Transfers from Reserve Funds c) Adopt the FY12 and FY13 Purchase Power and Resource Plan I. WHY THIS MATTER IS BEFORE THE BOARD This item completes the FY12 and FY13 Budget preparation process. 2. HISTORY District Code requires the District to prepare a two-year budget. The Board, staff, and public have participated in the following 9 workshops: budget worksho •September 7 • Discussed the budget objectives, goals, and assumptions October 5 • Discussed the: • Budget overview; • Purchase power plan; and • Supporting services budget. October 19 • Discussed the Electric and Water Utility operational and capital budgets p g November 2 • Held a public hearing • Presented a draft of the FY12 and FY13 Budget • Presented the Financial Master Plan Summary Attachment 1 summarizes these workshops. 3. NEW INFORMATION No changes have been made to the FY12 and FY13 Budget as drafted and resented on November 2, 2011. p No changes have been made to the FY12 and FY13 Purchase Power Plan as drafted and presented on October 5, 2011. 4. FISCAL IMPACT No rate increases are proposed. Staff is proposing a balanced budget for FY12 and FY13. Total revenue and transfers from other existing funds will equal total expenses and transfers to reserves. Attachment 3 is a list of transfers included in the FY12 and FY13 Budget. The overhead allocation rates used in the proposed budget are as follows: Overhead Rate Metric FY12 FY12 Labor Payroll Dollars 97% 99% Transportation Pavroll Hours $ 11.80 $ 12.09 l ]Inventory Inventory Issues 21% 21% Administration Payroll Dollars 3% 3% Construction Payroll Dollars 18% 18% 5. RECOMMENDATION a.) Approve the resolution to adopt the FY12 and FY13 Budget and overhead allocation rates (Attachment 2). g ad b.)Approve the budgeted transfers listed in Attachment 3. c.)Adopt the FY12 and FY13 Purchase Power Plan as presented on October 5 2012. Robert Mescher Administrative Services Manager Michael D. HolleyGeneral Manager Attachment 1 FY12 and FY13 Budget WorkshopSummary At the previous workshops, staff presented the following: • Key Assumptions • Electric and Water Budget Drivers • Reserve Fund Projections and Goals • Revenue Requirements • Elements of the FY12 and FY13 Budget • FY12 and FY13 Purchased Power Plan Kev Assumptions • Customer utility rates will not be increased in FY12 and FY13; • Direct labor rates are estimated to be flat in FY12 and increased an estimated 3% in FY13; • Staffing level changes include a reduction of two employees from the FY11 Budget; • Most other operational expenses will remain flat or slight) increased ranging from 0% to 4% per year; Y ' P Y , • No new debt will be incurred; and • The budget will be balanced. Electric and Water Budget Drivers Electric Department • One less employee • No other significant changes in year-to-year expenses • Focus will continue on system maintenance, the SCADA Reliability Improvement Project, and the reliabilityof the Donner La Lake Substation Water Department ' • One less employee • Power supply costs are reduced as leaks were repaired and residential meters were installed • Focus will continue on completing the new residential water meter installations and the replacement of the Water SCADA system Page 1 of 6 Attachment 1 Reserve Fund Proiections and Goals The District continues to fund the reserves for the Electric Department, but those reserve fund balances have not yet reached the District's goals. However, once the Electric Department's debt is extinguished in FY12, the District will be able to quickly reach its operating and capital reserve goals. By the end of FY11, the District will reach and exceed its reserve fund goals for the Water Department. These reserve balances will protect the District from the revenue uncertainties of the new residential volumetric billing and provide the District with internal funding for the last phase of the meter installation project. The following are the total projected reserve fund balances and the current goals for Electric and Water. FY11 FY12 FY13 Goal Electric $ 71665,000 $ 81081,000 $ 81669,000 $11,0002000 Water $10,531,000 $ 91918,000 $ 91617,000 $ 61700,000 Staff proposes that the Electric reserve goal be increased to 180 days of total annual expenditures. This proposal, along with the existing reserve goals and balances will be discussed with the Board again in the second quarter of next year. Revenue Requirements To fund the budgeted expenditures, no rate increases are proposed: FY12 FY13 Electric 0% 0% Water 0% 0% Page 2 of 6 Attachment 1 Elements of the FY12 and FY13 Budget For the November 2, 2011 Board Meeting, staff presented a draft of the proposed FY12 and FY13 Budget. It included: p • Executive Summary; • Part I District's Mission Statement and Goals; • Part II Electric Utility's Operating, Repair and Maintenance Plan; • Part III Water Utility's Operating, Repair and Maintenance Plan; • Part IV Electric and Water Capital Improvement Plans; and • Part V Appendices 0 1 Interdepartmental Rent o II Budgeted Positions by Department 0 1 1 1 Labor Overhead o IV Transportation Overhead o V Inventory Overhead 0 VI Administrative Overhead o VII Construction Overhead o VIII Electric Debt Schedule 0 IX Water Debt Schedule o X Vehicle Replacement Schedule FY12 and FY13 Budget FY12 Budget FY13 Budget Electric Water Total Electric Water Total Revenue $23,230 $10,910 $34,140 $23,240 $10,910 $34,150 Expenses 19,480 7,430 26,910 19,990 7,710 27,700 Income $ 3,750 $ 3,480 $ 73230 $ 31250 $ 31200 $ 6 450 Plus: From Funds $ 19470 $ 3,610 $ 5,080 $ 11150 $ 31300 $ 4 450 Less: Debt Service 25540 3$ 20 51860 890 31320 4 210 Capital Projects 2,240 21190 4,430 2,890 1,720 4,610 To Reserves 440 1,580 2,020 620 1,460 2080 Surplus (Deficit) $ - $ - $ _ _ ' Page 3 of 6 Attachment 1 FY12 and FY13 Purchase Power Plan For the October 5, 2011, staff presented the following Purchase Power Plan. The FY12 and FY13 Purchase Power Plan continues with the goals of the FY10 and FY11 plan. The District will maintain a more diversified purchase power portfolio that includes many different resources and has the goals of meeting the Renewable Portfolio Standard. The District may be adopting by the end of 2011 its Procurement Plan" to implement SBx1 2, 33% RPS by 2020. The FY12 Purchase Power Plan projects a similar load compared to FY11 with energy conservation and energy efficiency measures accounting for 1% to 3% of the load. Greater conservation has and will reduce future market purchases. The FY12 Plan projects a flat or same load as FY11 with conservation and energy efficiency measures again accountingfor 1% to 3° he /° of the load reduction. The FY13 has a modest growth rate compared to FY12. The budgeted load in MWh is shown below. Year Budgeted MWh FY11 162,000 FY 12 162,000 FY13 163,082 Page 4 of 6 Attachment 1 The details of the purchase power expenditures for FY12 and FY13 are listed in the next two tables. Costs for natural gas, electric market purchases and renewable market purchases are projected, along with average hydrologic conditions. PURCHASE POWER PLAN EXPENDITURES DETAIL 2012 BUDGET 2011 to 2012 Budget Budget $BUDGET Purchased Power and Resource Costs 2011 2012 CHANGE Total Energy Supply-Various $ 10,130,484 $10,757,413 $626,929 $/MWh $62.53 $66.40 Transmission-NVEnergy $ 1,043,766 $1,049,546 $5,781 Scheduling-NCPA $ 77,993 $68,859 ($9,134) WAPA cost/(credit)toward MM's $76,416 ($28,012) ($104,429) Total Bulk Power Costs $ 11,328,658 $ 11,847,806 $ 5199147 4.4% Total Annual MWh 162,000 162,000 0.00% 0 Total Delivered Cost$IMWh $69.93 $73.13 $3.20 4.38% 2013 BUDGET 2012 to 2013 Budget Budget $ BUDGET Purchased Power and Resource Costs 2012 2013 CHANGE Total Energy Supply-Various 1 $10,757,413 $10,918,075 $160,663 $IMWh $66.40 $66.95 Transmission- NVEnergy $1,049,546 $1,081,033 $31,486 Scheduling -NCPA $68,859 $73,226 1 $4,367 WAPA cost/(credit)toward MWh's ($28,012) ($28,012) $0 Total Bulk Power Costs $ 119847,806 $ 12,044,322 $ 196,516 1.6 0 Total Annual MWh 162,000 163,082 1,082 0.67% Total Delivered Cost$IMWh $73.13 $73.85 $0.72 0.97% Page 5 of 6 Attachment 1 The mix of resources for the FY12 and FY13 Purchase Power Plan is illustrated in the graphs below: FY12 Resource Mix UAMPS Pool Payson-Nat Gas 5% 6% Wind-PPM 0% St Fallon Exchange 2% FY13 Resource Mix DAMPS Pool 4% New Resource 5% Payson- Nat Gas 6% Wind-PPM 0% Fallon Exchange 3% Page 6of6 Attachment 2 TRUCKEE III DONNER Resolution No. 2011 - XX ADOPTING THE BUDGET AND OVERHEAD RATES FOR FYI 2 and FYI 3 WHEREAS The Board of Directors adopted a Mission Statement and statement of goals and objectives for the District; and WHEREAS District staff used that Mission Statement and statement of goals and objectives to prepare a draft FY12 and FY13 Budget; and WHEREAS the Board of Directors, Staff, and the public participated in budget workshops in the months of September, October, and November of 2011; and WHEREAS on November 2, 2011, the Board of Directors received a draft FY12 and FY13 Budget; and WHEREAS on November 2, 2011, a public hearing was held; and WHEREAS the Board of Directors accepts the organization changes as directed in the draft FY12 and FY13 Budget. WHEREAS the draft budget for District operations and capital spending for the years FY12 and FY13 describes accounting overhead allocation rates for labor,transportation, inventory, administration, and construction costs; and NOW THEREFORE BE IT RESOLVED by the Board of Directors of Truckee Donner Public Utility District as follows: 1. The draft FY12 and FY13 Budget is hereby adopted. 2. The General Manager and Staff are authorized to implement the biannual FY12 and FY13 Budget. 3. The following Budget overhead allocation rates are adopted: Overhead Rate FY12 FY13 Labor 97% 99% Transportation $ 11.80 $ 12.09 Inventory 21% 21 Administration 3% 3% Construction 18% 18% Attachment 2 PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 16th of November 2011 by the following roll call vote: AYES: ABSTAIN: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Jeff Bender, President of the Board ATTEST: Michael D. Holley, Clerk of the Board TRUCKEE DONNER PUBLIC UTILITY DISTRICT FY12 and FY13 BUDGETED TRANSFERS ELECTRIC UTILITY Vehicle General Fund Rate Reserve Replacement Reserve FY12 Vehicle Replacement Reserve Annual Contribution $ (164,440) $ 1649440 Rate Reserve Annual Contribution (272,174) 2729174 FY13 Vehicle Replacement Reserve Annual Contribution (1699373) 169,373 Rate Reserve Annual Contribution (4450760) 445,760 Total Transfer To(From)Funds $ (190515747) $ 7179934 $ 3339813 n 3 m w TRUCKEE DONNER PUBLIC UTILITY DISTRICT FY12 and FY13 BUDGETED TRANSFERS WATER UTILITY Debt Service Donner Lake Reserve for General Fund Coverage Capital Vehicle Repl. Assessment Facilities g Reserve Reserve Fees Future Water Reserve District Meters F_ 2006 Certificates of Participation Debt Service Payment 258,931 (9%984) (1589947) MSG 1551 Debt Service Payment 1509158 (1509158) Residential Meter Project 558 043 558 043 Vehicle Reserve Fund Annual Contribution (137,917) 1375917 Capital Reserve Annual Contribution (1579379) 157,379 Debt Service Coverage Reserve Annual Contribution (3355850) 3359850 F_ 2006 Certificates of Participation Debt Service Payment 348,987 (995145) (24%842) MSG 1551 Debt Service Payment 1509158 (15%158) Residential Meter Project 578,090 (5789090) Vehicle Reserve Fund Annual Contribution (142,055) 1429055 Capital Reserve Annual Contribution (157,379) 157,379 Debt Service Coverage Reserve Annual Contribution (2969785) 2969785 Total Transfer To(From)Funds $ 817,002 $ 6329635 $ 314,758 $ 279,972 $ (1999129) $ (7099105) $ (19136,133) 0 3 CD w