HomeMy WebLinkAbout5 Schedule Electric Connection Charge Agenda Item #5 I _UPUbliC Utility District �i II ^y1 Memorandum To: Board of Directors From: Peter Holzmeister Date: April 12, 2001 Ordinance amending Electric Connection Charge Schedule Attached is a draft ordinances with two exhibits, one incorporating the flat rate approach to the electric connection charge, the other incorporating the connection fee schedule that is specific to underground and overhead. Bob Quinn, Mary Chapman and I concur in recommending that the board adopt the flat rate approach. Our reasons are: 1) All the fee schedules are averages of costs spread over many customers. We cannot so accurately calculate a fee that each new service is paying an actual cost. The specific cirsumstances of each service result in different actual costs. Thus, averaging overhead costs in with underground costs and designing a single fee is a slight modification of that we have always done. 2) It is easier to administer a single fee. The front counter staff who collect the fee will not know whether a given new service is underground or overheard or served by a padmount or polemount transformer. Recommendation I recommend that the Board adopt the ordinance increasing the electric connection charge and attach the exhibit incorporating the flat rate approach. F,F • , KEE III . • NNER Public Ordinance No. 2001 -_ Effecting a change in the electric connection fee schedule WHEREAS, a review if the electrical connection fees has revealed an increase in costs over the past several years; NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: • Effective 30 days from the date this ordinance is adopted, the electric connection fees, a copy of which is attached hereto as Exhibit A, shall go into effect and prior electric connection fee schedules shall be rescinded. • The Clerk of the Board is hereby directed to post and publish this ordinance in accordance with state law. PASSED AND ADOPTED by the Board of directors of the Truckee Donner Public Utility District at a regular meeting thereof duly called and held within said District on the 1 e day of April 2001,by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By James A. Maass, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board smc Exhibit A-1 ELECTRIC CONNECTION FEES Size and Type of Service Connection Fee A. Single phase, 1201240 service Three-wire overhead Actual cost 1) Temporary $ 990 2) Permanent connection to structure $1,190 3) Temporary connection to customer-owned power pole and subsequent transfer to structure B. Single phase, 1201240 service Three-wire underground (overhead transformer) $1,240 1) Permanent connection to structure $1,490 2) Temporary connection to customer-owned power pole; removal of same and installation of undergroud permanent service to structure C. Single phase, 1201240 service Three-wire underground (padmounttransformer) $1,115 1) Permanent connection to structure $1,365 2) Temporary connection to customer-owned power pole; removal of same and installation of undergroud permanent service to structure Exhibit A-2 ELECTRIC CONNECTION FEES Size and Type of Service Connection Fee A. Single phase, 1201240 service Three-wire overhead Actual cost 4) Temporary $1,100 5) Permanent connection to structure $1,300 6) Temporary connection to customer-owned power pole and subsequent transfer to structure B. Single phase, 120/240 service Three-wire underground(overhead transformer) $1,100 3) Permanent connection to structure $1,350 4) Temporary connection to customer-owned power pole; removal of same and installation of undergroud permanent service to structure C. Single phase, 1201240 service Three-wire underground (padmount transformer) $1,100 3) Permanent connection to structure 4) Temporary connection to customer-owned power $1,350 pole; removal of same and installation of undergroud permanent service to structure