Loading...
HomeMy WebLinkAbout2000-03-15 Agenda Packet - Board (15) TDPUD Memorandum March 15, 2000 TO: Board of Directors FROM: Ed Taylor, Water Superintendent SUBJECT: 1-80 PIPELINE CROSSING AND BRIDGE REPLACEMENT PROJECT Agenda # BACKGROUND CalTrans is going to replace the Donner Pass Road over-crossing of 1-80 at the Donner Lake Interchange. The bridge replacement is scheduled for the summer of 2001. Additionally, CalTrans will widen westbound 1-80 with the addition of a truck lane. The truck lane addition is scheduled for 2004. The addition of the westbound truck lane will impact the District's 18" pipeline crossing under 1-80 near Richards drive. Caltrans has notified the District that this water main crossing must be relocated and should be placed in the new bridge. Staff is currently working with Caltrans on the relocation design. The relocation of the water main has an estimated cost of$250,000. This project will be reviewed and alternatives evaluated. Staff will bring this project back to the Board as it progresses. If it is determined that the water main must be relocated and that the District is responsible for the cost, then a request for funding will be included in the 2001 budget. CalTrans is claiming it has superior rights in the area and the cost of the water main relocation is the responsibility of the District. Staff and the District's Legal Council will research all records to establish who has the superior rights. If the District can establish superior rights for the pipeline, then a claim will be made to CalTrans.