Loading...
HomeMy WebLinkAbout9 Sauers Engineering Agenda Item # !r'-TRUCKEE DONNER PublicI Memorandum To: Board of Directors From: Peter Holzmeister Date: March 16, 2001 Subject: Request for additional compensation for Sauers Engineering Please review the attached letter from Keith Knibb Dated March 7, 2001. He is asking that we consider increasing the compensation authorized to Sauers Engineering for preparation of the Donner Lake CEQA because they had to do additional work in revising the documents to eliminate the treatment plant. The first set of documents were based on construction of a treatment plant and use of a lake intake. So many critical comments were submitted that we modified the project to eliminate surface water and use ground water. This required that a new Negative Declaration be prepared and circulated, thus requiring additional work on the part of the Sauers Engineering staff. RECOMMENDATION: I recommend that the Board approve the request submitted by Sauers Engineering for an increase in their authorization of$4,081.76 for preparation of the Donner Lake environmental documents. Sauers Engineering, Inc. Civil & Environmental Engineers March 7, 2001 Mr. Peter Holzmeister Truckee Donner Public Utility District P.O. Box 309 Truckee, CA 96160-0309 SUBJECT: DONNER LAKE WATER SYSTEM CEQA Dear Peter: In September 2000, the District authorized Sauers Engineering, Inc. to provide services related to the preparation of the CEQA environmental review for the Donner Lake water system. Based on our proposal, the authorization was for a fixed fee of$6,000.00. This is typical for District projects requiring a negative declaration. In the case of the Donner Lake project, however, significant additional work was needed based on a change in project scope including an amended initial study and negative declaration, and the recirculation of the documents. I am requesting an increase in authorization to cover the additional work. Our actual costs on this project totaled $10,081.76. I am therefore requesting an increase in authorization of$4,081.76. Included with this letter is the final invoice for this project which reflects the increased amount. If this acceptable, please process the enclosed invoice. If this is not acceptable, please let me know and we will prepare a final invoice for the original amount. Yo ly, Keith Knibb Enc. 440 Lower Grass Valley Road, Suite A, Nevada City, CA 95959 (530) 265-8021 Fax (530) 265-6834 Sauers Engineering, Inc. Civil & Environmental Engineers INVOICE Date 03/07/01 Truckee Donner PUD Invoice 4 2502 PO Box 309 Truckee CA 96160-309 Job 4 95-006-81 Client Code TDPUD-81 Job Description: Dormer Lake Water Svstem Environmental Review FOR PROFESSIONAL SERVICES: Progress Billing -March 2001 Contract Amount Job Status Amount to Date Less Previous Invoices Amount Due Origginal $6,000.00 100.00% $6,000.00 $5,700.00 $300.00 Additional Authorization $4,081.76 100,00% $4,081.76 $0.00 $4,081.76 Total Due $4381.76 440 Lower Grass Valley Road. Suite A, Nevada City, CA 95959 (530)265-8021 Fax (530)265-6834