Loading...
HomeMy WebLinkAbout6 Bridgestreet Tank TDPUD STAFF REPORT May 11, 2001 To: Board of Directors From: Neil Kaufman Subject Construction of Bridge Street 6160 Tank, Phase 1 AGENDA # At the past Strategic Planning meeting, Ed Taylor discussed the need for the District to bring a number of developers together, along with the District in order to construct some of the upcoming infrastructure projects. More recently, Ed discussed this issue at a Board Meeting in regards to the area northeast of downtown Truckee. Figure 1 shows the upcoming projects in this area. The Woodlands project is currently under development and the Pioneer Commerce Center will likely start within the next two months. The other projects will likely start construction either this fall or next spring. The existing water system infrastructure is inadequate to serve these projects. The Water Master Plan identified that creation of a new pressure zone with a hydraulic grade line of 6160 feet is necessary to serve this area. The proposed service area of this pressure zone is given in Figure 2. The Master Plan identified the need for a total of 3.6 million gallons of storage in this pressure zone at buildout conditions. The site for this storage was identified as the 129 acres of land acquired from Steele Family Partners. A conceptual piping network was also laid out and is shown on Figure 3. It is proposed that the 3.6 million gallons storage be provided in two separate tanks located adjacent to each other. Two tanks at the same site provides the District with a number of advantages: 1) One tank can be taken out of service for maintenance (painting, cleaning, etc.) while the other remains in service. 2) During periods of low demand (winter), one tank can be taken out of service to provide better water quality. 3) Allows for phased construction and would given the District the opportunity to better match actual system needs. Ed, Peter and I have been meeting with developers and the School District regarding the needed infrastructure. The projects shown on Figure 1 have a need for about 2.3 million gallons of storage upon completion (See attached Table 1). It is proposed that a 1.5 million gallon tank be constructed as the first phase. A tank of this size would provide adequate storage for the initial phases of the projects described. The second tank would likely be required within the next 3 to 5 years, depending on how quickly the projects reach full buildout. Ed believes that it is in the District's best interest that the District undertake the design and construction of the tank directly, as opposed having a developer construct the project. Please note that four existing District customers will be served from this new tank. Therefore, It is my opinion that the District is responsible for a small portion of the cost of the storage tank. The 24-inch pipeline from the tank site to just south of the existing Sanders Well would be constructed by the developer of the Pioneer Commerce Center. A reimbursement agreement would be written for this pipeline. The pipe size required for the developer projects is 16-inch diameter. The rationale for a 24-inch pipeline is to provide the ability to move the water from four (or more) anticipated wells from the eastern portion of the service area to the western portion of the service area. It is my opinion that the District is responsible for the additional cost incurred to upsize the pipeline from 16-inch to 24-inch. The budget level cost estimate for the storage tank and 24-inch pipeline is given in Table 2. Recommendation: • The Board approve the proposal from Sauers Engineering for professional services related to the storage tank site and the 24-inch pipeline located on District-owned property. The proposed fee is$84,500. • 1 anticipate returning to the June 20 Board meeting with a request to Advertise for Bids Table 1. Anticipated Demands for Upcoming Projects in Northeast Area Buildout Emergency + Maximum Day Regulatory Emergency Regulatory Maximum Fire Flow Zone Demand, mod Storage, mg Storage, mg Storage, mg Flow, gpm Duration, hours Volume, m Jibboom Street Townhouses 0.075 0.025 0.04 0.06 1,750 2 0.21 Pioneer Commerce Center 0.040 0.013 0.02 0.03 2,500 2 0.30 Barsell Project- Retail 0.100 0.033 0.05 0.08 2,000 2 0.24 Barsell Project -Hotel 0.100 0.033 0.05 0.08 2,200 4 0.53 McKay Condominiums 0.016 0.005 0.01 0.01 1,750 2 0.21 Hoffman Project 0.075 0.025 0.04 0,06 1,500 2 0.18 Meadowbrook 1.051 0.350 0.17 0.52 2,500 4 0.60 Woodlands 1.408 0.469 0.34 0.81 2,500 4 0.60 Middle School 0.075 0.025 0.04 0.06 2,500 3 0.45 Combined 2.94 0.980 0.75 1.73 Worst Case Fire= 0.60 mg Total Requirement= 1.73+ 0.60= 2.33 mg Jibboom Street Townhouses 80 Units* 938 gpd/unit=75,040 gpd Pioneer Commerce Center Assumed=40,000 gpd Barsell Project- Retail Assumed= 100,000 gpd Barsell Project- Hotel Assumed= 100,000 gpd McKay Condominiums 17 Units * 938 gpd/unit= 15,946 gpd Hoffman Project 80 Units* 938 gpd/unit=75,040 gpd Woodlands Residential =300 Units* 938 gpd/unit= 281,400 gpd Lodge=50,000 gpd assumed Golf Course=720,000 mgd Middle School Assumed=75,000 gpd Meadowbrook Residential = 600 Units *938 gpd/unit= 562,800 Commercial =75,000 gpd assumed Golf Clubhouse =50,000 gpd assumed Golf Course=720,000 mgd Table 2. Proposed Cost Allocation for Storage Tank and 24-inch Pipeline ITEM TOTAL TDPUD Middle Developers NO. ITEM DESCRIPTION PRICE School 1 24"WATER $368,251 $111,279 $16,363 $240,609 2 UTILITIES $20,764 $1,322 $19,442 3 WATER TANK SITE (First Tank at 1.5 mg) $1,005,086 $64,001 $941,085 4 WATER TANK SITE (Second Tank at 1.5 mg) $450,000 $250,000 $200,000 5 IMISCELANEOUS ITEMS $53,000 $7,571 $45,429 Subtotal: $1,897,101 $361,279 $89,258 $1,446,564 Contingencies (15%): $284,565 $54,192 $13,389 $216,985 Engineering &Administration 20% $379,420 $72,256 $17,852 $289,313 GRAND TOTAL: $2,561,086 $487,726 $120,499 $1,952,861 a. 31 5aucrs Engineering, Inc. Civil 8� Environmental Engineers i May 11,2001 i Mi.Neil Kaufman, Water System Engineer 1'ruekee Vonner public Utility District P.O. Dox 309 Tntckex,CA.96160-0309 i SUBJECT: BRIDGE STREET 6160 WATER STORAGE TANKS -PROPOSAT,FOR ,I ENGINEERING SERVICES i Dear Neil: ,this letter is our proposal for professinnal services for the design and construction of the proposed Bridge Street 6160 Water Storage Tanks. It is my understanding that the pistrict intends to construct two 1,500,000 gallon(total 3,000,000 galluu) water sturage tali cs at a District owned nits north of the Nnrthside Well along with approximately 1,000 feel of 24" pipeline to connect the tank to the distribution syetcm. This project is included in the District's Water Master plan tlpdate. Scope of Set-vices We propose to provide the following services: I. Euviruumental Review-Based on our experience with similar District projects,we anticipate that a negative declaration will be the appropriate level of review for the project. For the construction of the tanks and pipeline,we will prt:pare an environmental initial study and proposed negative declaration following CEQA Guidelines. We will distribute preliminary documents to the State Clearinghouse and responsible agencies. We will coordinate a public hearing,receive oral and written comments and prepare responses, we will prepare a final negative declaration and notice of determination and file appropriate i final documents with the County Clerk and State Clearinghouse. i j Based on the location of the proposed project site, an archaeological site survey and record search may he an npprnpriare.component to the environmental review. We will include archaeological services as part of the environmental review. �. Tank Design-We will provide design of the water storage tanks in accordance with the AWWA D-100 standard for welded steel tanks. We will prepare contract drajvutgs and technical specilluatiurls. ! i 3. Tank Site Engineering-We will prepare a grading plan,drainage caloulatioas, rctaiuing wall design, and design of access road,paving,slope protection, and erosion control, including contract plans and specifications. 3 440 Lower Grass Valley Road,Suite A,Ncvada Citv,CA 95959 (530)265-8021 Fax(51{1)265-691A Sauers Ensineerins Inc. 5302656834 i I Task Fee Environmental Review 7,500 Tank Design 11,200 I Tank Site Engineering 23,200 I Pipeline Engineering 7,600 Total Fixed Fee $49,500 1 Ie propose to provide other services on a time and expenses basis with a not-to-exceed amount. We will not exceed the maximum limits without further authorization from the District. Hourly sates will be ebarged according to the attached rate sheet. The tasks and not-to-cxcycd amounts are shown below. t Task Estimated Fee Construction Engineering 7,500 Construction Inspection 15,000 k Total Not-To-Exceed $ 22,500 We will contract with other professionals to provide services during design. These costs will be i in addition to the above fees and are estimated as follows: 1 Service Estimated Fee i i Geoteehnical Investigation 7,500 1 Survey Services 5,000 t Dotal Estimate $ 12,500 Closure Thank you for the opportunity to provide this proposal for professional services for this project. 1 am available to discuss this pmpnsnl with you at your convenience and with the Board of Directors at the Mayl6,2001 board meeting. i Yo nrly Keith Knibb 7 � i So.uers Ens ineer ins Inc. 5302656834 P. 02 1. Pipeline Engineering-Design will include inlet/outlet pipeline,overflowldrainage pipeline, and control valves,including pipeline plan/profile sheets, construction details, and specifications. i 5. Construction Engineering. We will provide cuuslructiun engineering services including interpretation of contract requirements,preparation of field orders and change orders, review and certification of contract progress payments,reports to the District regarding project progress,supervise regular contractor/Water Department/engineer coordination meetings,and related tasks. We will prepare Record Drawings for the project at the completion of the work. We will make recommendations concerning acceptance of the work, and prepare a Notice of Completion. 6. Construction Inspection. We will provide inspection during construction to,assure compliance with the contract. i i 7. Additional Services-We will contract with and coordinate the services of other professionals during tank design including geotechnical engineering and surveying services. E k , This proposal does not include services related to obtaining the various permits which may be necessary to carry out the project. We would be happy to provide services for permitting at your request. ; r Schedule of Services nviroamental Review t We anticipate needing approximately twenty to thirty days following the District's authorization t to proceed to prepare the initial study and the proposed negative declaration. Depending on the number and nature of cnmmentx,preparation of final documents for approval by the District � should take an additional thirty to forty-five days including the public review period and public hearing. Design Engineering Design engineering including geotechnical investigation and any necessary survey work should p take approximately thirty to forty five days. This work can take place simultaneous.with the environmental review. construction Engineering and Inspection This project is expected to be constructed through the sununer and fall of this year. Our services w under this proposal will run concurrent with the construction and through project close-out. t j I Engineer's Fee We propose to provide the following services for a fixed fee as calculated below: i i i Sauers Ensineerins Inc. 5302656334 P. 04 i I i alders Engineering, Inc. Civil & Environmental Engineers FEESCHEAULE Mareb 1, 1998 i I I 1. The following aye hourly rates for professional services. Overtime and weekend hours are billed at time-and-a-lial£ Evening meetutgs arc uut wusidured overtime unless',the total daily hours exceed eight. i i Senior Engineer (Registered) S 85.00/hour AssociateEngineer (Registered) 75.00/hour Assistant Engineer (E.I.T.) 65.00/hour Technician,Construction inspector 50.00/hour Clerical 35.00%hour i Expert Witness/Litigation Consulting 125.001our 11. Consultant will remain the judge of the level of qualification required to complete a given task In addition to the above,all expenses(telephone,postage,materials,blueprints,xerox copies, cte.) will be billed directly,at a rate of cost plus I S%. Consultant rescrvcs the right to utilize sub-consultants when necessary, i ; III. Clients are requested to contract directly with the vendors of significant outsideservices,snch as soils engineering,aerial photography,title work,and so on. In the event that client wishes to retain the above services utilizing consultant as a billing agent, advance payment of the sub-consultant's fee is requhcd. A service charge of 15%per billing will also'be assessed. i IV. Mileage will be billed at a rate of$0.35 per mile, Aeith kKnibb, RCE 51290 E Professional Engineer { I' 1 440 Lower Grass VNtcy Road, Suite A,Ncvada City, CA 95959 (530) 263-8021 Fix(330) 265-6834