Loading...
HomeMy WebLinkAbout9 Computer Server Hardware and Software Agenda Item ---------- TRUCKEE DONNER Public Utlky D'Istrict —1d A TION To: Board of Directors From: Ian Fitzgerald Date: February 01, 2012 Subject: Consideration of the Purchase of Computer Server Hardware & Software 1. WHY THIS MATTER IS BEFORE THE BOARD Board approval is required for expenditures in excess of$15,000. 2. HISTORY The District currently operates 27 servers - tasked to manage company email, monitor and operate the network LAN, operate the OIS, Electric Design, Outage Management and Customer Information databases, and maintain terabytes of file data important to daily company activities. 3. NEW INFORMATION In addition to the current server environment, new projects on the near horizon will require new server hardware, including Building Security, Vehicle Maintenance, Voice- Over-IP, Digital Media, Web Hosting and Water SCADA among others. Most of the existing servers have exceeded their life expectancy and are in need to be upgraded. Hardware upgrades will not only improve performance and capacity, but increase intrusion security. We are at a point of server hardware turnover, where any decision on the future of hardware design architecture today, will determine architectural design for the next 10 years. To minimize cost going forward, staff plans to consolidate the majority of District servers into a blade server, Virtual management environment. This approach provides for many advantages will be seen, including: • Reduced Power Consumption and Improved Power Management • Improved Disaster Management and Hardware/Software Failover • Reduced Administration and Management Costs • Increased Scalability- New servers can be added at little to no cost • Reduced Costs Reduced Power Consumption and Improved Power Management Consolidation of individual servers into a blade server, virtual environment will reduce power consumption by 96-97%. Additional savings will occur due to reduced cooling loads. Improved Disaster Management and Hardware/Software Failover Most of our system servers are configured to ensure hard drive failures do not create a loss of data, however they do not ensure fail-over or redundancy should a server motherboard fail, or operating system crash. The proposed blade server configuration will provide for replicated services to provide redundancies for a vast range of hardware failover. Lower Administration and Management Costs Managing 27 servers spread throughout the District offices is time consuming. Having the ability to manage all servers at one location will reduce administration and maintenance costs to the District significantly. This will ensure quicker response times and restoration of any hardware or software issues that may be encountered. Reduced Upgrade Costs The District is planning for several IT projects in the coming 3-5 years. Most of these projects will require server hardware and software in order to support these endeavors. Some the more critical projects include upgrading the Water SCADA; adding building security devices; tracking vehicle inspections, maintenance, fuel consumption and repairs; and finally adding digital media display to support the District's customers and conservation programs. Depending on requirements, new individual servers would cost between $6,000 and $10,000 each. The proposed environment would allow these servers to be added to the existing design through server virtualization with zero hardware cost. The proposed blade server system (hardware and software) is from NetXperts; the same company which our network switches was purchased from. This would ensure there was one point of contact for all IT infrastructure support, ensure communication between hardware devices is proven, and allow for quicker implementation and higher confidence in the final build Out. Section 3.08.060 of the District's code (Joint Purchasing with the State of California and other public agencies) permits the District to take advantage of other agencies low bids providing that competitive procurement procedures were followed. The costs proposals are submitted on both the California Multiple Award Schedules (CMAS) and p the Western States Contracting Alliance (WSCA), which both adhere to this section of the District code. Proposal put forth by NetXperts NetXperts has put together a WSCA/CMAS quote that will handle all the District's server requirements for the next 10 years. This design will reduce power, provide disaster recovery and failover redundancy, and use future scalability and growth as new IT project come on board. CMAS Contract 1. Cisco UCS B Series Blade and Chassis = $63,672 2. 2nd Redundant Cisco B Series Chassis = $ 20,769 3. NetXpert Professional Services=$32,800 WSCA Contract 4. Cisco Storage Server& Virtual Software = $60,263 4. FISCAL IMPACT Sufficient funds exist in the FY12 Budget for the purchase of the computer server hardware and software. Administrative Services, Server Replacement = $50,000 Power Supply, Server Replacement = $40,000 Water, New SCADA Servers = $20,000 Conservation Green Partners Program = $67,504 There is also a 5% contingency allowance for any potential change orders. 5. RECOMMENDATION Approve the purchase of the proposed server hardware and professional services .through NetXperts for the amount of $177,504, plus a 5% contingency, not to exceed $186,379. Stephen Hollabaugh Michael D. Holley Assistant General Manager General Manager