Loading...
HomeMy WebLinkAbout2000-08-16 Agenda Packet - Board (11) TDPUD STAFF REPORT August 11, 2000 To: Board of Directors From: Joe Horvath, District Electrical Engineer Subject: Wood Pole Bid Award Recommendation a� Agenda # Bids have been opened and analyzed for the District's purchase of wood poles. This material is required for a joint project with Sierra Pacific Power Co. and the purchase has been budgeted. Attached is a summary schedule of the bid information received. The schedule shows the description and quantity required, vendor name, quoted price, delivery time, and any noted exceptions to our bid requirements. The following factors were used in determining the successful bidder:price, adherence to our contract and specifications, and delivery time. Adherence to our contract and specifications is very important, however minor deviations from our specifications may be permitted based on our review of the particular situation. Delivery time, however, is very critical due to our short construction season. Recommendation: 1 recommend the Board approve the award to the low bidder, McFarland-Cascade Co. WOOD POLE BID SUMMARY - 2000 Length -50 ft, Class - H3; Qty. 23 Unit Exceptions Bidder Price (mft) Total Price Delivery Time to Bid McFarland-Cascade 852.00 19,596.00 4 weeks North Pacific Lumber 922.00 21,206.00 4-6 weeks Taylor Lumber 881.00 20,263.00 4 weeks J.H. Baxter 902.00 20,746.00 4-6 weeks Length-50 ft, Class- 1­12; Qty. 4 Unit Exceptions Bidder Price (mft) Total Price Delivery Time to Bid McFarland-Cascade 738.00 2,952.00 4 weeks North Pacific Lumber 882.00 3,528.00 4-6 weeks Taylor Lumber 785.00 3,140.00 4 weeks J.H. Baxter 813.00 3,252.00 4-6 weeks Length-55 ft, Class- 1; Qty. 1 Unit Exceptions Bidder Price (mft) Total Price Delivery Time to Bid McFarland-Cascade 581.00 581.00 4 weeks North Pacific Lumber 585.00 585.00 4-6 weeks Taylor Lumber 544.00 544.00 4 weeks J.H. Baxter 612.00 612.00 4-6 weeks Length -55 ft, Class- 1; Qty. 1 Unit Exceptions Bidder Price (mft) Total Price Delivery Time to Bid McFarland-Cascade 581.00 581.00 4 weeks North Pacific Lumber 585.00 585.00 4-6 weeks Taylor Lumber 544.00 544.00 4 weeks J.H. Baxter 603.00 603.00 4-6 weeks Total Bidder Bid Price McFarland-Cascade $23,710.00 North Pacific Lumber $25,904.00 Taylor Lumber $24,491.00 J.H. Baxter $25,213.00 Page 1 of 1 08/02/2000