Loading...
HomeMy WebLinkAbout12 SCADA Optical Data Network Agenda Item # 12 TRUCKEE DONNER Public Utility Distr' Ict ACTION To: Board of Directors From: Joe Horvath Date: May 04, 2011 Subject: Consideration of the Award of a Contract for the S 'SCADA Conduit and Vault Project and a Report on the Optical Data Network Reliability Improvement Project I. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of$15 000. 2. HISTORY The District has 5 electric and 55 water facilities located throughout territory. These facilities include electric our service substations, pump stations, wells, storage tanks and control valves. We communicate to these facilities over s media including leased data circuits dial-u t everal types of p elephone lines, cellular modems and a variety of radio systems. These systems, which serve Electric and I antiquated Water SCADA systems, are becoming increasingly y t quated and are experiencing ongoing loss of reliability issues with the equipment itself and also with our t personnel elecomm carriers. Frequently, we dispatch p el out to remote facilities to troubleshoot communication problems, adding to operating costs. We are also severely limited in due to bandwidth restrictions the type and amount of data we can transmit inherent to older technology. In addition, only basic security protocols are avail sensitive utility data. able to protect our In anticipation of improving communication reliabilityusing newer District has been installingcommunication g wer technologies, the ation conduit with underground electric system extensions since approximately 2000. The conduit system allows for the future use of District-owned communication media. Currently, there are some gaps in this communication conduit system which prevent its use b the District. Conduit and Vault project will complete the y t. The SCADA p few remaining conduit connections and box installations required to make the conduits stem continuous office to Truckee Substation Martis y nuous from the District Valley Substation, 6170 Tank, and Glenshire Drive Well areas. Subsequent to project completion the District conduit system to improve communication reliability to these electric and water 3. NEW INFORMATION The District does not currently have the network infras tructure in place to support modern communication technologies between our office and remote facilities. W lack the infrastructure to support users across mission-criticale also applications including business, GIS and SCADA systems which currently operate as separate within the District. We propose that our network p networks equipment, including core switches, routers, and firewall appliances, be upgraded to form a foundation which will integrate these systems for increased efficiency, security, and hi Y y, high availability. This network will also serve as a communications hub to remote facilities. We using but flexible network architecture from a single propose 9 standard g e equipment vendor to reduce costs, increase reliability and ensure easy migration as our needs change. We network equipment from Cisco Systems g believe that y (Cisco), a long-time industry leader in network technologies, is the right choice for the needs of the District, now and into th e future. The State of California has competitively bid p y equipment from Cisco as part of the California Multiple Award Schedule (CMAS) program. Local governments, the District, are eligible to take advantage g meets, including g of State bids through CMAS. Staff will compile a list of proposed equipment from Cisco through the CMAS program for 9 possible Board approval at the June Board meeting. As previously mentioned, the District has communication conduit in place to support District-owned communication media. fiber o We believe the right choice for this media is optic cable. Fiber technology allows us to future proof' our network. fiber uses light as the signal, it is theoretical) Because Y unlimited in bandwidth (capacity). Fiber also has the advan tage of being more reliable and has a longer life span than co er wire cables. It is also immune to electromagnetic interference unlike pp wireless products. As technology and our needs � copper cables or change, we can upgrade electronic equipment without changing the fiber cables. Staff is preparingbid documents contractor to procure, install, and test fiber optic c is for a between the District office and Truckee Substation,cables Martis Valley Substation 617 Tank, and Glenshire Drive Well areas. RemainingDistrict f fiber in a phased approach over facilities will be connected to pp er the next several years. We anticipate bringin the oval Phase 1 Fiber project bid results to the Board for possible approval g Board meeting. p pp at the August Before cables can be installed, the project to close in the gaps communication conduit system must be complete. Therefore staff prepared the necessary bid documents for the installation of conduit and vaults. The bid period began on A April 26, 2011.The bid opening was g pill 12, and ended on P g held at 2.00PM on April 26 and five bids were received. A summary of the bids is shown below: Bidder mo Resp onsiveonsive 211TEHea Equipment �q YsAM-X e $71,117 Yes Aspen Developers $73,430 Yes rDale Burt $79,999 Yes L7ongo, Inc. $94,500 Yes 4. FISCAL IMPACT Sufficient monies exist within the approved FY11 District capital bud project. Anticipated project costs are shown below. p gets for this Project Component Cost Comments Network Equipment $2153000 Estimate Fiber Cable Build $175,000 Estimate Conduit and Vault Installation $641 750 Low Bid Amount Total $454,750 Project benefits will accrue not only to the Electric and Water departments' to s p ents, but to the entire District. Therefore it is proposed plit costs among the Electric, Water and Administration departments according to the following schedule: Department Cost Source Electric $1893875 Capital Reserves and Projects Water $189,875 capital Projects Administration $75,000 Capital Projects Total J $454,750 5. RECOMMENDATION Award the SCADA Conduit and Vault Project - 2011 to Heavy Equipment in the amount of$64,750 plus a 10 p change order allowance of$6,475 for an amount not to exceed $71,225. Stephen Hollabaugh Assistant General Manager Michael D. Holley General Manager