Loading...
HomeMy WebLinkAboutAgenda Packet 2025-09-17 Board of Directors General Manager Jeff Bender • Brian C. Wright Christa Finn Executive Leadership Tony Laliotis Chad J. Reed Courtney Murrell Jared Carpenter Steve Randall REGULAR BOARD MEETING Mike Swanson 11570 DONNER PASS ROAD, TRUCKEE Michael Salmon 6:00 PM, Wednesday, September 17, 2025 Steven Poncelet AGENDA Scott Crow Jillian Steward Martina Rochefort 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Changes to the agenda 5. Public Comment— This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that that item is considered. (The public may comment on any subject that is not on the agenda. Each speaker will be limited to three minutes, but speaker time may be reduced at the discretion of the Board President if there are a large number of speakers on any given subject.) DIRECTOR UPDATE 6. This item provides time for Directors to comment on any item within the purview of the District. CONSENT CALENDAR 7. Consideration to Schedule a Public Hearing on the District's Workforce Vacanies, Recruitment and Retention Efforts Schedule a Public Hearing for October 1, 2025 at 6.00pm or as soon thereafter as possible, to provide information to the public regarding the District's workforce vacancies, recruitment, and retention efforts, receive and consider public input and provide direction to staff. 8. Consideration to Amend the 2025 Contract with Full Heart Design for Graphic Design Services. Authorize the General Manager to amend the 2025 contract with Full Heart Design to increase the not-to-exceed amount from $24,500 to $34,500. a ASPEA I P%UL LEADERSHIP FaUN.�i...I..I ON® 11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.org Page 1 of 241 9. Consideration of Award of a Contract for Conceptual Design Development at Two Storage Tank Sites Authorize the General Manager to enter into a contract with Sauers Engineering to develop conceptual designs for two water storage tanks in the amount of $48,500, plus a ten percent change order allowance of$4,850, for a total authorization not to exceed $53,350. 10. Approval of Meeting Minutes Consider approval of September 3, 2025 Board Meeting Minutes ACTION ITEMS 11. Consideration of Adoption of the 2026-2035 Water Capital Improvement Plan (CIP) Adopt the Truckee Donner Public Utility District Water Capital Improvement Plan for 2026-2035 in substantially the form presented. 12. Consideration of Procurement for Electric Distribution System Line Sensors Authorize the General Manager to execute a Material Purchase Contract with Gridware for electric utility distribution system line sensors in an amount not- to-exceed $770,000 13. Consideration of a Contract with Streamline for the District's 2025 Website Project Authorize the General Manager to enter into a special services contract with Streamline for an amount not to exceed $35,750 for the District's 2025 Website Project and 2026 hosting, maintenance, and support. WORKSHOP 14. 2025 Electric Utility Cost of Service and Rate Study Workshop #2 Receive this report and provide direction to staff. ADJOURNMENT The agenda is available for review at the TDPUD Administrative Office and the District's internet website. Posted on Friday, September 12, 2025. Martina Rochefort, District Clerk A copy of the agenda packet is available for public review, during normal business hours, at the District Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to Page 2 of 241 accommodate participation of the disabled in all of the Districts public meetings. If particular accommodations for the disabled are needed (i.e. disability-related aids, or other services), please contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the meeting. Any person with a disability may submit a request for reasonable modification or accommodation to the above-described means for accessing and offering comment at the meeting to Martina Rochefort, District Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request. Page 3 of 241 AGENDA ITEM #7 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Jillian Steward, Director of Human Resources & Risk Management SUBJECT: Consideration to Schedule a Public Hearing on the District's Workforce Vacanies, Recruitment and Retention Efforts Z_ APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Schedule a Public Hearing for October 1, 2025 at 6:OOpm or as soon thereafter as possible, to provide information to the public regarding the District's workforce vacancies, recruitment, and retention efforts, receive and consider public input and provide direction to staff. BACKGROUND: To address the widespread and significant problem job vacancies in the public sector pose to the State of California, Governor Newsom signed Assembly Bill 2561 (AB 2561) on September 22, 2024. AB 2561 creates new requirements for public agencies to report before the governing board on vacant positions as well as recruitment and retention efforts through a public hearing at least once per fiscal year. If the governing board will be adopting an annual or multiyear budget during the fiscal year, the presentation shall be made prior to the adoption of the final budget. As part of the hearing, public agencies, i.e. the District, must identify any challenges and potential necessary changes to policies, procedures, and recruitment activities to overcome these challenges. If the number of budgeted job vacancies represented by a single bargaining unit meets or exceeds 20 percent of the total number of authorized full-time positions, the public agency shall, upon request of the recognized employee organization, include additional information during the public hearing. This information includes total number of job vacancies within a bargaining unit, total number of applicants, average number of days to complete the hiring process, and opportunities to improve compensation and other working conditions. The recognized employee organization for a bargaining unit shall be entitled to make a presentation at the public hearing. ANALYSIS AND BODY: Page 1 of 2 Page 4 of 241 Staff is prepared to present the District's vacant positions and recruitment and retention efforts in accordance with AB 2561 through a Public Hearing during the October 1, 2025 Board Meeting. Staff will notify our recognized employee organization, the International Brotherhood of Electrical Workers (IBEW) 1245, of their opportunity to make a presentation during the public hearing. Public notice of the hearing will be provided in accordance with District Code by publication of a notice in a generally circulated newspaper for two successive weeks, with at least five days between the respective publication dates, and at least 10 days prior to the public hearing. The notice will be published in the Sierra Sun in accordance with the District Code. GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this item. ATTACHMENTS: None Page 2 of 2 Page 5 of 241 AGENDA ITEM #8 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Steven Poncelet, Public Information Officer SUBJECT: Consideration to Amend the 2025 Contract with Full Heart Design for Graphic Design Services. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to amend the 2025 contract with Full Heart Design to increase the not-to-exceed amount from $24,500 to $34,500. BACKGROUND: Communications is one of the District's core values and the District has made investments in both staff resources and professional services to improve and expand both internal and external communications. In mid-2022, the District added a Communications position to the Public Information and Strategic Affairs Department to leverage existing professional services in marketing, communications, and graphic design. Professional services have also expanded to include photo/video creation and digital marketing. Each year the communications team has developed annual communications plans and is expanding staff's capacity to create compelling communications and leverage traditional and emerging communications channels. This includes expansion into social media and digital platforms that require compelling and modern images, videos, and graphics to tell the District's story. In 2025, the District expanded the contract for marketing and outreach services to include, in addition to ongoing annual activities, one major communications campaign. For 2025, this campaign is focused on the District's water resources, infrastructure, and what goes into water rates. Staff have shared with the Board some infographics and a new web page that was developed to support the first portion of this campaign. The campaign is now shifting towards water rates and the value provided to our ratepayers by the District. This includes designing a Proposition 218 customer mailer as well as an educational flyer to help customers understand the District's water rates process. In addition to the water campaign, there has been a significant effort to begin updating the TDPUD Patricia S. Sutton Conservation Garden signage, marketing materials, and web page. Page 1 of 3 Page 6 of 241 This year, communication and outreach efforts with newly-designed visual components included wildfire mitigation/NV Energy Public Safety Outage Management (PSOM), Your Money at Work (various electric and water projects), standardizing the District's logos/press materials, and creating social media templates for evergreen campaigns. All of the above, plus the additional water campaign, have required significant support from the District's graphic design consultant, Full Heart Design. This was compounded by additional work needed from Full Heart Design to fill in for the absence of the District's Communications Program Manager for a few months while out on leave. ANALYSIS AND BODY: The District's current 2025 contract with Full Heart Design is for an amount not to exceed $24,500. Through July, the District has spent —$17,500 with an additional $5,000 expected for August, leaving only —$2,000 for the remaining four months of the year. As detailed above, the District did see an increase in the workload for graphic design this year. There remain significant communication activities for the remainder of 2025. This includes completing the water campaign all the way through the budget process. The budget process will see new proposed rates for both electric and water customers and District staff are working on communicating the value that the District provides for the proposed rates. This will include a new rate 'one-sheet' and a web section on 'how to read your bill', both of which require compelling graphics and designs to support the message. Also planned for this year are: the completion of the conservation garden signage, marketing materials, and web page update; ongoing wildfire mitigation communications including new District system hardening and pre-emptive de-energization programs; creation of graphic assets for the District's digital screens, a year-end report, and regular print/web/social/digital graphic designs. As a result of the increased workload to date and anticipated workload to complete the year, staff are proposing to increase the amount of the 2025 Full Heart Design contract in the amount of$10,000, from a not-to-exceed amount of$24,500 to $34,500. Excess funds are projected to exist in 1/2.2.930.10.655 (Digital Marketing) to cover the increase in the contract. It should be noted that the Digital Marketing account was created to support the District's communications expansion, which includes the graphic designs needed to create compelling communications and outreach. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 3. Engage with our customers and communities in a welcoming and transparent way to Page 2 of 3 Page 7 of 241 identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The District's current 2025 contract with Full Hear Design is for an amount not to exceed $24,500 and the proposed contract amendment is an increase of$10,000 for an amount not to exceed $34,500. Excess funds are projected to exist in 1/2.2.930.10.655 (Digital Marketing) to cover the increase in the contract with the current balance to date of —$8,000 and the 2025 budget of $42,436. ATTACHMENTS: None Page 3 of 3 Page 8 of 241 AGENDA ITEM #9 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Neil Kaufman, System Engineer Chad Reed, Water Utility Director SUBJECT: Consideration of Award of a Contract for Conceptual Design Development at Two Storage Tank Sites _t ev APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to enter into a contract with Sauers Engineering to develop conceptual designs for two water storage tanks in the amount of $48,500, plus a ten percent change order allowance of $4,850, for a total authorization not to exceed $53,350. BACKGROUND: The District currently operates 35 water storage tanks located throughout the water distribution system: • 31 ground level welded steel tanks • Two ground level bolted steel tanks • One partially buried pre-stressed concrete tank • One elevated welded steel tank The tanks range in volume from 100,000 gallons to 2.25 million gallons with the oldest tank constructed in 1963 and the newest tank constructed in 2024. The District's Water System Master Plan identified the need for additional water storage capacity. Recent analyses regarding the implementation of modified water pumping schemes and time-of-use electricity rates have also bolstered the case for additional storage capacity. ANALYSIS AND BODY: District staff has performed a preliminary review of all the District's existing water storage tank sites to determine where additional storage capacity could be Page 1 of 3 Page 9 of 241 beneficial. This review considered four main factors: 1. Water system operations: This issue considered pump operations, pressure zone configuration, movement of water from the source wells efficiently moved through the distribution system and water quality concerns. 2. Available real estate space: This issue considered whether additional storage capacity could be constructed on property currently owned by the District, or whether additional property would be required. 3. Condition and age of existing storage tanks: As discussed at prior Board meetings, recent project experience has determined that rehabilitation of the existing storage tanks that were constructed in the 1960s and 1970s may not be cost-effective in some cases. In some circumstances, the replacement of these tanks is the recommended alternative. 4. System Impact: This issue considered how a replacement storage tank would be constructed while maintaining water service to the District's customers. It also considered whether a pump station is also located at the tank site and how the pump station would be affected by the storage tank replacement. Multiple sites were identified for future tank replacement or rehabilitation. Innsbruck and Ski Lodge Tank facilities are both located within the Tahoe Donner subdivision and are shown in the attached figure (Attachment 1). In August 2025, Water Department staff discussed the need for additional water system storage with Sauers Engineering. Staff requested that Sauers submit a proposal to develop conceptual designs for additional storage at the Innsbruck and Ski Lodge tank sites. These conceptual designs would include site, grading and piping plans developed to a sufficient level that the need for additional property and/or easements could be determined. Sauers would then prepare drawings that the District would be presented to the property owners for further discussion. Staff wanted to start the preliminary engineering now. Once the engineering is done, the District will be better informed on how to proceed with any necessary easements and/or parcel lot line adjustments. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. Page 2 of 3 Page 10 of 241 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The cost proposal from Sauers Engineering is $48,500. A ten percent change order allowance of $4,850 is also recommended, for a total not to exceed amount of $53,350. Sufficient funds exist in the 2025 capital budget to begin this engineering services contract in FY2025, with completion in 2026. Project funding will be included in the FY 2026-27 proposed budgett. ATTACHMENTS: 1. Board - Tank Concept Design Proposal - Figure Page 3 of 3 Page 11 of 241 ����� �i♦ 0 Illlllll�\ �� 1 AIR Cp�Q ���♦ ��I/SIG i�i �. -i 1►O ���� C�:14G�GG� 1►����C Q���,�� ������►� III I �� II IU 00 p11111I Ilrnri/��� p II���•_ �,, ��� .���y�_.�illl►1���� ����`�0�.�� � uull►pi / ��i��i ♦��,�iiiuiii�iiili IIIr:////i/ :,i%////Il1►,i�\1�j IIIIIIj�� ���`,�O,��O�`�\\1u■- ���i ►♦ ♦ �`��♦ ��, I/I/ �i �� ♦ �. /III .1 /i/ �� Iill►Ij ♦ `� O `I11�,� �� `►�J �� ���� ♦♦ �� 11111II/j /I� ���UIIIIIIIIIII/I���/ I►I/j/��III/j►III� 1II ��1►�0 `����0��� �I� �- ���1111■ II�� ������ `������\IIIII//II �I c�',i� ���111111► OIII 41 �� ♦� ����� I ���• O� VIIP���Q`♦♦� ��O�O��V/I I/OI��� ♦ °�����11111111111►/��1i i //I/j �i�////j I 1 � ��O Q Q ♦ �� ♦ ��` �����♦ O`���� ��// /�I�O�O� ��,0 O ��V��►IIII �I �I/►i�11 11_��� �O�� .� 7��� ♦ ♦11�1 � Q ♦ ♦♦ � �,.♦ ♦ --.ill // ♦ ■--� ►� �I � �i � �.� ♦ -- /III/ //Ir�11111111111 1111111� 4111�! i un► . �. • � � I� I// ♦i GG G .,.,ii O --�I►IjI ///// rrri =��= ♦� �,1,�\ 1 // : //I�i i �� 'iI�/I////,_ III ��I�� ///I►►�I� ► G _� �1111►1► ♦ IIIII I ♦ ♦ i�♦ ii i ♦I I/ �-� II I I I � ���. i � ��i ��I►�1/I/j �� //// ��i��/ �G ��I ��� ♦ ♦i rq 1111 •�. OI == om �i/I i� ♦�I ♦ ♦ i � i � � �� .I I/j// IIIII �►� I��i�������� r IIII►j/♦��,11►j/ I���I/��I��/ ���� ����♦j � �� I III �►♦ �VIIIII►►j p ZC i�0�� �p0 I/jh II/�II� �I��I/ �► ♦IIIII -I► ■ ♦ ♦ � ���=�"- �//;I``��� ♦♦ v��/i/,►�i,�O��i ����/1111\�,��`���0, �=► �1 11111111�1�1�^" . I ►I� �� ------- ��p00��``�� '�s//4i���������►♦♦♦♦ OuvO�O``O�♦`,� 111v ♦�__15 r�� ,���1 ���►���-_ ♦ � ♦ ♦ �,� 1111111111111111� ♦ I r _- __�-� �- �� / � � ♦ � `,,�, ` `� 111� � C �111111I111111// �G �� ���-� �►EGG♦� �1�� �� // ♦/I►� �� � �Q �� �� ��y�� ��- ♦ �___�_ ♦� �- � �p� �� �111►� ♦\VIIIIII�\ ►I� � I �►�O���1 ♦ O`er�O��O` �111 � • � �-_--� ,11�1�/// ♦♦♦ �411O1 �� �� /I � ��� ��♦ � �►+ ♦♦\\\\\\ /I� C�I�►��1�� -� --- O V►� //I O ����� ♦ ��111111I �� �I � ��� �►. �� D \11/I ii � �/�► �(I� � ��-- --� ������� ♦ �1►� ♦ ♦ �� �IIIIIIII I���V/�� � �■�i� ��� ♦ ��♦ \\\\\\\ iii�i QII11► �I�1►-SO �� �� �� ����� ��� �C�00` Q��V�p� O` DI �G ♦ ���♦ II -p ♦ II►\ �40i� \II /IIIII►♦ I �O p�p�� �p�` 111111►�/♦j O/j_I� 9 ','I'' �� �� �it►��=_C� ���� ♦ ♦ ♦ ♦ �trl ►�\IIIIIIII/I I �� I ��I�I�� ,� � � C� �� ��♦�I �I♦ i I���D����, ��Q� �����,� ��� rIII/ III � � �♦ � ��� ��i���/111►I / I� �� p �jI►i �� ♦ ♦► ■D O� O� Q��p \\111111111���II / � *� �� �►�� �III� ,�� ,Q,Q,,Q �ItI`QIIIIII/ \II►j �� Q �Q III►I� I����� � ► � � �11 � ���� � I� �V► IIIIIII►�� �` ��� � Q // �I �1,� �� i C, ►�►��I►/��� I� I�� ��\II �� � �11►0� ��i p ����� ��� p� ��111111/� � �1111�i11111D� //, �_ 1►p�••��i ��/� ♦�i♦i♦�////Ilmun�ID�14iG� O��O�` ♦illlll� �' � �I��,, -I�==►. =ups♦ �� �� ��� `O `p � /� qw. � . � ♦. ., .\�.�. � �iU1 . ♦��� :III/►I���,./� ///iiiiiiiiiii iDv��Oj/�0����iillliiiiiiii•�i ♦��i��i���ilu�� 'rrr/i/ Pil��• �c `� •��� ,���ijj/ii��i� �,���, IIIII/j/ ��Ijj11 U►\\���Iu�O�`�I/ulllllllllu►�� � ���.���/I u1111111�////b�/♦��� �� ♦ �, /►I���� � ` •_�i�1• i� unuu //�annl V�ri ij�� //� b'�> pinuuuu��� _ �► ;�, �� ��j�����\ ! IuuWlw•1r III► galhlr /► ♦ �unllvm �,i 1111111111111111I��r►1111\\IIIIIIIIIIIu1111111111111/III11111/I�I11 1111���!���4111111W1 �I�� O��O`� ♦ IIu1.11►r,�♦ ♦ �1111111111�1 -- � •rulllllllllllllllllllllllllllii►Ii ,. •Iln►1111►�/i \�� ��1��11111111►►IIIIU�� ��f� ,�//j///��I/II /I�i11II11I111111111111111u.�-d L11111111 rl►DPI -- • •• _ 11IIIIIIIIIIIIIIIII����■Illuulun.��'--IIIII► ♦u11 j�� I/i111►11►111111111111►IIIID ��11►��� � - '''�����IIIIIIIIIIIIIIIIIIIII�IIIIIIIL'IIIIIII�IIIII�IIIIIIII11/IIIII/in-sellNINE HIS TRUCKEE DONNER • Public Utility District AGENDA ITEM #10 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: Approval of Meeting Minutes APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Consider approval of September 3, 2025 Board Meeting Minutes BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. FISCAL IMPACT: There is no fiscal impact associated with approval of meeting minutes. ATTACHMENTS: 1. Minutes 2025 0903 DRAFT Page 1 of 1 Page 13 of 241 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 3, 2025 1. Call to Order Meeting was called to order at 6:01 p.m. 2. Roll Call Directors Present: Courtney Murrell, Steve Randall, Vice President Tony Laliotis and President Christa Finn Staff in attendance: Brian Wright, General Manager; Scott Crow, Chief Information Officer/Director of IT/Assistant General Manager; Mike Salmon, Chief Financial Officer; Chad Reed, Water Utility Director; Jared Carpenter, Director of Electric Power Supply; Mike Swanson, Director of Electric Engineering & Operations; Neil Kaufman, Water Engineer; Alex Spychalsky, Communication Specialist; Trey Griffin, Senior Network & Systems Administrator; Martina Rochefort, District Clerk/Executive Assistant Other: Steve Gross, General Counsel; Shawn Koorn & Kevin Lorentzen of HDR Engineering, Inc. Absent: Director Jeff Bender 3. Pledge of Allegiance Director Laliotis led the Pledge of Allegiance. 4. Changes to the agenda No changes were made to the agenda. 5. Public Comment No public comment was received. DIRECTOR UPDATE 6. President Finn provided an update on recent developments in the energy sector. DEPARTMENT UPDATES 7. Department updates were received from Mike Swanson, Director of Electric Operations & Engineering, Chad Reed, Water Utility Director, Alex Spychalsky, Communication Specialist, and Jillian Steward, Director of Human Resources and Risk Management. CONSENT CALENDAR 8. Closeout of the Ski Run Tank Replacement Construction Contract Adopt Resolution 2025-22 accepting the Ski Run Tank Replacement project as complete and authorize the filing of the Notice of Completion. 1 Page 14 of 241 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 3, 2025 9. Closeout of the District Pipeline Replacement— 2024 Construction Contract Adopt Resolution 2025-23 accepting the District Pipeline Replacement — 2024 project as complete and authorize the filing of the Notice of Completion. 10. Consideration of Adopting Resolution 2025-24 Authorizing Staff and Special Counsel to Proceed with the Foreclosure Process on all Parcels with Delinquent Assessments within the CFDs as Required by Bond Covenant. a. Adopt foreclosure Resolution 2025-24 authorizing staff and special counsel to proceed with the foreclosure process on all parcels with delinquent assessments within the CFDs as required by Bond covenant; and b. Authorize the General Manager to execute a contract for legal services with Stradling, Yocca, Carlson, & Rauth for their work relating to the foreclosure on delinquent parcels. 11. Consider approval of the District's updated Conflict of Interest Code a. Approve the District's updated Conflict of Interest Code and direct staff to submit the code to the FPPC for final approval; and b. Direct staff to update District Code Chapter 2.52 upon receipt of final approval from the FPPC 12. Approval of Meeting Minutes Consider approval of August 20, 2025 Board Meeting Minutes 13. Consider Approval of the Treasurer's Report, September 2025 Approve the Treasurer's Report for September 2025 which includes: a. Fund Balances for the Month of June 2025 b. Disbursements for the Month of July 2025 c. Delinquent accounts receivable write-offs in accordance with District Code section 3.12.020 14. Schedule a Public Hearing for November 5, 2025 on the proposed FY26 and FY27 Budget. Schedule a Public Hearing for November 5, 2025 at 6:OOpm, or as soon thereafter, to receive public comment on the proposed FY26 and FY27 Budget. 15. Schedule a Public Hearing for November 5, 2025 on the proposed electric rates for FY26 and FY27. Schedule a Public Hearing for November 5, 2025 at 6:OOpm, or as soon thereafter, to receive public comment on the adoption of an Ordinance of proposed electric rates for the years 2026 and 2027. 2 Page 15 of 241 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 3, 2025 16. Consideration to increase the 2025 Annual Authorization for Electric Material Market Basket Purchases Authorize an annual procurement increase of$350,000 for electric material market basket purchases for a total FY25 not-to-exceed amount of$950,000. 17. Closeout of 2025 Asphalt Replacement Project Contract Adopt Resolution 2025-25 accepting the 2025 Asphalt Replacement Project as complete and authorizing the filing of the Notice of Completion. No public comment was received. ACTION: Motion made by Director Randall to approve the Consent Calendar as presented, seconded by Director Laliotis. AYES: Murrell, Randall, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: Bender Motion passed unanimously. ACTION ITEMS 18. 2025 Water Utility Cost of Service and Rate Study - Establish proposed water rates for FY26 - FY30 and set Public Hearing date of November 19, 2025 for Water Rates Ordinance a. Establish proposed water rates for the five years 2026 through 2030 and begin the rate adoption process in accordance with California's Proposition 218 b. Schedule a Public Hearing on November 19, 2025, starting at 6:00pm or as soon thereafter, to consider adoption by Ordinance the water rates for the years 2026 through 2030 Mike Salmon, Chief Financial Officer, and Shawn Koorn of HDR Engineering, Inc. presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Laliotis to establish proposed water for the five years 2026 through 2030 and begin the rate adoption process in accordance with California's Proposition 218 and schedule a public hearing on November 19, 2025 to consider adoption by Ordinance the water rates for the years 2026 through 2030, seconded by Director Murrell. 3 Page 16 of 241 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, SEPTEMBER 3, 2025 AYES: Murrell, Randall, Laliotis and Finn NAYS: none ABSTAIN: none ABSENT: Bender Motion passed unanimously. WORKSHOP 19. 2025 Electric Utility Cost of Service and Rate Study Workshop Receive this report and provide direction to staff. CFO, Mr. Koorn and Kevin Lorentzen of HDR Engineering, Inc. presented the item. No public comment was received. Discussion was held. ADJOURNMENT Meeting adjourned at 8:10 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Christa Finn, President Respectfully Submitted, Martina Rochefort, District Clerk 4 Page 17 of 241 AGENDA ITEM #11 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Chad Reed, Water Utility Director SUBJECT: Consideration of Adoption of the 2026-2035 Water Capital Improvement Plan (CIP) APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Adopt the Truckee Donner Public Utility District Water Capital Improvement Plan for 2026-2035 in substantially the form presented. BACKGROUND: The District maintains an extensive potable water system, including more than 220 miles of pipeline, 46 pressure zones, 32 storage tanks, and 25 pump stations, with a large share of the original infrastructure installed between 1965 and 1975 and now at or beyond its intended service life. Utility capital improvement plans are intended to provide long-term forecasts of anticipated capital improvements required to maintain infrastructure. These plans often require periodic updates and revisions to account for changing conditions (economic, regulatory and system demands). The current Capital Improvement Plan (CIP, adopted in 2019) has guided work to date but requires refinement to reflect evolving regulations, updated costs, and theDistrict's strategic direction. The CIP is a long-range roadmap of the major rehabilitation and replacement projects needed to keep the water system reliable and safe. CIP's focus on asset condition, useful life, system criticality, and opportunities to reduce operating costs. For the District, the useful life of many facility types, including pipelines installed after 1976, storage tanks, pump stations, and wells, is typically about 75 years. Some older installations (e.g., pipelines prior to 1976) have shorter planning lives due to historical materials and installation practices. For the current CIP update, staff included the evaluation of how Time of Use (TOU) power pricing may be incorporated into water utility operations by using existing water storage capacity to reduce peak period pumping demands, without compromising emergency reserves. To address these challenges and update the CIP plan, a Request for Proposal (RFP) was issued to DOWL to prepare a 10-year plan (2026-2035). Staff recommendation to select DOWL without public advertisement of a formal RFP was driven in large part by Page 1 of 3 Page 18 of 241 DOWL's substantial experience and intimate knowledge of the District's water utility capital projects.The selection of Dowl and contract award were approved by the Board of Directors on March 12, 2025, with a not-to-exceed contract amount of$86,328. On July 16, 2025, staff and DOWL presented the draft CIP at a workshop to the public and the Board. The presentation covered system conditions, regulatory context, prioritization methods, cost estimating, and the draft project list, and invited input from the Board and community. The Board's general direction was supportive of the proposed road map and emphasized staying current on capital replacements rather than delaying capital projects. Feedback from the workshop has been incorporated into this adoption item. This update also supports the District's 2025 Water Rate Study by aligning rate-funded capital work with documented needs, updated costs, and operational opportunities; in short, it ties rate-funded capital to system requirements for the next decade. ANALYSIS AND BODY: One of the primary goals of this document is to establish long term capital plans in alignment with the evolving regulatory and legislative standards, while maintaining affordability and system reliability. The final section of the CIP deals with how the District can be more efficient as we move forward and assess TOU pumping schemes and practices. DOWL and Water Department staff have been collaboratively working on the CIP study and the final work product is a technical memorandum. Copies of the draft memorandum and all supporting documents are included as attachment to this staff report (Attachment 1). Representatives from DOWL will attend the Board meeting to present the technical memorandum and answer questions. The CIP positions TDPUD to stay current with state water policy and performance frameworks, including California's "Conservation as a Way of Life" (AB 1668/SB 606), which drives ongoing attention to distribution system water loss reductions and efficient operations. The regulatory review completed for the update considered local, State, and Federal requirements relevant to rehabilitation and replacement programs and recommends continued monitoring as changes advance. Scope and priorities are consistent with Board direction provided during the previous workshop. The 2026-2035 program prioritizes rehabilitation and replacement of existing assets based on condition, useful life, and system criticality. Projects are aimed at maintaining reliable service and are expected to be rate funded under the forthcoming rate design. The method and useful life project timing are grounded in the District's Facilities Replacement Plan methodology: first inventory assets, next assess condition and year of installation, and compute remaining life using expected useful life in combination with age and condition factors. These lifecycle assumptions, combined with operational history (e.g., leak experience), inform the prioritization and pace of replacements. Page 2 of 3 Page 19 of 241 The plan also evaluates whether existing tank storage can support off-peak pumping (reduced pumping during periods of peak energy demands) while maintaining an emergency reserve equal to 75% of water storage tank capacity. The high level assessment indicates that most sections of the system can meet maximum day demand without pumping during peak energy demand windows, with only a few sections requiring either limited peak pumping or future storage adjustments. These findings support targeted updates to pumping schedules to reduce power costs while preserving public safety margins. Planning level costs are based on FY2025 (Q1) labor, equipment, and materials with a 5% annual escalation applied through 2035. The District's targeted annual capital investments goals are approximately $6.5—$8.0 million per year, with an average of roughly $7.9 million per year over the 2026-2035 period (actual year-to-year expenditures will vary with project sequencing and available funding). GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: Adoption of the updated CIP does not have a direct fiscal impact. The CIP serves as a long term plan to inform the development of annual water utility capital budgets and utility rates. ATTACHMENTS: 1. Attachment 1 Page 3 of 3 Page 20 of 241 DOWL TECHNICAL MEMORANDUM TO: Chad Reed,TDPUD FROM: DOWL DATE: 8/14/2025 PROJECT: Capital Improvement Plan Development 2025 1.0 BACKGROUND The Truckee Donner Public Utility District (District) completed an updated water system Capital Improvement Plan (CIP) in 2020 that focused on water storage during power outages, project cost estimation, and project prioritization and schedule.The purpose of this study is to update the infrastructure needs of the District as they relate to useful life, condition, criticality, and potential to optimize operations for time of use savings. The 2020 CIP update was used by the District for financial planning; however, economic conditions resulting from the COVID 19 pandemic inflated project costs which limited the quantity of projects the District was able to complete between 2021 and 2025.The District is preparing to complete a utility rate adjustment in the fall of 2025, and an update to the CIP is required to prioritize current infrastructure needs based on realistic increases to rates and expected funding. In March of 2025, the District entered into an agreement with DOWL Engineering (DOWL)to prepare the District's 2026 Water Infrastructure CIP Development (Project)which will focus on the preparation of an updated 10-year Water Infrastructure CIP 2.0 PROJECT SUMMARY DOWL was directed by the District to develop a 10-year CIP beginning with projects in 2026. This 10- year CIP spans the timeframe of 2026-2035. The Project Scope of Work identified the following Project tasks: 1. Review Existing System Information. 2. Identify Existing Facilities Planned and Recommended for Rehabilitation and/or Replacement. 3. Review Regulatory Impacts. 4. Conduct Time of Use Electrical Rate Analysis. 5. Develop Cost Estimating Criteria. 6. Develop 10-year CIP. 7. Prepare CIP Report. DOWL evaluated the Project tasks and closely coordinated with District staff to develop a complete list of CIP Projects based on the District's understanding of the condition and criticality of existing infrastructure. Based on discussion with District Staff, buildout demand projections are less than estimated in the 2012 Water System Master Plan due to construction of fewer developments overall and incorporation of water conservation elements into developments which are completed. Projects included in the 2026 CIP will therefore focus on maintenance and operational needs of existing District infrastructure and are expected to be rate funded. The CIP is intended to be a tool for the District to understand and plan for critical facility improvements which will be used to develop utility rates allowing the District to proactively complete necessary system improvements.The CIP was developed using available data and input provided by the District. Future 775-851-4788 5510 Longley Lane Reno, Nevada 89511 www.dowl.com Page 21 of 241 TECHNICAL MEMORANDUM CIPs may benefit from or require additional studies or investigations if more granular analysis is required for a given project or need. 3.0 REGULATORY IMPACTS To consider potential regulatory impacts related to the District's system facilities rehabilitation and replacement within the next 10 years, a review of current and proposed water, air quality, and electrical regulations was conducted. Regulatory changes with the potential to impact the District's water utility system fall under local, state, and federal regimes. Regulatory agencies and relevant associations consulted and researched include the State Water Resource Control Board (SWRCB), Division of Drinking Water(DDW), the California Special Districts Association (CSDA),the Association of California Water Agencies (ACWA),the California Air Resources Control Board (CARB),the Northern Sierra Air Quality Management District (NSAQMD),the California Legislature, and the United States Environmental Protection Agency(US EPA). No Agency would provide certainty of any regulatory mandates and when they would be implemented over the next 10-years, but certain parameters were discussed and identified in the following sections.The District should routinely monitor all regulatory agencies for proposed changes.A summary of all identified current and proposed regulatory impacts is included in Appendix A. 3.1 LOCAL WATER REGULATIONS Local regulations currently impacting the District's water system infrastructure include requirements of the Truckee Sanitary District (TSD) and the Tahoe-Truckee Sanitation Agency(T-TSA).TSD is responsible for wastewater collection throughout the Truckee area.The wastewater is sent to T-TSA facilities for wastewater treatment and eventual discharge into the Martis Valley Aquifer.TSD is one of five member agencies of the T-TSA, which protect the water quality of Lake Tahoe and the Truckee River under the Porter Cologne Act. The Truckee River Operating Agreement(TROA) governs how surface water is stored, released, and accounted for in the basin, and TROA imposes detailed accounting, environmental flow requirements, and potential drought-year curtailment requirements.The District owns surface water rights, governed by TROA requirements, but does not currently exercise their rights to use surface water. Therefore, TROA is currently not of great concern to the District. If the District intends to use surface water rights in the future,TROA requirements will need to be understood and followed to ensure compliance. The District is permitted to discharge drinking water to the Town storm drain system under the California Statewide General NPDES (National Pollutant Discharge Elimination System) Permit for Drinking Water System Discharges. Occasionally, the District conducts water main flushing discharge into the sewer system through agreements with TSD and T-TSA.This activity typically occurs only during water main construction projects, and a permit is required from both TSD and T-TSA for temporary discharges into the sewer system.The District should continue to obtain a Permit for Temporary Discharge into TSD facilities for each applicable construction project to allow flushing of water mains into the sanitary sewer. 3.2 STATE WATER REGULATIONS State-level regulatory requirements applicable to this CIP include the Urban Water Management Planning Act, Making Conservation a California Way of Life (SB 606/AB 1668), Sustainable Groundwater Page 2 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 22 of 241 TECHNICAL MEMORANDUM Management Act (SGMA), and a range of water quality and efficiency regulations overseen by the State Water Resources Control Board (SWRCB) and California Department of Water Resources (DWR). The most relevant regulation to near-term CIP priorities is Making Conservation a California Way of Life, which establishes a phased framework for water efficiency performance standards.These include indoor and outdoor residential water use targets, dedicated landscape metering, and distribution system water loss performance objectives. While initial reporting requirements began in late 2023,full compliance with volumetric water loss standards and infrastructure efficiency measures is required starting in 2027, with system-wide implementation expected through 2036 and beyond. Capital improvements that enhance leak detection, pressure management, and pipeline replacement will be key to meeting these requirements. The District is also subject to the Urban Water Management Planning Act, which requires submission of an updated Urban Water Management Plan (UWMP) every five years.The UWMP must include a Water Shortage Contingency Plan, drought risk assessments, and five-year drought planning scenarios. The most recently adopted UWMP is the 2020 Urban Water Management Plan which was adopted by the District June 2, 2021, and District staff is currently preparing the 2025 UWMP update. The District holds surface water rights (McGlashen, Southside,Tonini, Sheepherder, and Hofert Springs) regulated by the SWRCB Division of Water Rights. Although these sources are not currently in use, minimum reporting and maintenance of permits and statements are necessary to retain them. Future use would require review of applicable regulations, including the Surface Water Treatment Rule and Water Code provisions. Though the Sustainable Groundwater Management Act (SGMA) and Integrated Regional Water Management (IRWM) requirements are not currently applicable to the District,these regulatory frameworks are actively evolving and should continue to be monitored for future applicability. In addition, stormwater discharges into the Truckee River basin are regulated under the National Pollutant Discharge Elimination System (NPPES) program.The Truckee-Donner area is subject to Region 6 Lahontan NDPES Municipal Permit and the District should maintain best practices in stormwater protection to ensure compliance. Emerging and ongoing water quality regulations may require future treatment or infrastructure upgrades.These should be tracked through SWRCB updates to ensure readiness and eligibility for state and federal funding. 3.3 FEDERAL WATER REGULATIONS At the federal level,the primary regulations for drinking water quality are the Safe Drinking Water Act (SDWA) and its associated Maximum Contaminant Levels (MCLs),treatment techniques, and monitoring requirements.The U.S. Environmental Protection Agency (EPA) periodically updates MCLs, and California often adopts more stringent state-level standards administered by the SWRCB. While there are currently no planned federal changes to arsenic MCLs,the EPA is advancing regulatory actions on emerging contaminants per-and polyfluoroalkyl substances (PFAS),with proposed national primary drinking water standards anticipated to be finalized in 2025. Other constituents, including chromium-6 and perchlorate, remain under study for potential new limits. The District is encouraged to monitor these federal limits that may require future local treatment upgrades. Page 3 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 23 of 241 TECHNICAL MEMORANDUM Additionally,the EPA maintains lead and copper rule improvements (LCRI) requiring ongoing monitoring and potential service line replacements.Though lead is not currently identified as a major issue for the District, continued compliance with sampling requirements and documentation is essential. Other federal changes to drinking water standards remain under review,with no final federal MCL changes currently scheduled for implementation.The District should continue any monitoring programs and maintain compliance with both state and federal testing requirements. For federal regulation updates,visit the EPA website. 3.4 ELECTRICAL REGULATIONS Electrical regulation research focused on potential power supply outage requirements and regulations governing the use of emergency power generators which support the utility system. Electric utilities in Northern California and Northern Nevada have developed policies to implement Public Safety Power Shutoffs (PSPS) in extreme fire-risk situations. Particular environmental conditions, such as strong wind events, high temperatures, and low humidity, warrant the de-energization of power lines and equipment to prevent destructive and deadly wildfires. Public Safety Outage Management (PSOM) is the NV Energy specific program to shut off power during extreme fire events. The District operates its own local electric utility that procures its energy from a variety of sources and multiple contracts with overlapping durations.To procure energy, the District negotiates with multiple transmission system operators including PacificCorp and NV Energy. While the District works with multiple transmission providers including PacificCorp and NV Energy,the final delivery of transmission into Truckee is through infrastructure operated by NV Energy at voltages ranging from 14.4 to 120 kV. Additionally,the Water department takes energy services from Liberty Utilities in a few locations outside the District electric service territory. Liberty Utilities is similarly dependent on transmission service from NV Energy, and therefore subject to similar constraints including potential disruptions to power delivery from PSPS, PSOM, or any other unplanned or planned outage. In these events,the District may lose power to large sections of the customer base at a time that greatly impact day-to-day business in Truckee. Related to regulatory compliance as an electric utility,the District is subject to many laws around how the electric grid is built and operated, greenhouse gas emissions, and complying with the renewable portfolio standard under the jurisdiction of the California Independent System Operator(CAISO), California Public Utilities Commission (CPUC), California Energy Commission (CEC), California Air Resources Board (CARE), and more. The 2020 CIP Report prepared for the District provided an analysis of the District water system performance during extended power outages. Since 2020,the District has added standby generators to key system facilities including the Martis Valley Well,Airport Well,Alder Creek Pump Station, Prosser Village Pump Station, and a 500 kW portable generator. The backup power for these facilities will enable the District to produce and convey more water during PSPS and PSOM events.The District should continue to monitor system demands and performance and add more generators, as necessary, if more system water is needed during outage events. Some District owned portable generators require a permit to operate.The District should continue to maintain permits for portable generators.Air pollution standards for generators are regulated by the local air pollution district, in this case the NSAQMD. Natural gas or propane-fueled generators do not have air quality emissions restrictions. If the District uses diesel fueled generators during emergencies, there are currently no emissions restrictions.This includes generators used during a PSPS event. Page 4 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 24 of 241 TECHNICAL MEMORANDUM However, if a diesel generator is used as a prime power source, strict emission regulations are imposed under CARB. California low sulfur(15 Parts Per Million) diesel fuel is required for all diesel generators. In addition, CARB regulations allow for the use of private and public back-up generators during PSPS, such as during high fire risk weather conditions. For more information on CARB regulations,visit the California Air Resources Board Website. 3.5 REGULATION DISCUSSION AND RECOMMENDATIONS The primary regulatory concerns influencing this Capital Improvement Plan (CIP) include treatment requirements and water loss auditing and prevention. Arsenic remains the water quality constituent of greatest concern for the District, with some potable wells requiring management to ensure arsenic levels remain below the MCL.The District operates the Glenshire Drive Well, Prosser Village Well, and Old Greenwood Well under a SWRCB approved blending permit,which reduces total arsenic levels in the distribution system.There are no planned changes to the arsenic MCL at the state or federal level currently. However, emerging contaminants are under active regulatory review, particularly PFAS compounds, with both the EPA and SWRCB advancing MCL development. Other constituents, including chromium-6 and perchlorate, remain under study for potential new limits.The District is recommended to monitor emerging contaminants as part of its monitoring program, maintain awareness of new regulations, and plan for potential future treatment upgrades. Water loss auditing and prevention remain high priorities for the District. Past projects have addressed metering and pipeline replacement to reduce leaks. Under Making Conservation a California Way of Life (SB 606/AB 1668), California has implemented new reporting requirements as of late 2023 and is phasing in enforceable water loss reduction standards between 2027 and 2036.The District should plan for continued investment in system metering, leak detection, pressure management, and prioritized pipeline replacement to meet these evolving requirements. 4.0 ELECTRICAL TIME OF USE ANALYSIS 4.1 BACKGROUND The District provides both water and power utilities and offers a program available to residential customers for time-of-use (TOU) electricity rates.TOU rates are intended to incentivize customers to use energy during "off-peak" hours by providing a lower electricity rate when energy is less expensive to procure,while applying a higher rate during the designated peak hours. Peak energy usage has been identified as occurring between 4pm and 9pm every day, making the energy consumed outside of this window eligible for the lower off-peak rate. Currently,the District is considering expanding the TOU Rate program to commercial customers,which could potentially affect the operational strategy of the water distribution system. Electricity represents a major portion of the District's water system operating expenses, and this analysis evaluated current water system storage to determine if pumping during off-peak hours can be scheduled to take advantage of lower-rate periods while maintaining sufficient water system storage for emergency use. The District directed Dowl to perform a high-level evaluation of system performance to Page 5 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 25 of 241 TECHNICAL MEMORANDUM determine whether meaningful cost savings could be realized if power consumption by the water system was reduced or eliminated during peak TOU periods. 4.2 EVALUATION APPROACH The TOU analysis focused on the difference between system demand and system storage during the five-hour TOU peak period. Dowl worked closely with District personnel to establish the approach and criteria used for the TOU evaluation. Ultimately,the District water system was organized into 13 individual evaluation sections which are displayed in Appendix B. The District water system is complex due to the number of pressure zones, numerous tanks, location of wells in some (but not all) pressure zones, and extensive interconnections between pressure zones and tank sections. Each section was evaluated independently, assuming no pumping would occur during peak TOU periods except for hydropneumatic zones,to determine whether the usable tank storage volume is greater than the total section demand during the five-hour TOU peak period.The choice to evaluate each section individually was selected to simplify the evaluation to align with the scope of the project. Since pumping into or between sections was excluded (except hydropneumatics zones) during the evaluation, the sections were separated at booster pump station locations. Gravity flow between sections via pressure reducing stations was included in the evaluation since this operation would be necessary to meet demands and occur without power use. By separating the system at booster pump stations, the analysis evaluated how demand can be met solely by available storage without replenishment by costly pumping.The analysis aimed to maintain 75%of tank capacity reserved for emergencies while meeting demand requirements for sections. The District established the specific criteria listed below regarding water storage tanks for the TOU evaluation to ensure reliable system performance and public safety.A tank is deemed to have adequate storage if the demands did not cause water levels to drop below this 75%threshold during the evaluation period. ■ Each tank is assumed to be full at the start of the TOU five-hour peak period. ■ Each tank is required to recover its storage to 100% capacity each day. ■ 25% of the capacity of each tank is available as usable storage to supply demand during peak TOU periods. ■ 75% of the capacity of each tank must be maintained for fire and emergency storage and is not available for use to supply demand during peak TOU periods. Maximum daily demand (MDD) data provided by the District for each zone was used to evaluate system demand. The analysis used MDD rather than average day demand (ADD) or winter day demand (WDD) for a more conservative assessment of the system performance. MDD represents the highest recorded total flow volume for a single day per zone in a given year. The TOU analysis focused on a five-hour peak period, so the MDD daily flow total value was divided by 24 hours to get a flowrate per hour for each zone which was used in the analysis. The hourly flow total calculated from the MDD is the average hourly maximum day demand (AHMDD). While this approach does not capture flow changes and peaking throughout each day, it provides a reasonable value for comparison for a high-level evaluation. Page 6 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 26 of 241 TECHNICAL MEMORANDUM 4.3 EVALUATION RESULTS AND RECOMMENDATIONS The storage capacity assessment showed that, without pumping during the peak TOU period,the system's total tank volume generally satisfied AHMDD while maintaining the 75%emergency reserve target. Only three sections (Section 5, Section 9, and Section 11)fell slightly below the 75% reserve threshold, with the lowest reserve tank level observed at approximately 70%. A summary of all section performances is included in Appendix C. Based on these findings, if TOU is implemented for commercial customers, it is recommended that the District proceed with updating its pumping schedules to prioritize pumping during off-peak periods. Existing storage capacity is sufficient, in most cases,to meet demand during higher-rate peak TOU periods, allowing the District to take advantage of a change to the electricity rate structure. Section 5, Section 9, and Section 11 will require either pumping during peak TOU periods to prevent tank levels receding below 75%during the peak TOU period or the volume of the tanks would need to be increased. A high level, simplified approach was used for this analysis. It is recommended that the District consider utilizing a detailed hydraulic model to support future planning under TOU specific conditions. A model simulation would provide better insight into hourly demand patterns, system peaking behavior, operational impacts of proposed pump changes, and specific cost savings. While the current analysis shows cost savings are likely with time-of-use pumping adjustments, more precise modeling would help the District confirm system flexibility under varied demand conditions and identify additional optimizations for cost savings or operational improvements. 5.0 CONSTRUCTION COST ESTIMATION 5.1 BASIS OF COST The preparation of the CIP costs includes the evaluation of multiple criteria to create prospective unit rates that can be utilized for budgeting both near term and long-term project costs. A detailed cost analysis of identified projects with specific and typical bid items was performed including using the following basis for cost estimating, shown in Table 1: Page 7 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 27 of 241 TECHNICAL MEMORANDUM Table 1: Basis for Cost Estimating Cost Basis Inclusions *Note-All costs basis criteria are based on Q1-2025 data and no escalation is applied. Labor includes the wages, benefits, and taxes associated with separate trade Labor classifications based on local prevailing wages obtained from CA Dept of Labor. Examples include laborer, equipment operator, and carpenter trades. Prevailing wage rates are used to determine hourly labor cost. Equipment rates include the typical rental equipment rates for heavy equipment, as well Equipment as fuel consumption,wear parts, and routine maintenance and preventative care.These criteria are utilized to determine operated equipment hourly costs. Material Material pricing for pipe,valve,fittings, and accessories is provided from local wholesale and retail suppliers at the time of this report. Market and logistics volatility are Pricing potential issues and are addressed outside of the direct cost. With this cost basis information, a detailed estimate for each scope of work was created using unit pricing based on local conditions and industry practice as well as lump sum and subcontractor unit pricing typical of the scope of work.The estimate includes all the costs of the work associated with a complete installation of all associate infrastructure. The detailed cost estimate was created in HCSS Heavy-Bid estimating software, and a copy of the detailed estimates are included in Appendix D. Standard percentages for mobilization, contingency, engineering, inspection, legal, and permitting were used. No land acquisition fees were assumed or included. 5.2 COST EVALUATION PROCESS Budgets were prepared using the created opinions of probable construction costs shown in Appendix D. Where applicable, estimated cost was evaluated against recent unit price, however greater consideration was given to projected costs in the estimate. Due to the many factors that affect unit pricing as well as variations in bid tabs,the estimated unit price was used in establishing projected future costs.The estimated unit pricing was incorporated into major items that could be quantified. Allowances were incorporated into each project estimate to create a total project cost for each identified project, as well as create baseline estimates for projects that are similar in nature, such as tank coating, new storage tanks, pump stations, and pipeline budgeting. Projects such as well and pump station projects and emergency generator projects are unique to the size of the pumps,flow rates, horsepower, and electrical demands in both average and peak flow conditions. These variations make generalizing project costs challenging to budget and the results inaccurate. For this reason, well pump, pump station, and emergency generator project costs utilize individual budgets based on anticipated size of the building, assumed flow rates, pump and motor sizing, and complimentary electrical and instrumentation equipment. 5.3 RECOMMENDATIONS Budgetary cost estimates have been prepared and organized in Appendix D. While the direct cost, design, inspection, and contingencies have been included, additional project scope may be considered for critical infrastructure and would impact the budgetary costs. Contingency as well as tariff allowances have been included in the pricing for evaluation.As economic conditions can change and are unable to Page 8 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 28 of 241 TECHNICAL MEMORANDUM be firmly identified into the future, it is recommended that these allowances and contingencies are evaluated at the time a project is budgeted, prepared, and bid to determine the potential impact. 6.0 10 YEAR CAPITAL IMPROVEMENT PLAN DOWL produced an updated 10-year CIP for the District spanning the years 2026-2035. The 2026 CIP is largely based on information from the 2021 CIP, input from the District, and analysis performed as part of the project scope. Projects included in the CIP were established from the following parameters: ■ Incorporate priority projects as directed by the District. ■ Exclude projects that are necessary to accommodate additional capacity to serve growth. ■ If the general need for replacement or rehabilitation is known but specific facilities are not identified, use assumptions for generic facilities to schedule and price in the CIP. Assumptions regarding project scope (for both specific and generic projects)were presented to and confirmed by the District. When evaluating the system during peak electric rate periods,the assumption was that the system goal is to maintain requisite emergency storage while meeting customer demand without requiring additional pumping.The evaluation determined that existing water system storage could allow for the District to minimize pumping during peak TOU events if a TOU electric rate structure was implemented for commercial customers.The updated CIP incorporates the District's preferences for adding projects, project prioritization, and project frequency. 6.1 PUMP STATIONS Select pump stations have been identified and prioritized by the District for complete replacement based on several factors, including equipment age and condition, useful life, system criticality, and the results of recent facility evaluations conducted by the District. The District evaluation determined that, due to facility conditions,full replacement of pump stations was the optimal choice as opposed to pump station rehabilitations which replace only key components of pump stations. Complete replacement includes replacement of buildings, pumps and motors, associated piping,valving, generators, meters, telemetry, VFDs, PLC, and SCADA systems to improve efficiency. Pump and motor replacement is assumed to require the same number of pumps and total horsepower for the pump station. Hydropneumatic pump station replacements were based on the skid mounted pump station example by R.F. MacDonald Company supplied by the District, as well as a permanent generator to ensure customer supply during a power outage event. Based on existing District generator inventory, it is assumed new generators will be Cummins brand and housed in a weatherproof enclosure not within a building. Since 2020, the District has installed new generators to the Alder Creek and Airport booster pump sites and Prosser Village well. It is recommended that the District plan to install permanent generators or ensure the availability of portable generators at any new sites to maintain operations during power outages, including PSOM events. Many of the District pump stations are considered to be in need of replacement. The 2026 CIP includes complete replacements of the pump stations listed below. To provide water during PSOM events,the projects include the installation of a permanent stand-by generator.The construction costs for the projects mentioned include specific individual budgets. ■ 2026—Martiswood Pump Station Page 9 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 29 of 241 TECHNICAL MEMORANDUM ■ 2026—Sitzmark Hydropneumatic Pump Station ■ 2026—Innsbruck Pump Station ■ 2027—Round Hill Hydropneumatic Pump Station ■ 2027-Alder Creek Pump Station ■ 2028—Northside Pump Station ■ 2028—West Palisades Hydropneumatic Pump Station ■ 2031—Pinnacle Hydropneumatic Pump Station ■ 2031—Pump Station TBD ■ 2032—Ski Lodge Pump Station ■ 2033—Pump Station TBD ■ 2034- Pump Station TBD ■ 2034- Pump Station TBD 6.2 STO RAG E TAN KS The District's system currently has 34 active storage tanks which range in capacity from 100,000 gallons to 2,200,000 gallons.The average tank capacity is 400,000 gallons.The storage tank inventory excludes Prosser Lakeview,which is planned for demolition. Of the 34 tanks in the system, 24 were constructed prior to 1990. While individual assessments were not performed as part of the scope for this technical memorandum, the District actively monitors tank conditions through ongoing inspection programs, including diving assessments and comprehensive evaluations conducted prior to major rehabilitation or replacement projects.Tank assessment information was used by District staff to determine which tanks should be replaced and rehabilitated in the 2026 CIP. It is recommended that this objective, proactive approach continue,with periodic evaluations used to adjust project timing and scope as necessary. Generally,the District plans to replace older tanks and tanks located in the Tahoe Donner development. Newer tanks in good condition will be rehabilitated including both interior and exterior coating, as well as seismic retrofitting, and are generally planned for rehabilitation in pairs.The six tanks constructed between 1990 to 1999 are assumed to only need interior and exterior coatings. Storage tank rehabilitation can include internal and external coating replacement,various appurtenance maintenance, or structural and seismic upgrades to meet current seismic code. The two tanks constructed after 2000 are not included in the 10-year CIP. Tank rehabilitations included in the 2026 CIP are listed below. ■ 2026- Donner Trails (0.16 MG) ■ 2027-Sierra Meadows (0.25 MG) ■ 2027-The Strand 2 (0.32 MG) ■ 2028-Somerset 2 (0.21 MG) ■ 2028- Prosser Heights (0.21 MG) ■ 2029-Wolfe Estates (0.23 MG) ■ 2033 - Prosser Annex(0.215 MG) ■ 2033 -Gateway (0.45 MG) Select tanks were chosen by the District to be replaced in the 2026 CIP. The size of the new tanks was determined by the District based on system water storage needs. New tanks will be welded steel with a concrete foundation ring and site work allowance and removal of the existing tank. New tanks are Page 10 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 30 of 241 TECHNICAL MEMORANDUM anticipated to be located in approximately the same location as the smaller tanks being replaced. Tank replacements included in the 2026 CIP are listed below. ■ 2028- New Somerset 1 Tank (0.28 MG) ■ 2029- New Herringbone Tank (1 MG) ■ 2030- New Innsbruck Tank(1 MG) ■ 2032 - New Strand 1 Tank(0.42 MG) ■ 2035 - New Ski Lodge Tank (1 MG) 6.3 WELLS The District currently has fourteen total wells, two of which are exclusively non-potable.The District actively tracks and assesses the condition and rehabilitation schedule of all wells, considering factors such as useful life, production levels, and drawdown trends. Well replacement and maintenance work is prioritized by the District based on performance and assessment data. It is recommended that this objective, proactive approach continue, with periodic evaluations used to adjust project timing and scope as necessary. Generator additions and rehabilitation can vary from installing generators at critical facilities for emergency power to general maintenance. It is assumed new generators will be housed in a weatherproof enclosure, not within a building. Since 2020,the District has installed new generators to the Martis Valley Well and Airport Well and Prosser Village Well. It is recommended that the District plan to install permanent generators or ensure the availability of portable generators at any new sites to maintain operations during power outages, including PSOM events. The District has identified complete replacement of the Airport Well site as a project in 2027. Full facility replacements include the pump, motor, and cable assembly as well as any above ground facilities including the building and sodium hypochlorite dosing system. The Airport Well's well bore and casing are not completely vertical and there is significant offset in the casing, limiting the size of a submersible pump and well capacity. Replacement of the Airport Well with a casing supporting a larger pump would eliminate the need for the deteriorating Airport tank.Another well is proposed for replacement in 2033, and the District will determine which specific well will be replaced at a later date. A well rehabilitation is scheduled for 2031. Well rehabilitation can vary from pump and motor replacement to full above ground facility replacement. Specific sites are to be determined by the District as these projects approach. 6.4 PIPELINE REPLACEMENT A condition assessment of existing pipeline infrastructure was not conducted for this study; however the District maintains detailed pipeline age and leak data and is in the process of integrating this information into its GIS system to easily identify problem areas. The District evaluates multiple criteria when determining pipeline replacement priorities to ensure infrastructure investments are both strategic and effective.These considerations include the age of the pipe, the frequency and severity of past leaks, and any known material-related or installation-era deficiencies. Additionally, pipelines are assessed for potential upsizing to meet current and projected demand, and for their criticality within the overall water distribution network, particularly whether failure would significantly impact service reliability, fire protection, or key facilities.This data-driven Page 11 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 31 of 241 TECHNICAL MEMORANDUM approach enables the District to target replacement efforts where they are most needed, rather than relying solely on age as a decision-making factor.As a result,the limited capital resources of the District are allocated efficiently, supporting the long-term resilience and reliability of the system. The District currently accepts the installation of both PVC and ductile iron pipe.Table 2 compares the single bid item cost per linear foot between Ductile Iron and the District's preferred PVC pipe. For planning purposes, replacement pipeline costs have been calculated for 4"through 12", DR 14 Class 305 PVC C900 in residential neighborhoods with basic traffic control requirements and a fixed amount of service connections per linear foot of pipe. Table 2: Ductile Iron (DI) Pipe vs. DR 14 Class 305 C900 Cost Comparison Description Unit PVC Cost % Increase for DI Ductile Iron Cost 4" Water Main LF $8.64 118% $18.83 6" Water Main LF $17.46 76% $30.75 8" Water Main LF $30.29 71% $51.88 10" Water Main LF $44.57 42% $63.12 12" Water Main LF $59.33 30% $76.92 The District proposes to perform pipeline replacement projects yearly during the duration of the 2026 CIP. An annual target cost of$1.9M 2026 dollars was selected by the District as the basis for the scope of the pipeline project work instead of length of pipe.The cost of pipeline projects was escalated yearly to reflect construction cost inflation. Table 3 provides all in construction costs per lineal foot of C900 PVC pipe replacement work. Table 3:All-In Average Cost for DR 14 C900 PVC Water Main Replacement Description Cost per LF Notes 4" Water Main $611.19 Includes mobilization, pipe material, water 6" Water Main $693.57 services, fire hydrants, system 8" Water Main $714.28 connections, rock excavation,AC 10" Water Main $812.32 pavement and base material, 12" Water Main $823.72 miscellaneous work, and contingencies This cost-based approach reflects the District's effort to balance available funding with the need to maintain and upgrade other critical components of the system.The $1.9M target represents what is currently feasible within the District's budget constraints. While the District has the capacity to complete additional pipeline projects, progress is limited by the available funding after accounting for system- wide priorities and ongoing operational needs. It is recommended the District maintain the pipeline replacement program to comply with Making Conservation and CA Way of Life (AB 1668/SB 606) and limit system water loss through leaking infrastructure.The District has prioritized inclusion of a pipeline replacement project annually to show that effort is being made to address the requirements of the Making Conservation and CA Way of Life statute. It is also recommended the District continue to regularly evaluate the condition of each potential water main replacement and prioritize rehabilitation based on the useful life and maintenance requirements and reorder the project as needed. If a project contains significantly less linear feet or other parameters change that will slow production,the average unit price will increase. Page 12 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 32 of 241 TECHNICAL MEMORANDUM 6.5 CONTROL VALVE STATIONS The District currently has 40 control valve stations throughout the Truckee System, with six being inactive. The District does not plan to replace or add control valve stations at this time via capital improvement projects. Instead, and any work to maintain or replace control valve stations would be funded and completed through existing maintenance budgets. 6.6 COST ESTIMATES AND BUDGET Cost estimates for new projects in the 2026 CIP are based on Q1-2025 labor, equipment, and material costs. Projects proposed from 2026 to 2035 were applied with a year over year escalation factor of 5.0%, shown in Table 4. The District provided a target annual budget range of$6.5 million to $8 million.This target budget range serves as a guideline to distribute project costs throughout the duration of the CIP. The 2035 estimated project cost exceeds the target amount to allow the District to both complete an annual pipeline replacement project and also construct a new 1 MG tank. The annual target budget reflects the amount of projects the District believes they can accomplish yearly under revenue from rates. If the rate structure is adjusted or other sources of funding become available, additional projects could be added to the CIP. The 2026—2035 Capital Improvement Project List is displayed in Appendix D. Table 4:Cost Escalation Year % per Year Escalation 2026 5% 0.050 2027 5% 0.103 2028 5% 0.158 2029 5% 0.216 2030 5% 0.276 2031 5% 0.340 2032 5% 0.407 2033 5% 0.477 2034 5% 0.551 2035 5% 0.629 Based on discussion with District Staff, system buildout projections are less than estimated in the 2012 Water System Master Plan. Projects included in the 2026 CIP address maintenance and operational needs of existing District infrastructure. Projects to address maintenance and operations needs are expected to be rate funded. Average yearly cost of the 2026-2035 CIP is approximately$7,900,000 including all projects, assumptions, and inflation. The average yearly cost is an equivalent cost representing a distribution of project costs evenly during the 10-year CIP period. Upon review and consideration by the District,the CIP may be revised, reordered, and modified to better align with District financial needs. Actual yearly expenditures for CIP projects could vary greatly from year to year based on District preference. Page 13 of 13 J:163130591-01140Reports\Archive12025 CIP Report(DRAFT_4).docx Page 33 of 241 APPENDIX A: POTENTIAL REGULATORY IMPACTS Potential Regulatory Impacts for TDPUD CIP planning Regulatory Origin Nature of the requirement Timing of requirement Local Regulations T-TSA/TSD Temporary discharge permit to flush water Ongoing mains into the sewer from TSD and TTSA (chlorine residual in excess of 100 mg/L prohibited-TTSA Ordinance 2-2015), neighborhoods with no sanitary sewer system will need to flush into water trucks for delivery to T-TSA Stormwater protection Stormwater protection under an NPDES Ongoing permit may be necessary to protect Truckee River State Regulations Urban Water management plans(Water Code water shortage contingency plan,water loss 1-Jul-26 Section 10610-10656) audits Making Conservation a CA Way of Life(AB proposed reporting requirements:Residential- 1-Jan-27 1668/SB 606) Gallons Per Capita per Day(R-GPCPD) Making Conservation a CA Way of Life(AB Urban Water Use efficiency Standards 1-Jul-26 1668/SB 606) Making Conservation a CA Way of Life(AB Annual Water use reporting including Ongoing 1668/SB 606) estimated indoor and outdoor residential use, and irrigation and landscaping dedicated meter readings,and water losses Making Conservation a CA Way of Life(AB additional water use efficiency standards to 1-Jan-27 1668/SB 606) be developed and implemented.Water loss control can be addressed through four foundational approaches:Detecting and locating leaks,efficient responses to reported leaks,reducing operational pressure and pressure variations,and prioritizing infrastructure replacement Making Conservation a CA Way of Life(AB require URWS's to implement feasible 2028-2035 1668/SB 606) technologies on a system-wide scale to effectively detect and locate leaks,prioritize infrastructure replacement and repair or replace infrastructure cost-effectively.For URWS's that opt for pressure management in part or whole of their system,large-scale implementation of pressure management[8) will be expected in this phase Making Conservation a CA Way of Life(AB regular monitoring of the distribution system, 2036 and beyond 1668/SB 606) prioritizing infrastructure replacement and continued repair(and replacement as suitable)for system components.From 2036 onwards,URWS's would be required to comply with their final allowable water loss volume on a three-year average basis with a maximum allowed deviation of 5% Urban water use efficiency standards 1-Nov-27 including indoor/outdoor targets and water SB 606&AB 1668 loss standards. Sustainable Groundwater Management Act Mandates sustainable groundwater use via (SGMA) Groundwater Sustainability Plans(GSPs). 2040-2042 Establishes monitoring and treatment 26-Apr-29 AB 794-PFAS Drinking Water Standards requirements for PFAS in drinking, Page 35 of 241 Proposes a statewide low-income water rate SB 222(Water Affordability Program) assistance program. Unkown AB 1204 adoption or amendment of primary drinking 2 Year Bill water standard equal to or more stringent that federal standards SB 19/SB361 Stream Gages:DWR and SWRCB unknown SB 646 Local agency utility services:extension of Ongoing utility services. would revise the definition of "fee"to mean a fee for the physical facilities necessary to make a water connection or sewer connection,and that the estimated reasonable cost of labor and materials for installation of those facilities bears a fair or reasonable relationship to the payor's burdens on,or benefits received from,the water connection or sewer connection. AB 756/AB 841 Public water systems:perfluoroalkyl Ongoing substances and polyfluoroalkyl substances. AB 990 Public water sysyems:emergency notification 27-Jun-25 plan AB 1180 Water:recycled water:backflow prevention Ongoing requirements AB 1414 Urban Retail Water Suppliers:reporting Ongoing.Annual validated audits due every Jan 1 AB 1432 Water Shortage Emergency:water supplier Ongoing can declare a shortage in emergency conditions of wildfire w/out a hearing AB 1588 Drinking water and wastewater operator Ongoing certification programs.Gives reciprocity/equivalence for military status in hiring Legislative proposals-Electrical related SB 49 Energy:appliance standards and State Water Ongoing Project assessment SB 70/SB 167 Electricity:undergrounding of electrical unknown infrastructure, wildfire mitigation plan SB 774 Electricity:microgrids. Would require each unknown electrical corporation to collaborate with the Office of Emergency Services,and local governments and other interested parties in its service territory,to identify locations where sources of back-up electricity may provide increased electrical distribution grid resiliency AB 2182 Emergency back up generators:water and unknown waste water facilities exempt from regulation EXCEPT by the NFPA 110 standards Federal Changes US EPA Water quality standards changes including currently ongoing perchlorate levels US EPA Clean Water Act Changes to definition of"Waters of the United currently ongoing States" Page 36 of 241 APPENDIX B: EXISTING SYSTEM SCHEMATIC Cs TANKS NOT TO BE CONSIDERED IN ANALYSIS Cs TANKS CURRENTLY OUT OF SERVICE 8000 7800 7600 Glacier Tank 150,000 gals 7400 GLACI ZONE 14526 PRV Station WDD• 0.009 : 0.014 SECTION 2 D: D. Ski Run Tank 100,000 gals UPPER KISLOP ZONE WDD• 0.006 F S E C TI O N 3 Ski Run Boaster — A : 0.007 D: 0.0 UPPER SKI RUN ZONE B Wei A Well WDD: 0.000 13770 PRV Station NOT IN SERVICE ADD: 0.000 L MDD: 0.000 16133 PRV Station ♦ L Donner View Tank Ski Lodge Tank LOWER SKI RUN ZONE DUE S LOPE NE 350,000 gals 350.000 gals WDD: 0.002 SECTION 4 D: 0 02 ADD: .004 ADD: 0.006 I MD 0.009 13330 PRV Station PDONr/'TIC Ski Lodge Booster MDD: 0.013 Pinnacle Tank )OWP"V 180,000 gals D:D: 0 lew Pinnacle pneumatic Hydropneumatic p ACLE ROP TIC LO SKISL ZON 6800 — � WDD: .015 0.0041 ADD 0.019 DD: 0,608 Roundhill Tank Herringbone Tank Stockholm Tank I MDD: 0.036 Heidi Way ONNER EW ZO 300,000 gals 300,000 guts 320,000 gals PRV Station WDD: .135 L J ADD* 0.194 PI ACLE E M 0.41 D: 0.0 ALTITUDE VALVE ALTITUDE ADD: 0 40 ROUNDHILL HYDRONEUMATIC ONE VALVE MDD: .080 WDD: 0.001 0.02 Stockholm Booster ADD: 0.001 DD: 0. 0 Herrin one Ider Cr k MDD: 0.001 Booster Boost 6600 Sitzmark Tank Falcon Point Tank Innsbruck Tank Roundhill ST KHO ONE West Hillside PRV Station Hydropneumatic D: 0. ADD: 0 34 .615 IDE E FS, Innsbruck MOD: .615 IDE ru ca r TZMARTZMARK HYDROPNEUMATIC Booster WDD: 34 ALTITUDE ALTITUDE East Hillside PRV Station ADD: .049 Blitz Tank D: 0. 3 VALVE VALVE MD . 0.100 SECTION 11 85.000 gals DD Oo9 Stzmarx ZONE SECTION 1y OF S-91,1E) pneumatic SECTION 9 6400 DL-6323 Tank I B or 0.0 Trout Creek 6550 0•�2 100,000 gals Prosser Annex Tank Prosser Heights Tank Glenshire Upper Tanks J Armstrong Tank Alder Creek : 0.00 9 0 300,000 gals PRV Station 215,000 als 215,000 gals I 492,000 gals 100,000 gals PRV Station DD: 0. 2 9 9 9 Martiswoods Tank Ponderosa Palisades Tank Biltz Well Somo Stemo Tank INN UCK Z E SECTION 5 200,000 gals 200,000 gals ALTITUDE VALVE OUT OF SERVICE Q�200,000 gals D. 00.117 North Bennett Flat South Bennett Flat J SECTION 7 �E C TI O N U MDD: 88 PRV Station PRV Station J PROSS HEIGH — ALTITUDE VALVE HYD NEUM C ZON WD OUT OF SERVICE 0.008 j� S E C TI 0 N 1 O Hydropneu Prosser Heights DD: 0 017 Soma Sierra Booster Palisades P SAD HYDR EUMA ZO WD 0.006 .017 Hydropneumatic 07 — Martl as 6200 M 0.03 Prosser Annex Well 1,500,000 gals 738,000 gals MDD: 0.036 ST P SADES Prosser Lakeview Tank Red Mountain Tank 9 Wolfe Estates Tank 210,000 gals CHEZ HYDR EUMA ONE PO EROSA ALISAD ZONE 250,000 gals 230,000 gals OUT OF SERVICE SOMA ERRA E — HYD ENUM C ZON WDD• 0.001 D: 0.0 Sierra Meadows Tank OLFE (DROP UMATI ZONE Red Mountain RE MOUNT � A 0.00 250,000 gals ROPN ATIC ZOVXO..05 WD 0.— ADD: 0 0 D 0.002 Hydropneumatic ARM ONG E Donner Trails 0.00 D: 0 ADD: .412 Prosser PXSHH ZONE D: 0 2 West Palisades ALTITUDE VALVE W D 0.006 ALTITUDE VALVE WD : 0.041 PRV Station DD: 0. 3 PRV Station ADD: 002 Donner Trails Tanks Gateway Tank Northside Well Hydropneumattc A: 0.0 : 0.0 ALTITUDE VALVE Snowshoe NOT IN SERVICEMD 0.004 300,000 gals 450,000 gals Northside Tank Sierra Meadows B ater Old Greenwood Donnington Wolfe Estates Summit Drive DD: 0 64 400,000 als PRV Station UP R LA EWPRV Station 9 PRV No. 4 � Waterloo PRV Sta LENSHI 1ZOHydropneumatic Z WDD: .070D NER L E 6124 ONE PRV StationADD• 0.141eaee E� 6000 ADD: .20 Loch Leven ratla Booster ALTITUDE VALVE MDD• 0.260 ow Control StationPRV t tion D: 0. 3 Hydra Featherstone 5988 Tank 1y0D: •464 Rainbow ONNER DD: .009 Hydropneumatic 360,000 gals D: 37 9 Old Greenwood GL SHIRE ZONE Strand Booster ADD: 0.038 DD' 0.015 (OUT OF SERVICE) Martls Valley PRV AD 0.653 PRV No. 3 L R LAK EW ZO PRV Station Wellington RV Station D: 0.2 ONE MDD: 0.066 Richards Control G WAY E Station 1'32 D: 0.0 9 ADD: 0 5F___V D: .055 Valve No. 1 D: 0. 9 TO ZONE Fire now Only ADD: 17 350 sernHei is Well Donner Park ADD: 21 NC O,12 YMPIC EIGHTS Tudor PRV Station MDD: .217 9p MDD: .218 MDD: 0.024 PRV Station MDD• 0.700 DD: 0. 40 R X ATERL ZON I NIELD ZONE Richards Control MDD: .89 Glenshire Well Richards Booster D WDD: .009 Valve No. 2 PRV China Camp Alder Drive ADDJ�j ADD• 0.023 Estates PRV Station MDD Reynold PRV Station Pump Station PRV Station ADD: 0.052 MDD: 042 College Ghez Northside No. 6 1 L 5800 PRV Station FCV Station PRV Station Northside No. 5 PRV Station Ghirard PRV Station Glenshire l knield PRV Station Airport Tank Control Valve 600,000 gals Well No. 20 Sauthside Glenshire Mortis Volley Sanders Well Prosser Old t t No. 2 Well Drive Well Well No. 1 Village Well Greenwood Well Hirschdale Tank 100,000 gals Airport Well 5600 Airport Booster I HI CHDALE ZONE 5400 Hirschdale well 5400 SECTION 13 5200 — 5200 5000 5000 NOTES: 1 ) STORAGE TANKS AND PRESSURE ZON SERVICE AREAS ARE SHOWN TO THE PROPER ELEVATIONS. 2) PUMP STATION, WELLS, CONTROL STATIONS AND PIPING ARE NOT SHOWN TO THE PROPER ELEVATIONS. TRUCKEE [IONNER FIGURE 3-1 Ilublic Utility [tistrict EXISTING SYSTEM SCHEMATIC Page 38 of 241 APPENDIX C: TOU RATE ANALYSIS RESULTS Summary of Section Water Supply and Demands Section Capacity MDD(MGD) WDD(MGD) ADD(MGD) (Gallons) MGD GPM MGD GPM MGD GPM Section 1 150,000 0.061 42.361 0.02 13.889 0.029 20.139 Section 2 214,000 0.013 9.028 0.002 1.389 0.006 4.167 Section 3 1,020,000 0.465 322.917 0.162 112.500 0.221 153.472 Section 4 180,000 0.116 80.556 0.04 27.778 0.059 40.972 Section 5 600,000 0.731 507.639 0.295 204.861 0.391 271.528 Section 6 600,000 0.442 306.944 0.192 133.333 0.244 169.444 Section 7 540,000 0.537 372.917 0.247 171.528 0.287 199.306 Section 8 200,000 0.028 19.444 0.01 6.944 0.017 11.806 Section 9 500,000 0.512 355.556 0.078 54.167 0.235 163.194 Section 10 3,200,000 2.589 1797.917 0.98 680.556 1.288 894.444 Section 11 425,000 0.435 302.083 0.125 86.806 0.129 89.583 Section 12* - 1.595 1107.639 0.305 211.806 0.739 513.194 Section 13** 100,000 0 0.000 0 0.000 0 0.000 *- Missing Tank Information **- Missing Demand Information Page 40 of 241 Detailed Capacity Analysis by Section Section 1 Capacity(gal) %Capacity 4:00 PM 150,000 100% 5:00 PM 147,458 98% 6:00 PM 144,917 97% 7:00 PM 142,375 95% 8:00 PM 139,833 93% 9:00 PM 137,292 92% 10:00 PM 134,750 90% Tanks: • Glacier Tank- 150,000 gallons Zones: • Glacier-0.0.029 MGD (MDD) • Upper Skislope-0.015 MGD (MDD) • Middle Skislope-0.009 MGD (MDD) • Lower Skislope-0.008 MGD (MDD) Section 2 Capacity(gal) %Capacity 4:00 PM 214,000 100% 5:00 PM 213,458 100% 6:00 PM 212,917 99% 7:00 PM 212,375 99% 8:00 PM 211,833 99% 9:00 PM 211,292 99% 10:00 PM 210,750 98% Tanks: • Ski Run-214,000 gallons Zones: • Upper Ski Run-0.000 MGD (MDD) • Lower Ski Run-0.013 MGD (MDD) Page 41 of 241 Section 3 Capacity(gal) %Capacity 4:00 PM 1,020,000 100% 5:00 PM 1,000,625 100% 6:00 PM 981,250 99% 7:00 PM 980,708 99% 8:00 PM 980,167 99% 9:00 PM 979,625 99% 10:00 PM 979,083 98% Tanks: • Donner View-350,000 gallons • Ski Lodge-350,000 gallons • Stockholm-320,000 gallons Zones: • Donner View Hydro-0.013 MGD(MDD) • Donner View-0.414 MGD(MDD) • Heidi Way-0.038 MGD(MDD) Section 4 Capacity(gal) %Capacity 4:00 PM 180,000 100% 5:00 PM 175,167 100% 6:00 PM 170,333 99% 7:00 PM 165,500 99% 8:00 PM 160,667 99% 9:00 PM 155,833 99% 10:00 PM 151,000 98% Ta n ks: • Pinnacle- 180,000 gallons Zones: • Pinnacle Hydro-0.036 MGD(MDD) • Pinnacle-0.080 MGD(MDD) Page 42 of 241 Section 5 Capacity(gal) %Capacity 4:00 PM 600,000 100% 5:00 PM 569,542 100% 6:00 PM 539,083 99% 7:00 PM 508,625 99% 8:00 PM 478,167 99% 9:00 PM 447,708 99% 10:00 PM 417,250 98% Tanks: • Herringbone-300,000 gallons • Round Hill-300,000 gallons Zones: • Roundhill Hydro-0.001 MGD (MDD) • Stockholm-0.615 MGD(MDD) • Hillside-0.100 MGD (MDD) • Alder Creek-0.012 MGD(MDD) • Trout Creek 6550-0.003 MGD (MDD) Section 6 Capacity(gal) %Capacity 4:00 PM 600,000 100% 5:00PM 581,583 100% 6:00 PM 563,167 99% 7:00 PM 544,750 99% 8:00PM 526,333 99% 9:00 PM 507,917 99% 10:00 PM 489,500 98% Tanks: • Falcon Point-200,000 gallons • Innsbruck-200,000 gallons • Sitzmark-200,000 gallons Zones: • Sitzmark Hydro-0.018 MGD (MDD) • Innsbruk-0.388 MGD(MDD) • Bennett Flat-0.036 MGD(MDD) Page 43 of 241 Section 7 Capacity(gal) %Capacity 4:00 PM 540,000 100% 5:00 PM 517,625 100% 6:00 PM 495,250 99% 7:00 PM 472,875 99% 8:00 PM 450,500 99% 9:00PM 428,125 99% 10:00 PM 405,750 98% Ta n ks: • Armstrong- 100,000 gallons • Red Mountain-210,000 gallons • Wolfe Estates-230,000 gallons Zones: • Red Mountain Hydro-0.004 MGD(MDD) • Wolfe Hydro-0.011 MGD (MDD) • Donner Lake 6124-0.260 MGD (MDD) • Donner Lake 6323-0.108 MGD (MDD) • Armstrong-0.064 MGD (MDD) • Donnerlake NE-0.066 MGD (MDD) • Coldstream 6080-0.024 MGD (MDD) Section 8 Capacity(gal) %Capacity 4:00 PM 200,000 100% 5:00 PM 198,833 100% 6:00 PM 197,667 99% 7:00 PM 196,500 99% 8:00 PM 195,333 99% 9:00 PM 194,167 99% 10:00 PM 193,000 98% Tanks: • Soma Sierra-200,000 gallons Zones: • Donner Trails-0.015 MGD(MDD) • Soma Sierra-0.013 MGD (MDD) Page 44 of 241 Section 9 Capacity(gal) %Capacity 4:00 PM 500,000 100% 5:00 PM 478,667 100% 6:00 PM 457,333 99% 7:00 PM 436,000 99% 8:00 PM 414,667 99% 9:00 PM 393,333 99% 10:00 PM 372,000 98% Tanks: • Martis Woods-200,000 gallons • Martis Woods Tower- 100,000 gallons • Ponderosa Palisades-200,000 gallons Zones: • Martiswoods-0.063 MGD (MDD) • West Palisades Hydro-0.005 MGD (MDD) • Palisades Hydro-0.032 MGD (MDD) • Ponderosa Palisades-0.412 MGD (MDD) Page 45 of 241 Section 10 Capacity(gal) %Capacity 4:00 PM 3,200,000 100% 5:00PM 3,092,125 100% 6:00 PM 2,984,250 99% 7:00 PM 2,876,375 99% 8:00 PM 2,768,500 99% 9:00 PM 2,660,625 99% 10:00 PM 2,552,750 98% Ta n ks: • Airport-600,000 gallons • 6170 A- 1,500,000 gallons • Gateway-450,000 gallons • Northside-400,000 gallons • Sierra Meadows-250,000 gallons Zones: • 6170/Sierra Meadows- 1.328 MGD (MDD) • Gateway-0.700 MGD (MDD) • Town-0.189 MGD(MDD) • Gateway Hydro-0.001 MGD (MDD) • 6040-0.205 MGD(MDD) • Riverview-0.166 MGD(MDD) Page 46 of 241 Section 11 Capacity(gal) %Capacity 4:00 PM 425,000 100% 5:00 PM 406,875 100% 6:00 PM 388,750 99% 7:00 PM 370,625 99% 8:00 PM 352,500 99% 9:00 PM 334,375 99% 10:00 PM 316,250 98% Tanks: • Prosser Annex-215,000 gallons • Prosser Heights-210,000 gallons Zones: • Prosser Heights Hydro-0.017 MGD(MDD) • Prosser Heights-0.201 MGD(MDD) • Lower Lakeview-0.201 MGD (MDD) • Upper Lakeview-0.217 MGD (MDD) Section 12 Capacity(gal) %Capacity 4:00 PM - - 5:00 PM (66,458) - 6:00 PM (132,917) - 7:00 PM (199,375) - 8:00 PM (265,833) - 9:00 PM (332,292) - 10:00 PM (398,750) - Ta n ks: • No Tank Data Available Zones: • Glenshire 1-0.283 MGD(MDD) • Glenshire 2- 1.218 MGD(MDD) • Waterloo-0.052 MGD(MDD) • Icknield-0.042 MGD (MDD) Page 47 of 241 Section 13 Capacity(gal) %Capacity 4:00 PM 100,000 - 5:00 PM 100,000 - 6:00 PM 100,000 - 7:00 PM 100,000 - 8:00 PM 100,000 - 9:00 PM 100,000 - 10:00 PM 100,000 - Tanks: • Hirschdale- 100,000 gallons Zones: • Hirschdale- No Demand Data Available Page 48 of 241 APPENDIX D: PLANNING LEVEL COST ESTIMATES Truckee Donner Public Utility District 2026 Water System CIP FACILITY TYPE DESCRIPTION LENGTH, DIAM, IN YEAR RESPONSIBLE FUNDING JUSTIFICATION QUANTITY UNITS UNIT COST CONSTRUCTION FT PARTY SOURCE COST 2026 PROJECTS Pipeline Rehabilitation Northwoods/Zermatt, Northwoods/ Driving Range, Skybowl Condos, and Hwy 3600 Various 2026 TDPUD Rates Life-Cycle Replacement 3447 feet $ 355.45 $ 1,225,230.35 89/ Rainbow Intertie Pipeline Construction Slipline Tank Rehabilitation Donner Trails 0.16 MG NA NA 2026 TDPUD Rates Life-Cycle Maintenance 1 EA $ 302,538.06 $ 302,538.06 New Pump Station Martiswoods Pump Station Replacement NA NA 2026 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,291,348.74 $ 2,291,348.74 New Pump Station Sitzmark Hydro Station Replacement NA NA 2026 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,650,010.71 $ 1,650,010.71 New Pump Station InnsBruck Pump Station Replacement NA NA 2026 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,378,554.17 $ 2,378,554.17 ANNUAL TOTAL $ 7,847,682.03 2027 PROJECTS (Airport Well Replacement Option) Pipeline Replacement TBD TBD TBD 2027 TDPUD Rates Life-Cycle Replacement 1 LS $ 1,995,000.00 $ 1,995,000.00 Tank Rehabilitation Sierra Meadows 0.25 MG NA NA 2027 TDPUD Rates Life-Cycle Maintenance 1 EA $ 454,148.20 $ 454,148.20 Tank Rehabilitation The Strand 2 0.32 MG NA NA 2027 TDPUD Rates Life-Cycle Maintenance 1 EA $ 535,135.61 $ 535,135.61 New Well New Airport Well or Tank NA NA 2027 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,237,576.52 $ 1,237,576.52 New Pump Station Roundhill Hydro Station Replacement NA NA 2027 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,286,972.50 $ 1,286,972.50 New Pump Station JAIder Creek Pump Station Replacement NA NA 2027 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,326,049.60 $ 2,326,049.60 ANNUAL TOTAL $ 7,834,882.43 2028 PROJECTS Pipeline Replacement TBD TBD TBD 2028 TDPUD Rates Life-Cycle Replacement 1 LS $ 2,094,750.00 $ 2,094,750.00 Tank Rehabilitation Somerset 2 (0.21 MG) NA NA 2028 TDPUD Rates Life-Cycle Maintenance 1 EA $ 426,604.93 $ 426,604.93 Tank Rehabilitation Prosser Heights (0.21 MG) NA NA 2028 TDPUD Rates Life-Cycle Maintenance 1 EA $ 437,412.56 $ 437,412.56 New Tank New Somerset 1 Tank (0.28 MG) NA NA 2028 TDPUD Rates Life-Cycle Maintenance 1 EA $ 1,757,104.55 $ 1,757,104.55 New Pump Station Northside Pump Station Replacement NA NA 2028 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,785,096.97 $ 1,785,096.97 New Pump Station lWest Palisades Hydro Station Replacement NA NA 2028 1 TDPUD I Rates Life-C cle Replacement 1 EA $ 1,067,101.84 $ 1,067,101.84 ANNUAL TOTAL $ 7,568,070.85 2029 PROJECTS Pipeline Replacement TBD TBD TBD 2029 1 TDPUD I Rates Life-Cycle Replacement 1 LS $ 2,199,487.50 $ 2,199,487.50 New Tank New Herringbone Tank (1 MG) NA NA 2029 1 TDPUD I Rates I Life-Cycle Replacement 1 EA $ 5,356,508.26 $ 5,356,508.26 Tank Rehabilitation Wolfe Estates 0.23 MG NA NA 2029 1 TDPUD I Rates Life-C cle Maintenance 1 EA $ 464,574.15 $ 464,574.15 ANNUAL TOTAL $ 8,020,569.91 2030 PROJECTS Pipeline Replacement TBD TBD I TBD 2030 1 TDPUD I Rates Life-Cycle Replacement 1 LS $ 2,309,461.88 $ 2,309,461.88 New Tank New InnsBruck Tank 1 MG NA I NA 2030 TDPUD I Rates I Life-Cycle Replacement 1 EA $ 5,617,532.32 $ 5,617,532.32 ANNUAL TOTAL $ 7,926,994.20 2031 PROJECTS Pipeline Replacement TBD TBD TBD 2031 TDPUD Rates Life-Cycle Replacement 1 LS $ 2,424,934.97 $ 2,424,934.97 Well Rehabilitation TBD NA NA 2031 TDPUD Rates Life-Cycle Replacement 1 EA $ 464,531.87 $ 464,531.87 New Pump Station Pinnacle Hydro Station Replacement NA NA 2031 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,805,432.00 $ 1,805,432.00 New Pump Station TBD NA NA 2031 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,376,952.29 $ 2,376,952.29 ANNUAL TOTAL $ 7,071,851.13 2032 PROJECTS Pipeline Replacement TBD TBD I TBD 2032 1 TDPUD I Rates Life-Cycle Replacement 1 LS $ 2,546,181.72 $ 2,546,181.72 New Tank New Strand 1 Tank (0.42 MG) NA I NA 2032 TDPUD I Rates I Life-Cycle Replacement 1 EA $ 2,215,843.04 $ 2,215,843.04 New Pump Station Ski Lodge Pump Station Replacement NA I NA 2032 TDPUD I Rates I Life-Cycle Replacement 1 EA $ 2,973,740.87 $ 2,973,740.87 Page 50 of 241 Truckee Donner Public Utility District 2026 Water System CIP FACILITY TYPE DESCRIPTION LENGTH, DIAM, IN YEAR RESPONSIBLE FUNDING JUSTIFICATION QUANTITY UNITS UNIT COST CONSTRUCTION FT PARTY SOURCE COST ANNUAL TOTAL 1 $ 7,735,765.63 2033 PROJECTS Pipeline Replacement TBD TBD TBD 2033 TDPUD Rates Life-Cycle Replacement 1 LS $ 2,673,490.80 $ 2,673,490.80 Tank Rehabilitation Prosser Annex (0.215 MG) NA NA 2033 TDPUD Rates Life-Cycle Maintenance 1 EA $ 559,208.35 $ 559,208.35 Tank Rehabilitation Gateway(0.45 MG) NA NA 2033 TDPUD Rates Life-Cycle Maintenance 1 EA $ 947,880.76 $ 947,880.76 New Well TBD NA NA 2033 TDPUD Rates Life-Cycle Replacement 1 EA $ 1,378,345.70 $ 1,378,345.70 New Pump Station TBD NA NA 2033 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,412,663.02 $ 2,412,663.02 ANNUAL TOTAL $ 7,971,588.63 2034 PROJECTS Pipeline Replacement TBD TBD TBD 2034 TDPUD Rates Life-Cycle Replacement 1 LS $ 2,807,165.34 $ 2,807,165.34 New Pump Station TBD NA NA 2034 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,513,817.85 $ 2,513,817.85 New Pump Station TBD NA NA 2034 TDPUD Rates Life-Cycle Replacement 1 EA $ 2,513,817.85 $ 2,513,817.85 ANNUAL TOTAL $ 7,834,801.04 2035 PROJECTS Pipeline Replacement TBD TBD TBD 2035 1 TDPUD I Rates Life-Cycle Replacement 1 LS $ 2,947,523.61 $ 2,947,523.61 New Tank I New Ski Lodge Tank 1 MG NA NA 2035 TDPUD Rates I Life-Cycle Replacement 1 EA $ 7,031,220.02 $ 7,031,220.02 ANNUAL TOTAL $ 9,978,743.63 CIP TOTAL $ 79,790,949.48 Page 51 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity unium Unit Price Bid Total Slipline 1 Slipline Northwoods/Zermatt 500.000 LF 264.58 132,290.00 Slipline 2 Slipline Northwoods/Driving Range 935.000 LF 236.29 220,931.15 Slipline 3 Slipline Skybowl Condos 1,000.000 LF 224.10 224,100.00 Slipline 4 Slipline 89/Rainbow Intertie 1,012.000 LF 227.08 229,804.96 Slipline TC 1 Slipline Traffic Control 1.000 LS 92,662.60 92,662.60 Slipline GA Slipline GA/Fee 1.000 LS 241,740.61 241,740.61 Slipline Tariff TariffAllowancc(25%of Materials Cost) 1.000 LS 83,701.03 83,701.03 Allowance Sliplining Program(2026) $1,225,230.35 9 Page 52 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 33 of 172 Biditem Slipline Northwoods/Zermatt 500 TakeoffQty: 500.000 LF Client #: Slipline 1 Bid Qty: 500.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 45.61 15.68 61.29 31.61 51.40 3.58 114.24 262.12 Total 22,804.00 7,842.30 30,646.30 15,804.12 25,698.50 1,790.25 57,122.00 131,061.17 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 288.0000 1.7361 0.5760 455.0735 79.1806 106.4108 8.9286 Activity: 312500-02 Pipeline Materials Quantity: 500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 50.17 0.00 8.70 58.87 Total 0.00 0.00 0.00 0.00 25,085.20 0.00 4,350.00 29,435.20 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 2MISCMTL Misc Materials 1.00 500.00 LF 1.00 108.500 1.09 542.50 2PIPEFTG Pipe Fittings 1.00 1.00 LS 7,500.00 108.500 8,137.50 8,137.50 2PIPEMTL Pipe Materials- Permanent 1.00 500.00 LF 24.00 108.500 26.04 13,020.00 2SAND Bedding Sand - FOB Plant 1.00 195.00 TON 16.00 108.500 17.36 3,385.20 4HAUL Hauling-Sub 1.00 30.00 HR 145.00 100.000 145.00 4,350.00 Activity: 339900.01.2 Slipline Sub Quantity: 500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 3.17 1.09 4.26 2.49 0.00 0.00 85.00 91.75 Total 1,584.00 544.74 2,128.74 1,246.19 0.00 0.00 42,500.00 45,874.93 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 6.7499 0.0080 125.0000 843.7325 0.5000 1,000.0000 0.0010 91,749.8600 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 20.0000 25.0000 0.0400 106.4370 3.1680 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:CH 4 Eff:100.00 Crew Hrs:4.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4SLIPLINE Slipline Sub 1.00 500.00 LF 85.00 100.000 85.00 42,500.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 4.00 HR 111.02 108.500 120.46 481.83 8276 EXCAVATOR SMALL 1.00 4.00 HR 130.15 108.500 141.21 564.84 8UTLPU Utility Pickup 1.00 4.00 HR 49.88 100.000 49.88 199.52 LABORER Laborer 2.00 8.00 MH 65.00 100.000 87.35 698.83 OPER4 Operator Foreman 1.00 4.00 MH 92.00 100.000 123.64 494.56 OPERATOR Operator 2.00 8.00 MH 87.00 100.000 116.92 935.35 Activity: 321216-02 AC Patch Paving • 100.00 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 29.08 10.00 39.08 28.27 3.42 0.00 5.80 76.57 Total 2,908.00 1,000.06 3,908.06 2,826.70 342.05 0.00 580.00 7,656.81 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 67.3476 0.0400 25.0000 1,683.6900 0.5000 200.0000 0.0050 15,313.6200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 36.0000 2.7778 0.3600 108.5572 29.0800 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Page 53 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 34 of 172 Crew: PAVE (Mod)Asphalt Paving Prod:CH 4 Eff:100.00 Crew Hrs:4.00 Labor PCs:9.00 Equipment PCs:6.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2ACPAVEMENT Asphalt 1.00 3.25 TON 97.00 108.500 105.25 342.05 4HAUL Hauling-Sub 1.00 4.00 HR 145.00 100.000 145.00 580.00 8042 ROLLER MD DOUBLE DRUM 1.00 4.00 HR 62.64 108.500 67.97 271.86 8043 ROLLER LG DOUBLE DRUM 1.00 4.00 HR 75.10 108.500 81.48 325.93 8272 LOADER LANDSCAPER 4WD 1.00 4.00 HR 41.69 108.500 45.24 180.95 8326 4000 GAL WATER TRUCK 1.00 4.00 HR 126.37 108.500 137.11 548.44 8998 AC PAVER 1.00 4.00 HR 325.00 100.000 325.00 1,300.00 8UTLPU Utility Pickup 1.00 4.00 HR 49.88 100.000 49.88 199.52 LABORER Laborer 3.00 12.00 MH 65.00 100.000 87.35 1,048.24 OPER4 Operator Foreman 2.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 4.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-01.0 Instatt Pipelines- Dig/Lay/Backfitt Quantity: 500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 12.67 4.36 17.03 9.97 0.00 3.04 11.02 41.05 Total 6,336.00 2,178.95 8,514.95 4,984.76 0.00 1,519.00 5,508.00 20,526.71 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 26.9994 0.0320 31.2500 843.7319 2.0000 250.0000 0.0040 10,263.3550 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 6.2500 0.1600 106.4369 12.6720 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: sMPiPE Small Pipe Crew Prod:S 2 Eff:100.00 Crew Hrs:16.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3FUSIO N RENT Fusion Rental 1.00 0.50 WK 2,800.00 108.500 3,038.00 1,519.00 4HAUL Hauling-Sub 1.00 16.00 HR 145.00 100.000 145.00 2,320.00 4SAW Sawcutting Sub 1.00 6.00 HR 190.00 100.000 190.00 1,140.00 4WATER Water Truck 1.00 16.00 HR 128.00 100.000 128.00 2,048.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 16.00 HR 111.02 108.500 120.46 1,927.31 8276 EXCAVATOR SMALL 1.00 16.00 HR 130.15 108.500 141.21 2,259.37 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 Activity: 339900-01.1 Sliplining Approach and Receiving Pits Quantity: 2.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 1,246.19 0.00 0.00 1,092.00 4,466.93 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 2,184.00 8,933.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 3,374.9250 4.0000 0.2500 843.7313 1.0000 2.0000 0.5000 8,933.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0500 20.0000 106.4370 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 1 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4HAUL Hauling-Sub 1.00 8.00 HR 145.00 100.000 145.00 1,160.00 4WATER Water Truck 1.00 8.00 HR 128.00 100.000 128.00 1,024.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 Page 54 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 35 of 172 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-05 Potholing Quantity: 4.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 722.85 0.00 0.00 500.00 3,351.59 Total 6,336.00 2,178.95 8,514.95 2,891.41 0.00 0.00 2,000.00 13,406.36 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,851.5900 4.0000 0.2500 712.8975 2.0000 2.0000 0.5000 6,703.1800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 0.0500 20.0000 106.4369 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:HU 4 Eff:100.00 Crew Hrs:16.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4VACTOR Vactor Truck 1.00 8.00 HR 250.00 100.000 250.00 2,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 0.50 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 0.50 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 Activity: 402319.01 Pipe Testing/Cleaning Quantity: 500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 4.94 1.70 6.64 2.73 0.54 0.54 0.00 10.45 Total 2,472.00 850.12 3,322.12 1,362.69 271.25 271.25 0.00 5,227.31 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 9.3696 0.0160 62.5000 585.6013 1.0000 500.0000 0.0020 5,227.3100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 15.6250 0.0640 103.8163 4.9440 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:4.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2PIPEMTL Pipe Materials- Permanent 1.00 500.00 LF 0.50 108.500 0.54 271.25 3BACT Bacteria Testing 1.00 1.00 EA 250.00 108.500 271.25 271.25 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 1.00 8.00 MH 87.00 100.000 116.92 935.35 Page 55 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 36 of 172 Biditem Slipline Northwoods/Driving Range 510 Takeoff Qty: 935.000 LF Client #: Slipline 2 Bid Qty: 935.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 36.25 12.47 48.71 26.23 43.51 3.54 112.10 234.09 Total 33,892.00 11,655.46 45,547.46 24,527.44 40,678.99 3,309.25 104,813.50 218,876.64 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 428.0000 2.1846 0.4578 511.3940 79.1869 106.4193 11.1310 312500-02 Pipeline • 00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 42.60 0.00 8.70 51.30 Total 0.00 0.00 0.00 0.00 39,829.70 0.00 8,134.50 47,964.20 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 2MISCMTL Misc Materials 1.00 935.00 LF 1.00 108.500 1.09 1,014.48 2PIPEFTG Pipe Fittings 1.00 1.00 LS 7,500.00 108.500 8,137.50 8,137.50 2PIPEMTL Pipe Materials- Permanent 1.00 935.00 LF 24.00 108.500 26.04 24,347.40 2SAND Bedding Sand - FOB Plant 1.00 364.65 TON 16.00 108.500 17.36 6,330.32 4HAUL Hauling-Sub 1.00 56.10 HR 145.00 100.000 145.00 8,134.50 339900.01.2 Slipline Sub • 00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 3.39 1.17 4.55 2.67 0.00 0.00 85.00 92.22 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 79,475.00 86,224.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 7.2191 0.0086 116.8750 843.7313 1.0000 935.0000 0.0011 86,224.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 23.3750 0.0428 106.4370 3.3882 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4SLIPLINE Slipline Sub 1.00 935.00 LF 85.00 100.000 85.00 79,475.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 321216-02 AC Patch Paving • 100.00 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 29.08 10.00 39.08 28.27 3.42 0.00 5.80 76.57 Total 2,908.00 1,000.06 3,908.06 2,826.70 342.05 0.00 580.00 7,656.81 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 67.3476 0.0400 25.0000 1,683.6900 0.5000 200.0000 0.0050 15,313.6200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 36.0000 2.7778 0.3600 108.5572 29.0800 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Page 56 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 37 of 172 Crew: PAVE (Mod)Asphalt Paving Prod:CH 4 Eff:100.00 Crew Hrs:4.00 Labor PCs:9.00 Equipment PCs:6.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2ACPAVEMENT Asphalt 1.00 3.25 TON 97.00 108.500 105.25 342.05 4HAUL Hauling-Sub 1.00 4.00 HR 145.00 100.000 145.00 580.00 8042 ROLLER MD DOUBLE DRUM 1.00 4.00 HR 62.64 108.500 67.97 271.86 8043 ROLLER LG DOUBLE DRUM 1.00 4.00 HR 75.10 108.500 81.48 325.93 8272 LOADER LANDSCAPER 4WD 1.00 4.00 HR 41.69 108.500 45.24 180.95 8326 4000 GAL WATER TRUCK 1.00 4.00 HR 126.37 108.500 137.11 548.44 8998 AC PAVER 1.00 4.00 HR 325.00 100.000 325.00 1,300.00 8UTLPU Utility Pickup 1.00 4.00 HR 49.88 100.000 49.88 199.52 LABORER Laborer 3.00 12.00 MH 65.00 100.000 87.35 1,048.24 OPER4 Operator Foreman 2.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 4.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-01.0 Instatt Pipelines- Dig/Lay/Backfitt Quantity: 935.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 13.55 4.66 18.21 10.66 0.00 3.25 10.97 43.09 Total 12,672.00 4,357.90 17,029.90 9,969.51 0.00 3,038.00 10,256.00 40,293.41 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 28.8764 0.0342 29.2188 843.7316 4.0000 233.7500 0.0043 10,073.3525 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 160.0000 5.8438 0.1711 106.4369 13.5529 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 4 Eff:100.00 Crew Hrs:32.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3FUSIONRENT Fusion Rental 1.00 1.00 WK 2,800.00 108.500 3,038.00 3,038.00 4HAUL Hauling-Sub 1.00 32.00 HR 145.00 100.000 145.00 4,640.00 4SAW Sawcutting Sub 1.00 8.00 HR 190.00 100.000 190.00 1,520.00 4WATER Water Truck 1.00 32.00 HR 128.00 100.000 128.00 4,096.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 32.00 HR 111.02 108.500 120.46 3,854.61 8276 EXCAVATOR SMALL 1.00 32.00 HR 130.15 108.500 141.21 4,518.74 8UTLPU Utility Pickup 1.00 32.00 HR 49.88 100.000 49.88 1,596.16 LABORER Laborer 2.00 64.00 MH 65.00 100.000 87.35 5,590.62 OPER4 Operator Foreman 1.00 32.00 MH 92.00 100.000 123.64 3,956.44 OPERATOR Operator 2.00 64.00 MH 87.00 100.000 116.92 7,482.84 Activity: 339900-01.1 Sliplining Approach and Receiving Pits Quantity: 2.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 3,168.00 1,089.48 4,257.48 2,492.38 0.00 0.00 2,184.00 8,933.86 Total 6,336.00 2,178.95 8,514.95 4,984.76 0.00 0.00 4,368.00 17,867.71 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 6,749.8550 8.0000 0.1250 843.7319 2.0000 1.0000 1.0000 8,933.8550 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 0.0250 40.0000 106.4369 3,168.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 2 Eff:100.00 Crew Hrs:16.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4HAUL Hauling-Sub 1.00 16.00 HR 145.00 100.000 145.00 2,320.00 4WATER Water Truck 1.00 16.00 HR 128.00 100.000 128.00 2,048.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 16.00 HR 111.02 108.500 120.46 1,927.31 Page 57 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 38 of 172 8276 EXCAVATOR SMALL 1.00 16.00 HR 130.15 108.500 141.21 2,259.37 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 Activity: 339900-05 Potholing Quantity: 4.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 722.85 0.00 0.00 500.00 3,351.59 Total 6,336.00 2,178.95 8,514.95 2,891.41 0.00 0.00 2,000.00 13,406.36 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,851.5900 4.0000 0.2500 712.8975 2.0000 2.0000 0.5000 6,703.1800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 0.0500 20.0000 106.4369 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:HU 4 Eff:100.00 Crew Hrs:16.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4VACTOR Vactor Truck 1.00 8.00 HR 250.00 100.000 250.00 2,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 0.50 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 0.50 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 402319.01 Pipe - • 00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 2.64 0.91 3.55 1.46 0.54 0.29 0.00 5.84 Total 2,472.00 850.12 3,322.12 1,362.69 507.24 271.25 0.00 5,463.30 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 5.0105 0.0086 116.8750 585.6013 1.0000 935.0000 0.0011 5,463.3000 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 29.2188 0.0342 103.8163 2.6439 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:4.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2PIPEMTL Pipe Materials- Permanent 1.00 935.00 LF 0.50 108.500 0.54 507.24 3BACT Bacteria Testing 1.00 1.00 EA 250.00 108.500 271.25 271.25 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 1.00 8.00 MH 87.00 100.000 116.92 935.35 Page 58 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 39 of 172 Biditem Slipline Skybowl Condos 5 �O Takeoff Qty: 1,000.000 LF Client #: Slipline 3 Bid Qty: 1,000.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 30.72 10.57 41.29 22.04 45.63 3.58 109.48 222.02 Total 30,724.00 10,565.99 41,289.99 22,035.05 45,629.95 3,580.50 109,480.00 222,015.49 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 388.0000 2.5773 0.3880 572.2049 79.1856 106.4175 13.1579 Activity: 312500-02 Pipeline Materials Quantity: 1000.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 44.75 0.00 8.70 53.45 Total 0.00 0.00 0.00 0.00 44,745.40 0.00 8,700.00 53,445.40 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 2MISCMTL Misc Materials 1.00 1,000.00 LF 1.00 108.500 1.09 1,085.00 2PIPEFTG Pipe Fittings 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2PIPEMTL Pipe Materials- Permanent 1.00 1,000.00 LF 24.00 108.500 26.04 26,040.00 2SAND Bedding Sand - FOB Plant 1.00 390.00 TON 16.00 108.500 17.36 6,770.40 4HAUL Hauling-Sub 1.00 60.00 HR 145.00 100.000 145.00 8,700.00 Activity: 339900.01.2 Slipline Sub Quantity: 1000.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 3.17 1.09 4.26 2.49 0.00 0.00 85.00 91.75 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 85,000.00 91,749.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 6.7499 0.0080 125.0000 843.7313 1.0000 1,000.0000 0.0010 91,749.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 25.0000 0.0400 106.4370 3.1680 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4SLIPLINE Slipline Sub 1.00 1,000.00 LF 85.00 100.000 85.00 85,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 321216-02 AC Patch Paving • 100.00 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 29.08 10.00 39.08 28.27 3.42 0.00 5.80 76.57 Total 2,908.00 1,000.06 3,908.06 2,826.70 342.05 0.00 580.00 7,656.81 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 67.3476 0.0400 25.0000 1,683.6900 0.5000 200.0000 0.0050 15,313.6200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 36.0000 2.7778 0.3600 108.5572 29.0800 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Page 59 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 40 of 172 Crew: PAVE (Mod)Asphalt Paving Prod:CH 4 Eff:100.00 Crew Hrs:4.00 Labor PCs:9.00 Equipment PCs:6.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2ACPAVEMENT Asphalt 1.00 3.25 TON 97.00 108.500 105.25 342.05 4HAUL Hauling-Sub 1.00 4.00 HR 145.00 100.000 145.00 580.00 8042 ROLLER MD DOUBLE DRUM 1.00 4.00 HR 62.64 108.500 67.97 271.86 8043 ROLLER LG DOUBLE DRUM 1.00 4.00 HR 75.10 108.500 81.48 325.93 8272 LOADER LANDSCAPER 4WD 1.00 4.00 HR 41.69 108.500 45.24 180.95 8326 4000 GAL WATER TRUCK 1.00 4.00 HR 126.37 108.500 137.11 548.44 8998 AC PAVER 1.00 4.00 HR 325.00 100.000 325.00 1,300.00 8UTLPU Utility Pickup 1.00 4.00 HR 49.88 100.000 49.88 199.52 LABORER Laborer 3.00 12.00 MH 65.00 100.000 87.35 1,048.24 OPER4 Operator Foreman 2.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 4.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-01.0 Instatt Pipelines- Dig/Lay/Backfitt Quantity: 1000.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 12.67 4.36 17.03 9.97 0.00 3.04 11.02 41.05 Total 12,672.00 4,357.90 17,029.90 9,969.51 0.00 3,038.00 11,016.00 41,053.41 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 26.9994 0.0320 31.2500 843.7316 4.0000 250.0000 0.0040 10,263.3525 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 160.0000 6.2500 0.1600 106.4369 12.6720 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: sMPiPE Small Pipe Crew Prod:S 4 Eff:100.00 Crew Hrs:32.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3FUSIO NRENT Fusion Rental 1.00 1.00 WK 2,800.00 108.500 3,038.00 3,038.00 4HAUL Hauling-Sub 1.00 32.00 HR 145.00 100.000 145.00 4,640.00 4SAW Sawcutting Sub 1.00 12.00 HR 190.00 100.000 190.00 2,280.00 4WATER Water Truck 1.00 32.00 HR 128.00 100.000 128.00 4,096.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 32.00 HR 111.02 108.500 120.46 3,854.61 8276 EXCAVATOR SMALL 1.00 32.00 HR 130.15 108.500 141.21 4,518.74 8UTLPU Utility Pickup 1.00 32.00 HR 49.88 100.000 49.88 1,596.16 LABORER Laborer 2.00 64.00 MH 65.00 100.000 87.35 5,590.62 OPER4 Operator Foreman 1.00 32.00 MH 92.00 100.000 123.64 3,956.44 OPERATOR Operator 2.00 64.00 MH 87.00 100.000 116.92 7,482.84 Activity: 339900-01.1 Sliplining Approach and Receiving Pits Quantity: 2.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 1,246.19 0.00 0.00 1,092.00 4,466.93 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 2,184.00 8,933.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 3,374.9250 4.0000 0.2500 843.7313 1.0000 2.0000 0.5000 8,933.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0500 20.0000 106.4370 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 1 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4HAUL Hauling-Sub 1.00 8.00 HR 145.00 100.000 145.00 1,160.00 4WATER Water Truck 1.00 8.00 HR 128.00 100.000 128.00 1,024.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 Page 60 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 41 of 172 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-05 Potholing Quantity: 4.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 722.85 0.00 0.00 500.00 3,351.59 Total 6,336.00 2,178.95 8,514.95 2,891.41 0.00 0.00 2,000.00 13,406.36 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,851.5900 4.0000 0.2500 712.8975 2.0000 2.0000 0.5000 6,703.1800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 0.0500 20.0000 106.4369 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:HU 4 Eff:100.00 Crew Hrs:16.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4VACTOR Vactor Truck 1.00 8.00 HR 250.00 100.000 250.00 2,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 0.50 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 0.50 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 Activity: 402319.01 Pipe Testing/Cleaning Quantity: 1000.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 2.47 0.85 3.32 1.36 0.54 0.54 0.00 5.77 Total 2,472.00 850.12 3,322.12 1,362.69 542.50 542.50 0.00 5,769.81 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 4.6848 0.0080 125.0000 585.6013 1.0000 1,000.0000 0.0010 5,769.8100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 31.2500 0.0320 103.8163 2.4720 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:4.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2PIPEMTL Pipe Materials- Permanent 1.00 1,000.00 LF 0.50 108.500 0.54 542.50 3BACT Bacteria Testing 1.00 2.00 EA 250.00 108.500 271.25 542.50 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 1.00 8.00 MH 87.00 100.000 116.92 935.35 Page 61 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 42 of 172 Biditem Slipline 89/Rainbow Intertie 530 Takeoff Qty: 1,012.000 LF Client #: Slipline 4 Bid Qty: 1,012.000 LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 32.80 11.28 44.08 23.12 45.50 3.54 108.73 224.97 Total 33,196.00 11,416.11 44,612.11 23,397.75 46,048.76 3,580.50 110,030.00 227,669.12 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 420.0000 2.4095 0.4150 542.0693 79.0381 106.2193 12.0476 312500-02 Pipeline •uantity: 1012.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 44.62 0.00 8.88 53.51 Total 0.00 0.00 0.00 0.00 45,157.70 0.00 8,990.00 54,147.70 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 2MISCMTL Misc Materials 1.00 1,012.00 LF 1.00 108.500 1.09 1,098.02 2PIPEFTG Pipe Fittings 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2PIPEMTL Pipe Materials- Permanent 1.00 1,012.00 LF 24.00 108.500 26.04 26,352.48 2SAND Bedding Sand - FOB Plant 1.00 395.00 TON 16.00 108.500 17.36 6,857.20 4HAUL Hauling-Sub 1.00 62.00 HR 145.00 100.000 145.00 8,990.00 Activity: 339900.01.2 Slipline Sub Quantity: 1012.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 3.13 1.08 4.21 2.46 0.00 0.00 85.00 91.67 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 86,020.00 92,769.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 6.6698 0.0079 126.5000 843.7313 1.0000 1,012.0000 0.0010 92,769.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 25.3000 0.0395 106.4370 3.1304 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4SLIPLINE Slipline Sub 1.00 1,012.00 LF 85.00 100.000 85.00 86,020.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 321216-02 AC Patch Paving • 100.00 Unit: SF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 29.08 10.00 39.08 28.27 3.42 0.00 5.80 76.57 Total 2,908.00 1,000.06 3,908.06 2,826.70 342.05 0.00 580.00 7,656.81 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 67.3476 0.0400 25.0000 1,683.6900 0.5000 200.0000 0.0050 15,313.6200 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 36.0000 2.7778 0.3600 108.5572 29.0800 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Page 62 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 43 of 172 Crew: PAVE (Mod)Asphalt Paving Prod:CH 4 Eff:100.00 Crew Hrs:4.00 Labor PCs:9.00 Equipment PCs:6.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2ACPAVEMENT Asphalt 1.00 3.25 TON 97.00 108.500 105.25 342.05 4HAUL Hauling-Sub 1.00 4.00 HR 145.00 100.000 145.00 580.00 8042 ROLLER MD DOUBLE DRUM 1.00 4.00 HR 62.64 108.500 67.97 271.86 8043 ROLLER LG DOUBLE DRUM 1.00 4.00 HR 75.10 108.500 81.48 325.93 8272 LOADER LANDSCAPER 4WD 1.00 4.00 HR 41.69 108.500 45.24 180.95 8326 4000 GAL WATER TRUCK 1.00 4.00 HR 126.37 108.500 137.11 548.44 8998 AC PAVER 1.00 4.00 HR 325.00 100.000 325.00 1,300.00 8UTLPU Utility Pickup 1.00 4.00 HR 49.88 100.000 49.88 199.52 LABORER Laborer 3.00 12.00 MH 65.00 100.000 87.35 1,048.24 OPER4 Operator Foreman 2.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 4.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-01.0 Instatt Pipelines- Dig/Lay/Backfitt Quantity: 1012.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 12.52 4.31 16.83 9.85 0.00 3.00 10.13 39.82 Total 12,672.00 4,357.90 17,029.90 9,969.51 0.00 3,038.00 10,256.00 40,293.41 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 26.6793 0.0316 31.6250 843.7316 4.0000 253.0000 0.0040 10,073.3525 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 160.0000 6.3250 0.1581 106.4369 12.5217 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 4 Eff:100.00 Crew Hrs:32.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3FUSIONRENT Fusion Rental 1.00 1.00 WK 2,800.00 108.500 3,038.00 3,038.00 4HAUL Hauling-Sub 1.00 32.00 HR 145.00 100.000 145.00 4,640.00 4SAW Sawcutting Sub 1.00 8.00 HR 190.00 100.000 190.00 1,520.00 4WATER Water Truck 1.00 32.00 HR 128.00 100.000 128.00 4,096.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 32.00 HR 111.02 108.500 120.46 3,854.61 8276 EXCAVATOR SMALL 1.00 32.00 HR 130.15 108.500 141.21 4,518.74 8UTLPU Utility Pickup 1.00 32.00 HR 49.88 100.000 49.88 1,596.16 LABORER Laborer 2.00 64.00 MH 65.00 100.000 87.35 5,590.62 OPER4 Operator Foreman 1.00 32.00 MH 92.00 100.000 123.64 3,956.44 OPERATOR Operator 2.00 64.00 MH 87.00 100.000 116.92 7,482.84 Activity: 339900-01.1 Sliplining Approach and Receiving Pits Quantity: 2.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 1,246.19 0.00 0.00 1,092.00 4,466.93 Total 3,168.00 1,089.48 4,257.48 2,492.37 0.00 0.00 2,184.00 8,933.85 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 3,374.9250 4.0000 0.2500 843.7313 1.0000 2.0000 0.5000 8,933.8500 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 40.0000 0.0500 20.0000 106.4370 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE Small Pipe Crew Prod:S 1 Eff:100.00 Crew Hrs:8.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4HAUL Hauling-Sub 1.00 8.00 HR 145.00 100.000 145.00 1,160.00 4WATER Water Truck 1.00 8.00 HR 128.00 100.000 128.00 1,024.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 Page 63 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 44 of 172 8276 EXCAVATOR SMALL 1.00 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 2.00 16.00 MH 87.00 100.000 116.92 1,870.71 Activity: 339900-05 Potholing Quantity: 4.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 722.85 0.00 0.00 500.00 3,351.59 Total 6,336.00 2,178.95 8,514.95 2,891.41 0.00 0.00 2,000.00 13,406.36 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,851.5900 4.0000 0.2500 712.8975 2.0000 2.0000 0.5000 6,703.1800 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 80.0000 0.0500 20.0000 106.4369 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:HU 4 Eff:100.00 Crew Hrs:16.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4VACTOR Vactor Truck 1.00 8.00 HR 250.00 100.000 250.00 2,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 0.50 8.00 HR 111.02 108.500 120.46 963.65 8276 EXCAVATOR SMALL 0.50 8.00 HR 130.15 108.500 141.21 1,129.68 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 2.00 32.00 MH 87.00 100.000 116.92 3,741.42 402319.01 Pipe - •uantity: 1012.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 4.89 1.68 6.57 2.69 0.54 0.54 0.00 10.34 Total 4,944.00 1,700.24 6,644.24 2,725.39 549.01 542.50 0.00 10,461.14 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 9.2585 0.0158 63.2500 585.6019 2.0000 506.0000 0.0020 5,230.5700 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 64.0000 15.8125 0.0632 103.8163 4.8854 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:CH 16 Eff:100.00 Crew Hrs:16.00 Labor Pcs:4.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2PIPEMTL Pipe Materials- Permanent 1.00 1,012.00 LF 0.50 108.500 0.54 549.01 3BACT Bacteria Testing 1.00 2.00 EA 250.00 108.500 271.25 542.50 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 16.00 HR 111.02 108.500 120.46 1,927.31 8UTLPU Utility Pickup 1.00 16.00 HR 49.88 100.000 49.88 798.08 LABORER Laborer 2.00 32.00 MH 65.00 100.000 87.35 2,795.31 OPER4 Operator Foreman 1.00 16.00 MH 92.00 100.000 123.64 1,978.22 OPERATOR Operator 1.00 16.00 MH 87.00 100.000 116.92 1,870.71 Page 64 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 45 of 172 Biditem Slipline Traffic Control 5 40 Takeoff Qty: 1.000 LS Client #: Slipline TC Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 47,596.80 16,368.55 63,965.35 11,971.20 0.00 15,864.44 0.00 91,800.99 Total 47,596.80 16,368.55 63,965.35 11,971.20 0.00 15,864.44 0.00 91,800.99 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 840.0000 0.0012 840.0000 109.2869 56.6629 76.1492 0.0042 Activity: 015526-01 Traffic Control- Paved Road Sections Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 47,596.80 16,368.55 63,965.35 11,971.20 0.00 15,864.44 0.00 91,800.99 Total 47,596.80 16,368.55 63,965.35 11,971.20 0.00 15,864.44 0.00 91,800.99 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 75,936.5500 240.0000 0.0042 316.4023 30.0000 0.0333 30.0000 3,060.0330 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 840.0000 0.0012 840.0000 76.1492 47,596.8000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: TRAFiC (Mod)Traffic Control Prod:S 30 Eff:100.00 Crew Hrs:240.00 Labor PCs:3.50 Equipment PCs:1.00 Notes: Assumed Traffic Control for paved road alignment 13,500 LF +/- Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 3TCARROW Traffic Control Arrow Board 1.00 60.00 EAD 39.00 108.500 42.32 2,538.90 3TCCONES Traffic Control Cones 1.00 1,600.00 EAD 1.75 108.500 1.90 3,038.00 3TCPLATE Traffic Control Traffic Plate 1.00 120.00 EAD 50.00 108.500 54.25 6,510.00 3TCSIG NS Traffic Control Signs 1.00 512.00 EAD 6.80 108.500 7.38 3,777.54 8UTLPU Utility Pickup 1.00 240.00 HR 49.88 100.000 49.88 11,971.20 FLAG Flagger 2.00 480.00 MH 48.91 100.000 65.73 31,550.48 LAB4 Labor Foreman 1.00 240.00 MH 68.00 100.000 91.39 21,932.45 LABORER Laborer 0.50 120.00 MH 65.00 100.000 87.35 10,482.42 Page 65 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 46 of 172 Biditem Slipline GA/Fee 550 Takeoff Qty: 1.000 LS Client #: Shpline GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 239,492.83 0.00 239,492.83 Total 0.00 0.00 0.00 0.00 0.00 239,492.83 0.00 239,492.83 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 239,492.83 0.00 239,492.83 Total 0.00 0.00 0.00 0.00 0.00 239,492.83 0.00 239,492.83 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2026 2026 Escalation 1.00 1,053,011.00 LS 0.05 100.000 0.05 52,650.55 1SUBFEE Sub Fee 1.00 962,737.00 LS 0.12 100.000 0.12 115,528.44 1SUBOH Sub Overhead 1.00 891,423.00 LS 0.08 100.000 0.08 71,313.84 Page 66 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 47 of 172 Biditem Tariff Allowance (25% of Materials Cost) 5 51 Takeoff Qty: 1.000 LS Client #: Slipline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 331,691.00 LS 0.25 100.000 0.25 82,922.75 Page 67 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Donner Trails Donner Trails Tank Rehab 1.000 LS 235,650.99 235,650.99 Tank Rehab Donner Trails Donner Trails Tank GA/OH 1.000 LS 58,262.63 58,262.63 Tank GA Donner Trails Tariff Allowance(25%of Materials Cost) 1.000 LS 1 8,624.44 8,624.44 Tariff Allow Donner Trails Tank Rehab $302,538.06 Page 68 of 241 Cost Report Pre-Construction Services Group Page 1 of 172 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Biditem Donner Trails Tank Rehab 1 Takeoff Qty: 1.000 LS Client #: Donner Trails Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 97,641.36 33,578.87 131,220.23 32,799.60 34,177.50 35,262.50 0.00 233,459.83 Total 97,641.36 33,578.87 131,220.23 32,799.60 34,177.50 35,262.50 0.00 233,459.83 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,476.0000 0.0007 1,476.0000 158.1706 66.1527 88.9026 0.0028 Activity: 41001.01 Tank Rehab Quantity: 160000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.61 0.21 0.82 0.20 0.21 0.22 0.00 1.46 Total 97,641.36 33,578.87 131,220.23 32,799.60 34,177.50 35,262.50 0.00 233,459.83 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.0251 0.0023 444.4444 455.6106 45.0000 3,555.5556 0.0003 5,187.9962 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,476.0000 108.4011 0.0092 88.9026 0.6103 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod)Painting Crew Prod:S 45 Eff:100.00 Crew Hrs:360.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 17,000.00 108.500 18,445.00 18,445.00 2STEEL Steel Plate 8 Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 290.00 BAG 80.00 108.500 86.80 25,172.00 3SANDPOT Sand Pot 1.00 30.00 DAY 110.00 108.500 119.35 3,580.50 3TEMPMTL Temp Materials 1.00 1.00 LS 6,000.00 108.500 6,510.00 6,510.00 8*BOOM45 45'Boomlift 1.00 360.00 HR 38.00 108.500 41.23 14,842.80 8UTLPU Utility Pickup 1.00 360.00 HR 49.88 100.000 49.88 17,956.80 IRON Iron Worker 0.10 36.00 MH 82.86 100.000 111.36 4,008.80 LABORER Laborer 1.00 360.00 MH 65.00 100.000 87.35 31,447.26 PAINT Painter 3.00 1,080.00 MH 65.98 100.000 88.67 95,764.17 Page 69 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 2 of 172 Biditem Donner Trails Tank GA/OH 1 Takeoff Qty: 1.000 LS Client #: Donner Trails Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 57,720.89 0.00 57,720.89 Total 0.00 0.00 0.00 0.00 0.00 57,720.89 0.00 57,720.89 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 57,720.89 0.00 57,720.89 Total 0.00 0.00 0.00 0.00 0.00 57,720.89 0.00 57,720.89 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2026 2026 Escalation 1.00 258,513.00 LS 0.05 100.000 0.05 12,925.65 1SUBFEE Sub Fee 1.00 230,815.00 LS 0.12 100.000 0.12 27,697.80 1SUBOH Sub Overhead 1.00 213,718.00 LS 0.08 100.000 0.08 17,097.44 Page 70 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 3 of 172 Biditem Tariff Allowance (25% of Materials Cost) 14 Takeoff Qty: 1.000 LS Client #: Donner Trails Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 34,177.00 LS 0.25 100.000 0.25 8,544.25 Page 71 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total Martis Woods Martis Wood Pump Station Replacement 1.000 LS 1,688,702.09 1,688,702.09 PS Martis Woods Martis Woods PS GA/Fee 1.000 LS 456,079.57 456,079.57 GA Martis Tariff Tariff Allowance(25%of Materials Cost) 1.000 1 LS 1 146,567.08 146,567.08 Allowance Martis Woods/Northside PS(2026) $2,291,348.74 10 Page 72 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 49 of 172 Biditem Martis Wood Pump Station Replacement 600 Takeoff Qty: 1.000 LS Client #: Martis Woods PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 1,673,000.00 1,673,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 1,673,000.00 1,673,000.00 600.1 • ••• -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 Activity: 600.2 03000-09000 Building She[L Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 411,000.00 411,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 411,000.00 411,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 Activity: 600.3 22000-26000-MEP Trades Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 397,000.00 397,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 397,000.00 397,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 220,000.00 100.000 220,000.00 220,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 Activity: 600.4 31000-33000 Site Work Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 Page 73 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 50 of 172 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 600.5 40000-46000 Mechanical.Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 395,000.00 395,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 395,000.00 395,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply Et Install 1.00 3.00 EA 95,000.00 100.000 95,000.00 285,000.00 Page 74 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 51 of 172 Biditem Martis Woods PS GA/Fee 60 Takeoff Qty: 1.000 LS Client #: Martis Woods GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 451,838.80 0.00 451,838.80 Total 0.00 0.00 0.00 0.00 0.00 451,838.80 0.00 451,838.80 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 451,838.80 0.00 451,838.80 Total 0.00 0.00 0.00 0.00 0.00 451,838.80 0.00 451,838.80 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2026 2026 Escalation 1.00 2,023,656.00 LS 0.05 100.000 0.05 101,182.80 1SUBFEE Sub Fee 1.00 1,806,800.00 LS 0.12 100.000 0.12 216,816.00 1SUBOH Sub Overhead 1.00 1,673,000.00 LS 0.08 100.000 0.08 133,840.00 Page 75 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 52 of 172 Biditem Tariff Allowance (25% of Materials Cost) 611 Takeoff Qty: 1.000 LS Client #: Martis Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 580,817.00 LS 0.25 100.000 0.25 145,204.25 Page 76 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Stitzmark PS Stitzmark TD Hyddostation 1.000 LS 1,173,587.39 1,173,587.39 Stitzmark PS Stitzmark Hyrdostation GA/Fee 1.000 LS 381,138.83 381,138.83 GA Stitzmark Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 95,284.49 95,294.49 Allowance Stitzmark Hydrostation $1,650,010.71 Page 77 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 54 of 172 Biditem Stitzmark TD Hydrostation 650 Takeoff Qty: 1.000 LS Client #: Stitzmark PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 59,675.00 0.00 1,103,000.00 1,162,675.00 Total 0.00 0.00 0.00 0.00 59,675.00 0.00 1,103,000.00 1,162,675.00 • ••• 1 • ••• -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 125,000.00 100.000 125,000.00 125,000.00 Activity: 03-09.01 03000-09000 Building She[L Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 Activity: 22-26.01 22000-26000-MEP Trades Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 59,675.00 0.00 242,000.00 301,675.00 Total 0.00 0.00 0.00 0.00 59,675.00 0.00 242,000.00 301,675.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2G ENSET Emergency Generator 1.00 1.00 LS 55,000.00 108.500 59,675.00 59,675.00 4CONTROL Controls SCADA Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4ELEC Electric- Sub 1.00 1.00 LS 120,000.00 100.000 120,000.00 120,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4HVAC HVAC Sub 1.00 1.00 LS 55,000.00 100.000 55,000.00 55,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 12,000.00 100.000 12,000.00 12,000.00 4SECURITY Security 1.00 1.00 LS 5,000.00 100.000 5,000.00 5,000.00 Activity: 31-33-01 31000-33000 Site Work Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 195,000.00 195,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 195,000.00 195,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 Page 78 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 55 of 172 4SITEWORK Sitework 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4UTILITIES Utilities 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 Activity: 40-46.01 40000-46000 Mechanical Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 140,000.00 140,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 140,000.00 140,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 4PUMP Pump- Supply ii Install 1.00 1.00 EA 20,000.00 100.000 20,000.00 20,000.00 4PUMP2 Pump 2 -Supply it Install 1.00 1.00 EA 60,000.00 100.000 60,000.00 60,000.00 Page 79 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 56 of 172 Biditem Stitzmark Hyrdostation GA/Fee 6 51 Takeoff Qty: 1.000 LS Client #: Stitzmark PS GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 377,594.88 0.00 377,594.88 Total 0.00 0.00 0.00 0.00 0.00 377,594.88 0.00 377,594.88 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 377,594.88 0.00 377,594.88 Total 0.00 0.00 0.00 0.00 0.00 377,594.88 0.00 377,594.88 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 1,397,342.00 LS 0.10 100.000 0.10 143,227.56 1SUBFEE Sub Fee 1.00 1,247,359.00 LS 0.12 100.000 0.12 149,683.08 1SUBOH Sub Overhead 1.00 1,058,553.00 LS 0.08 100.000 0.08 84,684.24 Page 80 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 57 of 172 Biditem Tariff Allowance (25% of Materials Cost) 652 Takeoff Qty: 1.000 LS Client #: Stitzmark Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 377,594.00 LS 0.25 100.000 0.25 94,398.50 Page 81 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Innsbruck PS Innsbruck Pump Station 1.000 LS 1,678,608.24 1,678,608.24 Innsbruck PS Innsbruck PS GA 1.000 LS 559,956.77 559,956.77 GA Innsbruck Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 139,989.16 139,989.16 Allowance Innsbruck Pump Station $2,378,554.17 12 Page 82 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 59 of 172 Biditem Innsbruck Pump Station 6�O Takeoff Qty: 1.000 LS Client #: Innsbruck PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 1,663,000.00 1,663,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 1,663,000.00 1,663,000.00 • ••• 1 • ••• -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 Activity: 03-09.01 03000-09000 Building She[L Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 Activity: 22-26.01 22000-26000-MEP Trades Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 382,000.00 382,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 382,000.00 382,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 200,000.00 100.000 200,000.00 200,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 Activity: 31-33-01 31000-33000 Site Work Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 Page 83 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 60 of 172 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46-01 40000-46000 Mechanical.Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 410,000.00 410,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 410,000.00 410,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply Et Install 1.00 4.00 EA 75,000.00 100.000 75,000.00 300,000.00 Page 84 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 61 of 172 Biditem Innsbruck PS GA 6 Takeoff Qty: 1.000 LS Client #: Innsbruck PS GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 554,750.11 0.00 554,750.11 Total 0.00 0.00 0.00 0.00 0.00 554,750.11 0.00 554,750.11 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 554,750.11 0.00 554,750.11 Total 0.00 0.00 0.00 0.00 0.00 554,750.11 0.00 554,750.11 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 2,011,564.00 LS 0.10 100.000 0.10 206,185.31 1SUBFEE Sub Fee 1.00 1,796,040.00 LS 0.12 100.000 0.12 215,524.80 1SUBOH Sub Overhead 1.00 1,663,000.00 LS 0.08 100.000 0.08 133,040.00 Page 85 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 62 of 172 Biditem Tariff Allowance (25% of Materials Cost) 6 74 Takeoff Qty: 1.000 LS Client #: Innsbruck Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 554,750.00 LS 0.25 100.000 0.25 138,687.50 Page 86 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2027 Pipe 2027 Pipe Replacement Program 1.000 LS 2,114,410.46 2,114,410.46 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 61,067.83 61,067.83 Allowance 2027 Pipe Program $2,175,478.29 13 Page 87 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 64 of 172 Biditem 2027 Pipe Replacement Program 700 Takeoff Qty: 1.000 LS Client #: 2027 Pipe Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,094,750.00 0.00 2,094,750.00 Total 0.00 0.00 0.00 0.00 0.00 2,094,750.00 0.00 2,094,750.00 2027.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,094,750.00 0.00 2,094,750.00 Total 0.00 0.00 0.00 0.00 0.00 2,094,750.00 0.00 2,094,750.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 1,900,000.00 LS 0.10 100.000 0.10 194,750.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 88 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 65 of 172 Biditem Tariff Allowance (25% of Materials Cost) 70 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 242,000.00 LS 0.25 100.000 0.25 60,500.00 Page 89 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Sierra Meadows Tank Sierra Meadows Tank Rehab 1.000 LS 333,261.20 333,261.20 Rehab Sierra Meadowns Sierra Meadows Tank GA/OH 1.000 LS 111,167.37 111,167.37 Tank GA Sierra Meadows Tank Tariff Allowance(25%of Materials Cost) 1.000 LS 9,719.63 9,719.63 Tariff Sierra Meadows Tank Rehab $454,148.20 3 Page 90 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 9 of 172 Biditem Sierra Meadows Tank Rehab 40 Takeoff Qty: 1.000 LS Client #: Sierra Meadows Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 141,037.52 48,502.81 189,540.33 47,377.20 38,517.50 54,727.40 0.00 330,162.43 Total 141,037.52 48,502.81 189,540.33 47,377.20 38,517.50 54,727.40 0.00 330,162.43 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,132.0000 0.0005 2,132.0000 154.8604 66.1527 88.9026 0.0019 Activity: 41001-01 Tank Rehab Quantity: 250000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.56 0.19 0.76 0.19 0.15 0.22 0.00 1.32 Total 141,037.52 48,502.81 189,540.33 47,377.20 38,517.50 54,727.40 0.00 330,162.43 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.9477 0.0021 480.7692 455.6106 65.0000 3,846.1538 0.0003 5,079.4220 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,132.0000 117.2608 0.0085 88.9026 0.5642 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 65 Eff:100.00 Crew Hrs:520.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 21,000.00 108.500 22,785.00 22,785.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 454.00 BAG 80.00 108.500 86.80 39,407.20 3SANDPOT Sand Pot 1.00 42.00 DAY 110.00 108.500 119.35 5,012.70 3TEMPMTL Temp Materials 1.00 1.00 LS 9,500.00 108.500 10,307.50 10,307.50 8*BOOM45 45'Boomlift 1.00 520.00 HR 38.00 108.500 41.23 21,439.60 8UTLPU Utility Pickup 1.00 520.00 HR 49.88 100.000 49.88 25,937.60 IRON Iron Worker 0.10 52.00 MH 82.86 100.000 111.36 5,790.49 LABORER Laborer 1.00 520.00 MH 65.00 100.000 87.35 45,423.82 PAINT Painter 3.00 1,560.00 MH 65.98 100.000 88.67 138,326.02 Page 91 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 10 of 172 Biditem Sierra Meadows Tank GA/OH 4 Takeoff Qty: 1.000 LS Client #: Sierra Meadowns Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 110,133.70 0.00 110,133.70 Total 0.00 0.00 0.00 0.00 0.00 110,133.70 0.00 110,133.70 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 110,133.70 0.00 110,133.70 Total 0.00 0.00 0.00 0.00 0.00 110,133.70 0.00 110,133.70 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 399,361.00 LS 0.10 100.000 0.10 40,934.50 1SUBFEE Sub Fee 1.00 356,572.00 LS 0.12 100.000 0.12 42,788.64 1SUBOH Sub Overhead 1.00 330,132.00 LS 0.08 100.000 0.08 26,410.56 Page 92 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 11 of 172 Biditem Tariff Allowance (25% of Materials Cost) 44 Takeoff Qty: 1.000 LS Client #: Sierra Meadows Tank Tariff Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 38,517.00 LS 0.25 100.000 0.25 9,629.25 Page 93 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total The Strand The Strand Tank Rehab 1.000 LS 397,387.92 397,387.92 Tank Rehab The Strand The Strand Tank GA/OH 1.000 LS 125,016.31 125,016.31 Tank GA The Strand Tariff Allowance(25%of Materials Cost) 1.000 LS 1 12,731.38 12,731.38 Tank Tariff The Strand Tank Rehab $535,135.61 2 Page 94 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 5 of 172 Biditem The Strand Tank Rehab 20 Takeoff Qty: 1.000 LS Client #: The Strand Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 162,735.60 55,964.78 218,700.38 54,666.00 50,452.50 69,874.00 0.00 393,692.88 Total 162,735.60 55,964.78 218,700.38 54,666.00 50,452.50 69,874.00 0.00 393,692.88 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,460.0000 0.0004 2,460.0000 160.0378 66.1527 88.9026 0.0017 Activity: 41001-01 Tank Rehab Quantity: 320000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.51 0.17 0.68 0.17 0.16 0.22 0.00 1.23 Total 162,735.60 55,964.78 218,700.38 54,666.00 50,452.50 69,874.00 0.00 393,692.88 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.8543 0.0019 533.3333 455.6106 75.0000 4,266.6667 0.0002 5,249.2384 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,460.0000 130.0813 0.0077 88.9026 0.5085 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 75 Eff:100.00 Crew Hrs:600.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 32,000.00 108.500 34,720.00 34,720.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 580.00 BAG 80.00 108.500 86.80 50,344.00 3SANDPOT Sand Pot 1.00 50.00 DAY 110.00 108.500 119.35 5,967.50 3TEMPMTL Temp Materials 1.00 1.00 LS 12,500.00 108.500 13,562.50 13,562.50 8*BOOM45 45'Boomlift 1.00 600.00 HR 38.00 108.500 41.23 24,738.00 8UTLPU Utility Pickup 1.00 600.00 HR 49.88 100.000 49.88 29,928.00 IRON Iron Worker 0.10 60.00 MH 82.86 100.000 111.36 6,681.34 LABORER Laborer 1.00 600.00 MH 65.00 100.000 87.35 52,412.10 PAINT Painter 3.00 1,800.00 MH 65.98 100.000 88.67 159,606.94 Page 95 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 6 of 172 Biditem The Strand Tank GA/OH 2 Takeoff Qty: 1.000 LS Client #: The Strand Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 123,853.87 0.00 123,853.87 Total 0.00 0.00 0.00 0.00 0.00 123,853.87 0.00 123,853.87 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 123,853.87 0.00 123,853.87 Total 0.00 0.00 0.00 0.00 0.00 123,853.87 0.00 123,853.87 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 449,100.00 LS 0.10 100.000 0.10 46,032.75 1SUBFEE Sub Fee 1.00 400,982.00 LS 0.12 100.000 0.12 48,117.84 1SUBOH Sub Overhead 1.00 371,291.00 LS 0.08 100.000 0.08 29,703.28 Page 96 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 7 of 172 Biditem Tariff Allowance (25% of Materials Cost) 24 Takeoff Qty: 1.000 LS Client #: The Strand Tank Tariff Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 50,452.00 LS 0.25 100.000 0.25 12,613.00 Page 97 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units MUnit Price Bid Total Airport Well Airport Well Option 1.000 LS 873,408.73 873,408.73 Option Airport Well Airport Well GA/Fee 1.000 LS 291,334.31 291,334.31 GA Airport Well Tariff Allowance(25%of Materials Cost) 1.000 1 LS 1 72,833.48 72,833.48 TariffAllow Airport Well Options(2027) $1,237,576.52 14 Page 98 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 67 of 172 Biditem Airport Well Option 710 Takeoff Qty: 1.000 LS Client #: Airport Well Option Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Total 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Total 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2WELLDIS Well Disinfection 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2WELLDRILL Well Drilling 1.00 450.00 VF 1,100.00 108.500 1,193.50 537,075.00 2WELLMOB Well Driller Mob 1.00 1.00 EA 25,000.00 108.500 27,125.00 27,125.00 2WELLPUMP Supply Et Install Well Pump 1.00 1.00 LS 250,000.00 108.500 271,250.00 271,250.00 2WELLTEST Test Well w Temp Pump 1.00 1.00 LS 17,500.00 108.500 18,987.50 18,987.50 Page 99 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 68 of 172 Biditem Airport Well GA/Fee 712 Takeoff Qty: 1.000 LS Client #: Airport Well GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 288,625.39 0.00 288,625.39 Total 0.00 0.00 0.00 0.00 0.00 288,625.39 0.00 288,625.39 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 288,625.39 0.00 288,625.39 Total 0.00 0.00 0.00 0.00 0.00 288,625.39 0.00 288,625.39 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 1,046,451.00 LS 0.10 100.000 0.10 107,261.23 1SUBFEE Sub Fee 1.00 934,510.00 LS 0.12 100.000 0.12 112,141.20 1SUBOH Sub Overhead 1.00 865,287.00 LS 0.08 100.000 0.08 69,222.96 Page 100 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 69 of 172 Biditem Tariff Allowance (25% of Materials Cost) 714 Takeoff Qty: 1.000 LS Client #: Airport Well Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 288,625.00 LS 0.25 100.000 0.25 72,156.25 Page 101 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Airport Tank Airport Tank Replacement Option 1.000 LS 2,039,475.15 2,039,475.15 Option Airport GA Airport Tank GA/Fee 1.000 LS 650,114.56 650,114.56 Airport Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 285,842.86 285,842.86 Allowance Airport Tank $2,975,432.57 16 Page 102 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 76 of 172 Biditem Airport Tank Replacement Option 1050 Takeoff Qty: 1.000 LS Client #: Airport Tank Option Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 119,032.32 40,935.22 159,967.54 107,803.92 1,132,740.00 0.00 620,000.00 2,020,511.46 Total 119,032.32 40,935.22 159,967.54 107,803.92 1,132,740.00 0.00 620,000.00 2,020,511.46 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,584.0000 0.0006 1,584.0000 1,275.5754 75.1467 100.9896 0.0019 Activity: 700.1 Tank Foundation 8t Siteowrk Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 290,000.00 290,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 290,000.00 290,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07 q Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4TANKDEMO Existing Tank Demolition 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 150,000.00 100.000 150,000.00 150,000.00 Activity: 700.2 Welded Steel Tank Quantity: 600000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.20 0.07 0.27 0.18 1.89 0.00 0.55 2.88 Total 119,032.32 40,935.22 159,967.54 107,803.92 1,132,740.00 0.00 330,000.00 1,730,511.46 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.4463 0.0009 1,136.3636 507.1429 66.0000 9,090.9091 0.0001 26,219.8706 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,584.0000 378.7879 0.0026 100.9896 0.1984 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 66 Eff:100.00 Crew Hrs:528.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2STEEL Steel Plate Et Structure 1.00 180,000.00 LB 5.80 108.500 6.29 1,132,740.00 4CRANE Crane 1.00 66.00 DAY 5,000.00 100.000 5,000.00 330,000.00 8'FO RK10 Reach Forklift- 10000 lb 1.00 528.00 HR 128.66 108.500 139.60 73,706.74 8336 WELDER ARC 300 AMP 1.00 528.00 HR 14.70 100.000 14.70 7,760.54 GAS/DIESE 8UTLPU Utility Pickup 1.00 528.00 HR 49.88 100.000 49.88 26,336.64 LABORER Laborer 1.00 528.00 MH 65.00 100.000 87.35 46,122.65 MILLWR Millwright 2.00 1,056.00 MH 80.22 100.000 107.81 113,844.89 Page 103 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 77 of 172 Biditem Airport Tank GA/Fee 1052 Takeoff Qty: 1.000 LS Client #: Airport GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 644,069.59 0.00 644,069.59 Total 0.00 0.00 0.00 0.00 0.00 644,069.59 0.00 644,069.59 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 644,069.59 0.00 644,069.59 Total 0.00 0.00 0.00 0.00 0.00 644,069.59 0.00 644,069.59 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 2,335,946.00 LS 0.10 100.000 0.10 239,434.47 1SUBFEE Sub Fee 1.00 2,084,952.00 LS 0.12 100.000 0.12 250,194.24 1SUBOH Sub Overhead 1.00 1,930,511.00 LS 0.08 100.000 0.08 154,440.88 Page 104 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 78 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1054 Takeoff Qty: 1.000 LS Client #: Airport Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 1,132,740.00 LS 0.25 100.000 0.25 283,185.00 Page 105 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units =Unit Price Bid Total Roundhill Roundhill Hydrostation 1.000 LS 887,527.51 887,527.51 Hydrostation Roundhill GA Roundhill Hydrostation GA/Fee 1.000 LS 296,064.98 296,064.98 Roundhill Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 103,380.01 103,380.01 Allowance Roundhill Hydrostation $1,286,972.50 18 Page 106 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 84 of 172 Biditem Roundhill Hydrostation 1150 TakeoffQty: 1.000 LS Client #: Roundhill Hydrostation Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 59,675.00 0.00 819,600.00 879,275.00 Total 0.00 0.00 0.00 0.00 59,675.00 0.00 819,600.00 879,275.00 • ••• 1 • ••• -Abatement/Demo • • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 03-09.01 03000-09000 Building She[L (Unreviewed) Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 240,600.00 240,600.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 240,600.00 240,600.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 21,000.00 100.000 21,000.00 21,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 10,800.00 100.000 10,800.00 10,800.00 4FRAMIN G Framing Sub 1.00 1.00 LS 45,000.00 100.000 45,000.00 45,000.00 41NSUL Insulation Sub 1.00 1.00 LS 9,000.00 100.000 9,000.00 9,000.00 4MASON Masonry Sub 1.00 1.00 LS 48,000.00 100.000 48,000.00 48,000.00 4METAL Metals Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4PAINT Painting Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4ROOF Roofing Sub 1.00 1.00 LS 40,800.00 100.000 40,800.00 40,800.00 Activity: 22-26.01 22000-26000-MEP Trades Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 59,675.00 0.00 198,000.00 257,675.00 Total 0.00 0.00 0.00 0.00 59,675.00 0.00 198,000.00 257,675.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2G ENSET Emergency Generator 1.00 1.00 LS 55,000.00 108.500 59,675.00 59,675.00 4CONTROL Controls SCADA Sub 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4ELEC Electric- Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 8,000.00 100.000 8,000.00 8,000.00 4HVAC HVAC Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 4SECURITY Security 1.00 1.00 LS 5,000.00 100.000 5,000.00 5,000.00 Activity: 31-33-01 31000-33000 Site Work (Unreviewed) Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 165,000.00 165,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 165,000.00 165,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 Page 107 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 85 of 172 4SITEWORK Sitework 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4UTILITIES Utilities 1.00 1.00 LS 45,000.00 100.000 45,000.00 45,000.00 Activity: 40-46.01 40000-46000 Mechanical Systems (Unreviewed) Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 116,000.00 116,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 116,000.00 116,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 41,000.00 100.000 41,000.00 41,000.00 4PUMP Pump- Supply ii Install 1.00 1.00 EA 15,000.00 100.000 15,000.00 15,000.00 4PUMP2 Pump 2 -Supply it Install 1.00 1.00 EA 60,000.00 100.000 60,000.00 60,000.00 Page 108 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 86 of 172 Biditem Roundhill Hydrostation GA/Fee 1160 Takeoff Qty: 1.000 LS Client #: Roundhill GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 293,312.07 0.00 293,312.07 Total 0.00 0.00 0.00 0.00 0.00 293,312.07 0.00 293,312.07 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 293,312.07 0.00 293,312.07 Total 0.00 0.00 0.00 0.00 0.00 293,312.07 0.00 293,312.07 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 1,063,571.00 LS 0.10 100.000 0.10 109,016.03 1SUBFEE Sub Fee 1.00 949,617.00 LS 0.12 100.000 0.12 113,954.04 1SUBOH Sub Overhead 1.00 879,275.00 LS 0.08 100.000 0.08 70,342.00 Page 109 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 87 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1170 Takeoff Qty: 1.000 LS Client #: Roundhill Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 409,675.00 LS 0.25 100.000 0.25 102,418.75 Page 110 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price L Bid Total Alder Creek PS Alder Creek Pump Station 1.000 LS 2,164,529.48 2,164,529.48 Alder Creek Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 161,520.12 161,520.12 Allowance Alder Creek PS(2029) $2,326,049.60 23 Page 111 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 102 of 172 Biditem Alder Creek Pump Station 1400 Takeoff Qty: 1.000 LS Client #: Alder Creek PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 536,402.99 1,608,000.00 2,144,402.99 Total 0.00 0.00 0.00 0.00 0.00 536,402.99 1,608,000.00 2,144,402.99 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 536,402.99 0.00 536,402.99 Total 0.00 0.00 0.00 0.00 0.00 536,402.99 0.00 536,402.99 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12027ESC 2027 Escalation 1.00 1,945,036.00 LS 0.10 100.000 0.10 199,366.19 1SUBFEE Sub Fee 1.00 1,736,640.00 LS 0.12 100.000 0.12 208,396.80 1SUBOH Sub Overhead 1.00 1,608,000.00 LS 0.08 100.000 0.08 128,640.00 1 111 1 1 111 -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 150,000.00 100.000 150,000.00 150,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 397,000.00 397,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 397,000.00 397,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 220,000.00 100.000 220,000.00 220,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 1 111 111 Site Work • 11 Unit: LS Page 112 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 103 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 40000-46000 Mechanicat Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 365,000.00 365,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 365,000.00 365,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply 8 Install 1.00 3.00 EA 85,000.00 100.000 85,000.00 255,000.00 Page 113 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 104 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1401 Takeoff Qty: 1.000 LS Client #: Alder Creek Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 640,073.00 LS 0.25 100.000 0.25 160,018.25 Page 114 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2028 Pipe 2028 Pipe Replacement Program 1.000 LS 2,216,630.94 2,216,630.94 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 62,581.91 62,581.91 Allowance 2028 Pipe Replacement Program $2,279,212.85 19 Page 115 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 89 of 172 Biditem 2028 Pipe Replacement Program 1180 TakeoffQty: 1.000 LS Client #: 2028 Pipe Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,196,020.00 0.00 2,196,020.00 Total 0.00 0.00 0.00 0.00 0.00 2,196,020.00 0.00 2,196,020.00 2028.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,196,020.00 0.00 2,196,020.00 Total 0.00 0.00 0.00 0.00 0.00 2,196,020.00 0.00 2,196,020.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 1,900,000.00 LS 0.16 100.000 0.16 296,020.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 116 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 90 of 172 Biditem Tariff Allowance (25% of Materials Cost) 118 2 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 248,000.00 LS 0.25 100.000 0.25 62,000.00 Page 117 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Somerset 2 Somerset 2 Tank Rehab 1.000 LS 299,872.65 299,872.65 Tank Rehab Somerset 2 Somerset 2 Tank GA/OH 1.000 LS 118,107.84 118,107.84 Tank GA Somerset Rehab Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 8,624.44 8,624.44 Allow Somerset 2 Tank Rehab $426,604.93 4 Page 118 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 80 of 172 Biditem New Somerset Tank (0.28MG) 1100 Takeoff Qty: 1.000 LS Client #: Somerset Tank Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 63,123.20 21,708.06 84,831.26 57,168.75 528,612.00 0.00 480,000.00 1,150,612.01 Total 63,123.20 21,708.06 84,831.26 57,168.75 528,612.00 0.00 480,000.00 1,150,612.01 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 840.0000 0.0012 840.0000 1,369.7762 75.1467 100.9896 0.0036 Activity: 700.1 Tank Foundation Et Sitework (Unreviewed) Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 305,000.00 305,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 305,000.00 305,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07 q Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4TANKDEMO Existing Tank Demolition 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 150,000.00 100.000 150,000.00 150,000.00 Activity: 700.2 Welded Steel Tank Quantity: 280000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.23 0.08 0.30 0.20 1.89 0.00 0.63 3.02 Total 63,123.20 21,708.06 84,831.26 57,168.75 528,612.00 0.00 175,000.00 845,612.01 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.5071 0.0010 1,000.0000 507.1429 35.0000 8,000.0000 0.0001 24,160.3431 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 840.0000 333.3333 0.0030 100.9896 0.2254 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 35 Eff:100.00 Crew Hrs:280.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2STEEL Steel Plate 8 Structure 1.00 84,000.00 LB 5.80 108.500 6.29 528,612.00 4CRANE Crane 1.00 35.00 DAY 5,000.00 100.000 5,000.00 175,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 280.00 HR 128.66 108.500 139.60 39,086.91 8336 WELDER ARC 300 AMP 1.00 280.00 HR 14.70 100.000 14.70 4,115.44 GAS/DIESE 8UTLPU Utility Pickup 1.00 280.00 HR 49.88 100.000 49.88 13,966.40 LABORER Laborer 1.00 280.00 MH 65.00 100.000 87.35 24,458.98 MILLWR Millwright 2.00 560.00 MH 80.22 100.000 107.81 60,372.28 Page 119 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 81 of 172 Biditem Somerset Tank GA 1110 Takeoff Qty: 1.000 LS Client #: Somerset Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 458,001.43 0.00 458,001.43 Total 0.00 0.00 0.00 0.00 0.00 458,001.43 0.00 458,001.43 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 458,001.43 0.00 458,001.43 Total 0.00 0.00 0.00 0.00 0.00 458,001.43 0.00 458,001.43 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 1,391,775.00 LS 0.16 100.000 0.16 216,838.55 1SUBFEE Sub Fee 1.00 1,242,616.00 LS 0.12 100.000 0.12 149,113.92 1SUBOH Sub Overhead 1.00 1,150,612.00 LS 0.08 100.000 0.08 92,048.96 Page 120 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 82 of 172 Biditem Tariff Allowance (25% of Materials Costs) 1120 Takeoff Qty: 1.000 LS Client #: Somerset Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 528,612.00 LS 0.25 100.000 0.25 132,153.00 Page 121 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 13 of 172 Biditem Somerset 2 Tank Rehab 5 O Takeoff Qty: 1.000 LS Client #: Somerset 2 Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 44,213.75 0.00 297,084.34 Total 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 44,213.75 0.00 297,084.34 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,968.0000 0.0005 1,968.0000 150.9575 66.1527 88.9026 0.0021 Activity: 41001-01 Tank Rehab Quantity: 210000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.62 0.21 0.83 0.21 0.16 0.21 0.00 1.41 Total 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 44,213.75 0.00 297,084.34 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.0414 0.0023 437.5000 455.6106 60.0000 3,500.0000 0.0003 4,951.4057 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,968.0000 106.7073 0.0094 88.9026 0.6199 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 60 Eff:100.00 Crew Hrs:480.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 17,000.00 108.500 18,445.00 18,445.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 380.00 BAG 80.00 108.500 86.80 32,984.00 3SANDPOT Sand Pot 1.00 35.00 DAY 110.00 108.500 119.35 4,177.25 3TEMPMTL Temp Materials 1.00 1.00 LS 6,500.00 108.500 7,052.50 7,052.50 8*BOOM45 45'Boomlift 1.00 480.00 HR 38.00 108.500 41.23 19,790.40 8UTLPU Utility Pickup 1.00 480.00 HR 49.88 100.000 49.88 23,942.40 IRON Iron Worker 0.10 48.00 MH 82.86 100.000 111.36 5,345.06 LABORER Laborer 1.00 480.00 MH 65.00 100.000 87.35 41,929.68 PAINT Painter 3.00 1,440.00 MH 65.98 100.000 88.67 127,685.55 Page 122 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 14 of 172 Biditem Somerset 2 Tank GA/OH 5 Takeoff Qty: 1.000 LS Client #: Somerset 2 Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 117,009.64 0.00 117,009.64 Total 0.00 0.00 0.00 0.00 0.00 117,009.64 0.00 117,009.64 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 117,009.64 0.00 117,009.64 Total 0.00 0.00 0.00 0.00 0.00 117,009.64 0.00 117,009.64 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 351,353.00 LS 0.16 100.000 0.16 54,740.80 1SUBFEE Sub Fee 1.00 320,851.00 LS 0.12 100.000 0.12 38,502.12 1SUBOH Sub Overhead 1.00 297,084.00 LS 0.08 100.000 0.08 23,766.72 Page 123 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 15 of 172 Biditem Tariff Allowance (25% of Materials Cost) 5 4 Takeoff Qty: 1.000 LS Client #: Somerset Rehab Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 34,177.00 LS 0.25 100.000 0.25 8,544.25 Page 124 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Prosser Heights Prosser Heights Tank Rehab 1.000 LS 304,077.44 304,077.44 Tank Rehab Prosser Heights Prosser Heights Tank GA/OH 1.000 LS 122,301.12 122,301.12 Tank GA Prosser Heights Tariff Allowance(25%of Materials Cost) 1.000 LS 11,034.00 11,034.00 TariffAllow Prosser Heights Tank Rehab $437,412.56 6 Page 125 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 21 of 172 Biditem Prosser Heights Tank Rehab 70 Takeoff Qty: 1.000 LS Client #: Prosser Heights Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 130,188.48 44,771.81 174,960.29 43,732.80 33,960.50 57,803.38 0.00 310,456.97 Total 130,188.48 44,771.81 174,960.29 43,732.80 33,960.50 57,803.38 0.00 310,456.97 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,968.0000 0.0005 1,968.0000 157.7525 66.1527 88.9026 0.0021 Activity: 41001-01 Tank Rehab Quantity: 280000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.46 0.16 0.62 0.16 0.12 0.21 0.00 1.11 Total 130,188.48 44,771.81 174,960.29 43,732.80 33,960.50 57,803.38 0.00 310,456.97 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.7810 0.0017 583.3333 455.6106 60.0000 4,666.6667 0.0002 5,174.2828 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,968.0000 142.2764 0.0070 88.9026 0.4650 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 60 Eff:100.00 Crew Hrs:480.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 16,800.00 108.500 18,228.00 18,228.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 500.00 BAG 80.00 108.500 86.80 43,400.00 3SANDPOT Sand Pot 1.00 52.50 DAY 110.00 108.500 119.35 6,265.88 3TEMPMTL Temp Materials 1.00 1.00 LS 7,500.00 108.500 8,137.50 8,137.50 8*BOOM45 45'Boomlift 1.00 480.00 HR 38.00 108.500 41.23 19,790.40 8UTLPU Utility Pickup 1.00 480.00 HR 49.88 100.000 49.88 23,942.40 IRON Iron Worker 0.10 48.00 MH 82.86 100.000 111.36 5,345.06 LABORER Laborer 1.00 480.00 MH 65.00 100.000 87.35 41,929.68 PAINT Painter 3.00 1,440.00 MH 65.98 100.000 88.67 127,685.55 Page 126 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 22 of 172 Biditem Prosser Heights Tank GA/OH 7 2 Takeoff Qty: 1.000 LS Client #: Prosser Heights Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 121,163.93 0.00 121,163.93 Total 0.00 0.00 0.00 0.00 0.00 121,163.93 0.00 121,163.93 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 121,163.93 0.00 121,163.93 Total 0.00 0.00 0.00 0.00 0.00 121,163.93 0.00 121,163.93 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 373,465.00 LS 0.16 100.000 0.16 58,185.85 1SUBFEE Sub Fee 1.00 333,424.00 LS 0.12 100.000 0.12 40,010.88 1SUBOH Sub Overhead 1.00 287,090.00 LS 0.08 100.000 0.08 22,967.20 Page 127 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 23 of 172 Biditem Tariff Allowance (25% of Materials Cost) 7 5 Takeoff Qty: 1.000 LS Client #: Prosser Heights Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 38,452.00 LS 0.25 100.000 0.25 9,613.00 Page 128 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total Somerset Tank New Somerset Tank(0.28MG) 1.000 LS 1,161,411.18 1,161,411.18 Somerset Tank Somerset Tank GA 1.000 LS 462,300.04 462,300.04 GA Somerset Tariff Tariff Allowance(25%of Materials Costs) 1.000 LS 133,393.33 133,393.33 Allowance Somerset Tank(2028) $1,757,104.55 17 Page 129 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Northside PS Northside Pump Station 1.000 LS 1,210,758.02 1,210,758.02 Northside GA Northside PS GA/Fee 1.000 LS 475,019.19 475,019.19 Northside Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 99,319.76 99,319.76 Allowance Northside Pump Station $1,785,096.97 15 Page 130 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 71 of 172 Biditem Northside Pump Station 8OO Takeoff Qty: 1.000 LS Client #: Northside PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 1,199,500.00 1,199,500.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 1,199,500.00 1,199,500.00 605.1 • ••• -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 150,000.00 100.000 150,000.00 150,000.00 Activity: 605.2 03000-09000 Building She[L Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 322,000.00 322,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 322,000.00 322,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 41NSUL Insulation Sub 1.00 1.00 LS 12,000.00 100.000 12,000.00 12,000.00 4MASON Masonry Sub 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4METAL Metals Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4PAINT Painting Sub 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4ROOF Roofing Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 Activity: 605.3 22000-26000-MEP Trades Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 302,500.00 302,500.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 302,500.00 302,500.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4ELEC Electric - Sub 1.00 1.00 LS 165,000.00 100.000 165,000.00 165,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4HVAC HVAC Sub 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 12,000.00 100.000 12,000.00 12,000.00 4SECURITY Security 1.00 1.00 LS 7,500.00 100.000 7,500.00 7,500.00 Activity: 605.4 31000-33000 Site Work Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 230,000.00 230,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 230,000.00 230,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description PCs/taste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4SITEWORK Sitework 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 Page 131 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 72 of 172 4UTILITIES Utilities 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 Activity: 605.5 40000-46000 Mechanical.Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 195,000.00 195,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 195,000.00 195,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 85,000.00 100.000 85,000.00 85,000.00 4PUMP Pump- Supply Et Install 1.00 2.00 EA 55,000.00 100.000 55,000.00 110,000.00 Page 132 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 73 of 172 Biditem Northside PS GA/Fee 8 O Takeoff Qty: 1.000 LS Client #: Northside GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 470,602.31 0.00 470,602.31 Total 0.00 0.00 0.00 0.00 0.00 470,602.31 0.00 470,602.31 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 470,602.31 0.00 470,602.31 Total 0.00 0.00 0.00 0.00 0.00 470,602.31 0.00 470,602.31 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 1,444,975.00 LS 0.16 100.000 0.16 225,127.11 1SUBFEE Sub Fee 1.00 1,245,960.00 LS 0.12 100.000 0.12 149,515.20 1SUBOH Sub Overhead 1.00 1,199,500.00 LS 0.08 100.000 0.08 95,960.00 Page 133 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 74 of 172 Biditem Tariff Allowance (25% of Materials Cost) 8 2 Takeoff Qty: 1.000 LS Client #: Northside Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 393,585.00 LS 0.25 100.000 0.25 98,396.25 Page 134 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total West Palisades West Palisades Pump Station 1.000 LS 978,792.46 978,792.46 PS West Palisades TariffAllowance(25%ofMaterials Cost) 1.000 LS 88,309.38 88,309.38 TariffAllow West Palisades PS(2028) 1 $1,067,101.84 20 Page 135 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 92 of 172 Biditem West Palisades Pump Station 1 200 Takeoff Qty: 1.000 LS Client #: West Palisades PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 276,091.33 693,600.00 969,691.33 Total 0.00 0.00 0.00 0.00 0.00 276,091.33 693,600.00 969,691.33 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 276,091.33 0.00 276,091.33 Total 0.00 0.00 0.00 0.00 0.00 276,091.33 0.00 276,091.33 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 12028ESC 2028 Escalation 1.00 838,978.00 LS 0.16 100.000 0.16 130,712.77 1SUBFEE Sub Fee 1.00 749,088.00 LS 0.12 100.000 0.12 89,890.56 1SUBOH Sub Overhead 1.00 693,600.00 LS 0.08 100.000 0.08 55,488.00 1 111 1 1 111 -Abatement/Demo . • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 240,600.00 240,600.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 240,600.00 240,600.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 21,000.00 100.000 21,000.00 21,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 10,800.00 100.000 10,800.00 10,800.00 4FRAMIN G Framing Sub 1.00 1.00 LS 45,000.00 100.000 45,000.00 45,000.00 41NSUL Insulation Sub 1.00 1.00 LS 9,000.00 100.000 9,000.00 9,000.00 4MASON Masonry Sub 1.00 1.00 LS 48,000.00 100.000 48,000.00 48,000.00 4METAL Metals Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4PAINT Painting Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4ROOF Roofing Sub 1.00 1.00 LS 40,800.00 100.000 40,800.00 40,800.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 202,000.00 202,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 202,000.00 202,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4ELEC Electric - Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 4HVAC HVAC Sub 1.00 1.00 LS 42,000.00 100.000 42,000.00 42,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 4SECURITY Security 1.00 1.00 LS 5,000.00 100.000 5,000.00 5,000.00 1 111 111 Site Work • 11 Unit: LS Page 136 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 93 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 142,000.00 142,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 142,000.00 142,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 24,000.00 100.000 24,000.00 24,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SITEWORK Sitework 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4UTILITIES Utilities 1.00 1.00 LS 58,000.00 100.000 58,000.00 58,000.00 Activity: 40-46-01 40000-46000 Mechanical Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 59,000.00 59,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 59,000.00 59,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 38,000.00 100.000 38,000.00 38,000.00 4PUMP Pump- Supply Et Install 1.00 1.00 EA 21,000.00 100.000 21,000.00 21,000.00 Page 137 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 94 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1201 Takeoff Qty: 1.000 LS Client #: West Palisades Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 349,953.00 LS 0.25 100.000 0.25 87,488.25 Page 138 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2029 Pipe 2029 Pipe Replacement Program 1.000 LS 2,323,454.22 2,323,454.22 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 68,385.87 68,385.87 Allowance 2029 Pipe Program $2,391,840.09 22 Page 139 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 99 of 172 Biditem 2029 Pipe Replacement Program 13 50 Takeoff Qty: 1.000 LS Client #: 2029 Pipe Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,301,850.00 0.00 2,301,850.00 Total 0.00 0.00 0.00 0.00 0.00 2,301,850.00 0.00 2,301,850.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,301,850.00 0.00 2,301,850.00 Total 0.00 0.00 0.00 0.00 0.00 2,301,850.00 0.00 2,301,850.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2029 2029 Escalation 1.00 1,900,000.00 LS 0.21 100.000 0.21 401,850.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 140 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 100 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1352 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 271,000.00 LS 0.25 100.000 0.25 67,750.00 Page 141 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total Herringbone Herringbone Tank IM Gal 1.000 LS 4,880,103.50 4,880,103.50 Tank Herringbone Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 476,404.76 476,404.76 Allowance Herringbone Tank(2030) 1 $5,356,508.26 24 Page 142 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 106 of 172 Biditem Herringbone Tank 1M Gal 1700 Takeoff Qty: 1.000 LS Client #: Herringbone Tank Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 1,535,540.98 965,000.00 4,834,726.74 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 1,535,540.98 965,000.00 4,834,726.74 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,640.0000 0.0004 2,640.0000 1,831.3359 75.1467 100.9896 0.0011 Activity: 700.1 Tank Foundation Et Sitework Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 415,000.00 415,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 415,000.00 415,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4TANKDEMO Existing Tank Demolition 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 215,000.00 100.000 215,000.00 215,000.00 Activity: 700.2 Welded Steel Tank Quantity: 1000000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.20 0.07 0.27 0.18 1.89 0.00 0.55 2.88 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 550,000.00 2,884,185.76 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.4463 0.0009 1,136.3636 507.1429 110.0000 9,090.9091 0.0001 26,219.8705 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,640.0000 378.7879 0.0026 100.9896 0.1984 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 110 Eff:100.00 Crew Hrs:880.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2STEEL Steel Plate 8 Structure 1.00 300,000.00 LB 5.80 108.500 6.29 1,887,900.00 4CRANE Crane 1.00 110.00 DAY 5,000.00 100.000 5,000.00 550,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 880.00 HR 128.66 108.500 139.60 122,844.57 8336 WELDER ARC 300 AMP 1.00 880.00 HR 14.70 100.000 14.70 12,934.24 GAS/DIESE 8UTLPU Utility Pickup 1.00 880.00 HR 49.88 100.000 49.88 43,894.40 LABORER Laborer 1.00 880.00 MH 65.00 100.000 87.35 76,871.08 MILLWR Millwright 2.00 1,760.00 MH 80.22 100.000 107.81 189,741.47 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 1,535,540.98 0.00 1,535,540.98 Total 0.00 0.00 0.00 0.00 0.00 1,535,540.98 0.00 1,535,540.98 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2029 2029 Escalation 1.00 3,990,694.00 LS 0.21 100.000 0.21 844,031.78 1SUBFEE Sub Fee 1.00 3,563,120.00 LS 0.12 100.000 0.12 427,574.40 1SUBOH Sub Overhead 1.00 3,299,185.00 LS 0.08 100.000 0.08 263,934.80 Page 143 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 107 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1701 Takeoff Qty: 1.000 LS Client#: Herringbone Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 1,887,900.00 LS 0.25 100.000 0.25 471,975.00 Page 144 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Wolfe Estates Wolfe Estates Tank Rehab 1.000 LS 313,324.92 313,324.92 Tank Rehab Wolfe Estates Wolfe Estates Tank GA/OH 1.000 LS 141,547.43 141,547.43 Tank GA Wolfe Estates Tariff Allowance(25%of Materials Cost) 1.000 LS 9,701.80 9,701.80 Tariff Wolfe Estates Tank Rehab $464,574.15 5 Page 145 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 17 of 172 Biditem Wolfe Estates Tank Rehab 6 Takeoff Qty: 1.000 LS Client #: Wolfe Estates Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 48,423.55 0.00 301,294.14 Total 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 48,423.55 0.00 301,294.14 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,968.0000 0.0005 1,968.0000 153.0966 66.1527 88.9026 0.0021 Activity: 41001-01 Tank Rehab Quantity: 230000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.57 0.19 0.76 0.19 0.15 0.21 0.00 1.31 Total 130,188.48 44,771.81 174,960.29 43,732.80 34,177.50 48,423.55 0.00 301,294.14 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.9508 0.0021 479.1667 455.6106 60.0000 3,833.3333 0.0003 5,021.5690 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,968.0000 116.8699 0.0086 88.9026 0.5660 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 60 Eff:100.00 Crew Hrs:480.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 17,000.00 108.500 18,445.00 18,445.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 416.00 BAG 80.00 108.500 86.80 36,108.80 3SANDPOT Sand Pot 1.00 35.00 DAY 110.00 108.500 119.35 4,177.25 3TEMPMTL Temp Materials 1.00 1.00 LS 7,500.00 108.500 8,137.50 8,137.50 8*BOOM45 45'Boomlift 1.00 480.00 HR 38.00 108.500 41.23 19,790.40 8UTLPU Utility Pickup 1.00 480.00 HR 49.88 100.000 49.88 23,942.40 IRON Iron Worker 0.10 48.00 MH 82.86 100.000 111.36 5,345.06 LABORER Laborer 1.00 480.00 MH 65.00 100.000 87.35 41,929.68 PAINT Painter 3.00 1,440.00 MH 65.98 100.000 88.67 127,685.55 Page 146 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 18 of 172 Biditem Wolfe Estates Tank GA/OH 6 Takeoff Qty: 1.000 LS Client #: Wolfe Estates Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 140,231.28 0.00 140,231.28 Total 0.00 0.00 0.00 0.00 0.00 140,231.28 0.00 140,231.28 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 140,231.28 0.00 140,231.28 Total 0.00 0.00 0.00 0.00 0.00 140,231.28 0.00 140,231.28 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2029 2029 Escalation 1.00 364,445.00 LS 0.21 100.000 0.21 77,080.12 1SUBFEE Sub Fee 1.00 325,397.00 LS 0.12 100.000 0.12 39,047.64 1SUBOH Sub Overhead 1.00 301,294.00 LS 0.08 100.000 0.08 24,103.52 Page 147 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 19 of 172 Biditem Tariff Allowance (25% of Materials Cost) 6 Takeoff Qty: 1.000 LS Client #: Wolfe Estates Tariff Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 43,732.00 LS 0.25 100.000 0.25 10,933.00 Page 148 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2030 Pipe 2030 Pipe Replacement Program 1.000 LS 2,447,729.77 2,447,729.77 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 71,666.38 71,666.38 Allowance 2030 Pipe Program $2,519,396.15 26 Page 149 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 113 of 172 Biditem 2030 Pipe Replacement Program 19 50 Takeoff Qty: 1.000 LS Client #: 2030 Pipe Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,424,970.00 0.00 2,424,970.00 Total 0.00 0.00 0.00 0.00 0.00 2,424,970.00 0.00 2,424,970.00 2030.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,424,970.00 0.00 2,424,970.00 Total 0.00 0.00 0.00 0.00 0.00 2,424,970.00 0.00 2,424,970.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2030 2030 Escalation 1.00 1,900,000.00 LS 0.28 100.000 0.28 524,970.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 150 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 114 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1952 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 284,000.00 LS 0.25 100.000 0.25 71,000.00 Page 151 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Innsbruck Tank Innsbruck Tank I Gal Upsize 1.000 LS 5,141,127.56 5,141,127.56 Innsbruck Tank Tariff Allowance(25%of Materials Cost) 1.000 LS 476,404.76 476,404.76 TariffAllow luusbruck Tank(2029) $5.617,532.32 21 Page 152 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 96 of 172 Biditem Innsbruck Tank 1M Gal Upsize 1 00 Takeoff Qty: 1.000 LS Client #: Innsbruck Tank Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 1,794,137.95 965,000.00 5,093,323.71 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 1,794,137.95 965,000.00 5,093,323.71 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,640.0000 0.0004 2,640.0000 1,929.2893 75.1467 100.9896 0.0011 Activity: 700.1 Tank Foundation Et Sitework Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 415,000.00 415,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 415,000.00 415,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4TANKDEMO Existing Tank Demolition 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 215,000.00 100.000 215,000.00 215,000.00 Activity: 700.2 Welded Steel Tank Quantity: 1000000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.20 0.07 0.27 0.18 1.89 0.00 0.55 2.88 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 550,000.00 2,884,185.76 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.4463 0.0009 1,136.3636 507.1429 110.0000 9,090.9091 0.0001 26,219.8705 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,640.0000 378.7879 0.0026 100.9896 0.1984 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 110 Eff:100.00 Crew Hrs:880.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2STEEL Steel Plate 8 Structure 1.00 300,000.00 LB 5.80 108.500 6.29 1,887,900.00 4CRANE Crane 1.00 110.00 DAY 5,000.00 100.000 5,000.00 550,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 880.00 HR 128.66 108.500 139.60 122,844.57 8336 WELDER ARC 300 AMP 1.00 880.00 HR 14.70 100.000 14.70 12,934.24 GAS/DIESE 8UTLPU Utility Pickup 1.00 880.00 HR 49.88 100.000 49.88 43,894.40 LABORER Laborer 1.00 880.00 MH 65.00 100.000 87.35 76,871.08 MILLWR Millwright 2.00 1,760.00 MH 80.22 100.000 107.81 189,741.47 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 1,794,137.95 0.00 1,794,137.95 Total 0.00 0.00 0.00 0.00 0.00 1,794,137.95 0.00 1,794,137.95 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2030 2030 Escalation 1.00 3,990,694.00 LS 0.28 100.000 0.28 1,102,628.75 1SUBFEE Sub Fee 1.00 3,563,120.00 LS 0.12 100.000 0.12 427,574.40 1SUBOH Sub Overhead 1.00 3,299,185.00 LS 0.08 100.000 0.08 263,934.80 Page 153 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 97 of 172 Biditem Tariff Allowance (25% of Materials Cost) 13 01 Takeoff Qty: 1.000 LS Client #: Innsbruck Tank Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 1,887,900.00 LS 0.25 100.000 0.25 471,975.00 Page 154 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2031 Pipe 2031 Pipe Replacement Program 1.000 LS 2,569,895.71 2,569,895.71 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 76,460.96 76,460.96 Allowance 2031 Pipe Program $2,646,3556.67 27 Page 155 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 116 of 172 Biditem 2031 Pipe Replacement Program 19 70 Takeoff Qty: 1.000 LS Client #: 2031 Pipe Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,546,000.00 0.00 2,546,000.00 Total 0.00 0.00 0.00 0.00 0.00 2,546,000.00 0.00 2,546,000.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,546,000.00 0.00 2,546,000.00 Total 0.00 0.00 0.00 0.00 0.00 2,546,000.00 0.00 2,546,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2031 2031 Escalation 1.00 1,900,000.00 LS 0.34 100.000 0.34 646,000.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 156 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 117 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1972 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 303,000.00 LS 0.25 100.000 0.25 75,750.00 Page 157 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total 2031 Well 2031 Well Rehab Program 1.000 LS 426,679.91 426,679.91 Rehab Tank Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 37,851.96 37,851.96 Allowance 2031 Well Rehab $464,531.87 29 Page 158 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 123 of 172 Biditem 2031 Well Rehab Program 19 90 Takeoff Qty: 1.000 LS Client #: 2031 Well Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 328,212.50 0.00 94,500.00 422,712.50 Total 0.00 0.00 0.00 0.00 328,212.50 0.00 94,500.00 422,712.50 1990.1 Well Rehab • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 328,212.50 0.00 94,500.00 422,712.50 Total 0.00 0.00 0.00 0.00 328,212.50 0.00 94,500.00 422,712.50 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2WELLDIS Well Disinfection 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2WELLMOB Well Driller Mob 1.00 1.00 EA 25,000.00 108.500 27,125.00 27,125.00 2WELLPUMP Supply Et Install Well Pump 1.00 1.00 LS 250,000.00 108.500 271,250.00 271,250.00 2WELLTEST Test Well w Temp Pump 1.00 1.00 LS 17,500.00 108.500 18,987.50 18,987.50 4PUMPREHAB Rehab Existing Well 1.00 450.00 VF 210.00 100.000 210.00 94,500.00 Page 159 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 124 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1992 Takeoff Qty: 1.000 LS Client #: Tank Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 150,000.00 LS 0.25 100.000 0.25 37,500.00 Page 160 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Pinacle Hydro Pinacle Hydro Station 1.000 LS 1,679,547.23 1,679,547.23 Station Pinacle Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 125,884.77 125,884.77 Allowance Pinacle Hydro Station(2030) $1,805,432.00 25 Page 161 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 109 of 172 Biditem Pinacle Hydro Station 1 00 Takeoff Qty: 1.000 LS Client #: Pinacle Hydro Station Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 45,570.00 637,360.26 981,000.00 1,663,930.26 Total 0.00 0.00 0.00 0.00 45,570.00 637,360.26 981,000.00 1,663,930.26 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 637,360.26 0.00 637,360.26 Total 0.00 0.00 0.00 0.00 0.00 637,360.26 0.00 637,360.26 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2031 2031 Escalation 1.00 1,241,739.00 LS 0.34 100.000 0.34 422,191.26 1SUBFEE Sub Fee 1.00 1,108,695.00 LS 0.12 100.000 0.12 133,043.40 1SUBOH Sub Overhead 1.00 1,026,570.00 LS 0.08 100.000 0.08 82,125.60 1 111 1 1 111 -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 45,570.00 0.00 200,000.00 245,570.00 Total 0.00 0.00 0.00 0.00 45,570.00 0.00 200,000.00 245,570.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2GENSET Emergency Generator 1.00 1.00 LS 42,000.00 108.500 45,570.00 45,570.00 4CONTROL Controls SCADA Sub 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4ELEC Electric - Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 4HVAC HVAC Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 4SECURITY Security 1.00 1.00 LS 5,000.00 100.000 5,000.00 5,000.00 Page 162 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 110 of 172 Activity: 31-33-01 31000-33000 Site Work Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 175,000.00 175,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 175,000.00 175,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07 q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 25,000.00 100.000 25,000.00 25,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4SITEWORK Sitework 1.00 1.00 LS 45,000.00 100.000 45,000.00 45,000.00 4UTILITIES Utilities 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 Activity: 40-46-01 40000-46000 Mechanicat Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 117,000.00 117,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 117,000.00 117,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07 q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4PUMP Pump- Supply Et Install 1.00 1.00 EA 25,000.00 100.000 25,000.00 25,000.00 4PUMP2 Pump 2 -Supply Et Install 1.00 1.00 LS 52,000.00 100.000 52,000.00 52,000.00 Page 163 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 111 of 172 Biditem Tariff Allowance (25% of Materials Cost) 19 01 Takeoff Qty: 1.000 LS Client #: Pinacle Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 498,857.00 LS 0.25 100.000 0.25 124,714.25 Page 164 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total 2031 New 2031 New Pump Station 1.000 LS 2,160,153.17 2,160,153.17 Pump Station Well Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 216,799.12 216,799.12 Allowance 2031 New Pump Station $2,376,952.29 28 Page 165 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 119 of 172 Biditem 2031 New Pump Station 1980 Takeoff Qty: 1.000 LS Client #: 2031 New Pump Station Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 609,067.38 1,531,000.00 2,140,067.38 Total 0.00 0.00 0.00 0.00 0.00 609,067.38 1,531,000.00 2,140,067.38 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 609,067.38 0.00 609,067.38 Total 0.00 0.00 0.00 0.00 0.00 609,067.38 0.00 609,067.38 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2031 2031 Escalation 1.00 1,186,617.00 LS 0.34 100.000 0.34 403,449.78 1SUBFEE Sub Fee 1.00 1,059,480.00 LS 0.12 100.000 0.12 127,137.60 1SUBOH Sub Overhead 1.00 981,000.00 LS 0.08 100.000 0.08 78,480.00 1 111 1 1 111 -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 1 111 111 Site Work • 11 Unit: LS Page 166 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 120 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 40000-46000 Mechanical Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply 8 Install 1.00 1.00 EA 215,000.00 100.000 215,000.00 215,000.00 4PUMP2 Pump 2 -Supply$ Install 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 Page 167 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 121 of 172 Biditem Tariff Allowance (25% of Materials Cost) 1 Takeoff Qty: 1.000 LS Client #: Well Tariff Allowance 982 Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 859,133.00 LS 0.25 100.000 0.25 214,783.25 Page 168 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2032 Pipeline 2032 Pipeline Replacement Program 1.000 LS 2,698,390.50 2,698,390.50 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 80,750.85 80,750.85 Allowance 2032 Pipeline Program $2,779,141.35 30 Page 169 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 126 of 172 Biditem 2032 Pipeline Replacement Program 2000 Takeoff Qty: 1.000 LS Client #: 2032 Pipeline Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,673,300.00 0.00 2,673,300.00 Total 0.00 0.00 0.00 0.00 0.00 2,673,300.00 0.00 2,673,300.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,673,300.00 0.00 2,673,300.00 Total 0.00 0.00 0.00 0.00 0.00 2,673,300.00 0.00 2,673,300.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2032 2032 Escalation 1.00 1,900,000.00 LS 0.41 100.000 0.41 773,300.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 170 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 127 of 172 Biditem Tariff Allowance (25% of Materials Cost) 20 0 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 320,000.00 LS 0.25 100.000 0.25 80,000.00 Page 171 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total New Strand 1 New Strand 1 Tank(0.42 MG) 1.000 LS 2,114,904.48 2,114,904.48 New Strand 1 Tariff Allowance(25%of Materials Cost) 1.000 LS 100,938.56 100,938.56 TariffAllow New Strand Tank(2032) $2,215,843.04 33 Page 172 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 136 of 172 Biditem New Strand 1 Tank (0.42 MG) 2 w 00 Takeoff Qty: 1.000 LS Client #: New Strand 1 1 Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 108,211.20 37,213.83 145,425.03 98,003.57 792,918.00 543,892.82 515,000.00 2,095,239.42 Total 108,211.20 37,213.83 145,425.03 98,003.57 792,918.00 543,892.82 515,000.00 2,095,239.42 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,440.0000 0.0007 1,440.0000 1,455.0274 75.1467 100.9896 0.0021 Activity: 700.1 Tank Foundation Et Sitework Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 215,000.00 215,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 215,000.00 215,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 150,000.00 100.000 150,000.00 150,000.00 Activity: 700.2 Welded Steel Tank Quantity: 420000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.26 0.09 0.35 0.23 1.89 1.29 0.71 4.48 Total 108,211.20 37,213.83 145,425.03 98,003.57 792,918.00 543,892.82 300,000.00 1,880,239.42 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.5796 0.0011 875.0000 507.1429 60.0000 7,000.0000 0.0001 31,337.3237 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,440.0000 291.6667 0.0034 100.9896 0.2576 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 60 Eff:100.00 Crew Hrs:480.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2032 2032 Escalation 1.00 1,336,346.00 LS 0.41 100.000 0.41 543,892.82 2STEEL Steel Plate Et Structure 1.00 126,000.00 LB 5.80 108.500 6.29 792,918.00 4CRANE Crane 1.00 60.00 DAY 5,000.00 100.000 5,000.00 300,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 480.00 HR 128.66 108.500 139.60 67,006.13 8336 WELDER ARC 300 AMP 1.00 480.00 HR 14.70 100.000 14.70 7,055.04 GAS/DIESE 8UTLPU Utility Pickup 1.00 480.00 HR 49.88 100.000 49.88 23,942.40 LABORER Laborer 1.00 480.00 MH 65.00 100.000 87.35 41,929.68 MILLWR Millwright 2.00 960.00 MH 80.22 100.000 107.81 103,495.35 Page 173 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 137 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2202 Takeoff Qty: 1.000 LS Client #: New Strand 1 Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 400,000.00 LS 0.25 100.000 0.25 100,000.00 Page 174 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Ski Lodge PS Ski Lodge Pump Station 1.000 LS 2,753,762.69 2,753,762.69 Ski Lodge PS Tariff Allowance(25%of Materials Cost) 1.000 LS 219,978.18 219,978.18 TariffAllow Ski Lodge PS(2030) $2,973,740.87 31 Page 175 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 129 of 172 Biditem Ski Lodge Pump Station 2 00 Takeoff Qty: 1.000 LS Client #: Ski Lodge PS Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 1,125,157.32 1,603,000.00 2,728,157.32 Total 0.00 0.00 0.00 0.00 0.00 1,125,157.32 1,603,000.00 2,728,157.32 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 1,125,157.32 0.00 1,125,157.32 Total 0.00 0.00 0.00 0.00 0.00 1,125,157.32 0.00 1,125,157.32 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2032 2032 Escalation 1.00 1,938,989.00 LS 0.41 100.000 0.41 789,168.52 1SUBFEE Sub Fee 1.00 1,731,240.00 LS 0.12 100.000 0.12 207,748.80 1SUBOH Sub Overhead 1.00 1,603,000.00 LS 0.08 100.000 0.08 128,240.00 1 111 1 1 111 -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 125,000.00 100.000 125,000.00 125,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 441,000.00 441,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 441,000.00 441,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CO NC Concrete-Sub 1.00 1.00 LS 70,000.00 100.000 70,000.00 70,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 402,000.00 402,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 402,000.00 402,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 225,000.00 100.000 225,000.00 225,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 1 111 111 Site Work • 11 Unit: LS Page 176 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 130 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 40000-46000 Mechanicat Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 340,000.00 340,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 340,000.00 340,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4PUMP Pump- Supply 8 Install 1.00 2.00 EA 125,000.00 100.000 125,000.00 250,000.00 Page 177 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 131 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2101 Takeoff Qty: 1.000 LS Client #: Ski Lodge PS Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 871,731.00 LS 0.25 100.000 0.25 217,932.75 Page 178 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2033 Pipeline 2033 Pipeline Replacement Program 1.000 LS 2,832,638.78 2,832,638.78 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 83,274.31 83,274.31 Allowance 2033 Pipeline $2,9155,913.09 35 Page 179 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 143 of 172 Biditem 2033 Pipeline Replacement Program 2350 Takeoff Qty: 1.000 LS Client #: 2033 Pipeline Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,806,300.00 0.00 2,806,300.00 Total 0.00 0.00 0.00 0.00 0.00 2,806,300.00 0.00 2,806,300.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,806,300.00 0.00 2,806,300.00 Total 0.00 0.00 0.00 0.00 0.00 2,806,300.00 0.00 2,806,300.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2033 2033 Escalation 1.00 1,900,000.00 LS 0.48 100.000 0.48 906,300.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 180 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 144 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2352 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 330,000.00 LS 0.25 100.000 0.25 82,500.00 Page 181 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Prosser Annex Prosser Annex Tank Rehab 1.000 LS 307,648.45 307,648.45 Tank Rehab Prosser Annex Prosser Annex Tank GA/OH 1.000 LS 241,840.27 241,840.27 Tank GA Prosser Annex Tariff Allowance(25%of Materials Cost) 1.000 LS 1 9,719.63 9,719.63 Tariff Allow Prosser Annex Tank Rehab $559,208.35 Page 182 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 25 of 172 Biditem Prosser Annex Tank Rehab 9 Takeoff Qty: 1.000 LS Client #: Prosser Annex Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 130,188.48 44,771.81 174,960.29 43,732.80 38,517.50 47,577.25 0.00 304,787.84 Total 130,188.48 44,771.81 174,960.29 43,732.80 38,517.50 47,577.25 0.00 304,787.84 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 1,968.0000 0.0005 1,968.0000 154.8719 66.1527 88.9026 0.0021 Activity: 41001-01 Tank Rehab Quantity: 215000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.61 0.21 0.81 0.20 0.18 0.22 0.00 1.42 Total 130,188.48 44,771.81 174,960.29 43,732.80 38,517.50 47,577.25 0.00 304,787.84 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.0172 0.0022 447.9167 455.6106 60.0000 3,583.3333 0.0003 5,079.7973 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,968.0000 109.2480 0.0092 88.9026 0.6055 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 60 Eff:100.00 Crew Hrs:480.00 Labor PCs:4.10 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 21,000.00 108.500 22,785.00 22,785.00 2STEEL Steel Plate 8t Structure 1.00 2,500.00 LB 5.80 108.500 6.29 15,732.50 3G REENSAND Sandblast Sand 1.00 390.00 BAG 80.00 108.500 86.80 33,852.00 3SANDPOT Sand Pot 1.00 35.00 DAY 110.00 108.500 119.35 4,177.25 3TEMPMTL Temp Materials 1.00 1.00 LS 8,800.00 108.500 9,548.00 9,548.00 8*BOOM45 45'Boomlift 1.00 480.00 HR 38.00 108.500 41.23 19,790.40 8UTLPU Utility Pickup 1.00 480.00 HR 49.88 100.000 49.88 23,942.40 IRON Iron Worker 0.10 48.00 MH 82.86 100.000 111.36 5,345.06 LABORER Laborer 1.00 480.00 MH 65.00 100.000 87.35 41,929.68 PAINT Painter 3.00 1,440.00 MH 65.98 100.000 88.67 127,685.55 Page 183 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 26 of 172 Biditem Prosser Annex Tank GA/OH 9 Takeoff Qty: 1.000 LS Client #: Prosser Annex Tank GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 239,591.56 0.00 239,591.56 Total 0.00 0.00 0.00 0.00 0.00 239,591.56 0.00 239,591.56 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 239,591.56 0.00 239,591.56 Total 0.00 0.00 0.00 0.00 0.00 239,591.56 0.00 239,591.56 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1 ESC2033 2033 Escalation 1.00 368,361.00 LS 0.48 100.000 0.48 175,708.20 1SUBFEE Sub Fee 1.00 329,170.00 LS 0.12 100.000 0.12 39,500.40 1SUBOH Sub Overhead 1.00 304,787.00 LS 0.08 100.000 0.08 24,382.96 Page 184 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 27 of 172 Biditem Tariff Allowance (25% of Materials Cost) 9 Takeoff Qty: 1.000 LS Client #: Prosser Annex Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 38,517.00 LS 0.25 100.000 0.25 9,629.25 Page 185 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Gateway Tank Gateway Tank Rehab 1.000 LS 521,047.97 521,047.97 Rehab Gateway Tank Gateway Tank Rehab GA/OH 1.000 LS 409,775.44 409,775.44 Rehab GA Gateway Tank Tariff Allowance(25%of Materials Cost) 1.000 LS 17,057.35 17,057.35 TariffAllow Gateway Tank Rehab $947,880.76 8 Page 186 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 29 of 172 Biditem Gateway Tank Rehab 1 0O Takeoff Qty: 1.000 LS Client #: Gateway Tank Rehab Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 221,312.00 76,109.20 297,421.20 58,310.40 67,595.50 92,876.00 0.00 516,203.10 Total 221,312.00 76,109.20 297,421.20 58,310.40 67,595.50 92,876.00 0.00 516,203.10 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 3,200.0000 0.0003 3,200.0000 161.3135 69.1600 92.9441 0.0016 Activity: 41001-01 Tank Rehab Quantity: 450000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.49 0.17 0.66 0.13 0.15 0.21 0.00 1.15 Total 221,312.00 76,109.20 297,421.20 58,310.40 67,595.50 92,876.00 0.00 516,203.10 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.7905 0.0014 703.1250 555.8306 80.0000 5,625.0000 0.0002 6,452.5388 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 3,200.0000 140.6250 0.0071 92.9441 0.4918 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: PAINT (Mod) Painting Crew Prod:S 80 Eff:100.00 Crew Hrs:640.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2PAINT Paint Matt 1.00 1.00 LS 42,000.00 108.500 45,570.00 45,570.00 2STEEL Steel Plate 8 Structure 1.00 3,500.00 LB 5.80 108.500 6.29 22,025.50 3G REENSAND Sandblast Sand 1.00 820.00 BAG 80.00 108.500 86.80 71,176.00 3SANDPOT Sand Pot 1.00 50.00 DAY 110.00 108.500 119.35 5,967.50 3TEMPMTL Temp Materials 1.00 1.00 LS 14,500.00 108.500 15,732.50 15,732.50 8*BOOM45 45'Boomlift 1.00 640.00 HR 38.00 108.500 41.23 26,387.20 8UTLPU Utility Pickup 1.00 640.00 HR 49.88 100.000 49.88 31,923.20 IRON Iron Worker 1.00 640.00 MH 82.86 100.000 111.36 71,267.56 LABORER Laborer 1.00 640.00 MH 65.00 100.000 87.35 55,906.24 PAINT Painter 3.00 1,920.00 MH 65.98 100.000 88.67 170,247.40 Page 187 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 30 of 172 Biditem Gateway Tank Rehab GA/OH 10 2 Takeoff Qty: 1.000 LS Client #: Gateway Tank Rehab GA Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 405,965.22 0.00 405,965.22 Total 0.00 0.00 0.00 0.00 0.00 405,965.22 0.00 405,965.22 1 111 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 405,965.22 0.00 405,965.22 Total 0.00 0.00 0.00 0.00 0.00 405,965.22 0.00 405,965.22 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2033 2033 Escalation 1.00 624,352.00 LS 0.48 100.000 0.48 297,815.90 1SUBFEE Sub Fee 1.00 557,109.00 LS 0.12 100.000 0.12 66,853.08 1SUBOH Sub Overhead 1.00 516,203.00 LS 0.08 100.000 0.08 41,296.24 Page 188 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 31 of 172 Biditem Tariff Allowance (25% of Materials Cost) 104 Takeoff Qty: 1.000 LS Client #: Gateway Tank Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 67,595.00 LS 0.25 100.000 0.25 16,898.75 Page 189 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total New Well 2033 New Well 1.000 LS 1,290,024.46 1,290,024.46 Program New Well Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 88,321.24 88,321.24 Allowance 2032 New Well $1,378,345.70 32 Page 190 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 133 of 172 Biditem 2033 New Well 215 0 Takeoff Qty: 1.000 LS Client #: New Well Program Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 412,741.90 0.00 1,278,029.40 Total 0.00 0.00 0.00 0.00 865,287.50 412,741.90 0.00 1,278,029.40 1 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 412,741.90 0.00 1,278,029.40 Total 0.00 0.00 0.00 0.00 865,287.50 412,741.90 0.00 1,278,029.40 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2033 2033 Escalation 1.00 865,287.00 LS 0.48 100.000 0.48 412,741.90 2WELLDIS Well Disinfection 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2WELLDRILL Well Drilling 1.00 450.00 VF 1,100.00 108.500 1,193.50 537,075.00 2WELLMOB Well Driller Mob 1.00 1.00 EA 25,000.00 108.500 27,125.00 27,125.00 2WELLPUMP Supply Et Install Well Pump 1.00 1.00 LS 250,000.00 108.500 271,250.00 271,250.00 2WELLTEST Test Well w Temp Pump 1.00 1.00 LS 17,500.00 108.500 18,987.50 18,987.50 Page 191 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 134 of 172 Biditem Tariff Allowance (25% of Materials Cost) 215 2 Takeoff Qty: 1.000 LS Client #: New Well Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 350,000.00 LS 0.25 100.000 0.25 87,500.00 Page 192 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price Bid Total S1 Pump 2033 New Pump Station 1.000 LS 2,324,341.78 2,324,341.78 Station 2033 PS Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 88,321.24 88,321.24 Allowance 2033 Pump Station $2,412,663.02 34 Page 193 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 139 of 172 Biditem 2033 New Pump Station 2 00 Takeoff Qty: 1.000 LS Client #: 2033 Pump Station Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 771,729.31 1,531,000.00 2,302,729.31 Total 0.00 0.00 0.00 0.00 0.00 771,729.31 1,531,000.00 2,302,729.31 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 771,729.31 0.00 771,729.31 Total 0.00 0.00 0.00 0.00 0.00 771,729.31 0.00 771,729.31 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2033 2033 Escalation 1.00 1,186,817.00 LS 0.48 100.000 0.48 566,111.71 1SUBFEE Sub Fee 1.00 1,059,480.00 LS 0.12 100.000 0.12 127,137.60 1SUBOH Sub Overhead 1.00 981,000.00 LS 0.08 100.000 0.08 78,480.00 1 111 1 1 111 -Abatement/Demo • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 1 1• 1 1 111 1.111 Building Shell • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 -MEP Trades • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 1 111 111 Site Work • 11 Unit: LS Page 194 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 140 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 40000-46000 Mechanical Systems Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply 8 Install 1.00 1.00 EA 215,000.00 100.000 215,000.00 215,000.00 4PUMP2 Pump 2 -Supply$ Install 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 Page 195 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 141 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2302 Takeoff Qty: 1.000 LS Client #: 2033 PS Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 350,000.00 LS 0.25 100.000 0.25 87,500.00 Page 196 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2034 Pipeline 2034 Pipeline Replacement Program 1.000 LS 2,974,558.39 2,974,558.39 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 85,797.78 85,797.78 Allowance 2034 Pipeline 53,060,3556.17 37 Page 197 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 150 of 172 Biditem 2034 Pipeline Replacement Program 24 50 Takeoff Qty: 1.000 LS Client #: 2034 Pipeline Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,946,900.00 0.00 2,946,900.00 Total 0.00 0.00 0.00 0.00 0.00 2,946,900.00 0.00 2,946,900.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 2,946,900.00 0.00 2,946,900.00 Total 0.00 0.00 0.00 0.00 0.00 2,946,900.00 0.00 2,946,900.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2034 2034 Escalation 1.00 1,900,000.00 LS 0.55 100.000 0.55 1,046,900.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 198 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 151 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2452 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 340,000.00 LS 0.25 100.000 0.25 85,000.00 Page 199 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL iditem Description Quantity Units Unit Price L Bid Total 2034 New 2034 New Pump Station 1.000 LS 2,412,879.29 2,412,879.29 u Pmp Station Pump Station TariffAllow Tariff Allowance(25%of Materials Cost) 1.000 LS 100,938.56 100,938.56 2034 Pump Station $2,513,817.85 36 Page 200 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 146 of 172 Biditem 2034 New Pump Station 2 0 Takeoff Qty: 1.000 LS Client #: 2034 New Pump Station Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 859,443.57 1,531,000.00 2,390,443.57 Total 0.00 0.00 0.00 0.00 0.00 859,443.57 1,531,000.00 2,390,443.57 01000-01 GA Et Fee • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 859,443.57 0.00 859,443.57 Total 0.00 0.00 0.00 0.00 0.00 859,443.57 0.00 859,443.57 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2034 2034 Escalation 1.00 1,186,617.00 LS 0.55 100.000 0.55 653,825.97 1SUBFEE Sub Fee 1.00 1,059,480.00 LS 0.12 100.000 0.12 127,137.60 1SUBOH Sub Overhead 1.00 981,000.00 LS 0.08 100.000 0.08 78,480.00 1 111 1 1 111 -Abatement/Demo . • 11 Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement 6t Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 1 1• 1 1 111 1.111 : . • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 389,000.00 389,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4DOORWIN Door 6t Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . 1 111 .111 . . • 11 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 287,000.00 287,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric - Sub 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 1 111 111 Site Work (Unreviewed) • 11 Unit: LS Page 201 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 147 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 40000-46000 Mechanical Systems (Unreviewed) Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 385,000.00 385,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply 8 Install 1.00 1.00 EA 215,000.00 100.000 215,000.00 215,000.00 4PUMP2 Pump 2 -Supply$ Install 1.00 1.00 LS 60,000.00 100.000 60,000.00 60,000.00 Page 202 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 148 of 172 Biditem Tariff Allowance (25% of Materials Cost) 2 A 1 Takeoff Qty: 1.000 LS Client #: Pump Station Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 400,000.00 LS 0.25 100.000 0.25 100,000.00 Page 203 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total 2035 Pipeline 2035 Pipeline Replacement Program 1.000 LS 3,124,149.34 3,124,149.34 Pipeline Tariff Tariff Allowance(25%of Materials Cost) 1.000 LS 90,844.70 90,844.70 Allowance 2035 Pipeline Program $3,214,994.04 39 Page 204 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 156 of 172 Biditem 2035 Pipeline Replacement Program 4100 Takeoff Qty: 1.000 LS Client #: 2035 Pipeline Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 3,095,100.00 0.00 3,095,100.00 Total 0.00 0.00 0.00 0.00 0.00 3,095,100.00 0.00 3,095,100.00 2029.1 Pipe Program • •• Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 3,095,100.00 0.00 3,095,100.00 Total 0.00 0.00 0.00 0.00 0.00 3,095,100.00 0.00 3,095,100.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2035 3035 Escalation 1.00 1,900,000.00 LS 0.63 100.000 0.63 1,195,100.00 1PIPEALLOW Pipeline Allowance 1.00 1.00 LS 1,900,000.00 100.000 1,900,000.00 1,900,000.00 Page 205 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 157 of 172 Biditem Tariff Allowance (25% of Materials Cost) 4110 Takeoff Qty: 1.000 LS Client #: Pipeline Tariff Allowance Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 360,000.00 LS 0.25 100.000 0.25 90,000.00 Page 206 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 4:55 PM BID PROPOSAL Biditem Description Quantity Units Unit Price Bid Total Ski Lodge Tank Ski Lodge Tank I Gal Upsize 1.000 LS 6,526,527.23 6,526,527.23 Ski Lodge Tank Tariff Allowance(25%of Materials Cost) 1.000 LS 504,692.79 504,692.79 Tariff Allow Ski Lodge Tank(2035) $7,031,220.02 38 Page 207 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 153 of 172 Biditem Ski Lodge Tank 1M Gal Upsize 4000 Takeoff Qty: 1.000 LS Client #: Ski Lodge Tank Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 3,201,655.73 930,000.00 6,465,841.49 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 3,201,655.73 930,000.00 6,465,841.49 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,640.0000 0.0004 2,640.0000 2,449.1824 75.1467 100.9896 0.0011 Activity: 700.1 Tank Foundation Et Sitework Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 380,000.00 380,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 380,000.00 380,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/07% Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 4TANKDEMO Existing Tank Demolition 1.00 1.00 LS 90,000.00 100.000 90,000.00 90,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 190,000.00 100.000 190,000.00 190,000.00 Activity: 700.2 Welded Steel Tank Quantity: 1000000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.20 0.07 0.27 0.18 1.89 0.00 0.55 2.88 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 550,000.00 2,884,185.76 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.4463 0.0009 1,136.3636 507.1429 110.0000 9,090.9091 0.0001 26,219.8705 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,640.0000 378.7879 0.0026 100.9896 0.1984 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 110 Eff:100.00 Crew Hrs:880.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2STEEL Steel Plate 8 Structure 1.00 300,000.00 LB 5.80 108.500 6.29 1,887,900.00 4CRANE Crane 1.00 110.00 DAY 5,000.00 100.000 5,000.00 550,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 880.00 HR 128.66 108.500 139.60 122,844.57 8336 WELDER ARC 300 AMP 1.00 880.00 HR 14.70 100.000 14.70 12,934.24 GAS/DIESE 8UTLPU Utility Pickup 1.00 880.00 HR 49.88 100.000 49.88 43,894.40 LABORER Laborer 1.00 880.00 MH 65.00 100.000 87.35 76,871.08 MILLWR Millwright 2.00 1,760.00 MH 80.22 100.000 107.81 189,741.47 Activity: 01000-01 Contractor Overhead Et Fee Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 3,201,655.73 0.00 3,201,655.73 Total 0.00 0.00 0.00 0.00 0.00 3,201,655.73 0.00 3,201,655.73 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ESC2035 3035 Escalation 1.00 3,990,694.00 LS 0.63 100.000 0.63 2,510,146.53 1SUBFEE Sub Fee 1.00 3,563,120.00 LS 0.12 100.000 0.12 427,574.40 1SUBOH Sub Overhead 1.00 3,299,185.00 LS 0.08 100.000 0.08 263,934.80 Page 208 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 154 of 172 Biditem Tariff Allowance (25% of Materials Cost) 4010 Takeoff Qty: 1.000 LS Client #: Ski Lodge Tank Tariff Allow Bid Qty: 1.000 LS 01000.1 Tariff Allowance • •• Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1ALLOWANCE Allowance 1.00 2,000,000.00 LS 0.25 100.000 0.25 500,000.00 Page 209 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 163 of 172 Biditem (Non Additive) Pipeline Installation Baseline 500� Takeoff Qty: 1.000 LS Client #: Pipe Unit Pricing Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 272,548.00 93,729.26 366,277.26 252,836.41 359,745.31 19,920.60 189,058.00 1,187,837.58 Total 272,548.00 93,729.26 366,277.26 252,836.41 359,745.31 19,920.60 189,058.00 1,187,837.58 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 3,492.0000 0.0003 3,492.0000 340.1597 78.0493 104.8904 0.0016 /I I2 (Non Additive)Pipeline Materials • . 4500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 78.98 0.00 10.63 89.62 Total 0.00 0.00 0.00 0.00 355,424.30 0.00 47,850.00 403,274.30 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 2BASE Base Rock 1.00 1,250.00 TON 18.00 108.500 19.53 24,412.50 2HYDRANTS Fire Hydrants 1.00 9.00 EA 8,500.00 108.500 9,222.50 83,002.50 2MISCMTL Misc Materials 1.00 4,500.00 LF 1.00 108.500 1.09 4,882.50 2PIPEFTG Pipe Fittings 1.00 1.00 LS 25,000.00 108.500 27,125.00 27,125.00 2PIPEMTL Pipe Materials- Permanent 1.00 4,500.00 LF 38.00 108.500 41.23 185,535.00 2SAND Bedding Sand - FOB Plant 1.00 1,755.00 TON 16.00 108.500 17.36 30,466.80 4HAUL Hauling-Sub 1.00 330.00 HR 145.00 100.000 145.00 47,850.00 ../I I7 (Non Additive) ..r .•- • .e • . 4500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1.17 0.40 1.58 1.11 0.00 0.00 0.77 3.46 Total 5,280.00 1,815.78 7,095.78 4,992.45 0.00 0.00 3,480.00 15,568.23 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2.6863 0.0053 187.5000 503.6763 3.0000 1,500.0000 0.0007 5,189.4100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 72.0000 62.5000 0.0160 98.5525 1.1733 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: LAB4 (Mod)4 Man Labor Crew Prod:CH 24 Eff:100.00 Crew Hrs:24.00 Labor PCs:3.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4HAUL Hauling-Sub 1.00 24.00 HR 145.00 100.000 145.00 3,480.00 8'FORK8 Reach Forklift-8000 lb 1.00 24.00 HR 145.75 108.500 158.14 3,795.33 8UTLPU Utility Pickup 1.00 24.00 HR 49.88 100.000 49.88 1,197.12 LAB4 Labor Foreman 1.00 24.00 MH 68.00 100.000 91.39 2,193.24 LABORER Laborer 1.00 24.00 MH 65.00 100.000 87.35 2,096.48 OPERATOR Operator 1.00 24.00 MH 87.00 100.000 116.92 2,806.06 /I I1 (Non Additive)Erosion . Controls • . /I Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 10,850.00 3,731.32 14,581.32 3,984.88 0.00 6,954.85 10,280.00 35,801.05 Total 10,850.00 3,731.32 14,581.32 3,984.88 0.00 6,954.85 10,280.00 35,801.05 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 18,566.2000 50.0000 0.0200 371.3240 6.2500 0.1600 6.2500 5,728.1680 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 150.0000 0.0067 150.0000 97.2088 10,850.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Page 210 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 164 of 172 Crew: MINIP Mini Pipe Crew Prod:CH 50 Eff:100.00 Crew Hrs:50.00 Labor PCs:3.00 Equipment PCs:1.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3BMPROCK Access Rock 1.00 30.00 TON 24.00 108.500 26.04 781.20 3BMPSF Silt Fence 1.00 300.00 LF 2.80 108.500 3.04 911.40 3BMPWADDLE Straw Waddle 1.00 200.00 LF 3.50 108.500 3.80 759.50 3DUMPSTER Du mpster 1.00 1.00 EA 650.00 108.500 705.25 705.25 3SWPPP SWPPP Plan Et Admin 1.00 1.00 LS 3,500.00 108.500 3,797.50 3,797.50 4HAUL Hauling-Sub 1.00 16.00 HR 145.00 100.000 145.00 2,320.00 4SWEEPER Street Sweeper 1.00 24.00 HR 225.00 100.000 225.00 5,400.00 4WATERTRUCK Water Truck 1.00 20.00 HR 128.00 100.000 128.00 2,560.00 8243 4WD HOE/LOADER 60-90HP 1.00 50.00 HR 73.45 108.500 79.70 3,984.88 LABORER Laborer 2.00 100.00 MH 65.00 100.000 87.35 8,735.35 OPERATOR Operator 1.00 50.00 MH 87.00 100.000 116.92 5,845.97 Additive)Activity: 339900-01.0 (Non . Pipelines- Quantity: 4500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 31.18 10.72 41.90 38.32 0.00 2.70 17.81 100.72 Total 140,288.00 48,245.04 188,533.04 172,424.90 0.00 12,152.00 80,148.00 453,257.94 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 80.2129 0.0569 17.5781 1,409.9920 32.0000 140.6250 0.0071 14,164.3106 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 1,792.0000 2.5112 0.3982 105.2082 31.1751 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: LGPiPE Large Pipe Crew Prod:S 32 Eff:100.00 Crew Hrs:256.00 Labor Pcs:7.00 Equipment PCs:4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 3FUSIO NRENT Fusion Rental 1.00 4.00 WK 2,800.00 108.500 3,038.00 12,152.00 4HAUL Hauling-Sub 1.00 256.00 HR 145.00 100.000 145.00 37,120.00 4SAW Sawcutting Sub 1.00 54.00 HR 190.00 100.000 190.00 10,260.00 4WATER Water Truck 1.00 256.00 HR 128.00 100.000 128.00 32,768.00 8268 LOADER WHEEL 3.0-3.4 CUBIC 1.00 256.00 HR 153.44 108.500 166.48 42,619.22 8283 EXCAVATOR LARGE 1.00 256.00 HR 294.99 108.500 320.06 81,936.42 8326 4000 GAL WATER TRUCK 1.00 256.00 HR 126.37 108.500 137.11 35,099.98 8UTLPU Utility Pickup 1.00 256.00 HR 49.88 100.000 49.88 12,769.28 LABORER Laborer 3.00 768.00 MH 65.00 100.000 87.35 67,087.49 OPER4 Operator Foreman 1.00 256.00 MH 92.00 100.000 123.64 31,651.53 OPERATOR Operator 3.00 768.00 MH 87.00 100.000 116.92 89,794.02 Activity: 339900-01.1 (Non Additive)Install Laterals and FH Quantity: 25.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,647.36 566.53 2,213.89 1,296.04 0.00 0.00 1,092.00 4,601.92 Total 41,184.00 14,163.18 55,347.18 32,400.92 0.00 0.00 27,300.00 115,048.10 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 3,509.9240 4.1600 0.2404 843.7317 13.0000 1.9231 0.5200 8,849.8538 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 520.0000 0.0481 20.8000 106.4369 1,647.3600 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPIPE Small Pipe Crew Prod:S 13 Eff:100.00 Crew Hrs:104.00 Labor Pcs:5.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4HAUL Hauling-Sub 1.00 100.00 HR 145.00 100.000 145.00 14,500.00 Page 211 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 165 of 172 4WATER Water Truck 1.00 100.00 HR 128.00 100.000 128.00 12,800.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 104.00 HR 111.02 108.500 120.46 12,527.50 8276 EXCAVATOR SMALL 1.00 104.00 HR 130.15 108.500 141.21 14,685.90 8UTLPU Utility Pickup 1.00 104.00 HR 49.88 100.000 49.88 5,187.52 LABORER Laborer 2.00 208.00 MH 65.00 100.000 87.35 18,169.53 OPER4 Operator Foreman 1.00 104.00 MH 92.00 100.000 123.64 12,858.44 OPERATOR Operator 2.00 208.00 MH 87.00 100.000 116.92 24,319.21 Activity: 339900.05 (Non Additive)Potholing Quantity: 40.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 1,584.00 544.74 2,128.74 722.85 0.00 0.00 500.00 3,351.59 Total 63,360.00 21,789.51 85,149.51 28,914.19 0.00 0.00 20,000.00 134,063.70 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 2,851.5925 4.0000 0.2500 712.8981 20.0000 2.0000 0.5000 6,703.1850 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 800.0000 0.0500 20.0000 106.4369 1,584.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:HU 4 Eff:100.00 Crew Hrs:160.00 Labor PCs:5.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4VACTOR Vactor Truck 1.00 80.00 HR 250.00 100.000 250.00 20,000.00 8267 LOADER WHEEL 2.5-2.9 CUBIC 0.50 80.00 HR 111.02 108.500 120.46 9,636.54 8276 EXCAVATOR SMALL 0.50 80.00 HR 130.15 108.500 141.21 11,296.85 8UTLPU Utility Pickup 1.00 160.00 HR 49.88 100.000 49.88 7,980.80 LABORER Laborer 2.00 320.00 MH 65.00 100.000 87.35 27,953.12 OPER4 Operator Foreman 1.00 160.00 MH 92.00 100.000 123.64 19,782.21 OPERATOR Operator 2.00 320.00 MH 87.00 100.000 116.92 37,414.18 Activity: 339900.06 (Non Additive)RaiselCollar Quantity: 21.00 Unit: EA Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 434.00 149.25 583.25 416.97 89.51 0.00 0.00 1,089.74 Total 9,114.00 3,134.31 12,248.31 8,756.38 1,879.76 0.00 0.00 22,884.45 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1,000.2233 2.0000 0.5000 500.1117 5.2500 4.0000 0.2500 4,358.9429 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 126.0000 0.1667 6.0000 97.2088 434.0000 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: RAISE Utilitiy Raise/Collar Prod:HU 2 Eff:100.00 Crew Hrs:42.00 Labor Pcs:3.00 Equipment PCs:4.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2CO NC Ready-Mix Concrete 1.00 10.50 CY 165.00 108.500 179.02 1,879.76 8002 COMPRESSOR 175-195 CFM 1.00 42.00 HR 28.37 108.500 30.78 1,292.82 8016 BREAKER PAVEMENT AIR 90# 1.00 42.00 HR 18.00 108.500 19.53 820.26 8245 4WD HOE/LOADER 91-104HP 1.00 42.00 HR 99.81 108.500 108.29 4,548.34 8UTLPU Utility Pickup 1.00 42.00 HR 49.88 100.000 49.88 2,094.96 LABORER Laborer 2.00 84.00 MH 65.00 100.000 87.35 7,337.69 OPERATOR Operator 1.00 42.00 MH 87.00 100.000 116.92 4,910.62 Activity: 402319-01 (Non Additive)Pipe Testingl Cleaning Quantity: 4500.00 Unit: LF Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.55 0.19 0.74 0.30 0.54 0.18 0.00 1.76 Total 2,472.00 850.12 3,322.12 1,362.69 2,441.25 813.75 0.00 7,939.81 Page 212 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 166 of 172 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 1.0411 0.0018 562.5000 585.6013 1.0000 4,500.0000 0.0002 7,939.8100 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 32.0000 140.6250 0.0071 103.8163 0.5493 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: SMPiPE (Mod)Small Pipe Crew Prod:CH 8 Eff:100.00 Crew Hrs:8.00 Labor Pcs:4.00 Equipment PCs:2.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2PIPEMTL Pipe Materials- Permanent 1.00 4,500.00 LF 0.50 108.500 0.54 2,441.25 3BACT Bacteria Testing 1.00 3.00 EA 250.00 108.500 271.25 813.75 8267 LOADER WHEEL 2.5-2.9 CUBIC 1.00 8.00 HR 111.02 108.500 120.46 963.65 8UTLPU Utility Pickup 1.00 8.00 HR 49.88 100.000 49.88 399.04 LABORER Laborer 2.00 16.00 MH 65.00 100.000 87.35 1,397.66 OPER4 Operator Foreman 1.00 8.00 MH 92.00 100.000 123.64 989.11 OPERATOR Operator 1.00 8.00 MH 87.00 100.000 116.92 935.35 Page 213 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 167 of 172 Biditem (Non Additive) Tank Installation Baseline 5010 Takeoff Qty: 1.000 LS Client#: Tank Unit Pricing Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 840,000.00 3,174,185.76 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 840,000.00 3,174,185.76 Manhours Unit/MH MH/Unit $/MH Base Labor/MH Total Labor/MH Unit/CH 2,640.0000 0.0004 2,640.0000 1,202.3431 75.1467 100.9896 0.0011 Activity: 700.1 (Non Additive) Tank Foundation Et Siteowrk Quantity: 1.00 Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 290,000.00 290,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 290,000.00 290,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4SITEWORK Sitework 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 4TANKFND Tank Foundation 1.00 1.00 LS 190,000.00 100.000 190,000.00 190,000.00 Activity: 700.2 (Non Additive) Welded Steel Tank Quantity: 1000000.00 Unit: GAL Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.20 0.07 0.27 0.18 1.89 0.00 0.55 2.88 Total 198,387.20 68,225.35 266,612.55 179,673.21 1,887,900.00 0.00 550,000.00 2,884,185.76 Crew$/Unit Crew Hrs/Unit Units/Crew Hr $/Crew Hour Shifts Units/Shift Shifts/Unit $/Shift 0.4463 0.0009 1,136.3636 507.1429 110.0000 9,090.9091 0.0001 26,219.8705 Manhours Unit/MH MH/Unit Total Labor/MH Base Labor/Unit 2,640.0000 378.7879 0.0026 100.9896 0.1984 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Crew: WELD Welding Crew Prod:S 110 Eff:100.00 Crew Hrs:880.00 Labor PCs:3.00 Equipment PCs:3.00 Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2STEEL Steel Plate Et Structure 1.00 300,000.00 LB 5.80 108.500 6.29 1,887,900.00 4CRANE Crane 1.00 110.00 DAY 5,000.00 100.000 5,000.00 550,000.00 8'FORK10 Reach Forklift- 10000 lb 1.00 880.00 HR 128.66 108.500 139.60 122,844.57 8336 WELDER ARC 300 AMP 1.00 880.00 HR 14.70 100.000 14.70 12,934.24 GAS/DIESE 8UTLPU Utility Pickup 1.00 880.00 HR 49.88 100.000 49.88 43,894.40 LABORER Laborer 1.00 880.00 MH 65.00 100.000 87.35 76,871.08 MILLWR Millwright 2.00 1,760.00 MH 80.22 100.000 107.81 189,741.47 Page 214 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 168 of 172 Biditem (Non Additive) Hydrostation/PS Baseline 5020 Takeoff Qty: 1.000 LS Client #: PS/Hydro Pricing Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 348,564.80 2,218,000.00 2,566,564.80 Total 0.00 0.00 0.00 0.00 0.00 348,564.80 2,218,000.00 2,566,564.80 III I1 (Non Additive) • . II Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 348,564.80 0.00 348,564.80 Total 0.00 0.00 0.00 0.00 0.00 348,564.80 0.00 348,564.80 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 1SUBFEE Sub Fee 1.00 1,796,040.00 LS 0.12 100.000 0.12 215,524.80 1SUBOH Sub Overhead 1.00 1,663,000.00 LS 0.08 100.000 0.08 133,040.00 I III I .. 02000 .. ► • II Unit: LS Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4ABATEDEMO Abatement Et Demo 1.00 1.00 LS 175,000.00 100.000 175,000.00 175,000.00 ERMI I• I1 (Non Additive) I III I•III Building . • . II Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 401,000.00 401,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONC Concrete-Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4DOORWIN Door Et Window Sub 1.00 1.00 LS 35,000.00 100.000 35,000.00 35,000.00 4DRYWALL Drywall Sub 1.00 1.00 LS 18,000.00 100.000 18,000.00 18,000.00 4FRAMIN G Framing Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 41NSUL Insulation Sub 1.00 1.00 LS 15,000.00 100.000 15,000.00 15,000.00 4MASON Masonry Sub 1.00 1.00 LS 80,000.00 100.000 80,000.00 80,000.00 4METAL Metals Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4PAINT Painting Sub 1.00 1.00 LS 30,000.00 100.000 30,000.00 30,000.00 4ROOF Roofing Sub 1.00 1.00 LS 68,000.00 100.000 68,000.00 68,000.00 . I1 (Non Additive) III .III .. . • . II Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 377,000.00 377,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 377,000.00 377,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 4CONTROL Controls SCADA Sub 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4ELEC Electric- Sub 1.00 1.00 LS 200,000.00 100.000 200,000.00 200,000.00 4FIREPRO Fire Protection Subs 1.00 1.00 LS 22,000.00 100.000 22,000.00 22,000.00 4HVAC HVAC Sub 1.00 1.00 LS 75,000.00 100.000 75,000.00 75,000.00 4PLUMB Plumbing Sub 1.00 1.00 LS 20,000.00 100.000 20,000.00 20,000.00 4SECURITY Security 1.00 1.00 LS 10,000.00 100.000 10,000.00 10,000.00 Additive) III III Site Work . • . II ®� Page 215 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 169 of 172 Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 295,000.00 295,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4EARTHWORK Site Earthwork 1.00 1.00 LS 50,000.00 100.000 50,000.00 50,000.00 4FENCE Fencing-Sub 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4LANDSCAPING Landscaping 1.00 1.00 LS 40,000.00 100.000 40,000.00 40,000.00 4SITEWORK Sitework 1.00 1.00 LS 65,000.00 100.000 65,000.00 65,000.00 4UTILITIES Utilities 1.00 1.00 LS 100,000.00 100.000 100,000.00 100,000.00 Activity: 40-46.01 (Non Additive)40000-46000 Mechanical (Unreviewed) Quantity: 1.00 Unit: LS Systems Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 0.00 0.00 970,000.00 970,000.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 970,000.00 970,000.00 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT q Actual UC Total 4MECHPIPE Mechanical Pipe 1.00 1.00 LS 110,000.00 100.000 110,000.00 110,000.00 4PUMP Pump- Supply 8 Install 1.00 4.00 EA 215,000.00 100.000 215,000.00 860,000.00 Page 216 of 241 2025TDPUDCIP TDPUD CIP 2025 7/25/2025 5:10 PM Page 170 of 172 Biditem (Non Additive) Well Baseline 5030 Takeoff Qty: 1.000 LS Client #: Well Pricing Bid Qty: 1.000 LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Total 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 IAdditive) • i II Unit: LS Base Labor Burden Total Labor Equipment Perm Matls Const Matls Sub Total U.Cost 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Total 0.00 0.00 0.00 0.00 865,287.50 0.00 0.00 865,287.50 Calendar: STD Standard Hrs/Shift:8 WC: 5221 Concrete Construction Resource Description Pcs/Wste Quantity Unit Unit Cost Tax/OT% Actual UC Total 2WELLDIS Well Disinfection 1.00 1.00 LS 10,000.00 108.500 10,850.00 10,850.00 2WELLDRILL Well Drilling 1.00 450.00 VF 1,100.00 108.500 1,193.50 537,075.00 2WELLMOB Well Driller Mob 1.00 1.00 EA 25,000.00 108.500 27,125.00 27,125.00 2WELLPUMP Supply Et Install Well Pump 1.00 1.00 LS 250,000.00 108.500 271,250.00 271,250.00 2WELLTEST Test Well w Temp Pump 1.00 1.00 LS 17,500.00 108.500 18,987.50 18,987.50 Page 217 of 241 AGENDA ITEM #12 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Mike Swanson, Director of Electric Engineering & Operations Keith Renshaw, Electric Engineering Manager SUBJECT: Consideration of Procurement for Electric Distribution System Line Sensors APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a Material Purchase Contract with Gridware for electric utility distribution system line sensors in an amount not-to-exceed $770,000 BACKGROUND: As electric utilities face growing operational and environmental challenges, including wildfire risk, aging infrastructure, and increased customer expectations for reliability, the use of distribution system line sensors (line sensors) has become an emerging tool in modern grid management over the past several years. Line sensors provide real-time visibility into distribution system line infrastructure conditions, enabling utilities to move from reactive to proactive operations. Line sensor technologies enable the detection of early warning signs of hazardous conditions such as arcing, conductor to conductor contact (slap), vegetation contact, and high impedance faults. Modern line sensors have the capability to monitor physical data points associated with grid infrastructure in addition to electrical data points. This is a significant difference from the traditional sensors that monitor only electrical data points locally, increasing situational awareness of grid infrastructure where deployed. This enhanced situational awareness improves the utility's ability to mitigate risk, enhance safety, and expedite outage restoration efforts. Across the industry, the deployment of line sensors is recognized as a best practice for wildfire mitigation and grid modernization. Utilities in high wildfire exposure regions have leveraged line sensors to reduce ignition risks and to support wildfire safety de- energization operations, where verification of system safety before re-energization is required. Staff has identified several operational, reliability, and safety benefits which would result from the District's deployment of line sensors: Page 1 of 4 Page 218 of 241 • Wildfire Risk Reduction: Line sensors provide near real-time detection of abnormal conditions (arcing, downed conductors, vegetation and animal contact), allowing proactive response and reducing ignition risks; • Expedited PPS Restoration: During wildfire safety de-energization events, such as the District's new Premptive Power Shutoff (PPS), line sensors enhance visibility and reduce the scope of visual patrols, expediting safe re-energization and minimizing outage duration; • Routine Outage Management: Line sensors allow for precise fault localization, reducing the time required for field crews to locate and isolate faults, which leads to faster service restoration and improved customer satisfaction; • Operational Insight: Real-time monitoring of load, voltage, and power quality provides data for system planning, load balancing, and preventive maintenance, supporting long-term grid modernization. ANALYSIS AND BODY: On August 12, 2025, the District issued a Request for Bids for line sensors. One addendum was issued during the bidding period providing clarification on required technical specifications of the hardware. The bid opening was held on September 4, 2025 at 2:30PM and the District received one bid. The bid opening results from September 4, 2025 are shown in the Table 1 below: Table 1: Line Sensor Bid Opening Results Vendor Bid Schedule Responsive Notes: Total Bid? Gridware $770,000 Yes None. To staff's knowledge, only a few line sensor manufacturers exist in North America who manufacture equipment meeting the District's technical specifications for line sensors. Because very few manufacturers meet the District's technical specifications, receiving only one bid is not unexpected. To further support the District's risk-reduction strategies and modernization objectives, staff recommends that the Board authorize the General Manager to execute a Material Purchase Contract with Gridware for distribution system line sensor purchases for the remainder of FY2025 for a not-to-exceed purchase authorization amount of $770,000. If approved, this contract will be effective upon execution in late September 2025 and ending December 31, 2025, with the option to extend the contract for four additional years (option years 2026, 2027, 2028, and 2029). For contract extension years, the contract period for line sensors purchases will begin on January 1 and end December 31 each year and will be included in Board annual procurement authorizations. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 4. Provide reliable and high quality electric supply and distribution system to meet Page 2 of 4 Page 219 of 241 current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The FY24-25 Capital Budget allocates $356,670 for FCI & Line Sensor deployments in FY25 funded through rates. As of July 31, 2025, year-to-date expenditures for FCI and line sensor deployments equal $1,251, with a remaining budget allocation of$355,419 for FY25. The remaining budget allocation is insufficient to fund this agenda item and additional faulted circuit indicator (FCI) hardware which is forecasted to be procured in FY25. The table below summarizes the year to date (YTD) and forecasted expenditures remaining in FY25 for the FCI & Line Sensor Deployment project: Table 2: FY25 FCI & Line Sensor Deployment Expenditures Description Total YTD Expenditures $ (1,251.00) Forecasted Expenditures - Overhead FCIs $ (28,500.00 Forecasted Expenditures - Underground FCIs $ (450,000.0 0) Line Sensor Purchases FY25 (this agenda item) $ (770,000.0 0) Estimated FY25 Labor for FCI & Line Sensor Deployment $ (130,000.0 0) FY25 FCI & Line Sensor Deployment Budget Allocation $ 356,670.0 0 $ (1,023,081 .00) On March 12, 2025 the Board approved the rejection of all proposals received for the Page 3 of 4 Page 220 of 241 procurement of a Battery Energy Storage System (BESS) because none of the proposals received met the District's technical specifications. The FY25 Electric Capital Budget allocated $1,500,000 from rates for the BESS project in 2025. While staff continues to pursue the BESS project, the District will not incur any BESS related expenditures in FY25 and a surplus of capital dollars exist for FY25. Staff is recommending that the Board approves the reallocation of $1,023,081 from the BESS project to the FCI & Line Sensor Deployment project in FY25. This reallocation of budgeted capital dollars will enable staff to accelerate the installation of line sensors and FCIs in 2025. Staff intends to include the BESS and full deployment of line sensors and FCIs in the FY26-27 Capital Improvement Plan (CIP). Staff will include budget allocation in the corresponding FY26-27 Electric Capital Budget. Capital budget allocation for line sensor procurement option years will also be included in the FY26-27 CIP and corresponding Electric Capital Budget. ATTACHMENTS: None Page 4 of 4 Page 221 of 241 AGENDA ITEM #13 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Steven Poncelet, Public Information Officer SUBJECT: Consideration of a Contract with Streamline for the District's 2025 Website Project APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to enter into a special services contract with Streamline for an amount not to exceed $35,750 for the District's 2025 Website Project and 2026 hosting, maintenance, and support. BACKGROUND: The District's website (www.tdpud.org) is a critical tool in the District's communications and outreach efforts along with regulatory compliance. The website also touches on almost every aspect of District utility operations, including: • Customer engagement and transactions; • Outage communications and customer alerts; • Public eduction and postings; • Public bids and proposals; • HR and hiring; • Board meetings and archives; and • News and events. While District staff have worked diligently to optimize the performance of the current District website, there are opportunities to improve both the rate payer/public website experience and the staff resources needed to keep the website current and up-to-date. In general, the website navigation and layout can be greatly improved. New website designs have improved to maintain The Americans with Disabilities Act (ADA) website compliance, search engine optimization, translation capabilities, and compatibility with digital devices. ANALYSIS AND BODY: The District issued a Request for Proposals (RFP) for the Truckee Donner PUD 2025 Website Project on August 6, 2025, and was advertised in the Sierra Sun. The District Page 1 of 3 Page 222 of 241 received hundreds of questions/clarifications by the August 20, 2025 deadline and proposals were due on September 4, 2025. The District received over 30 proposals in total and a scoring committee was formed to evaluate the proposals. The scoring committee took the time to review all the proposals submitted. A list of the vendors who proposed is Attachment 1. In general, the District has received a few proposals from vendors who specialize in Content Management System (CMS) websites for government agencies and have developed a standard platform that is used by all government clients (this is similar to the District's current website vendor Granicus). The District also received a handful of proposals from vendors who specialize in websites for government agencies but who design custom CMS websites for each client. The remaining 20+ proposals were from vendors with limited experience with government agencies and who design custom CMS websites for clients in a variety of industries. In general, District staff found the vendors who specialize in CMS websites for government agencies and have developed a standard platform utilized by all government clients to be most advantageous. Based on the requirements of the RFP, scoring criteria, and proposals received, staff have determined that Streamline's proposal is the most advantageous to the District. Streamline specializes in government Content Management System (CMS) websites for government agencies and has a strong track record of working with local governments such as South Lake Tahoe Public Utility District. They are able to best meet the requirements of the District's RFP. Streamline's pricing is based on a nominal initial migration fee plus a monthly subscription fee to cover the initial website design, future website updates, and ongoing support. Streamline was also the strongest vendor in regard to their services for ADA compliance and works closely with the California Special District Association and others. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to Page 2 of 3 Page 223 of 241 identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: The lump sum cost for the District's 2025 Website Project and annual hosting, maintenance, and support through the end of 2026 is for a not-to-exceed amount of $32,500. Staff are recommending a 10% change order authorization of $3,250 for a total not-to-exceed contract amount of $35,750. Future annual hosting, maintenance, and support is estimated to not exceed $25,000 per year. Sufficient funds exist in the FY25 District budget for the 2025 Website Project ($50,000 in GL 1/2.2.930.10.753) and ongoing annual hosting, maintenance, and support will be included in future budgets. ATTACHMENTS: 1. TDPUD Website 2025 Project Proposers Page 3 of 3 Page 224 of 241 PublicG TRUCKEE DONNER District Attachment 1 TDPUD 2025 Website Project Proposer List Absolution Information Technologies, Inc. ASC Creative Acuta Digital Aress Software & Education Technologies Pvt. Ltd. Ask the Egghead, Inc. ATZ Solution LLC BonfireLA Productions, LLC Capitol Tech Solutions CivicPlus CodeBright, LLC Concourse Tech Inc. GHD Digital Invictech Inc. iSpectra LLC KiwiTech L.A. Design Studio Linkosys Matson & Isom Technology Consulting Neumeric Technologies Corporation Planetary Corporation Planeteria Media Project6 Design, Inc. Promet Source RighIT Solutions LLC Seattle New Media Solara6 Streamline Technology Teric/Vision Biz Solutions LLC The Abbi Agency UpSela Talent Solutions VND Wildish Agency Z'Onion Creative Group LLC Page 225 of 241 AGENDA ITEM #14 Public Utility District m MEETING DATE: September 17, 2025 TO: Board of Directors FROM: Michael Salmon, Chief Financial Officer SUBJECT: 2025 Electric Utility Cost of Service and Rate Study Workshop #2 APPROVED BY. Brian C. Wright, General Manager RECOMMENDATION: Receive this report and provide direction to staff. BACKGROUND: The District's electric retail rates are set by the Board of Directors and adopted by Ordinance. Recent year's average rate changes are as follows: Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 Average 27 12% 12% Rate 2% 3% 3% 0 3% 8.5% 6.5% and and Increase �° PCA PCA Beginning in 2024, Ordinance 2023-01 established a new Power Cost Adjustment (PCA) component to electric rates. The PCA is calculated quarterly and provides a credit or charge to the customer based on the District's wholesale power cost fluctuations. In 2024, the effective rate change from 2023 to 2024, including PCA net credits received by customers in 2024, was an average increase of 10.9%. Note, the Q4 of 2024 PCA credit amount was applied to customer accounts in 2025 billings and factoring this into the year 2024, the effective rate increase over 2023 is 8.0%. In 2025, including PCAs both years as applicable, the Year to Date (YTD) July effective rate change compared to YTD July 2024 is 8.4%. An electricity cost benchmark information is provided below: Page 1 of 4 Page 226 of 241 Electricity Cost per kWh-Retail-All Customer Types cents per kilowatthour 30.00 25.00 20.00 15.00 • • • 10.00 500 2017 2018 2019 202C 2021 2022 2023 2024 —9--TDPUD SUS/,- CA€ € source for USA and CA is the U.S. Energy Information Administration(EIA.GOV) CAGRs: TDPUD USA€ CAC 2024 5yr 6.4% 4.3% 9.8% 2024 9yr 4.2% 2.5% 6.4% In advance of the efforts to prepare the FY26-27 budget, staff anticipated the need for consultant assistance to support the District's possible establishment of the next Cost of Service Analysis (COSA) justified electric rates starting in FY26. The Board, at its April 2, 2025 meeting, approved a contract with HDR, Inc. (HDR) to prepare a comprehensive Electric Utility COSA and retail rate design update. HDR has extensive experience in providing financial consulting services, including COSA and rate design services for many Publically Owned Utilities (POUs), including POUs of similar size to the District, across California and other western states. ANALYSIS AND BODY: The purpose of the COSA and Rate Study is the adoption of cost-based and equitable electric rates that provide adequate funding for the District's operation and maintenance (O&M), capital expenditure, and reserve requirement needs over the long-term. The COSA and Rate Study process will determine the District's total revenue requirement and how the revenue requirement may best be allocated to rates over the next two years. There are three interrelated steps to the process: determining the revenue requirement, or total cost of service; allocating the revenue requirement among customer classes; and designing rates to recover costs. HDR's Proposal included the following key services to accomplish this effort: • Meet with District staff to discuss study goals and collect financial information; • Develop a projected minimum next five-years revenue requirement; • Review current rate schedules and classes and identify potential changes; • Develop cost-based rate design alternatives for each rate category; • Review Time-of-Use (TOU) rates established in FY24 for potential modification; • Review Commercial EV charging demand for potential new rate class/rate; • Review NEM successor rate analysis prepared by the District and identify a recommendation; and Page 2 of 4 Page 227 of 241 • Present the Cost of Service and Rate Study to the Board. HDR has extensive experience in establishing cost-based electric rates and is highly qualified to perform this work for the District. Their project team specializes in rate and cost of service analyses full-time and has successfully completed rate studies for electric utilities nationwide, including the District. Their proposed schedule to perform the Rate Study also aligns with staff's requirement to prepare the FY26-27 Budget for the Board's review and consideration by November 2025. The COSA and Rate Study results will inform and be an integral component of the proposed FY26-27 Budget. Workshp #1 was held on September 3, 2025 and the board provided input to staff. For this workshop item, HDR will present the draft Electric Cost of Service Analysis and Rate Study report to the board of directors. Important highlights of the rate study include: • Analyze rate design for FY26 and FY27; • Analyze fixed infrastructure maintenance and operation costs proportionate to rates; • Evaluate the rate increase applied to the customer charge; • Analyze each rate category individually and collectively to ensure adequate cost recovery; • Present updated customer generator rate recommendation; • Present commercial electric vehicle time of use rates recommendation; Attachment 1 is the current draft Electric Cost of Service Analysis and Rate Study summary results (page 1) and the detailed report schedules. Below are the planned schedule milestones: • September 3, 2025 - Schedule a public hearing for November 5 and conduct workshop #1 • September 17, 2025 - Conduct a 2nd workshop to review the Electric Utility cost of service analysis and proposed rate changes • November 5, 2025 - Hold a Public Hearing regarding proposed rates, and consideration of an Ordinance to change electric rates for the years 2026 and 2027 GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. Page 3 of 4 Page 228 of 241 District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this item. ATTACHMENTS: 1. TDPUD - 2025 Electric COSA V3 9 12 2025 Page 4 of 4 Page 229 of 241 Truckee Donner PUD Electric Rate Study Revenue Requirement Exhibit 1-Revenue Requirement Summary FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Revenue Rate Revenue $42,284,677 $42,692,785 $43,112,738 $43,536,740 $43,965,121 $44,397,582 $44,834,564 $45,276,154 $45,721,947 $46,171,957 $46,626,609 Miscellaneous Revenue 1,385,120 1,288,859 1,336,736 1,348,805 1,367,485 1,386,287 1,405,212 1,424,261 1,443,436 1,456,248 1,469,188 Total Revenue $43,669,797 $43,982,644 $44,449,473 $44,885,545 $45,332,606 $45,783,869 $46,239,776 $46,700,416 $47,165,383 $47,628,205 $48,095,798 Expenses Board of Directors $352,767 $366,878 $381,553 $396,815 $412,687 $429,195 $446,363 $464,217 $482,786 $502,097 $522,181 General Management 1,650,540 1,980,648 2,059,874 2,142,269 2,227,960 2,317,078 2,409,761 2,506,152 2,606,398 2,710,654 2,819,080 Administrative Services 1,624,192 1,689,160 1,756,726 1,826,995 1,900,075 1,976,078 2,055,121 2,137,326 2,222,819 2,311,732 2,404,201 Conservation 1,068,733 1,111,482 1,155,942 1,202,179 1,250,266 1,300,277 1,352,288 1,406,380 1,462,635 1,521,140 1,581,986 Electric Operations 8,951,943 10,294,734 10,706,524 11,134,785 11,580,176 12,043,383 12,525,119 13,026,123 13,547,168 14,089,055 14,652,617 Information Technology(IT) 1,928,360 1,928,360 2,005,494 2,085,714 2,169,143 2,255,908 2,346,145 2,439,991 2,537,590 2,639,094 2,744,658 UAMPS-Energy 15,901,420 14,371,223 14,701,369 15,036,700 15,945,637 16,909,537 17,755,014 18,642,765 19,574,903 20,553,648 21,581,331 NV Energy-Transmission 1,153,084 755,971 801,707 850,211 901,649 956,198 1,004,008 1,054,209 1,106,919 1,162,265 1,220,378 Building Maintenance 866,381 863,348 897,882 933,797 971,149 1,009,995 1,050,395 1,092,411 1,136,107 1,181,551 1,228,813 Additional Future O&M 0 0 0 0 0 0 0 0 0 0 0 Total Operations&Maintenance $33,497,420 $33,362,804 $34,467,072 $35,609,465 $37,358,742 $39,197,650 $40,944,214 $42,769,572 $44,677,325 $46,672,236 $48,755,245 Taxes&Transfers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Debt Service 431,931 429,181 431,181 1,882,681 1,878,681 1,879,431 1,879,681 1,879,431 1,878,681 1,882,431 1,880,431 Rate Funded Capital 6,703,300 8,010,000 9,087,000 9,800,000 10,600,000 11,400,000 12,300,000 13,300,000 14,400,000 15,600,000 16,800,000 To/(From)Reserves 3,039,823 4,318,136 4,886,284 3,979,043 3,960,203 3,443,448 3,004,440 2,475,519 1,856,046 1,134,384 427,673 Total Revenue Requirement $43,672,474 $46,119,121 $48,871,537 $51,271,189 $53,797,626 $55,920,530 $58,128,335 $60,424,522 $62,812,052 $65,288,052 $67,863,349 Net Bal./(Def.)Before Rate Adj. ($2,677) ($2,137,477) ($4,422,064) ($6,385,644) ($8,465,019) ($10,136,660) ($11,888,559) ($13,724,106) ($15,646,669) ($17,659,847) ($19,767,552) Bal.as a%of Rate Rev 0.0% 5.0% 10.3% 14.7% 19.3% 22.8% 26.5% 30.3% 34.2% 38.2% 42.4% Proposed Rate Adjustment 0.0% 5.0% 5.0% 4.0% 4.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Add'I Revenue from Rate Adj. $0 $2,134,639 $4,419,056 $6,382,486 $8,461,703 $10,133,212 $11,884,973 $13,720,378 $15,642,792 $17,655,815 $19,763,359 Bal/(Def.)of Funds After Adj. ($2,677) ($2,838) ($3,008) ($3,158) ($3,316) ($3,448) ($3,586) ($3,729) ($3,878) ($4,032) ($4,193) Bal./(Def.)as a%of Rate Rev After Adj. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Debt Service Coverage Ratio DSC Before Rate Adj. 23.55 24.74 23.15 4.93 4.24 3.50 2.82 2.09 1.32 0.51 0.00 DSC After Rate Adj. 23.55 29.72 33.40 8.32 8.75 8.90 9.14 9.39 9.65 9.89 10.16 Average Monthly Residential Bill(800 KWh) $179.89 Rate After Adjustment $179.89 $188.88 $198.33 $206.26 $214.51 $220.95 $227.58 $234.40 $241.44 $248.68 $256.14 Annual Adjustment $8.99 $9.44 $7.93 $8.25 $6.44 $6.63 $6.83 $7.03 $7.24 $7.46 Cumulative Adjustment $8.99 $18.44 $26.37 $34.62 $41.06 $47.69 $54.51 $61.55 $68.79 $76.25 Total Ending Fund Balance/Reserves $34,732,921 $30,807,419 $32,384,137 $33,791,385 $37,052,010 $39,031,406 $42,843,304 $45,796,858 $48,576,947 $51,052,132 $52,853,413 9/12/2025 Draft Truckee Donner PUD Page 230 of 241 Truckee Donner PUD Page 1 of 1 Electric Rate Study Revenue Requirement Exhibit 2-Escalation Factors Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Revenue Customer Growth 0.5% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% Demand Growth 0.5% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% Renewable Energy Credit Growth 0.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% Interest Income 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% Misc.Income Budget 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% Flat 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Expenses Labor&Benenfits Budget 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% Repair&Maintenance Budget 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% Materials&Supplies Budget 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% UAMPS Rate 3.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% NV Energy Rate 3.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% Purchased Power-UAMPS 3.5% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Purchased Power-NV Energy 3.5% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Utilities Budget 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% Miscellaneous Budget 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% New Debt Service Assumptions Revenue Bond Term(Years) 20 20 20 20 20 20 20 20 20 20 20 Rate 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% Low Interest Loan Term(Year) 20 20 20 20 20 20 20 20 20 20 20 Rate 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 9/12/2025 Draft Truckee Donner PUD Page 231 of 241 Truckee Donner PUD Electric Rate Study Page 1 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Revenue Rate Revenue Permanent Residents $10,471,007 $10,577,345 $10,683,201 $10,789,920 $10,897,880 $11,006,720 $11,116,818 $11,227,814 $11,340,086 $11,453,275 $11,567,757 Calculated on CustData Tab Non-Permanent Residents 12,718,896 12,845,977 12,974,219 13,103,817 13,234,781 13,367,122 13,500,848 13,635,971 13,772,131 13,909,708 14,048,713 Calculated on CustData Tab Small Commercial(<50 kW) 7,649,878 7,726,700 7,803,686 7,881,368 7,959,751 8,038,844 8,118,653 8,199,683 8,281,444 8,363,943 8,447,187 Calculated on CustData Tab Medium Commercial(>50 kW<200 kW) 4,666,778 4,712,646 4,756,903 4,801,599 4,846,739 4,892,324 4,938,397 4,984,904 5,031,887 5,079,329 5,127,253 Calculated on CustData Tab Large Commercial(>200 kW) 5,575,880 5,616,815 5,670,260 5,724,263 5,778,791 5,833,867 5,889,512 5,945,695 6,002,455 6,059,780 6,117,672 Calculated on CustData Tab EV 1,202,237 1,213,302 1,224,468 1,235,773 1,247,179 1,258,706 1,270,335 1,282,087 1,293,943 1,305,922 1,318,026 Calculated on CustData Tab ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- Total Rate Revenue $42,284,677 $42,692,785 $43,112,738 $43,536,740 $43,965,121 $44,397,582 $44,834,564 $45,276,154 $45,721,947 $46,171,957 $46,626,609 Miscellaneous Revenue Late Charges $72,037 $72,757 $73,485 $74,220 $74,962 $75,712 $76,469 $77,233 $78,006 $78,786 $79,574 As Misc.Income Trip Charges/Misc/Int 3,179 3,211 3,243 3,275 3,308 3,341 3,375 3,408 3,442 3,477 3,512 As Misc.Income Return Check Charges 3,593 3,629 3,665 3,702 3,739 3,776 3,814 3,852 3,891 3,930 3,969 As Misc.Income Fees for Changing&Connecting Service 69,269 69,962 70,661 71,368 72,082 72,802 73,530 74,266 75,008 75,758 76,516 As Misc.Income Other Electric Revenues-Miscellaneous 6,096 6,157 6,219 6,281 6,344 6,407 6,471 6,536 6,601 6,667 6,734 As Misc.Income Misc Op Revenue-Cal Card Rebate 1,044 1,054 1,065 1,076 1,086 1,097 1,108 1,119 1,131 1,142 1,153 As Misc.Income As built fee 1,012 1,022 1,032 1,043 1,053 1,064 1,074 1,085 1,096 1,107 1,118 As Misc.Income Misc Operating Revenue-SEEA Admin Fee 3,036 3,066 3,097 3,128 3,159 3,191 3,223 3,255 3,288 3,320 3,354 As Misc.Income Timber Sales 1,634 1,650 1,667 1,684 1,700 1,717 1,735 1,752 1,769 1,787 1,805 As Misc.Income Pole Replacements and Contacts 420,000 400,000 420,000 424,200 428,442 432,726 437,054 441,424 445,838 450,297 454,800 As Misc.Income Standby Funds-Nevada County 14,600 14,746 14,893 15,042 15,193 15,345 15,498 15,653 15,810 15,968 16,127 As Misc.Income Standby Funds-Placer County 400 404 408 412 416 420 425 429 433 437 442 As Misc.Income Interdepartmental Rent (separate calc) 607,500 581,400 607,500 613,575 619,711 625,908 632,167 638,489 644,873 651,322 657,835 As Misc.Income Facility Fees 181,720 129,800 129,800 129,800 136,290 142,780 149,270 155,760 162,250 162,250 162,250 Total Miscellaneous Revenue $1,385,120 $1,288,859 $1,336,736 $1,348,805 $1,367,485 $1,386,287 $1,405,212 $1,424,261 $1,443,436 $1,456,248 $1,469,188 Total Revenue $43,669,797 $43,981,644 $44,449,473 $44,885,545 $45,332,606 $45,783,869 $46,239,776 $46,700,416 $47,165,383 $47,628,205 $48,095,798 9/12/2025 Draft Truckee Donner PUD Page 232 of 241 Truckee Donner PUD Electric Rate Study Page 2 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Operating Expenses Board of Directors Outside Service Employed $160,000 $166,400 $173,056 $179,978 $187,177 $194,664 $202,451 $210,549 $218,971 $227,730 $236,839 As Labor&Benenfits Miscellaneous General Expenses 192,767 200,478 208,497 216,837 225,510 234,531 243,912 253,668 263,815 274,368 285,342 As Miscellaneous --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Board of Directors $352,767 $366,878 $381,553 $396,815 $412,687 $429,195 $446,363 $464,217 $482,786 $502,097 $522,181 General Management Public Information $151,845 $182,214 $189,503 $197,083 $204,966 $213,165 $221,691 $230,559 $239,781 $249,372 $259,347 As Materials&Supplies Legislature&Regulations 0 0 0 0 0 0 0 0 0 0 0 As Miscellaneous Admin&General-Salaries 746,922 896,306 932,159 969,445 1,008,223 1,048,552 1,090,494 1,134,114 1,179,478 1,226,657 1,275,723 As Labor&Benenfits Office Supplies&Expenses 105,055 126,066 131,109 136,353 141,807 147,479 153,379 159,514 165,894 172,530 179,431 As Materials&Supplies Outside Service Employed 204,660 245,592 255,416 265,632 276,258 287,308 298,800 310,752 323,182 336,110 349,554 As Labor&Benenfits Injuries&Damages 324,148 388,978 404,537 420,718 437,547 455,049 473,251 492,181 511,868 532,343 553,636 As Labor&Benenfits General Advertising Expenses 117,910 141,492 147,152 153,038 159,159 165,526 172,147 179,033 186,194 193,642 201,387 As Materials&Supplies Misc.General Expenses 0 0 0 0 0 0 0 0 0 0 0 As Miscellaneous --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total General Management $1,650,540 $1,980,648 $2,059,874 $2,142,269 $2,227,960 $2,317,078 $2,409,761 $2,506,152 $2,606,398 $2,710,654 $2,819,080 Administrative Services Meters/Services Operation Expenses $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 As Repair&Maintenance Customer Installation Expense 0 0 0 0 0 0 0 0 0 0 0 As Repair&Maintenance Customer Account Op.Exp.-Salaries 179,057 186,219 193,668 201,415 209,471 217,850 226,564 235,627 245,052 254,854 265,048 As Labor&Benenfits Meter Reading Expense 9,270 9,641 10,026 10,427 10,845 11,278 11,730 12,199 12,687 13,194 13,722 As Miscellaneous Customer Records&Collections Exp. 622,869 647,784 673,695 700,643 728,669 757,815 788,128 819,653 852,439 886,537 921,998 As Materials&Supplies Cust.Records&Collections-Meter Readers 13,222 13,751 14,301 14,873 15,468 16,087 16,730 17,399 18,095 18,819 19,572 As Materials&Supplies Provision for Bad Debts 12,275 12,766 13,277 13,808 14,360 14,934 15,532 16,153 16,799 17,471 18,170 As Miscellaneous Admin&Operations Gen-Salaries 393,686 409,433 425,811 442,843 460,557 478,979 498,138 518,064 538,786 560,338 582,751 As Labor&Benenfits Office Supplies&Expenses 99,141 103,107 107,231 111,520 115,981 120,620 125,445 130,463 135,681 141,109 146,753 As Materials&Supplies Outside Services Employed 42,767 44,478 46,257 48,107 50,031 52,033 54,114 56,278 58,530 60,871 63,306 As Labor&Benenfits Insurance 220,195 229,003 238,163 247,689 257,597 267,901 278,617 289,762 301,352 313,406 325,942 As Miscellaneous Injuries&Damages(Safety) 31,710 32,978 34,298 35,669 37,096 38,580 40,123 41,728 43,397 45,133 46,939 As Labor&Benenfits --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Administrative Services $1,624,192 $1,689,160 $1,756,726 $1,826,995 $1,900,075 $1,976,078 $2,055,121 $2,137,326 $2,222,819 $2,311,732 $2,404,201 9/12/2025 Draft Truckee Donner PUD Page 233 of 241 Truckee Donner PUD Electric Rate Study Page 3 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Conservation PBC-Residential $277,285 $288,376 $299,911 $311,908 $324,384 $337,360 $350,854 $364,888 $379,484 $394,663 $410,450 As Materials&Supplies PBC-Commercial $240,401 250,017 260,018 270,418 281,235 292,485 304,184 316,351 329,005 342,166 355,852 As Materials&Supplies PBC-Education&Outreach 41,326 42,979 44,698 46,486 48,346 50,279 52,291 54,382 56,557 58,820 61,173 As Materials&Supplies PBC-Income-Qualified 52,429 54,526 56,707 58,975 61,335 63,788 66,339 68,993 71,753 74,623 77,608 As Materials&Supplies PBC-Research&Development 140,366 145,981 151,820 157,893 164,208 170,777 177,608 184,712 192,101 199,785 207,776 As Materials&Supplies PBC-Renewables 165,000 171,600 178,464 185,603 193,027 200,748 208,778 217,129 225,814 234,846 244,240 As Materials&Supplies LCFS:Residential 37,272 38,763 40,313 41,926 43,603 45,347 47,161 49,047 51,009 53,050 55,172 As Labor&Benenfits LCFS:Commercial 33,003 34,323 35,696 37,124 38,609 40,153 41,759 43,430 45,167 46,974 48,853 As Materials&Supplies LCFS:Income Qualified 30,179 31,386 32,642 33,947 35,305 36,717 38,186 39,714 41,302 42,954 44,672 As Materials&Supplies Admin&Operations Gen-Salaries 26,577 27,640 28,746 29,896 31,091 32,335 33,628 34,974 36,372 37,827 39,340 As Materials&Supplies Office Supplies&Expenses 22,155 23,041 23,963 24,921 25,918 26,955 28,033 29,154 30,321 31,533 32,795 As Materials&Supplies Injuries&Damages(Safety) 2,740 2,850 2,964 3,082 3,205 3,334 3,467 3,606 3,750 3,900 4,056 As Materials&Supplies --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Conservation $1,068,733 $1,111,482 $1,155,942 $1,202,179 $2,250,266 $1,300,277 $1,352,288 $1,406,380 $2,462,635 $1,521,140 $1,581,986 Electric Operations Operations/PM Sup&Engineering $1,238,327 $1,424,076 $1,481,039 $1,540,281 $1,601,892 $1,665,968 $1,732,606 $1,801,911 $1,873,987 $1,948,946 $2,026,904 As Materials&Supplies Substation Operations/PM 480,107 552,123 574,208 597,176 621,063 645,906 671,742 698,612 726,556 755,619 785,843 As Materials&Supplies Distribution Operations/PM 3,448,266 3,965,506 4,124,126 4,289,091 4,460,655 4,639,081 4,824,644 5,017,630 5,218,335 5,427,069 5,644,151 As Materials&Supplies Security/Street Light Operations/PM 0 0 0 0 0 0 0 0 0 0 0 As Materials&Supplies Meter Operations/PM 267,013 307,065 319,348 332,121 345,406 359,223 373,591 388,535 404,077 420,240 437,049 As Materials&Supplies Customer Installation Operations/PM 143,154 164,627 171,212 178,061 185,183 192,590 200,294 208,306 216,638 225,304 234,316 As Labor&Benenfits Misc.General Operations/PM 846,956 973,999 1,012,959 1,053,478 1,095,617 1,139,442 1,185,019 1,232,420 1,281,717 1,332,985 1,386,305 As Materials&Supplies Maintenance of Station Equipment 0 0 0 0 0 0 0 0 0 0 0 As Materials&Supplies Maintenance of Distribution Lines 1,651,477 1,899,199 1,975,166 2,054,173 2,136,340 2,221,794 2,310,665 2,403,092 2,499,216 2,599,184 2,703,152 As Miscellaneous Maintenance of Security/Street Lights 0 0 0 0 0 0 0 0 0 0 0 As Miscellaneous Professional Services-Rate Case Costs 376,980 433,527 450,868 468,903 487,659 507,165 527,452 548,550 570,492 593,312 617,044 As Miscellaneous Injuries&Damages(Safety) 334,458 384,627 400,012 416,012 432,653 449,959 467,957 486,675 506,142 526,388 547,444 As Miscellaneous Regulatory Commission Expense 165,205 189,986 197,585 205,489 213,708 222,256 231,147 240,393 250,008 260,009 270,409 As Miscellaneous --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Electric Operations $8,951,943 $10,294,734 $10,706,524 $11,134,785 $11,580,176 $12,043,383 $12,525,119 $13,026,123 $13,547,168 $14,089,055 $14,652,617 9/12/2025 Draft Truckee Donner PUD Page 234 of 241 Truckee Donner PUD Electric Rate Study Page 4 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Information Technology(IT) Engineering&SCADA Operations $213,674 $213,674 $222,221 $231,110 $240,354 $249,968 $259,967 $270,366 $281,180 $292,428 $304,125 As Materials&Supplies GIS/Engineering Operations 308,833 308,833 321,186 334,034 347,395 361,291 375,743 390,772 406,403 422,659 439,566 As Materials&Supplies Meter Reading 157,789 157,789 164,101 170,665 177,491 184,591 191,974 199,653 207,640 215,945 224,583 As Materials&Supplies Customer Records 203,385 203,385 211,520 219,981 228,780 237,932 247,449 257,347 267,641 278,346 289,480 As Materials&Supplies Administrative&General IT Ops 957,580 957,580 995,883 1,035,719 1,077,147 1,120,233 1,165,042 1,211,644 1,260,110 1,310,514 1,362,935 As Materials&Supplies Office Supplies&Expenses 38,563 38,563 40,106 41,710 43,378 45,113 46,918 48,794 50,746 52,776 54,887 As Labor&Benenfits Outside Services Employed 25,750 25,750 26,780 27,851 28,965 30,124 31,329 32,582 33,885 35,241 36,650 As Materials&Supplies Safety 22,786 22,786 23,697 24,645 25,631 26,656 27,723 28,832 29,985 31,184 32,432 As Materials&Supplies --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Information Technology(IT) $1,928,360 $1,928,360 $2,005,494 $2,085,714 $2,169,143 $2,255,908 $2,346,145 $2,439,991 $2,537,590 $2,639,094 $2,744,658 Purchased Power UAMPS-Energy $15,901,420 $14,371,223 $14,701,369 $15,036,700 $15,945,637 $16,909,537 $17,755,014 $18,642,765 $19,574,903 $20,553,648 $21,581,331 As Purchased Power-UAMPS NV Energy-Transmission 1,153,084 755,971 801,707 850,211 901,649 956,198 1,004,008 1,054,209 1,106,919 1,162,265 1,220,378 As Purchased Power-NV Energy --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Purchased Power $17,054,504 $15,127,194 $15,503,077 $15,886,911 $16,847,285 $17,865,735 $18,759,022 $19,696,973 $20,681,822 $21,715,913 $22,801,709 -11.3% 2.5% 2.5% 6.0% 6.0% 5.0% 5.0% 5.0% 5.0% 5.0% Building Maintenance $866,381 $863,348 $897,882 $933,797 $971,149 $1,009,995 $1,050,395 $1,092,411 $1,136,107 $1,181,551 $1,228,813 As Miscellaneous $15,127,194 $15,503,077 $15,886,911 $16,847,285 $17,865,735 Additional Future O&M Tree Trimming $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 As Repair&Maintenance -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- -------------- Total Additional Future O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Operation&Maintenance $33,497,420 $33,361,804 $34,467,071 $35,609,465 $37,358,742 $39,197,650 $40,944,214 $42,769,572 $44,677,325 $46,671,236 $48,755,245 -0.4% 3.3% 3.3% 4.9% 4.9% 4.5% 4.5% 4.5% 4.5% 4.5% Taxes&Transfers From Overhead to Pay CAPERS $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 As Misc.Income --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- --------------- Total Taxes&Transfers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Debt Service Principal $155,000 $160,000 $170,000 $180,000 $185,000 $195,000 $205,000 $215,000 $225,000 $240,000 $250,000 Debt Schedule Interest 276,931 269,181 261,181 252,681 243,681 234,431 224,681 214,431 203,681 192,431 180,431 Debt Schedule HQ Debt Service 0 0 0 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 New Low Interest Loan 0 0 0 0 0 0 0 0 0 0 0 Calc @ 2.5%for 20 Yrs New Revenue Bond 0 0 0 0 0 0 0 0 0 0 0 Calc @ 5%for 20 Yrs --------------- --------------- -------------- --------------- --------------- --------------- Total Debt Service $431,931 $429,181 $431,181 $1,882,681 $1,878,681 $1,879,431 $1,879,681 $1,879,431 $1,878,681 $1,882,431 $1,880,431 9/12/2025 Draft Truckee Donner PUD Page 235 of 241 Truckee Donner PUD Electric Rate Study Page 5 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Rate Funded Capital $6,703,300 $8,010,000 $9,087,000 $9,800,000 $10,600,000 $11,400,000 $12,300,000 $13,300,000 $14,400,000 $15,600,000 $16,800,000 2024 Depr._$3,507,341 To/(From)Reserves To/(From)0&M Fund ($156,897) ($550,664) ($120,516) $1,373,243 $1,200,913 $1,826,668 $2,356,170 $1,795,759 $993,796 $272,134 ($434,577) To/(From)Capital Fund 2,000,000 4,000,000 4,000,000 1,500,000 2,000,000 1,000,000 0 0 0 0 0 To/(From)Facility Fee Fund 181,720 129,800 129,800 129,800 136,290 142,780 149,270 155,760 162,250 162,250 162,250 To/(From)Vehicle Reserve Fund 925,000 588,000 676,000 777,000 800,000 824,000 849,000 874,000 900,000 900,000 900,000 To/(From)Rate Reserve Fund 540,000 551,000 551,000 549,000 173,000 0 0 0 150,000 150,000 150,000 To/(From)Unfunded Liability 0 0 0 0 0 0 0 0 0 0 0 To/(From)AB 32 (450,000) (400,000) (350,000) (350,000) (350,000) (350,000) (350,000) (350,000) (350,000) (350,000) (350,000) --------------- --------------- --------------- --------------- --------------- ------------- -- --------------- --------------- --------------- Total To/(From)Reserves $3,039,823 $4,318,136 $4,886,284 $3,979,043 $3,960,203 $3,443,448 $3,004,440 $2,475,519 $1,856,046 $1,134,384 $427,673 Revenue Requirement $43,672,474 $46,119,121 $48,871,537 $51,271,289 $53,797,626 $55,920,530 $58,128,335 $60,424,522 $62,812,052 $65,288,052 $67,863,349 5.6% 6.0% 4.9% 4.9% 3.9% 3.9% 4.0% 4.0% 3.9% 3.9% Balance(Deficiency)of Funds ($2,677) ($2,137,477) ($4,422,064) ($6,385,644) ($8,465,019) ($10,136,660) ($11,888,559) ($13,724,106) ($15,646,669) ($17,659,847) ($19,767,552) ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- Net Bal./(Def.)Before Rate Adj. ($2,677) ($2,137,477) ($4,422,064) ($6,385,644) ($8,465,019) ($10,136,660) ($11,888,559) ($13,724,106) ($15,646,669) ($17,659,847) ($19,767,552) Bal.as a%of Rate Rev 0.0% 5.0% 10.3% 14.7% 19.3% 22.8% 26.5% 30.3% 34.2% 38.2% 42.4% Proposed Rate Adjustment 0.00% 5.00% 5.00% 4.00% 4.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% Add'I Revenue from Rate Adj. $0 $2,134,639 $4,419,056 $6,382,486 $8,461,703 $10,133,212 $11,884,973 $13,720,378 $15,642,792 $17,655,815 $19,763,359 Bal/(Def.)of Funds After Adj. ($2,677) ($2,838) ($3,008) ($3,158) ($3,316) ($3,448) ($3,586) ($3,729) ($3,878) ($4,032) ($4,193) Bal./(Def.)as a%of Rate Rev After Adj. 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Debt Service Coverage Ratio DSC Before Rate Adj. 23.55 24.74 23.15 4.93 4.24 3.50 2.82 2.09 1.32 0.51 0.00 DSC After Rate Adj. 23.55 29.72 33.40 8.32 8.75 8.90 9.14 9.39 9.65 9.89 10.16 Average Monthly Residential Bill(800 KWh) $179.89 Rate After Adjustment $179.89 $188.88 $198.33 $206.26 $214.51 $220.95 $227.58 $234.40 $241.44 $248.68 $256.14 Annual Adjustment 0.00 8.99 9.44 7.93 8.25 6.44 6.63 6.83 7.03 7.24 7.46 Cumulative Adjustment 0.00 8.99 18.44 26.37 34.62 41.06 47.69 54.51 61.55 68.79 76.25 9/12/2025 Draft Truckee Donner PUD Page 236 of 241 Truckee Donner PUD Electric Rate Study Page 6 of 6 Revenue Requirement Exhibit 3-Sources&Application of Funds Budgeted I Projected FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Operating Reserve Fund Beginning Balance $10,674,399 $10,517,502 $10,200,000 $10,324,476 $11,901,051 $13,336,668 $15,426,621 $18,087,737 $20,241,522 $21,636,271 $22,337,099 Addition of Funds 0 0 0 1,370,085 1,197,596 1,823,220 2,352,584 1,792,030 989,919 268,102 0 Use of Funds (156,897) (553,502) (123,524) 0 0 0 0 0 0 0 (438,770) Interest Earnings 0 236,000 248,000 206,490 238,021 266,733 308,532 361,755 404,830 432,725 446,742 Ending Balance $10,517,502 $10,200,000 $10,324,476 $11,901,051 $13,336,668 $15,426,621 $18,087,737 $20,241,522 $21,636,271 $22,337,099 $22,345,071 180 Days of O&M Excluding Purchased Power $8,108,835 $8,992,410 $9,352,107 $9,726,191 $10,115,239 $10,519,848 $10,940,642 $11,378,268 $11,833,399 $12,306,735 $12,799,004 ($4,906,773) 1,207,590 972,369 2,174,859 3,221,429 4,906,773 7,147,095 8,863,254 9,802,872 10,030,364 9,546,067 Capital Replacement Fund Beginning Balance $11,009,923 $13,009,923 $8,691,462 $10,352,206 $8,802,772 $10,236,855 $8,953,960 $9,122,579 $9,296,256 $9,475,144 $9,659,398 Addition of Funds 2,000,000 4,000,000 4,000,000 2,240,000 3,270,000 1,000,000 0 0 0 0 0 Use of Funds 0 (8,665,000) (2,600,000) (4,100,000) (2,100,000) (2,590,001) (100,000) (100,000) (100,000) (100,000) (100,000) Interest Earnings 346,539 260,744 310,566 264,083 307,106 268,619 273,677 278,888 284,254 289,782 Ending Balance $13,009,923 $8,691,462 $10,352,206 $8,802,772 $10,236,855 $8,953,960 $9,122,579 $9,296,256 $9,475,144 $9,659,398 $9,849,180 Annual Depreciation $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 Facility Fee Fund Beginning Balance $653,845 $835,565 $965,365 $1,095,165 $1,224,965 $1,361,255 $1,504,035 $1,653,305 $1,809,065 $1,971,315 $2,133,565 Addition of Funds 181,720 129,800 129,800 129,800 136,290 142,780 149,270 155,760 162,250 162,250 162,250 Use of Funds 0 0 0 0 0 0 0 0 0 0 0 Ending Balance $835,565 $965,365 $1,095,165 $1,224,965 $2,362,255 $1,504,035 $1,653,305 $1,809,065 $1,971,315 $2,133,565 $2,295,815 Vehicle Reserve Beginning Balance $2,084,418 $1,675,168 $2,524,943 $383,828 $810,738 $594,774 $1,314,115 $1,828,984 $1,973,252 $2,533,108 $3,463,584 Addition of Funds 925,000 588,000 676,000 777,000 800,000 824,000 849,000 874,000 900,000 900,000 900,000 Fund From Trade in of Vehicles 35,250 16,450 20,885 29,035 18,020 15,045 27,825 23,900 30,475 30,476 30,477 Use of Funds (1,369,500) (754,675) (1,838,000) (379,125) (1,033,984) (119,704) (361,956) (753,632) (370,619) 0 0 Ending Balance $1,675,168 $1,524,943 $383,828 $810,738 $594,774 $1,314,115 $1,828,984 $1,973,252 $2,533,108 $3,463,584 $4,394,061 9/12/2025 Draft Truckee Donner PUD Page 237 of 241 Truckee Donner PUD Electric Rate Study Page 1 of 2 Revenue Requirement Exhibit 5-Capital Improvement Plan FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Emergency Storm Damage,Car v.Poles/padmounted equipment,etc. $150,000 $154,500 $159,135 $163,909 $168,826 $173,891 $179,108 $184,481 $190,016 $195,716 Planned Pole Replacements Pole Replacements 100,000 103,000 106,090 109,273 112,551 115,927 119,405 122,987 126,677 130,477 System Reliability/Capacity/Wildfire Mitigation Rebuild and Hardening of 6 miles of OH per year 6,000,000 6,180,000 6,365,400 6,556,362 6,753,053 6,955,644 7,164,314 7,379,243 7,600,620 7,828,639 System Reliability/RegulatoryCompliance 0 1,053,001 1,776,000 2,591,001 3,496,999 6,384,000 Capital Maintenance&System Upgrades Protection Device Upgrades 300,000 500,000 515,000 530,450 546,364 562,754 579,637 597,026 614,937 633,385 Major Projects Freeway,River,Railroad Crossing Rebuilds 100,000 300,000 0 0 300,000 309,000 318,270 327,818 337,653 347,782 Battery Energy Storage System 0 0 2,000,000 2,000,000 0 0 0 0 0 0 Mantis Valley Substation Rebuild 2026 Scope of Rebuild Project 3,000,000 0 0 0 0 0 0 0 0 0 SCADA&Grid Technology Pole Line Sensors 1,000,000 1,030,000 1,060,900 1,092,727 1,125,509 220,000 226,600 233,398 240,400 247,612 New Business/Joint Projects Town of Truckee School St.E St.Undergrounding 50,000 500,000 515,000 530,450 546,364 562,754 579,637 597,026 614,937 633,385 Capital Equipment/Tools Procurement of specialized tools or tools over$30k 50,000 51,500 53,045 54,636 56,275 57,964 59,703 61,494 63,339 65,239 Meter Replacement&AMI Upgrades Annual Meter Replacement Costs 10,000 10,000 20,000 20,000 0 0 0 0 0 10,000 AMI Meter Replacements Beginning in 2030 0 0 0 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 0 SCADA Reliability Improvement Projects-Fiber SCADA Reliability Improvement Projects-Fiber 2,750,000 0 2,000,000 0 2,000,000 0 0 0 0 0 Contingency Contingency 250,000 258,000 265,430 272,193 281,059 289,065 297,326 305,526 314,422 323,765 District Building/Land District Building EV Charging Infrastructure Upgrades 300,000 0 0 0 0 0 0 0 0 0 District Building Tire Storage Unit with Racking 15,000 0 0 0 0 0 0 0 0 0 District Building Other/Contingency 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 Land/Building(Capital Reserve) 2,500,000 2,500,000 0 0 0 0 0 0 0 0 Misc. Information Technology Projects 740,000 519,000 262,000 183,000 474,000 335,000 266,000 187,000 491,000 315,000 Vehicle Reserves Expenditures 754,675 1,838,000 379,125 1,033,984 119,704 361,956 753,632 370,619 481,176 356,817 Total Electric Capital Projects $13,203,300 $18,169,675 $14,044,000 $13,801,225 $12,646,984 $14,583,705 $13,096,956 $14,419,632 $15,057,619 $16,672,176 $17,571,817 Transfer to Capital Reserve $0 $0 $0 $740,000 $1,270,000 $0 $0 $0 $0 $0 $0 0 Less:Uncompleted Capital Projects $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Capital Improvements $13,203,300 $18,169,675 $14,044,000 $14,541,125 $13,916,984 $14,583,705 $13,096,956 $14,419,632 $15,057,619 $16,672,176 $17,571,817 9/12/2025 Draft Truckee Donner PUD Page 238 of 241 Truckee Donner PUD Electric Rate Study Page 2 of 2 Revenue Requirement Exhibit 5-Capital Improvement Plan FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 Notes Funding Sources Operating Reserve $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Sum OR Debt Proceeds 6,500,000 0 0 0 0 0 0 0 0 0 0 Capital Reserve 0 8,665,000 2,600,000 4,100,000 2,100,000 2,590,001 100,000 100,000 100,000 100,000 100,000 Sum CR Information Technology 0 740,000 519,000 262,000 183,000 474,000 335,000 266,000 187,000 491,000 315,000 Vehicle Reserve 0 754,675 1,838,000 379,125 1,033,984 119,704 361,956 753,632 370,619 481,176 356,817 Facility Fees 0 0 0 0 0 0 0 0 0 0 0 Grants 0 0 0 0 0 0 0 0 0 0 0 Existing Debt Proceeds 0 0 0 0 0 0 0 0 0 0 0 New Revenue Bond 0 0 0 0 0 0 0 0 0 0 0 New Low Interest Loan 0 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources $6,500,000 $10,159,675 $4,957,000 $4,741,125 $3,316,984 $3,183,705 $796,956 $1,119,632 $657,619 $1,072,176 $771,817 Rate Funded Capital $6,703,300 $8,010,000 $9,087,000 $9,800,000 $10,600,000 $11,400,000 $12,300,000 $13,300,000 $14,400,000 $15,600,000 $16,800,000 9/12/2025 Draft Truckee Donner PUD Page 239 of 241 Present Rates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Proposed Rate Adj. Jan 1,2025 6.0% 5.0% 4.0% 4.0% 3.0% Permanent Residents Customer Charge$/Mo. $30.77 $32.62 $34.25 $35.62 $37.04 $38.15 Energy Charge$/kWh $0.186 $0.198 $0.207 $0.216 $0.224 $0.231 Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.261 $0.276 $0.290 $0.302 $0.314 $0.323 11:01am-4:OOpm Mid-Peak 0.132 0.140 0.147 0.153 0.159 0.164 9:01pm-11:OOam Off-Peak 0.132 0.140 0.147 0.153 0.159 0.164 Non-Permanent Residents Customer Charge$/Mo. $30.77 $32.62 $34.25 $35.62 $37.04 $38.15 Energy Charge$/kWh $0.212 $0.225 $0.236 $0.245 $0.255 $0.263 Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.332 $0.352 $0.369 $0.384 $0.399 $0.408 11:01am-4:OOpm Mid-Peak 0.168 0.178 0.187 0.195 0.202 0.206 9:01pm-11:OOam Off-Peak 0.168 0.178 0.187 0.195 0.202 0.206 Customer Generator 1 Customer Charge$/Mo. $32.616 $34.25 $35.62 $37.04 $38.15 Import-Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.276 $0.290 $0.302 $0.314 $0.323 11:01am-4:OOpm Mid-Peak $0.140 $0.147 $0.153 $0.159 $0.164 9:01pm-11:OOam Off-Peak $0.140 $0.147 $0.153 $0.159 $0.164 Export-Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.147 $0.154 $0.160 $0.166 $0.171 11:01am-4:OOpm Mid-Peak $0.085 $0.089 $0.093 $0.096 $0.099 9:01pm-11:OOam Off-Peak $0.085 $0.089 $0.093 $0.096 $0.099 Customer Generator 2 Customer Charge$/Mo. $51.17 $53.72 $55.87 $58.11 $59.85 Import-Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.221 $0.232 $0.241 $0.251 $0.258 11:01am-4:OOpm Mid-Peak $0.147 $0.154 $0.160 $0.166 $0.171 9:01pm-11:OOam Off-Peak $0.147 $0.154 $0.160 $0.166 $0.171 Export-Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.293 $0.308 $0.320 $0.333 $0.343 11:01am-4:OOpm Mid-Peak $0.085 $0.089 $0.093 $0.096 $0.099 9:01pm-11:OOam Off-Peak $0.085 $0.089 $0.093 $0.096 $0.099 9/12/2025 Draft Truckee Donner PUD Page 240 of 241 Truckee Donner PUD Page 2 of 2 Electric Rate Study Rate Design Exhibit 23-Summary of Rate Design Present Rates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Proposed Rate Adj. Jan 1,2025 4.0% 5.0% 4.0% 4.0% 3.0% Small Commercial Customer Charge$/Mo. $41.47 $43.13 $45.29 $47.10 $48.98 $50.45 Energy Charge$/kWh $0.236 $0.246 $0.258 $0.268 $0.279 $0.287 Medium Commercial Customer Charge$/Mo. 342.25 $355.94 $373.74 $388.69 $404.23 $416.36 Energy Charge$/kWh $0.1577 $0.1640 $0.1722 $0.1791 $0.1863 $0.1918 Demand Charge$/kW $18.73 $19.48 $20.45 $21.27 $22.12 $22.79 Large Commercial Customer Charge$/Mo. $1,501.25 $1,561.30 $1,639.37 $1,704.94 $1,773.14 $1,826.33 Energy Charge$/kWh $0.168 $0.175 $0.184 $0.191 $0.199 $0.205 Demand Charge$/kW $18.07 $18.79 $19.73 $20.52 $21.34 $21.98 Commercial EV Charging Customer Charge$/Mo. Small Com. 15 $43.96 $46.16 $48.00 $49.92 $51.42 Medium Com.20 362.79 380.92 396.16 412.01 424.37 Large Com.25 1,591.33 1,670.89 1,737.73 1,807.24 1,861.45 Demand Charge$/kW $19.19 $20.15 $20.96 $21.79 $22.45 Time of Use-Energy Charge$/kWh 4:01pm-9:OOpm Peak $0.250 $0.263 $0.273 $0.284 $0.293 11:01am-4:OOpm Mid-Peak 0.140 0.147 0.153 0.159 0.164 9:01pm-11:OOam Off-Peak 0.140 0.147 0.153 0.159 0.164 9/12/2025 Draft Truckee Donner PUD Page 241 of 241