Loading...
HomeMy WebLinkAboutAgenda Packet 2025_0507 Board of Directors General Manager Jeff Bender • Brian C. Wright Christa Finn Executive Leadership Tony Laliotis Chad J. Reed Courtney Murrell Jared Carpenter Steve Randall REGULAR BOARD MEETING Mike Swanson 11570 DONNER PASS ROAD, TRUCKEE Michael Salmon 6:00 PM, Wednesday, May 7, 2025 Steven Poncelet AGENDA Scott Crow Jillian Steward Martina Rochefort 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Changes to the agenda 5. Public Comment— This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that that item is considered. (The public may comment on any subject that is not on the agenda. Each speaker will be limited to three minutes, but speaker time may be reduced at the discretion of the Board President if there are a large number of speakers on any given subject.) DIRECTOR UPDATE 6. This item provides time for Directors to comment on any item within the purview of the District. DEPARTMENT UPDATES 7. This item provides time for each Department to update the Board of Directors. PUBLIC HEARING 8. Public Hearing Related to Adoption of the Annual Electric and Water Standby Charges A. Conduct a public hearing at the regularly scheduled District Board Meeting on May 7, 2025, at 6:OOPM, or as soon thereafter, to receive input on the adoption of annual Electric and Water Standby Charges; and B. Adopt the following resolutions: a ASPEA I P%UL LEADERSHIP FaUN.�i...I..I ON® 11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.org Page 1 of 68 1. Resolution 2025-09 Continuing and Fixing Electric Standby Charges for the Fiscal Year 2025-2026; 2. Resolution 2025-10 Continuing and Fixing Water Standby Charges for the Fiscal Year 2025-2026; 3. Resolution 2025-11 Requesting Collection of Electric and Water Standby Charges on County of Nevada Tax Roll; and 4. Resolution 2025-12 Fixing and Placing Electric and Water Standby Charges on Placer County Tax Roll for Collection. 9. Public Hearing Related to the Adoption of an Ordinance Authorizing the Board to Appoint and Establish Compensation for Officers of the District by Resolution A. Conduct a Public Hearing regarding Ordinance No. 2025-01; B. Adopt Ordinance No. 2025-01 approving the process for appointing and establishing compensation for officers of the District CONSENT CALENDAR 10. Consideration to increase the 2025 Annual Authorization for Electric Engineering Consulting Services Authorize the General Manager to execute a professional services contract amendment for an additional authorization amount of $423,000 with NV5 for engineering consulting services for a total FY25 not-to-exceed contract amount of $673,000. 11. Approval of Minutes Approval of April 2, 2025 Regular Meeting and April 3, 2025 Special Meeting Minutes 12. Consider Approval of the Treasurer's Report, May 2025 Approve the Treasurer's Report for May 2025 which includes: a. Fund Balances for the Month of February 2025 b. Disbursements for the Month of March 2025 WORKSHOP 13. Considering Review of the District's 2024 Water Utility Annual Consumer Confidence Reports Page 2 of 68 Review the Truckee Donner Public Utility District's Main System and Hirschdale System's 2024 Water Quality Consumer Confidence Reports and provide feedback to staff. CLOSED SESSION 14. Closed Session Pursuant to Government Code Section 54957 Public Employee General Manager's Performance Plan Review. 15. Closed Session Pursuant to Government Code Section 54957.6 Conference with Labor Negotiator Agency Negotiator(s): Board President Christa Finn, Board Vice President Tony Laliotis Unrepresented Employee: General Manager ADJOURNMENT The agenda is available for review at the TDPUD Administrative Office and the District's internet website. Posted on Friday, May 2, 2025. Martina Rochefort, District Clerk A copy of the agenda packet is available for public review, during normal business hours, at the District Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the Districts public meetings. If particular accommodations for the disabled are needed (i.e. disability-related aids, or other services), please contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the meeting. Any person with a disability may submit a request for reasonable modification or accommodation to the above-described means for accessing and offering comment at the meeting to Martina Rochefort, District Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request. Page 3 of 68 AGENDA ITEM #7 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: SUBJECT: This item provides time for each Department to update the Board of D i recto rs. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: BACKGROUND: ANALYSIS AND BODY: Water Department Update General Update As we head into summer, construction activities will begin ramping up across the District starting in May. Key projects this season include: • Sierra Meadows Repiping Project—A full-scale replacement of aging pipeline infrastructure is slated to begin early summer. • Tahoe Donner Small Diameter Pipe Project— One localized upgrade to address aging pipeline and long-term system performance. • Completion of the 2024 Water Tank Project—This major capital improvement will be finalized, enhancing water storage capacity and system reliability in the upper pressure zones. These projects are essential to continuing our long-term commitment to reliable service, infrastructure resilience, and safe water delivery to our customers. Water Operations This summer, our Operations team will be focusing on inspection, maintenance, and replacement of Cla-Val control valves throughout the system. What is a Cla-Val? Cla-Vats are automatic control valves that regulate flow and pressure in the distribution system. They respond to hydraulic pressure changes and are commonly used to: Page 1 of 9 Page 4 of 68 • Maintain pressure zones • Reduce or relieve pressure • Automatically shut off flow during emergency conditions • Prevent backflow and manage tank levels Picture Caption: The picture shows one of four Cla-Vals at Joe Aguera Pump Station. This valve was put there to hold pressure back till the pump is producing adequate press and slowly stops the flow (no hammer)when the run time has concluded. Cla-Vals are essential for protecting system integrity and ensuring consistent service to customers in varying elevations. There will be full replacement of all three pump control valves at Richards Booster Station and 6 rebuilds of pump control valves at other stations. Also we will be rebuilding and or replacing PRV valves in Glenshire and Donner lake for scheduled maintenance and improvements. This is all scheduled maintenance and station improvements. Due to an early surge in demand—particularly from local golf courses—we've brought several of our seasonal wells online ahead of schedule. Our water operations team is working closely with both our field crews and water quality staff to ensure each startup is performed safely and in full compliance with regulatory standards. We appreciate everyone's coordination and commitment during this accelerated timeline. We're also pleased to report that the Martis Valley well motor rebuild has been successfully completed. The well has been returned to service and is performing as expected. Work on Well 20 is currently underway. At this stage, we anticipate it will be back online and operational by early summer. Our team will continue to monitor progress closely and provide updates as we move forward. In addition, upgrades to the Red Mountain fire flow infrastructure are nearing completion. Once finalized and commissioned, the improved system will be placed into service, enhancing fire protection capacity in the area. We're grateful for the collaboration and dedication across all departments as we manage these critical early-season demands. Water Distribution The Distribution crew continues to work diligently with routine and specialized system maintenance: • Valve Turning Program —Ongoing valve exercise is crucial to ensure operability in emergency situations and supports system optimization. Page 2 of 9 Page 5 of 68 • Olympic Heights Flushing and Valve Installations—A significant flushing effort will be underway this summer, along with the installation of several new valves and blow-offs to enhance flow control and water quality. • Leak Repairs & System Response—The team continues to respond quickly and efficiently to system leaks and maintenance needs, maintaining our high standard of service reliability. Picture Caption: Water Departments Distribution crew locating and fixing a deep leak on East Alder Creek. Their consistent performance and dedication are critical to our day-to-day operations. Water Quality The Water Quality team will be conducting Lead and Copper Rule (LCR) sampling this season. This is part of our compliance with EPA and State guidelines to ensure continued safe drinking water. Sampling Process Overview: • The District works with selected Tier 1 residences (typically built between 1983-1987)that meet LCR criteria. • Customers are provided with bottles and instructions to collect first-draw samples after water has been stagnant for at least 6 hours. • Samples are analyzed at a certified lab, and results are reported to both customers and regulatory agencies. In addition, our Cross-Connection Control Program continues with field inspections and coordination with customers and businesses to prevent backflow incidents. Meter Maintenance &Water Loss The Meter Maintenance and Water Loss team is actively addressing both efficiency upgrades and non-revenue water: • New 6" Caltrans Meter— Scheduled for installation on May 3rd, this will improve metering accuracy for high-volume usage. • Leak Correlation Program — Using acoustic listening devices and software, we've completed the Prosser neighborhood and identified 4 potential leaks (2 confirmed) and 2 more in Sierra Meadows. • Glenshire Meter Exchange—Set to begin in the coming weeks. Customers will be notified via door knocks for brief 10-minute outages during exchanges. • MTU and Meter Replacements— Field staff will continue replacing non-functioning units. Customers may see us accessing meter boxes and providing brief notice. Page 3 of 9 Page 6 of 68 • Power BI Water Loss Dashboard — Pano Valcanas and Austin are developing a real-time visualization tool that will help analyze high-risk areas for leaks and inefficiencies, improving our decision-making and response capabilities. Electric Engineering & Operations As we approach summer, wildfire mitigation and system reliability continue to be primary strategic focuses for the Electric Engineering and Operations teams. The following summarizes key initiatives currently underway: Engineering Martis Valley Substation Rebuild The bid package for the civil construction phase of the Martis Valley Substation Rebuild has been completed and released. We anticipate receiving contractor bids by the end of May. Concurrently, securing all required permits and regulatory approvals remains a high-priority effort to ensure the project remains on schedule. Wildfire Mitigation Design The engineering team is actively evaluating and implementing hardened system designs to enhance resilience. These efforts include the deployment of:Ductile iron poles • Covered conductors • Composite and fiberglass cross arms This construction strategy is aligned with industry best practices and has been widely adopted by peer utilities as an effective means of reducing wildfire ignition risk. 's Operations Tahoe Donner— Mogul Lane Flat-Top Project Line crews are currently executing a transition from vertical to flat-top construction in the Tahoe Donner area. This configuration is expected to significantly improve service reliability. Idle Line Removal Sections of idle distribution line are being removed. This work supports wildfire risk reduction, improves system reliability, and will yield long-term cost savings by reducing vegetation management requirements. Vegetation Management Hazard Tree Removal & Facility Clearing Targeted hazard tree removal and vegetation clearing around critical electric facilities continue to be a central element of our wildfire mitigation strategy. These activities are being carried out in coordination with local agencies and in adherence to regulatory standards. Page 4 of 9 Page 7 of 68 Information Technology On April 24, 2025, the District proudly hosted TNT Tech Teens, a workforce initiative designed to introduce Truckee and North Tahoe students to the diverse range of technology-driven careers in our region. This free seven-week series, which runs from March 27 to May 16, provides high school students with valuable insights into various technology sectors and their real-world applications. By fostering community engagement, building connections with future talent, and equipping students with modern skills, the program benefits both participants and Truckee agencies alike. During our day at the District, we showcased how technology plays a vital role in Electric and Water Utilities and how IT (Information Technology) supports these innovations. Students explored key concepts such as engineering, AMI (Advanced Metering Infrastructure), water leak detection, SCADA (Supervisory Control and Data Acquisition), a more technical adaptation of our"Learn or Burn" demonstration, and students were involved in discussions of pathways for Electric and Water Engineering and Operations careers. Additionally, we introduced them to the devices used for network communication and our fiber infrastructure. The day concluded with an overview of IT career opportunities within the District, offering a glimpse into the impactful roles that support our mission. Feedback from students and representatives of other public agencies has been overwhelmingly positive, highlighting the value of this experience. We extend our gratitude to our dedicated staff as well as staff from participating agencies who contributed to the event and to the Truckee Chamber of Commerce for their leadership in organizing and administering this outstanding program. Administration • Customer service scores for entire year 2024 are presented below Overall,how satisfied were you with the experience with How much time did it take us to address your questions our customer support? and concerns? Answered:510 Skipped:0 Answered:508 Skipped:2 100% 100% 90% 90% 00°0 00% 70% 70 GM 60"b sm 50% 40% 40% 30% 0% 2� � 2� 1d% 1❑^/0 Extremely Very Net ao Not at all Muchahorter Shorterthan Aboet what Longerthan Mechlonger u1i,4ed as Mi d a ,Aed ­iaeed aat'ufied than expected expected expected expected than expected Please categorized the reason(s)for your service call Was your issue completely resolved? Anawered:394 Skipped:116 Answered:504 Skipped:6 t00% 90% 80% 70% 60% Yea 50% 40% 30% 20% 10% 111111111111111 No 0% Billing Payment New Power Water leak New qu estlon We'd n Service ar eukage Commercial Stop Service 0% 10% 20% 30% 40% 50% 60% 70% 801A 90% 100% service_. • Purchasing and Warehouse - Part of the Month - Page 5 of 9 Page 8 of 68 o 3 phase transformer bracket assemblies MFR: Scott Manufacturing Solutions Item No: 524-P QTY: 5 Cost: $1,409.30/each Lead Time: 8-10 weeks This style of transformer bracket was specifically requested by the line crew vs. other circular bracket designs. The main reason this style was requested relates to incidental wiring clearance. Incidental wiring clearance refers to the specific requirements for maintaining safe distances when working near or around electrical conductors. Ab k a_ • Finance and Accounting o Auditors completed fieldwork on April 10th, as scheduled. o The Annual Comprehensive Financial Report (ACFR) draft was provided to auditors on April 23rd, as scheduled. o Completion of audit and ACFR on schedule for review/release at the June 4th Board meeting • Facilities & Fleet o Planning fleet replacements, water tank paintings, and asphalt repairs o Completed decommissioning of EV charging stations o Water Operations garage paint project completed o FleetSoft Truck Tracker software upgrade completed, thank you to IT for the assistance Human Resources and Risk Staffing Congratulations to Casey Chavez for his promotion to Electric Foreman Welcome seasonal Water Helpers - Kenny Johnson and Luis Aguilar Current Job Openings: Customer Service Representative - Interviews in process Culture 5/05 - Cinco De Mayo Potluck/Birthday and Anniversary Celebration Recognition Page 6 of 9 Page 9 of 68 James Flowers - Safety Clayton Wise -Accountability Staff Development 4/29 - Leadership Meeting - Collaboration Training 5/28/25 -All Staff Meeting 5/29 - GM Quarterly Lunch Safety & Risk • In April our Risk and Compliance Program Manager attended the NRECA Safety Leadership Summit • 2025 Quarter 1 incidents down 12.5%from Quarter 1 in 2024 • 4/30-Safety Committee Meeting • 5/01/25 - Burn Kit Training with Truckee Fire • 5/06-5/07 - HAZWOPER Refresher Training PIO and Strategic Affairs NCPA/NWPPA Federal Policy Conference & Advocacy, Visits: Almost 60 members of the Northern California Power Agency (NCPA) and the Northwest Public Power Association (NWPPA), including District staff, traveled to Washington DC for the annual conference and advocacy visit. The event started with a full day conference that included Scott Corwin, President of the American Public Power Association (APPA), Jim Robb, President and CEO, North American Electric Reliability Corporation, key House and Senate staff who talked about energy policy priorities on the 119th Congress including Federal wildfire challenges, and Sushan Demirjian, Assistant US Trade Representative for Small Business, Market Access, and Industrial Competitiveness, impacts of tariff policies on trade. District staff then participated in three full days of meeting on Capitol Hill with key regulatory agencies. Meetings were held with the offices of the District's Federal representatives (Senator Padilla, Senator Schiff, and Congressman Kiley). The District played a key role in the meeting with the office of Congressman Kiley engaging with the Chief of Staff Bob Holste. The Key topic was the District's resolution on the impacts of Federal cuts to forest health and wildfire mitigation and how we could best work with their office to share and address concerns. Staff participated in multiple meetings with Federal Energy Regulatory Commission (FERC) commissioners including a productive meeting with Chairman Christie where the Pathways Initiative (regionalization) was front and center. District staff also met with key staff and leaders from NERC, the Department of Energy (DOE) Grid Deployment Office, and the United States Forest Service (USFS). This was a critical time in Washington DC as the Trump administration hit the 100-day mark and significant changes are occurring. General Manager's Office Page 7 of 9 Page 10 of 68 • The District participated in meetings with multiple local public agencies including Truckee Tahoe Airport and Tahoe Truckee Sanitation Agency evaluating opportunities for local/community solar generation projects. Staff continues to explore opportunities to meet the needs for local clean generation resources in alignment with the District's Integrated Resource Plan. These projects also include battery energy storage systems (BESS), demand response (behind the meter) energy efficiency programs. • In early April, the GM and Staff attended the California Municipal Utilities Associations 2025 Annual Conference in Anaheim, CA. General Manager Wright participated as a speaker on a strategic issues panel alongside Amy Zubaly, Executive Director of Florida Municipal Electric Association (FMEA), Mona Freels, Executive Director fo the Office of Emergency Management for Los Angeles Department of Water and Power (LADWP), and Lori Nezhura, Deputy Director of Planning, Preparedness and Prevention with California Offices of Emergency Services (CaIOES). The strategic panel facilitated discussions on the critical components of emergency and disaster preparedness, reflecting on lessons learned and future opportunities for public water and electric utilities. While the representatives from LADWP and Cal OES were able to bring first-hand experience and knowledge gained from emergency declarations across the state (Palisades Fire, Camp Fire, earthquakes, etc), the District brought valuable insights on experiences gained through winter weather events and wildfire preparedness from the perspective of smaller public utilities that may not have the resources made available to larger entities. • On May 1st, GM Wright and Staff hosted a meeting with the California Air Resources Board (CARB) to discuss the District's continuing concerns regarding the economic and operational impacts of the recently implemented Advance Clean Fleet (ACF) Rule. The meeting provided opportunities to discuss directly with CARB staff the anticipated impacts of ACF on public utilities in the Sierra Nevada, the issues not addressed by the provisions proposed in AB 1594 and future compliance for the District. • The District submitted District Resolution No. 2025-06 to Congressman Kevin Kiley, Congressman Doug LaMalfa, Senator Adam Schiff and Senator Alex Padilla along with a cover letter co-signed with support from Lassen Municipal Utility District, Plumas Sierra Rural Electric and Plumas Slerra Telecommunications documenting the concerns for actual and potential catastrophic impacts to local forest health and wildfire mitigation efforts resulting from the recent federal funding cuts. The District adopted Resolution No. 2025- 06 on March 12, 2025, in support of a local collaborative voice from several Page 8 of 9 Page 11 of 68 public agencies across the Northern Sierra. The District's resolution and cover letter identified several federally funded programs associated with public utility forest health and wildfire mitigation initiatives that will result in significant negative impacts if cut. In addition to the resolution and cover letter, staff met with Congressman Kiley's office in Washington DC while attending the Northern California Power Agency (NCPA) Federal Energy Policy Forum. GOALS AND OBJECTIVES: FISCAL IMPACT: ATTACHMENTS: None Page 9 of 9 Page 12 of 68 AGENDA ITEM #8 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager SUBJECT: Public Hearing Related to Adoption of the Annual Electric and Water Standby Charges APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: A. Conduct a public hearing at the regularly scheduled District Board Meeting on May 7, 2025, at 6:OOPM, or as soon thereafter, to receive input on the adoption of annual Electric and Water Standby Charges; and B. Adopt the following resolutions: 1. Resolution 2025-09 Continuing and Fixing Electric Standby Charges for the Fiscal Year 2025-2026; 2. Resolution 2025-10 Continuing and Fixing Water Standby Charges for the Fiscal Year 2025-2026; 3. Resolution 2025-11 Requesting Collection of Electric and Water Standby Charges on County of Nevada Tax Roll; and 4. Resolution 2025-12 Fixing and Placing Electric and Water Standby Charges on Placer County Tax Roll for Collection. BACKGROUND: It is the Board's purview to conduct public hearings. At the April 2, 2025, meeting, the Board set a public hearing to be held on May 7, 2025, to receive written and oral comments from the public regarding the adoption of certain resolutions establishing/continuing and collecting electric and water standby charges for the 2025- 2026 property tax year. The Public Hearing was advertised in the Sierra Sun Newspaper on April 11 and 18, 2025. Board action is required to adopt electric and water standby charges for the 2025-2026 property tax year. This process begins by scheduling a public hearing to renew the existing electric and water standby charges. Each year, the Board is required to adopt resolutions establishing and setting electric Page 1 of 3 Page 13 of 68 and water standby charges, and to request Nevada and Placer Counties collect the charges as part of the annual property tax bills. Standby charges have been assessed on vacant parcels in the District since 1975. These annual charges recoup the District's operating and maintenance costs of the electric and water distribution facilities from parcel owners, who benefit from their vacant lot being in close proximity to the distribution facilities. ANALYSIS AND BODY: The current Electric Standby Charge applies to vacant parcels with a District electric distribution line installed along an easement or along a public road or right of way, within 200 feet of the nearest exterior boundary line of any such parcel. The Electric Standby Charge is $20.00 per year for each parcel 1 acre or larger, or $10.00 per year for each parcel less than 1 acre. The current Water Standby Charge applies to vacant parcels with a District water distribution line not less than two inches in diameter installed within 100 feet of the nearest exterior boundary line of any such parcel. The current Water Standby Charge is $80.00 per parcel per year. Standby rates have not been modified in many years. No changes to Standby Charge rates is recommended for 2025/2026. The qualifying parcel lists are currently in preliminary draft form. Final lists will be on record with Placer and Nevada Counties and the District Clerk's Office. Staff recommends, after hearing and considering all public comments in the Public Hearing, reviewing and discussing the Resolutions and this Staff report; renewing the existing Electric and Water Standby Charges on vacant parcels in the District for 2025/2026. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Take the best of private sector thinking to modernize the utility and add value to our communities. Page 2 of 3 Page 14 of 68 FISCAL IMPACT: The estimated standby revenue for 2025-2026 is $15K for Electric and $91 K for Water, consistent with budgeted revenue in the approved FY25 Budget. There are an estimated 1400 parcels in Nevada County and 60 parcels in Placer County subject to Standby Charges. ATTACHMENTS: 1. R2025-09 Standby Resolution-electric 2. R2025-10 Standby Resolution-water 3. R2025-11 Standby Resolution,NevadaCounty 4. R2025-12 Standby Resolution,PlacerCounty Page 3 of 3 Page 15 of 68 ;W- Public Utility District Resolution No. 2025-09 Continuing and Fixing Electric Standby Charges for the Fiscal Year 2025-2026 WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District duly adopted Ordinance No. 7501 fixing Electric Standby Charges on lands within the District boundaries and providing a means for collection thereof; and WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240 amending Ordinance 7501 to include Placer as well as Nevada County; and WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges shall be made by resolution of the Board for each fiscal year. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The Electric Standby Charge for the fiscal tax year 2025-2026 shall be the sum of$20 for any parcel consisting of one acre or more, and the sum of$10 for any parcel of less than one acre. 2. The District shall determine the lands to be affected thereby for the current fiscal year and the charges to be assessed, levied and collected on the lands and parcels, and upon the completion thereof a subsequent Resolution shall be approved fixing and placing the electrical standby charges on the District tax roll for collection by Placer and Nevada Counties. 3. Certified copies of this Resolution are to be forwarded along with the direct charges to the County Auditor of the County of Placer and the County Auditor of the County of Nevada. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within the District on May 7, 2025 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Christa Finn, President ATTEST: Brian Wright, General Manager Page 16 of 68 TRUCKEE DONNE' a Resolution No. 2025-10 Continuing and Fixing Water Standby Charges For the Fiscal Year 2025-2026 WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District duly adopted Ordinance No. 7501 fixing Water Standby Charges on lands within the District boundaries and providing a means for collection thereof; and WHEREAS, on August 16, 1982, the Board of Directors adopted Resolution No. 8240 amending Ordinance 7501 to include Placer as well as Nevada County; and WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103 amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance and resolution concern the fixing of Water Standby Charges in the County of Nevada; and WHEREAS, on April 8, 1991, the Board of Directors adopted Ordinance No. 9105 amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance and resolution concern the fixing of water standby charges in the County of Placer; and WHEREAS, Ordinance No. 7501 prescribes that implementation of the actual charges shall be made by resolution of the Board for each fiscal tax year; and WHEREAS, fees authorized by this resolution shall not be charged, assessed, levied and collected in the District's Donner Lake or Glenshire Service areas. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The Water Standby Charge for the fiscal tax year 2025-2026 shall be the sum of $80 for all parcels regardless of size. 2. The District shall determine the lands to be affected thereby for the current fiscal year, which shall not include lands in Donner Lake or Glenshire Service areas, and the charges to be assessed, levied and collected on the lands and parcels, and upon the completion thereof a subsequent Resolution shall be approved fixing and placing the Water Standby Charges on the District tax roll for collection by Placer and Nevada Counties. 3. Certified copies of this resolution be forwarded to the County Auditor of the County of Placer and the County Auditor of the County of Nevada. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within the District on May 7, 2025 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Christa Finn, President ATTEST: Brian Wright, General Manager Page 17 of 68 ■ UCKEE r ■ ublic Utility District Resolution No. 2025-11 Fixing and Placing Electric and Water Standby Charges on County of Nevada Tax Roll for Collection WHEREAS, on February 18, 1975, the Board of Directors of the Truckee Donner Public Utility District duly adopted Ordinance No. 7501 fixing Electric and Water Standby Charges on lands within the District boundaries and providing a means for collection thereof; and WHEREAS, on August 16, 1982, the Board adopted Resolution No. 8240 amending Ordinance 7501 to include Placer as well as Nevada County; and WHEREAS, on March 18, 1991, the Board of Directors adopted Ordinance No. 9103 amending Ordinance No. 7501 and Resolution No. 8240 to the extent that such ordinance and resolution concern the fixing of water standby charges in the County of Nevada; and WHEREAS, on May 7, 2025, the Board adopted Resolution No. 2025-09 and 2025-10 continuing and fixing electric and water standby charges pursuant to Ordinances 7501, 9103 and 9105 for the fiscal tax year 2025-2026; and WHEREAS, the District has now determined the lands affected thereby and the charges to be assessed, levied and collected on the lands and parcels; and WHEREAS, by Resolution No. 9723 adopted November 5, 1997, the Board of Directors of the Truckee Donner Public Utility District approved execution of a continuous Standard Form Tax Collection Services Contract with the County of Nevada. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the Board of Supervisors of the County of Nevada, State of California, levy the Standby Charges against the parcel numbers (APN) of record listed on the computer itemization of unimproved parcels kept and maintained in the Administrative Services Department of the District and made a part hereof by reference, and that the County Auditor and Tax Collector be instructed to levy and collect said charges in the same manner as County taxes as by law and in said ordinance provided. Upon completion and correction of the current list through June 30, 2025, a copy will be forwarded to the Auditor Controller of the County. 1 Page 18 of 68 2. The District warrants and represents that charges imposed by the District and being requested to be collected by Nevada County comply with all requirements of state law, including but not limited to Articles XIIIC and XIIID of the California Constitution (Proposition 218). 3. That a certified copy of this resolution be forwarded to the County Auditor of the County of Nevada. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on May 7, 2025 by the following roll call vote: AYES: NOES: ABSENT:. TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Christa Finn, President ATTEST: Brian Wright, General Manager 2 Page 19 of 68 ■ UCKEE r Public Utility District rp" Resolution No. 2025-12 Requesting Collection of Electric and Water Standby Charges on Placer County Tax Roll WHEREAS, the Truckee Donner Public Utility District requests the County of Placer collect on the County tax rolls certain charges which have been imposed by the District pursuant to Resolution No. 2025-09 and 2025-10 attached, and WHEREAS, the County has required as a condition of the collection of said charges that the District warrant the legality of said charges and defend and indemnify the County from any challenge to the legality thereof. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The Auditor-Controller of Placer County is requested to attach for collection on the County tax rolls those taxes, assessments, fees and/or charges, attached hereto; 2. The District warrants and represents that the taxes, assessments, fees and/or charges imposed by the District and being requested to be collected by Placer County comply with all requirements of state law, including but not limited to Articles XIIIC and MID of the California Constitution (Proposition 218); 3. The District releases and discharges County, and its officers, agents and employees from any and all claims, demands, liabilities, costs and expenses, damages, causes of action, and judgments, in any manner arising out of the collection by County on the property tax toll of any taxes, assessments, fees and/or charges on behalf of District; 4. In consideration for the County's collection of the charge through the County's property tax roll, the District agrees to and shall defend, indemnify and hold harmless the County, its officers, agents and employees (the "Indemnified Parties") from any and all claims, demands, liabilities, costs and expenses, damages, causes of action, and judgments, in any manner arising out of the 1 Page 20 of 68 collection by County of any of District's said taxes, assessments, fees and/or charges requested to be collected by County for District, or in any manner arising out of District's establishment and imposition of said taxes, assessments, fees and/or charges. District agrees that, in the event a judgment is entered in a court of law against any of the Indemnified Parties as a result of the collection of one of District's taxes, assessments, fees and/or charges, the County may offset the amount of the judgment from any other monies collected by County on behalf of District, including property taxes; 5. The District agrees that its officers, agents and employees will cooperate with the County in answering questions referred to District by County from any person concerning the District's taxes, assessments, fees and/or charges, and that District will not refer such persons to County officers and employees for response; and 6. The District agrees to pay the County for the reasonable and ordinary charges to recoup its costs of placement and collection on the tax rolls at the agreed upon rate of 1% of the taxes, assessments, fees and/or charges, as provided by Government Code section 29304 and 51800. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on May 7, 2025 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Christa Finn, President ATTEST: Brian Wright, General Manager 2 Page 21 of 68 AGENDA ITEM #9 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Brian Wright, General Manager SUBJECT: Public Hearing Related to the Adoption of an Ordinance Authorizing the Board to Appoint and Establish Compensation for Officers of the District by Resolution APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: A. Conduct a Public Hearing regarding Ordinance No. 2025-01; B. Adopt Ordinance No. 2025-01 approving the process for appointing and establishing compensation for officers of the District BACKGROUND: It is the Board's purview to conduct public hearings. At the April 2, 2025, meeting, the Board set a public hearing to be held on May 7, 2025, to receive written and oral comments from the public regarding the proposed ordinance authorizing the Board of Directors to appoint and establish compensation of District officers by resolution. The Public Hearing was advertised in the Sierra Sun Newspaper on April 11 and 18, 2025. ANALYSIS AND BODY: The Public Utility Code (Division 7, Chapter 3, Article 5), Section 16111, establishes that the officers of the District, other than the Board of Directors, are: • Clerk, who is also ex officio of the Board • Accountant • Treasurer • General Manager Section 16112 establishes that officers of the District, other than the Board of Directors, shall be appointed by the Board, hold office at its pleasure, and receive such compensation as is provided for by the Board by ordinance. Staff is recommending the adoption of an ordinance to include important clarifications Page 1 of 2 Page 22 of 68 and efficiencies to the process related to the appointment and establishment of compensation for the officers of the District, by permitting the Board of Directors to make future adjustments via resolution rather than ordinance. Establishing the proposed ordinance will offer clarifications on the process, maintain the intended integrity and transparency of the public process while also providing opportunities for efficiency. GOALS AND OBJECTIVES: 1. Manage for Financial Stability and Resiliency 2. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 3. Modernize the utility and add value to our communities through collaboration and innovation. 4. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this public hearing. ATTACHMENTS: 1. 02025-01 Process for Appointing and Establishing Compensation for Officers of the District Page 2 of 2 Page 23 of 68 TRUCKEE DONNER Ordinance No. 2025- 01 Process for Appointing and Establishing Compensation for Officers of the District WHEREAS, per Section 16111 of the California Public Utilities Code, the officers of the District, other than the Board of Directors, are: a) A clerk, who is also ex officio secretary of the board b) An accountant c) A treasurer d) A general manager and; WHEREAS, per Section 16112 of the California Public Utilities Code the officers of the District other than the board of directors shall be appointed by the Board of Directors, hold office at the pleasure of the Board of Directors, and receive such compensation as is provided for by the Board of Directors by ordinance; and WHEREAS, the Board of Directors have appointed the other officers of the District; and WHEREAS, the Board of Directors approved a new employment agreement with its General Manager and established compensation in 2021 via the adoption of Ordinance No. 2021- 02; and WHEREAS, the Board of Directors desires to update and clarify the process for appointing and establishing compensation for the other officers of the District. NOW, THEREFORE, BE IT ENACTED, by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. Any employee of the District appointed by the Board as one of the officers of the District shall serve in such role at the pleasure of the Board and independently and separately from their employment with the District, and if their appointment as an officer is terminated by the Board for any reason, said termination shall be without any procedural or due process rights and shall be separate and independent from any decision regarding their employment with the District. 2. When an employee of the District appointed by the Board as one the officers of the District is separated from their employment with the District, their appointment as an officer of the District shall terminate automatically with their separation from the District. Ordinance No. 2025-01 Page 24 of 68 3. The District Clerk, District Accountant and District Treasurer shall be compensated at One Hundred Dollars ($100.00) per year for serving as and providing the services of their respective offices. 4. The General Manager shall serve per the terms established and set forth in the Employment Agreement as adopted by the Board of Directors via Ordinance No. 2021-02. 5. From the effective date of this Ordinance and thereafter, the Board of Directors may set compensation for officers of the District other than Board Members via Resolution. 6. The District Clerk is directed to publish this Ordinance in accordance with the laws of the State of California. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a regular meeting thereof duly called and held within said District on the 7t" day of May, 2025 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Christa Finn, President of the Board ATTEST: Brian Wright, General Manager Ordinance No. 2025-01 Page 25 of 68 AGENDA ITEM #10 r P, -I Public Utility District MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Keith Renshaw, Electric Engineering Manager SUBJECT: Consideration to increase the 2025 Annual Authorization for Electric Engineering Consulting Services APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a professional services contract amendment for an additional authorization amount of$423,000 with NV5 for engineering consulting services for a total FY25 not-to-exceed contract amount of$673,000. BACKGROUND: For many years, the District has utilized professional service contracts for electric engineering consulting services. Consulting work has included specialized engineering support for substation improvement projects, system impact studies, electric capital improvement projects, and other engineering support as needed. The District is currently in contract with two consulting firms for electric engineering support: Qualus Engineering and NV5. Qualus is primarily supporting the Martis Valley Substation Rebuild project while NV5 is supporting other capital and O&M projects. On December 4, 2024, the Board approved a professional service contract extension for NV5 for electric engineering consulting services for 2025. The Board approved authorization for FY2025 is $250,000. To date in FY25, the District has expended approximately$98,000 with NV5 for electric engineering consulting services. ANALYSIS AND BODY: The Electric Department is currently utilizing NV5's engineering consulting services for multiple capital projects including a pilot project to rebuild a section of overhead infrastructure with wildfire- hardening materials such as ductile iron poles, fiberglass crossarms, and covered conductors. In addition to capital projects, the Electric Department continues working on the Electric Department's Electric System Master Plan. Staff has identified the need to secure additional electric engineering professional services to ensure timely completion of the electric utility capital construction and planning work within the projected timelines. Since NV5 has completed a considerable amount of work on each of the projects listed in Table 1 below, and has established a familiarity with the projects included in the District's FY2025 goals, staff has determined that seeking proposals for additional engineering consulting services from other vendors at this time would not be financially beneficial to the District or its rate payers, and Page 1 of 3 Page 26 of 68 therefore recommends that the General Manager forego the request for additional proposals from engineering firms. District Code Section 3.08.050 allows the General Manager to evaluate the need to seek proposals for special services: • Section 3.08.050.4 of District Code allows agreements for special services if"the General Manager determines that no proposals are necessary, then he/she may enter into an agreement for the special services up to his/her Board authorized spending limit. Should the amount exceed the General Manager's spending limit, approval to enter into an agreement will be brought to Board of Directors for their consideration." • District Code defines Engineering consulting services as special services in District code section 3.08.050.1: • The term "special services"includes, but is not limited to professional services, such as legal, engineering, architectural, landscape architecture, land surveying, construction project management, accounting, financial, economic, energy advisory, information technology, environmental, payroll services and administrative services, as included within California Government Code Sections 4525, 4526 and 53060. Staff worked with NV5 to forecast FY25 engineering consulting services costs for Electric Department projects. The projected project costs for NV5 in FY25 is shown in the table below: Table 1: Engineering Consulting Cost Estimates by Project Project NV5 Engineering Cost Estimate Northwoods Wildfire Hardening - Pilot Project $ 40,000.00 Poles Replacements 135 $ 85,000.00 Glenshire -Truckee Substation Tie Project $ 60,000.00 SCADA Reliability Improvement Project Phase 6 $ 90,000.00 Steel Pole Design $ 85,000.00 Electric System Master Plan $ 135,000.00 CEQA Support $ 20,000.00 Substation Physical Security Standard $ 10,000.00 $ 525,000.00 The total shown in Table 1, $525,000, does not include work already invoiced in 2025. Under the current Board authorization of$250,000 for FY25, the remaining available authorization for NV5 is approximately $152,000. An additional amount of$373,000 is needed to complete the planned engineering work with NV5 in FY25. An additional $50,000 of authorization is being requested as a contingency for work needed in FY25 that is not yet planned. Therefore, staff recommends that the Board of Directors authorize the General Manager to execute a professional services contract amendment for an additional authorization amount of$423,000 with NV5 for engineering consulting services for a total FY25 not-to-exceed contract amount of$673,000. GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 4. Provide reliable and high quality electric supply and distribution system to meet Page 2 of 3 Page 27 of 68 current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: Table 1 projects are capital expenditures, except for the Electric System Master Plan of $135,000. The District's electric capital budget for FY25 is $20.9M and is $9.7M excluding land & buildings capital. This capital budget of $9.7M allocates sufficient funds for each of the capital projects shown in Table 1. Utilization of third-party engineering consulting services replaces internal staffing resources for engineering activities planned for these projects at a similar cost. There should not be an adverse effect on project budgets as shown in the District's Capital Budget for FY24-25 due to the utilization of third-party engineering consulting services. As noted in the budget performance review on March 12, 2025, the Electric System Master Plan (MP) was budgeted in FY24 for $100,000 (GL 1 .6.923-736) and was forecast to occur in FY25 due to timing. The operating reserve FY24 year-end balance of$10.7M favorably exceeded the policy target balance by $2.4M. This favorable variance included $300,000 for known timing expense items (including the MP $100k) shifting from FY24 to FY25. The additional $35k of estimated cost for the MP can sufficiently be funded from the operating reserve balance. ATTACHMENTS: None Page 3 of 3 Page 28 of 68 AGENDA ITEM #11 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: Approval of Minutes APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Approval of April 2, 2025 Regular Meeting and April 3, 2025 Special Meeting Minutes BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. Page 1 of 2 Page 29 of 68 FISCAL IMPACT: There is no fiscal impact. ATTACHMENTS: 1. Minutes 2025 0402 DRAFT 2. Minutes 2025 0403 DRAFT Page 2 of 2 Page 30 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 1. Call to Order Meeting was called to order at 6:00 p.m. 2. Roll Call Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony Laliotis and President Christa Finn Staff in attendance: Brian Wright, General Manager; Mike Salmon, Chief Financial Officer; Jillian Steward, Director of Human Resources & Risk Management; Scott Crow, Director of IT/Chief Information Officer/Assistant General Manager; Chad Reed, Water Utility Director; Grant Sacks, Customer Service Manager; Xander Thomassian, Network & Systems Administrator; Alex Spychalsky, Communication Specialist; Martina Rochefort, District Clerk Other: Steve Gross, General Counsel 3. Pledge of Allegiance Director Murrell led the Pledge of Allegiance. 4. Changes to the agenda No changes were made to the agenda. 5. Public Comment No public comment was received. DIRECTOR UPDATE 6. Director Bender welcomed the spring season. There were no other Director updates. DEPARTMENT UPDATES 7. Chad Reed, Water Utility Director, shared water production data and congratulated TJ Dwyer on his promotion to Water Operations Manager. Mike Swanson, Director of Electric Engineering & Operations, shared highlights from the recent Lineman's Rodeo. Jillian Steward, Director of Human Resources and Risk Management, noted the District was able to collect $110,249 in property damage claim reimbursements. The District was also awarded a $10,000 Risk Control Grant to support Emergency Operations Program development and training. Jennifer Mason, Matt Wellise and the entire Customer Service Department were recognized as Values winners. Mike Salmon, Chief Financial Officer, presented recent customer service scores. 1 Page 31 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 CONSENT CALENDAR 8. Consideration of Annual Resolutions for Special Tax: Gray's Crossing and Old Greenwood Communities Facilities Districts a) Adopt Resolution 2025-07 requesting Nevada County to collect the special taxes for the Gray's Crossing 04-1 Community Facilities District; and b) Adopt Resolution 2025-08 requesting Nevada County to collect the special taxes for the Old Greenwood 03-1 Community Facility District. 9. Award of a Contract to Develop Contract Documents for Rehabilitation of the Bridge Street 6170 Tank #1 Authorize the General Manager to execute a professional services contract with Carollo Engineers to develop contract documents for rehabilitation of the Rehabilitation of the Bridge Street 6170 Tank #1 for an amount of $23,427, plus a ten percent change order allowance for a total authorization not to exceed $25,800. 10. InComm Vanilla Direct Pay (3rd Party Payments) Approve the implementation of the NISC integrated InComm Vanilla Direct Pay (third party payments) for TDPUD customers. 11 . Consideration of Scheduling a Public Hearing Related to the Adoption of an Ordinance Authorizing the Board to Appoint and Establish Compensation of Officers of the District by Resolution Schedule a Public Hearing at the regularly scheduled District Board Meeting on May 7, 2025, at 6:00 PM, or as soon thereafter, for the purpose of receiving input on the adoption of a proposed ordinance authorizing the Board of Directors to appoint and establish compensation for officers of the District by way of resolution. 12. Consideration of Contract for Fire Alarm System Upgrades at District Headquarters Authorize the General Manager to execute a construction contract with Johnson Controls, Inc. to perform fire alarm system upgrades in the amount of $19,670, plus a 10% contingency amount, or$1,967, for a total authorization not to exceed $21,637. 13. Consideration of Scheduling a Public Hearing Related to Adoption of the Annual Electric and Water Standby Charges Schedule a public hearing at the regularly scheduled District Board Meeting on May 7, 2025 at 6:00 PM, or as soon thereafter, for the purpose of receiving 2 Page 32 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 input on the adoption of annual Electric and Water Standby Charges. 14. Consideration for Approval of a Professional Services Contract to Conduct an Electric Utility Cost of Service Analysis and Rate Study Authorize the General Manager to execute a professional services agreement with HDR Engineering Inc. for the 2025 Electric Cost of Service Analysis and Rate Study in the amount of $82,243 plus a ten percent change order allowance of$8,224 for a total authorization not to exceed $90,467. 15. Consider Approval of the Treasurer's Report, April 2025 Approve the Treasurer's Report for April 2025 which includes: a. Fund Balances for the Month of January 2025 b. Disbursements for the Month of February 2025 16. Consider Approval of Meeting Minutes Consider approval of March 12, 2025 Special Meeting Minutes Director Bender noted he had a real property conflict and recused himself from item 8. No public comment was received. ACTION: Motion made by Director Murrell to approve the Consent Calendar as presented, seconded by Vice President Laliotis. The motion passed 5-0 by roll call vote. ACTION ITEMS 17. Consideration to approve a procurement contract with Howard Industries for customer payment kiosk Authorize the General Manager to execute a procurement contract with Howard Industries for the purchase of one customer payment kiosk for an amount not to exceed $25,000, which includes kiosk for $19,919 and contingency, taxes and other fees totaling $5,081. No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to authorize the General Manager to execute a procurement contract with Howard Industries for the purchase of one customer payment kiosk for an amount not to exceed $25,000, which includes kiosk for $19,919 and contingency, taxes and other fees totaling $5,081, seconded by Director Murrell. The motion passed 5-0 by roll call vote. 3 Page 33 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 Director Bender disclosed a real property conflict and recused himself from items 18 and 19. Director Bender departed the meeting at 6:36 p.m. 18. Consideration of Authorizing the General Manager to Execute the Agreement Regarding APN# 043-010-005-000. A. Determine that the waiver of current Penalty and Interest for APN# 043-010- 005-000 agreement complies with the requirements of Government Code section 53340(f), and B. Authorize the General Manager to execute the Agreement regarding APN# 043-010-005-000 (Attachment 1); accepting full payment for all installment special tax amounts past due, in exchange for waiving current Penalty and Interest amounts No public comment was received. Discussion was held. ACTION: Motion made by Vice President Laliotis to authorize the General Manager to execute the Agreement regarding APN# 043-010-005-000, accepting full payment for all installment special tax amounts past due, in exchange for waiving current Penalty and Interest amounts, seconded by Director Murrell. The motion passed 4-0 by roll call vote (Director Bender recused himself). 19. Consideration of Authorizing the General Manager to Execute the Agreement Regarding APN# 019-770-002-000. A. Determine that the waiver of current Penalty and Interest for APN# 019-770- 002-000 agreement complies with the requirements of Government Code section 53340(f), and B. Authorize the General Manager to execute the Agreement regarding APN# 019-770-002-000 (Attachment 1); accepting full payment for all installment special tax amounts past due, in exchange for waiving current Penalty and Interest amounts No public comment was received. Discussion was held. ACTION: Motion made by Vice President Laliotis to authorize the General Manager to execute the Agreement regarding APN# 019-770-002-000, accepting full payment for all installment special tax amounts past due, in exchange for waiving current Penalty and Interest amounts, seconded by Director Murrell. The motion passed 4-0 by roll call vote (Director Bender recused himself). 4 Page 34 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 Director Bender returned to the meeting at 6:57 p.m. 20. Consideration for Designation of Labor Negotiators for the General Manager's Employment Contract Appoint two members of the District's Board of Directors to serve as negotiators for the General Manager's Employment Contract No public comment was received. Discussion was held. ACTION: Motion made by Vice President Laliotis to appoint the Board President and Vice President to serve as labor negotiators for the General Manager's Employment Contract, seconded by Director Bender. The motion passed 5-0 by roll call vote. 21. Consideration of Vote for Local Agency Formation Commission of Nevada County's Open Regular Member Seat Consider two candidates for open Special Districts Regular Member seat on Local Agency Formation Commission (LAFCo) of Nevada County and take action for vote on the attached LAFCo Election Ballot. No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to vote for Rich Johansen for the open Nevada County LAFCo seat, seconded by Vice President Laliotis. The motion passed 5-0 by roll call vote. Open Session recessed at 7:10 p.m. CLOSED SESSION 22. Closed Session Pursuant to Government Code Section 54957 Public Employee Dismissal/Termination 23. Closed Session Pursuant to Government Code Section 549567.8 Conference With Real Property: Donner Lake Reserved Water Right Agreement with Truckee Meadows Water Authority; District Negotiator: General Manager, Brian Wright, Under Negotiation: Reserved Water Right Terms. 24. Closed Session Pursuant to Government Code Section 54957 Public Employee General Manager's Performance Plan Review. 25. Closed Session Pursuant to Government Code Section 54957.6 Conference with 5 Page 35 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, APRIL 2, 2025 Labor Negotiator Agency Negotiator(s): As Appointed in Agenda item 20 Unrepresented Employee: General Manager Open Session reconvened at 9:39 p.m. President Finn noted there was no reportable action taken in Closed Session. ADJOURNMENT Meeting adjourned at 9:39 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Christa Finn, President Respectfully Submitted, Martina Rochefort, District Clerk 6 Page 36 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SPECIAL BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 10:00 AM, THURSDAY, APRIL 3, 2025 1. Call to Order Meeting was called to order at 10:10 a.m. 2. Roll Call Directors Present: Courtney Murrell, Steve Randall, Jeff Bender, Vice President Tony Laliotis and President Christa Finn Staff in attendance: Brian Wright, General Manager; Martina Rochefort, District Clerk Other: Steve Gross, General Counsel; Michael McDonald, Regional Government Services 3. Pledge of Allegiance President Finn led the Pledge of Allegiance. 4. Changes to the agenda No changes were made to the agenda. 5. Public Comment No public comment was received. WORKSHOP 6. Board Governance Michael McDonald of Regional Government Services presented and facilitated board discussion on the following topics: • Governance Fundamentals • The Ralph M. Brown Act • Accountability & Ethical Decision-Making • Effective Meeting Management and Board Leadership • Board Culture & Conduct • Public Engagement & Communications Discussion was held. Open Session recessed at 11:42 a.m. Open Session reconvened at 11:51 a.m. Discussion was held. Scott Crow, Director of IT/CIO/AGM; Chad Reed, Water Utility Director; Jared Carpenter, Director of Electric Power Supply; Mike Swanson, Director of Electric Operations & Engineering, Jillian Steward, Director of Human Resources & Risk Management and Steven Poncelet, Strategic Affairs Director/PIO joined the meeting at 1:00 P.M. 1 Page 37 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SPECIAL BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 10:00 AM, THURSDAY, APRIL 3, 2025 Mr. McDonald departed the meeting at 1:18 p.m. Open Session recessed at 1:18 p.m. Open Session reconvened at 1:27 p.m. 7. Strategic Plan Review The Board of Directors reviewed the historical development of the District's Strategic Plan and revised initiatives. Discussion was held. The Board directed staff to remove the completed Broadband initiative and add Facilities Master Plan. ADJOURNMENT Meeting adjourned at 3:08 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Christa Finn, President Respectfully Submitted, Martina Rochefort, District Clerk 2 Page 38 of 68 AGENDA ITEM #12 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager SUBJECT: Consider Approval of the Treasurer's Report, May 2025 APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Approve the Treasurer's Report for May 2025 which includes: a. Fund Balances for the Month of February 2025 b. Disbursements for the Month of March 2025 BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: FISCAL IMPACT: ATTACHMENTS: 1. 2025-05 Treasurer's Report Page 1 of 1 Page 39 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT TREASURER'S REPORT May 7, 2025 Fund Balances for the Month February 28, 2025 (Preliminary — pending year-end close and annual audit) And Disbursements for the Month March 31, 2025 (includes Government Code section 53065.5 items) Page 1 of 13 Page 40 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Summary report of fund balances for the month ending February 28, 2025 and disbursements for March 2025. 1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary The attached listing of checks and ACH payments issued during March 2025 total $4,195,444.31 in disbursements. 2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES Per Government Code 53065.5: Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred dollars ($100) for each individual charge for services or product received. "Individual charge" includes, but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by including the reimbursement information in a document published or printed at least annually by a date determined by that district and shall be made available for public inspection. The Disbursements listing referenced in 1) includes above subject reimbursements information, as applicable. 3) STATEMENT OF GENERAL FUND: As of February 28, 2025 the balance in the General Fund was $15,352,469 (Electric $7,974,402 and Water $7,378,067). 4) FUNDS STATUS REPORT: The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California CLASS, BNY and TVI Investments as of February 28, 2025 was $57,275,043 ($41,117,269 Electric and $16,157,774 Water). 5) INVESTMENT STATUS REPORT: The majority of the District's investments are in California's Local Agency Investment Fund (LAIF), Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County Investment Fund (PCIF). The earnings rates for the last 13 months were: LAIF PCIF UPTIF 1 YR T-B ILL TVI CLASS February 2024 4.12% 3.45% 5.48% 4.76% 0.55% March 2024 4.27% 3.34% 5.44% 4.79% 0.55% April 2024 4.23% 3.61% 5.45% 4.99% 0.55% May 2024 4.33% 3.52% 5.43% 4.94% 0.55% June 2024 4.48% 3.65% 5.44% 4.86% 0.55% July 2024 4.52% 3.77% 5.43% 4.58% 0.55% August 2024 4.58% 3.80% 5.41% 4.23% 0.55% September 2024 4.58% 3.78% 5.32% 3.85% 0.55% October 2024 4.52% 3.66% 5.04% 4.08% 0.55% 5.00% November 2024 4.48% 3.79% 4.87% 4.11% 0.55% 4.83% December 2024 4.43% 3.73% 4.74% 4.11% 0.55% 4.64% January 2025 4.37% 3.83% 4.55% 3.99% 0.55% 4.42% February 2025 4.33% 4.10% 4.53% 3.91% 0.55% 4.41% Page 2 of 13 Page 41 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Request for Approval of Disbursements The disbursements of the Truckee Donner Public Utility District for the month of March 2025 totaled $4,195,444.31. A listing of those disbursements is attached. AP DISBURSEMENTS METRICS (excludes Payroll): Accounts Payable (A/P) Metrics $ A/P Disbursements 7,000,000.00 — 6,000,000.00 5,000,000.00 4,000,000.00 3,000,000.00 — 2,000,000.00 — 1,000,000.00 — — 0.00 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 2021 0 2022 0 2023 0 2024 0 2025 # A/P Payments Issued 400 — 350 — — 300 — 250 I 200 — 150 — 100 — 50 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 2021 0 2022 0 2023 0 2024 2025 # A/P I nvoices Vouchered 1,200 — — 1,000 — — — 800 — — 600 400 200 I I Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2021 ■2022 ■2023 ■2024 I 2025 Page 3 of 13 Page 42 of 68 Truckee Donner Public Utility District Check Register CA March 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 6206 3/1/2025 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE $ 906.92 6221 3/1/2025 WIRE 6731 CALIFORNIA DEPARTMENT OF TAX AND FEE USE TAX PAYABLE 192.00 6228 3/1/2025 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 32,742.81 6210 3/6/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9637 8,9738 FINAL 1,949.46 6211 3/6/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9637&9738 FIN 7,711.18 6212 3/6/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS 9637&9738 FINAL 1,649.43 45508 3/6/2025 DID 5440 ALTEC INDUSTRIES INC 20241-TON MECHANIC TRUCK 955.88 45509 3/6/2025 DO 1537 AMAZON CAPITAL SERVICES,INC 20241-TON MECHANIC TRUCK 2,064.21 45510 3/6/2025 DID 9503810 CDW GOVERNMENT INC. HARDWARE REFRESH-COMPUTER HARDWARE 9,873.75 45511 3/6/2025 DO 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,797.45 45512 3/6/2025 DID 640 EMPLOYER LYNX INC. PERSONNEL EXPENSES 83.00 45513 3/6/2025 DO 1484 FUENTES CONSULTING LLC MATERIALS&SERVICES 1,897.50 45514 3/6/2025 DID 3340 GENERAL PACIFIC INC METER PURCHASE 10,887.98 45515 3/6/2025 DO 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,014.87 45516 3/6/2025 DID 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 408.24 45517 3/6/2025 DO 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 376.96 45518 3/6/2025 DID 1149 LOOMIS BANKING CHARGES 941.97 45519 3/6/2025 DO 1312 MILSOFT UTILITY SOLUTIONS LICENSING,MAINTENANCE&SUPPORT 3,999.96 45520 3/6/2025 DID 10008 MOTION&FLOW CONTROL PRODUCTS,INC. MISC PARTS&SUPPLIES 741.94 45521 3/6/2025 DO 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00 45522 3/6/2025 DID 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 219.39 45523 3/6/2025 DO 5130 NCPA MEMBERSHIP DUES 8,794.00 45524 3/6/2025 DID 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 16.44 45525 3/6/2025 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 130.23 45526 3/6/2025 DID 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 147.35 45527 3/6/2025 DO 419 QCS LLC MATERIALS&SERVICES 641.25 45528 3/6/2025 DID 552 RK CONTRACTORS INC. SECONDARY UPGRADE-VILLAGE GREEN 63,197.50 45529 3/6/2025 DO 837 SIERRA OFFICE SOLUTIONS XEROX COPIER LEASE 11.39 45530 3/6/2025 DID 6402 SIERRA PACIFIC POWER CO PURCHASED POWER-SPPC&NEVADA POWER 59,230.60 45531 3/6/2025 DO 1787 SILVER STATE INTERNATIONAL TRUCKS MISC PARTS&SUPPLIES 87.31 45532 3/6/2025 DID 1473 SINGLEWIRE SOFTWARE LICENSING,MAINTENANCE&SUPPORT 2,150.00 45533 3/6/2025 DO 1532 SLATE ROCK FIR EMPLOYEE UNIFORMS - 45534 3/6/2025 DID 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 212,265.13 45535 3/6/2025 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 503.28 45536 3/6/2025 DID 10584 LAMPS PURCHASED POWER-LAMPS 1,261,203.17 45537 3/6/2025 DO 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES - 45538 3/6/2025 DID 630 WESTERN AREA POWER ADMINISTRATION ENVIRONMENTAL COMPLIANCE FEES 5,360.54 45539 3/6/2025 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 632.60 135649 3/6/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 5,274.04 135650 3/6/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 6,459.05 135651 3/6/2025 CHK 99999 AMI HOUSING CUSTOMER REFUND-CLOSEDACCOUNT 612.18 135652 3/6/2025 CHK 134 ANIXTER INC. INVENTORY 2,329.07 135653 3/6/2025 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00 135654 3/6/2025 CHK 99999 MSASHLEY E BELLINE CUSTOMER REFUND-CLOSEDACCOUNT 17.49 135655 3/6/2025 CHK 1518 COLUMN SOFTWARE PBC GENERAL ADVERTISEMENT 707.21 135656 3/6/2025 CHK 1601 CROWN TECHNICAL SYSTEMS MARTIS VALLEY SUBSTATION MODERNIZATION 557,104.20 135657 3/6/2025 CHK 5661 DOORKING,INC BUILDING MAINTENANCE 45.95 135658 3/6/2025 CHK 1614 DUNCAN WEINBERG GENZER&PEMBROKE,P.C. PROFESSIONAL SERVICES:OTHER 2,250.00 135659 3/6/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 11.00 135660 3/6/2025 CHK 348 EDGES ELECTRICALGROUP MATERIALS&SERVICES 201.74 135661 3/6/2025 CHK 999 BELINDA GIMBERT REFUNDTPP-16501JEBSCT 815.00 135662 3/6/2025 CHK 99999 REBEKAH MASTERS CUSTOMER REFUND-CLOSED ACCOUNT 95.79 135663 3/6/2025 CHK 5151 NRECA MARCH 2025 INSURANCE 17,478.53 135664 3/6/2025 CHK 5150 NRECA GROUP BENEFITS TRUST MARCH 2025 INSURANCE 247,692.77 135665 3/6/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 30,917.37 135666 3/6/2025 CHK 999 REYES GENERAL CONSTRUCTION LLC REFUNDTPP-13094SKISLOPE WAY 772.00 135667 3/6/2025 CHK 11226 SHRED-IT USA LLC OFFICE SUPPLIES 85.00 135668 3/6/2025 CHK 2240 SPRINGHILL SUITES BY MARRIOTT STORM DAMAGE 923.04 135669 3/6/2025 CHK 7040 TEICHERT&SON INC CREDIT DE MATERIALS&SERVICES 3,881.81 135670 3/6/2025 CHK 7380 UNITED PARCEL SERVICE UPS CHARGES 161.60 135671 3/6/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 2,117.00 135672 3/6/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 394.20 6208 3/13/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 241,394.20 6213 3/13/2025 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 10,417.00 6214 3/13/2025 WIRE 11233 CALPERS PENSION 76,479.67 6215 3/13/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 03/07/2025 24,929.15 6216 3/13/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 03/07/2025 25,100.06 6217 3/13/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 03/07/25 1,436.48 6218 3/13/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 03/07/2025 117,312.60 6219 3/13/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS PPE 03/07/2025 37,217.12 45618 3/13/2025 DID 1537 AMAZON CAPITAL SERVICES,INC MATERIALS&SERVICES 2,805.06 45619 3/13/2025 DO 9070 EDWARD ATKINS III 53605.5 DMV PHYSICAL 120.00 45620 3/13/2025 DID 9941 KATELYN AUERBACH PERSONNEL EXPENSES 58.70 45621 3/13/2025 DO 11443 AUTOGLASS/MOTORSPORTS EXPRESS-TRUCKEE REPAIRS&MAINTENANCE 1,599.38 45622 3/13/2025 DID 1587 DILLARD ENVIRONMENTAL SERVICES ENVIRONMENTAL COMPLIANCE FEES 3,031.05 45623 3/13/2025 DO 1535 EPLUS TECHNOLOGY INC LICENSING,MAINTENANCE&SUPPORT 207.60 45624 3/13/2025 DID 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 106.75 45625 3/13/2025 DO 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 325.65 45626 3/13/2025 DID 3480 GRAINGER INC. FACILITY SUPPLIES 172.75 45627 3/13/2025 DO 1617 HUDSON TECHNOLOGIES COMPANY ENVIRONMENTAL COMPLIANCE FEES 13,838.00 45628 3/13/2025 DID 3820 IBEW LOCAL 1245 UNION DUES MARCH EMPLOYEE CONTRIBUTIONS 7,097.25 45629 3/13/2025 DO 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 263.00 45630 3/13/2025 DID 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 515.48 45631 3/13/2025 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 232.41 45632 3/13/2025 DID 9504397 PACE SUPPLY INVENTORY 4,052.32 Page Iof3 Page 4 of 13 Page 43 of 68 Truckee Donner Public Utility District Check Register CA March 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 45633 3/13/2025 DD 5450 PDM STEEL SERVICE CENTERS MATERIALS&SERVICES 539.35 45634 3/13/2025 DD 5070 PLATT MATERIALS&SERVICES 130.49 45635 3/13/2025 DD 5730 PORTERSIMON LEGAL SERVICES 9,306.00 45636 3/13/2025 DD 9924 RYAN PURSEL* MEETING EXPENSES 298.00 45637 3/13/2025 DD 419 QCS LLC BUILDING MAINTENANCE 5,158.00 45638 3/13/2025 DD 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 12,048.00 45639 3/13/2025 DD 846 REAL GRAPHIC MISC PARTS&SUPPLIES 313.93 45640 3/13/2025 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00 45641 3/13/2025 DD 6155 SAFETY-KLEEN CORPORATION HAZARDOUS MATERIAL COMPLIANCE 494.98 45642 3/13/2025 DD 3826 STONE'S COUNTRYTIRE REPAIRS&MAINTENANCE 110.00 45643 3/13/2025 DD 349 STRADLING YOCCA CARLSON&RAUTH P.C. GC&OG MELLO R0OS ADMIN COSTS 3,859.36 45644 3/13/2025 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 935.48 45645 3/13/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 387.84 45646 3/13/2025 DD 1328 TRAFFIC MANAGEMENT,INC. POLE CHANGE OUTS 5,873.00 45647 3/13/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 1,947.61 45648 3/13/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 995.66 45649 3/13/2025 DD 1546 WATERS CHIROPRACTIC DMV PHYSICAL-C.KRAUSS 140.00 45650 3/13/2025 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 1,291.26 135673 3/13/2025 CHK 657 AT&T COMMUNICATIONS 5,853.27 135674 3/13/2025 CHK 1006 CALIFORNIASTATE DISBURSEMENT UNIT CHILD SUPPORT PPE 03/07/2025 115.38 135675 3/13/2025 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 537.32 135676 3/13/2025 CHK 1553 CRANMER ENGINEERING INC WATER SAMPLE ANALYSIS 100.00 135677 3/13/2025 CHK 348 EDGES ELECTRICALGROUP HARDWARE REFRESH-NETWORK LIFECYCLE 721.56 135678 3/13/2025 CHK 369 FIRSTAMERICAN TITLE INS CO OG MELLO ROOS ADMIN COSTS 2,640.00 135679 3/13/2025 CHK 905 HEALTHEQUITY INC. HSA ADMINISTRATIVE FEES 87.75 135680 3/13/2025 CHK 10932 1&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 277.90 135681 3/13/2025 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 1,885.72 135683 3/13/2025 CHK 5200 NORTHWEST PUBLIC POWER ASSOCIATION MEMBERSHIP DUES 10,632.90 135684 3/13/2025 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 59,102.73 135685 3/13/2025 CHK 99999 FELIX PEDROZA CUSTOMER REFUND-CLOSED ACCOUNT 82.96 135686 3/13/2025 CHK 10808 RAILROAD MANAGEMENTCO LLC LEASE:O/H POWER LINE XING 2,632.27 135687 3/13/2025 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 5,302.29 135688 3/13/2025 CHK 1497 STATE COLLECTIONS AND DISBURSEMENT UNIT CHILD SUPPORT PPE 03/07/2025 612.18 135689 3/13/2025 CHK 10408 TAHOE TRUCKEE AIRPORT DISTRICT EMPLOYEE DEVELOPMENT 4,436.00 135690 3/13/2025 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 3,054.09 135691 3/13/2025 CHK 61 TECH PRODUCTS INC. MATERIALS&SERVICES 332.71 135692 3/13/2025 CHK 999 TOWN OF TRUCKEE REFUND WO#24631225-10144 W.RIVER ST. 2,533.77 6224 3/20/2025 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS 9946 FINAL 1,120.93 6225 3/20/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING TAX 9946 FINAL 1,865.20 6226 3/20/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9946 7,478.62 6227 3/20/2025 WIRE 3824 MISSIONSQUARE 401A CONTRIBUTIONS 9946 FINAL 882.26 45651 3/20/2025 DD 1414 ALPINE SMITH,INC. REPAIRS&MAINTENANCE 110.68 45652 3/20/2025 DD 1537 AMAZON CAPITAL SERVICES,INC SAFETY SUPPLIES 1,476.10 45653 3/20/2025 DD 907 BSK ASSOCIATES WATER SAMPLE ANALYSIS 312.40 45654 3/20/2025 DD 9157 JOSHUAJ CAMPBELL' MEETING EXPENSES 141.00 45655 3/20/2025 DD 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 66.00 45656 3/20/2025 DD 736 FACTORY MOTOR PARTS MISC PARTS&SUPPLIES 455.07 45657 3/20/2025 DD 9347 EMPLOYEE VISION REIMBURSEMENT 518.00 45658 3/20/2025 DD 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 1,087.50 45659 3/20/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 311.06 45660 3/20/2025 DD 10257 GMES LLC TOOLS 878.10 45661 3/20/2025 DD 3480 GRAINGER INC. MATERIALS&SERVICES 466.32 45662 3/20/2025 DD 3515 GRAYBAR ELECTRIC CO INC MATERIALS&SERVICES 322.90 45663 3/20/2025 DD 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,357.82 45664 3/20/2025 DD 1581 J HARLEN COMPANY INC MATERIALS&SERVICES 661.42 45665 3/20/2025 DD 9733 EMPLOYEE VISION REIMBURSEMENT 99.00 45666 3/20/2025 DD 11025 MOONSHINE INK MARKETING 428.00 45667 3/20/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 62.20 45668 3/20/2025 DD 289 NISC FEBRUARY 2025 PRINT SERVICES 22,275.34 45669 3/20/2025 DD 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 142.31 45670 3/20/2025 DD 9504397 PACE SUPPLY MATERIALS&SERVICES 250.00 45671 3/20/2025 DD 10414 SNAP-ON INDUSTRIAL MECHANICS TOOLS:PUD 694.37 45672 3/20/2025 DD 7313 TAHOE SUPPLY COMPANY MATERIALS&SERVICES 202.90 45673 3/20/2025 DD 1328 TRAFFIC MANAGEMENT,INC. POLE CHANGE OUTS 8,768.90 45674 3/20/2025 DD 7176 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 34.25 45675 3/20/2025 DD 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 33,635.89 45676 3/20/2025 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 220.00 45677 3/20/2025 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORM 11.89 45678 3/20/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 497.83 45679 3/20/2025 DD 643 UNITED SITE SERVICES OF NEVADA MATERIALS&SERVICES 655.27 45680 3/20/2025 DD 320 W&T GRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORM 113.93 45681 3/20/2025 DD 7820 WESTERN NEVADA SUPPLY CO INVENTORY 1,512.05 135693 3/20/2025 CHK 134 ANIXTER INC. OFFICE SUPPLIES 4,046.67 135694 3/20/2025 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,353.52 135695 3/20/2025 CHK 99999 ANDREW A BENNETT CUSTOMER REFUND-CLOSEDACCOUNT 149.53 135696 3/20/2025 CHK 80 BORGES&MAHONEY CO MATERIALS&SERVICES 2,333.18 135697 3/20/2025 CHK 99999 RANDY CAMPBELL CUSTOMER REFUND-CLOSED ACCOUNT 25.25 135698 3/20/2025 CHK 193 EASTERN REGIONAL LANDFILL LANDFILLCHARGES 16.25 135699 3/20/2025 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 101.66 135700 3/20/2025 CHK 99999 SERENA MORROW CUSTOMER REFUND-CLOSEDACCOUNT 263.38 135701 3/20/2025 CHK 1540 P31 ENTERPRISES POLE CHANGE OUTS 30,662.45 135702 3/20/2025 CHK 10400 PLACER COUNTYATFN:ACCOUNTS RECEIVABLE 2025 PIPELINE REPLACEMENT 983.62 135703 3/20/2025 CHK 462 POWERPLAN-OIB REPAIRS&MAINTENANCE 97.30 135704 3/20/2025 CHK 999 REYES GENERAL CONSTRUCTION LLC REFUND FEES-14144 HANSELAVE 2,025.00 135705 3/20/2025 CHK 999 RYAN SMITH REFUND TPP 815.00 Page 2of3 Page 5 of 13 Page 44 of 68 Truckee Donner Public Utility District Check Register CA March 2025 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 135706 3/20/2025 CHK 589 STATE OF CALIFORNIA INSURANCE DEDUCTIONS&LOSSES 25.00 135707 3/20/2025 CHK 6860 TAHOE FOREST HOSPITAL DISTRICT PERSONNEL EXPENSES 670.00 135708 3/20/2025 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 12.37 135709 3/20/2025 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.16 135710 3/20/2025 CHK 526 WESTERN INDUSTRIAL PARTS INC. MATERIALS&SERVICES 408.07 135711 3/20/2025 CHK 99999 DAVID WINGARD II CUSTOMER REFUND-CLOSEDACCOUNT 349.66 135712 3/20/2025 CHK PL PAYROLL PAYROLL FINAL CHECK 9,226.93 6223 3/27/2025 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 272,343.65 6229 3/27/2025 WIRE 11233 CALPERS PENSION 83,120.87 6230 3/27/2025 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 03/21/2025 24,368.46 6231 3/27/2025 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 03/21/2025 29,269.08 6232 3/27/2025 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 03/21/25 1,436.48 6233 3/27/2025 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 03/21/2025 132,724.94 6234 3/27/2025 WIRE 3824 MISSIONSQUARE 401A/457 CONTRIBUTIONS PPE 03/21/2025 39,679.60 45765 3/27/2025 DD 1537 AMAZON CAPITAL SERVICES,INC FACILITY SUPPLIES 1,970.91 45766 3/27/2025 DD 11443 AUTOGLASS/MOTORSPORTS EXPRESS-TRUCKEE REPAIRS&MAINTENANCE 304.25 45767 3/27/2025 DD 10376 CORWIN FORD RENO REPAIRS&MAINTENANCE 1,106.18 45768 3/27/2025 DD 893 DEBBIE MADERA CLEANING SERVICE BUILDING CLEANING 7,004.00 45769 3/27/2025 DD 10669 E.H.WACHS COMPANY REPAIRS&MAINTENANCE 452.95 45770 3/27/2025 DD 1562 FASTENERS INC MATERIALS&SERVICES 351.78 45771 3/27/2025 DD 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 137.35 45772 3/27/2025 DD 1484 FUENTES CONSULTING LLC SAFETY MEETING 1,663.45 45773 3/27/2025 DD 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORMS 151.56 45774 3/27/2025 DD 3480 GRAINGER INC. FACILITY SUPPLIES 391.18 45775 3/27/2025 DD 3520 JOHNSON CONTROLS FIRE PROTECTION LP BUILDING MAINTENANCE 1,753.06 45776 3/27/2025 DD 4720 MOUNTAIN HARDWARE AND SPORTS MISC PARTS&SUPPLIES 48.94 45777 3/27/2025 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 220.35 45778 3/27/2025 DD 95 OKONITE COMPANY INVENTORY 120,490.55 45779 3/27/2025 DD 9504397 PACE SUPPLY INVENTORY 1,787.24 45780 3/27/2025 DD 5450 PDM STEEL SERVICE CENTERS MATERIALS&SERVICES 662.74 45781 3/27/2025 DD 1574 REGIONAL GOVERNMENT SERVICES PROFESSIONAL SERVICES:OTHER 1,207.68 45782 3/27/2025 DD 9927 EMPLOYEE VISION REIMBURSEMENT 392.87 45783 3/27/2025 DD 9933 JOSHUA P SCOTVOLD 53605.5 EMPLOYEE DEVELOPMENT-CLASS REGISTRATION 299.99 45784 3/27/2025 DD 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 875.00 45785 3/27/2025 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 863.89 45786 3/27/2025 DD 1286 TYNDALE COMPANY INC EMPLOYEE UNIFORMS 87.83 45787 3/27/2025 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 497.83 45788 3/27/2025 DD 7820 WESTERN NEVADA SUPPLY CO INVENTORY 359.14 45789 3/27/2025 DD 9999 EMPLOYEE VISION REIMBURSEMENT 1,000.00 135713 3/27/2025 CHK 657 AT&T COMMUNICATIONS 95.75 135714 3/27/2025 CHK 99999 JEAN BURROWS CUSTOMER REFUND-CLOSEDACCOUNT 202.69 135715 3/27/2025 CHK 2420 CALIFORNIA MUNICIPAL UTILITIES ASSN MEMBERSHIP DUES 10,000.00 135716 3/27/2025 CHK 1006 CALIFORNIASTATE DISBURSEMENT UNIT CHILD SUPPORT PPE 03/21/2025 115.38 135717 3/27/2025 CHK 9176 JARED CARPENTER* MEETING EXPENSES 360.00 135718 3/27/2025 CHK 1073 CLEAN MACHINE REPAIRS&MAINTENANCE 560.00 135719 3/27/2025 CHK 99999 MISS ALEXIS K EBNER CUSTOMER REFUND-CLOSEDACCOUNT 16.83 135720 3/27/2025 CHK 348 EDGES ELECTRICALGROUP MATERIALS&SERVICES 405.18 135721 3/27/2025 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 58.15 135722 3/27/2025 CHK 1242 GRATEFUL GARDENS BUILDING MAINTENANCE 4,325.00 135723 3/27/2025 CHK 99999 EMILY HALPORN CUSTOMER REFUND-CLOSED ACCOUNT 92.62 135724 3/27/2025 CHK 999 BECK JENSEN REFUND TPP-11885 RIO VISTA DR 836.00 135725 3/27/2025 CHK 7220 NAPA SIERRA REPAIRS&MAINTENANCE 31.44 135726 3/27/2025 CHK 592 NORTHERN SIERRA AIR QUALITY HAZARDOUS MATERIAL COMPLIANCE 993.44 135727 3/27/2025 CHK 99999 LUIS A ORDUNO CONTRERAS CUSTOMER REFUND-CLOSED ACCOUNT 77.01 135728 3/27/2025 CHK 99999 MR HECTOR C RODRIGUEZ CUSTOMER REFUND-CLOSED ACCOUNT 3.62 135729 3/27/2025 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 31.19 135730 3/27/2025 CHK 1497 STATE COLLECTIONS AND DISBURSEMENT UNIT CHILD SUPPORT PPE 03/21/2025 612.18 135731 3/27/2025 CHK 999 TRUCKEE DONNER LLC REF-24644500,ZERO IMPACT EVCHRGRS 349.29 135732 3/27/2025 CHK 99999 JIM VALENTINE CUSTOMER REFUND-CLOSEDACCOUNT 169.21 135733 3/27/2025 CHK 5643 ZORO TOOLS,INC MATERIALS&SERVICES 312.85 230 $4,195,444.31 *Denotes employee reimbursement containing multiple items with no individual item charge of$100 or greater. Page 3of3 Page 6 of 13 Page 45 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND Activity for the Month Ended 2/28/2025 Page 1 of 2 Electric Dept Water Dept Total Balance in General Fund 1/31/2025 $7,295,387 $7,139,352 $14,434,739 Receipts: Revenue received $3,470,601 $1,408,015 $4,878,616 Retired employees medical insurance 19,659 - 19,659 Record interest earned 12,939 2,455 15,393 Reimbursement for COP funded projects - 30,074 30,074 FF Funding&DL Surcharge Reimbursement for 2006 COP - 8,160 8,160 Cash clearing accounts(timing-prior month reversal) (93,381) - (93,381) Cash clearing accounts(timing-current month) 173,498 - 173,498 Total Receipts $3,583,316 $1,448,703 $5,032,019 Disbursements: Accounts payable/payroll disbursements $2,841,074 $1,195,193 $4,036,267 Restrict facilities fees 7,139 5,475 12,614 Restrict Donner Lake surcharge - 9,320 9,320 Section 125 benefit disbursement 42,811 - 42,811 Bank charges 13,277 - 13,277 Total Disbursements $2,904,300 $1,209,988 $4,114,288 Balance in General Fund 2/28/2025 $7,974,402 $7,378,067 $15,352,469 4/24/2025 4:49 PM I:\Treasurers Report\Statement of General Fund\2025\2025-02 GF Page 7 of 13 Page 46 of 68 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Funds Status Report Activity for the Month Ended 2/28/2025 Page 2 of 2 Electric Dept Water Dept Total Distribution of Operating Funds At Month-End: Customer Services Operating Funds $2,400 $0 $2,400 Operating clearing accounts 173,498 - 173,498 U.S. Bank-General Fund 2,834,862 - 2,834,862 LAIF, UPTIF, PCIF, &TVI-General Fund 4,963,643 7,378,067 12,341,710 Total Operating Funds $7,974,402 $7,378,067 $15,352,469 Distribution of Designated&Restricted Funds at Month-End: LAIF, UPTIF, PCIF,TVI &CLASS $33,213,491 $8,088,825 $41,302,316 UPTIF-Donner Lake Assessment District - 87,850 87,850 2015 COP Water Bonds, Principal Payment Fund - 325,835 325,835 2022 COP Issuance/Payment Fund 129,579 286,575 416,154 U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171 Total Designated&Restricted Funds $33,343,070 $8,832,256 $42,175,326 Total Market Adjustments (200,204) (52,549) (252,753) Total Funds Available $41,117,269 $16,157,774 $57,275,043 4/24/2025 4:49 PM I:\Treasurers Report\Statement of General Fund\2025\2025-02 GF Page 8 of 13 Page 47 of 68 INVESTMENT STATUS REPORT Activity for the Month Ended 2/28/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025 ELECTRIC FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-4.33%(4.37%) General Fund 1..136.1 $ 6,294,941 $ 1,252,534 $ (212,821) $ 1,039,712 Consolidate cash (212,821) Capital Replacement Fund 1..136.41 2,181,606 4,207,148 - 4,207,148 AB 32 Cap&Trade Fund 1..136.58 481,113 486,751 - 486,751 Deferred Liabilites Reserve 1..136.42 2,267,444 2,293,973 - 2,293,973 LCFS Credits 1..136.59 112,056 113,382 - 113,382 2022 COP Project Fund 1..132.95 7,039,834 7,122,211 - 7,122,211 Total LAIF Electric Investments 18,376,994 15,475,998 (212,821) 15,263,177 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.53%(4.55%) General Fund 1..136.12 521,095 501,050 (5,135) 495,915 Restrict facility fees (7,139) Record monthly interest 2,004 Facilities Fees 1..136.9 653,845 663,696 9,793 673,489 Restrict facilites fees 7,139 Record monthly interest 2,654 Electric Rate Reserve Fund 1..136.45 1,868,991 2,416,635 9,665 2,426,299 Record monthly interest 9,665 Capital Replacement Fund 1..136.46 495,353 497,379 1,989 499,368 Record monthly interest 1,989 Electric Vehicle Reserve 1..136.13 1,428,687 2,359,530 9,436 2,368,966 Record monthly interest 9,436 Total UPTIF Electric Investments 4,967,970 6,438,289 25,748 6,464,038 PLACER COUNTY INVESTMENT FUND(PCIF)- 4.10%(3.83%) Electric General Fund PC 1..136.49 908,374 911,253 2,964 914,217 Record monthly interest 2,964 Electric Rate Reserve Fund 1..136.47 1,115,617 1,119,153 3,641 1,122,793 Record monthly interest 3,641 Capital Replacement Fund 1..136.48 1,335,212 1,339,444 4,358 1,343,801 Record monthly interest 4,358 Total PCIF County Electric Investments 3,359,204 3,369,849 10,963 3,380,812 TVI INVESTMENTS- 0.55%(0.55%) Capital Replacement Fund 1..136.43 2,966,550 2,966,550 - 2,966,550 Electric Rate Reserve Fund 1..136.44 1,500,000 1,500,000 - 1,500,000 Total TVI Electric Investments 4,466,550 4,466,550 4,466,550 4/24/2025 5:26 PM Investments Status Report Page 9 of 13 r re\Trea,ur,R,port\1,v--t smm,Reports\m2s\m -,--St-,i-, -sums Rep- Page 1 of 4 Page 48 of 68 INVESTMENT STATUS REPORT Activity for the Month Ended 2/28/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025 CLASS INVESTMENTS- 4.41%(4.42%) General Fund 1..136.16 503,934 505,828 2,007,970 2,513,798 Record monthly interest 7,970 Transfer from US Bank 2,000,000 Electric Rate Reserve Fund 1.136.22 1,511,598 1,517,277 4,826 1,522,103 Record monthly interest 4,826 Vehicle Reserve Fund 1..136.23 503,934 505,828 1,609 507,437 Record monthly interest 1,609 Capital Reserve Fund 1..136.24 4,031,201 4,046,348 12,870 4,059,218 Record monthly interest 12,870 Total CLASS Electric Investments 6,550,668 6,575,281 2,027,276 8,602,557 Total Electric Investments $ 37,721,387 $ 29,750,687 $ (176,110) $ 29,574,577 4/24/2025 5:26 PM Investments Status Report Page 10 of 13 I:\Treasurers Report\Investment Status Reports\2025\2025-02 In vestments Status Report Page 2 of 4 Page 49 of 68 INVESTMENT STATUS REPORT Activity for the Month Ended 2/28/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025 WATER FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-4.33%(4.37%) General Fund 2..136.1 3,090,636 3,529,439 207,347 3,736,786 Consolidate cash 212,821 Restrict facility fees (5,475) Facilities Fees 2..136.90 1,411,527 1,891,488 5,475 1,896,962 Restrict facility fees 5,475 Capital Replacement Fund 2..136.41 1,210,177 2,474,330 - 2,474,330 Reserve funding @ budget - Total LAIF Water Investments 5,712,340 7,895,256 212,821 8,108,078 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 4.53%(4.55%) General Fund 2..136.12 908,092 613,741 31,369 645,110 Transfer to DLAD surcharge (9,320) DL Surcharge Reimbursement for 2006 COP 8,160 FF Funding portion of 2006 COP 30,074 Record monthly interest 2,455 Facilities Fees 2..136.25 495,007 16,958 (30,006) (13,047) Record monthly interest 68 Transfer to GF for FF Funding portion of 2006 COP (30,074) West River St.Assessment District 2..136.31 43,090 43,266 173 43,439 Record monthly interest 173 Prepaid Connection Fees 2..136.7 88,057 88,417 354 88,771 Record monthly interest 354 Donner Lake Assessment District Fund 2..136.84 87,144 87,500 350 87,850 Record monthly interest 350 Donner Lake Assessment District Surcharge Fund 2..136.61 223,320 225,372 2,061 227,433 DLAD surcharge collections 9,320 DL Surcharge reimbursement to GF for 2006 COP (8,160) Record monthly interest 901 TSA SAD II Improvement Fund 2..136.85 20,787 20,872 83 20,956 Record monthly interest 83 Water Vehicle Reserve 2..136.13 728,607 1,058,587 4,234 1,062,820 Record monthly interest 4,234 Deferred Liabilites Reserve 2..136.42 120,249 120,741 483 121,223 Record monthly interest 483 Capital Replacement Fund 2..136.46 1,131,023 135,649 542 136,191 Record monthly interest 542 Total UPTIF Water Investments 3,845,376 2,411,104 9,643 2,420,746 PLACER COUNTY INVESTMENT FUND(PCIF)- 4.10%(3.83%) Total PCIF Water Investments - - - - TVI INVESTMENTS- 0.55%(0.55%) Water General Fund TVI2..136.15 2,996,171 2,996,171 - 2,996,171 Total TVI Water Investments 2,996,171 2,996,171 2,996,171 CLASS INVESTMENTS- 4.41%(4.42%) Water Vehicle Reserve 2..136.24 2,015,738 2,023,311 6,436 2,029,747 Record monthly interest 6,436 Total CLASS Water Investments 2,015,738 2,023,311 6,436 2,029,747 Total Water Investments $ 14,569,625 $ 15,325,843 $ 228,900 $ 15,554,742 4/24/2025 5:26 PM Investments Status Report Page 11 of 13 r re\Trea,ur,Rport\1,v--t smm,Reports\mzs\m gymzs-o2-, -sums Rep- Page 3 of 4 Page 50 of 68 INVESTMENT STATUS REPORT Activity for the Month Ended 2/28/2025 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2024 1/31/2025 Activity 2/28/2025 ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS Pre-Market Adjustments Total LAIF Investments 43% 24,089,334 23,371,254 - 23,371,254 Total UPTIF Investments 17% 8,813,347 8,849,393 35,391 8,884,784 Total PCIF Investments 6% 3,359,204 3,369,849 10,963 3,380,812 Total TVI Investments 14% 7,462,722 7,462,722 - 7,462,722 Total CLASS Investments 20% 8,566,405 8,598,592 2,033,712 10,632,304 Total Investments 100% Month End Bal.Mix $ 52,291,011 $ 51,651,811 $ 2,080,064 $ 53,731,876 Market Adjustments Total LAIF Investments (9,106) (9,106) - (9,106) Total UPTIF Investments 16,492 16,492 - 16,492 Total PCIF Investments (16,653) (16,653) (16,653) Total TVI Investments (243,495) (243,408) 86 (243,322) Total CLASS Investments (165) (165) (165) Total Investments $ (252,761) $ (252,840) $ 86 $ (252,754) Post-Market Adjustments Total LAIF Investments 44% 24,080,227 23,362,148 - 23,362,148 Total UPTIF Investments 17% 8,829,839 8,865,885 35,391 8,901,276 Total PCIF Investments 6% 3,342,552 3,353,196 10,963 3,364,159 Total TVI Investments 13% 7,219,227 7,219,314 86 7,219,400 Total CLASS Investments 20% 8,566,240 8,598,427 2,033,712 10,632,139 Total Investments 100% Month End Bal.Mix $ 52,038,084 $ 51,398,971 $ 2,080,151 $ 53,479,122 4/24/20255:26 PM Investments Status Report Page 12 of 13 I:\Treasurers Report\Investment Status Reports\2025\2025-02 In vestments Status Report Page 4 of 4 Page 51 of 68 TRUCKEE DONNER PUD INVESTMENT BALANCES as of February 28,2025 Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/ LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas sec Port Treas Security Treas Cash Res Checking Cash clearings Total 131.1 ELECTRIC FUNDS General Fund $ 1,039,712 $ 914,217 $ 495,915 $ 2,513,798 $ $ $ $ $ $ 2,834,862 $ 175,898 $ 7,974,402 Facilities Fees - - 673,489 - - - 673,489 Rate Reserve Fund - 1,122,793 2,426,299 1,522,103 1,500,000 6,571,196 Capital Reserve Fund 4,207,148 1,343,801 499,368 4,059,218 2,966,550 13,076,086 Deferred Liabilites Reserve/POB Fund 2,293,973 - - - - 2,293,973 Electric Vehicle Reserve Fund - 2,368,966 507,437 2,876,403 AB 32 Fund 486,751 - - 486,751 LCFS Credits 113,382 113,382 COP Project Fund 7,122,211 7,122,211 COP Issuance/Payment Fund - - - 129,579 129,579 Market Adjustments (6,947) (16,653) 9,297 (127) (185,775) - - - (200,204) Total Electric Investments 15,256,230 3,364,159 6,473,334 8,602,430 4,280,776 129,579 2,834,862 175,898 41,117,269 WATER FUNDS General Fund $ 3,736,786 $ - $ 645,110 $ - $ 2,996,171 $ $ $ $ - $ - $ - 7,378,067 Facilities Fees 1,896,962 (13,047) - - 1,883,915 Capital Reserve Fund 2,474,330 136,191 2,029,747 4,640,268 2015 COP Funds - - - 325,835 325,835 West River St.Assessment District 43,439 - 43,439 Deferred Liabilites Reserve 121,223 121,223 Prepaid Connection Fees 88,771 88,771 DLAD Fund 87,850 43,171 131,021 DLAD Surcharge 227,433 - 227,433 TSA SAD II Improvement Fund 20,956 20,956 Water Vehicle Reserve 1,062,820 1,062,820 COP Project Funds - - COP Issuance/Payment Fund - - 286,575 286,575 Market Adjustments (2,159) 7,196 (39) (57,547) - - - (52,549) Total Water Investments 8,105,918 - 2,427,942 2,029,708 2,938,625 325,835 286,575 43,171 - 16,157,774 Electric and Water,subtotal 23,362,148 3,364,159 8,901,276 10,632,139 7,219,401 325,835 416,154 2,878,033 175,898 57,275,043 MELLO ROOS-OLD GREENWOOD - - - - - - 261,424 313,448 - - - 574,872 Total Mello Roos-Old Greenwood - 261,424 313,448 - 574,872 MELLO ROOS-GRAY'S CROSSING 1,941,209 - - 1,377,596 3,318,805 Total Mello Roos-Gray's Crossing 1,941,209 1,377,596 3,318,805 Total Investments $ 25,303,357 $ 3,364,159 $ 8,901,276 $ 10,632,139 $ 7,219,401 $ 325,835 $ 261,424 $ 313,448 $ 1,793,750 $ 2,878,033 $ 175,898 $ 61,168,720 202501 Last Month End Balances 25,303,357 3,353,196 8,891,634 8,598,427 7,219,314 234,245 260,489 312,902 1,667,687 4,072,113 95,781 57,159,757 Change from last month - 10,963 9,642 2,033,712 87 91,590 935 546 126,064 (1,194,080) 80,118 4,008,963 202402 PY Month End Balances 25,225,693 6,606,254 8,849,553 - 9,381,221 315,359 302,850 309,927 1,886,245 3,236,593 200,688 56,314,383 Change from PY Month 77,664 (3,242,095) 51,724 10,632,139 (2,161,821) 10,476 (41,426) 3,522 (92,495) (358,561) (24,790) 4,854,337 2024 12 PYE Balances 25,999,121 3,342,552 8,891,634 8,566,240 7,219,227 142,863 259,524 306 - 2,266,449 220,427 57,159,757 Change from PYE (695,764) 21,608 9,642 2,065,899 174 182,972 1,900 313,142 1,793,750 611,584 (44,529) 4,008,963 I:\Treasurers Report\2025\2025 5Treasurer's Re n\All Investments 202502 S55 Page 13 of 13 Page 52 of 68 AGENDA ITEM #13 Public Utility District m MEETING DATE: May 7, 2025 TO: Board of Directors FROM: Chad Reed, Water Utility Director SUBJECT: Considering Review of the District's 2024 Water Utility Annual Consumer Confidence Reports APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Review the Truckee Donner Public Utility District's Main System and Hirschdale System's 2024 Water Quality Consumer Confidence Reports and provide feedback to staff. BACKGROUND: The Truckee Donner Public Utility District's mission is to "provide reliable, high-quality utility and customer services while managing District resources in a safe, open, responsible, and environmentally sound manner at the lowest practical cost." Additionally, one of the goals outlined in the District's Strategic Plan is to "engage with our customers and communities in a welcoming and transparent way to identify opportunities." Among the many services provided to our ratepayers, the District's annual Consumer Confidence Reports (CCRs) on water quality play a crucial role in fulfilling this mission. A 1996 amendment to the U.S. Environmental Protection Agency's Safe Drinking Water Act (SDWA) mandates that urban water systems deliver an annual water quality report, known as the Consumer Confidence Report. The CCR provides a summary of key water quality information, including the source of the water, detected contaminants, and compliance with regulatory standards. Each year, the District prepares separate CCRs for the Truckee Main System and the Hirschdale System. The State Water Resources Control Board (SWRCB) requires the District to mail or directly deliver the appropriate report to each customer by July 1 . However, since 2012, the SWRCB has permitted the District to provide customers with notice and a direct, "one-click" web link to the CCR as an alternative to mailing a printed copy. ANALYSIS AND BODY: Page 1 of 2 Page 53 of 68 The District's Water Department has prepared the 2024 Consumer Confidence Reports (CCRs) for the Truckee Main System and the Hirschdale System (Attachments 1 and 2, respectively). Each report will be submitted to the State Water Resources Control Board (SWRCB) to ensure regulatory compliance. The Truckee community benefits from a reliable and sustainable high-quality water supply sourced from the Martis Valley Aquifer. This water meets all state and federal drinking water standards, with no reportable violations exceeding the Maximum Contaminant Level (MCL), as established and monitored by regulatory agencies such as the U.S. Environmental Protection Agency (EPA) and the SWRCB (Safe Drinking Water Act, 1996). To ensure customer awareness, notifications regarding the CCR's availability will be included in May water bills via a District bill insert or electronic notification. Customers will be directed to access the report through a "one-click" link on the District's website. Printed copies will also be available upon request. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. FISCAL IMPACT: The costs associated with preparing and distributing the 2024 Consumer Confidence Reports (CCRs) are accounted for in the Board-approved Fiscal Year 2025 (FY25) Water Operations Budget. ATTACHMENTS: 1. 2024 Main System CCR 2. 2024 Hirschdale CCR Page 2 of 2 Page 54 of 68 4 TRUCKEE DONNER Public Utility District 2024 WATER QUALITY REPORT Truckee Main System PWS# 2910003 Customer Views Are Welcome For more information about please visit our website The Truckee Donner Public Utility District encourages community partici- us, at www.tdpud.org . pation in the public process. If you are interested in participating in the TDPUD's decision-making process, you are welcome to attend Board 0 0 0 01-10 Meetings. The Board of Directors meets at 6:00 PM on the first and third Wednes- day of each month in the TDPUD Board room, located at 11570 Donner In This Document Pass Road, Truckee, California. Agendas for upcoming meetings may be obtained on our website or from the Deputy District Clerk's office, (530) . Water Quality General 582-3980. Information For More Information: . Source Water Assessment Where Our Water Comes 0 About this report or the water treatment process, contact Truckee From Donner Public Utility District's Senior Water Quality Technician, Clay Walker at (530)582-3926. Lead In Home Plumbing 0 About water conservation and efficiency, the TDPUD has water con- • Radon servation programs that will help customers save water and save money. Information can be found on our website or by calling (530) • Definitions 587-3896. � 7 II.M1 lllill 1t11t1 11t11i ifii�ii iifi�r II iII Ili. 1f111r[a1Ta if+I111f[flJftjill.11 I fJf Jid!1i€ ITAI►ffi! E� � � I I llll ,.11:lll,l ll[lJl. Eilllt it i�� Illlll lililf will IIiEfl !11W 1ri��'Ininall null f: �^ Este informe contiene informacion muy importante sobre su agua potable. Traduzcalo o hable con alguien que to entienda bien. Page 55 of 68 Water Quality Truckee Donner Public Utility District(TDPUD) is dedicated to providing its cus- tomers with the highest quality drinking water. Our water quality team works dili- gently to exceed State and U.S. Environmental Protection Agency(USEPA) standards. Each year,we collect and analyze 520 routine bac-t samples, along with additional monitoring required under Title 22.All samples are tested by a certified Environmental Laboratory Accreditation Program (ELAP)laboratory using methodologies mandated by State and Federal regulations.This report provides a snapshot of the water quality delivered to TDPUD customers in 2024. It includes details about your local water sources,water monitoring data, and how it com- pares to State and USEPA standards.We believe that well-informed customers play a vital role in maintaining high drinking water standards.That's why we are committed to transparency about your water supply and ongoing efforts to im- prove its quality. It is important to note,that while the TDPUD meets all State and Federal drinking water standards, certain individuals may be more vulnerable to contaminants than the general population. People with weakened immune sys- Source Water tems such as those undergoing cancer treatment, individuals who have received organ transplants, people with HIV/AIDS or other immune disorders, some elderly Assessment individuals, and infants, may be at a higher risk of infection.These individuals should consult their healthcare providers for guidance on drinking water safety. A source water assessment was prepared in For more information on reducing the risk of infection from Cryptosporidium and 2002 for the wells serving the Truckee area. other microbiological contaminants, refer to guidelines from the USEPA and the The wells are located throughout the town of Centers for Disease Control (CDC).You can access this information by calling the Truckee and Glenshire.The District owns Safe Drinking Water Hotline at(800)426-4791 or visiting httl)s://www.epa.gov/ and operates 10 wells varying in depth from 120ft to 500ft. The complete source water ground-water-and-drinking-water/safe-drinking-water-hotline. assessment and known vulnerabilities may be viewed at the Truckee Donner Public Utility District office, located at 11570 Donner Lead in Residential Plumbing Pass Road, Truckee, California, or by calling Chad Reed at(530)582-3984. If present, elevated levels of lead in drinking water can pose serious health risks, particularly for pregnant women and young children.When lead is detected, it typically originates from materials and components in service lines and residential plumbing rather than from the water source itself. While TDPUD ensures the de- livery of high-quality water,we cannot control the plumbing materials used in pri- vate properties. If water has been sitting in your pipes for an extended period, you can reduce potential lead exposure by flushing your tap for 30 seconds to 2 minutes before using water for drinking or cooking. TDPUD conducts routine lead sampling every three years.The most recent testing, performed in 2022,con- firmed that all sampled sites were below the Federal action level for lead.The next round of testing is scheduled for summer 2025. More information about lead in drinking water,testing methods, and steps you can take to minimize exposure visit www.epa.gov/lead. Where Our Water Comes From The drinking water supplied to Truckee Donner Public Utility District(TDPUD) customers in the Truckee system comes from 10 deep groundwater wells.Thanks to natural filtration,the underlying aquifer is well-protected from surface water Lead Line Service contamination, ensuring a high-quality drinking water supply. Inventory Cryptosporidium and Giardia A lead service line material inventory was Recognizing that our potable water sources are exclusively deep groundwater conducted and prepared in 2024 . There are wells,the presence of microscopic organisms such as Cryptosporidium and Giar- no lead lines in the distribution system. A dia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can detailed inventory is available here. cause diarrhea,fever, and other gastrointestinal symptoms. https://www.tdpud.org/departments/water/ water-quality Page 56 of 68 Arsenic In 2001 the United States Environmental Protection Agency (USEPA) implemented stricter standards for arsenic in drink- ing water, reducing the maximum contaminant level (MCL) from 50 parts per billion (ppb) to 10 ppb To put this into per- 7 ` spective, 1 ppb is equivalent to 1 second in 32 years—an ex- r , tremely small measurement. The drinking water provided by ., Truckee Donner Public Utility District (TDPUD) meets all cur- " rent Federal and State standards for arsenic. However, thef USEPA continues to research the potential health effects of prolonged exposure to low levels of arsenic, a naturally occur- ring mineral linked to an increased risk of cancer, as well as potential skin and circulatory issues. Water Source Blending: The TDPUD operates the Glen- shire Drive Well, Prosser Village Well and Old Greenwood Well under a State Water Resources Control Board (SWRCB) approved blending permit. This blending process helps re- duce detectable arsenic concentrations before the water en- Water Hardness ters the distribution system Recent arsenic monitoring results Occasionally, a water user will need to adjust an from the blending point ranged from 4.6 ppb to 9.4 ppb, with appliance, such as a dishwasher or water sof- an average of 7.1 ppb—well below the 10 ppb MCL set by the USEPA. tener, to a particular setting based upon the hardness of the water served to their home or Radon business. Radon is a radioactive gas that is colorless, tasteless, and Please use the information provided below to odorless. It is found throughout the United States and can help with water hardness questions. enter homes through cracks and openings in foundations, accumulating indoors regardless of a home's age or con- struction type. Radon can also be released into indoor air from household water use, such as showering, washing dishes, or other activities. However, compared to radon en- tering through the ground, exposure from drinking water is Water Softener /Appliance Setting far less common and occurs at much lower levels. Radon In 2022 testing, TDPUD had an average hard- is a known human carcinogen, and long-term exposure to ness result of 71.0 mg/L. That translates to an airborne radon has been linked to lung cancer. Drinking wa- average of 4.1 grains per gallon. One grain per ter containing radon may also increase the risk of stomach gallon equals 17.1 mg/L. cancer. If you are concerned about radon levels in your home, testing is recommended. It is generally affordable and easy to perform, and mitigation is advised for concentrations exceeding 4 picocuries per liter (pCi/L) of air. Many radon Grains per Gallon ppm (or mg/ issues can be resolved with cost-effective solutions. For Degree of Hardness (gpg) Q more information, contact: Your State Radon Program (1-800-745-7236) Soft < 1.0 < 17.0 USEPA Safe Drinking Water Hotline (1-800-426-4791) Slightly Hard 1.0- 3.5 17.1-60 National Safety Council Radon Hotline (1-800-SOS- Moderately Hard 3.5 - 7.0 60- 120 RADON). Hard 7.0- 10.5 120- 180 Very Hard > 10.5 > 180 age 57 01 Substances That Could Be In Water Definitions Drinking water—whether from tap or bottled Maximum Contaminant Level (MCL): The highest sources—comes from rivers, lakes, streams, level of a contaminant that is allowed in drinking wa- ponds, reservoirs, springs, and wells. As wa- ter. Primary MCLs are set as close to the PHGs (or ter moves across the land or through the MCLGs) as is economically and technologically fea- ground, it can dissolve naturally occurring �,r sible. Secondary MCLs are set to protect the odor, minerals and radioactive materials and may0 taste, and appearance of drinking water. also pick up substances from human activi- ties or animal presence. , Maximum Contaminant Level Goal (MCLG): The level of a contaminant in drinking water below which To ensure the safety of tap water, the U.S. � there is no known or expected risk to health. MCLGs Environmental Protection Agency (USEPA) F are set by the U.S. Environmental Protection Agency and the State Water Resources Control (USEPA). Board (State Board)establish regulations that limit the presence of certain contaminants in Public Health Goal (PHG): The level of a contami- public water systems. Similarly, State Board regulations set contaminant limits nant in drinking water below which there is no known for bottled water to provide the same level of public health protection. or expected risk to health. PHGs are set by the Cali- fornia Environmental Protection Agency. It is important to note that all drinking water, including bottled water, may con- tain small amounts of contaminants. However,their presence does not neces- Maximum Residual Disinfectant Level (MRDL): sarily indicate a health risk. The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of Contaminants that may be present in source water include: a disinfectant is necessary for control of microbial Microbial Contaminants, such as viruses and bacteria, that may come from contaminants. sewage treatment plants, septic systems, agricultural livestock operations, and Maximum Residual Disinfectant Level Goal wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the rally occurring or can result from urban stormwater runoff, industrial or domes- tic wastewater discharges, oil and gas production, mining, or farming; use of disinfectants to control microbial contami- nants. Pesticides and Herbicides, that may come from a variety of sources such as Primary Drinking Water Standards (PDWS): MCLs agriculture, urban stormwater runoff, and residential uses; and MRDLs for contaminants that affect health along Organic Chemical Contaminants, including synthetic and volatile organic with their monitoring and reporting requirements, and chemicals, which are by-products of industrial processes and petroleum water treatment requirements. production, and which can also come from gas stations, urban stormwater Secondary Drinking Water Standards (SDWS): runoff, agricultural applications, and septic systems; MCLs for contaminants that affect taste, odor, or Radioactive Contaminants, that can be naturally occurring or can be the re- appearance of the drinking water. Contaminants with sult of oil and gas production and mining activities. SDWSs do not affect the health at the MCL levels. More information about contaminants and potential health effects can be Regulatory Action Level (AL):The concentration of obtained by calling the USEPA's Safe Drinking Water Hotline at(800)426- a contaminant which, if exceeded, triggers treatment 4791. or other requirements that a water system must fol- low. Table Key N/A: not applicable N/D: not detectable at testing limit ppm: parts per million or milligrams per liter(mg/L) ppb: parts per billion or micrograms per liter(pg/1) ppt: parts per trillion or nanograms per liter(ng/L) pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter Page 58 of 68 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drink- ing water regulations. Some data may be more than one year old. Based upon Federal and State requirements, the moni- toring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annual- ly, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1 - SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Highest No. Microbiological Contam- No. of months in viola- inants of Detec- tion MCL MCLG Typical Source of Bacteria tions More than 5%of Naturally present in the envi- Total Coliform Bacteria 0 0 samples in a month 0 ronment with a detection TABLE 2 -DISINFECTION BYPRODUCTS #Samples, Average MCLG Typical Source of Contami- Contaminant Frequency Level Range MCL(MDRL) (MDRLG) nant 40-50 per Drinking water disinfectant Chlorine Residual(ppm) month 0.38 .36-.42 4 4 added for treatment By-product of drinking water Haloacetic Acids(ppb) 2 on 8/21/24 1.1 0-2..2 60 N/A disinfection Total Trihalomethanes By-product of drinking water (ppb) 2 on 8/21/24 12.05 7.1-17 80 N/A disinfection TABLE 3 -DISTRIBUTION CUSTOMER TAP SAMPLING FOR LEAD AND COPPER No. of sam- 90th No. sites Date Last percentile Typical Source of Contami- Lead and Copper Sampled Ples collect- level de- exceeding AL PHG nant ed tected AL Internal corrosion of household Lead(ppb) August 32 7.0 0 15 0.2 plumbing systems; discharges 2022 from industrial manufac- tures,erosion of natural deposits Internal corrosion of household Copper(ppm) August 32 0.180 0 1.3 0.3 plumbing systems; erosion of 2022 natural deposits; leaching from wood preservatives Page 59 of 68 TABLE 4- LEAD SAMPLING FOR SCHOOL DISTRICT No. of Schools Re- No. sites Contaminant Dated questing Range exceeding AL PHG Typical Source of Contami- pleLead Sam- AL nant pling Internal corrosion of household Lead(ppb) Dec-18 8 <0.2 0 15.0 0.2 plumbing systems; erosion of natural deposits; leaching from wood preservatives TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Average Level Range of Detec- PHG Typical Source of Contami- (reporting units) Sampled Detected tions MCL (MCLG) nant Alkalinity(as CaCO3) 2022 77 69-88 N/A N/A Naturally present in water (ppm) Bicarbonate Alkalinity(as 2022 77 69-88 N/A N/A Naturally present in water HCO3) (ppm) Calcium(ppm) 2022 15 11-33 N/A N/A Naturally occurring Potassium(ppm) 2022 3.3 2.1-8.3 N/A N/A Leaching of natural depo TABLE 6 -DETECTION OF CONTAMINANTS PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Average Level Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled Detected tions (MCLG) nant Arsenic (ppb) 2022 4.70 N/D - 10 10 0.004 Erosion of natural deposits Barium(ppb) 2022 17.70 7.1-29 1000 2000 Erosion of natural deposits Chromium, Total(ppb) 2022 0.50 N/D- 1.4 100 100 Erosion of natural deposits Chromium,Hexavalent 2023 .8 .29-1.4 10 .1 Erosion of natural deposits (ppb) Fluoride(ppm) 2022 0.01 N/D - 0.63 2 1 Erosion of natural deposits Runoff and leaching from ferti- Nitrate as N(ppm) 2024 0.30 N/D - 0.50 10 10 lizer use; leaching from septic tanks and sewage; erosion of natural deposits Turbidity(NTU) 2022 0.20 N/D - 0.45 5 5 Soil runoff Gross Alpha Particle 2007-2018 0.7 N/D -4.6 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2004 90.8 N/D-560 N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon.The EPA has an advisory MCL of 4000 Page 60 of 68 TABLE 7 —DETECTION OF CONTAMINANTS SECONDARY DRINKING WATER STAND- ARD Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant Chloride(ppm) 2022 11.7 1-62 250 N/A Leaching of natural deposits Odor-Threshold(TON) 2022 0.4 N/D- 1 3 N/A Naturally-occurring organic materials pH 2O22 8.1 8-8.2 6.5 - 8.5 6.5 - 8.5 Leaching of natural deposits Specific Conductance 2019 182 110- 380 1600 N/A Substances that form ions when (µS/cm) in water. Total Dissolved Solids 2019 122 110-230 500 N/A Leaching of natural deposits (ppm) TABLE 8 — Fifth Unregualted Contaminant Monitoring Rule (UCMR 5) Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant PFHxA 2023 .0006 N/D-.0044 N/A .003 Leaching of anthropogenic sub- stance PFPeA 2023 .0007 N/D-.0046 N/A .003 Leaching of anthropogenic sub- stance PFNA 2023 .0004 N/D-.0046 N/A .004 Leaching of anthropogenic sub- stance Lithium 2023 7.7 N/D-32 N/A 9 Naturally-occurring elements Page 61 of 68 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A. The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of water quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. age 2 of 68 ' TRUCKEE DONNER Public Utility District 2094 WAT�B QWAWTY B�PORT Customer Views Are Welcome The Truckee Donner Public Utility District encourages community partici- pation in the public process. If you are interested in participating in the TDPUD's decision-making process, you are welcome to attend Board Meetings. _ The TDPUD Board of Directors meets at 6:00 PM on the first and third --•� .3 Wednesday of each month in the TDPUD Board room, located at 11570 Donner Pass Road, Truckee, California. Agendas for upcoming meetings -- z may be obtained on our website or from the Deputy District Clerk's office, '' (530)582-3980. c> For More Information: 0 About this report or the water treatment process, contact Truckee / � 1J1/l Donner Public Utility District's Senior Water Quality Technician, Clay For more Walker at (530)582-3926. information about us,please visit our 0 About water conservation and efficiency, the TDPUD has water website at conservation programs that will help customers save water and save www.tdpud.org . money. Information can be found on our website or by calling (530) 587-3896. 11111144 HIRSCHDALE WATER SYSTEM �� In This Document . Water Quality General Information • Source Water Assessment . Where Our Water Comes From ■ ,� • Lead In Drinking Water Definitions s i •� f Sampling Results . . bien. Page 63 of 68 Water Quality �r Truckee Donner Public Utility District (TDPUD) is committed to delivering high quality drinking water to its customers. Our water quality team strives to exceed 7 t State and U.S. Environmental Protection Agency(USEPA)standards by conducting 12 routine bacteriological samples annually, along with additional monitoring re- quired under Title 22.All samples are analyzed by a certified Environmental Labora- tory Accreditation Program (ELAP) laboratory using methodologies mandated by =' State and Federal regulations. This report provides a snapshot of the water quality h- "--- delivered to TDPUD customers in 2024. It includes details about local water - •• _ __ sources, annual water quality sampling data, and how our water compares to State and USEPA standards. We believe that well-informed customers play a crucial role in maintaining high drinking water standards. That's why TDPUD is dedicated to transparency and communication about your water supply. It is important to note R that while TDPUD meets all State and Federal drinking water standards, some indi- viduals may be more vulnerable to contaminants than the general population.Those at higher risk include immunocompromised individuals—such as cancer patients undergoing chemotherapy, organ transplant recipients, people with HIV/AIDS or Source Water other immune disorders, some elderly individuals, and infants. These individuals Assessment should consult their healthcare providers for guidance on drinking water safety. A source water assessment has been For more information on reducing the risk of infection from Cryptosporidium and completed for the well serving the other microbiological contaminants, refer to guidelines from the USEPA and the Hirschdale area. The well is located in the Centers for Disease Control (CDC). You can access this information by calling the town of Hirschdale. The District owns and Safe Drinking Water Hotline at (800) 426-4791 or visiting https://www.epa.gov/ operates the single well which is 270ft in ground-water-and-drinking-water/safe-drinking-water-hotline. depth. A copy of the complete assessment may be viewed at the Truckee Donner Public Utility District office, located at 11570 Lead in Residential Plumbing Donner Pass Road, Truckee, California, or by calling Chad Reed at(530)582-3984. Elevated levels of lead in drinking water can pose serious health risks, particularly for pregnant women and young children. When lead is detected, it typically origi- nates from service lines and residential plumbing materials, rather than from the water source itself. While Truckee Donner Public Utility District (TDPUD) provides high-quality water, we cannot control the plumbing materials used in private proper- ties. If water has been sitting in your pipes for an extended period, you can reduce • , I 4 potential lead exposure by flushing your tap for 30 seconds to 2 minutes before ~ - using it for drinking or cooking. TDPUD conducts lead testing every three years. i The most recent sampling, performed in 2022, confirmed that all tested sites were below the Federal action level for lead. For more information on lead in drinking water, testing methods, and ways to minimize exposure,visitwww.epa.gov/lead. .. Where Our Water Comes From The drinking water supplied to our Hirschdale customers comes from a deep aquifer Lead Line Service well. Before reaching your home, this water is filtered to remove iron, manganese, and arsenic, ensuring its safety and quality.Thanks to natural filtration,the ground- Inventory water aquifer is well-protected from surface water contamination, providing a high- quality drinking water supply. A lead service line material inventory was conducted and prepared in 2024 . There are no lead lines in the distribution system. A Cryptosporidium and Giardia detailed inventory is available here. Recognizing that our potable water sources are exclusively drawn from a deep groundwater well, the presence of microscopic organisms such as Cryptosporidium and Giardia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can cause diarrhea,fever, and other gastrointestinal symptoms. Page 64 of 68 Substances That May Be Found In Water Definitions Drinking water sources—both tap and bot- (MCL): The highest tled—include rivers, lakes, streams, ponds, level of a contaminant that is allowed in drinking water. reservoirs, springs, and wells. As water Primary MCLs are set as close to the PHGs (or MCLGs) moves over land or through the ground, it as is economically and technologically feasible. dissolves naturally occurring minerals and, in Secondary MCLs are set to protect the odor, taste, and some cases, radioactive materials, and can appearance of drinking water. also pick up substances from animals or hu- man activities. (MCLG): The level of a contaminant in drinking water below which there is To ensure the safety of tap water, the U.S. x no known or expected risk to health. MCLGs are set by Environmental Protection Agency (USEPA) the U.S. Environmental Protection Agency(USEPA). and the State Water Resources Control _ Board (State Board) establish regulations ,f� (PHG): The level of a contaminant that limit the amount of certain contaminants in drinking water below which there is no known or in water provided by public systems. While drinking water, including bottled expected risk to health. PHGs are set by the California water, may contain small amounts of some contaminants, the presence of Environmental Protection Agency. many contaminants does not necessarily mean the water poses a health risk. ■ I (MRDL): The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of a Examples of contaminants that may be present in source water include: disinfectant is necessary for control of microbial contaminants. Microbial Contaminants, such as viruses and bacteria, that may come from stormwater or wastewater, septic systems, agricultural livestock operations, ORP and wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the use of rally occurring or can result from erosion, urban stormwater runoff, industrial or disinfectants to control microbial contaminants. domestic wastewater discharges, oil and gas production, mining, or farming; (PDWS): MCLs Pesticides and Herbicides, that may come from a variety of sources such as and MRDLs for contaminants that affect health along agriculture, urban stormwater runoff, and residential uses; with their monitoring and reporting requirements, and Organic Chemical Contaminants, including synthetic and volatile organic water treatment requirements. chemicals, which are by-products of industrial processes and petroleum Secondary Drinking Water Stand, (SDWS): MCLs production, and which can also come from gas stations, urban stormwater for contaminants that affect taste, odor, or appearance runoff, agricultural applications, and septic systems; of the drinking water. Contaminants with SDWSs do not Radioactive Contaminants, that can be naturally occurring or can be the affect the health at the MCL levels. result of oil and gas production and mining activities. (AL): The concentration of a More information about contaminants and potential health effects can be contaminant which, if exceeded, triggers treatment or obtained by calling the U.S. EPA's Safe Drinking Water Hotline at (800) 426- other requirements that a water system must follow. 4791. I Table Key N/A: not applicable N/D: not detectable at testing limit ppm: parts per million or milligrams per liter(mg/L) zk ppb: parts per billion or micrograms per liter(pg/L) ppt: parts per trillion or nanograms per liter(ng/L) pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter (NTU): nephelometric turbidity unit(measures water cloudiness) Page 65 of 68 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drinking water regulations. Some data may be more than one year old. Based upon Federal and State requirements,the monitoring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annually, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1—SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Microbiological Contami- Highest No. No.of months in nants of Detec- violation MCL MCLG Typical Source of Bacteria tions More than 5%of samples Total Coliform Bacteria 0 0 in a month with a detec- 0 Naturally present in the environment tion TABLE 2—DISINFECTION BY-PRODUCTS Contaminant #Samples, Average Range MCL(MRDL) MCLG Typical Source of Contaminant Frequency Level (MRDLG) Chlorine Residual(ppm) 1 per month 0.48 .40-.56 4 4 Drinking water disinfectant added for treatment Total Trihalomethanes 1 on 24 N/A 80 N/A By-product of drinking water (ppb) 8/21/24 disinfection Haloacectic Acids(ppb) 1 on 3.2 N/A 60 N/A By-product of drinking water 8/21/24 disinfection TABLE 3—DISTRIBUTION SYSTEM CUSTOMER TAP SAMPLING FOR LEAD AND COPPER 90th per- No.of No.sites Date Last centile Lead and Copper Sampled samples level de- exceeding AL PHG Typical Source of Contaminant collected tected AL Internal corrosion of household water Lead(ppb) 8/11/22 5 .02 0 15 0.2 plumbing systems;discharges from industrial manufacturers;erosion of natural deposits Internal corrosion of household Copper(ppm) 8/11/22 5 0.046 0 1.3 0.3 plumbing systems;erosion of natu- ral deposits;leaching from wood preservatives TABLE 4—SAMPLING RESULTS FOR SODIUM AND HARDNESS Chemical or Constituent Date Last Level De- PHG (reporting units) Sampled tected Range of Detections MCL (MCLG) Typical Source of Contaminant Sodium(ppm) 2022 40 N/A N/A N/A Salt present in the water and is general- ly naturally occurring Sum of polyvalent cations present Hardness(as CaCO3)(ppm) 2022 91 N/A N/A N/A in the water,generally magnesium and calcium,and are usually natu- rally occurring TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant Alkalinity(as CaCO3)(ppm) 2022 150 N/A N/A N/A Erosion of natural deposits Bicarbonate Alkalinity(as 2022 180 N/A N/A N/A Leaching of natural deposits HCO3)(ppm) Calcium(ppm) 2022 15 N/A N/A N/A Erosion of natural deposits Magnesium(ppm) 2022 13 N/A N/A N/A Erosion of natural deposits Potassium(ppm) 2022 7.1 N/A N/A N/A Erosion of natural deposits Page 66 of 68 _ TABLE 6—DETECTION OF CONTAMINANTS WITH A PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tiions MCL (MCLG) Typical Source of Contaminant Inorganic Contaminants Arsenic(ppb) 2023 .63 N/D-1.8 10 0.004 Erosion of natural deposits Barium(ppm) 2022 87 N/A 1000 2000 Erosion of natural deposits Fluoride(ppm) 2022 0.096 N/A 2 1 Erosion of natural deposits Turbidity(NTU) 2022 3 N/A 5 5 Soil runoff Radioactive Contaminants Gross Alpha Particle 2018 N/D 3 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2005 570 N/A N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon. The EPA has an advisory MCL of 4000 pCi/L for Radon. TABLE 7—DETECTION OF CONTAMINANTS WITH A SECON NDAR Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant Chloride(ppm) 2022 7.6 N/A 250 N/A Leaching of natural deposits Iron(ppb) 2022 9.5 N/A 300 N/A Leaching of natural deposits Manganese(ppb) 2022 13 N/A 50 N/A Leaching of natural deposits pH 2O22 7.9 7.7- 8.0 6.5- 8.5 N/A Erosion of natural deposits Specific)Conductance 2022 350 N/A 1600 N/A Substances that form ions when in (µS/cm Sulfate 2022 14 N/A 250 N/A Leaching of natural deposits Total Dissolved Solids 2022 250 N/A 500 N/A Leaching of natural deposits (ppm) Page 67 of 68 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A.The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of wa- ter quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. Page 68 of 68