HomeMy WebLinkAbout7 Donner Park Pipeline Crossing Modification Project Memorandum To: Board of Directors From: Neil Kaufman,Water Systems Engineer Date: August 9, 2001 Subject: BID AWARDS BACKGROUND: The Board authorized staff to advertise for construction of the Donner Park Pipeline Crossing Modification Project. Bids for received and opened at 2:00 PM on August 8, 2001. Staff has totaled and reviewed all bids. Three Bids were received. The lowest bid was for$67,500 from Deal's Excavating of Truckee, CA. However, Deal's Excavating did not include a Bid Bond or other acceptable security as required by the Bidding Documents. Therefore, it is recommended that the bid from Deal's Excavating be rejected as non- responsive and that the project be awarded to Contri Construction. RECOMMENDATION: 1) Award the DONNER PARK PIPELINE CROSSING MODIFICATION project to Contri Construction in the amount of$240,466.00. SUMMARY OF BIDS FOR DONNER PARK PIPELINE CROSSING MODIFICATION Contractor Location Bid Amount Deal's Excavating Truckee, CA 67,500.00 Contri Construction Reno, CA 240,466.00 Manuel Brothers Grass Valley, CA 517,482.00