HomeMy WebLinkAbout7 Donner Park Pipeline Crossing Modification Project Memorandum
To: Board of Directors
From: Neil Kaufman,Water Systems Engineer
Date: August 9, 2001
Subject: BID AWARDS
BACKGROUND:
The Board authorized staff to advertise for construction of the Donner Park Pipeline
Crossing Modification Project.
Bids for received and opened at 2:00 PM on August 8, 2001. Staff has totaled and reviewed
all bids. Three Bids were received. The lowest bid was for$67,500 from Deal's Excavating
of Truckee, CA. However, Deal's Excavating did not include a Bid Bond or other acceptable
security as required by the Bidding Documents.
Therefore, it is recommended that the bid from Deal's Excavating be rejected as non-
responsive and that the project be awarded to Contri Construction.
RECOMMENDATION:
1) Award the DONNER PARK PIPELINE CROSSING MODIFICATION project to
Contri Construction in the amount of$240,466.00.
SUMMARY OF BIDS FOR
DONNER PARK PIPELINE CROSSING MODIFICATION
Contractor Location Bid Amount
Deal's Excavating Truckee, CA 67,500.00
Contri Construction Reno, CA 240,466.00
Manuel Brothers Grass Valley, CA 517,482.00