HomeMy WebLinkAboutRES 2025-27 - Board Docusign Envelope ID: 16533AF9-57E9-4E91-B02B-9DOA707672AA
RESOLUTION No. 2025-27
A RESOLUTION AUTHORIZING THE FREMONT SOLAR PPA PROJECT
TRANSACTION SCHEDULE UNDER THE MASTER FIRM POWER SUPPLY
AGREEMENT WITH UTAH ASSOCIATED MUNICIPAL POWER SYSTEMS; AND
RELATED MATTERS.
***** ***** *****
WHEREAS, Truckee Donner Public Utility District (the "Member') owns and operates a utility system
for the provision of electric energy to its residents and others (the "System') and is a member of Utah
Associated Municipal Power Systems ("UAMPS') pursuant to the provisions of the Utah Associated
Municipal Power Systems Amended and Restated Agreement for Joint and Cooperative Action dated as of
March 20, 2009, as amended (the "Joint Action Agreement');
WHEREAS, the Member desires to purchase all or a portion of its requirements for electric power
and energy from or through UAMPS and has entered into a Power Pooling Agreement with UAMPS to
provide for the efficient and economic utilization of its power supply resources;
WHEREAS, the Member has previously entered into the Master Firm Power Supply Agreement with
UAMPS in order to allow for UAMPS entering into various firm transactions for the purchase and sale of
firm supplies of electric power and energy;
WHEREAS, UAMPS has investigated the Fremont Solar PPA Project, a 99 megawatt (MW) solar
photovoltaic generation facility and a 49.5 MW battery storage system located in Iron County, Utah, on
behalf of its members and is now prepared to enter into a 25 year power purchase agreement with Fremont
Solar, LLC to secure the delivery of all the energy from the Project and associated environmental attributes;
and
WHEREAS, the Member now desires to authorize and approve the Fremont Solar Transaction
Schedule ("Transaction Schedule") attached hereto as Exhibit A for the Project subject to the parameters
set forth in this Resolution.
Now, THEREFORE, BE IT RESOLVED by the Board of Truckee Donner Public Utility District as
follows:
Section 1. Authorization of Fremont Solar Transaction Schedule. The Transaction Schedule,
in substantially the form presented at the meeting at which this resolution is adopted, is hereby authorized
and approved, and the Member Representative is hereby authorized, empowered and directed to execute
and deliver the Transaction Schedule on behalf of the Member. If additional subscription becomes
available, Member Representative may approve an adjustment to the Member's kW subscription up to
total subscription, in which case a revised Transaction Schedule reflecting the increase will be
prepared for signature. Promptly upon its execution, the Transaction Schedule shall be filed in the official
records of the Member.
Docusign Envelope ID: 16533AF9-57E9-4E91-BO2B-9DOA707672AA
Section 2. Other Actions. The President, Secretary, Member Representative and other
officers and employees of the Member shall take all actions necessary or reasonably required to carry out,
give effect to, and consummate the transactions contemplated hereby and shall take all actions necessary
to carry out the execution and delivery of the Transaction Schedule and the performance thereof.
Section 3. Miscellaneous; Effective Date. (a) All previous acts and resolutions in conflict with
this resolution or any part hereof are hereby repealed to the extent of such conflict.
(b) In case any provision in this resolution shall be invalid, illegal or unenforceable, the validity,
legality and enforceability of the remaining provisions shall not in any way be affected or impaired thereby.
(c) This resolution shall take effect immediately upon its adoption and approval.
ADOPTED AND APPROVED this 1st day of October, 2025
TRUCKEE DONNER PUBLIC UTILITY DISTRICT
Signed by:
r,(tiViSfa iln"
F
Christa Finn, Board President
ATTEST AND COUNTERSIGN:
Signed by:
C. Wiz
PF9754AR
Brian Wright, General Manager
2
Docusign Envelope ID: 16533AF9-57E9-4E91-B02B-9DOA707672AA
EXHIBIT A
FREMONT SOLAR PROJECT TRANSACTION SCHEDULE
3