Memorandum
To: Board of Directors
From: Neil Kaufman, Water Systems Engineer
Date: 3/16/01
Subject: BID AWARD PIPE AND MATERIALS FOR THE JOERGER DRIVE
TRANSMISSION PIPELINE PROJECT.
BACKGROUND:
The Board authorization staff to advertise for, accept and open bids for 24"pipe and other
materials for the pipeline project. Bids were received and opened on March 15, 2001.
Staff has totaled and reviewed all bids.
RECOMMENDATION:
1) Award the purchase of 24" Pipe to US Pipe & Foundry.
2) Award the purchase of Fittings, Specials & Other Appurtenances to Western
Nevada Supply Company
Attachments:
SUMMARY OF BIDS FOR 24" PIPE
Supply of 4,032 feet of 24" Class 200 Ductile Iron Pipe with push-on joints, including delivery
and sales tax.
Supplier Unit Price I Bid Amount
US Pi e & Foundry 29.93 120,679.83
Familian Northwest 30.02 121,026.98
R Supply Company 30.2965 1 122,155.49
The Bid from Familian Northwest did not include the required Non-Collusion Affidavit
and was rejected as incomplete and non-responsive.
SUMMARY OF BIDS FOR FITTINGS, SPECIALS AND OTHER APPURTENANCES
Supply of Fittings, Specials And Other Appurtenances as described in 16 schedules
Supplier Total Bid Amount
Western Nevada Supply Com an 44,669.94
Camellia Valley Supply..._ 56,964.75
R Suppl Corn any No Bid
Familian Northwest Rejected
The Bid Opening was scheduled for, and held, at 9:00 AM. The Bid from
Familian Northwest was received at 9:19 AM. The Bid was rejected since it
was not received prior to 9:00 AM.
0 Page 2
II II TRUCKEE
I. DONNER
` Public 't r
Memorandum
To: Board of Directors
From: Ed Taylor, Water Superintendent
Date: 03/16/01
Subject: ENGINEERING AND INSPECTION SERVICES FOR MARTIS VALLEY
WELL#1 PUMP STATION AND PIPELINE
BACKGROUND:
The Board of Directors approved the Mattis Valley Well#1. The well drilling is complete. The
construction of a Pump Station and Pipeline for the project is about to start.
Staff is requesting the approval of a contract for services with Sauers Engineering for the
Construction Engineering and Inspection for the Mattis Valley Well#1 Pump Station and
Pipeline Project.
SCOPE OF ENGINEERING SERVICES
Task Fee
Construction Engineering $10,000
Construction Inspection $20,000
Total Estimate $30,000
The Scope of service for Construction Engineering and Inspection for the Mattis Valley Well
#1 Pump Station and Pipeline Project is defined in the attached proposal dated March 15,
2001.
RECOMMENDATION
That the Board approves the Engineering Services agreement with Sauers Engineering, Inc.
for service of Construction Engineering and Construction Inspection in an amount not to
exceed of$30,000.
Attachments:
• Page 1
Sauer.: Eno racer ino Inc. ScO26568'e� P. ar
Sauers Engineering, Inc.
Civil & Environmental.Frigi.neers
I
I j i 1
March 15, 2001
Nii. Ed Taylor, Water Superintendent
i'ruckee Donner Public Utility District !
P.O.Box 309
Truckee;CA 96160-0309
i
I
SUBJECT: MARTIS VALLEY WELL NO. 1—
PROPOSAL FOR ENGINEERING SFRVICF.S
I
Dear Ed: j
I
i
This letter is mir proposal for construction engineering and,inspection service for the
Mattis Valley Well No. 1 pump station,pipeline,and conduit. We are proposing to
provide construction management and inspection for three construction eont} cts
currently out to bid.
i
Scope of Service
Engineering services will include the following tasks_
I. Construction Engineering. We NAH provide construction engineeriti services
including interpretation of contract requirements,preparation of field rders and
change order.,,review and certificatiun of conrral:l pwgiess payments reports to
the District regarding project progress, supervise regular contractorlW ter
Department/engineer coordination meetings, and related tasks. We 11 prepare
Record Drawings for the pump station building at the cumpletiun of�c caulk,and
provide mark-ups on the pipeline and conduit plans for preparation o Record
Drawings. We will make recommendations concerning acceptance tithe work,
and prepare Notices of Completion.
Construction Inspection. We will provide inspection during constrir tion to
assure compliance with the contract.
i
I
Schedule of Services
This project is expected to be completed April and June of this year, Our sc (ices under
this proposal will run concurrent with the construction and through project chse-ant.
F,ngineer's Fee
We propose to provide the services described above on a time and expenses basis with a
not-to-exceed amount. We will not exceed the maximum limits without fu er
i
i
I
I
110 Tower Gi a.e Valley Road,Suite A, Nevada City, CA 95959 (530)265 8021 Fa I it(530) 265 6831
i
I d
^oaucrc Enoinccr ino Inc. 5'e026568'e� P• �=
II
7
authori
zation from the District. Hourly rates will be charged according to this attached
rate sheer. The tasks and not-to-exceed amounts are shown below.
Task Fee
Construction Engineering $ I0,000 }
Construction Inspection _20,000 1
Total Rarimate $ 30,000
{
Closure
Thank you for the opportunity to provide [his proposal fur cneiucering servic s. I am
available to discuss this project and the proposed engineering services with y u at your
convenience.
Y , truly,
Keith Knihb
Euc.
it
i
i
I
i
i
I
I
i
I
8aucrc Eno inter ino Inc. 5'e026568c� P. 01
i
i
Satners Engineering, Inc.
Civil& ) nvironmcntal Engineers
,
FFF, SCHFDTTT.F
March 1, 1998
I. The following arc hourly rates for professional services: Overtime and we kend hours are
billet]at time-and-a-half_ Evening meetings are not considered overtime un[e s the total daily
hours exceed eight
i
Senior Engineer (Registered) S 85.001hour
Associate Engineer (Registered) 75,00/hour
Assistant Engineer (E.1.'1'.) 65.001hour
Technician, Construction Inspector ', 50,00/hour ;
Clerical 35-00/hour
Expert Witness/Litigation Consulting 125.00/hour
i
i
I
Ii. Consultant will remain the judge of the level of qualification requireA to f mplete a given
task. In addition to the above,all expenses(telephone,postage,materials,, ueprints,xerox
copies,ctcJ will be billed directly, at a role of cult plus O%. Consultant T serves the right "{
to utilize sub-consultants when necessary. I
TTL Clienrsarerequestedrncontracrdirecttywith the,vendors;nfsignifieantoatsf.(eservices,such f
as soils engineering,aerial photography,title work,and so on. In the event that client wishes 1
to retain the above services utilizing consultant as a billing agent, advanct payment of the I
sub-consultant's fee is required. A service charge of 15%per billing will al o be assessed.
IV. Mileage will be billed at a rate of$0.35 per mile.
IC ith S. Knibb, RCE 5129 {
Professional Engineer
1
i
i
440 Lower Crazs Vattvy Roars; CniiP.A, Nevada City,CA 05959 (530)2654021 Fa> 530)265-6834 ,
Q
�I�I� MI� Awls
Memorandum
To: Board of Directors
From: Neil Kaufman, Water Systems Engineer
Date: 3/16/01
Subject: BID AWARD PIPE AND MATERIALS FOR THE JOERGER DRIVE
TRANSMISSION PIPELINE PROJECT.
BACKGROUND:
The Board authorization staff to advertise for, accept and open bids for 24"pipe and other
materials for the pipeline project Bids were received and opened on March 15, 2001.
Staff has totaled and reviewed all bids.
RECOMMENDATION:
1) Award the purchase of 24" Pipe to US Pipe & Foundry.
2) Award the purchase of Fittings, Specials &Other Appurtenances to Western
Nevada Supply Company
Attachments:
SUMMARY OF BIDS FOR 24" PIPE
Supply of 4,032 feet of 24"Class 200 Ductile Iron Pipe with push-on joints, including delivery
and sales tax.
Supplier Unit Price Bid Amount
US Pipe & Foundry 29.93 120,679.83
Familian Northwest 30.02 121,026.98
R Supply Com any 30.2965 122,155.49
The Bid from Familian Northwest did not include the required Non-Collusion Affidavit
and was rejected as incomplete and non-responsive.
SUMMARY OF BIDS FOR FITTINGS, SPECIALS AND OTHER APPURTENANCES
Supply of Fittings, Specials And Other Appurtenances as described in 16 schedules
Supplier Total Bid Amount
Western Nevada Supply Company 44,669.94
Camellia Valley Supply 56,964.75
R Supply Company No Bid
Familian Northwest Rejected
The Bid Opening was scheduled for, and held, at 9:00 AM. The Bid from
Familian Northwestwas received at 9:19 AM. The Bid was rejected since it
was not received prior to 9:00 AM.
0 Page 2