HomeMy WebLinkAbout2000-12-20 Agenda Packet - Board (7) Memorandum
To: Board of Directors
From: Ed Taylor, Water Superintendent
Date: 12/15/00
Subject: Consideration of proposal from Nimbus Engineering on results of test hole
and recommendation on Martis Valley Well #1.
BACKGROUND:
The first test hole for the location of a new water supply is complete. The results of the water
quality and the possible quantity are available. Nimbus Engineering has prepared a report
with the results and the recommended location for drilling of a production well. The report is
ready and well be presented at the Board Meeting.
RECOMMENDATION:
1 recommend that the Board accept the report from Nimbus Engineering.
0 Page 1