HomeMy WebLinkAbout10 Broadband Business planning Agenda Item # 10 UCK�uE�� DONNE, DistrictPublic Utility Memorandum To: Board of Directors From: Peter Holzmeister Date: April 26, 2001 Broadband business palnning This memorandum has as its purpose to develop the Broadband issue to the point where the Board can consider making the next set of decisions. The business planning process has been dynamic in that our thinking has evolved throughout the process. We began the process three years ago with two related goals in mind: (1) develop an advanced SCADA system that would allow us to manage our water and electric systems more efficiently and (2) create a "smart community" in Truckee. We retained Navigant Consulting to prepare a business case analysis to define how we could develop an advanced broadband system to meet those goals. In that process we learned about the inadequacy of current levels of service in Truckee. We learned that there is a huge desire in Truckee for access to high-speed data services. We also learned that in the community there is considerable interest in having improved cable television service and in having choice. When the first business case analysis was developed, it suggested that we build a fiber optic backbone network with coaxial cable reaching to the customers. On this system we would operate our water and electric SCADA systems and provide high-speed data services and improved cable television service. The business case analysis showed that this set of services is needed in Truckee and would be financially supported by the revenue streams. We then retained Vectren Consultants to perform a validation study of the Navigant study. Vectren verified the conclusions of the Navigant study and went one step further. Vectren suggested that we consider adding voice telephone service to the mix of services offered on the broadband network. This recommendation increased the estimated capital cost of the broadband system from the original $8,000,000 to approximately 14,000,000. It also concluded that the revenue streams resulting from the provision of services would support the investment and operation of the broadband system. The addition of telephony pushed the investment significantly higher and introduced a new element of risk. It also began to tie us to Vectren for the long-term. Paul Norsel, a member of the tAFCo review committee, raised probing questions about the assumptions in the Vectren report that needed to be answered. Alan and I began a new due diligence process that included a trip to Glasgow, Kentucky to see, in the field, a broadband system with several years of experience being operated by a public power agency. Nelson Van Gundy, Alan Harry and I came away from Glasgow with the view that it would be advisable to return to the basic plan: SCADA and smart community. Eliminate telephony for now. What this accomplishes is: (1) Return us to our utility roots. We need the SCADA system for our utility operations. (2) Returns us to the "smart community" concept wherein high-speed movement of data is the goal. (3) Reduce the investment back to about $8,000,000 (4) Reduce the business risk posed by the new and immature CLEC world. (5) Permit us to deal with design consultants other than Vectren. (6) Eliminate the need to consider funding participation by Vectren and a long-term stream of payments to Vectren. There are some next steps that we wish to suggest to the Board: (1) Submit the required material to LAFCo to achieve final approval of activation of the latent power (Master Service Element, in-lieu of franchise agreements and risk mitigation plan). (2) Design the final broadband system. (3)Arrange for financing of construction. (4) Visit Ashland and Alameda to complete the last of the due diligence. At the Board meeting on Wednesday evening Alan and i will have a presentation that provides additional information about Glasgow and the planning process in general. 8aucro Ena inccr ino Inc. 53D265683� P• D1 1 1, i I TRUC:KEE DONNER' PUBLIC UTILITY DISTRICT MASTER SERVICES ELIME'NT I i FOR BROADBAND TELECOMMUNICATIONS SERVICES (, NEVADA COUNTY LOCAL AGENCY FORMATION COMMISSION April, 2001 i {{1 t t Prepared by: Saueas Enguieering, Inc. ` E i t i Sauers Ensineerine Inc. 5302656834 P. 02 II i i TABLE OF CONTENTS j I. INTRODUCTION . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A, General Project Overview . B. District's Sphere of Influence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 11. SPECIFIC ELEMENT REQUIREMENTS . . . . A. Existing and Proposed Facilities . . . . . . . . . . . . ... . . . . . . . . . . . . . . . • . . . . . . . . . Backbone Fiber Network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Metropolitan Area Network . . . . . . . . . . . Hybrid Fiber/Coax Network . . . . . . . . . . . . . . . . . Network Operations Center . • . . . . . . . . . . . .L . . . . . . . . . . . . . . . . . . . . . . . . • B. Services To Be Provided • . . . . . . . . . . . Data Transfer Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : Cable TV Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Internet Access Service 4 Local Telephone Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i C. Present Service Level Capacity . . . . . . . . . . .i4 D. Anticipated Service Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E. Actions, Improvements, and Construction . . . . . . . . . . . . . . . . . Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . � . . . • . . . . . . . Improvements ( . . . . . . . . . ;' Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I{ F. Projected Revenue and Expense G. Cost of Services . . . . . . . . . . . . . . . . . . . . . . . . . . !. . . . . . . . . . . . . . . . . . . . . . . . . �I H. District Enabling Legislation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i I, ,I �I So.uers Eneineerins Inc. 53026568E P. 03 I i it I � i I, INTRODUCTION j the"Truckee Donner Public Utility District(the"District")intends to provide brt�adband u telecommunications services to customers within its existing Service area and, as� evelopment continues around the Truckee community, to future customers within its sphere o£intuence. This Master Services Element will provide descriptiuns of the services to be provided,the infrdstructure improvements and facilities necessary to provide the services, and rrojectiow of the costs and revenues generated by the provision of the new telecommunications services. Projections will be made over five year planning perinds consistent with the Dig let's existing sphere of influence. This report is intended to satisfy the requirement of the Nev da County Local Agency Formation Conmxissioii ("LAFCu") fur a Master Services Elemen to demonstra4 the District's ability to provide adequate and efficient broadband telecornmunica ions services within its sphere. A. General Project Overview The District intends to construct and operate a network of fiber opliu and coaxial cables along with electronic equipment to provide broadband telecommunications services for!the District's existing water and electric facilities and for residential, commercial,and public a ency customers. Generally speaking, the District will provide four types of telecomm.. nication services. These are data transfer,cable TV,internet access, and telephone. In so no cases, the District will be the actual provider of the service(data transfer and cable TV),w tie for others, m el the District will make capacity available for others to provide the service (inte access and telephone). it The District will provide a fiber optic cable backbone system extending througho1 t the existing service area along with metropolitan area uctwurks providing fiber optic connections at various locations within the District. A hybrid fiber/coax network will extend from the fiber backbone . to provide service to individual customers. The District will also provide the elec onic equipment necessary for the operation of the network. R. District's Sphere of Influence In 1998,the District completed an update of its"Sphere of Influence Report." The Sphere of Influence Report was based on the District providing water and electric services, iThe report describes the District's existing service area boundary along with projected spher s of influence, in five year planning periods over twenty years. The District's sphere of influence as dcfiucd ii: i the report has beta appiuvcd by LAFCu. j The telecommunications services to be provided by the District as described in th s Master Services Element are consistent with the District's existing sphere of influence. e District intends to initially provide these services within its existing service area boundaries. Expansion of telecommunications services iutu bphcir areas will occur as development occurs similar to th expansion of water and electric facilities described in the Sphere of Influence Re ort. The District's "Sphere of Influence Report,Reviseal January 1998,"is ineorporat d herein by reference. The report includes maps of the District's existing service area and sp eres of f } 1 t J I it Suers Ensineerins Inc. 5302656834 P. 04 influence in five year planning periods. The repot t also identifies existing land L ses and projections of future land uses based on the General Plans of the Town of Truck e, County of Nevada, and County of Placer. Future projections of telecominunication service in this Master; Services Element are based on the planning perind.- of the sphere report. II. SPECIFIC ELEMENT RE,QUM MENTS A. Existing and Proposed Facilities !i Construction of the fiber optic backbone cable, metropolitan area network, and h brid fiber/coa network will be similar in nature to the construction of other wire utilities such I electricity an' phones. Fibcr optic and coax cables will installed on caisting poles where exist] g utilities are overhead and in buried conduit where existing utilities are underground. Custo er service connections will also be similar to other utility connections with either fiber optic or coax cable installed to a connection at the customer's point of service. Facilities would alsg include a Network Operations Center housing the electronic equipment;needed to operate t e network, an core sites and nodes which include equipment for branching off of the fiber back one to individual customers. 1 Backbone Fiber Network The core fiber optic network that would initially be used to provide eommunieati nand service between TDPUD's sites for the utility's Supervisory Control and Data Acquisitto (SCADA) system to connect electric substations,water pumping stations, and other Distriettacilities. Th District will utilize a minimum 96-count to 144-count fiber optic cable for the telecommunications network. This should he snffncient for applications, such as he metropolitan area network(MAN) and broadband services. This fiber optic baokYme will be approximately 26.3 miles in length, based on the assumption teat the fiber will compose 20% o j the distribution plant, and will have the capability to meet all the fixture telecom cations needs of the District and its residents. II The backbone fiber network will utilize a ring topology for redundancy and inert tscd rcliability� A fiber ring architecture offers the customer built-in teduudancy for data in the s, stem and therefore is much more reliable. l Metronoli an Area Network 1 i r The metropolitan area network, or MAN, will include the extension of fiber optic cable directly to customers requiring a high bandwidth connection to the fiber backbone. These sites include but arc nut limited to government agencies, substations, schools,hospitals, and c tnnter"al and j industrial sites. Core sites, which include equipment to allow connection betwee the fiber ; backbone and the MAN, will be located along the fiber backbone for branching t the customer 1 site locations. Fiber cable for the MAN will be installed on poles or in buried con duits depending on the type of electric utility service provided in the area. f i Hybrid 1"iber/Coax Network The final phase in the Districts's telecommunications system would he. the deliv' y of high, speed Internet and cable TV(CATV) services to the Distriet's'eustomers. This 111 require the I ; 2 III F A 5auers Ensineerin9 Znc. 5302656834 P. 05 i� I! 4 construction of a hybrid fibcdcoax(11M) nctwoLk. Tbo Disrict anticipates cons,i cling the HFC network to be available to 9,480 horses in the initial year with up to 12,400 by thet t year. Nodes will be installed along the fiber backbone and metropolitan area aet}vork which will provide the connections between individual customer's coax cables and the fiber netwnr..k. A node size of 100 homes per node was chosen so that CATV, Internet and telepho�y may be offered to District residents. initially there will be approximately 126 mites of di tributiun plant' (coax) fecdiug customers off the 26.3-mile fiber backbone. Network Operations Center The District will provide a network operations center(NOC)to house all of the c eetronic equipment necessary to operate the fiber network and provide;dre Villiuus services. The NOC, headend,holds all the electronics responsible for receiving signals from the charels, combinin them and modulating them into a form that can be transmitted over fiber. Space ill be needed' for the racks that to hold the electronics. This facility will need considerahla air .onditioning a the heat gain from all the electronics will be great. The NOC facility/room will be in the range of 1200-1500 square feet. The District anticipates housing the NOC at its exist'nt building. B. Services To Be Provided The District will provide four classes of telecommunications services. in some c ses the Distri # will provide both the infrastructure and the service (direct service provision),while in other cases,the District will provide only the infrastructure, leasing capacity to anoArcr sci vice pruvider(indirect service provision). The services to be provided are: Data Transfer Service (Direct Service Provision) Cable TV Service (Direct Service Provision) Internet Access Service (Indirect Service Provision) Local Telephone Service (indirect Service Provision) Data Transfer Service High speed data transfer would be available using the fiber backbone and MAN bcr systems. This scrvicc would initially be used to provide conuuunicatiur and services betw the District's own existing sites facilitating the modernization of the utility's Supervi ory Control i and Data Acquisition (SCADA) system to connect electric substations,water p ' ping stations and other District facilities. Data transfer services would he made available to ut1"trilds; er customers with similar needs involving data communication between remote sites within thservice area. . Cable TV Service [ for the cable television system, the District will provide an 870 MHz system. Ts enables the District to offer up to 78 analog channels of video along with a digital channel ti , digital music, and pay-per-view. A full 78-channel lineup may not be offered initially,but this into the system the ability to expand the channel lineup and add otlicr broadband services n the funne. Cable TV service will be made available to all residences and businesses in the se� ice area. a �I 3 is d Saucers Erie ineer ins Znc. 5302656834 P. 06 • II Internet Access Service For high speed internet,the District would provide only the ltcadend equipment�rrd hybrid fibei I' coax network needed to provide customers access to the internet. The District itself would not be an Internet Service Provider (ISP). Instead, capacity will be made avniinhle t�1 local ISPs so that community members can keep using the ISP service they are currently using, The District will rely on the individual ISPs to provide the cable modems, 'addicss any servic issues that their customers have and take care of the day-to-day operations of the system. is internet i access would be provided via coax through a cable modem,which offers speeds p to 10 Megabits per second(Mops). Local Telephone Service Another service to be offered by the District is cable telephony, As with internet access, the District will only provide the headend electronics(digital switch)necessary for it� customers along with access through the hybrid fiber/coax network. Through a partnership with a competitive local exchange carrier, the exchange carrier would be responsible fpz'the operation 1 and service issues of the telephone system while the District would bo respvusibl for prvvidin the ueccssary equipment. This basically involves providing the switch,which w uld be used to give District customers access to voice services. Because of the intricacies that o;nerating a telephony system would entail (e,g.Emergency 911),the competitive local excha ge.carrier would be responsible for all operational and service issues, �I C. Present Service Level Capacity 'the broadband telecommunications services being proposed by the District are n t currently available within the District's service area nor are they being provided by any other overlapping service provider. The facilities needed to provide the telecommunication service$ e d de are also non-i i existent. Although some communication services are available such as telephuricl- cable TV, anlll ltaditiuual internee access through phone lines,the level of service of these syst s does not compare with that of the broadband network proposed by the District. The broa and telecommunications service addressed in this Master Services'Element is consi 'ed a new i service to the District's service area. D. Anticipated Service Level 4 It is anticipated that all of the telecommunication services offered by the District ill be available to customers throughout the District's service area within 18 months of decision by i the District to proceed. This will likely result in telecommunications services bei g available to;I all existing residences and businesses within the District's service area between t e years 2002 and 2003, This will include data transfer, internet access,cable TV,and local t-1(phone services. Once the fiber optic and hybrid fiber/coax network are completed,the telecommupication systerp will be comparable to the District's water and electric systeurs in that it will be avtulable to all III existing customers within the current service area. Expansion of telecommunicat#tons service into the District's spheres of intluence will occur as development continues around the Truckee community following the same patterns described in the Sphere of Influence Re' rt for water I and electric service. However, unlike water and electric service where it is expec ed that 4 I! t l Sauers Engineering Inc. 5302656834 P. 07 Ili i it virtually every residence and business will connect, it is not anticipated that ever potential customer will desire telecommunications services. The District has made projec ons of the number of customers utilizing each of the services based on the total number of omes passed by the network and the penetration rate, or anticipated percentage of homes ntiIi7in the services. Table 1 PROJECTED CUSTOMERS Year I Year 10 Total homes passed by network 9,480 12,369 Data Transfer penetration rate 45% 81% Data Transfer customers 4,266 10,019 (' li Cable TV penetration rate 40% 45% j Cable TV customers 3,792 5,566 I Internet penetration rate 66% 43% Internet customers 6,257 5,319 Telephone penetration rate 1.0% 60% Telephone customers 948 7,421 I, �I E. Actions,Improvements,and Construction There will be additional actions required by the District prior to implementation gf the i telecommunications service project. FLA and foremost,the District must make I he determination to move ahead with the telecommunications services plan. If the District I{ determines that it is in the best interest of its customers to provide the proposed telecommunications services, the District, through its Board of Directors,will take action to approve the plan. Following approval of the plan,the District'will take a number of other i actions leading up to implarllculaGolt of the project. These actions include authorization for , financing the construction of the network, approval of network design, authorization of construction contracts, and authorization of service agreements with service proyrders for internet and telephone services. Imgrovcmcnts I) None of the improvements needed to provide the telecommunications services ar currently in existence. All of the infrastructure including fiber optic cable,coax cable, and el ctronic .I equipment needed to create the broadband network will have to be installed in or er to provide the proposed level of services. �!I i 5 i Sauers Engineering Inc. 5302656834 P. 08 I Conetruotion �, In order to provide the proposed telecommunications services, the District will b ve to construct the fiber optic backbone network,the metropolitan area network, the hybrid fib' coax networkP and the network operations center. Construction of the cable networks will involve installing fiber and/or coax cable along existing poles or in buried conduits depending on e type of electric service(overhead or underground) in the area. A'odes�which. allow i1 v5dual custome�$ to connect to Ozc fiber network, will be installed at a rate of approximately one p r every one hundred homes passed by the network. A conditioned space will need to be mad available for the network operations center. This will likely he at the District's existing facila F. Projected Revenue and Expense The District has prepared revenue and expense projections for a ten year period:, he projections indicate that the District will be operating the service at a loss for the first two ye rs. Starting with the third year of operation, the system will generate revenue in exceas of ex enses, according to the projections. I Table 2 REVENUE AND EXPENSE PROJECTIONS OPERATING REVENUE Year 1 Year 5 Ye r 10 Data/Intcruet Service $ 773,058 S 1,456,148 $ 4,970,216 iI i Cablc TV Service 912,260 2,969,397 1, �42,388 Telephone Service 2,884,355 4,467,339 7,)23,690,648 01 Other Services 1,242,931 2,418,873 3s i Total Revenue $5,812,624 $11,311,786 $17; 26,853 OPERATING EXPENSE Year I Year 5 Ycttr 10 Programming S 506,314 $ 803,466 $ 1,,1I84,667 j Depreciation 1,110,565 1,265,258 1;4I 4,315 l Payroll & Benefits 579,t59 676,889 656,552 j Telecom Plant O &M 480,574 80,428 �5,232 Marketing &Advertising 340,311 34,601 3,063 i Admin& General 654,482 812,166 1;137,046 I j I ' Non-Video Services 2,547,099 4,409,688 6,819,861 Tn-T.ieu of Franchise Fees 45,613 148,470 248,511 Total Expense $6,264,120 58,230,966 $11,6 9,247 I � 6 i iJ Sauers Engineering Inc. 5302656834 P. 09 i ij G. Cost of Services The District has estimated the cost of services for a ten year period. Because telecommunications services are not considered essential services such as water nd electric services, costs will only be incurred by consumers who choose to take advantage of the service$ provided. Residences and businesses may choose to utilize some or all of the so icesoffcicd and will be billed only for tho services provided. Table 3 BILLING RATES BILLING RATES Year I Year 5 1;ear 10 Data Transfer Service $175.00/mo $193.00/mo S219.00/mo 1 i Internet Service S21.94/mo S13.01/mo $10'81/mo Cable TV Service(Basic) $29.95/mo $36.40/mo $461 6/mo Local Telephone Service S17.00/mo $17.00/mo $17.00/mo 11 I H. District Enabling Legislation The enabling legislation for the District is the California Public Utility Code,Di Vision? - Publi Utility District Act. Of particular pertinence to this Master Services Element is Chapter 4, Powers and Functions of Districts, Article 3,Utility Works and Services, Section]16462, Acquisition, construction, and operation of utility works and services which state j the followinO I I "A district may acquire,construct, own,operate, control,or use, within or without or partly within and partly without the district, works for supplying its inhabitants with light, water,power, heat, transportation, telephone service,or other means of communication, or means for the disposition of garbage, sewage, or refuse matter,and may do all things necessary or convenient to the full exercise of the powers granted in this article." •emphasis added by author j i Other pertinent sections of the District's enahling legislation are included in the istrict's Sphere of Influence Report which has been included herein by reference. it k 7 1