HomeMy WebLinkAboutBridge Street 6160 SAUERS ENGINEERING 580 265 68S4 12/13/02 11:55am P. 001 Sauers Engineering, Ine. Civil & Environmental Engineers MEMORANDUM TO: Ed Taylor, Water Superintendent FROM: Keith Knibb,Project Engineer DATE: December 13, 2002 SUBJECT: BRIDGE STREET 6160 WATER TANK With this memo is Contract Change Order No. 2 for the Bridge Street 6160 Water Tank. This is the final close-out change order for the project. Contract Change Order No. 2 is for an increase of$106,745.55 and a time extension of 30 days. This represents an increase of 8% over the original contract price. Also included is the Resolution of Acceptance and Notice of Completion for the project. Item I Construction of additional pipeline. The original contract had the tank contractor terminating the pipeline at the end of the new tank access road. At the same time, the contractor for the nearby Pioneer Village project extended a distribution main to within 340 feet of the tank access road. This item included the additional 340 feet of pipeline to connect the tank to the distribution system and allow the tank to be put in service. Item 2 Rock excavation. During the construction of the tank pad and cut slope,the contractor encountered rock which required removal by blasting or other specialized rock breaking equipment. The contractor opted for the use of extra heavy duty rock breaking equipment as a less expensive alternative to blasting. This item is for the utilization of the rock breaking equipment. Item 3 Additional erosion control measures. In order to obtain the Lahontan RWQCB permit for construction of the tank project, additional erosion control measures were added to the project. These included additional hydroseeding, construction of rock lined V-ditches along the access road, and construction of road cross drains and rock lined detention basins along the access road. This item is for these additional measures. Item 4 Delete gunite on detention basin embankment. The original contract required the application of"Shotcrete" gunite on the interior face of the detention basin embankment. This was SAJERS ENGINEERING 630 ZSS 63S4 1Z113102 11:53am P. 002 included in the design because the material to be used for the embankment was expected to be mostly porous, light-weight red cinder material from the tank pad excavation. As constructed,the material used for the embankment was well mixed including cinders, silts, clay, and soil. It was determined that this material did not require a gunite face. This item is a credit for the deletion of the gunite. Item 5 Time extension. The contractor did proceed with due diligence through the course of the project. The tank was completed on schedule, however some miscellaneous items remained to be completed. This item is for a time extension for the completion to the project. RECOMMENDATION I recommend the Board of Directors take the following actions: I. Approve Contract Change Order No. 2 for the Bridge Street 6160 Water Tank for an increase of$106,745.55 and a time extension of 30 days. 2. Adopt the Resolution of Acceptance and authorize the filing of the Notice of Completion. SAUERS ENGINEERING Sao 26S 6834 12t13102 11:S3am P. 003 CONTRACT CHANGE ORDER 2 DATE: December 13,2002 CONTRACTOR: CB&I Water OWNER: P.O.Box 12210 Truckee Donner Public Utility District San Luis Obispo,CA 43406-2210 PROTECT: Bridge Street 6160 Water Tank You are hereby requested to comply with the changes from the contract plans and specifications: ITEM PROPOSED CHANGES AMT. of INCREASE(T)or No. DECREASE(-) 1. Construction of an additional 340 Lf.of 24"pipeline form the end of the tank access road to a point of connection on Pioneer Road. 34011 X$170.00/11 =$57,800.00 + 57,800.00 2. Blastingfbreaking rock in tank pad and cut slope area. + 34,531.75 3. Additional erosion control and rock detention basins in conformance with Lahontan + 25,681.80 RWQCB requirements. 4. Delete"Shoterete"gunite from detention basin embankments. 11 268.00 5. Contract time extension of 30 days until December 1, 2002 to allow final completion of 0.00 projec t NET CHANGE THIS ORDER $ + 106,745.55 CONTRACT AMOUNT PRIOR TO THIS CHANGE $ 1,405,887.00 NEW CONTRACT TOTAL $ 1,512,632.55 CONTRACT COMPLETION DAYS INCREASED THIS ORDER DAYS DECREASED THIS ORDER NEW TOTAL CONTRACT DATE:October 31.2002 30 0 COMPLETION DATE:Dec.1,2002 If and when approved by the owner,I hereby accept this order as to work to be performed,prices to be paid and contract time as shown above. Accepted by Date ( [ratter ,/� P Title Recommended b°r �' '� —{ �ie A n ��'✓ �2�' Date (Engineer) Tl Approved by (Owner) ,title Date SAUERS ENGINEERING S50 2SS 6834 12115/02 11:SSam P. 004 TRUCKEE lulu ui uq i D O NNi i _ PublicDistrict I 1 Resolution No. 2002- AUTHORIZING THE ACCEPTANCE OF THE BRIDGE STREET 6160 TANK PROJECT AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Bridge Street 6160 Tank Project; and WHEREAS, CB &I Water, was selected by the District to perform the work; and WHEREAS, The District's Consulting Engineer and Engineer of Record, Keith Knibb, certifies the completion of the project; and WHEREAS, the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1 That the District hereby accepts Bridge Street 6160 Tank Project as complete. 2 That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3 That 35 days following the filing of the Notice of Completion, the 10% retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 18th day of December 2002 by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By J. Ronald Hemig, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board SAUERS ENGINEERING 550 28S 8884 12113102 11:63am P. 005 RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 96160. 2. That on December 18, 2002 the hereinafter described improvements were accepted as complete pursuant to a resolution of the Truckee Donner Public Utility District, the awarding authority. 3. That the subject improvements of the Notice are generally described and identified as follows: Bridge Street 6160 Tank Project. 4. That the name and address of the contractor for such project was: CB & I Water, P.O. Box 12210, San Luis Obispo, CA 93406-2210. I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. Holzmeister, General Manager