Loading...
HomeMy WebLinkAbout2000-12-20 Agenda Packet - Board (7) Memorandum To: Board of Directors From: Ed Taylor, Water Superintendent Date: 12/15/00 Subject: Consideration of proposal from Nimbus Engineering on results of test hole and recommendation on Martis Valley Well #1. BACKGROUND: The first test hole for the location of a new water supply is complete. The results of the water quality and the possible quantity are available. Nimbus Engineering has prepared a report with the results and the recommended location for drilling of a production well. The report is ready and well be presented at the Board Meeting. RECOMMENDATION: 1 recommend that the Board accept the report from Nimbus Engineering. 0 Page 1