Loading...
HomeMy WebLinkAbout8 Pipeine extinction i TRUCKEE DONNER Tublic Utility District Memorandum To: Board of Directors From: Ed Taylor, Water Superintendent Date: 07/13/01 Subject: Authorization to bid for construction of an extension of the Districts Interstate 80 under crossing pipeline extinction. BACKGROUND: Caltrans is going to widen Interstate 80 from Donner Pass Road interchange to the to of Donner summit. The District has a pipeline under crossing of Interstate 80 in the area, which is to be widened. Caltrans has notified the District staff that the under crossing of the pipeline must be extended outside of the Interstate 80 right of way. This project also involves the fiber conduits inside the casing under the roadway. The plans and specifications for the construction of the extension of the Districts 180 under crossing are complete. We are now asking authorization to advertise for, accept and open bids for the construction of the extension of the Districts Interstate 80 under crossing. RECOMMENDATION: I recommend that the Board authorize staff to advertise for, accept and open bids for the construction of the extension of the Districts Interstate 80 under crossing with a bid opening on August 8, 2001. 0 Page 1