Loading...
HomeMy WebLinkAbout#7 Director Updates AGENDA ITEM #7 Public Utility District m MEETING DATE: November 6, 2024 TO- Board of Directors FROM: SUBJECT: This item provides time for each Department to update the Board of D i recto rs. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: BACKGROUND: ANALYSIS AND BODY: Water Utility: Water Deliveries Water Production(Gallons) ssOptleo �y Idl i uuucuu 4 ■2024 P-du—n ■2023 R du ian r,3 yea,prig.:. As we continue through the drier portion of the water year the production has increased by 6% when compared to last year. However, when September production data for 2024 is compared to the running three-year average, the production is 16% less. Page 1 of 8 Page 5 of 153 System Updates Water Leak at Rainbow Road and Highway 89 on Caltrans Right-of-Way On Wednesday, October 30th, the section of pipeline containing the water leak near Rainbow Drive was isolated and the customers of Prosser Lake View subdivision were switched over to the recently installed redundant pipeline located slightly further north along Hwy 89. Staff would like to publicly thank CAL-TRANS and Hansen Brothers Enterprise for the quick response and professional manner that was maintained throughout this project. This is a new permanent water distribution pipeline for the Prosser Lake View subdivision. When the original pipeline is scheduled to be repaired in Spring 2025, at which point both pipelines will be utilized going forward. Capital Improvements: With the conclusion of another construction season, all planned capital projects have been finished for 2024 , with the exception of the Hirschdale waterline realignment project. • Ski Run Tank Replacement: The new water tank will be put into service on November 4th. While the old tank will not be removed this season, the new tank will remain in service and the old tank will be demoed this spring. �q • Annual Pipeline Replacement Project: All pipeline replacement projects have been placed on pause for the season. The District was able to finish all the pipeline projects on Northwoods Blvd. • Installation of Emergency Generator Backup at Alder Creek Pump Station: Electrical staff were able to underground the service to the station, while updating to the newest electrical standards. This addresses both operational and safety issues. Page 2 of 8 Page 6 of 153 w:u Electric Utility: Power supply in September consisted of more Undisclosed power than recent months due to reductions in solar output and less hydropower generated from contracted TDPUD resources Energy Source (RECs not included) - Sept 2024 Gas,21% 4cl,sed,isd 36% Wind,26% Hydro,0% Carbon- r Free,4% Solar,12% Gas •Wind Solar •Carbon-kee •Hydro •VndlQlmed Significant Outages: 10/11/24 - —10,000 customers affected, —15 minutes, NV Energy performing transmission level work 10/25/24 - —10,000 customers affected, <5 minutes, NV Energy performing transmission level work 10/31/24 - —260 customers affected, 90 minutes for most, 6 hours for a few, vehicle into pole incident Customers Out/Calls Per Hour 10�01 I2024 OD 00 00 IO I OI3112024 171200 12.Sk — 101, 7.5 k — ro O sk 2.51, Ok 2.Oct 4.Oct 6.Oct O.Oct IU.Oct 12.Oct 14.Oct 16.Oct Is.Oct 20.Oct 22.Oct 24.Oct Date/Time •Customers Out+Calls Page 3 of 8 Page 7 of 153 Finance and Accounting Work Orders - notable activity metrics Year to Date September 300 250 43 200 13 51 150 44 25 1°° 76 so 137 149 o A ML A 54 2021 2022 2023 2024 ■Solars Initiated ■ Panel Upgrades Initiated ■ New Construction Applications Initiated Customer Service Scores, last month: Page 4of8 Page 8 of 153 OveraLL, how satisfied were you with the experience with our cult... Answered:36 Skipped: 100% 1 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% MENEEMENEEL— Extremely Very satisfied Somewhat Not sc Not at all satisfied satisfied satisfied satisfied How much time did it take us to address your questions and conc... Answered:36 Skipped:0 100% 90% 190% 70% 60% 50% 40% 30% 20% 10% 0% Much shorter Shorter than About what I Longer than Much longer than expected expected expected expected than expected Page 5 of 8 Page 9 of 153 Please categorized the reason(s) for your service call Answerec:28 Skipped:8 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% - 0 billing Payment New Service Poweroutage Water leak New question question or Stop Commercial Service to Service existing... General Services • East wing remodel progressing, completion mid-December • Facilities Master Plan update, on today's agenda as workshop item • Annual Procurements preparations for December board meeting A financial briefing as of September 30, 2024, is provided as Attachment 1. Electric revenues are on budget and expenses are under budget. Water revenues are 3% over budget and expenses are under budget. Public Information and Strategic Affairs There has been significant engagement in numerous regulatory efforts at the State level including in implementation of the California Air Resources Board (CARB) Advanced Clean Fleets (ACF) rule including AB 1594 passed last year to partially address concerns that electric and water utilities had with the ACF regulation. CARB staff have been hosting a series of meetings and workshops to implement the ACF and AB 1594 and the District and our partners at the California Municipal Utilities Association (CMUA), Northern California Power Agency (NCPA), and Association of California Water Agencies (ACWA) are engaged and continue to educated CARB on the critical role utilities play in providing essential electric and water services and supporting emergency response. Key topics include commercial availability, addressing utility trucks that do work in the field (sometimes for days in a row), the need to plan for the most extreme events, and how to determine end of life. These discussions are expected to continue through 2025. The CARB ACF, which is a purchase requirement, was implemented in 2024, but the District has a 'low population county' exemption till 2027. Staff are also engaged on a California State Water Page 6 of 8 Page 10 of 153 Resources Control Board (SWRCB) General Order that could negatively impact the District's wildfire mitigation efforts and the January 1, 2025, implementation of the Making Water Conservation a California Way of Life regulation. The California Municipal Utilities Association (CMUA) will be hosting their annual Legislative and Regulatory planning meeting on November 14, 2024, in Roseville, CA. This meeting will also be one of the last attended by CMUA's current Executive Director, Barry Moline who is retiring at the end of the year. Barry is being replaced by CMUA's Deputy Executive Director, Danielle Blacet. Staff wishes Barry good luck in his retirement and we look forward to working with Danielle going forward.> Human Resources and Risk Staffing Congratulations to Ben Silva for completing the apprentice lineman program and becoming a Journeyman Lineman! Current Job Openings: • Contract Administrator-Final interview stages • District Clerk/Executive Assistant- iinterviews being scheduled • Customer Service Representative- Interviews being scheduled Culture 11/04- Birthday&Anniversary Celebrations 11/26-Thanksgiving Potluck/Dessert Contest Recognition Casey Chavez-Communication Chuck Gazso & Ryan Clement-Timeliness Ryan Pursel, Dan Baumbach, & Cody Laplaca -Work Life Balance Carlos Reyes-Accountability Safety& Risk Anti-Harassment Training- 11/12 Events 11/05- Flu Shot &Wellness Lab Clinics 11/19- Know Your Numbers Presentation -Tahoe Forest GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet Page 7 of 8 Page 11 of 153 current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Take the best of private sector thinking to modernize the utility and add value to our communities. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: ATTACHMENTS: 1. BTN Sept2024 Page 8 of 8 Page 12 of 153 ' TRUCKEE DONNER Public Utility District By the Numbers YTD September 2024 Customer Billing Metrics Electric Change to Prior Year Average per Month Water Change to Prior Year 141787 120 0.8% Number of Accounts 1301 91 0.7% 960 (47) -4.7% Billed Volume per Account 7,837 819 11.7% $ 0.2191 $ 0.022 11.2% Billed Dollars / Billed Volume $ 0.0146 $ (0.001) -4.6% $ 215 $ 18.41 9.4% Average Bill $ 117 $ 10.61 10.0% $ 21.4 $ 6.7 45.5% Billed AR Past Due 90+ days $ 12.2 $ 1.9 18.2% $ 1.6 7.9% AR 90+var to last month $ 1.0 8.8% Operating Electric Variance to Budget Dollars in Thousands Water Variance to Budget $ 29,353 133 0.5% Revenues $ 141791 435 3.0% 11,299 (937) -7.7% - Expenses 8,146 (130) -1 .6% 10,417 (458) -4.2% - Purchased Power 1,204 (116) -8.8% $ 71637 1 ,528 25.0% = Operating Net Result $ 51441 681 14.3% Excludes Depreciation(non-cash)operating expense By the Numbers-Page 1 of 2 Page 13 of 153 ' TRUCKEE DONNER Public Utility District By the Numbers September 2024 Capital1 ' 1 1 Key Reserve Balances . Electric Variance to Budget Dollars in Thousands Water Variance to Budget $ 4,306 (8,555) -66.5% Capital Expenditures $ 41677 (1 ,221 ) -20.7% Actual YTD Variances-Red Over Budget Green Under Budget Actual YTD $ 111099 (1 ,761) -13.7% Capital Expenditures $ 9,724 3,826 64.9% Forecast Annual (draft) Variances-Red Over Budget Green Under Budget Forecast Annual(draft) TIMING OF PROJECTS BETWEEN YEARS IS MAIN VARIANCE DRIVER $ 101894 4,657 74.7% Capital Reserve Balance $ 41289 550 14.7% $ 61956 56 0.8% ® 2022 Debt Project Funds Bal. $ (0) (0) - $ 51940 (20) -0.3% Rate Reserve Balance NA $ 91781 2,281 30.4% Operating Reserve Balance $ 71575 954 14.4% By the Numbers-Page 2 of 2 Page 14 of 153