To: Board of Directors
From: Neil Kaufman
Date: September 05, 2012
Subject: Ordinance to Adjust Water Connection Fees
1. WHY THIS MATTER IS BEFORE THE BOARD
Board action is required to adjust Connection Fees
2. HISTORY
The current Water Connection Fee schedule was adopted in February 2008. No
adjustments have been made since that time. In July 2012, The Board adopted the
2012 Water Master Plan Update. The Water Master Plan Update recommended that
Connection Fees be adjusted to reflect current costs.
3. NEW INFORMATION
A draft of the ordinance adjusting Water Connection Fees is included as Attachment
1. The Board is required to hold a public hearing before adoption of an ordinance.
Adoption of the ordinance is currently scheduled for the October 3 2012 Board
Meeting. '
4. FISCAL IMPACT
The 2012 Water Master Plan Update recommends that Water Connection Fee
schedule be adjusted as shown in the table below:
Meter Size Existing Proposed
Connection Fee Connection Fee
5/8"x 3/4" $1,185 $1,290
3/4" $19220 $1,330
1" Actual Cost $1,430
1 1/2" Actual Cost Actual Cost
2" Actual Cost Actual Cost
3" Actual Cost Actual Cost
4" Actual Cost Actual Cost
6" Actual Cost Actual Cost
5. RECOMMENDATION
Conduct the public hearing to receive comment on the draft ordinance.
Michael D. Holley
General Manager l Water Utility Manager
}k•}v
Attachment
ti} 5
- TRUCKEE DONNER
Pubhc- Ut'lity Dstrict
tik. Pr
Ordinance Na. 2012
Amending Water Connection Fees
WHEREAS the District's current Connection Fee schedule was established on February
6, 2008, and
WHEREAS, the District has been experiencing increased costs for labor, fuel materials
and other items since that time; and
WHEREAS on September 5, 2012 a public hearing was held to receive public comments
on the proposed Water Connection Fee increase;
NOW, THEREFORE, BE IT ORDAINED that the Board of Directors of the Truckee Donner
Public Utility District does hereby enact the following:
1. Connection fees are charged to reimburse the District for the actual administrative
material and labor costs of connecting to the water system (excluding the service
lateral).
2. Connection fees shall be charged according to the following schedule:
METER SIZE CONNECTION
(inches) FEE
5/8 x 3/4 $1,290
3/4 $1,330
1 $1,430
1-%2 Actual cost
2 Actual cost
3 Actual cost
4 Actual cost
6 Actual cost
3. This ordinance shall be effective sixty (60) days after the date it was adopted b th
p y e
Bo
ard of Directors.
Page 1 Ordinance 2012-XX
Attachment 1
4. The Clerk of the District shall immediately cause a co of this ordinance to b
. copy e
published in a newspaper of general circulation and posted in three places within the
District.
PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the
District on the day of 2012 by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Tony Laliotis, President
ATTEST:
Michael D. Holley, District Clerk
Page 2 Ordinance 2012-XX
Ilss d1- dm Tahoe
September 5, 2012
The Honorable Tony Laliotis
President,
Directors Aguera, Bender, and Hemig
Truckee Donner Public Utility District
11570 Donner Pass Road
Truckee, CA 96161
RE: Public Hearin -Consideration of an Ordinance to Ad'ust Water F 'ac�lity Fees
Dear President Laliotos and Directors:
The Contractors Association of Truckee Tahoe is a regional trade association '
member companiesbuilding anon representing 300
across the broad spectrum of the building industry. Man of our members
construction customers and utility rat y rs are
•. ity ratepayers of the District. Thank you for the opportunity to comment
on the Water Facility Fees for new residential an y d commercial construction. Neil Kaufman and Steven
Poncelet of your staff have been very helpful in presenting the fee changes
professional . . � ges to CATT.members and the
p a! courtesy shown by Steven and Neil is greatly appreciated.- It is worth '
our staff asks p while to mention that
y d questions and considered the samples we provided of fee
envies. This issue h programs. conducted by other
agencies. as taken a lot of their time and we appreciate that.
SPECIFIC COMMENTS
1} Annual adjustment for Residential and Commercial Fees based on changes to the ENR CCI
We support this change to District policy as a wayto keep ace with in p p flagon.
Any needed changes are usually minimal and easyto absorb into `
also i , a construction budget. It
s proactive and more fair, not reactive (playing catch-up with one huge change
8 years). Thanks to TDPUD staff g ge every
a for clarifying that the District fiscal year"starts January 1
and not July 1 (the height of the building season—not a good time to change fees}
Language could be added to the Ordinance paragraph #6 •
• P 9 p (page 3} to clarify that the
District will start tracking the ENRCCI in December of 2013 '
(sets the baseline) and then
meas
ure the change in December 2014. This degree of change is the
January2014 fee a g n applied to the
mounts (shown in paragraph #5, page 2). The new fee amounts
become effective January 1 2015.
12313 Soaring Way, Suite 1 G • Truckee CA 96161 • 530-550-9999 • fa
x 530-550-9998 • info@ca-tt.corn
2) Fee Review after$1,000,000 Spent on Capital Project
We support this change to District policy where actual costs are used to inform/modify
your CIP (Capital Improvements Plan).
We do not support a $1,000,000 threshold for Fee Review and think an annual revie
w of
all CIP project costs completed during the year is more realistic and appropriate. Tab!e 8-
4 in the Water Master Plan has a detailed listing of all projects with estimated construction ctron
costs. That is the table where actual costs would be plugged in once a project has be p � been
completed.
3) Residential Facilities Fees
- We support the decrease of the fee from $1.64 per SF to $1.61. The Water
Master Plan
does adequately explain the need for the decrease.
- We do not support the decrease phased in over two ears as the amour i '
. Y t s minimal and
does not cause undue hardship on the District. Keep it simple, save staff time
ff p � , and make
the decrease effective 60 days after adoption of the Ordinance. Your customers certain)
treat fee increases different from fee decreases s y o it makes sense that the District treat
them differently too and adopt the decrease all at once.
4) Commercial Facilities Fees
We are neutral on the increase of the fee as proposed for the various p meter sizes. The
Water Mas
ter Plan does adequately explain the need for the increase.
We do not support the almost 30% increase phased in over two ear +o
Y s �15_Io each year}
as the
amount is significant with a $504 increase in year one and a $503 increase in
year
two. We support a three year phase in at 10±% increase each year ($336). '
. y This is a
manageable amount to build into contracts pending this year, as the increase se becomes
effective sometime in December 2012. Soften the
blow to future business owners and
make the increase a lower amount over a longer time — lease do not penalize
the District's as increasing
p alize them for
past practice of not regularly increasing fees.
GENERAL COMMENTS
1) Town growth rate has slowed
We strongly support a revision to the Water Master Plan that tak
es into account the slow
down in the growth rate to give you a more realistic picture of
p needed improvements.
Here is the T
owns Annual Community Development Report for 2011 released i
of 2012. I quote from the Intro n March
� Introduction, page 5:
"Residential growth slowed in 2011 with housingunits increasing
a 0.4% increase � 9 by only 0.3/o (dawn from
In 2010). For the llrst time in preparing the CommunityDevelopment
Annual Report, the non-residential elOpment
t al growth rate decreased, gang from 1.2% to 0.3%."
The Red Mountain Storage Tank replacement slated for 201
5 might not be needed for a
while, just as New Well#1, slated for 2016, might not be needed ded for several years beyond
that. We did bring up this issue to your staff and they are now aware of the change in
growth rate. From a buildout perspective, it may not change what is needed but '
is needed. --- it does
change when something d. In an "agree to disagree" discussion, it is my
understanding that your staff will update the Water Master Plan when the Town updates
its General Plan but not sooner. That is disappointing.
2) AB 1600 Fees—A Short Overview of Development Impact Fees
Here is useful information prepared by the League of CA Cities on the historical
background of the state law and Government Code sections pertaining to the mitigation
fee program with some do's and don'ts. It was written for legal counsel but is very easy to
Y
understand and you will see some comments similar to mine in this LCC document.
Thank you for listening. We look forward to your favorable decision on our requested changes:
Clarify Ordinance Paragraph#6 with baseline date and means by which the District
calculates new fee for January 1, 2015
Use actual construction costs every year to update report(not$1 M threshold)
Decrease residential fees without two year phasing
Increase commercial fees with three year phasing
. Please contact me (530-550-9999 or Pat(fta-tt.com) if you have any questions.
Sincerely,
CONT CTORS ASSOCIATION OF TRUCKEE TAHOE
r
R
Pat Davison
Executive Director
Attachments: Slide 15, Truckee Community Development 2011 Annual Report, March 2 p 012
Table 8-4, page 1, TDPUD 2012 Water Master Plan
2003 LCC Overview of Development Impact Fees
Woo fig
� 3f
>' milk its
Wo
j I I2338883d! iBD� �s�isssy� ��g
Wo
Wo
11616
Jill II,
4 a a FfEE��tlta fta� ffE��tE1a
IL
gill
04400040
W.
s
0
g 1 49-
1 --44t44444 -141 1 ••.....i4
t311if1ifllE4R Ills I3 I �3I
sale
944
v- SAS,
Jill
Non-Residential Development
• Donner Offices Finn Industrial
• Hotel Avery Building
Inn at Truckee Royal Ridg e
• Remodel Waltman Use
Permit
• Pioneer East TSD Vehicle
• Dependable Tow Building
"]Loll
TE Z 0 2, 3tO 7'0
7'-o-'71
C�0�5 d?uf iurGl� (� Y�ZP fSCtr��G<z� a -
City Attorneys Department
League of California Cities
Continuing Education Seminar
February 27,2003
Peter N.Brown, City Attorney
Graham Lyons,Deputy City Attorney
City of Carpinteria
A SHORT OVERVIEW OF
DEVELOPMENT IMPACT FEES
A SHORT OVERVIEW OF DEVELOPMENT IMPACT FEES
BY:
PETER N.BRowN,CITY ATTORNEY,CITY OF CARPINTERIA
GRAHAM LYONS,DEPUTY CITY ATTORNEY,CITY OF CARPINTERIA
CITY ATTORNEYS DEPARTMENT
LEAGUE OF CALIFORNIA CITIES
2003 CONTINUING EDUCATION PROGRAM
FEBRiuARY 279 2003
I. DEFINITION OF DEVELOPMENT EWPACT FEE
A development impact fee is a monetary exaction other than a tax or special assessment
that is charged by a local governmental agency to an applicant in connection with ap-
proval of a development project for the purpose of defraying all or a portion of the cost of
public facilities relaxed to the development project. (Gov. Code § 66000(b).) The legal
requirements for enactment of development impact fee program are set forth in Govern-
ment Code §§ 66000-66025 (the "Mitigation Fee Act"),the bulk of which were adopted
as 1987's AB 1600 and thus are commonly referred to as "AB 1600 requirements." A
development impact fee is not a tax or special assessment;by its definition, a fee is vol-
untary and must be reasonably related to the cost of the service provided by the local
agency. If a development impact fee does not relate to the impact created by develop-
ment or exceeds the reasonable cost of providing the public service,then the fee may be
declared a special tax and must then be subject to a two-thirds voter approval. (Cal.
Const.,Art.XiII A,§4.)
Practice Pointer: Both the political and legal implications of having a development impact fee de-
clared to be a special tax can be exceedingly grim. The best defense against such an outcome is
careful construction of the development impact fee program and scrupulous attention to substan-
tive and procedural requirements of the Mitigation Fee Act. The City Attorney must play an active
role in this process.
II. PUBLIC AGENCY'S AUTHORITY TO IlWPOSE DEVELOPMENT IM-
PACT FEES
The power to exact development impact fees arises from the city's police power to pro-
tect the public health, safety and welfare. (Cal. Const.,Art.XI, § 7.) The police power
allows a city to act in the interest of its citizenry and to enact and enforce ordinances and
regulations that are not in conflict with state law. Charter cities have the additional
power to regulate by virtue of their plenary authority with respect to municipal affairs.
(Cal.Const.,Art.M. §5.)
2
SB 322494 v4.000009.0001
A. A TRUNCATED HISTORY OE CITIES'A UTHORITY TO EXACT DEVELOPMENT IM-
PACT FEES.
While the California Mitigation Fee Act was enacted in 1987, local governmental agen-
cies had been collecting impact fees for many years. Impact fees, originally called
exactions,were first adopted in the 1920s by cities seeking new infrastructure financing
alternatives. (Practical Issues in Adopting Local Impact Fees, Jerry Kolo and Todd J.
Dicker, excerpt from State and Local Government Review,Vol. 25,no. 3 (Fall 1993);
197 206). In 1949, California courts first adopted the "reasonable relationship"test be-
tween a project's conditions of approval and development impacts. (See Ayers v City of
Los Angeles, 207 P.2d 1 (1949).) This original pronouncement of the test required that an
exaction by a local agency be reasonably related to the development project's impact on
the need for public infrastructure. The concept of exactions expanded in the 1960s with
the enactment of the Quimby Act, which authorized either the dedication of land or pay-
ment of in-lieu fees for development of parks. (Gov. Code § 66477; see also wide to
California Planning,2nd Ed.,William Fulton,p. 181.)
In the 1970s,California courts and the California Attorney General affirmed cities' abil-
ity to exact from new development both the dedication of land and the payment of funds.
In Associated Homebuilders,Inc. v City of Walnut Creek the California Supreme Court
upheld the imposition of development impact fees to mitigate indirect impacts created by
new development. (4 Cal.3 d 633 (1971).) In 1976, the California Attorney General is-
sued an opinion affirming a city's authority to impose an exaction provided it furthers
implementation of the city's general plan and bears at least an indirect relationship to the
impacts created by the proposed development. (59 Ops.Cal.Atty.Gen. 129(1976).)
The modern law of exactions was established beginning in the late 1980s.
I. Nollan v. California Coastal Commission and the Enactment of the
Mitigation Fee Act.
In 1987,the U.S. Supreme Court decided Nollan v. California Coastal Commission,483
U.S. 825 (1987). As most every land use lawyer now knows,the Nollans proposed con-
struction of a two-story home within the same footprint as their existing one-story
beachfront house. As a condition of issuing a coastal development permit, the Coastal
Commission required that the Nollans grant a public access easement across the beach in
front of their house. The Nollans successfully argued,and the U.S. Supreme Court held,
that the exaction(the grant of public easement)was not related to the impact created by
the development(increased building height). Proof of such an "essential nexus"was re-
quired if exaction was to be lawful. The Supreme Court,however, did not specify how
close the nexus must be.
With the passage of Proposition 13 in 1978 and the decline in local government revenues,
local government increasingly relied on impact fees in order to mitigate the impacts cre-
ated by new development. In response,developers lobbied the State Legislature to curtail
the growing use of impact fees. In response,the Legislature passed AB 1600, the Cali-
3
SB 322494 v4:000009.0001
forma Mitigation Fee Act, which codified many of the principles laid out in Nollan and
established a statewide procedure(discussed below)for exacting certain fees from devel-
opment projects.
2. Dolan v. City of Tigard
The U.S. Supreme Court revisited the question of exactions in the Dolan case. (Dolan v.
City of Tigard,512 U.S.319(1994). in this case,Dolan applied to the city for an expan-
sion of her downtown hardware store, which was located on a flood plain. The cit
y
sought to condition approval of her project on the dedication to the city of a bike path and
a greenway along a stream that bounded her property. The Supreme Court laid down a
more refined test for the exaction of real property,ruling that in order for the government
to require project-specific exactions, the government must demonstrate that(i)an essen-
tial nexus exists between the legitimate state interest and the exaction imposed by the city
(as Noll an had held),and(u)the nature of the exaction must be"roughly proportional"to
the impact the project is creating. The Dolan court found that,while the city had demon-
strated the required essential nexus,the exactions involved were not roughly proportional
to the project's impacts. The court noted that it was dealing with an ad hoc quasi-
adjudicative,rather than legislative,decision by the city.
The Dolan case concerned physical exactions, and is significant chiefly in that context.
For a good summary of Dolan's applicability for contemporary permit conditions that in-
volve exaction of real property, see Curtin's California Land Use and Planning Law
(2002),page 271.
I Ehrlich v. City of Culver City
When the Dolan decision came down, a California appellate court had just ruled on an
impact fee case involving a recreation fee and a public art fee. Unlike Dolan, Ehrlich v.
City of Culver City involved the payment of money,not the exaction of real property. (12
Cal.App.0 854 (1996).) After deciding Dolan, the Supreme Court vacated the Califor-
nia appellate court's ruling in Ehrlich and remanded it for reconsideration in light of
Dolan.
Ehrlich purchased a 2.4-'acre parcel and developed a private tennis club. The parcel was
zoned for commercial uses,which included use as a sports facility. After a few years,the
tennis club failed. Ehrlich applied to the city for approvals to tear down the facility and
to construct thirty townhouses,which would require a rezoning of the property and a gen-
eral plan amendment. The city ultimately conditioned approval of Ehrlich's project on
the payment of a $280,000 recreation facilities mitigation fee for the loss of the tennis
courts and a$33,200"art in public places"fee. The art in public places fee had been en-
acted legislatively pursuant to AB 1600, but the fee for recreational facilities was
imposed on an ad hoc basis,purportedly to address the specific impacts of Ehrlich's pro-
posal.
4
SB 322494 v4:000009.O001
In deciding the case,the California Supreme Court laid out a new test to address the law-
fulness of exactions. First, the court clarified that the same legal standard applies
whether the exaction is in the form of a land dedication, a monetary fee, or the required
construction of certain public facilities. Second, an exaction imposed pursuant to an or-
dinance or rule of general applicability is constitutionally permissible unless the
landowner meets his or her burden of proving that the exaction either does not substan-
tially advance a legitimate governmental purpose or deprives the landowner of any
economically viable use of the land. Third, an exaction imposed on a specific develop-
ment,whether in the form of dedication of property or payment of fees in an ad hoc way
rather than via legislation, is subject to the Nollan/Dolan "essential nexus" and "rough
proportionality"standards. To meet this test,the government must show that(1)the ex-
action is directly related to the impacts of the development giving rise to the exaction,
and(2)the nature of the exaction is roughly proportional to the impacts of the project.
Because the $280,000 recreation fee was specific to Ehrlich's project, and not imposed
uniformly upon all developers, the court applied the Nollan/Dolan test. The court held
the city met the "essential nexus" portion of the Nollan/Dolan test in that it had estab-
lished that the development of townhouses would result in the loss of recreational
facilities. Thus, the city had demonstrated a potential basis for a connection between a
social need generated by the project and the recreation fee imposed by the city. (Ehrlich,
supra, at 879.) However, the city failed to demonstrate a rough proportionality between
the impact created and the fee unposed. The court found the record"devoid"of any find-
ings related specifically to support the required fit between the amount of the recreation
fee and the loss of a parcel zoned for recreational use. (Id)without such project-specific
findings,the city's imposition of the recreational fee failed to meet the"rough proportion-
a.lityt'prong of the NollanlDolan test and was thus invalid. In contrast to the recreation
fee,the court held that,if an exaction such as the"art in public places"fee uniformly ap-
plies to all development as part of a broad-based plan, the fee need only bear a
"reasonable relationship" to the impact created. The court held that the imposition of
such a fee is more akin to traditional land use regulations,which are regularly held to be
valid exercises of the city's police power.
Practice Pointers:
• It is well settled law that,since at least the Associated Homebuilders case,a development
project need only contribute to(rather than cause)an infrastructure impact in order to ren-
der lawful a development impact fee to mitigate the impact. The enactment of a valid
development impact fee pursuant to the Mitigation Fee Act establishes the required con-
nection between development projects and required infrastructure improvements.
• Avoid imposing ad hoc, project-specific fees if possible. Under Ehrlich, a project-specific
fee that is imposed on an ad hoc basis is subject to the Nollan/Dolan heightened scrutiny
standard. Project-specific fees must be supported by individualized findings demonstrating
a direct relationship between the impact created and the fee collected and that the amount
of the fee is roughly proportional to the impact created. Legislative fees of general applica-
tion, on the other hand, are subject to a more deferential standard of review under the
5
SB 322494 v4:000009.0001
city`s traditional"police power"authority. (See Garrick Dev. Co. v. Hayward Unified School
District(1992)3 Cal.AppAth 320.)
• After Nollan and Dolan, the government rather than the developer bears the burden of
proof to show that the fee bears a reasonable relationship to the impact of the proposed
development. However,once the city enacts the proper legislative fee,the burden shifts to
the developer to show that the fee either fails to advance a legitimate state interest or de-
prives the developer of any viable economic use of its land. The city's burden is met
through legislatively-enacted findings, which comply with the Mitigation Fee Act. The bur-
den is not met by conclusory statements. Again, involvement by the City Attorney is
crucial.
• In order to meet the"rough proportionality"component of Dolan for ad hoc project-specific
fees, the city doesn't need to make a precise mathematical calculation; however, it must
make some sort of individualized determination that the required exaction is related both in
nature and extent to the actual impact of the proposed development.
• Monetary fees, dedications of land and the construction of public facilities all must meet
the same legal standard: i.e.,that the exaction advances a legitimate state interest,that a
proper nexus between the impacts caused by the development and the condition which
advances the governmental interest has been demonstrated, and—if imposed in an ad
hoc manner—that the amount of the exaction is roughly proportional to the impacts of the
project.
• All exactions, whether ad hoc or legislatively-enacted, require findings demonstrating the
proper relationship between the impact created and the fee exacted. Thus,the language
of the adopted findings is extremely important. Findings are an opportunity for the gov-
ernment to explain why the fee is necessary,what impact is created by development,how
new development impacts the existing cifizenry, and how the collection of a fee will allevi-
ate all or a portion of this impact. Failure to make the proper findings may result in an
invalidation of the fee. (See Bixel Associates v. City of Los Angeles (1989) 216
Cal.App.3d 1208.)
• A city may impose an exaction on a specific development to mitigate the loss of a previ-
ously private use(such as the private tennis club in Ehrlich) if the loss of the private use
has quantified public consequences and the city can satisfy the Nollan/Dolan heightened
scrutiny standard.
• For an example of a development fee supported by a defensible nexus study,refer to Russ
Bldg. Partnership v. City and County of San Francisco(1987) 199 Cal.App.3d 1496. Al-
though the case was decided before Nollan and the effective date of AB 1600, it follows
the same principles.
• Remember: If the government doesn't make adequate findings connecting the fee and the
impact,the fee may be subject to challenge as an illegal,non-voter-approved"special tax".
b
SB 322494 v4:000009.0002
I
• If voter approval under Propositions 62 and 218 can be obtained for a special tax,a devel-
opment fee program can be imposed that lacks the narrow drafting and careful findings of
a proper fee under AB 1600. this alternative,however,requires -voter approval
M. CREATING A VALID DEVELOPMENT IMPACT FEE PROGRAM
A. Preliminary Considerations
Before creating a comprehensive fee program, a city should make a few preliminary
decisions. The city should plan ahead. Creating an impact fee program can be a
costly and labor-intensive process that should not be undertaken more often than nec-
essary. A well planned fee program can generate sufficient funds to allow the city to
adequately mitigate impacts created by new development. Conversely, a poorly
planned fee can result in the city either collecting too little money and being forced to
pay for new development through its general fund, or collecting too much money
based on an unsupported fee program,thus exposing the city to a fee challenge.Either
of these results can lead to a dissatisfied citizenry and a frustrated city council. The
following principles should guide the creation and implementation of a fee program:
• Plan for future development. Anticipate where and how growth will occur
in your city. The city's general plan should be your guideline;however,if the
general plan hasn't been updated recently,you might consider such an update
before basing your fees on the general plan's growth projections.
Understanding where growth may occur within the city will also help the city
plan for specific public facilities and infrastructure that may be needed in sev-
eral respects. First,if new development is projected to occur in a concentrated
area geographically separated from existing development,the city may decide
that new, stand-alone facilities,such as fire stations and libraries,are required
to service new development rather than expansion of existing facilities. This
will have an impact on the cost of new infrastructure and, of course, on the
uses to which the resulting fee revenues may be devoted. Second, you may
wish to consider adopting a fee program that is limited to a particular geo-
graphic area within the city and that addresses the area's peculiar needs.
• Don't try to fix every problem with one fee. It is important to tailor each
fee to address a particular impact. Broad-brush fees are subject to legal chal-
lenge under AB 1600. Remember that each fee must bear a reasonable
relationship to the impact it is intended to mitigate. You must also be able to
clearly account for each fee collected. On the flip side,creating too many fee
categories may create administrative difficulties in implementing and account-
ing for fees once they are collected.
• Review the general plan and decide what level of service the city wants to
provide. Fees should be designed to collect sufficient funds to provide public
facilities and infrastructure at a certain level of service. The general plan may
7
SB 322494 v4:000009.0001
specify the size and level of service at which certain types of public infrastruc-
ture must be maintained. While a city cannot require new development to pay
for existing deficiencies,it can require new development to provide an accept-
able level of service. when considering new fees, the city should decide
whether it wants to raise the current level of service for public facilities. If so,
the city could raise the level of service for existing development through ex-
penditures from the general fund,while requiring new development to pay for
a level of service above what is currently in place.
Don't try to make new development pay more than its fair share. New
development cannot be required to pay for existing deficiencies, and the
amount of any impact fee must bear a reasonable relationship to the actual
cost of providing the public services demanded by the new development on
which the fee is imposed.
• Deep your council informed. At the beginning of the process to enact fees,
ensure that your council understands the nexus requirement. If your jurisdic-
tion is a slow-growth community, explain to your city council that new
development cannot be required to mitigate current deficiencies. If your
council is pro-growth, explain that undercharging new development may
mandate that general fund monies be used to maintain required service levels.
• Too many exactions might hurt,rather than help,the city's economy. Al-
though California has seen a robust economy during the last decade, the
reality is that development can only absorb so many fees before development
doesn't pencil out. Before a city starts creating multiple layers of fees, it
should consider what types of developments are most affected by high impact
fees and whether the kinds of development the city wants to encourage will be
helped or hindered by new fees. For example,housing advocates often argue
that impact fees on residential projects can price many low- and moderate-
income wage earners out of the local housing market and encourage develop-
ers to construct larger,more expensive homes because high-end occupants can
more easily absorb higher impact fees. Similarly,business groups argue that
imposing fees on commercial development may prevent the city from attract-
ing businesses into the city. If the city is interested in revitalizing its
downtown area, high impact fees for commercial development may drive
commercial tenants to a neighboring city or into an unincorporated area that
has lower fees. One way to address such issues is to provide fee waivers for
certain types of projects. Such waivers should be included in whatever fee
legislation your city adopts. However, please note that waivers cannot be
funded with fee revenues, as this cross-subsidy would prove that fee payers
are over charged. Other local government revenues must be relied upon to
backfill revenues that are lost due to fee waivers.
+ Consider use of development agreements as appropriate. Agreements to
pay fees or to construct infrastructure, which are contained in development
8
SB 322494 v4:000009.0001
agreements evidence contractual agreements between government and the de-
veloper, and are not constrained by AB 1600 requirements. To be safe,
include a provision in your development agreement whereby the developer
waives any right to contest fees under AB 1600 protest provisions.
B. Applicability ofAB 1600 to Fee Programs
1. When AB 1600 Applies
AB 1600 applies to all local agencies in the state, including all general law and charter
cities. (Gov.Code§66000(c).) However,AB 1600 does not apply to every fee or exac-
tion collected by a local agency. AB 1600 only applies when a local agency imposes a
fee on an applicant in connection with approval of a development project to defray all or
a portion of the cost of public facilities related to the project. (Gov. Code § 66001.)
"Public facilities" are defined to include public improvements, public services and com-
munity amenities. (Gov.Code§66000(d).)
Practice Pointer:
• "Public facilities"is defined very loosely and can be broadly interpreted. Case law provides
little guidance in this area, so cities are left to apply the definition to specific infrastructure
needs created by new development. Clearly public facilities"includes works of public im-
provements such as fire stations, libraries, sewer plants, traffic improvements and city
administrative buildings. Less clear are items that don't readily constitute an Improve-
ment","service"or"amenity",such as police weapons and service vehicles.
Z. When AB 1600 Does Not Apply
AB 1600 does not apply to the following exactions that are regularly collected by cities:
• School fees(the Legislature has occupied the field in Gov.Code§65995).
• Quimby Fees(Gov.Code§66477)
• Fees collected under development agreements pursuant to Government Code
§65864
• Fees for processing applications for governmental regulatory actions or approvals
(Government Code Section 66017).
• Fees collected pursuant to agreements with redevelopment agencies (Public
Needs c&Private Dollars, p. 122.)
• Reimbursement agreements between a developer and an agency for the cost of
public facility, which exceeds the developer's proportionate share of the cost
(Gov. Code§66003).
• Penalties assessed against developers who receive a density bonus pursuant to
Government Code § 65917.5, but failed to use the space for child care facilities
(Gov.Code §65917.5(f)).
9
SB 322494 v4:000009.0001
Practice Pointer:
• Water and sewer connection fees are treated differently than are other fees under AB
1600. Fees collected for these services are not subject to the findings and accounting re-
quirements contained in Chapter 5(§§66000-66009), but are subject to the provisions of
Sections 66016(notice), 66022(legal challenge), and 66023 (audits).' As with other de-
velopment impact fees, water and sewer charges cannot exceed the reasonable cost of
providing service unless approved as a special tax by two-thirds of the electorate. Capac-
ity charges collected pursuant to this section must meet similar accounting and public
notice requirements as fees adopted pursuant to §66001. (See Gov. Code§ 66013(c).)
Any legal challenge to a water or sewer connection fee or capacity charge must be brought
pursuant to§§66022 and 66023.2
• Some non-AB 1600 exactions interrelate with AB 1600 fees. For example, Quimby Fees
can be collected from residential subdivisions for park or recreational purposes. However,
Quimby fees cannot be collected from commercial developments, apartment projects, or
subdivisions of fewer than five(5)parcels. To ensure that such development mitigates its
parks impacts, an equivalent AB 1600 fee could be collected. Also,there is authority for
the proposition that Quimby fees can only be based on the value of unimproved land.
(Norsco Enterprises v. City of Fremont(1976)54 Cai.App.3d 488.)3 Cities will often adopt
an AB 1600 impact fee to ufill in the gap" left by Quimby. Also, Quimby fees cannot be
used to maintain parks or recreation facilities,only for the initial development Therefore,
under this approach, cities could have three separate fees that relate to park and recrea-
tion facilities: (1) a Quimby fee applicable to residential subdivisions for the purchase of
park or recreation acreage, (2) an AB 1600 fee applicable to commercial, condominium
and residential developments of fewer than five parcels for the same purpose, and (3) an
AB 1600 fee applicable to all new development for the construction of park improvements.
The authors have been informed that some jurisdictions in California have not adopted a
Quimby Fee and instead impose AB 1600 fees on residential subdivisions.
C. General Considerationsa for Establishing an AB 1600 Impact Fee
Once a city has considered the areas where growth may occur and the scope of public
improvements that will be required by this growth,the city should prepare a fee study and
capital improvements plan to establish the necessary impact fees. Establishing an impact
fee requires (1)projecting the future growth that will be served, (2) identifying the cur-
rent and projected level of service for each public facility, (3)identifying any additional
facilities or improvements that will be needed to accommodate future growth,and(4)al-
1 Technically these provisions of the government code were not adopted by AB 1600 and there is some
diversity of practice was to whether the term AB 1600 refers to them. They are discussed here in the inter-
est of completeness.
2 A case is now pending in the California Supreme Court on a challenge to a water connection charge im-
posed by a special district. In Richmond v.Shasta Community Services District,Case No.S 105078,a
developer argues that the District's water connection charge is an assessment for which property owner
approval is required. The case is fully briefed and awaiting oral argument and may be decided in 2003.
Fees,once collected,may be used for the development of park facilities. (81 Ops.Ag.293(1998).)
10
SB 322494 v4:000009 0001
locating the costs of providing the needed public services between the existing population
and new population.
Practice Pointers.-
Don't adopt too long a time horizon for future growth. Pick a time frame within which
you can be reasonably sure that the required improvements will be built and projected de-
velopment will occur. Even with a legislatively-adopted fee, requiring development to pay
for infrastructure that is not needed for 20 years may erode the required nexus determina-
tion. In addition, any fees collected now will likely be a fraction of the real cost to develop
improvements that are 20 years off.
• A repeated admonition: Don't make new development pay for existing deficiencies.
While development impact fees are intended to prevent the city from footing the bill for new
development,they are not intended to compensate the city for existing deficiencies
• The existing citizenry can receive some incidental benefit from new public im-
provements. While development impact fees can't be used to fix existing problems, a fee
is not invalid just because existing residents receive an incidental benefit from the new
public improvements created through development impact fees. In Shapell Industries v.
Governing Board(1991) 1 Cal.App.4th 218, the court upheld a fee that required new de-
velopment to pay for new science laboratories, libraries, gymnasiums and administrative
buildings to support additional classrooms, even though these new facilities incidentally
benefited existing residents who happened to live in the same school district as the new
development.
• Develop a package of infrastructure improvements for study. Some impact areas
may be obvious, such as congested intersections. others may be less obvious, such as
the lack of art in public places. Your council may wish to schedule a workshop to receive
public input prior to initiating a fee study.
• Think creatively about the use of development impact fees in your community. If the
improvements to be funded by development impact fees constitute"public facilities,"fees
may be assessed to support their construction,installation,or purchase. Examples of pub-
lic facilities that have been supported by development impact fees include streets,bridges,
traffic control devices,flood control improvements,city government administrative facilities,
recreation facilities, libraries, public safety facilities, day care facilities, and art in public
places.
• Do Not Assess Fees for operation and Maintenance. Development impact fees cannot
be assessed for operation and maintenance of capital facilities,with limited exceptions re-
lated to assessment districts. (See Gov.Code §65913.8.)
• Consider holding at least one public workshop before finalizing a fee study and de-
veloping a Capital Improvement Plan. Public participation at the beginning of the fee
process allows the city to hear from its residents and land owners and answer questions
11
SB 322494 v4:000009.0001
and to incorporate concems into its fee program. Public participation near the end of the
process, prior to.bringing the required ordinance to the city council for action,can provide
early notice of any potential legal challenges to the program. The city will also be able to
learn which fees may be subject to challenge and respond accordingly before final action
is taken.
A Preparing the Fee Study
Once a city decides what public services and infrastructure will require funding through
impact fees, it should prepare a fee study. A fee study provides the quantified basis for
the imposition of fees. The goal of the fee study is two-fold. First,the fee study provides
the city with the legal support to impose the fee. A fee study demonstrates the required
nexus between the impact created by new development and the amount of the fee. Sec-
ond, the fee study quantifies the projected burden that new development will create on
the city's infrastructure. The city may review the fee study and decide that the level of
service it would like to provide cannot be met simply through the imposition of impact
fee.
Practice Pointers:
• Hire a consultant. Unless the fee being considered is extremely rudimentary, it is advis-
able to hire a consultant. Many consulting firms are experienced in creating defensible AB
1600 fees,which will be invaluable to the city's position in the event of a legal challenge.
Consultants can also help the city come up with fees it had not considered and can pro-
pose funding altematives. When selecting a consultant, ask other similarly sized cities
whom they would recommend. Don't just hire the first consultant you find. Ask to see
samples of fee studies they have completed.
• Avoid a rush to the planning counter. Once a city proposes the preparation of a fee
study, developers may rush to secure project approval before the new fees are in place.
To avoid this,the city should consider passing a resolution requiring all future development
to participate in the pending fee program. (See Kaufman&Broad-Central Valley.. Inc. v.
City of Modesto,25 Cal.App.4th 1577(1994)). Alternatively,the city may attach conditions
of approval requiring new development to comply with whatever fee program is ultimately
adopted. (See Russ Building Partnership v. City and County of San Francisco, 199
Cal.App.3d 1496(1987).) For tract map applications, any subsequently adopted fee pro-
gram will be effective if the city initiates proceedings regarding the fee study and publishes
notice prior to a map application's completeness determination, and completes proceed-
ings prior to action on the map. (Gov.Code§66474.2.) In order to fully inform developers
of the potential exactions that may be required, a city could include in any resolution or
other action initiating the fee program an estimate of the maximum level of the new fee. If
a maximum amount can't be determined, the city can put a cap on the amount collected
from development projects that are pending during the fee study. Without such an esti-
mate or cap, the city may face a due process challenge if it tries to impose the fee on
projects pending during the fee study. (See Kaufman&Broad,supra.)
12
SB 322494 v4.000009.0001
• Assess current service levels as part of your fee study. To help ensure that new de-
velopment is not required to mitigate existing infrastructure deficiencies, it is useful to
establish a baseline for current infrastructure operation, either in your fee study or else-
where. This baseline should then be considered in deciding how to allocate the cost of
required infrastructure between existing and future development. This is a fact-intensive
inquiry.
E. Preparing a Capital Improvement Plan in Conjunction with the Fee Study
Many jurisdictions prepare a capital improvements plan CUP")in conjunction with a fee
program. AB 1600 encourages the use of a CEP to assist in scheduling and implementing
the services and improvements funded through impact fees. (Gov. Code § 66002.) A
CIP establishes a schedule of improvements necessary to accommodate the projected
growth. The CIP must indicate the approximate size, location, time of availability, and
estimated costs of all improvements to be financed through fees. (Gov. Code §
66002(a).) In order to create a usable CIP,a city must have an accurate understanding of
its current service baseline and its projected growth. This requires an understanding of
when,where,and how growth may occur within the city. The more information the city
can collect about future growth,the more comprehensive and accurate will be the CIP. A
CIP can also help a city determine when new public improvements or expansion of exist-
ing public improvements need to be constructed in relation to the timing of new
development.
Practice Pointers:
• Consider Sub-Areas for Study. Capital improvements may be developed for the entire
city or for specific geographic areas of the city. Make sure the area serviced and the new
development to be charged for the improvement coincide.
• Properly Allocate Costs for Capital Improvements. Different types of development will
require the construction of public facilities at different rates (i.e. commercial development
affects the demand for the development of new park facilities at a different rate than does
single-family residential development). The CIP and fee study,taken together,can assess
how best to allocate the costs of public improvements among user categories.
• Avoid creating numerous fees that are too specific. Implementing, collecting and ac-
counting for numerous fees can prove difficult for city staff.
F. Role of the City Attorney.
The City Attorney's role in the creation of a legally defensible AB 1600 program is criti-
cal. Because you will be defending the program from any legal challenges,you must be
sure it is defensible. Although obviously this involves many tasks,at least three compo-
nents are critical. First,the City Attorney-should draft the fee ordinance carefully and
review all project documents (fee study, staff report, council resolution, etc.) to ensure
that a full and proper record is created. Second,the City Attorney should ensure that the
13
SB 322494 v4:000009.0001
fee study complies with the critical legal principles involved in AB 1600 law (i.e., that
fees support only improvements which are required by new development, do not exceed
the cost of constructing the improvement,and are not to be used for maintenance and op-
eration expenses). Last,the City Attorney should make sure the fee study is written in
understandable English. If you can't understand the report, you can be sure the public
will not, and, most likely, the judge hearing a mandate challenge to your program will
not. The evidence supporting the city's legislative findings must be clear and straight-
forward. Do not be afraid to ask the consultant to explain any item you do not
understand;your questions will undoubtedly lead to clarifying language in the text of the
fee study and may well identify legal deficiencies in the draft analysis.
Practice Pointers Jhese Practice Pointers focus on the City Attomey's review of the fee study):`__ ��
Formatted
• Make sure you understand the numbers. Fee studies are filled with charts,tables,and
graphs that fay out current services provided,the cost for those services,projected growth
and the anticipated cost for servicing future growth. These calculations are the factual
support for new impact fees. However,,fee studies often do not adequate explain_how_ Forn�atbed
• - -- --- -
calculations were derived or what assumptions were used in projecting future needs. Take Foy
the time to understand what each calculation means and how it is used to create the pro-
posed fees. You may need to have the consultant revise the fee study to explain the
calculations.
• Check the development projections. Generally, the consultant doesn't know the city's
development trends as well as you and city staff do. Make sure the study's projections are_ Formatted
consistent with what realistically will happen in the next ten years. If the projections are FbrmatWd
wrong, the city could end up collecting too little money to mitigate the impacts of new
growth.
• Ensure that a justification is provided for"administrative"fees. A,fee study will_fre- - Formatted
•----------------
quently recommend inclusion of tan_administrative fee_to-cover-ongoing program^ - - Formatted
administration that is added on to all impact_fees._While AB 1600 permits imposition of - Fo,.
fees for this purpose, the*kmust be supported by evidence that the fees,are jgasonable_i
FannaUnd
and do not collect more than the cost of the service...................................
-------------------------- - Formatted
fonnatbed
• Make sure that fee calculations are adequately supported. `Consultants and_city staff_
work t ether'n developing the fee stud_since staff is more familiar with the actual_o era-_ FO""
09 �- - -p �- -y -- --------------------- -p ormatted
lion of the city. Sometimes a fee study will base a growth projection or,agkcipated-impact_ F
on city staffs "professional judgment" or opinion,_While staffs opinion and expertise are FOrnmtftd
invaluable in the fee process,the basis for all conclusions articulated in the fee study must `, Formatted
be supported by evidence which,for safety's sake, you will want to be at the level of sub- Forna�ted
stantial evidence1_ Formate
Formatted
G. Required Findings for AB 1600 Fee Program Formatted
y
matted
Government Code § 66001(a)requires that any action establishing, increasing or impos-
FOFol Olin
ing a fee as a condition of approval of a development project must do all of the following:
14
SB 322494 v4:000009.0001
Y
• Identify the purpose of the fee;
• Identify how the fee is to be used;
• Determine how a reasonable relationship exists between the fee's use and the type
of development project on which the fee is unposed;
• Determine how a reasonable relationship exists between the need for the public
facility and the type of development project on which the fee is imposed.
In addition, when a city imposes a project-specific fee,the city must also demonstrate a
reasonable relationship between the amount of the fee and the cost of the public facility
or the portion of the public facility attributable to the development on which the fee is
imposed. (Gov. Code § 66001(b); see Garrick Dev. Co., et al. v. Hayward Unified Sch.
Dist., 3 Cal.App.4 320,336(1992)). Typically the fee study and CIP provide the basis
of the required findings.
Practice Pointer:
• The findings required by§66001 must be made in the ordinance which establishes
the fee program. The findings should also be made in the consultant's fee study and in
the staff report that is submitted to the city council when it takes action on the program.
Both the fee study and the staff report should explain the evidence that supports the valid-
ity of each required finding.
H. Public Hearings;Procedure for Adoption of Fees.
AB 1600 governs both the establishment of new fees and the increase of an existing fee,
and requires that specified procedural requirements be satisfied. The procedural require-
ments for impact fees are fairly general. (Gov. Code § 66018.) The requirements for
adopting particular processing fees are more specific. (Gov.Code §66017.)
1. Development Impact Fees(Gov,Code&66018)
Government Code § 66018 contains the public hearing requirements for the adop-
tion or increase of impact fees. Under § 66018, the local agency must conduct at least
one regularly scheduled meeting with notice given pursuant to § 6062a, which requires
publication of notice twice, at least five days apart, with the first ten days prior to the
hearing. Any costs incurred in conducting the required public hearing may be recovered
from the proceeds of the enacted fee. Upon adoption of the required ordinance and reso-
lution, the development impact fees become effective sixty (60) days thereafter. (Gov.
Code§66017.)
2. Processing and Other Fees(Gov.Code 4 66016.)
15
SB 322494 v4:000009.0001
The provisions of § 66016 only apply to those classes of fees set forth in §
66016(d). Speaking generally,§66016 applies to a variety of fees charged for processing
applications(i.e., specific plans,LAFCG applications,use permits,map processing,etc.)
and to water or sewer connection fees covered by § 66013. For these types of fees, the
following specific requirements apply:
• Prior to levying the new fee or increasing the existing fee, the local agency must
hold at least one open and public regularly scheduled hearing. Notice for the
meeting must be mailed to those who have filed a written request therefor at least
fourteen(14)days prior to the meeting.
• At least ten (10) days before the meeting, the local agency must make available
for public review the data indicating the amount of the cost required to provide
the service for which the fee is charged and the revenue sources anticipated to
provide the service,including general fund monies.
• Any new fee or increase in a fee must be made by ordinance or resolution of the
legislative body.
• Any cost incurred in conducting the public meeting may be recovered from the
fees to be collected.
• Upon adoption,the fees become effective sixty (60)days thereafter. (Gov. Code
§66017).
3. For all types of AB 1600 fees, a local agency may also adopt or in-
crease fees pursuant to an urgency ordinance.
• For all types of AB 1600 fees, a local agency may also adopt or increase fees
through an urgency ordinance. (Gov. Code § 66017(b).) If the legislative body
determines that anew fee or an increase in an existing fee is necessary to protect
the public health, safety and welfare,then the fee can be adopted or increased on
an interim basis without following the procedures otherwise required. The ur-
gency measure must be adopted by a four-fifths (4/5th) vote of the legislative
body and must include written findings that describe the immediate and current
threat to the public health, safety and welfare that justifies the urgency action.
The urgency measure is effective for thirty (30) days unless the legislative body,
after a noticed public hearing, extends the urgency measure for an additional
thirty(30)days. No more than two extensions may be granted.
Practice Pointers.-
Your city council may wish to consider adopting a fee amount that is lower than the
actual cost of providing public services. Taking a conservative approach in adopting a
fee of less than 100%of full recovery can help avoid challenges that the fee is too high.
16
sa 32M94 v4:000W9 OWI
• Don't seek to recover study costs. Although both §66016 and§66018 provide for the
recovery of costs expended for conducting the public hearing, the legislative history sug-
gests that these costs were not intended to include the costs of the fee study and CIP,
• The city council is the ultimate decisionmaker. The legislative body cannot delegate
the responsibility of adopting or increasing impact fees to its planning commission or other
body. The city council alone must adopt the necessary ordinance and resolution.
• Consider adopting both a regular and urgency ordinance at the same time,provided
that urgency findings can be made. This will ensure that there is not a gap in the appli-
cability of the fees during the 60-day period before the regular ordinance becomes
effective.
• in passing an urgency ordinance,make sure to include specific facts supporting the
need for immediate action. A mere declaration by the local agency that an immediate
danger to the public health or welfare exists is neither conclusive nor sufficient. (Crown
Motors v. City of Redding(1991)232 Cal.App.3d 173, 179.)
L .Staff Report
In addition to the fee study and CIP,the staff report for adoption of a development impact
fee provides the city one more opportunity to support its fee. The sty report is also part
of the administrative record and can be used by the city (or a disgruntled developer) in
any later legal challenge. The staff report serves as an opportunity to explain the need for
public improvements and steps the city has taken to reach the fee it is recommending. A
well-drafted staff report can be the crux of the legal defense of the fee. The staff report
should refer to any improvement or infiastructure standards set forth in the general plan
or any specific plan and explain how the fee will help the city meet these standards. Fi-
nally, staff should conclude that the fee bears a reasonable relationship to the projected
impacts of new development and is necessary to mitigate these impacts.
Practice Pointers.
• The staff report is part of the administrative record. Any conclusions or opinions made
by staff in the staff report or at the public hearing constitute"substantial evidence"for pur-
poses of any future legal challenge. The city attorney should work with community
development or public works staff to ensure that all required evidence is presented.
I Ordinance and Fee Resolution
The ordinance establishing the fee program provides the legal basis for the imposition of
the fee and all required procedures; the resolution contains the actual amount of the fee.
Do not include the amount of the fee in the ordinance; otherwise, any change to the fee
itself will require a formal ordinance amendment.
The ordinance should include the following elements:
17
SB 322494 v4:000009.0001
• Legislative findings regarding the reasons why the fees are being imposed;
• A section formally establishing distinct fund categories for each of the fees;
• Provision for an automatic annual adjustment for inflation;
• A statement as to when the fees shall be paid;
• A provision providing an appeal procedure, which allows a developer to contend
that, for his particular project, the required legal nexus for imposition of the fee
does not exist. Failure to include such a provision may make it difficult for the
city to defend a facial challenge to the fee program or an as-applied challenge to a
fee condition on a particular project; including such a provision creates an admin-
istrative procedure which arguably must be exhausted prior to an as applied
challenge or a refund claim(the exhaustion issue is discussed further below);
• Provisions for exemptions or credits.
Samples of fee ordinances and resolutions are attached hereto as Exhibits A-C. Exhibit B
relates to a development impact fee created for a geographic area within the city.
IV. PROCEDURES FOLLOWING PASSAGE OF FEE PROGRAM
A. Annual Accounting for Fees.
Once the fee ordinance has been passed,the city will start collecting fees. AB 1600 re-
quires that both general law and charter cities account for every fee that they collect
under its terms. Funds collected for each capital facility or service.shall be deposited in
separate accounts and not commingled with any other funds for other impact fees. (Gov.
Code§66006(a).) while funds are accruing for individual capital facilities,the city must
keep track of each fund and provide an annual report. (Gov. Code § 66006(b).) If the
city fails to accurately account for the collected fees, the city can be required to refund
the fees. (Gov.Code§66001(d).)
Within 180 days after the last day of the fiscal year,the city must make available the fol-
lowing information:
• A brief description of the type of fee in each account or fund;
• The amount of the fee;
• The beginning and ending balance of the account or fund;
• The amount of the fees collected and the interest earned;
• An identification of each public improvement on which fees were expended and
the amount of each expenditure;
• An identification of the approximate date by which the construction of the public
improvement will commence;
18
SB 322494 v4:000009.0001
• A description of any inter-fund transfer or loan and the public improvement on
which the transferred funds will be expended;
• The amount of refunds made and any allocations of unexpended fees that are not
refunded. (Gov.Code §6606(b)(1).)
At the next regularly scheduled public meeting not less than 15 days after making the
above information available to the public, the city must review the information pro-
vided. (Gov.Code §66006(b)(2).)
Section 66001 contains some extremely important, additional, accounting require-
ments to which scrupulous compliance is required. Section 66001(d)provides that,
for the 5th fiscal year following the first deposit into each public improvement ac-
count or fund, and every 5 years thereafter, the agency must make the following
findings for funds remaining in each development impact fee account:
(1) Identify the purpose to which the fee is to be put.
(2) Demonstrate a reasonable relationship between the fee and the
purpose for which it is charged.
(3) Identify all sources and amounts of funding anticipated to com-
plete financing in incomplete improvements identified in
paragraph(2)of.subdivision(a).
(4) Designate the approximate dates on which the funding referred to
in paragraph (3) is expected to be deposited into the appropriate
account or fund.
If the agency fails to make the findings,it must refund any undisbursed monies to the
owner of record of the project sites originally contributing to the funds. (Gov.Code§
66001(d).)
Similarly, when sufficient funds have been collected to complete financing of the
public improvements contained in the CIP,the public agency within 180 days of col-
lection of the required funds shall identify "an approximate date by which the
construction of the public improvement will be commenced.' (Gov. Code §
66001(e).) Failure to comply with this requirement also mandates return of the col-
lected funds,as stated above.
Practice Pointers.
• Annual accounting requirements apply to both general law and charter cities.
• As part of adjudicatory decisions, identify improvements to be constructed.
When a local agency imposes a fee for public improvements on a specific project,the
local agency must identify the public improvement that the fee will be used to finance
at the time the fee is imposed. This is a difficult requirement to meet if the identifica-
19
SB 322494 v4:000009.0001
ton must be done on an ad hoc, project-by-project basis. (Gov. Code§66020(d)(1).)
The authors believe this requirement can be met through the annual review of the
city's CIP (see below), at which time funding priorities can be established for each
class of public improvements in the CIP.
• Establish a tickler system. When the city first establishes its fee program, it should
set up a tickler system in the department of public works to establish the date of the
first deposit into each fund and to calendar the required 5-year review. If you have an
existing fee program but are unsure if your city has been making the required 5-year
findings,investigate and pursue substantial compliance.
B. Annual Review of'CIP.
If the public agency adopts a CIP, the CIP must be updated annually. (Gov. Code §
66002(b).) Ten days' published notice is provided pursuant to Government Code §
65090,and is also provided to any city or county that may be significantly affected by the
capital improvement plan.
An example of a combined Government Code §§ 66002/66006 report and resolution is
attached hereto as Exhibit D.
C. Audits
Anyone can request an audit of a local agency's fee in order to determine whether the fee
exceeds the amount reasonably necessary to cover the cost of the product or service pro-
vided. (Gov.Code § 66006(d); § 66023(a).) The local agency or an independent auditor
may conduct the audit. All costs incurred by the local agency in preparing the audit may
be recovered from the person requesting the audit. (Gov.Code§66023(b).)
D. When Fees Can Be Collected
Development impact fees for the construction of public improvements or facilities are
typically collected at the date of final inspection or upon issuance of a certificate of occu-
pancy,whichever is earlier. (Gov.Code§66007(a).) However,the following exceptions
apply:
• Utility service fees may be collected at the time an application for utility service is
received. (Id.)
• Fees can be received earlier if the local agency determines that(1)the fee will be
collected for public improvements or facilities for which an account has been es-
tablished and funds appropriated and for which the local agency has adopted a
proposed construction schedule or plan prior to final inspection or issuance of the
certificate of occupancy or(2)the fees are to reimburse the local agency for ex-
penditures previously made. (Gov.Code§66007(b).)
20
SB 322494 v4:000009.0001
Different rules govern the collection of fees from residential projects. Residential devel-
opments that include more than one dwelling may be required to pay fees (1) on a pro
rata basis for each dwelling when it receives its final inspection or certificate of occu-
pancy, (2)on a pro rata basis when a certain percentage of dwellings have received their
final inspection or certificate of occupancy, or (3) on a lump sum basis when the first
dwelling in the development receives its final inspection or certificate of occupancy,
whichever occurs first. It is up to the local agency to decide which of these three pay-
ment options it requires. (Gov. Code §66007(a).) If a different payment schedule is
critical for the local agency,execution of a development agreement may provide the only
alternative approach.
For residential developments,the local agency may require a contract from the developer
to pay the applicable fee at the time required by the local agency consistent with Gov-
ernment Code § 66007(a). This contract may be imposed as a condition of issuing a
building permit for the project. (Gov. Code § 66007(c)(1).) The contract may also re-
quire that the developer provide appropriate notification of the opening of any escrow for
the sale of the property for which a building permit was issued and fees have yet to be
paid. In addition,the local agency can also require that any proceeds from the sale of the
property be used to pay the outstanding fees. (Gov.Code§66007(c)(3.)
V. FEE CHALLENGES AND REFUNDS
A. Fee Challenges.
AB 1600 provides a very specific procedure for challenging development impact fees.
Failure to follow the requisite procedures can preclude challenge.
1. Challenge to Imiosition of Fee on a Development Proiect. In
order to protest a condition imposing a specific fee on a development project, a party
must: (i)tender any required payment in full or provide satisfactory evidence of arrange-
ments to pay the fee when due or to ensure performance of the conditions necessary to
meet the requirements of imposition,and(ii)serve written notice to the local agency that
the required payment has been tendered. The notice must inform the local agency of the
factual elements of the dispute and the legal theory forming the basis of the protest.
(Gov.Code§66020(a).) The protest must be filed at the time of approval or conditional
approval of the development or within 90 days after the imposition of the fee. Failure to
file a timely protest will preclude a subsequent lawsuit.
The local agency must provide the developer with written notice at the
time of project approval or at the time the fees are imposed stating the amount of the fee
and providing notice that the 90-day protest period has begun. (Gov. Code §
66020(d)(1).)
A developer has 180 days after receiving notice from the local agency as
to the imposition of a project specific fee within which to file a legal challenge regarding
21
SB 322494 v4:000009.0001
the project-specific fee. (Gov. Code §66020(d)(2).) Failure to file challenge within this
time bars any challenge to the fee.
If the developer claims that the impact fee constitutes a special tax,thirty
(30) days prior to filing suit, the developer must request a copy of the city's documents
that demonstrates how the fee was calculated If the fee is claimed to be a special tax,the
city bears the burden of producing evidence that the fee does not exceed the cost of pro-
viding the required service,facility,or regulatory activity.
2. Challenge to Legislative Approval of Fee Program. A party has
120 days from the date on which an ordinance or resolution to establish or modify certain
fees is enacted to challenge such ordinance or resolution. These fees are restricted to wa-
ter and sewer connection charges, capacity charges, and processing fees. Any such
challenge must be brought pursuant to the validation statute contained in CCP § 860 et
seq. (Gov. Code § 66022(b).) For challenges to legislative enactments of other types of
fees, Government Code § 65009 does not apply, and the applicable statute appears to be
the four-year statute of limitations contained in Code of Civil Procedure § 343. (See
Balch Enterprises v New Haven Unified School District,219 Cal.App.3d 783 (1990).) If
a party challenges both the imposition of a fee on a specific development and the ordi-
nance that created the fee, the 180-day statute of limitation applies, as it is the more
specific provision. (WesternlCalifornia,Ltd. v.Dry Creek Joint Elementary School Dist.,
50 Cal.App.0 1461 (1996).)
Practice Pointers:
• Help your council know the rules. A local agency cannot withhold approval simply be-
cause a party protests the fee; however, a local agency certainly can deny a project on
other grounds even if the fee is going to be challenged. Ensure that decision makers know
this principle before they commence deliberations on a project when fees are likely to be
an issue.
• Know when fees are imposed. Imposition of fees"which triggers the protest period be-
gin when the local agency first imposes the fees as a condition of approval, not when the
developer actually pays the fee. (See Ponderosa Homes, Inc. v. City of San Ramon, 23
Cal.App.4th 1761 (1994).)
• Pay attention to procedural requirements. Government Code § 66022 applies when a
lawsuit challenges a legislative decision by a local agency promulgating or changing cer-
tain designated fees or service charges; Government Code § 66020 applies when a
lawsuit challenges an adjudicatory decision by a local agency imposing such a fee or ser-
vice charge on a specific development (N. T. Hill, Inc. v. City of Fresno (1999) 72
Cal.App.4th 977.) A petitioner's failure to follow the correct statutory procedures could re-
sult in his or her claim being subject to the agency's demurrer and dismissal.
• Ditto. A party's failure to file the required written protest that complies with §66020 pre-
cludes the party from challenging the fee,even if the party has challenged the fee orally or
22
3B 322494 v4:000009.0001
in writing before the fee was imposed. (See North State Development co. v.Pittsburg Uni
fled School Dist.,220 Cal.App.3d 1418.)
• Provide written notice. Make sure your agency provides written notice consistent with §
66020(d)(1)at the time a development project is approved. The 180-day notice to file suit
does not begin to run until notice is delivered to the developer,so failure to file the notice
may result in an open-ended statute of limitations. This could place the agency in an ex-
tremely difficult position should the developer build out the project and then file its protest
and lawsuit The easiest way to ensure that proper notice is provided is to build the re-
quired language into the agency's"macro"or standard fee condition.
• Provide for permit suspension upon litigation if appropriate. To partially mitigate the
issue set forth above, the agency at the time of project approval may make specific find-
ings that the construction of public facilities that are directly attributable to the development
project is required to protect the public health, safety and welfare. If such a finding is
made,the agency may suspend the permit pending resolution of any dispute as to the pro-
priety of the fees.
• Use the validation procedure. To ensure an early resolution of any claims regarding the
lawfulness of the fee program, the agency can initiate a validation action after enactment
of the fee program, which would serve to consolidate all possible claims into a single ac-
tion.
• Consider exhaustion of remedies issues. It is not clear how the specific protest proce-
dure established in § 66020(a) intersects with the statutory exhaustion of remedies
doctrine enunciated in Government Code§65009(b)(1). This latter doctrine requires that
the applicant present every factual dispute it has to the agency at the time of the adjuidica-
tory decision. Imposition of development impact fees falls within the planning and zoning
law(Title 7 of the Government Code)and is subject to§65009. Of course,the statutory
exhaustion requirement only operates if the agency has provided prior written notice that
the exhaustion doctrine will apply should subsequent litigation be filed. (Gov. Code §
65009(b)(2).)
B. Refunds
If a project-specific challenge is successful, the local agency may be required to refund
the collected fee with interest,. If the court finds in favor of the developer in a challenge
to the imposition of a fee on a specific project, the court shall direct the local agency to
refund the unlawful portion of the payment, with interest at an annual rate of 8 percent.
(Gov.Code§66020(e).)
Similarly,if in a challenge to the enactment of the fee ordinance the court finds that a fee
ordinance or resolution is invalid as enacted, the court shall direct that any local agency
refund the unlawful portion of the fee, plus interest. The refund will go to any person
who has complied with the protest provisions of the Mitigation Fee Act.