Loading...
HomeMy WebLinkAbout#16 Facilities Master Plan AGENDA ITEM #16 Public Utility District m MEETING DATE: November 6, 2024 TO: Board of Directors FROM: Brian Yohn, General Services Manager SUBJECT: Board of Directors Workshop Presentation with JK Architecture and Engineering for the 2024 Facilities Master Plan Update. Z_ APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Receive this informational workshop and provide feedback and direction to staff. BACKGROUND: At the June 5, 2019, Board of Directors meeting, the Board approved funding for a project for the design and development of a Facilities Master Plan. JK Architecture and Engineering (JKAE) was awarded the contract for the project. JKAE developed nine (9) facility development concepts and, in collaboration with District staff, performed an analysis to identify two viable development concept options, Options D2 and E3 — Option 2. Challenges with each of the selected development concepts and site locations were identified with each option. In addition to existing challenges, new challenges and considerations have been identified. Other considerations include the Town of Truckee updated General Plan, local land use considerations, CARB Advanced Clean Fleet adoption in 2023, ZEV charging or hydrogen fueling infrastructure, rooftop solar photovoltaic installation, battery storage solutions, and micro-grid system integration opportunities. At the February 7, 2024, Board of Directors Meeting, staff presented an informational workshop to provide an update of the Facility Master Plan project history and current DRAFT status. The Board provided feedback from the workshop presentation and discussion, which included interest in continuing to work with JKAE to bring the DRAFT 2020 Facilities Master Plan up to date to 2024 building code and development requirements, with consideration to alternative opportunities, and current and future regulatory constraints. The Board of Directors also provided feedback for staff to explore alternative properties for potential relocation and provide development concept options. Page 1 of 3 Page 130 of 153 At the April 3, 2024, Board of Directors meeting, the Board of Directors authorized the General Manager to contract with JKAE to update the 2020 Facility Master Plan Draft to the 2024 building code and development requirements with consideration to alternative opportunities, and current and future regulatory constraints, as well as consider a third development concept option considering relocation of the District to a new property sufficiently sized to develop a new campus to accommodate all District operations and provide future growth opportunities. ANALYSIS AND BODY: For the November 6, 2024, Board of Director Workshop, JKAE provides a Facility Master Plan 2024 Update with consideration to preferred Concept D2 and Concept E3 - Option 2, from the DRAFT 2020 Facility Master Plan updated to 2024, and will include three (3) new concept options (Schemes 1, 2, 3) which reflect Preliminary Development Study concept options considering the development of a new, larger property. • Development Concept 01 — Reflects a consolidated central campus where all operations, administration, customer service, support services, and warehouse inventory can be achieved on a single property. Open spaces are shared, and common area program blocks are clustered in proximity. Primary circulation pattern loops around centralized program blocks • Development Concept 02 — Reflects a consolidated central campus where all operations, administration, customer service, support services, and warehouse inventory can be achieved on a single property. Program blocks are placed in a sequential linear pattern along a common open area, with primary circulation pattern loops around linear program blocks. • Development Concept 03 — Reflects a split campus with the repurpose of the current location at Donner Pass Road and creating a new supplemental facility for operations. Primary public-based administrative functions remain on the current main campus property on Donner Pass Road. Utility operations and the remainder of utility programming are relocated to a separate new site. This concept includes demolition of an existing warehouse and operations building. Excess land at the current Donner Pass Road location was then converted to other uses to support the community. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. Page 2 of 3 Page 131 of 153 District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Take the best of private sector thinking to modernize the utility and add value to our communities. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no fiscal impact with this informational workshop. ATTACHMENTS: None Page 3 of 3 Page 132 of 153