Memorandum
To: Board of Directors
From: Peter Holzmeister
Date: April 12, 2001
Ordinance amending Electric Connection Charge Schedule
Attached is a draft ordinances with two exhibits, one incorporating the flat rate approach
to the electric connection charge, the other incorporating the connection fee schedule
that is specific to underground and overhead.
Bob Quinn, Mary Chapman and I concur in recommending that the board adopt the flat
rate approach. Our reasons are:
1) All the fee schedules are averages of costs spread over many customers. We
cannot so accurately calculate a fee that each new service is paying an actual
cost. The specific cirsumstances of each service result in different actual costs.
Thus, averaging overhead costs in with underground costs and designing a
single fee is a slight modification of that we have always done.
2) It is easier to administer a single fee. The front counter staff who collect the
fee will not know whether a given new service is underground or overheard or
served by a padmount or polemount transformer.
Recommendation
I recommend that the Board adopt the ordinance increasing the electric connection
charge and attach the exhibit incorporating the flat rate approach.
F,F • , KEE III . •
NNER
Public
Ordinance No. 2001 -_
Effecting a change in the electric connection fee schedule
WHEREAS, a review if the electrical connection fees has revealed an increase in costs over the
past several years;
NOW, THEREFORE, BE IT ENACTED by the Board of Directors of the Truckee Donner Public
Utility District as follows:
• Effective 30 days from the date this ordinance is adopted, the electric connection fees, a
copy of which is attached hereto as Exhibit A, shall go into effect and prior electric
connection fee schedules shall be rescinded.
• The Clerk of the Board is hereby directed to post and publish this ordinance in accordance
with state law.
PASSED AND ADOPTED by the Board of directors of the Truckee Donner Public Utility District at a
regular meeting thereof duly called and held within said District on the 1 e day of April 2001,by the
following roll call vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
James A. Maass, President of the Board
ATTEST:
Peter L. Holzmeister, Clerk of the Board
smc
Exhibit A-1
ELECTRIC CONNECTION FEES
Size and Type of Service Connection Fee
A. Single phase, 1201240 service
Three-wire overhead
Actual cost
1) Temporary $ 990
2) Permanent connection to structure $1,190
3) Temporary connection to customer-owned power
pole and subsequent transfer to structure
B. Single phase, 1201240 service
Three-wire underground (overhead transformer)
$1,240
1) Permanent connection to structure $1,490
2) Temporary connection to customer-owned power
pole; removal of same and installation of
undergroud permanent service to structure
C. Single phase, 1201240 service
Three-wire underground (padmounttransformer)
$1,115
1) Permanent connection to structure $1,365
2) Temporary connection to customer-owned power
pole; removal of same and installation of
undergroud permanent service to structure
Exhibit A-2
ELECTRIC CONNECTION FEES
Size and Type of Service Connection Fee
A. Single phase, 1201240 service
Three-wire overhead
Actual cost
4) Temporary $1,100
5) Permanent connection to structure $1,300
6) Temporary connection to customer-owned power
pole and subsequent transfer to structure
B. Single phase, 120/240 service
Three-wire underground(overhead transformer)
$1,100
3) Permanent connection to structure $1,350
4) Temporary connection to customer-owned power
pole; removal of same and installation of
undergroud permanent service to structure
C. Single phase, 1201240 service
Three-wire underground (padmount transformer)
$1,100
3) Permanent connection to structure
4) Temporary connection to customer-owned power $1,350
pole; removal of same and installation of
undergroud permanent service to structure