HomeMy WebLinkAboutAgenda Packet 2025_0507 Board of Directors General Manager
Jeff Bender • Brian C. Wright
Christa Finn Executive Leadership
Tony Laliotis Chad J. Reed
Courtney Murrell Jared Carpenter
Steve Randall REGULAR BOARD MEETING Mike Swanson
11570 DONNER PASS ROAD, TRUCKEE Michael Salmon
6:00 PM, Wednesday, May 7, 2025 Steven Poncelet
AGENDA Scott Crow
Jillian Steward
Martina Rochefort
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Changes to the agenda
5. Public Comment— This is time set aside for the public to address the Board on
any matter not on the agenda. Testimony related to any agendized matter should
be addressed at the time that that item is considered.
(The public may comment on any subject that is not on the agenda. Each
speaker will be limited to three minutes, but speaker time may be reduced at
the discretion of the Board President if there are a large number of speakers
on any given subject.)
DIRECTOR UPDATE
6. This item provides time for Directors to comment on any item within the purview of
the District.
DEPARTMENT UPDATES
7. This item provides time for each Department to update the Board of Directors.
PUBLIC HEARING
8. Public Hearing Related to Adoption of the Annual Electric and Water Standby
Charges
A. Conduct a public hearing at the regularly scheduled District Board Meeting
on May 7, 2025, at 6:OOPM, or as soon thereafter, to receive input on the
adoption of annual Electric and Water Standby Charges; and
B. Adopt the following resolutions:
a
ASPEA I P%UL LEADERSHIP FaUN.�i...I..I ON®
11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.org
Page 1 of 68
1. Resolution 2025-09 Continuing and Fixing Electric Standby Charges for
the Fiscal Year 2025-2026;
2. Resolution 2025-10 Continuing and Fixing Water Standby Charges for
the Fiscal Year 2025-2026;
3. Resolution 2025-11 Requesting Collection of Electric and Water
Standby Charges on County of Nevada Tax Roll; and
4. Resolution 2025-12 Fixing and Placing Electric and Water Standby
Charges on Placer County Tax Roll for Collection.
9. Public Hearing Related to the Adoption of an Ordinance Authorizing the Board to
Appoint and Establish Compensation for Officers of the District by Resolution
A. Conduct a Public Hearing regarding Ordinance No. 2025-01;
B. Adopt Ordinance No. 2025-01 approving the process for appointing
and establishing compensation for officers of the District
CONSENT CALENDAR
10. Consideration to increase the 2025 Annual Authorization for Electric Engineering
Consulting Services
Authorize the General Manager to execute a professional services contract
amendment for an additional authorization amount of $423,000 with NV5 for
engineering consulting services for a total FY25 not-to-exceed contract
amount of $673,000.
11. Approval of Minutes
Approval of April 2, 2025 Regular Meeting and April 3, 2025 Special Meeting
Minutes
12. Consider Approval of the Treasurer's Report, May 2025
Approve the Treasurer's Report for May 2025 which includes:
a. Fund Balances for the Month of February 2025
b. Disbursements for the Month of March 2025
WORKSHOP
13. Considering Review of the District's 2024 Water Utility Annual Consumer
Confidence Reports
Page 2 of 68
Review the Truckee Donner Public Utility District's Main System and
Hirschdale System's 2024 Water Quality Consumer Confidence Reports and
provide feedback to staff.
CLOSED SESSION
14. Closed Session Pursuant to Government Code Section 54957 Public Employee
General Manager's Performance Plan Review.
15. Closed Session Pursuant to Government Code Section 54957.6 Conference with
Labor Negotiator
Agency Negotiator(s): Board President Christa Finn, Board Vice President Tony
Laliotis
Unrepresented Employee: General Manager
ADJOURNMENT
The agenda is available for review at the TDPUD Administrative Office and the District's
internet website. Posted on Friday, May 2, 2025.
Martina Rochefort, District Clerk
A copy of the agenda packet is available for public review, during normal business hours, at the District
Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The
meeting location is accessible to people with disabilities. Every reasonable effort will be made to
accommodate participation of the disabled in all of the Districts public meetings. If particular
accommodations for the disabled are needed (i.e. disability-related aids, or other services), please
contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the
meeting.
Any person with a disability may submit a request for reasonable modification or accommodation to the
above-described means for accessing and offering comment at the meeting to Martina Rochefort, District
Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request.
Page 3 of 68
AGENDA ITEM #7
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM:
SUBJECT: This item provides time for each Department to update the Board of
D i recto rs.
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
BACKGROUND:
ANALYSIS AND BODY:
Water Department Update
General Update
As we head into summer, construction activities will begin ramping up across the District starting in
May. Key projects this season include:
• Sierra Meadows Repiping Project—A full-scale replacement of aging pipeline
infrastructure is slated to begin early summer.
• Tahoe Donner Small Diameter Pipe Project— One localized upgrade to address aging
pipeline and long-term system performance.
• Completion of the 2024 Water Tank Project—This major capital improvement will be
finalized, enhancing water storage capacity and system reliability in the upper pressure
zones.
These projects are essential to continuing our long-term commitment to reliable service,
infrastructure resilience, and safe water delivery to our customers.
Water Operations
This summer, our Operations team will be focusing on inspection, maintenance, and replacement of
Cla-Val control valves throughout the system.
What is a Cla-Val?
Cla-Vats are automatic control valves that regulate flow and pressure in the distribution system.
They respond to hydraulic pressure changes and are commonly used to:
Page 1 of 9
Page 4 of 68
• Maintain pressure zones
• Reduce or relieve pressure
• Automatically shut off flow during emergency conditions
• Prevent backflow and manage tank levels
Picture Caption: The picture shows one of four Cla-Vals at Joe Aguera Pump Station. This valve
was put there to hold pressure back till the pump is producing adequate press and slowly stops the
flow (no hammer)when the run time has concluded.
Cla-Vals are essential for protecting system integrity and ensuring consistent service to customers
in varying elevations.
There will be full replacement of all three pump control valves at Richards Booster Station and 6
rebuilds of pump control valves at other stations. Also we will be rebuilding and or replacing PRV
valves in Glenshire and Donner lake for scheduled maintenance and improvements. This is all
scheduled maintenance and station improvements.
Due to an early surge in demand—particularly from local golf courses—we've brought several of our
seasonal wells online ahead of schedule. Our water operations team is working closely with both our
field crews and water quality staff to ensure each startup is performed safely and in full compliance
with regulatory standards. We appreciate everyone's coordination and commitment during this
accelerated timeline.
We're also pleased to report that the Martis Valley well motor rebuild has been successfully
completed. The well has been returned to service and is performing as expected.
Work on Well 20 is currently underway. At this stage, we anticipate it will be back online and
operational by early summer. Our team will continue to monitor progress closely and provide
updates as we move forward.
In addition, upgrades to the Red Mountain fire flow infrastructure are nearing completion. Once
finalized and commissioned, the improved system will be placed into service, enhancing fire
protection capacity in the area.
We're grateful for the collaboration and dedication across all departments as we manage these
critical early-season demands.
Water Distribution
The Distribution crew continues to work diligently with routine and specialized system maintenance:
• Valve Turning Program —Ongoing valve exercise is crucial to ensure operability in
emergency situations and supports system optimization.
Page 2 of 9
Page 5 of 68
• Olympic Heights Flushing and Valve Installations—A significant flushing effort will be
underway this summer, along with the installation of several new valves and blow-offs to
enhance flow control and water quality.
• Leak Repairs & System Response—The team continues to respond quickly and efficiently
to system leaks and maintenance needs, maintaining our high standard of service reliability.
Picture Caption: Water Departments Distribution crew locating and fixing a deep leak on East Alder
Creek.
Their consistent performance and dedication are critical to our day-to-day operations.
Water Quality
The Water Quality team will be conducting Lead and Copper Rule (LCR) sampling this season. This
is part of our compliance with EPA and State guidelines to ensure continued safe drinking water.
Sampling Process Overview:
• The District works with selected Tier 1 residences (typically built between 1983-1987)that
meet LCR criteria.
• Customers are provided with bottles and instructions to collect first-draw samples after water
has been stagnant for at least 6 hours.
• Samples are analyzed at a certified lab, and results are reported to both customers and
regulatory agencies.
In addition, our Cross-Connection Control Program continues with field inspections and coordination
with customers and businesses to prevent backflow incidents.
Meter Maintenance &Water Loss
The Meter Maintenance and Water Loss team is actively addressing both efficiency upgrades and
non-revenue water:
• New 6" Caltrans Meter— Scheduled for installation on May 3rd, this will improve metering
accuracy for high-volume usage.
• Leak Correlation Program — Using acoustic listening devices and software, we've
completed the Prosser neighborhood and identified 4 potential leaks (2 confirmed) and 2
more in Sierra Meadows.
• Glenshire Meter Exchange—Set to begin in the coming weeks. Customers will be notified
via door knocks for brief 10-minute outages during exchanges.
• MTU and Meter Replacements— Field staff will continue replacing non-functioning units.
Customers may see us accessing meter boxes and providing brief notice.
Page 3 of 9
Page 6 of 68
• Power BI Water Loss Dashboard — Pano Valcanas and Austin are developing a real-time
visualization tool that will help analyze high-risk areas for leaks and inefficiencies, improving
our decision-making and response capabilities.
Electric Engineering & Operations
As we approach summer, wildfire mitigation and system reliability continue to be primary strategic
focuses for the Electric Engineering and Operations teams. The following summarizes key initiatives
currently underway:
Engineering
Martis Valley Substation Rebuild
The bid package for the civil construction phase of the Martis Valley Substation Rebuild has been
completed and released. We anticipate receiving contractor bids by the end of May. Concurrently,
securing all required permits and regulatory approvals remains a high-priority effort to ensure the
project remains on schedule.
Wildfire Mitigation Design
The engineering team is actively evaluating and implementing hardened system designs to enhance
resilience. These efforts include the deployment of:Ductile iron poles
• Covered conductors
• Composite and fiberglass cross arms
This construction strategy is aligned with industry best practices and has been widely adopted by
peer utilities as an effective means of reducing wildfire ignition risk.
's
Operations
Tahoe Donner— Mogul Lane Flat-Top Project
Line crews are currently executing a transition from vertical to flat-top construction in the Tahoe
Donner area. This configuration is expected to significantly improve service reliability.
Idle Line Removal
Sections of idle distribution line are being removed. This work supports wildfire risk reduction,
improves system reliability, and will yield long-term cost savings by reducing vegetation
management requirements.
Vegetation Management
Hazard Tree Removal & Facility Clearing
Targeted hazard tree removal and vegetation clearing around critical electric facilities continue to be
a central element of our wildfire mitigation strategy. These activities are being carried out in
coordination with local agencies and in adherence to regulatory standards.
Page 4 of 9
Page 7 of 68
Information Technology
On April 24, 2025, the District proudly hosted TNT Tech Teens, a workforce initiative designed to
introduce Truckee and North Tahoe students to the diverse range of technology-driven careers in
our region. This free seven-week series, which runs from March 27 to May 16, provides high school
students with valuable insights into various technology sectors and their real-world applications. By
fostering community engagement, building connections with future talent, and equipping students
with modern skills, the program benefits both participants and Truckee agencies alike.
During our day at the District, we showcased how technology plays a vital role in Electric and Water
Utilities and how IT (Information Technology) supports these innovations. Students explored key
concepts such as engineering, AMI (Advanced Metering Infrastructure), water leak detection,
SCADA (Supervisory Control and Data Acquisition), a more technical adaptation of our"Learn or
Burn" demonstration, and students were involved in discussions of pathways for Electric and Water
Engineering and Operations careers. Additionally, we introduced them to the devices used for
network communication and our fiber infrastructure. The day concluded with an overview of IT
career opportunities within the District, offering a glimpse into the impactful roles that support our
mission.
Feedback from students and representatives of other public agencies has been overwhelmingly
positive, highlighting the value of this experience. We extend our gratitude to our dedicated staff as
well as staff from participating agencies who contributed to the event and to the Truckee Chamber
of Commerce for their leadership in organizing and administering this outstanding program.
Administration
• Customer service scores for entire year 2024 are presented below
Overall,how satisfied were you with the experience with How much time did it take us to address your questions
our customer support? and concerns?
Answered:510 Skipped:0 Answered:508 Skipped:2
100% 100%
90% 90%
00°0 00%
70% 70
GM 60"b
sm 50%
40% 40%
30% 0%
2� � 2�
1d% 1❑^/0
Extremely Very Net ao Not at all Muchahorter Shorterthan Aboet what Longerthan Mechlonger
u1i,4ed as Mi d a ,Aed iaeed aat'ufied than expected expected expected expected than expected
Please categorized the reason(s)for your service call
Was your issue completely resolved? Anawered:394 Skipped:116
Answered:504 Skipped:6 t00%
90%
80%
70%
60%
Yea 50%
40%
30%
20%
10% 111111111111111
No 0%
Billing Payment New Power Water leak New
qu estlon We'd n Service ar eukage Commercial
Stop Service
0% 10% 20% 30% 40% 50% 60% 70% 801A 90% 100% service_.
• Purchasing and Warehouse - Part of the Month -
Page 5 of 9
Page 8 of 68
o 3 phase transformer bracket assemblies
MFR: Scott Manufacturing Solutions
Item No: 524-P
QTY: 5
Cost: $1,409.30/each
Lead Time: 8-10 weeks
This style of transformer bracket was specifically requested by the line crew vs. other circular
bracket designs. The main reason this style was requested relates to incidental wiring clearance.
Incidental wiring clearance refers to the specific requirements for maintaining safe distances when
working near or around electrical conductors.
Ab
k a_
• Finance and Accounting
o Auditors completed fieldwork on April 10th, as scheduled.
o The Annual Comprehensive Financial Report (ACFR) draft was provided to auditors
on April 23rd, as scheduled.
o Completion of audit and ACFR on schedule for review/release at the June 4th Board
meeting
• Facilities & Fleet
o Planning fleet replacements, water tank paintings, and asphalt repairs
o Completed decommissioning of EV charging stations
o Water Operations garage paint project completed
o FleetSoft Truck Tracker software upgrade completed, thank you to IT for the
assistance
Human Resources and Risk
Staffing
Congratulations to Casey Chavez for his promotion to Electric Foreman
Welcome seasonal Water Helpers - Kenny Johnson and Luis Aguilar
Current Job Openings:
Customer Service Representative - Interviews in process
Culture
5/05 - Cinco De Mayo Potluck/Birthday and Anniversary Celebration
Recognition
Page 6 of 9
Page 9 of 68
James Flowers - Safety
Clayton Wise -Accountability
Staff Development
4/29 - Leadership Meeting - Collaboration Training
5/28/25 -All Staff Meeting
5/29 - GM Quarterly Lunch
Safety & Risk
• In April our Risk and Compliance Program Manager attended the NRECA Safety Leadership
Summit
• 2025 Quarter 1 incidents down 12.5%from Quarter 1 in 2024
• 4/30-Safety Committee Meeting
• 5/01/25 - Burn Kit Training with Truckee Fire
• 5/06-5/07 - HAZWOPER Refresher Training
PIO and Strategic Affairs
NCPA/NWPPA Federal Policy Conference & Advocacy, Visits:
Almost 60 members of the Northern California Power Agency (NCPA) and the
Northwest Public Power Association (NWPPA), including District staff, traveled to
Washington DC for the annual conference and advocacy visit. The event started with a
full day conference that included Scott Corwin, President of the American Public Power
Association (APPA), Jim Robb, President and CEO, North American Electric Reliability
Corporation, key House and Senate staff who talked about energy policy priorities on
the 119th Congress including Federal wildfire challenges, and Sushan Demirjian,
Assistant US Trade Representative for Small Business, Market Access, and Industrial
Competitiveness, impacts of tariff policies on trade.
District staff then participated in three full days of meeting on Capitol Hill with key
regulatory agencies. Meetings were held with the offices of the District's Federal
representatives (Senator Padilla, Senator Schiff, and Congressman Kiley). The District
played a key role in the meeting with the office of Congressman Kiley engaging with the
Chief of Staff Bob Holste. The Key topic was the District's resolution on the impacts of
Federal cuts to forest health and wildfire mitigation and how we could best work with
their office to share and address concerns. Staff participated in multiple meetings with
Federal Energy Regulatory Commission (FERC) commissioners including a productive
meeting with Chairman Christie where the Pathways Initiative (regionalization) was
front and center. District staff also met with key staff and leaders from NERC, the
Department of Energy (DOE) Grid Deployment Office, and the United States Forest
Service (USFS). This was a critical time in Washington DC as the Trump administration
hit the 100-day mark and significant changes are occurring.
General Manager's Office
Page 7 of 9
Page 10 of 68
• The District participated in meetings with multiple local public agencies including
Truckee Tahoe Airport and Tahoe Truckee Sanitation Agency evaluating
opportunities for local/community solar generation projects. Staff continues to
explore opportunities to meet the needs for local clean generation resources in
alignment with the District's Integrated Resource Plan. These projects also
include battery energy storage systems (BESS), demand response (behind the
meter) energy efficiency programs.
• In early April, the GM and Staff attended the California Municipal Utilities
Associations 2025 Annual Conference in Anaheim, CA. General Manager
Wright participated as a speaker on a strategic issues panel alongside Amy
Zubaly, Executive Director of Florida Municipal Electric Association (FMEA),
Mona Freels, Executive Director fo the Office of Emergency Management for Los
Angeles Department of Water and Power (LADWP), and Lori Nezhura, Deputy
Director of Planning, Preparedness and Prevention with California Offices of
Emergency Services (CaIOES). The strategic panel facilitated discussions on
the critical components of emergency and disaster preparedness, reflecting on
lessons learned and future opportunities for public water and electric
utilities. While the representatives from LADWP and Cal OES were able to bring
first-hand experience and knowledge gained from emergency declarations
across the state (Palisades Fire, Camp Fire, earthquakes, etc), the District
brought valuable insights on experiences gained through winter weather events
and wildfire preparedness from the perspective of smaller public utilities that may
not have the resources made available to larger entities.
• On May 1st, GM Wright and Staff hosted a meeting with the California Air
Resources Board (CARB) to discuss the District's continuing concerns regarding
the economic and operational impacts of the recently implemented Advance
Clean Fleet (ACF) Rule. The meeting provided opportunities to discuss directly
with CARB staff the anticipated impacts of ACF on public utilities in the Sierra
Nevada, the issues not addressed by the provisions proposed in AB 1594 and
future compliance for the District.
• The District submitted District Resolution No. 2025-06 to Congressman Kevin
Kiley, Congressman Doug LaMalfa, Senator Adam Schiff and Senator Alex
Padilla along with a cover letter co-signed with support from Lassen Municipal
Utility District, Plumas Sierra Rural Electric and Plumas Slerra
Telecommunications documenting the concerns for actual and potential
catastrophic impacts to local forest health and wildfire mitigation efforts resulting
from the recent federal funding cuts. The District adopted Resolution No. 2025-
06 on March 12, 2025, in support of a local collaborative voice from several
Page 8 of 9
Page 11 of 68
public agencies across the Northern Sierra. The District's resolution and cover
letter identified several federally funded programs associated with public utility
forest health and wildfire mitigation initiatives that will result in significant
negative impacts if cut. In addition to the resolution and cover letter, staff met
with Congressman Kiley's office in Washington DC while attending the Northern
California Power Agency (NCPA) Federal Energy Policy Forum.
GOALS AND OBJECTIVES:
FISCAL IMPACT:
ATTACHMENTS:
None
Page 9 of 9
Page 12 of 68
AGENDA ITEM #8
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Melanie Rives, Finance & Accounting Manager
SUBJECT: Public Hearing Related to Adoption of the Annual Electric and Water
Standby Charges
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
A. Conduct a public hearing at the regularly scheduled District Board Meeting on May 7,
2025, at 6:OOPM, or as soon thereafter, to receive input on the adoption of annual
Electric and Water Standby Charges; and
B. Adopt the following resolutions:
1. Resolution 2025-09 Continuing and Fixing Electric Standby Charges for the
Fiscal Year 2025-2026;
2. Resolution 2025-10 Continuing and Fixing Water Standby Charges for the Fiscal
Year 2025-2026;
3. Resolution 2025-11 Requesting Collection of Electric and Water Standby
Charges on County of Nevada Tax Roll; and
4. Resolution 2025-12 Fixing and Placing Electric and Water Standby Charges on
Placer County Tax Roll for Collection.
BACKGROUND:
It is the Board's purview to conduct public hearings. At the April 2, 2025, meeting, the
Board set a public hearing to be held on May 7, 2025, to receive written and oral
comments from the public regarding the adoption of certain resolutions
establishing/continuing and collecting electric and water standby charges for the 2025-
2026 property tax year. The Public Hearing was advertised in the Sierra Sun
Newspaper on April 11 and 18, 2025.
Board action is required to adopt electric and water standby charges for the 2025-2026
property tax year. This process begins by scheduling a public hearing to renew the
existing electric and water standby charges.
Each year, the Board is required to adopt resolutions establishing and setting electric
Page 1 of 3
Page 13 of 68
and water standby charges, and to request Nevada and Placer Counties collect the
charges as part of the annual property tax bills.
Standby charges have been assessed on vacant parcels in the District since 1975.
These annual charges recoup the District's operating and maintenance costs of the
electric and water distribution facilities from parcel owners, who benefit from their
vacant lot being in close proximity to the distribution facilities.
ANALYSIS AND BODY:
The current Electric Standby Charge applies to vacant parcels with a District electric
distribution line installed along an easement or along a public road or right of way,
within 200 feet of the nearest exterior boundary line of any such parcel. The Electric
Standby Charge is $20.00 per year for each parcel 1 acre or larger, or $10.00 per year
for each parcel less than 1 acre.
The current Water Standby Charge applies to vacant parcels with a District water
distribution line not less than two inches in diameter installed within 100 feet of the
nearest exterior boundary line of any such parcel. The current Water Standby Charge is
$80.00 per parcel per year.
Standby rates have not been modified in many years. No changes to Standby Charge
rates is recommended for 2025/2026. The qualifying parcel lists are currently in
preliminary draft form. Final lists will be on record with Placer and Nevada Counties
and the District Clerk's Office.
Staff recommends, after hearing and considering all public comments in the Public
Hearing, reviewing and discussing the Resolutions and this Staff report; renewing the
existing Electric and Water Standby Charges on vacant parcels in the District for
2025/2026.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Take the best of private sector thinking to modernize the utility and add value to our
communities.
Page 2 of 3
Page 14 of 68
FISCAL IMPACT:
The estimated standby revenue for 2025-2026 is $15K for Electric and $91 K for Water,
consistent with budgeted revenue in the approved FY25 Budget. There are an
estimated 1400 parcels in Nevada County and 60 parcels in Placer County subject to
Standby Charges.
ATTACHMENTS:
1. R2025-09 Standby Resolution-electric
2. R2025-10 Standby Resolution-water
3. R2025-11 Standby Resolution,NevadaCounty
4. R2025-12 Standby Resolution,PlacerCounty
Page 3 of 3
Page 15 of 68
;W- Public Utility District
Resolution No. 2025-09
Continuing and Fixing Electric Standby Charges
for the Fiscal Year 2025-2026
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District
duly adopted Ordinance No. 7501 fixing Electric Standby Charges on lands within the District
boundaries and providing a means for collection thereof; and
WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240 amending
Ordinance 7501 to include Placer as well as Nevada County; and
WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges shall be made by
resolution of the Board for each fiscal year.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
1. The Electric Standby Charge for the fiscal tax year 2025-2026 shall be the sum of$20 for any parcel
consisting of one acre or more, and the sum of$10 for any parcel of less than one acre.
2. The District shall determine the lands to be affected thereby for the current fiscal year and the
charges to be assessed, levied and collected on the lands and parcels, and upon the completion
thereof a subsequent Resolution shall be approved fixing and placing the electrical standby charges
on the District tax roll for collection by Placer and Nevada Counties.
3. Certified copies of this Resolution are to be forwarded along with the direct charges to the County
Auditor of the County of Placer and the County Auditor of the County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a
meeting held within the District on May 7, 2025 by the following roll call vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Christa Finn, President
ATTEST:
Brian Wright, General Manager
Page 16 of 68
TRUCKEE DONNE'
a
Resolution No. 2025-10
Continuing and Fixing Water Standby Charges
For the Fiscal Year 2025-2026
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District
duly adopted Ordinance No. 7501 fixing Water Standby Charges on lands within the District boundaries
and providing a means for collection thereof; and
WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240 amending
Ordinance 7501 to include Placer as well as Nevada County; and
WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103 amending
Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance and resolution concern
the fixing of Water Standby Charges in the County of Nevada; and
WHEREAS, on April 8, 1991, the Board of Directors adopted Ordinance No. 9105 amending Ordinance
No. 7501 and Resolution No. 8240 to the extent that such ordinance and resolution concern the fixing of
water standby charges in the County of Placer; and
WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges shall be made by
resolution of the Board for each fiscal tax year; and
WHEREAS, fees authorized by this resolution shall not be charged, assessed, levied and collected in
the District's Donner Lake or Glenshire Service areas.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility
District as follows:
1. The Water Standby Charge for the fiscal tax year 2025-2026 shall be the sum of $80 for all parcels
regardless of size.
2. The District shall determine the lands to be affected thereby for the current fiscal year, which shall not
include lands in Donner Lake or Glenshire Service areas, and the charges to be assessed, levied and
collected on the lands and parcels, and upon the completion thereof a subsequent Resolution shall be
approved fixing and placing the Water Standby Charges on the District tax roll for collection by Placer
and Nevada Counties.
3. Certified copies of this resolution be forwarded to the County Auditor of the County of Placer and the
County Auditor of the County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a
meeting held within the District on May 7, 2025 by the following roll call vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Christa Finn, President
ATTEST:
Brian Wright, General Manager
Page 17 of 68
■ UCKEE r
■
ublic Utility District
Resolution No. 2025-11
Fixing and Placing Electric and Water Standby
Charges on County of Nevada Tax Roll for Collection
WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public
Utility District duly adopted Ordinance No. 7501 fixing Electric and Water Standby
Charges on lands within the District boundaries and providing a means for collection
thereof; and
WHEREAS, on August 16, 1982, the Board adopted Resolution No. 8240 amending
Ordinance 7501 to include Placer as well as Nevada County; and
WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103
amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such
ordinance and resolution concern the fixing of water standby charges in the County of
Nevada; and
WHEREAS, on May 7, 2025, the Board adopted Resolution No. 2025-09 and 2025-10
continuing and fixing electric and water standby charges pursuant to Ordinances 7501,
9103 and 9105 for the fiscal tax year 2025-2026; and
WHEREAS, the District has now determined the lands affected thereby and the charges
to be assessed, levied and collected on the lands and parcels; and
WHEREAS, by Resolution No. 9723 adopted November 5, 1997, the Board of Directors
of the Truckee Donner Public Utility District approved execution of a continuous
Standard Form Tax Collection Services Contract with the County of Nevada.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. That the Board of Supervisors of the County of Nevada, State of California,
levy the Standby Charges against the parcel numbers (APN) of record listed on
the computer itemization of unimproved parcels kept and maintained in the
Administrative Services Department of the District and made a part hereof by
reference, and that the County Auditor and Tax Collector be instructed to levy
and collect said charges in the same manner as County taxes as by law and in
said ordinance provided. Upon completion and correction of the current list
through June 30, 2025, a copy will be forwarded to the Auditor Controller of the
County.
1
Page 18 of 68
2. The District warrants and represents that charges imposed by the District and
being requested to be collected by Nevada County comply with all
requirements of state law, including but not limited to Articles XIIIC and XIIID of
the California Constitution (Proposition 218).
3. That a certified copy of this resolution be forwarded to the County Auditor of
the County of Nevada.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a meeting held within said District on May 7, 2025 by the following roll call
vote:
AYES:
NOES:
ABSENT:.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Christa Finn, President
ATTEST:
Brian Wright, General Manager
2
Page 19 of 68
■ UCKEE r
Public Utility District
rp"
Resolution No. 2025-12
Requesting Collection of Electric and Water Standby
Charges on Placer County Tax Roll
WHEREAS, the Truckee Donner Public Utility District requests the County of Placer
collect on the County tax rolls certain charges which have been imposed by the District
pursuant to Resolution No. 2025-09 and 2025-10 attached, and
WHEREAS, the County has required as a condition of the collection of said charges that
the District warrant the legality of said charges and defend and indemnify the County
from any challenge to the legality thereof.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee
Donner Public Utility District as follows:
1. The Auditor-Controller of Placer County is requested to attach for collection
on the County tax rolls those taxes, assessments, fees and/or charges,
attached hereto;
2. The District warrants and represents that the taxes, assessments, fees and/or
charges imposed by the District and being requested to be collected by
Placer County comply with all requirements of state law, including but not
limited to Articles XIIIC and MID of the California Constitution (Proposition
218);
3. The District releases and discharges County, and its officers, agents and
employees from any and all claims, demands, liabilities, costs and expenses,
damages, causes of action, and judgments, in any manner arising out of the
collection by County on the property tax toll of any taxes, assessments, fees
and/or charges on behalf of District;
4. In consideration for the County's collection of the charge through the County's
property tax roll, the District agrees to and shall defend, indemnify and hold
harmless the County, its officers, agents and employees (the "Indemnified
Parties") from any and all claims, demands, liabilities, costs and expenses,
damages, causes of action, and judgments, in any manner arising out of the
1
Page 20 of 68
collection by County of any of District's said taxes, assessments, fees and/or
charges requested to be collected by County for District, or in any manner
arising out of District's establishment and imposition of said taxes,
assessments, fees and/or charges. District agrees that, in the event a
judgment is entered in a court of law against any of the Indemnified Parties as
a result of the collection of one of District's taxes, assessments, fees and/or
charges, the County may offset the amount of the judgment from any other
monies collected by County on behalf of District, including property taxes;
5. The District agrees that its officers, agents and employees will cooperate with
the County in answering questions referred to District by County from any
person concerning the District's taxes, assessments, fees and/or charges,
and that District will not refer such persons to County officers and employees
for response; and
6. The District agrees to pay the County for the reasonable and ordinary
charges to recoup its costs of placement and collection on the tax rolls at the
agreed upon rate of 1% of the taxes, assessments, fees and/or charges, as
provided by Government Code section 29304 and 51800.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public
Utility District at a meeting held within said District on May 7, 2025 by the following
roll call vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Christa Finn, President
ATTEST:
Brian Wright, General Manager
2
Page 21 of 68
AGENDA ITEM #9
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Brian Wright, General Manager
SUBJECT: Public Hearing Related to the Adoption of an Ordinance Authorizing
the Board to Appoint and Establish Compensation for Officers of the
District by Resolution
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
A. Conduct a Public Hearing regarding Ordinance No. 2025-01;
B. Adopt Ordinance No. 2025-01 approving the process for appointing and
establishing compensation for officers of the District
BACKGROUND:
It is the Board's purview to conduct public hearings. At the April 2, 2025, meeting, the
Board set a public hearing to be held on May 7, 2025, to receive written and oral
comments from the public regarding the proposed ordinance authorizing the Board of
Directors to appoint and establish compensation of District officers by resolution. The
Public Hearing was advertised in the Sierra Sun Newspaper on April 11 and 18, 2025.
ANALYSIS AND BODY:
The Public Utility Code (Division 7, Chapter 3, Article 5), Section 16111, establishes
that the officers of the District, other than the Board of Directors, are:
• Clerk, who is also ex officio of the Board
• Accountant
• Treasurer
• General Manager
Section 16112 establishes that officers of the District, other than the Board of Directors,
shall be appointed by the Board, hold office at its pleasure, and receive such
compensation as is provided for by the Board by ordinance.
Staff is recommending the adoption of an ordinance to include important clarifications
Page 1 of 2
Page 22 of 68
and efficiencies to the process related to the appointment and establishment of
compensation for the officers of the District, by permitting the Board of Directors to
make future adjustments via resolution rather than ordinance. Establishing the
proposed ordinance will offer clarifications on the process, maintain the intended
integrity and transparency of the public process while also providing opportunities for
efficiency.
GOALS AND OBJECTIVES:
1. Manage for Financial Stability and Resiliency
2. Engage with our customers and communities in a welcoming and transparent
way to identify opportunities.
3. Modernize the utility and add value to our communities through collaboration and
innovation.
4. Developing an inclusive culture drives organizational integration and success.
FISCAL IMPACT:
There is no direct fiscal impact associated with this public hearing.
ATTACHMENTS:
1. 02025-01 Process for Appointing and Establishing Compensation for Officers of
the District
Page 2 of 2
Page 23 of 68
TRUCKEE DONNER
Ordinance No. 2025- 01
Process for Appointing and Establishing Compensation for
Officers of the District
WHEREAS, per Section 16111 of the California Public Utilities Code, the officers of the
District, other than the Board of Directors, are:
a) A clerk, who is also ex officio secretary of the board
b) An accountant
c) A treasurer
d) A general manager
and;
WHEREAS, per Section 16112 of the California Public Utilities Code the officers of the
District other than the board of directors shall be appointed by the Board of Directors, hold
office at the pleasure of the Board of Directors, and receive such compensation as is
provided for by the Board of Directors by ordinance; and
WHEREAS, the Board of Directors have appointed the other officers of the District; and
WHEREAS, the Board of Directors approved a new employment agreement with its General
Manager and established compensation in 2021 via the adoption of Ordinance No. 2021-
02; and
WHEREAS, the Board of Directors desires to update and clarify the process for appointing
and establishing compensation for the other officers of the District.
NOW, THEREFORE, BE IT ENACTED, by the Board of Directors of the Truckee Donner
Public Utility District as follows:
1. Any employee of the District appointed by the Board as one of the officers of the
District shall serve in such role at the pleasure of the Board and independently
and separately from their employment with the District, and if their appointment
as an officer is terminated by the Board for any reason, said termination shall be
without any procedural or due process rights and shall be separate and
independent from any decision regarding their employment with the District.
2. When an employee of the District appointed by the Board as one the officers of
the District is separated from their employment with the District, their
appointment as an officer of the District shall terminate automatically with their
separation from the District.
Ordinance No. 2025-01
Page 24 of 68
3. The District Clerk, District Accountant and District Treasurer shall be
compensated at One Hundred Dollars ($100.00) per year for serving as and
providing the services of their respective offices.
4. The General Manager shall serve per the terms established and set forth in the
Employment Agreement as adopted by the Board of Directors via Ordinance No.
2021-02.
5. From the effective date of this Ordinance and thereafter, the Board of Directors
may set compensation for officers of the District other than Board Members via
Resolution.
6. The District Clerk is directed to publish this Ordinance in accordance with the
laws of the State of California.
PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility
District at a regular meeting thereof duly called and held within said District on the 7t" day
of May, 2025 by the following roll call vote:
AYES:
NOES:
ABSENT:
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
By
Christa Finn, President of the Board
ATTEST:
Brian Wright, General Manager
Ordinance No. 2025-01
Page 25 of 68
AGENDA ITEM #10
r P, -I
Public Utility District
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Keith Renshaw, Electric Engineering Manager
SUBJECT: Consideration to increase the 2025 Annual Authorization for Electric
Engineering Consulting Services
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Authorize the General Manager to execute a professional services contract amendment
for an additional authorization amount of$423,000 with NV5 for engineering consulting
services for a total FY25 not-to-exceed contract amount of$673,000.
BACKGROUND:
For many years, the District has utilized professional service contracts for electric engineering
consulting services. Consulting work has included specialized engineering support for substation
improvement projects, system impact studies, electric capital improvement projects, and other
engineering support as needed. The District is currently in contract with two consulting firms for
electric engineering support: Qualus Engineering and NV5. Qualus is primarily supporting the Martis
Valley Substation Rebuild project while NV5 is supporting other capital and O&M projects.
On December 4, 2024, the Board approved a professional service contract extension for NV5 for
electric engineering consulting services for 2025. The Board approved authorization for FY2025 is
$250,000. To date in FY25, the District has expended approximately$98,000 with NV5 for electric
engineering consulting services.
ANALYSIS AND BODY:
The Electric Department is currently utilizing NV5's engineering consulting services for multiple
capital projects including a pilot project to rebuild a section of overhead infrastructure with wildfire-
hardening materials such as ductile iron poles, fiberglass crossarms, and covered conductors. In
addition to capital projects, the Electric Department continues working on the Electric Department's
Electric System Master Plan.
Staff has identified the need to secure additional electric engineering professional services to ensure
timely completion of the electric utility capital construction and planning work within the projected
timelines.
Since NV5 has completed a considerable amount of work on each of the projects listed in Table 1
below, and has established a familiarity with the projects included in the District's FY2025 goals,
staff has determined that seeking proposals for additional engineering consulting services from
other vendors at this time would not be financially beneficial to the District or its rate payers, and
Page 1 of 3
Page 26 of 68
therefore recommends that the General Manager forego the request for additional proposals from
engineering firms.
District Code Section 3.08.050 allows the General Manager to evaluate the need to seek proposals
for special services:
• Section 3.08.050.4 of District Code allows agreements for special services if"the General
Manager determines that no proposals are necessary, then he/she may enter into an
agreement for the special services up to his/her Board authorized spending limit. Should the
amount exceed the General Manager's spending limit, approval to enter into an agreement
will be brought to Board of Directors for their consideration."
• District Code defines Engineering consulting services as special services in District code
section 3.08.050.1:
• The term "special services"includes, but is not limited to professional services, such as
legal, engineering, architectural, landscape architecture, land surveying, construction project
management, accounting, financial, economic, energy advisory, information technology,
environmental, payroll services and administrative services, as included within California
Government Code Sections 4525, 4526 and 53060.
Staff worked with NV5 to forecast FY25 engineering consulting services costs for Electric
Department projects. The projected project costs for NV5 in FY25 is shown in the table below:
Table 1: Engineering Consulting Cost Estimates by
Project
Project NV5 Engineering Cost
Estimate
Northwoods Wildfire Hardening - Pilot Project $ 40,000.00
Poles Replacements 135 $ 85,000.00
Glenshire -Truckee Substation Tie Project $ 60,000.00
SCADA Reliability Improvement Project Phase 6 $ 90,000.00
Steel Pole Design $ 85,000.00
Electric System Master Plan $ 135,000.00
CEQA Support $ 20,000.00
Substation Physical Security Standard $ 10,000.00
$ 525,000.00
The total shown in Table 1, $525,000, does not include work already invoiced in 2025. Under the
current Board authorization of$250,000 for FY25, the remaining available authorization for NV5 is
approximately $152,000. An additional amount of$373,000 is needed to complete the planned
engineering work with NV5 in FY25. An additional $50,000 of authorization is being requested as a
contingency for work needed in FY25 that is not yet planned. Therefore, staff recommends that the
Board of Directors authorize the General Manager to execute a professional services contract
amendment for an additional authorization amount of$423,000 with NV5 for engineering consulting
services for a total FY25 not-to-exceed contract amount of$673,000.
GOALS AND OBJECTIVES:
District Code 1.05.020 Objectives:
1. Responsibly serve the public.
4. Provide reliable and high quality electric supply and distribution system to meet
Page 2 of 3
Page 27 of 68
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
4. Modernize the utility and add value to our communities through collaboration and
innovation.
FISCAL IMPACT:
Table 1 projects are capital expenditures, except for the Electric System Master Plan of
$135,000.
The District's electric capital budget for FY25 is $20.9M and is $9.7M excluding land &
buildings capital. This capital budget of $9.7M allocates sufficient funds for each of the
capital projects shown in Table 1. Utilization of third-party engineering consulting
services replaces internal staffing resources for engineering activities planned for these
projects at a similar cost. There should not be an adverse effect on project budgets as
shown in the District's Capital Budget for FY24-25 due to the utilization of third-party
engineering consulting services.
As noted in the budget performance review on March 12, 2025, the Electric System
Master Plan (MP) was budgeted in FY24 for $100,000 (GL 1 .6.923-736) and was
forecast to occur in FY25 due to timing. The operating reserve FY24 year-end balance
of$10.7M favorably exceeded the policy target balance by $2.4M. This favorable
variance included $300,000 for known timing expense items (including the MP $100k)
shifting from FY24 to FY25. The additional $35k of estimated cost for the MP can
sufficiently be funded from the operating reserve balance.
ATTACHMENTS:
None
Page 3 of 3
Page 28 of 68
AGENDA ITEM #11
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Martina Rochefort, District Clerk/Executive Assistant
SUBJECT: Approval of Minutes
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Approval of April 2, 2025 Regular Meeting and April 3, 2025 Special Meeting Minutes
BACKGROUND:
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
2. Provide a healthy and safe work environment for all District employees.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
4. Provide reliable and high quality electric supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
6. Manage the District in an effective, efficient and fiscally responsible manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
4. Modernize the utility and add value to our communities through collaboration and
innovation.
5. Developing an inclusive culture drives organizational integration and success.
Page 1 of 2
Page 29 of 68
FISCAL IMPACT:
There is no fiscal impact.
ATTACHMENTS:
1. Minutes 2025 0402 DRAFT
2. Minutes 2025 0403 DRAFT
Page 2 of 2
Page 30 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
1. Call to Order
Meeting was called to order at 6:00 p.m.
2. Roll Call
Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony
Laliotis and President Christa Finn
Staff in attendance: Brian Wright, General Manager; Mike Salmon, Chief Financial Officer;
Jillian Steward, Director of Human Resources & Risk Management; Scott Crow, Director of
IT/Chief Information Officer/Assistant General Manager; Chad Reed, Water Utility Director;
Grant Sacks, Customer Service Manager; Xander Thomassian, Network & Systems
Administrator; Alex Spychalsky, Communication Specialist; Martina Rochefort, District
Clerk
Other: Steve Gross, General Counsel
3. Pledge of Allegiance
Director Murrell led the Pledge of Allegiance.
4. Changes to the agenda
No changes were made to the agenda.
5. Public Comment
No public comment was received.
DIRECTOR UPDATE
6. Director Bender welcomed the spring season. There were no other Director
updates.
DEPARTMENT UPDATES
7. Chad Reed, Water Utility Director, shared water production data and congratulated TJ
Dwyer on his promotion to Water Operations Manager.
Mike Swanson, Director of Electric Engineering & Operations, shared highlights from the
recent Lineman's Rodeo.
Jillian Steward, Director of Human Resources and Risk Management, noted the District
was able to collect $110,249 in property damage claim reimbursements. The District was
also awarded a $10,000 Risk Control Grant to support Emergency Operations Program
development and training. Jennifer Mason, Matt Wellise and the entire Customer Service
Department were recognized as Values winners.
Mike Salmon, Chief Financial Officer, presented recent customer service scores.
1
Page 31 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
CONSENT CALENDAR
8. Consideration of Annual Resolutions for Special Tax: Gray's Crossing and Old
Greenwood Communities Facilities Districts
a) Adopt Resolution 2025-07 requesting Nevada County to collect the special
taxes for the Gray's Crossing 04-1 Community Facilities District; and
b) Adopt Resolution 2025-08 requesting Nevada County to collect the special
taxes for the Old Greenwood 03-1 Community Facility District.
9. Award of a Contract to Develop Contract Documents for Rehabilitation of the
Bridge Street 6170 Tank #1
Authorize the General Manager to execute a professional services contract
with Carollo Engineers to develop contract documents for rehabilitation of the
Rehabilitation of the Bridge Street 6170 Tank #1 for an amount of $23,427,
plus a ten percent change order allowance for a total authorization not to
exceed $25,800.
10. InComm Vanilla Direct Pay (3rd Party Payments)
Approve the implementation of the NISC integrated InComm Vanilla Direct Pay
(third party payments) for TDPUD customers.
11 . Consideration of Scheduling a Public Hearing Related to the Adoption of an
Ordinance Authorizing the Board to Appoint and Establish Compensation
of Officers of the District by Resolution
Schedule a Public Hearing at the regularly scheduled District Board Meeting
on May 7, 2025, at 6:00 PM, or as soon thereafter, for the purpose of receiving
input on the adoption of a proposed ordinance authorizing the Board of
Directors to appoint and establish compensation for officers of the District by
way of resolution.
12. Consideration of Contract for Fire Alarm System Upgrades at District Headquarters
Authorize the General Manager to execute a construction contract with
Johnson Controls, Inc. to perform fire alarm system upgrades in the amount of
$19,670, plus a 10% contingency amount, or$1,967, for a total authorization
not to exceed $21,637.
13. Consideration of Scheduling a Public Hearing Related to Adoption of the Annual
Electric and Water Standby Charges
Schedule a public hearing at the regularly scheduled District Board Meeting on
May 7, 2025 at 6:00 PM, or as soon thereafter, for the purpose of receiving
2
Page 32 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
input on the adoption of annual Electric and Water Standby Charges.
14. Consideration for Approval of a Professional Services Contract to Conduct an
Electric Utility Cost of Service Analysis and Rate Study
Authorize the General Manager to execute a professional services agreement
with HDR Engineering Inc. for the 2025 Electric Cost of Service Analysis and
Rate Study in the amount of $82,243 plus a ten percent change order
allowance of$8,224 for a total authorization not to exceed $90,467.
15. Consider Approval of the Treasurer's Report, April 2025
Approve the Treasurer's Report for April 2025 which includes:
a. Fund Balances for the Month of January 2025
b. Disbursements for the Month of February 2025
16. Consider Approval of Meeting Minutes
Consider approval of March 12, 2025 Special Meeting Minutes
Director Bender noted he had a real property conflict and recused himself from item 8.
No public comment was received.
ACTION: Motion made by Director Murrell to approve the Consent Calendar as
presented, seconded by Vice President Laliotis. The motion passed 5-0 by roll
call vote.
ACTION ITEMS
17. Consideration to approve a procurement contract with Howard Industries for
customer payment kiosk
Authorize the General Manager to execute a procurement contract with
Howard Industries for the purchase of one customer payment kiosk for an
amount not to exceed $25,000, which includes kiosk for $19,919 and
contingency, taxes and other fees totaling $5,081.
No public comment was received. Discussion was held.
ACTION: Motion made by Director Randall to authorize the General Manager to
execute a procurement contract with Howard Industries for the purchase of
one customer payment kiosk for an amount not to exceed $25,000, which
includes kiosk for $19,919 and contingency, taxes and other fees totaling
$5,081, seconded by Director Murrell. The motion passed 5-0 by roll call vote.
3
Page 33 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
Director Bender disclosed a real property conflict and recused himself from items 18 and
19.
Director Bender departed the meeting at 6:36 p.m.
18. Consideration of Authorizing the General Manager to Execute the Agreement
Regarding APN# 043-010-005-000.
A. Determine that the waiver of current Penalty and Interest for APN# 043-010-
005-000 agreement complies with the requirements of Government Code
section 53340(f), and
B. Authorize the General Manager to execute the Agreement regarding APN#
043-010-005-000 (Attachment 1); accepting full payment for all installment
special tax amounts past due, in exchange for waiving current Penalty and
Interest amounts
No public comment was received. Discussion was held.
ACTION: Motion made by Vice President Laliotis to authorize the General
Manager to execute the Agreement regarding APN# 043-010-005-000,
accepting full payment for all installment special tax amounts past due, in
exchange for waiving current Penalty and Interest amounts, seconded by
Director Murrell. The motion passed 4-0 by roll call vote (Director Bender
recused himself).
19. Consideration of Authorizing the General Manager to Execute the Agreement
Regarding APN# 019-770-002-000.
A. Determine that the waiver of current Penalty and Interest for APN# 019-770-
002-000 agreement complies with the requirements of Government Code
section 53340(f), and
B. Authorize the General Manager to execute the Agreement regarding APN#
019-770-002-000 (Attachment 1); accepting full payment for all installment
special tax amounts past due, in exchange for waiving current Penalty and
Interest amounts
No public comment was received. Discussion was held.
ACTION: Motion made by Vice President Laliotis to authorize the General
Manager to execute the Agreement regarding APN# 019-770-002-000,
accepting full payment for all installment special tax amounts past due, in
exchange for waiving current Penalty and Interest amounts, seconded by
Director Murrell. The motion passed 4-0 by roll call vote (Director Bender
recused himself).
4
Page 34 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
Director Bender returned to the meeting at 6:57 p.m.
20. Consideration for Designation of Labor Negotiators for the General Manager's
Employment Contract
Appoint two members of the District's Board of Directors to serve as
negotiators for the General Manager's Employment Contract
No public comment was received. Discussion was held.
ACTION: Motion made by Vice President Laliotis to appoint the Board
President and Vice President to serve as labor negotiators for the General
Manager's Employment Contract, seconded by Director Bender. The motion
passed 5-0 by roll call vote.
21. Consideration of Vote for Local Agency Formation Commission of Nevada County's
Open Regular Member Seat
Consider two candidates for open Special Districts Regular Member seat on
Local Agency Formation Commission (LAFCo) of Nevada County and take
action for vote on the attached LAFCo Election Ballot.
No public comment was received. Discussion was held.
ACTION: Motion made by Director Randall to vote for Rich Johansen for the
open Nevada County LAFCo seat, seconded by Vice President Laliotis. The
motion passed 5-0 by roll call vote.
Open Session recessed at 7:10 p.m.
CLOSED SESSION
22. Closed Session Pursuant to Government Code Section 54957 Public Employee
Dismissal/Termination
23. Closed Session Pursuant to Government Code Section 549567.8 Conference With
Real Property: Donner Lake Reserved Water Right Agreement with Truckee
Meadows Water Authority; District Negotiator: General Manager, Brian Wright,
Under Negotiation: Reserved Water Right Terms.
24. Closed Session Pursuant to Government Code Section 54957 Public Employee
General Manager's Performance Plan Review.
25. Closed Session Pursuant to Government Code Section 54957.6 Conference with
5
Page 35 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
6:00 PM, WEDNESDAY, APRIL 2, 2025
Labor Negotiator
Agency Negotiator(s): As Appointed in Agenda item 20
Unrepresented Employee: General Manager
Open Session reconvened at 9:39 p.m.
President Finn noted there was no reportable action taken in Closed Session.
ADJOURNMENT
Meeting adjourned at 9:39 p.m.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Christa Finn, President
Respectfully Submitted,
Martina Rochefort, District Clerk
6
Page 36 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
SPECIAL BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
10:00 AM, THURSDAY, APRIL 3, 2025
1. Call to Order
Meeting was called to order at 10:10 a.m.
2. Roll Call
Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony Laliotis
and President Christa Finn
Staff in attendance: Brian Wright, General Manager; Martina Rochefort, District Clerk
Other: Steve Gross, General Counsel; Michael McDonald, Regional Government Services
3. Pledge of Allegiance
President Finn led the Pledge of Allegiance.
4. Changes to the agenda
No changes were made to the agenda.
5. Public Comment
No public comment was received.
WORKSHOP
6. Board Governance
Michael McDonald of Regional Government Services presented and facilitated board
discussion on the following topics:
• Governance Fundamentals
• The Ralph M. Brown Act
• Accountability & Ethical Decision-Making
• Effective Meeting Management and Board Leadership
• Board Culture & Conduct
• Public Engagement & Communications
Discussion was held.
Open Session recessed at 11:42 a.m.
Open Session reconvened at 11:51 a.m.
Discussion was held.
Scott Crow, Director of IT/CIO/AGM; Chad Reed, Water Utility Director; Jared
Carpenter, Director of Electric Power Supply; Mike Swanson, Director of Electric
Operations & Engineering, Jillian Steward, Director of Human Resources & Risk
Management and Steven Poncelet, Strategic Affairs Director/PIO joined the meeting at
1:00 P.M.
1
Page 37 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
SPECIAL BOARD MEETING MINUTES
TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA
10:00 AM, THURSDAY, APRIL 3, 2025
Mr. McDonald departed the meeting at 1:18 p.m.
Open Session recessed at 1:18 p.m.
Open Session reconvened at 1:27 p.m.
7. Strategic Plan Review
The Board of Directors reviewed the historical development of the District's Strategic
Plan and revised initiatives. Discussion was held.
The Board directed staff to remove the completed Broadband initiative and add
Facilities Master Plan.
ADJOURNMENT
Meeting adjourned at 3:08 p.m.
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Christa Finn, President
Respectfully Submitted,
Martina Rochefort, District Clerk
2
Page 38 of 68
AGENDA ITEM #12
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Melanie Rives, Finance & Accounting Manager
SUBJECT: Consider Approval of the Treasurer's Report, May 2025
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Approve the Treasurer's Report for May 2025 which includes:
a. Fund Balances for the Month of February 2025
b. Disbursements for the Month of March 2025
BACKGROUND:
ANALYSIS AND BODY:
GOALS AND OBJECTIVES:
FISCAL IMPACT:
ATTACHMENTS:
1. 2025-05 Treasurer's Report
Page 1 of 1
Page 39 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
TREASURER'S REPORT
May 7, 2025
Fund Balances for the Month February 28, 2025
(Preliminary — pending year-end close and annual audit)
And
Disbursements for the Month March 31, 2025
(includes Government Code section 53065.5 items)
Page 1 of 13
Page 40 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Summary report of fund balances for the month ending February 28, 2025 and
disbursements for March 2025.
1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary
The attached listing of checks and ACH payments issued during March 2025 total $4,195,444.31
in disbursements.
2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES
Per Government Code 53065.5:
Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any
reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred
dollars ($100) for each individual charge for services or product received. "Individual charge" includes,
but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any
employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by
including the reimbursement information in a document published or printed at least annually by a date
determined by that district and shall be made available for public inspection.
The Disbursements listing referenced in 1) includes above subject reimbursements information, as
applicable.
3) STATEMENT OF GENERAL FUND:
As of February 28, 2025 the balance in the General Fund was $15,352,469 (Electric $7,974,402
and Water $7,378,067).
4) FUNDS STATUS REPORT:
The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment
Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California
CLASS, BNY and TVI Investments as of February 28, 2025 was $57,275,043 ($41,117,269
Electric and $16,157,774 Water).
5) INVESTMENT STATUS REPORT:
The majority of the District's investments are in California's Local Agency Investment Fund (LAIF),
Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County
Investment Fund (PCIF). The earnings rates for the last 13 months were:
LAIF PCIF UPTIF 1 YR T-B ILL TVI CLASS
February 2024 4.12% 3.45% 5.48% 4.76% 0.55%
March 2024 4.27% 3.34% 5.44% 4.79% 0.55%
April 2024 4.23% 3.61% 5.45% 4.99% 0.55%
May 2024 4.33% 3.52% 5.43% 4.94% 0.55%
June 2024 4.48% 3.65% 5.44% 4.86% 0.55%
July 2024 4.52% 3.77% 5.43% 4.58% 0.55%
August 2024 4.58% 3.80% 5.41% 4.23% 0.55%
September 2024 4.58% 3.78% 5.32% 3.85% 0.55%
October 2024 4.52% 3.66% 5.04% 4.08% 0.55% 5.00%
November 2024 4.48% 3.79% 4.87% 4.11% 0.55% 4.83%
December 2024 4.43% 3.73% 4.74% 4.11% 0.55% 4.64%
January 2025 4.37% 3.83% 4.55% 3.99% 0.55% 4.42%
February 2025 4.33% 4.10% 4.53% 3.91% 0.55% 4.41%
Page 2 of 13
Page 41 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Request for Approval of Disbursements
The disbursements of the Truckee Donner Public Utility District for the month of March 2025
totaled $4,195,444.31. A listing of those disbursements is attached.
AP DISBURSEMENTS METRICS (excludes Payroll):
Accounts Payable (A/P) Metrics
$ A/P Disbursements
7,000,000.00 —
6,000,000.00
5,000,000.00
4,000,000.00
3,000,000.00 —
2,000,000.00 —
1,000,000.00 — —
0.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 2021 0 2022 0 2023 0 2024 0 2025
# A/P Payments Issued
400 —
350 — —
300 —
250 I 200 —
150 —
100 —
50
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 2021 0 2022 0 2023 0 2024 2025
# A/P I nvoices Vouchered
1,200 — —
1,000 — — —
800 — —
600
400
200 I I
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2021 ■2022 ■2023 ■2024 I 2025
Page 3 of 13
Page 42 of 68
Truckee Donner Public Utility District
Check Register CA
March 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
6206 3/1/2025 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE $ 906.92
6221 3/1/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAX AND FEE USE TAX PAYABLE 192.00
6228 3/1/2025 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 32,742.81
6210 3/6/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9637 8,9738 FINAL 1,949.46
6211 3/6/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9637&9738 FIN 7,711.18
6212 3/6/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS 9637&9738 FINAL 1,649.43
45508 3/6/2025 DID 5440 ALTEC INDUSTRIES INC 20241-TON MECHANIC TRUCK 955.88
45509 3/6/2025 DO 1537 AMAZON CAPITAL SERVICES,INC 20241-TON MECHANIC TRUCK 2,064.21
45510 3/6/2025 DID 9503810 CDW GOVERNMENT INC. HARDWARE REFRESH-COMPUTER HARDWARE 9,873.75
45511 3/6/2025 DO 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,797.45
45512 3/6/2025 DID 640 EMPLOYER LYNX INC. PERSONNEL EXPENSES 83.00
45513 3/6/2025 DO 1484 FUENTES CONSULTING LLC MATERIALS&SERVICES 1,897.50
45514 3/6/2025 DID 3340 GENERAL PACIFIC INC METER PURCHASE 10,887.98
45515 3/6/2025 DO 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,014.87
45516 3/6/2025 DID 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 408.24
45517 3/6/2025 DO 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 376.96
45518 3/6/2025 DID 1149 LOOMIS BANKING CHARGES 941.97
45519 3/6/2025 DO 1312 MILSOFT UTILITY SOLUTIONS LICENSING,MAINTENANCE&SUPPORT 3,999.96
45520 3/6/2025 DID 10008 MOTION&FLOW CONTROL PRODUCTS,INC. MISC PARTS&SUPPLIES 741.94
45521 3/6/2025 DO 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00
45522 3/6/2025 DID 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 219.39
45523 3/6/2025 DO 5130 NCPA MEMBERSHIP DUES 8,794.00
45524 3/6/2025 DID 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 16.44
45525 3/6/2025 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 130.23
45526 3/6/2025 DID 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 147.35
45527 3/6/2025 DO 419 QCS LLC MATERIALS&SERVICES 641.25
45528 3/6/2025 DID 552 RK CONTRACTORS INC. SECONDARY UPGRADE-VILLAGE GREEN 63,197.50
45529 3/6/2025 DO 837 SIERRA OFFICE SOLUTIONS XEROX COPIER LEASE 11.39
45530 3/6/2025 DID 6402 SIERRA PACIFIC POWER CO PURCHASED POWER-SPPC&NEVADA POWER 59,230.60
45531 3/6/2025 DO 1787 SILVER STATE INTERNATIONAL TRUCKS MISC PARTS&SUPPLIES 87.31
45532 3/6/2025 DID 1473 SINGLEWIRE SOFTWARE LICENSING,MAINTENANCE&SUPPORT 2,150.00
45533 3/6/2025 DO 1532 SLATE ROCK FIR EMPLOYEE UNIFORMS -
45534 3/6/2025 DID 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 212,265.13
45535 3/6/2025 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 503.28
45536 3/6/2025 DID 10584 LAMPS PURCHASED POWER-LAMPS 1,261,203.17
45537 3/6/2025 DO 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES -
45538 3/6/2025 DID 630 WESTERN AREA POWER ADMINISTRATION ENVIRONMENTAL COMPLIANCE FEES 5,360.54
45539 3/6/2025 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 632.60
135649 3/6/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 5,274.04
135650 3/6/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 6,459.05
135651 3/6/2025 CHK 99999 AMI HOUSING CUSTOMER REFUND-CLOSEDACCOUNT 612.18
135652 3/6/2025 CHK 134 ANIXTER INC. INVENTORY 2,329.07
135653 3/6/2025 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00
135654 3/6/2025 CHK 99999 MSASHLEY E BELLINE CUSTOMER REFUND-CLOSEDACCOUNT 17.49
135655 3/6/2025 CHK 1518 COLUMN SOFTWARE PBC GENERAL ADVERTISEMENT 707.21
135656 3/6/2025 CHK 1601 CROWN TECHNICAL SYSTEMS MARTIS VALLEY SUBSTATION MODERNIZATION 557,104.20
135657 3/6/2025 CHK 5661 DOORKING,INC BUILDING MAINTENANCE 45.95
135658 3/6/2025 CHK 1614 DUNCAN WEINBERG GENZER&PEMBROKE,P.C. PROFESSIONAL SERVICES:OTHER 2,250.00
135659 3/6/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 11.00
135660 3/6/2025 CHK 348 EDGES ELECTRICALGROUP MATERIALS&SERVICES 201.74
135661 3/6/2025 CHK 999 BELINDA GIMBERT REFUNDTPP-16501JEBSCT 815.00
135662 3/6/2025 CHK 99999 REBEKAH MASTERS CUSTOMER REFUND-CLOSED ACCOUNT 95.79
135663 3/6/2025 CHK 5151 NRECA MARCH 2025 INSURANCE 17,478.53
135664 3/6/2025 CHK 5150 NRECA GROUP BENEFITS TRUST MARCH 2025 INSURANCE 247,692.77
135665 3/6/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 30,917.37
135666 3/6/2025 CHK 999 REYES GENERAL CONSTRUCTION LLC REFUNDTPP-13094SKISLOPE WAY 772.00
135667 3/6/2025 CHK 11226 SHRED-IT USA LLC OFFICE SUPPLIES 85.00
135668 3/6/2025 CHK 2240 SPRINGHILL SUITES BY MARRIOTT STORM DAMAGE 923.04
135669 3/6/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 3,881.81
135670 3/6/2025 CHK 7380 UNITED PARCEL SERVICE UPS CHARGES 161.60
135671 3/6/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 2,117.00
135672 3/6/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 394.20
6208 3/13/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 241,394.20
6213 3/13/2025 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 10,417.00
6214 3/13/2025 WIRE 11233 CALPERS PENSION 76,479.67
6215 3/13/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 03/07/2025 24,929.15
6216 3/13/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 03/07/2025 25,100.06
6217 3/13/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 03/07/25 1,436.48
6218 3/13/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 03/07/2025 117,312.60
6219 3/13/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS PPE 03/07/2025 37,217.12
45618 3/13/2025 DID 1537 AMAZON CAPITAL SERVICES,INC MATERIALS&SERVICES 2,805.06
45619 3/13/2025 DO 9070 EDWARD ATKINS III 53605.5 DMV PHYSICAL 120.00
45620 3/13/2025 DID 9941 KATELYN AUERBACH PERSONNEL EXPENSES 58.70
45621 3/13/2025 DO 11443 AUTOGLASS/MOTORSPORTS EXPRESS-TRUCKEE REPAIRS&MAINTENANCE 1,599.38
45622 3/13/2025 DID 1587 DILLARD ENVIRONMENTAL SERVICES ENVIRONMENTAL COMPLIANCE FEES 3,031.05
45623 3/13/2025 DO 1535 EPLUS TECHNOLOGY INC LICENSING,MAINTENANCE&SUPPORT 207.60
45624 3/13/2025 DID 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 106.75
45625 3/13/2025 DO 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 325.65
45626 3/13/2025 DID 3480 GRAINGER INC. FACILITY SUPPLIES 172.75
45627 3/13/2025 DO 1617 HUDSON TECHNOLOGIES COMPANY ENVIRONMENTAL COMPLIANCE FEES 13,838.00
45628 3/13/2025 DID 3820 IBEW LOCAL 1245 UNION DUES MARCH EMPLOYEE CONTRIBUTIONS 7,097.25
45629 3/13/2025 DO 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 263.00
45630 3/13/2025 DID 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 515.48
45631 3/13/2025 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 232.41
45632 3/13/2025 DID 9504397 PACE SUPPLY INVENTORY 4,052.32
Page Iof3 Page 4 of 13
Page 43 of 68
Truckee Donner Public Utility District
Check Register CA
March 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
45633 3/13/2025 DD 5450 PDM STEEL SERVICE CENTERS MATERIALS&SERVICES 539.35
45634 3/13/2025 DD 5070 PLATT MATERIALS&SERVICES 130.49
45635 3/13/2025 DD 5730 PORTERSIMON LEGAL SERVICES 9,306.00
45636 3/13/2025 DD 9924 RYAN PURSEL* MEETING EXPENSES 298.00
45637 3/13/2025 DD 419 QCS LLC BUILDING MAINTENANCE 5,158.00
45638 3/13/2025 DD 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 12,048.00
45639 3/13/2025 DD 846 REAL GRAPHIC MISC PARTS&SUPPLIES 313.93
45640 3/13/2025 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00
45641 3/13/2025 DD 6155 SAFETY-KLEEN CORPORATION HAZARDOUS MATERIAL COMPLIANCE 494.98
45642 3/13/2025 DD 3826 STONE'S COUNTRYTIRE REPAIRS&MAINTENANCE 110.00
45643 3/13/2025 DD 349 STRADLING YOCCA CARLSON&RAUTH P.C. GC&OG MELLO R0OS ADMIN COSTS 3,859.36
45644 3/13/2025 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 935.48
45645 3/13/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 387.84
45646 3/13/2025 DD 1328 TRAFFIC MANAGEMENT,INC. POLE CHANGE OUTS 5,873.00
45647 3/13/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 1,947.61
45648 3/13/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 995.66
45649 3/13/2025 DD 1546 WATERS CHIROPRACTIC DMV PHYSICAL-C.KRAUSS 140.00
45650 3/13/2025 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 1,291.26
135673 3/13/2025 CHK 657 AT&T COMMUNICATIONS 5,853.27
135674 3/13/2025 CHK 1006 CALIFORNIASTATE DISBURSEMENT UNIT CHILD SUPPORT PPE 03/07/2025 115.38
135675 3/13/2025 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 537.32
135676 3/13/2025 CHK 1553 CRANMER ENGINEERING INC WATER SAMPLE ANALYSIS 100.00
135677 3/13/2025 CHK 348 EDGES ELECTRICALGROUP HARDWARE REFRESH-NETWORK LIFECYCLE 721.56
135678 3/13/2025 CHK 369 FIRSTAMERICAN TITLE INS CO OG MELLO ROOS ADMIN COSTS 2,640.00
135679 3/13/2025 CHK 905 HEALTHEQUITY INC. HSA ADMINISTRATIVE FEES 87.75
135680 3/13/2025 CHK 10932 1&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 277.90
135681 3/13/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 1,885.72
135683 3/13/2025 CHK 5200 NORTHWEST PUBLIC POWER ASSOCIATION MEMBERSHIP DUES 10,632.90
135684 3/13/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 59,102.73
135685 3/13/2025 CHK 99999 FELIX PEDROZA CUSTOMER REFUND-CLOSED ACCOUNT 82.96
135686 3/13/2025 CHK 10808 RAILROAD MANAGEMENTCO LLC LEASE:O/H POWER LINE XING 2,632.27
135687 3/13/2025 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 5,302.29
135688 3/13/2025 CHK 1497 STATE COLLECTIONS AND DISBURSEMENT UNIT CHILD SUPPORT PPE 03/07/2025 612.18
135689 3/13/2025 CHK 10408 TAHOE TRUCKEE AIRPORT DISTRICT EMPLOYEE DEVELOPMENT 4,436.00
135690 3/13/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 3,054.09
135691 3/13/2025 CHK 61 TECH PRODUCTS INC. MATERIALS&SERVICES 332.71
135692 3/13/2025 CHK 999 TOWN OF TRUCKEE REFUND WO#24631225-10144 W.RIVER ST. 2,533.77
6224 3/20/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS 9946 FINAL 1,120.93
6225 3/20/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING TAX 9946 FINAL 1,865.20
6226 3/20/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9946 7,478.62
6227 3/20/2025 WIRE 3824 MISSIONSQUARE 401A CONTRIBUTIONS 9946 FINAL 882.26
45651 3/20/2025 DD 1414 ALPINE SMITH,INC. REPAIRS&MAINTENANCE 110.68
45652 3/20/2025 DD 1537 AMAZON CAPITAL SERVICES,INC SAFETY SUPPLIES 1,476.10
45653 3/20/2025 DD 907 BSK ASSOCIATES WATER SAMPLE ANALYSIS 312.40
45654 3/20/2025 DD 9157 JOSHUAJ CAMPBELL' MEETING EXPENSES 141.00
45655 3/20/2025 DD 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 66.00
45656 3/20/2025 DD 736 FACTORY MOTOR PARTS MISC PARTS&SUPPLIES 455.07
45657 3/20/2025 DD 9347 EMPLOYEE VISION REIMBURSEMENT 518.00
45658 3/20/2025 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 1,087.50
45659 3/20/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 311.06
45660 3/20/2025 DD 10257 GMES LLC TOOLS 878.10
45661 3/20/2025 DD 3480 GRAINGER INC. MATERIALS&SERVICES 466.32
45662 3/20/2025 DD 3515 GRAYBAR ELECTRIC CO INC MATERIALS&SERVICES 322.90
45663 3/20/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,357.82
45664 3/20/2025 DD 1581 J HARLEN COMPANY INC MATERIALS&SERVICES 661.42
45665 3/20/2025 DD 9733 EMPLOYEE VISION REIMBURSEMENT 99.00
45666 3/20/2025 DD 11025 MOONSHINE INK MARKETING 428.00
45667 3/20/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 62.20
45668 3/20/2025 DD 289 NISC FEBRUARY 2025 PRINT SERVICES 22,275.34
45669 3/20/2025 DD 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 142.31
45670 3/20/2025 DD 9504397 PACE SUPPLY MATERIALS&SERVICES 250.00
45671 3/20/2025 DD 10414 SNAP-ON INDUSTRIAL MECHANICS TOOLS:PUD 694.37
45672 3/20/2025 DD 7313 TAHOE SUPPLY COMPANY MATERIALS&SERVICES 202.90
45673 3/20/2025 DD 1328 TRAFFIC MANAGEMENT,INC. POLE CHANGE OUTS 8,768.90
45674 3/20/2025 DD 7176 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 34.25
45675 3/20/2025 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 33,635.89
45676 3/20/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 220.00
45677 3/20/2025 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORM 11.89
45678 3/20/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 497.83
45679 3/20/2025 DD 643 UNITED SITE SERVICES OF NEVADA MATERIALS&SERVICES 655.27
45680 3/20/2025 DD 320 W&T GRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORM 113.93
45681 3/20/2025 DD 7820 WESTERN NEVADA SUPPLY CO INVENTORY 1,512.05
135693 3/20/2025 CHK 134 ANIXTER INC. OFFICE SUPPLIES 4,046.67
135694 3/20/2025 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,353.52
135695 3/20/2025 CHK 99999 ANDREW A BENNETT CUSTOMER REFUND-CLOSEDACCOUNT 149.53
135696 3/20/2025 CHK 80 BORGES&MAHONEY CO MATERIALS&SERVICES 2,333.18
135697 3/20/2025 CHK 99999 RANDY CAMPBELL CUSTOMER REFUND-CLOSED ACCOUNT 25.25
135698 3/20/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILLCHARGES 16.25
135699 3/20/2025 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 101.66
135700 3/20/2025 CHK 99999 SERENA MORROW CUSTOMER REFUND-CLOSEDACCOUNT 263.38
135701 3/20/2025 CHK 1540 P31 ENTERPRISES POLE CHANGE OUTS 30,662.45
135702 3/20/2025 CHK 10400 PLACER COUNTYATFN:ACCOUNTS RECEIVABLE 2025 PIPELINE REPLACEMENT 983.62
135703 3/20/2025 CHK 462 POWERPLAN-OIB REPAIRS&MAINTENANCE 97.30
135704 3/20/2025 CHK 999 REYES GENERAL CONSTRUCTION LLC REFUND FEES-14144 HANSELAVE 2,025.00
135705 3/20/2025 CHK 999 RYAN SMITH REFUND TPP 815.00
Page 2of3 Page 5 of 13
Page 44 of 68
Truckee Donner Public Utility District
Check Register CA
March 2025 Gov.Code
53605.5
Check/Tran Date Type Vendor Vendor Name Item Reference Amount
135706 3/20/2025 CHK 589 STATE OF CALIFORNIA INSURANCE DEDUCTIONS&LOSSES 25.00
135707 3/20/2025 CHK 6860 TAHOE FOREST HOSPITAL DISTRICT PERSONNEL EXPENSES 670.00
135708 3/20/2025 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 12.37
135709 3/20/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.16
135710 3/20/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MATERIALS&SERVICES 408.07
135711 3/20/2025 CHK 99999 DAVID WINGARD II CUSTOMER REFUND-CLOSEDACCOUNT 349.66
135712 3/20/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 9,226.93
6223 3/27/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 272,343.65
6229 3/27/2025 WIRE 11233 CALPERS PENSION 83,120.87
6230 3/27/2025 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 03/21/2025 24,368.46
6231 3/27/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 03/21/2025 29,269.08
6232 3/27/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 03/21/25 1,436.48
6233 3/27/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 03/21/2025 132,724.94
6234 3/27/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS PPE 03/21/2025 39,679.60
45765 3/27/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 1,970.91
45766 3/27/2025 DD 11443 AUTOGLASS/MOTORSPORTS EXPRESS-TRUCKEE REPAIRS&MAINTENANCE 304.25
45767 3/27/2025 DD 10376 CORWIN FORD RENO REPAIRS&MAINTENANCE 1,106.18
45768 3/27/2025 DD 893 DEBBIE MADERA CLEANING SERVICE BUILDING CLEANING 7,004.00
45769 3/27/2025 DD 10669 E.H.WACHS COMPANY REPAIRS&MAINTENANCE 452.95
45770 3/27/2025 DD 1562 FASTENERS INC MATERIALS&SERVICES 351.78
45771 3/27/2025 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 137.35
45772 3/27/2025 DD 1484 FUENTES CONSULTING LLC SAFETY MEETING 1,663.45
45773 3/27/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORMS 151.56
45774 3/27/2025 DD 3480 GRAINGER INC. FACILITY SUPPLIES 391.18
45775 3/27/2025 DD 3520 JOHNSON CONTROLS FIRE PROTECTION LP BUILDING MAINTENANCE 1,753.06
45776 3/27/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MISC PARTS&SUPPLIES 48.94
45777 3/27/2025 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 220.35
45778 3/27/2025 DD 95 OKONITE COMPANY INVENTORY 120,490.55
45779 3/27/2025 DD 9504397 PACE SUPPLY INVENTORY 1,787.24
45780 3/27/2025 DD 5450 PDM STEEL SERVICE CENTERS MATERIALS&SERVICES 662.74
45781 3/27/2025 DD 1574 REGIONAL GOVERNMENT SERVICES PROFESSIONAL SERVICES:OTHER 1,207.68
45782 3/27/2025 DD 9927 EMPLOYEE VISION REIMBURSEMENT 392.87
45783 3/27/2025 DD 9933 JOSHUA P SCOTVOLD 53605.5 EMPLOYEE DEVELOPMENT-CLASS REGISTRATION 299.99
45784 3/27/2025 DD 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 875.00
45785 3/27/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 863.89
45786 3/27/2025 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORMS 87.83
45787 3/27/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 497.83
45788 3/27/2025 DD 7820 WESTERN NEVADA SUPPLY CO INVENTORY 359.14
45789 3/27/2025 DD 9999 EMPLOYEE VISION REIMBURSEMENT 1,000.00
135713 3/27/2025 CHK 657 AT&T COMMUNICATIONS 95.75
135714 3/27/2025 CHK 99999 JEAN BURROWS CUSTOMER REFUND-CLOSEDACCOUNT 202.69
135715 3/27/2025 CHK 2420 CALIFORNIA MUNICIPAL UTILITIES ASSN MEMBERSHIP DUES 10,000.00
135716 3/27/2025 CHK 1006 CALIFORNIASTATE DISBURSEMENT UNIT CHILD SUPPORT PPE 03/21/2025 115.38
135717 3/27/2025 CHK 9176 JARED CARPENTER* MEETING EXPENSES 360.00
135718 3/27/2025 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 560.00
135719 3/27/2025 CHK 99999 MISS ALEXIS K EBNER CUSTOMER REFUND-CLOSEDACCOUNT 16.83
135720 3/27/2025 CHK 348 EDGES ELECTRICALGROUP MATERIALS&SERVICES 405.18
135721 3/27/2025 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 58.15
135722 3/27/2025 CHK 1242 GRATEFUL GARDENS BUILDING MAINTENANCE 4,325.00
135723 3/27/2025 CHK 99999 EMILY HALPORN CUSTOMER REFUND-CLOSED ACCOUNT 92.62
135724 3/27/2025 CHK 999 BECK JENSEN REFUND TPP-11885 RIO VISTA DR 836.00
135725 3/27/2025 CHK 7220 NAPA SIERRA REPAIRS&MAINTENANCE 31.44
135726 3/27/2025 CHK 592 NORTHERN SIERRA AIR QUALITY HAZARDOUS MATERIAL COMPLIANCE 993.44
135727 3/27/2025 CHK 99999 LUIS A ORDUNO CONTRERAS CUSTOMER REFUND-CLOSED ACCOUNT 77.01
135728 3/27/2025 CHK 99999 MR HECTOR C RODRIGUEZ CUSTOMER REFUND-CLOSED ACCOUNT 3.62
135729 3/27/2025 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 31.19
135730 3/27/2025 CHK 1497 STATE COLLECTIONS AND DISBURSEMENT UNIT CHILD SUPPORT PPE 03/21/2025 612.18
135731 3/27/2025 CHK 999 TRUCKEE DONNER LLC REF-24644500,ZERO IMPACT EVCHRGRS 349.29
135732 3/27/2025 CHK 99999 JIM VALENTINE CUSTOMER REFUND-CLOSEDACCOUNT 169.21
135733 3/27/2025 CHK 5643 ZORO TOOLS,INC MATERIALS&SERVICES 312.85
230 $4,195,444.31
*Denotes employee reimbursement containing multiple items with no individual item charge of$100 or greater.
Page 3of3 Page 6 of 13
Page 45 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
STATEMENT OF GENERAL FUND
Activity for the Month Ended 2/28/2025
Page 1 of 2
Electric Dept Water Dept Total
Balance in General Fund 1/31/2025 $7,295,387 $7,139,352 $14,434,739
Receipts:
Revenue received $3,470,601 $1,408,015 $4,878,616
Retired employees medical insurance 19,659 - 19,659
Record interest earned 12,939 2,455 15,393
Reimbursement for COP funded projects - 30,074 30,074
FF Funding&DL Surcharge Reimbursement for 2006 COP - 8,160 8,160
Cash clearing accounts(timing-prior month reversal) (93,381) - (93,381)
Cash clearing accounts(timing-current month) 173,498 - 173,498
Total Receipts $3,583,316 $1,448,703 $5,032,019
Disbursements:
Accounts payable/payroll disbursements $2,841,074 $1,195,193 $4,036,267
Restrict facilities fees 7,139 5,475 12,614
Restrict Donner Lake surcharge - 9,320 9,320
Section 125 benefit disbursement 42,811 - 42,811
Bank charges 13,277 - 13,277
Total Disbursements $2,904,300 $1,209,988 $4,114,288
Balance in General Fund 2/28/2025 $7,974,402 $7,378,067 $15,352,469
4/24/2025 4:49 PM
I:\Treasurers Report\Statement of General Fund\2025\2025-02 GF
Page 7 of 13
Page 46 of 68
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Funds Status Report
Activity for the Month Ended 2/28/2025
Page 2 of 2
Electric Dept Water Dept Total
Distribution of Operating Funds At Month-End:
Customer Services Operating Funds $2,400 $0 $2,400
Operating clearing accounts 173,498 - 173,498
U.S. Bank-General Fund 2,834,862 - 2,834,862
LAIF, UPTIF, PCIF, &TVI-General Fund 4,963,643 7,378,067 12,341,710
Total Operating Funds $7,974,402 $7,378,067 $15,352,469
Distribution of Designated&Restricted Funds at Month-End:
LAIF, UPTIF, PCIF,TVI &CLASS $33,213,491 $8,088,825 $41,302,316
UPTIF-Donner Lake Assessment District - 87,850 87,850
2015 COP Water Bonds, Principal Payment Fund - 325,835 325,835
2022 COP Issuance/Payment Fund 129,579 286,575 416,154
U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171
Total Designated&Restricted Funds $33,343,070 $8,832,256 $42,175,326
Total Market Adjustments (200,204) (52,549) (252,753)
Total Funds Available $41,117,269 $16,157,774 $57,275,043
4/24/2025 4:49 PM
I:\Treasurers Report\Statement of General Fund\2025\2025-02 GF
Page 8 of 13
Page 47 of 68
INVESTMENT STATUS REPORT
Activity for the Month Ended 2/28/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025
ELECTRIC FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-4.33%(4.37%)
General Fund 1..136.1 $ 6,294,941 $ 1,252,534 $ (212,821) $ 1,039,712
Consolidate cash (212,821)
Capital Replacement Fund 1..136.41 2,181,606 4,207,148 - 4,207,148
AB 32 Cap&Trade Fund 1..136.58 481,113 486,751 - 486,751
Deferred Liabilites Reserve 1..136.42 2,267,444 2,293,973 - 2,293,973
LCFS Credits 1..136.59 112,056 113,382 - 113,382
2022 COP Project Fund 1..132.95 7,039,834 7,122,211 - 7,122,211
Total LAIF Electric Investments 18,376,994 15,475,998 (212,821) 15,263,177
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.53%(4.55%)
General Fund 1..136.12 521,095 501,050 (5,135) 495,915
Restrict facility fees (7,139)
Record monthly interest 2,004
Facilities Fees 1..136.9 653,845 663,696 9,793 673,489
Restrict facilites fees 7,139
Record monthly interest 2,654
Electric Rate Reserve Fund 1..136.45 1,868,991 2,416,635 9,665 2,426,299
Record monthly interest 9,665
Capital Replacement Fund 1..136.46 495,353 497,379 1,989 499,368
Record monthly interest 1,989
Electric Vehicle Reserve 1..136.13 1,428,687 2,359,530 9,436 2,368,966
Record monthly interest 9,436
Total UPTIF Electric Investments 4,967,970 6,438,289 25,748 6,464,038
PLACER COUNTY INVESTMENT FUND(PCIF)- 4.10%(3.83%)
Electric General Fund PC 1..136.49 908,374 911,253 2,964 914,217
Record monthly interest 2,964
Electric Rate Reserve Fund 1..136.47 1,115,617 1,119,153 3,641 1,122,793
Record monthly interest 3,641
Capital Replacement Fund 1..136.48 1,335,212 1,339,444 4,358 1,343,801
Record monthly interest 4,358
Total PCIF County Electric Investments 3,359,204 3,369,849 10,963 3,380,812
TVI INVESTMENTS- 0.55%(0.55%)
Capital Replacement Fund 1..136.43 2,966,550 2,966,550 - 2,966,550
Electric Rate Reserve Fund 1..136.44 1,500,000 1,500,000 - 1,500,000
Total TVI Electric Investments 4,466,550 4,466,550 4,466,550
4/24/2025 5:26 PM Investments Status Report Page 9 of 13
r re\Trea,ur,R,port\1,v--t smm,Reports\m2s\m -,--St-,i-, -sums Rep- Page 1 of 4
Page 48 of 68
INVESTMENT STATUS REPORT
Activity for the Month Ended 2/28/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025
CLASS INVESTMENTS- 4.41%(4.42%)
General Fund 1..136.16 503,934 505,828 2,007,970 2,513,798
Record monthly interest 7,970
Transfer from US Bank 2,000,000
Electric Rate Reserve Fund 1.136.22 1,511,598 1,517,277 4,826 1,522,103
Record monthly interest 4,826
Vehicle Reserve Fund 1..136.23 503,934 505,828 1,609 507,437
Record monthly interest 1,609
Capital Reserve Fund 1..136.24 4,031,201 4,046,348 12,870 4,059,218
Record monthly interest 12,870
Total CLASS Electric Investments 6,550,668 6,575,281 2,027,276 8,602,557
Total Electric Investments $ 37,721,387 $ 29,750,687 $ (176,110) $ 29,574,577
4/24/2025 5:26 PM Investments Status Report Page 10 of 13
I:\Treasurers Report\Investment Status Reports\2025\2025-02 In vestments Status Report Page 2 of 4
Page 49 of 68
INVESTMENT STATUS REPORT
Activity for the Month Ended 2/28/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025
WATER FUNDS
LOCAL AGENCY INVESTMENT FUND(LAIF)-4.33%(4.37%)
General Fund 2..136.1 3,090,636 3,529,439 207,347 3,736,786
Consolidate cash 212,821
Restrict facility fees (5,475)
Facilities Fees 2..136.90 1,411,527 1,891,488 5,475 1,896,962
Restrict facility fees 5,475
Capital Replacement Fund 2..136.41 1,210,177 2,474,330 - 2,474,330
Reserve funding @ budget -
Total LAIF Water Investments 5,712,340 7,895,256 212,821 8,108,078
UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.53%(4.55%)
General Fund 2..136.12 908,092 613,741 31,369 645,110
Transfer to DLAD surcharge (9,320)
DL Surcharge Reimbursement for 2006 COP 8,160
FF Funding portion of 2006 COP 30,074
Record monthly interest 2,455
Facilities Fees 2..136.25 495,007 16,958 (30,006) (13,047)
Record monthly interest 68
Transfer to GF for FF Funding portion of 2006 COP (30,074)
West River St.Assessment District 2..136.31 43,090 43,266 173 43,439
Record monthly interest 173
Prepaid Connection Fees 2..136.7 88,057 88,417 354 88,771
Record monthly interest 354
Donner Lake Assessment District Fund 2..136.84 87,144 87,500 350 87,850
Record monthly interest 350
Donner Lake Assessment District Surcharge Fund 2..136.61 223,320 225,372 2,061 227,433
DLAD surcharge collections 9,320
DL Surcharge reimbursement to GF for 2006 COP (8,160)
Record monthly interest 901
TSA SAD II Improvement Fund 2..136.85 20,787 20,872 83 20,956
Record monthly interest 83
Water Vehicle Reserve 2..136.13 728,607 1,058,587 4,234 1,062,820
Record monthly interest 4,234
Deferred Liabilites Reserve 2..136.42 120,249 120,741 483 121,223
Record monthly interest 483
Capital Replacement Fund 2..136.46 1,131,023 135,649 542 136,191
Record monthly interest 542
Total UPTIF Water Investments 3,845,376 2,411,104 9,643 2,420,746
PLACER COUNTY INVESTMENT FUND(PCIF)- 4.10%(3.83%)
Total PCIF Water Investments - - - -
TVI INVESTMENTS- 0.55%(0.55%)
Water General Fund TVI2..136.15 2,996,171 2,996,171 - 2,996,171
Total TVI Water Investments 2,996,171 2,996,171 2,996,171
CLASS INVESTMENTS- 4.41%(4.42%)
Water Vehicle Reserve 2..136.24 2,015,738 2,023,311 6,436 2,029,747
Record monthly interest 6,436
Total CLASS Water Investments 2,015,738 2,023,311 6,436 2,029,747
Total Water Investments $ 14,569,625 $ 15,325,843 $ 228,900 $ 15,554,742
4/24/2025 5:26 PM Investments Status Report Page 11 of 13
r re\Trea,ur,Rport\1,v--t smm,Reports\mzs\m gymzs-o2-, -sums Rep- Page 3 of 4
Page 50 of 68
INVESTMENT STATUS REPORT
Activity for the Month Ended 2/28/2025
Balance Beg.Balance Month End Balance
%Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025
ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS
Pre-Market Adjustments
Total LAIF Investments 43% 24,089,334 23,371,254 - 23,371,254
Total UPTIF Investments 17% 8,813,347 8,849,393 35,391 8,884,784
Total PCIF Investments 6% 3,359,204 3,369,849 10,963 3,380,812
Total TVI Investments 14% 7,462,722 7,462,722 - 7,462,722
Total CLASS Investments 20% 8,566,405 8,598,592 2,033,712 10,632,304
Total Investments 100% Month End Bal.Mix $ 52,291,011 $ 51,651,811 $ 2,080,064 $ 53,731,876
Market Adjustments
Total LAIF Investments (9,106) (9,106) - (9,106)
Total UPTIF Investments 16,492 16,492 - 16,492
Total PCIF Investments (16,653) (16,653) (16,653)
Total TVI Investments (243,495) (243,408) 86 (243,322)
Total CLASS Investments (165) (165) (165)
Total Investments $ (252,761) $ (252,840) $ 86 $ (252,754)
Post-Market Adjustments
Total LAIF Investments 44% 24,080,227 23,362,148 - 23,362,148
Total UPTIF Investments 17% 8,829,839 8,865,885 35,391 8,901,276
Total PCIF Investments 6% 3,342,552 3,353,196 10,963 3,364,159
Total TVI Investments 13% 7,219,227 7,219,314 86 7,219,400
Total CLASS Investments 20% 8,566,240 8,598,427 2,033,712 10,632,139
Total Investments 100% Month End Bal.Mix $ 52,038,084 $ 51,398,971 $ 2,080,151 $ 53,479,122
4/24/20255:26 PM Investments Status Report Page 12 of 13
I:\Treasurers Report\Investment Status Reports\2025\2025-02 In vestments Status Report Page 4 of 4
Page 51 of 68
TRUCKEE DONNER PUD
INVESTMENT BALANCES
as of February 28,2025
Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/
LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas sec Port Treas Security Treas Cash Res Checking Cash clearings Total
131.1
ELECTRIC FUNDS
General Fund $ 1,039,712 $ 914,217 $ 495,915 $ 2,513,798 $ $ $ $ $ $ 2,834,862 $ 175,898 $ 7,974,402
Facilities Fees - - 673,489 - - - 673,489
Rate Reserve Fund - 1,122,793 2,426,299 1,522,103 1,500,000 6,571,196
Capital Reserve Fund 4,207,148 1,343,801 499,368 4,059,218 2,966,550 13,076,086
Deferred Liabilites Reserve/POB Fund 2,293,973 - - - - 2,293,973
Electric Vehicle Reserve Fund - 2,368,966 507,437 2,876,403
AB 32 Fund 486,751 - - 486,751
LCFS Credits 113,382 113,382
COP Project Fund 7,122,211 7,122,211
COP Issuance/Payment Fund - - - 129,579 129,579
Market Adjustments (6,947) (16,653) 9,297 (127) (185,775) - - - (200,204)
Total Electric Investments 15,256,230 3,364,159 6,473,334 8,602,430 4,280,776 129,579 2,834,862 175,898 41,117,269
WATER FUNDS
General Fund $ 3,736,786 $ - $ 645,110 $ - $ 2,996,171 $ $ $ $ - $ - $ - 7,378,067
Facilities Fees 1,896,962 (13,047) - - 1,883,915
Capital Reserve Fund 2,474,330 136,191 2,029,747 4,640,268
2015 COP Funds - - - 325,835 325,835
West River St.Assessment District 43,439 - 43,439
Deferred Liabilites Reserve 121,223 121,223
Prepaid Connection Fees 88,771 88,771
DLAD Fund 87,850 43,171 131,021
DLAD Surcharge 227,433 - 227,433
TSA SAD II Improvement Fund 20,956 20,956
Water Vehicle Reserve 1,062,820 1,062,820
COP Project Funds - -
COP Issuance/Payment Fund - - 286,575 286,575
Market Adjustments (2,159) 7,196 (39) (57,547) - - - (52,549)
Total Water Investments 8,105,918 - 2,427,942 2,029,708 2,938,625 325,835 286,575 43,171 - 16,157,774
Electric and Water,subtotal 23,362,148 3,364,159 8,901,276 10,632,139 7,219,401 325,835 416,154 2,878,033 175,898 57,275,043
MELLO ROOS-OLD GREENWOOD - - - - - - 261,424 313,448 - - - 574,872
Total Mello Roos-Old Greenwood - 261,424 313,448 - 574,872
MELLO ROOS-GRAY'S CROSSING 1,941,209 - - 1,377,596 3,318,805
Total Mello Roos-Gray's Crossing 1,941,209 1,377,596 3,318,805
Total Investments $ 25,303,357 $ 3,364,159 $ 8,901,276 $ 10,632,139 $ 7,219,401 $ 325,835 $ 261,424 $ 313,448 $ 1,793,750 $ 2,878,033 $ 175,898 $ 61,168,720
202501 Last Month End Balances 25,303,357 3,353,196 8,891,634 8,598,427 7,219,314 234,245 260,489 312,902 1,667,687 4,072,113 95,781 57,159,757
Change from last month - 10,963 9,642 2,033,712 87 91,590 935 546 126,064 (1,194,080) 80,118 4,008,963
202402 PY Month End Balances 25,225,693 6,606,254 8,849,553 - 9,381,221 315,359 302,850 309,927 1,886,245 3,236,593 200,688 56,314,383
Change from PY Month 77,664 (3,242,095) 51,724 10,632,139 (2,161,821) 10,476 (41,426) 3,522 (92,495) (358,561) (24,790) 4,854,337
2024 12 PYE Balances 25,999,121 3,342,552 8,891,634 8,566,240 7,219,227 142,863 259,524 306 - 2,266,449 220,427 57,159,757
Change from PYE (695,764) 21,608 9,642 2,065,899 174 182,972 1,900 313,142 1,793,750 611,584 (44,529) 4,008,963
I:\Treasurers Report\2025\2025 5Treasurer's Re n\All Investments 202502 S55
Page 13 of 13
Page 52 of 68
AGENDA ITEM #13
Public Utility District m
MEETING DATE: May 7, 2025
TO: Board of Directors
FROM: Chad Reed, Water Utility Director
SUBJECT: Considering Review of the District's 2024 Water Utility Annual
Consumer Confidence Reports
APPROVED BY:
Brian C. Wright, General Manager
RECOMMENDATION:
Review the Truckee Donner Public Utility District's Main System and Hirschdale
System's 2024 Water Quality Consumer Confidence Reports and provide feedback to
staff.
BACKGROUND:
The Truckee Donner Public Utility District's mission is to "provide reliable, high-quality
utility and customer services while managing District resources in a safe, open,
responsible, and environmentally sound manner at the lowest practical cost."
Additionally, one of the goals outlined in the District's Strategic Plan is to "engage with
our customers and communities in a welcoming and transparent way to identify
opportunities."
Among the many services provided to our ratepayers, the District's annual Consumer
Confidence Reports (CCRs) on water quality play a crucial role in fulfilling this mission.
A 1996 amendment to the U.S. Environmental Protection Agency's Safe Drinking Water
Act (SDWA) mandates that urban water systems deliver an annual water quality report,
known as the Consumer Confidence Report. The CCR provides a summary of key
water quality information, including the source of the water, detected contaminants, and
compliance with regulatory standards.
Each year, the District prepares separate CCRs for the Truckee Main System and the
Hirschdale System. The State Water Resources Control Board (SWRCB) requires the
District to mail or directly deliver the appropriate report to each customer by July 1 .
However, since 2012, the SWRCB has permitted the District to provide customers with
notice and a direct, "one-click" web link to the CCR as an alternative to mailing a printed
copy.
ANALYSIS AND BODY:
Page 1 of 2
Page 53 of 68
The District's Water Department has prepared the 2024 Consumer Confidence Reports
(CCRs) for the Truckee Main System and the Hirschdale System (Attachments 1 and 2,
respectively). Each report will be submitted to the State Water Resources Control
Board (SWRCB) to ensure regulatory compliance.
The Truckee community benefits from a reliable and sustainable high-quality water
supply sourced from the Martis Valley Aquifer. This water meets all state and federal
drinking water standards, with no reportable violations exceeding the Maximum
Contaminant Level (MCL), as established and monitored by regulatory agencies such
as the U.S. Environmental Protection Agency (EPA) and the SWRCB (Safe Drinking
Water Act, 1996).
To ensure customer awareness, notifications regarding the CCR's availability will be
included in May water bills via a District bill insert or electronic notification. Customers
will be directed to access the report through a "one-click" link on the District's website.
Printed copies will also be available upon request.
GOALS AND OBJECTIVES:
District Code 1 .05.020 Objectives:
1. Responsibly serve the public.
3. Provide reliable and high quality water supply and distribution system to meet
current and future needs.
5. Manage the District in an environmentally sound manner.
District Code 1 .05.030 Goals:
1. Manage for Financial Stability and Resiliency
2. Environmental Stewardship: Create a sustainable resilient environment for all our
communities.
3. Engage with our customers and communities in a welcoming and transparent way to
identify opportunities.
FISCAL IMPACT:
The costs associated with preparing and distributing the 2024 Consumer Confidence
Reports (CCRs) are accounted for in the Board-approved Fiscal Year 2025 (FY25)
Water Operations Budget.
ATTACHMENTS:
1. 2024 Main System CCR
2. 2024 Hirschdale CCR
Page 2 of 2
Page 54 of 68
4 TRUCKEE DONNER
Public Utility District
2024 WATER QUALITY REPORT
Truckee Main System PWS# 2910003
Customer Views Are Welcome
For more information about
please visit our website
The Truckee Donner Public Utility District encourages community partici- us, at www.tdpud.org .
pation in the public process. If you are interested in participating in the
TDPUD's decision-making process, you are welcome to attend Board 0 0 0 01-10
Meetings.
The Board of Directors meets at 6:00 PM on the first and third Wednes-
day of each month in the TDPUD Board room, located at 11570 Donner In This Document
Pass Road, Truckee, California. Agendas for upcoming meetings may be
obtained on our website or from the Deputy District Clerk's office, (530) . Water Quality General
582-3980.
Information
For More Information: . Source Water Assessment
Where Our Water Comes
0 About this report or the water treatment process, contact Truckee From
Donner Public Utility District's Senior Water Quality Technician, Clay
Walker at (530)582-3926. Lead In Home Plumbing
0 About water conservation and efficiency, the TDPUD has water con- • Radon
servation programs that will help customers save water and save
money. Information can be found on our website or by calling (530) • Definitions
587-3896.
� 7
II.M1 lllill 1t11t1 11t11i ifii�ii iifi�r II iII Ili. 1f111r[a1Ta if+I111f[flJftjill.11 I
fJf Jid!1i€ ITAI►ffi!
E� � � I I llll ,.11:lll,l ll[lJl. Eilllt it i�� Illlll lililf will IIiEfl !11W 1ri��'Ininall null f: �^
Este informe contiene informacion muy importante sobre su agua potable. Traduzcalo o hable
con alguien que to entienda bien. Page 55 of 68
Water Quality
Truckee Donner Public Utility District(TDPUD) is dedicated to providing its cus-
tomers with the highest quality drinking water. Our water quality team works dili-
gently to exceed State and U.S. Environmental Protection Agency(USEPA)
standards. Each year,we collect and analyze 520 routine bac-t samples, along
with additional monitoring required under Title 22.All samples are tested by a
certified Environmental Laboratory Accreditation Program (ELAP)laboratory using
methodologies mandated by State and Federal regulations.This report provides a
snapshot of the water quality delivered to TDPUD customers in 2024. It includes
details about your local water sources,water monitoring data, and how it com-
pares to State and USEPA standards.We believe that well-informed customers
play a vital role in maintaining high drinking water standards.That's why we are
committed to transparency about your water supply and ongoing efforts to im-
prove its quality. It is important to note,that while the TDPUD meets all State and
Federal drinking water standards, certain individuals may be more vulnerable to
contaminants than the general population. People with weakened immune sys- Source Water
tems such as those undergoing cancer treatment, individuals who have received
organ transplants, people with HIV/AIDS or other immune disorders, some elderly Assessment
individuals, and infants, may be at a higher risk of infection.These individuals
should consult their healthcare providers for guidance on drinking water safety. A source water assessment was prepared in
For more information on reducing the risk of infection from Cryptosporidium and 2002 for the wells serving the Truckee area.
other microbiological contaminants, refer to guidelines from the USEPA and the The wells are located throughout the town of
Centers for Disease Control (CDC).You can access this information by calling the Truckee and Glenshire.The District owns
Safe Drinking Water Hotline at(800)426-4791 or visiting httl)s://www.epa.gov/ and operates 10 wells varying in depth from
120ft to 500ft. The complete source water
ground-water-and-drinking-water/safe-drinking-water-hotline. assessment and known vulnerabilities may
be viewed at the Truckee Donner Public
Utility District office, located at 11570 Donner
Lead in Residential Plumbing Pass Road, Truckee, California, or by calling
Chad Reed at(530)582-3984.
If present, elevated levels of lead in drinking water can pose serious health risks,
particularly for pregnant women and young children.When lead is detected, it
typically originates from materials and components in service lines and residential
plumbing rather than from the water source itself. While TDPUD ensures the de-
livery of high-quality water,we cannot control the plumbing materials used in pri-
vate properties. If water has been sitting in your pipes for an extended period, you
can reduce potential lead exposure by flushing your tap for 30 seconds to 2
minutes before using water for drinking or cooking. TDPUD conducts routine lead
sampling every three years.The most recent testing, performed in 2022,con-
firmed that all sampled sites were below the Federal action level for lead.The next
round of testing is scheduled for summer 2025. More information about lead in
drinking water,testing methods, and steps you can take to minimize exposure
visit www.epa.gov/lead.
Where Our Water Comes From
The drinking water supplied to Truckee Donner Public Utility District(TDPUD)
customers in the Truckee system comes from 10 deep groundwater wells.Thanks
to natural filtration,the underlying aquifer is well-protected from surface water Lead Line Service
contamination, ensuring a high-quality drinking water supply.
Inventory
Cryptosporidium and Giardia A lead service line material inventory was
Recognizing that our potable water sources are exclusively deep groundwater conducted and prepared in 2024 . There are
wells,the presence of microscopic organisms such as Cryptosporidium and Giar- no lead lines in the distribution system. A
dia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can detailed inventory is available here.
cause diarrhea,fever, and other gastrointestinal symptoms. https://www.tdpud.org/departments/water/
water-quality
Page 56 of 68
Arsenic
In 2001 the United States Environmental Protection Agency
(USEPA) implemented stricter standards for arsenic in drink-
ing water, reducing the maximum contaminant level (MCL)
from 50 parts per billion (ppb) to 10 ppb To put this into per- 7 `
spective, 1 ppb is equivalent to 1 second in 32 years—an ex- r ,
tremely small measurement. The drinking water provided by .,
Truckee Donner Public Utility District (TDPUD) meets all cur- "
rent Federal and State standards for arsenic. However, thef
USEPA continues to research the potential health effects of
prolonged exposure to low levels of arsenic, a naturally occur-
ring mineral linked to an increased risk of cancer, as well as
potential skin and circulatory issues.
Water Source Blending: The TDPUD operates the Glen-
shire Drive Well, Prosser Village Well and Old Greenwood
Well under a State Water Resources Control Board (SWRCB)
approved blending permit. This blending process helps re-
duce detectable arsenic concentrations before the water en- Water Hardness
ters the distribution system Recent arsenic monitoring results Occasionally, a water user will need to adjust an
from the blending point ranged from 4.6 ppb to 9.4 ppb, with appliance, such as a dishwasher or water sof-
an average of 7.1 ppb—well below the 10 ppb MCL set by the
USEPA. tener, to a particular setting based upon the
hardness of the water served to their home or
Radon business.
Radon is a radioactive gas that is colorless, tasteless, and Please use the information provided below to
odorless. It is found throughout the United States and can help with water hardness questions.
enter homes through cracks and openings in foundations,
accumulating indoors regardless of a home's age or con-
struction type. Radon can also be released into indoor air
from household water use, such as showering, washing
dishes, or other activities. However, compared to radon en-
tering through the ground, exposure from drinking water is Water Softener /Appliance Setting
far less common and occurs at much lower levels. Radon In 2022 testing, TDPUD had an average hard-
is a known human carcinogen, and long-term exposure to ness result of 71.0 mg/L. That translates to an
airborne radon has been linked to lung cancer. Drinking wa- average of 4.1 grains per gallon. One grain per
ter containing radon may also increase the risk of stomach gallon equals 17.1 mg/L.
cancer. If you are concerned about radon levels in your
home, testing is recommended. It is generally affordable and
easy to perform, and mitigation is advised for concentrations
exceeding 4 picocuries per liter (pCi/L) of air. Many radon Grains per Gallon ppm (or mg/
issues can be resolved with cost-effective solutions. For Degree of Hardness (gpg) Q
more information, contact:
Your State Radon Program (1-800-745-7236) Soft < 1.0 < 17.0
USEPA Safe Drinking Water Hotline (1-800-426-4791) Slightly Hard 1.0- 3.5 17.1-60
National Safety Council Radon Hotline (1-800-SOS- Moderately Hard 3.5 - 7.0 60- 120
RADON).
Hard 7.0- 10.5 120- 180
Very Hard > 10.5 > 180
age 57 01
Substances That Could Be In Water Definitions
Drinking water—whether from tap or bottled Maximum Contaminant Level (MCL): The highest
sources—comes from rivers, lakes, streams, level of a contaminant that is allowed in drinking wa-
ponds, reservoirs, springs, and wells. As wa- ter. Primary MCLs are set as close to the PHGs (or
ter moves across the land or through the MCLGs) as is economically and technologically fea-
ground, it can dissolve naturally occurring �,r sible. Secondary MCLs are set to protect the odor,
minerals and radioactive materials and may0 taste, and appearance of drinking water.
also pick up substances from human activi-
ties or animal presence. , Maximum Contaminant Level Goal (MCLG): The
level of a contaminant in drinking water below which
To ensure the safety of tap water, the U.S. � there is no known or expected risk to health. MCLGs
Environmental Protection Agency (USEPA) F
are set by the U.S. Environmental Protection Agency
and the State Water Resources Control (USEPA).
Board (State Board)establish regulations that
limit the presence of certain contaminants in Public Health Goal (PHG): The level of a contami-
public water systems. Similarly, State Board regulations set contaminant limits nant in drinking water below which there is no known
for bottled water to provide the same level of public health protection. or expected risk to health. PHGs are set by the Cali-
fornia Environmental Protection Agency.
It is important to note that all drinking water, including bottled water, may con-
tain small amounts of contaminants. However,their presence does not neces- Maximum Residual Disinfectant Level (MRDL):
sarily indicate a health risk. The highest level of a disinfectant allowed in drinking
water. There is convincing evidence that addition of
Contaminants that may be present in source water include: a disinfectant is necessary for control of microbial
Microbial Contaminants, such as viruses and bacteria, that may come from
contaminants.
sewage treatment plants, septic systems, agricultural livestock operations, and Maximum Residual Disinfectant Level Goal
wildlife; (MRDLG): The level of a drinking water disinfectant
below which there is no known or expected risk to
Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the
rally occurring or can result from urban stormwater runoff, industrial or domes-
tic wastewater discharges, oil and gas production, mining, or farming; use of disinfectants to control microbial contami-
nants.
Pesticides and Herbicides, that may come from a variety of sources such as Primary Drinking Water Standards (PDWS): MCLs
agriculture, urban stormwater runoff, and residential uses; and MRDLs for contaminants that affect health along
Organic Chemical Contaminants, including synthetic and volatile organic with their monitoring and reporting requirements, and
chemicals, which are by-products of industrial processes and petroleum water treatment requirements.
production, and which can also come from gas stations, urban stormwater Secondary Drinking Water Standards (SDWS):
runoff, agricultural applications, and septic systems; MCLs for contaminants that affect taste, odor, or
Radioactive Contaminants, that can be naturally occurring or can be the re- appearance of the drinking water. Contaminants with
sult of oil and gas production and mining activities. SDWSs do not affect the health at the MCL levels.
More information about contaminants and potential health effects can be Regulatory Action Level (AL):The concentration of
obtained by calling the USEPA's Safe Drinking Water Hotline at(800)426- a contaminant which, if exceeded, triggers treatment
4791. or other requirements that a water system must fol-
low.
Table Key
N/A: not applicable
N/D: not detectable at testing limit
ppm: parts per million or milligrams per liter(mg/L)
ppb: parts per billion or micrograms per liter(pg/1)
ppt: parts per trillion or nanograms per liter(ng/L)
pCi/L: picocuries per liter(a measure of radiation)
(pS/cm): micro Siemens per centimeter
Page 58 of 68
The data in the following tables is from the most recent monitoring done in compliance with Federal and California drink-
ing water regulations. Some data may be more than one year old. Based upon Federal and State requirements, the moni-
toring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annual-
ly, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies.
TABLE 1 - SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA
Highest No.
Microbiological Contam- No. of months in viola-
inants of Detec- tion MCL MCLG Typical Source of Bacteria
tions
More than 5%of Naturally present in the envi-
Total Coliform Bacteria 0 0 samples in a month 0 ronment
with a detection
TABLE 2 -DISINFECTION BYPRODUCTS
#Samples, Average MCLG Typical Source of Contami-
Contaminant Frequency Level Range MCL(MDRL) (MDRLG) nant
40-50 per Drinking water disinfectant
Chlorine Residual(ppm) month 0.38 .36-.42 4 4 added for treatment
By-product of drinking water
Haloacetic Acids(ppb) 2 on 8/21/24 1.1 0-2..2 60 N/A disinfection
Total Trihalomethanes By-product of drinking water
(ppb) 2 on 8/21/24 12.05 7.1-17 80 N/A disinfection
TABLE 3 -DISTRIBUTION CUSTOMER TAP SAMPLING FOR LEAD AND COPPER
No. of sam- 90th No. sites
Date Last percentile Typical Source of Contami-
Lead and Copper Sampled Ples collect- level de- exceeding AL PHG nant
ed tected AL
Internal corrosion of household
Lead(ppb) August 32 7.0 0 15 0.2 plumbing systems; discharges
2022 from industrial manufac-
tures,erosion of natural deposits
Internal corrosion of household
Copper(ppm) August 32 0.180 0 1.3 0.3 plumbing systems; erosion of
2022 natural deposits; leaching from
wood preservatives
Page 59 of 68
TABLE 4- LEAD SAMPLING FOR SCHOOL DISTRICT
No. of
Schools Re- No. sites
Contaminant Dated questing Range exceeding AL PHG Typical Source of Contami-
pleLead Sam- AL nant
pling
Internal corrosion of household
Lead(ppb) Dec-18 8 <0.2 0 15.0 0.2 plumbing systems; erosion of
natural deposits; leaching from
wood preservatives
TABLE 5- UNREGULATED COMPOUNDS
Chemical or Constituent Date Last Average Level Range of Detec- PHG Typical Source of Contami-
(reporting units) Sampled Detected tions MCL (MCLG) nant
Alkalinity(as CaCO3) 2022 77 69-88 N/A N/A Naturally present in water
(ppm)
Bicarbonate Alkalinity(as 2022 77 69-88 N/A N/A Naturally present in water
HCO3) (ppm)
Calcium(ppm) 2022 15 11-33 N/A N/A Naturally occurring
Potassium(ppm) 2022 3.3 2.1-8.3 N/A N/A Leaching of natural depo
TABLE 6 -DETECTION OF CONTAMINANTS PRIMARY DRINKING WATER STANDARD
Chemical or Constituent Date Last Average Level Range of Detec- MCL PHG Typical Source of Contami-
(reporting units) Sampled Detected tions (MCLG) nant
Arsenic (ppb) 2022 4.70 N/D - 10 10 0.004 Erosion of natural deposits
Barium(ppb) 2022 17.70 7.1-29 1000 2000 Erosion of natural deposits
Chromium, Total(ppb) 2022 0.50 N/D- 1.4 100 100 Erosion of natural deposits
Chromium,Hexavalent 2023 .8 .29-1.4 10 .1 Erosion of natural deposits
(ppb)
Fluoride(ppm) 2022 0.01 N/D - 0.63 2 1 Erosion of natural deposits
Runoff and leaching from ferti-
Nitrate as N(ppm) 2024 0.30 N/D - 0.50 10 10 lizer use; leaching from septic
tanks and sewage; erosion of
natural deposits
Turbidity(NTU) 2022 0.20 N/D - 0.45 5 5 Soil runoff
Gross Alpha Particle 2007-2018 0.7 N/D -4.6 15 0 Erosion of natural deposits
Activity(pCi/L)
Radon(pCi/L) 2004 90.8 N/D-560 N/A* N/A* Erosion of natural deposits
*Note The State of California does not have an MCL for Radon.The EPA has an advisory MCL of 4000
Page 60 of 68
TABLE 7 —DETECTION OF CONTAMINANTS SECONDARY DRINKING WATER STAND-
ARD
Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami-
(reporting units) Sampled tions (MCLG) nant
Chloride(ppm) 2022 11.7 1-62 250 N/A Leaching of natural deposits
Odor-Threshold(TON) 2022 0.4 N/D- 1 3 N/A Naturally-occurring organic
materials
pH 2O22 8.1 8-8.2 6.5 - 8.5 6.5 - 8.5 Leaching of natural deposits
Specific Conductance 2019 182 110- 380 1600 N/A Substances that form ions when
(µS/cm) in water.
Total Dissolved Solids 2019 122 110-230 500 N/A Leaching of natural deposits
(ppm)
TABLE 8 — Fifth Unregualted Contaminant Monitoring Rule (UCMR 5)
Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami-
(reporting units) Sampled tions (MCLG) nant
PFHxA 2023 .0006 N/D-.0044 N/A .003 Leaching of anthropogenic sub-
stance
PFPeA 2023 .0007 N/D-.0046 N/A .003 Leaching of anthropogenic sub-
stance
PFNA 2023 .0004 N/D-.0046 N/A .004 Leaching of anthropogenic sub-
stance
Lithium 2023 7.7 N/D-32 N/A 9 Naturally-occurring elements
Page 61 of 68
FREQUENTLY ASKED QUESTIONS
Q. Why does my water smell and taste like chlorine?
A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat-
ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste
may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate
through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger
than normal. Some people are more sensitive than others to the taste and smell of chlorine and may
become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni-
tored.
Q. Why does my water taste like metal?
A. The source water is ground water, which has a mineral content that might give off a metal taste
some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been
sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in
pipes for an extending period of time, however, this does not indicate a higher or lower degree of
water quality.
Q. Why is there white crust on my shower head?
A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower
doors. These spots are calcium deposits and are not harmful to health.
Q. Why is there a black ring around my toilet?
A. This black ring some may find after returning home when water has sat in the bowl for extend-
ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect
place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this,
leave a small amount of bleach in the bowl before leaving for more than a couple days.
Q. What clauses cloudy water?
A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water
main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air,
similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be-
come clear.
age 2 of 68
' TRUCKEE DONNER
Public Utility District
2094 WAT�B QWAWTY B�PORT
Customer Views Are Welcome
The Truckee Donner Public Utility District encourages community partici-
pation in the public process. If you are interested in participating in the
TDPUD's decision-making process, you are welcome to attend Board
Meetings. _
The TDPUD Board of Directors meets at 6:00 PM on the first and third --•� .3
Wednesday of each month in the TDPUD Board room, located at 11570
Donner Pass Road, Truckee, California. Agendas for upcoming meetings -- z
may be obtained on our website or from the Deputy District Clerk's office, ''
(530)582-3980. c>
For More Information:
0 About this report or the water treatment process, contact Truckee / � 1J1/l
Donner Public Utility District's Senior Water Quality Technician, Clay For more
Walker at (530)582-3926. information about
us,please visit our
0 About water conservation and efficiency, the TDPUD has water website at
conservation programs that will help customers save water and save www.tdpud.org .
money. Information can be found on our website or by calling (530)
587-3896. 11111144
HIRSCHDALE
WATER SYSTEM �� In This Document
. Water Quality General Information
• Source Water Assessment
. Where Our Water Comes From
■ ,� • Lead In Drinking Water
Definitions
s i
•� f Sampling Results
. . bien.
Page 63 of 68
Water Quality �r
Truckee Donner Public Utility District (TDPUD) is committed to delivering high
quality drinking water to its customers. Our water quality team strives to exceed 7 t
State and U.S. Environmental Protection Agency(USEPA)standards by conducting
12 routine bacteriological samples annually, along with additional monitoring re-
quired under Title 22.All samples are analyzed by a certified Environmental Labora-
tory Accreditation Program (ELAP) laboratory using methodologies mandated by ='
State and Federal regulations. This report provides a snapshot of the water quality h- "---
delivered to TDPUD customers in 2024. It includes details about local water - •• _ __
sources, annual water quality sampling data, and how our water compares to State
and USEPA standards. We believe that well-informed customers play a crucial role
in maintaining high drinking water standards. That's why TDPUD is dedicated to
transparency and communication about your water supply. It is important to note R
that while TDPUD meets all State and Federal drinking water standards, some indi-
viduals may be more vulnerable to contaminants than the general population.Those
at higher risk include immunocompromised individuals—such as cancer patients
undergoing chemotherapy, organ transplant recipients, people with HIV/AIDS or Source Water
other immune disorders, some elderly individuals, and infants. These individuals
Assessment
should consult their healthcare providers for guidance on drinking water safety.
A source water assessment has been
For more information on reducing the risk of infection from Cryptosporidium and completed for the well serving the
other microbiological contaminants, refer to guidelines from the USEPA and the Hirschdale area. The well is located in the
Centers for Disease Control (CDC). You can access this information by calling the town of Hirschdale. The District owns and
Safe Drinking Water Hotline at (800) 426-4791 or visiting https://www.epa.gov/ operates the single well which is 270ft in
ground-water-and-drinking-water/safe-drinking-water-hotline. depth. A copy of the complete assessment
may be viewed at the Truckee Donner
Public Utility District office, located at 11570
Lead in Residential Plumbing Donner Pass Road, Truckee, California, or
by calling Chad Reed at(530)582-3984.
Elevated levels of lead in drinking water can pose serious health risks, particularly
for pregnant women and young children. When lead is detected, it typically origi-
nates from service lines and residential plumbing materials, rather than from the
water source itself. While Truckee Donner Public Utility District (TDPUD) provides
high-quality water, we cannot control the plumbing materials used in private proper-
ties. If water has been sitting in your pipes for an extended period, you can reduce • , I 4
potential lead exposure by flushing your tap for 30 seconds to 2 minutes before ~ -
using it for drinking or cooking. TDPUD conducts lead testing every three years. i The most recent sampling, performed in 2022, confirmed that all tested sites were
below the Federal action level for lead. For more information on lead in drinking
water, testing methods, and ways to minimize exposure,visitwww.epa.gov/lead. ..
Where Our Water Comes From
The drinking water supplied to our Hirschdale customers comes from a deep aquifer Lead Line Service
well. Before reaching your home, this water is filtered to remove iron, manganese,
and arsenic, ensuring its safety and quality.Thanks to natural filtration,the ground- Inventory
water aquifer is well-protected from surface water contamination, providing a high-
quality drinking water supply. A lead service line material inventory was
conducted and prepared in 2024 . There are
no lead lines in the distribution system. A
Cryptosporidium and Giardia detailed inventory is available here.
Recognizing that our potable water sources are exclusively drawn from a deep
groundwater well, the presence of microscopic organisms such as Cryptosporidium
and Giardia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia
can cause diarrhea,fever, and other gastrointestinal symptoms.
Page 64 of 68
Substances That May Be Found In Water Definitions
Drinking water sources—both tap and bot- (MCL): The highest
tled—include rivers, lakes, streams, ponds, level of a contaminant that is allowed in drinking water.
reservoirs, springs, and wells. As water Primary MCLs are set as close to the PHGs (or MCLGs)
moves over land or through the ground, it as is economically and technologically feasible.
dissolves naturally occurring minerals and, in Secondary MCLs are set to protect the odor, taste, and
some cases, radioactive materials, and can appearance of drinking water.
also pick up substances from animals or hu-
man activities. (MCLG): The level
of a contaminant in drinking water below which there is
To ensure the safety of tap water, the U.S. x no known or expected risk to health. MCLGs are set by
Environmental Protection Agency (USEPA) the U.S. Environmental Protection Agency(USEPA).
and the State Water Resources Control _
Board (State Board) establish regulations ,f� (PHG): The level of a contaminant
that limit the amount of certain contaminants in drinking water below which there is no known or
in water provided by public systems. While drinking water, including bottled expected risk to health. PHGs are set by the California
water, may contain small amounts of some contaminants, the presence of Environmental Protection Agency.
many contaminants does not necessarily mean the water poses a health risk. ■
I (MRDL): The
highest level of a disinfectant allowed in drinking water.
There is convincing evidence that addition of a
Examples of contaminants that may be present in source water include: disinfectant is necessary for control of microbial
contaminants.
Microbial Contaminants, such as viruses and bacteria, that may come from
stormwater or wastewater, septic systems, agricultural livestock operations, ORP
and wildlife; (MRDLG): The level of a drinking water disinfectant
below which there is no known or expected risk to
Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the use of
rally occurring or can result from erosion, urban stormwater runoff, industrial or disinfectants to control microbial contaminants.
domestic wastewater discharges, oil and gas production, mining, or farming;
(PDWS): MCLs
Pesticides and Herbicides, that may come from a variety of sources such as and MRDLs for contaminants that affect health along
agriculture, urban stormwater runoff, and residential uses; with their monitoring and reporting requirements, and
Organic Chemical Contaminants, including synthetic and volatile organic water treatment requirements.
chemicals, which are by-products of industrial processes and petroleum Secondary Drinking Water Stand, (SDWS): MCLs
production, and which can also come from gas stations, urban stormwater for contaminants that affect taste, odor, or appearance
runoff, agricultural applications, and septic systems; of the drinking water. Contaminants with SDWSs do not
Radioactive Contaminants, that can be naturally occurring or can be the affect the health at the MCL levels.
result of oil and gas production and mining activities. (AL): The concentration of a
More information about contaminants and potential health effects can be contaminant which, if exceeded, triggers treatment or
obtained by calling the U.S. EPA's Safe Drinking Water Hotline at (800) 426- other requirements that a water system must follow.
4791. I
Table Key
N/A: not applicable
N/D: not detectable at testing limit
ppm: parts per million or milligrams per liter(mg/L)
zk
ppb: parts per billion or micrograms per liter(pg/L)
ppt: parts per trillion or nanograms per liter(ng/L)
pCi/L: picocuries per liter(a measure of radiation)
(pS/cm): micro Siemens per centimeter
(NTU): nephelometric turbidity unit(measures water cloudiness)
Page 65 of 68
The data in the following tables is from the most recent monitoring done in compliance with Federal and California drinking
water regulations. Some data may be more than one year old. Based upon Federal and State requirements,the monitoring
interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annually, biennially,
or once every three, six, or nine years, or as deemed necessary by regulatory agencies.
TABLE 1—SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA
Microbiological Contami- Highest No. No.of months in
nants of Detec- violation MCL MCLG Typical Source of Bacteria
tions
More than 5%of samples
Total Coliform Bacteria 0 0 in a month with a detec- 0 Naturally present in the environment
tion
TABLE 2—DISINFECTION BY-PRODUCTS
Contaminant #Samples, Average Range MCL(MRDL) MCLG Typical Source of Contaminant
Frequency Level (MRDLG)
Chlorine Residual(ppm) 1 per month 0.48 .40-.56 4 4 Drinking water disinfectant added for
treatment
Total Trihalomethanes 1 on 24 N/A 80 N/A By-product of drinking water
(ppb) 8/21/24 disinfection
Haloacectic Acids(ppb) 1 on 3.2 N/A 60 N/A By-product of drinking water
8/21/24 disinfection
TABLE 3—DISTRIBUTION SYSTEM CUSTOMER TAP SAMPLING FOR LEAD AND COPPER
90th per-
No.of No.sites
Date Last centile
Lead and Copper Sampled samples level de- exceeding AL PHG Typical Source of Contaminant
collected tected AL
Internal corrosion of household water
Lead(ppb) 8/11/22 5 .02 0 15 0.2 plumbing systems;discharges from
industrial manufacturers;erosion of
natural deposits
Internal corrosion of household
Copper(ppm) 8/11/22 5 0.046 0 1.3 0.3 plumbing systems;erosion of natu-
ral deposits;leaching from wood
preservatives
TABLE 4—SAMPLING RESULTS FOR SODIUM AND HARDNESS
Chemical or Constituent Date Last Level De- PHG
(reporting units) Sampled tected Range of Detections MCL (MCLG) Typical Source of Contaminant
Sodium(ppm) 2022 40 N/A N/A N/A Salt present in the water and is general-
ly naturally occurring
Sum of polyvalent cations present
Hardness(as CaCO3)(ppm) 2022 91 N/A N/A N/A in the water,generally magnesium
and calcium,and are usually natu-
rally occurring
TABLE 5- UNREGULATED COMPOUNDS
Chemical or Constituent Date Last Range of Detec- PHG
(reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant
Alkalinity(as CaCO3)(ppm) 2022 150 N/A N/A N/A Erosion of natural deposits
Bicarbonate Alkalinity(as 2022 180 N/A N/A N/A Leaching of natural deposits
HCO3)(ppm)
Calcium(ppm) 2022 15 N/A N/A N/A Erosion of natural deposits
Magnesium(ppm) 2022 13 N/A N/A N/A Erosion of natural deposits
Potassium(ppm) 2022 7.1 N/A N/A N/A Erosion of natural deposits
Page 66 of 68
_ TABLE 6—DETECTION OF CONTAMINANTS WITH A PRIMARY DRINKING WATER STANDARD
Chemical or Constituent Date Last Range of Detec- PHG
(reporting units) Sampled Level Detected tiions MCL (MCLG) Typical Source of Contaminant
Inorganic Contaminants
Arsenic(ppb) 2023 .63 N/D-1.8 10 0.004 Erosion of natural deposits
Barium(ppm) 2022 87 N/A 1000 2000 Erosion of natural deposits
Fluoride(ppm) 2022 0.096 N/A 2 1 Erosion of natural deposits
Turbidity(NTU) 2022 3 N/A 5 5 Soil runoff
Radioactive Contaminants
Gross Alpha Particle 2018 N/D 3 15 0 Erosion of natural deposits
Activity(pCi/L)
Radon(pCi/L) 2005 570 N/A N/A* N/A* Erosion of natural deposits
*Note The State of California does not have an MCL for Radon. The EPA has an advisory MCL of 4000 pCi/L
for Radon.
TABLE 7—DETECTION OF CONTAMINANTS WITH A SECON NDAR
Chemical or Constituent Date Last Range of Detec- PHG
(reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant
Chloride(ppm) 2022 7.6 N/A 250 N/A Leaching of natural deposits
Iron(ppb) 2022 9.5 N/A 300 N/A Leaching of natural deposits
Manganese(ppb) 2022 13 N/A 50 N/A Leaching of natural deposits
pH 2O22 7.9 7.7- 8.0 6.5- 8.5 N/A Erosion of natural deposits
Specific)Conductance 2022 350 N/A 1600 N/A Substances that form ions when in
(µS/cm
Sulfate 2022 14 N/A 250 N/A Leaching of natural deposits
Total Dissolved Solids 2022 250 N/A 500 N/A Leaching of natural deposits
(ppm)
Page 67 of 68
FREQUENTLY ASKED QUESTIONS
Q. Why does my water smell and taste like chlorine?
A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat-
ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste
may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate
through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger
than normal. Some people are more sensitive than others to the taste and smell of chlorine and may
become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni-
tored.
Q. Why does my water taste like metal?
A.The source water is ground water, which has a mineral content that might give off a metal taste
some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been
sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in
pipes for an extending period of time, however, this does not indicate a higher or lower degree of wa-
ter quality.
Q. Why is there white crust on my shower head?
A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower
doors. These spots are calcium deposits and are not harmful to health.
Q. Why is there a black ring around my toilet?
A. This black ring some may find after returning home when water has sat in the bowl for extend-
ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect
place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this,
leave a small amount of bleach in the bowl before leaving for more than a couple days.
Q. What clauses cloudy water?
A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water
main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air,
similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be-
come clear.
Page 68 of 68