HomeMy WebLinkAbout9 Bid Awards Public Utility District Memorandum To: Board of Directors From: Neil Kaufman, Water Systems Engineer Date: March 30, 2001 Subject: BID AWARDS BACKGROUND: The Board authorized staff to advertise for construction of the following projects: • MARTIS VALLEY WELL NO. 1 PUMP STATION • JOERGER DRIVE TRANSMISSION PIPELINE • MARTIS VALLEY WELL PIPELINE Bids were received and opened on March 29, 2001. Staff has totaled and reviewed all bids. RECOMMENDATION. 1) Award the MARTIS VALLEY WELL NO. 1 PUMP STATION project to Schott Construction in the amount of$133,900.00. 2) Award the JOERGER DRIVE TRANSMISSION PIPELINE project to Joe Suter Construction in the amount of$238,040.00. 3) Award the MARTIS VALLEY WELL PIPELINE project to Joe Suter Construction in the amount of$201,399.00. SUMMARY OF BIDS FOR JOERGER DRIVE TRANSMISSION PIPELINE Contractor Location Bid Amount Joe Suter Construction Truckee, CA 238,040.00 Contri Construction Reno, NV 274,634.00 A&K Earthmovers Fallon, NV 326,623.00 Burdick Excavating Kings Beach, CA 351,018.00 Longo Construction Alpine Meadows, CA 594,986.00 Koch Construction Penn Valley, CA 795,140.00 SUMMARY OF BIDS FOR MAR71S VALLEY WELL NO. 1 PUMP STATION Contractor Location Bid Amount Schott Construction Paradise, CA 133,900.00 R.E. McCollum Cedar Ridge, CA 762,500.00 SUMMARY OF BIDS FOR MAR71S VALLEY WELL PIPELINE Contractor Location Bid Amount Joe Suter Construction Truckee, CA 201,399.00 A&K Earthmovers Fallon, NV 202,656.00 Contri Construction Reno, NV 216,276.00 Burdick Excavating Kings Beach, CA 231,016.81 Longo Construction Alpine Meadows, CA 263,928.00 Agenda Item # 9d 16&i 6Ura I Ilfl PublicUtility DZrict Memorandum To: Board of Directors From: Ed Taylor Date: April 2, 2001 Martis Valley Well Pump The Board of Directors, at the February 21, 2001 meeting, authorized staff to advertise and receive bids for the Martis Valley Well Pump. Bids were received and opened on March 29, 2001. One bid was received. The bidder was Flowserve Corporation, Rotating Equipment Division of Chico, California. Flowserve Corp. is the company that has supplied most of the well pump currently in use in the District. The brand name of the pump is Byron Jackson. We have reviewed the bid and determined that the bid is not responsive to the contract requirements. Flowserve Corp. did not provide a bid bond and installation was not included. Recommendation I recommend that the Board reject all bids and direct staff to purchase the well pump and installation of well pump in the best manor possible. Utility Public Memorandum To: Board of Directors From: Ed Taylor, Water Superintendent Date: 03/30/01 Subject: GEOTECHNICAL INSPECTION SERVICES FOR MARTIS VALLEY WELL #1 PUMP STATION AND PIPELINE BACKGROUND: The Board of Directors approved the Martis Valley Well#1. The well drilling is complete. The construction of a Pump Station and Pipeline for the project is about to start. Staff is requesting the approval of a contract for services with Joslin Geotechnical for the Geotechnical Inspection for the Martis Valley Well#1 Pump Station and Pipeline Project. SCOPE OF INSPECTION SERVICES Task Fee Construction Inspection $30,000 Total Estimate $30,000 The Scope of service for Geotechnical Inspection for the Martis Valley Well#1 Pump Station and Pipeline Project is defined in the attached proposal dated March 16, 2001. RECOMMENDATION That the Board approves the Geotechnical Inspection Services agreement with Joslin Geotechnical for service of Geotechnical Inspection in an amount not to exceed of$30,000. Attachments: 0 Page 1 MAR-16-01 FRI 13:29 JOSLIN GEOTECHNICAL FAX NO, S303898833 P. 01 JOSLIN GEOTECHNICAL C90TECHNICAL AND MIN1NG CONSULTANTS 92pCA 4 . Tel, 338 .25Fa S4 P.O. Box 193 t Dulph Blab (,Galjfpnda, 95714 t (5 98 (30)389.8833 FAX TRANSMISSION COVER SHEET Date: 3-16-01 Time: 12 : 00 noon Total Nu;nber of Pages Including Cover Sheet: 9 TO: Mr. Neil Kaufman FIRM: TDPUD FAX NUMBER (530) 587-1189 FROM: Joslin Geotechnical: Robert Joslin RE: Mantis Valley Improvements proposal For Testing and Observation Services REMARKS: Attached is our„proposal information for the referenced project. Thank you for consideration in this project. If you have any questions, please contact our office. If you do not receive the page(s) or are disconnected, please call (530) 389-2581 as soon as possible. Robert D. Joslin, P.E. Civil/Geological Engineer Joslin Geotechnical Fax f (530) 389-8833 JOSIJN G807delHJle il, t P.O. BOX 193 t DOCH P7.41't CAt,IFOBNIA. 95714 t RL (530)389.2581 t Fax (530)389 S833 MAR-16-01 FRI 13:29 10SLIN GEOTECHNICAL FAX NO. 5303898833 P, 02 JQ$LIN C�EOTECHNICAL C:ib11.,S6Xi.,UEOLtD(AC:AL K MLNi.NQ kYC,ItiFfFiNG(,UNSULl A;V 7S . v. "e N MA'th1QAC.�TF S'1ING S!•ItVICGS . . 024 SLockl,ul9 Svlo-i P'. O: Nix 193 • Dutch Flat, Celiflnnia 95714 ■ 530-389-2581 Fax S30 +,i9 lif �i March 16, 2001 Proposal # 519 fir. �ieix Ka2� a? ,' P, F M xuckee ,Dgnoet Public Utilities District (530) 587-3950 0. Pox �09 ruGkee,, Ga,l ,fornia 96160 Y 4�ttn: Mr. Well Kaugman a Af;�: Field Iri<siaeat.iop and Soil Testing; Possible other materials as . equired': a Mart?s Valley Well and ' Pipes, TDPUD improvements; �iruckee; Ca Qrnid Pear Mr.. .Y,4,Wf z in accox;danca with hour request, we are pleased to offer our scope n ' o4s ," t�P4sa1 for performing Field Density Tests and basic S CAn$�xkkct� on observation services relative to the subject project. aWa' undetst-and the project will consist of three general phases of _canstruc ?4?t?; a piimp building and associated pad area, about 6000 feet of 'ttesc '_ari3 pipe installation, and approximately 400 feet of arioth r. .trIGZl.q-b a>3d, pipe installation and backfill. These m�ro?temgnt '? in 'tile general area of Joerger Road, at the east ride ofa. u.�kee,, 'q nia. sr'e -undcars.taP that ' there is . no soil report, but that the 4spegig.j,rattiok�s,and plans, prepared by TDPUD personnel, describe the g;npac i�+tz_hgo tssting requirements. Most compaction requirements are in ' ,the 99 percent minimum range, for bedding; 95 percent SFtlnitntllp in t , payed'• areas (of which ,there is relatively little) , "Iarid ' some with 'a minimum of 85 percent. ';We ire 4it��1i�iar v. ith the site area and note .that the native soils dare pr,oba 1X 'nan-'expansive, are granular, and may contain is.3 i ,i aft ..large. cobbles and boulders. imported bedding is } ?ipeat s r T1 '3t';.may be necessary for the contractor to screen or a, herwss zem?ve ovErsize materials from native backfill, if used. ¢We propose ito. .a,f;fet the following services; 1 . Sampling' the soils and determining soil types and 1Yak?.oratoxy compaction curves for use in field density ts�tilig MAN-16-01 FNI 13:30 JOSLIN GEOTECNNICAL FAX NO, 6303898833 P, 03 �.} Kauf2nan Proposal 519 March 16 , 2001 2 . Site visits as required to perform field density testst it .is our intention to use the nuclear density te method as the basis of field compaction determination. Based on discussion with you, we presently expect about 35 to 50 days of construction work, with an "average" of about four to perhaps six hours in the field for testing. We also expect about six compaction curves, and perhaps about an equal number of check points. There will be some engineer time for office work and coordination and communication with PUD personnel. Our field time will be based on actual job needs, which may largely be determined by the rate and performance of work by the contractor(s) . 3 . provide a summary of tests and a letter noting the placement conditions of fill upon completion of the fill . This will require clerical and office engineer review, Ode will not charge for travel to or from Truckee, but will instead USG a fixed fee for vehicle use, milage, and field equip normally expected in the project vehicle. For this project, the fee will be $50. 00 per day, and nuclear gauge costs will be fixed at $50. 00 per day. In the event conditions require presence of more than one technician or engineer in more than one vehicle, the time and costs will be per each unit and person. Cost for performing these services is estimated to be between $25 ,000 and $35, 000. Actual total testing fee for this stage of the project would be determined based upon a time and materials s in accordance with our current fee schedule (copy attached, basis EASE BUDGETING CONTROLS, AT THIS TIME 2000 SL version) . TO HELP WE PROPOSE To NOT EXCEED A FEE OF $30, 000 without prior written approval from the PUD. As noted, actual costs will be based on the time and materials costs actually incurred. The fee schedule, which includes a STATEMENT OF CONDITIONS, shall be considered a part of this throughout the course a rs ofou nd t rinvo provisionshe therein lvement n he project. prevail Five copies of our report will be provided you upon completion of this phase of our work. We will issue at least one interim written summary of the work, and will invoice the project at a period of between two to four weeks, depending upon the amount of work performed by our firm during that time. As in our past work with the PUD, we will verbally keep the engineering staff aware of the site conditions and progress on an as-requested basis. If it can be arranged with appropriate PUD personnel, it woldb of assistance to us to place a small j e n ate, and able to Truckee, preferably at the PUD yard behind cked his trailer is about e chaired to a relatively immobile object. feet long, including tongue, and six feet wide. It would be used to store some of our equipment that may be used at the site, INCLUDING field storage of a Nuclear Density Gauge- If given this permission by the PUD, Joslin Geotechnical would be responsible ..,�....,µ,,,R,h.,.x..,..»�.,�.�.�.,,�.....�.,�.�.,,,��....w.,�,.,.<.,...�..,.....a.�......�...w»,my.....µ.. .,. .,�.........,. .,... . n n rnv ,az+nwirty MAT t CALIFORNIA- 95714 t To" (530)389-2581 t Fax (530)3894833 MAR-16-01 FRI 13:31 JOSLIN GEOTECHNICAL FAX NO. 5J03898833 P. 04 mr . Kaufman Proposal 518 March 16, 2001 for notification of the appropriate agencies -- state, and Town. The reason for this storage request is that it would allow the b,�nefit of using only one nuclear gauge on the project while allowing the versatility of having differing personnel able to perform the acZ'aal field duties. We also note that the personnel tentatively scheduled for performing this work are Robert Joslin, John Bonell, and (as a bickup) , James Putnam. All of these persons are registered Civil did geotechnical or geological engineers with greater than 25 years ekperience. While performing "technician" type work, the costs will be billed at a "senior technician" or "laboratory manager" irate. If performing engineering-type responsibilities on a temporary basis, the charges MAY be increased to reflect those *1ties , we ,have found this to generally be satisfactory to both our clients and Joslin Geotechnical. There may be some times, especially aftor college lets out, that technician-level personnel may be used for testing. These will be under the direction of one of the above-listed engineers. Should this proposal meet your approval, please sign and return one copy to our office as our authorization to proceed with the work. Thank your for considering our firm for your geotechnical needs. Very truly yours, JOSLIN GEOTECEMCAL &' Robert D. �az�,_;in. P.E. civil/Geological Engineer CE 37716 Copies: 2 to Tahoe Donner Public Utility District by U.S. Mail, 1 copy via fax. APPROVAL: DATE: .,...,....w.....,.:n....^,�...,,,c.y.....,e..u.............n.w+..w.,.a...,,umam...crmam:rmwrewwrvwNr.......>....,,..w:,...a.n..+nmvw.;ttrm..a.».nwe»sya>.*<,>...:....:...W.............. JOSLIN GE02'h'CHNICAI, t P.O. BOX 193 1 DUT'CH bZA7't CALWOXMA, 95714 t T81. (530)339-2581 f Fax(530)389.88.13 MAR-16-01 FRI 13:32 10SLIN GEOTECHNICAL FAX NO, 5303898833 P, 05 JOSLIN GEO TEC HNICAL GnonfiCHNICALAPM M1N240 CONSULVO S 924 Stodtrm strca,-P.O.Dux 193'Dutch Flnt`CaliWmia 95714•Telephone:(530)199-2581 Fax(530 3d9.8333 r�ynn�y,.w�•mmwv,.vmww.�reuwws:a.rm>::w.a.,..s.<' � - :xwmenw,�.�:>«w.ui•.'x::�,::o.r',h:r::w.w,mwa SC -IEDULE OF CHARGES, 2000SL "NNU. LrieaGvo January 1,2000 r, T' CHAROkSak,.•b R,� . . . . 535.00 _ WtutrY'6x)tnieul Msist:Pus, Cicticzl . . . . . . . . . . . . . . . . . . . . . . . . . • . Tsiirri wa'41 A;'is Drafting . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21acr a`'i. 'iWter+Gculogtsl,SoaiarTcclu:icinn,Lab A'lanaecr • . . . . . . . . . . . . . . . '4sajhrcC.wXn"+eer/Geologist . . . . . . . . . . • . . . . . . . . . • . . . . . . . . . . . . . . . . $90.00 t:ettior fiteginacrlGculug}sl - $135R0 Spc4idi C"adl".ions or Silunlicris(ie-bigh any,}c m nttdetWatet investigations,arc.) . . . . . . . . . . . . . .. . . . . . . . . . . . . . . 4in±a-in accordance wi)h'forcy!oSng schet}ute,up to a masiuttwn eight(2)hours par day- FiE&1 ftee anal equipped sa raApeetcd and cha:•gcd portal to Portal with:Emergency response Gcaa Than 24 hour prior nulice)- Fee rate above dnuhltd d one and mcAlaird Genes regular rate far time in excess oreilo hours per day al} Lahr aritiinutm for picking up corexum cyliadcra; ) b).^,baso^ gtirdnium fur hbxcr0al,iou and b,",ting: or Saturdays; e)SeNibca ewer Pour hours are an eight-hour minimwn; e)One said two thirds regular rate for observation and to on Smtdaya of _ holidays fi:r,lis a)M7u(MUM$65.00 per day pet peasVO,OR cost plus 15% ChacSca U>j u,tcciai coswultaut;,ato billed at cost plus eighteen(18)porcctu. ltaicu dlttS4}d the ewubaraal llditod Siatcs.tnipluyees torsi salary coA shall be increased by the PM an customarily Paid by other tar work at that nrgsnirations lor.aM+n. I'',XFjatT WI.1•NESS TFSTIM(JNY . . Unit rats listed rt,yp:nSEieel tax court ca&: . . . . . . . • • . . . Psjarnt}on.fur Cartel case or deposition appccmnt•e CANCELED with less dtan three(3)days ttatice will be billed at full rate Unit ("a'plus 50% 8ebwi'Fi+Vl to depnsiliun,miniasum h:dr day . . . . . . . . .. . . . . . . . . . . . . . . . . . . • . . . . . . . . Court ear athitra(ion appcurunda,per day . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . C,•utt or arbitration apposi"o,por IiAf-0ay(4 hours) . . . . . • . . • . • . . . . . . . . . 11,..(calowang charges am for spocial.:quipnuni and are in addition w personnel charges: !^AyUi+"'R1p:N'C CIIARGFS alo.oa Cnmt 1_f.Per flour . . . . . . . . . . Cer,4 iYhrcl Drive Util}ly Vehjcic ap paved reads,per mitt ' . . ' ' ' ' . . ' ' ' ' ' . . . ' . ' a Wh.:d MiYO Pick Ur Truck,Par mil. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . $0.65 SU.76 4 whzal 1){ivc 12'Utility thed, 1 on rough air uff-foad. . . . use;. . .. . .r. . . . per mite . . . . . . . . . . . . . . . . . • • • ' ' ' ' . . , S150.00 per is),pb+a S0.1101mile I WY,act Drivt 12'Flatbed,23,Q0011+.CrVW . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . 1,4,•;7ae,a 95U Hockhoa,Pee Mour . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . .550.00 P.+rtablc Hydraulic Auger,Drilti Inchu}.:d 7D950 hydraulic source,par hunt . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . spS.00 OULxWt S,:m+iacs Drill Rig,Rctdal sad operation,OWsidc service b=1dano. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost plus Is% H.tpd gnm+r,Tube Sampler,4adctrom:ter,Put Foot. . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Etvtlihr 70 Tun Condor Ho)c IaeL•,Ruck FkAt Tcat Equipment per hoot. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 515.00 w`7aitt L";ashy Cauga,Pct.',tour . . . . . . . , . . . . • • . . . . . . . . . • . . . . . . . . . . , . . . . . . . . . N 57.00 Qt1al Ec eiiccmcm Scisnthgruph . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30.00 soolP Iday . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . S3U.UU Pcr PennNP$6 Day Rork LSttlAbirtg bquipmeut. . . . . . , . . $60,00 Trgr%;y Pep Day . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00/day 0.5 17nlscpvwer Pomp,40 GPM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . S8(I U /dsy I! F!ut:afit..,ar Pump,208'IM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5100.00/day i?Ft}Winn Water Tmft(Leas ihun 5 days,cut uteiuding transport rag) - - - -• • • • • - - - . . SSO.00lhout Air Saripliu• . • . . . . . . . . . . . . . . . . . . . . . . . . . . 115.00/hour WsAur colupacux,Vibrawry Pram comraclac,cawcs/dive platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . `Ydpeer Ttet Equiquatu=CuraUttivily Mon:h SI50.00/day pll.Tamp, Dia.02,Dap Ot Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52S.OU f q,ins Ey{tipmeln,Per hour Pius bit:.hugs. . . (sec bit charges below) . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Concrete&Masonry Asphail Dinmetur of Carina S40.00/t) S30.00/0 2 3 S50.0U/ft S40,n0/n ' S45.00fil 4. 150.00/It S60 Milt 6. S80.001ft S100.00/111 V $120.00/ft • . . . . . . . . . Price.on Requcst ',)Per 10 holes,Cured at a I.m.per site • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAR-16-01 FRI 13:32 JOSLIN GEOTECHNICAL FAX NO, 5303898833 P, 06 sCHEUU%,E OF CHARGES, CONTINUED Effective January 1, 2000 . . , , . " . . Pascua oa regocai :)e,dr y;r ota'Equiptoeto . . . • . . - . . . . . . . . • . . . . . . . • . . . . . . . . . . . . . . . c,, - ) •crcent or at scmal cost for Equipment which ;y '-njial A transit from th4jutt site,or retained by dm client na a sumdby basis will ba biticd at cost plus eighteen(18)p �s.Sdnaad arpirb;cascJ,or otllcrv,,;W a,aUn Itt far.by losl;n Geutechnical tiurough its subcantraawts or others. M31'.!'aCct xgtulin�ani y txpnsad to W:uaual liatsh ier:aia or climactic.oaditions,an appropriate charge will be made fur resultant abnormal wear or maintorsrtca Cost- of f,)Ry TFSr/SolrMcCHANl(A . . . . . . $10.W Shrink-Swell(expansion-emunetion) . . . $IUS.W YJi+6iuta Ccatem . . . " - - . . . . . . . Fabricated . . . . . . . . . . . . Dsy L'«^yw,ry . . . . . . . • . . . . . . . 5175.W . . . . . . . . . . . . . . . . . . $10.W Undisturbed . . . . .. . . . N....7.1-Qtu,nF . . . . . $35.00 Compaction$90.OU ASTM ba8 p'qustir,hy hidcz . . . " . . . . . . . . . . . • $110.00 ' ' 4=mch diflntct.r mold - . . . . . . . . . . . WA--t ,dWilstx. . . . . . . . . . . . . S120.00 $50.00 6•in.h diameter mold . . - - F«m a.0 8aasing No. 200 s,uve . • . . . . . • . . . . . • • . . - . . • . $60.00 ASTM-D 1557 $l2U.W . . . . . . . . . . . . . • . . . 95.OU flinch diantctcr[Hold . . . • . . . . . . . . . . . $ . . . . . �md-vid2,p8 wash . . . . • . . - . . • . 6-inch diatrttter mold . . . . . . . . $120.00 L.•iktfdfq 00 wash A short . . . . . " . . . • . h%utv4 nar • . . . . . . . . . . . . . • " . . . • • . . . . . 5185.0 Caf Impact (216) S50.0 " Check point only . . . • . . ' ' ' . Ls:g bt)d:c,n.teq . . . . . . . . , 6150.00 wilt,ntn 51)"Ific Gravity . . . . . . . . . . . . . . . . . $135.00 Rdtancs Density{Min-Mflx.) - Pcn .abilfty S75.00 !PT..r'hc QnVity ' ' y.' . . . . . $SU.W Undisturbed samptt,luba . . . . • . . . " " . • • - " � � " • {�.ILeolrzsivc suit . . . . . . $$75.00 -Cohcaiwt sail . . . . . . . . . $SS.W Sand Equ va sump.. . . . • . . . . . . . . . . . . . . . . . . . . . . . 575.00 ' ' Sand Fquivalcm . . . . . . . . . . . . . . . . 13G<.o,t�larr Con ld dry iu.iuuin'm par set of 3 • . �tcxre romcM d densit . . . . . - . . . . . . . . . $80.W R-value Facpausion pressure,P . S200•00 l:+u ry y Ummotcd . . . . . . . . . • . . . . . . . . . . pjj suj Shckr, T.wluditk mo,aRlre wont.at Lime Tr.ated . • . . . . . . $210.00 end aF'aynnay 58 . pon ai . . . . . . . . P.U.R. Ua, tlrbad satupla,tubcd Dyneaia Tesu . . . . . . . . . . . . . . . . . . . . . µauiat7 . . . . . . Uirdisturbci aa+cpib . . P.U.R. . . . . . . . . . . . . . S90.00/point Hazardous Waste or Chemical Test . . . . . . . . . . . . . . kwilvid d astrtple • . . $SU0.00/poim c:an•,.$i¢aiion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00/point P.O.R. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . 561.)C(i.td1iCHANICS'r.dS'f1NCs . . . . • . . . - .. . • . 901yCk1a t h/MASONRY Y15TS FrmlfiCunctctc . . . . PA.R. . . 3.00 Mix Design . s . .. . . . . . . . . . . • q.r Colticnt . . . . . . . . . . . . SL50 Slu7:yt 4':at . . . . . ' . • . _ . . . . . . . . • . . . . . . . . . . . . $ .Op Cylinder Molds . . . . . . . . . . . . . . . . . . . . . . Stm gp,npma4aa Teat, 6'xl2'Cy7iadrr . . . . . . . . . . • . . . . . . . $19.00 Cnmout,set of .Ua S55.W S�. . . S19.W Grout,set of 3 . . . . . . . . . . . . . . . . . . . . . . ,Spna Cytudcr,Not Tesicd . . . . . . . . 155.00 Uaa W-Igm,Cylinder . . . . . . . " . . . . . . . . . . $19.W Mortar, set of 3 . . . . . . . . . 1?har$.a far laboratory tcsk,i;rclude lha usual laboratory work and the reporting cf tests only. . equipment.Cmrgcs f.\r spacial tests will be bnacd on hourly p.rsodda W l charges plus a charge of$10. per hour for laboratory equipment. 'ktt,zt' +rders at listed cost plus 75%6 manpower regeiromcnts of lost procedure may preclude granting*RUSH'request. MiSk.FLIANCOUS CHAAQ- ES Cim:yiw}of g+tcful of oubsnal aulshic services arc computed on the basis of Dost plus 19%. l:zae;\pies of such outside or utia 41ztcnus wjvimcs include,but shall nor be lfmittd to: piapm.at;nf hazardous Materials or Cnr]tanl6teL]d Samples Talcoramx of tong distance, fez,telepbane cuffs pfinkdy Gad nProductfun CmOsmen and taburcra R,nrcd ears or plck-up hacks Ranted heavy equipment lrajKipurJalion on pubic ccnzlus $pc�.al f cs,ptmrits,insurance,err ,(7j.13LF PREVIOUSLY fSSUFs , :I'0937S Tlm alas(of each ordor for cr,pics of p,"Wua)y isalltd ret'orta will be determined on s time and expense basis with nunimum charge of S25.W for the fi,xt copy end $2p,00 f,,r carh addhiumi cc}py. ...,'....w...,..•:r,..,w.w.:..:..x�•.:.,.....v.,..+�.,.......w::-.xw.......-,us-.�w.e...,,.,.»srvw.�-++..,,...rmcx«k......:»rtw„ ...:,..m.....w.-..,.,N.s .+.:.......r,.,.,............,....a.,....,,,.,w.:.�.». JOSi.)N GEO11iC11NICA1• t P.O. BOX 193 t VU7C11 FLAT t CAIJPORNIA, 9S714 t Tel. (530)389-2,581 t kas (530)'180-8311 aeon enntn'TTICIMS ARE A PART OF THIS FEE SCHEDULE MAR-16-01 FRI 13:33 10SLIN GEOTECNNICAL FAX NO. 5303898833 P. 07 OSLIN GEOTECHNICAL O.4SOTMITMCALAND MTNWo CONSULTANTS 924 SiWko.m Suwt`P.O.11.X 193 •C4lifun44 95714•Wvphwx(531n 329.2591 Fax(53(n 389.3833 � c°im�rs is will be charged accordance with Joslin Work performed on a time and expense bar ceotechnical''s "Schedule of Charges" detailed on Form A-1 scheduleoa oe charged unusual tyres of work not specifically covered by the foregoing at a rate determined to be equitable in relation to the scheduled rates.Work performed under lump sum contracts will be charged at the agreed lump sum. a.zkaE OF PAY, gNT unless Invoices snap be submitted monthly and upon completion of the work, otherwise provided by •contract or special written arrangement. said invoices shall be due apd. payable when rendered, If after a period of thirty days, said invoice remains unpaid, a service charge of 1.S% per month from the date of invoice shall be charged on the unpaid amount. Payments thereafter shall be applied first to the accrued Interest and then to the principal amount, if suit or action is instituted to collect' and sum due, owing and unpaid, client shall be liable for such sums as the court may abjudge reasonable for attorney's fees and other costs in said suit or action. If is expressly agreed and understood that venue for any such suit or action shall be, at the discretion of Joslin Geotechnical, in any court of competent jurisdicS.lµn located within the County of Placer, State of California. Joslin Geotechnical may at its option withhold delivery of reports and other data pending receipt of' paymenh for all services rendered. ECOPp AND "EC'UTI.OpF OF SERVICES Joslin 4eotechnical shall provide its findings, recommendations, specifications of professional advice after preparing such information in a manner consistent with that level of care ordinarily exercised by members of the profession currently practicing under similar conditions in the fields of gent this cal engineering, soil mechanics, mining engineering, and engineering geology. lieu of all warranties, either express or implied. Client recognized that subsurface conditions may vary from those encountered at the location where borings, pits or other explorations are made and that the data, interpretations and recommendations made by Joslin Geotechnical are based solely on the information available. Joslin Geotechnical will be responsible for those data, interpretations and recommendations, but shall not be responsible for the interpretation by others of the information developed. In the event that the client requests termination of the work prior to completion of a report, Joslin Geotechnical reserves the right to complete such analyses and records as may be necessary to place our files in order and, where considered by us necessary 't6 protect our professional reputation, to complete a report on the work ecessard ;to date. A termination charges to cover the costs thereof in and amount not to exceed eighteen fl8j percent of all charges incurred up to the date of the stoppage of the work may be made at the discretion of Joslin Geotechnical - Either party in this agreement may terminate these services by written notification to the ether. If Joslin Geotechnical terminates this work, copies of all work complet;ed .to that date will be provided the client upon such an event, and invoicing shall be presented for such work at time of termination. If client terminates this contract, termination details provided in paragraph 5 of the Terms and Conditions of Agreement shall prevail. Joslin Geotechnical will not be liable for damage or injury a arising from damage ewhich ato re subterranean struc{.ures (pipes, tanks, telephone cables, g not called to our attention and correctly shown on the plans furnished us, inside and out, including all fences, landscaping, shrubs and flowers, and our firm will not be responsible for damage cased by movement of earth or equipment affecting fences, lawns, shrubs, landscapes, walks, sprinkler systems, or underground utilitie4 and installations. Joslin Genter_hrical will diligently proceed with the work reed and underontracted stood that for and will submit its report in a timely manner, but it is expressly ag reed Joslin Geotechnical shall not be held responsible for delays occasioned by factors MAR-16-01 FRI 13:34 JOSLIN GEOTECHNICAL FAX NO. 5303898833 P, 08 TERMS AND C,ONDI,TIONS OF AGREEMENT CONTINUED, 2000SL beyond its control, nor factors which could not reasonably have been foreseen at the time of, the execution to the agreement between the parties. In the avert the: client makes a claim against Joslin Geotechnical at law or omission or other act arising out of the otherwise, for any alleged error, performance of our professional services, and the client fails to proved such claim, then the client shall pay all costs incurred by Joslin Geotechnical re in defending itself against the claim, including but not limited to personnel attorney's fees, court costs and other claim related expenses. Joslin Geotechnical will not be responsible for the general safety on the site or the work of other contractors and third parties. The presence of our field representative will be for the purpose of providing observation and field testing. our work does not include supervision or direction of the actual work of the contractor, his employees or agents. The contractor for the project should be so advised. The contractor should also be informed that neither the presence of our field representative nor the observation and testing by our firm shall excuse him in any way for defects discovered in his work. It is understood that our firm will not be responsible for job or site safety on this project. Job and site safety will be the sole responsibility of the contractor(s) . LXHITATION OF LIABILITY Joslin GVotechnical'a liability in this project will not exceed to times our fees, or $50,000, for professional services (or $10,00o for laboratory services) , whichever is less, for negligent professional acts, errors, or omissions, and CLIENT agrees to indemnify and hold harmless Joslin Geotechnical from and against all liabilities in excess of the monetary limit established above. If CLIENT wishes to discuss higher limits and the charges involved, he should arrange so with Joslin Geoteehnical. Higher limits, to be valid, must be made with a written addendum to this contract. FLES Unless specific arrangements are made, all samples will be disposed of 30 days after the submission of our final report, samples that have been disturbed or altered by testing will be disposed of at the completion of the test procedure unless otherwise prearranged. Storage arrangements can be made at the clients request for a monthly charge, or the a4p. lea an be providedto the client ADDITIONAL COSTS, for their collection. DISPOSAL E AT Proper disposal or handling of contaminated soil boring cuttings, test pit material, well development and purge waters, decontamination solutions and other contaminated or potentially contaminated materials and samples, and/or equipment contaminated during explorations, and decontamination costs associated with equipment or personnel, are the responsibility of the client. If Joslin Geotechnical performs this work, it shall be additional to any fees otherwise quoted unless otherwise specifically stated in the proposal. ISXJ1V'NDED MRATIONS per month for personnel on Site to residanpe. travel expenses A MINIMUM of once p extended field projects will be charged. Travel hours will not be invoiced for those trips. Expenses and travel hours associated with the initial mobilization and final de-mobilization of personnel and equipment will be charged. N U'A ER OF REPORTS ISSUED Unless otherwise provided for in the proposal, six copies of reports or laboratory results will be provided. Additional copies can be provided on a time and materials basis. LABORATORY COSTS Laboratory work prices include the reporting of routine results via mail. They do not include calling with results, comments, recommendations, opinions or xu ni..r.,.u...w ...nh anmia...xtu'..M SvMI...t.W.tv.�SWae.nwvuaw.v'tMO:wv..geuvu.KH.i4%mta^.a^w.vn^.MW..++M'M':+S(keT4.wa....w+xv'n'wn.'.++:rww,nvvrc+.a.....i... IOSI,IN C6,OI ECXN1CAL t P.O. BOX 193 t DUTCH FLAT t CALIFORNIA, 9S71 J t Tel. l53(0)389-2581 t Fox (530)389.8833 MAR-16-01 FRI 13:35 JOSLIN GEOTECHNICAL FAX NO, 5303898833 P' 09 TEPYIS AND CONDITIONS OF AGREEMENT CONTINUED, 2000SL conclusionA, t-q'ouF1X rates for appropriate personnel are charged for sampling, specification review, discussion, and report preparation for field testing. ElGT O)Vid'tlt {SsP Reports, drawings, plane, data, and are SPECIFIC and other analysis and project documents are and 'remain the prceperty of Joslin Co to the locations) described in the report. Reports shall not be valid, or otherwise used for design/cor.'®trvcti.on gurpose9 unless invoices are paid in full, nor shall report or 'other information obtained be released to client or other consultants unless invoices are paid. IND OF TERMS AND LIMITS SECTION, THIS DOCUMENT W»xa:ew�...».s.xnn•».-...ewr�..xa^ww..«.....w.w....-n»eao.,+..r:eav,m+w-.+. .,..:.�........x.w nm:w .i ...R..att.'/Y K...m..vx ..+n�x C Tawes.muxKMfi4iN'MH+s^CA%SKNN'+� JOSLIN Gh'OT.rVYN1CAL. t Y.O.BO%193 t DUTCH FLAT t'CALIFORNIA, 95714 t Tel. (536)389-158I t Pax (530)389-8833 ti Memorandum MEMO TO: BOARD OF DIRECTORS FROM: Ed Taylor DATE: March 30, 2001 SUBJECT: UPDATED ESTIMATED CONSTRUCTION PAYMENT SCHEDULE FOR MARTIS WELL #1 AND PIPELINE APRIL #1 - Lang Drilling April 20,2001 $340,000 #2 - Nimbus Engineering April 20, 2001 $90,000 TOTAL $430,000 MAY #1 - 24" Pipe May 20, 2001 $165,000 #2 - Well Building May 20,2001 $100,000 #3 - 16" Pipeline May 20,2001 $150,000 #4 - 24" Pipeline May 20,2001 $150,000 #5 —Inspection May 20, 2001 $20,000 TOTAL $585,000 JUNE #1 - 16" Pipeline June 20, 2001 $40,000 #2 - 24" Pipeline June 20, 2001 $50,000 i #3 — Well Pump June 20, 2001 $90,000 #4 -Inspection May 20, 2001 $20,000 TOTAL $200,000 JULY #1 - 24" Pipeline July 20, 2001 $25,000 #2 - Inspection July 20, 2001 $10,000 TOTAL $35,000 AUGUST #1 - 16" Pipeline - August 20, 2001 $10,000 #2 - 24" Pipeline August 20, 2001 $15,000 TOTAL $25,000 PROJECT TOTAL $1,275,000