HomeMy WebLinkAbout7 Water Master Plan Agenda Item # 8
via=
Memorandum
To: Board of Directors
From: Ed Taylor, Water Superintendent
Date: 03/02/2001
2001 WATER SYSTEM MASTER PLAN UPDATE
Background
Staff completed a draft Master Plan Update for the District's Water System. This Water System
Master Plan Update was presented to the Board for review and possible approval. Part of the
approval process was a CEQA review which is now complete.
Staff reviewed all comments and minor changes were made to the Master Plan Update. These
changes were minor clerical items. Staff is requesting the Board of Directors adopt the 2001 Water
Master Plan Update.
Recommendation
That the Board adopt the 2001 Water Master Plan Update.
0 Page 1
Saucra Eno inocr ino Znc. 5302656$a�i P• 01
5aucrs Engllnec Yng, Inc.
Civil &Environmental ) ngiocx,,r s j
Ii
Memorandum !
March 1,Mot
TO: Board of Directors, and
Ed Taylor,Disthct Water Superintendent
I
FROM: Keith Knibb, Consulting Engine&
SUBJECT: Truckee Water 4stem Water Master Plan Update- CEQA
3
As of February 21,200 t,the(�alitbtnia Environmental Quality Act(CEQA) rev ew period is
closed for the Truckee Water Srtenr Walcr Master Plan i ipdate.negative deelar tion. 1
contacted the State Clearingho use and no comments were received from the age ties on their
distribution list. The Board of�ircctors is holding a Public Hearing on March 7 2001.
a I
The final CEQA documents included with this report are:
Final Negative Declarafuu
► Notice of Determinatio
► Department of Fish andPamc Certificate of Pee Excuiptiun
RECOMMENDATIONS i
Provided no substantive oouun kris are received which cannot be addressed at th Public
Hearing,I recommend the Boa -of Directors take the following actions:
Adopt the Final Negati to Declaration.
► Approvc the project for l�uupuscs of CFQA.
5
► Authorize the filing of t e Notice of Dc(crmination with the Office of the. evada County
Clerk,the office of the Placer County Clerk, and the Govcmot's Office of Planning and
Research.
► Adopt the De Minimis I pact Finding and authorize the filing of Urc Ccrt f cate of Fee
Exemption with the Nedada County Clerk
► Adopt a finding that the draft documents as circulated add flit negative de.Inration reflect
the District's iudepcndot tjudgemenr,
t
I
I
j
7 i
440 Lower Grass valley Road,Suite A,Nevada City,CA 95959 (530) 265-8021 Fax Sin) ?6S-6934
I'
� d
1
lit
I
,
i
i
N TICE OF DETERMINATION
To: X Office of Plarutiag and Research From: Truckee Dotntcr PUD
1400 Tenth Street,Room 121 P.O.Box 399
Sacietucuto,CA 95$14 Truckee,CA 96160-0309
Cuunry Clerk
Cuunry of Nevada
201 Church Street j
Nevada City,CA 95959 {
q Sabjeet:
filing of Notice of Determination in compliance with Section 21198 or 211.52 o1 the Public Resource Code.
Truckee Water System Water Master Plan Utidate
Project Title I i
2001012066 Peter T.. Tlnlzmei er 530 587-389 _
Slate Clenringhouse Number Recpnnsible Agency Area Code/Telc hone
CnntnrtPerson
Truckee,Nevada Courtly
Project Location linclude county) li
Y
Prnjert IJescriptiort:
Acquisition of property for and consitti'tion of a new production well,well pump stotion� end pipeline.
'I his is to advise that the''rttekee;Donner prlblic Utility Div:(ric:t has nppmv I ed the described protect on 1Vlarch 7 2001 and
19 Lead Agency C, Responsible Agency Date
has mnde the lbhorving determinations regardin Ore above described pmjerr:
I. 'the project[Elwill rgw;ll not]have a ignificmt effect on the erwirnnmenl.
2, 0 Au Environmental Impnnl Report wJas prepared for this prcjest puisuan4 to the provisions of C. t X
W A Negative Declaration was prcl)w J fur this project puminnt to the provisions of CGQA.
3. Mitigative measures[❑were,ig were rt]made a condition of the approval of the project
4. A statement of Overriding Considerat ons[❑was 0 was not]adnpted for this project.
5. Findings[2 were t7 were not] made,ptrsoant to the provisions of CEQA- - !
i
This Is to certify that the Negative Declaration with coma cuts and responses and record of project approvi is avollable to the
General Pnhlir at:
i
Truckee Donner public Utility IJist-- P Brix 309 115/0 Mutter Pass Road Trucks �160-f1309 _
Peter L. Holzmeister,General Manager Date
DFG Pee S 0,00
Date received for filing at OPR:
J
saucer_ Enovn�or � n� r.,�, sao�6s6sa� a. oa
NEGATIVE DECT,ARATION
( } Ptupuscd
( ) final
NAML OF PROJECT: Truckcr,WateL System Water Master Phan Update
I
LOCATION: Truckee,California
Entity or Person Undertaking PTojeet:
{
(XX) Truckee Donner Public Utility District
11570 D�nner Pass Road
P.O. Box,309
Truckee,'iCA 95959
Other( ) Name:
Addacsa j
J
Phnne:
i
PROJECT DESCRIPTION:
Adoption of an update to the Dil'trict's water system master plan and water facili ies fees.
l'
Finding: It is hereby foun that the above named project will not have a signi rieant effect upon the
environment.
Initial An initial study of this project was under taken and prepared in ace ird2nce with Article V
Study: of the District's local environmental guidelitres'and Section 15063 of the EIR Guidelines
for the California'Environmental Quality Act for the Purpose of as ertaining whether this
project aright have a significant effect upon the g�nvironment. A copy of such initial study
is attached heret¢ and incorporated herein by tcference. Such i itial study ctocurnents
reasons to support the above finding.
Mitigation The following mitigation measures have bccn injcluded in the proj ct to avoid potentially
Measures: significant effcct�:
None,
i
Date:-
Peter L.fiolzmeister,GencrAl Manager
t
1
Saucr� Enoinccr in> Znc. 530265683� P. O'I
- i I
li
CAi IFOR NIA LILPARTMENT OF FISII AND GAME
CERTIFiCATF OF FEE EXEI VIPTION
Du Minimis impact Findln�
Project Title/Location,Name,and Address of Project Proponent(including ounty):
Truckee Water System ater Master Plan Update, Truckee,Nevada Cuu ty.
Truckee Domier Public itility District
P.O. Box 309
Truckee, Nevada County,CA 96160-0309
i
Project Description:
Adoption of an update t the District's water system master plan and wat i facilities fees.
Findings of Exemption:
An initial study has beer]conducted by the Truckee Donner Public Utihty,District so as
to evaluate the potential for adversc cavitontnerttal impact.
i
When considering the re�ord as a whole there is no evidence before the T ckee Donner
Public Utility DiSlliGt th t tile,,proposed project will have potential for an dvcrsc effect
on wildlife resources or(he habitat upon which the wildlife depends.
The Truckee Donner Pllic Utility District has, on the basis of substautiat evidence,
rebutted the presumptiott of adverse effect contained ins Section 753.5 (d) f Title 11,
Code of Califouria Regulations.
Certification:
1 hereby certify that the'�'mekee Donner Public Utility District has made tl o above
findings of fact and that used upon the initial study an�hearing record th project will
not individunily or cumulatively have an adverse effect on wildlife resources, as defined
in Section 7111 of the Fish and Gann: Code.
II .F
Pcter L, Hylcmeister
Title: Otneral Manager
4
Lead Agency: Tntckee.Donner 'UD
Date:
1
�I
i
i