Loading...
HomeMy WebLinkAbout7 Surveying Glenshire Drive iTRUCKEE DONNER Public Memorandum To: Board of Directors From: Neil Kaufman, Water Systems Engineer Date: April 24, 2002 Subject: Surveying for Glenshire Drive Pipeline East of the Glenshire Drive Bridge BACKGROUND: As part of the consolidation of the TDPUD and Glenshire Mutual water system, it is necessary to construct a pipeline to provide additional water supply to the Glenshire area. For design purpose, the pipeline has been broken into three parts. GLENSHIRE DRIVE WELL TO THE GLENSHIRE DRIVE BRIDGE Three potential alignments have currently been identified and others are under consideration. Ed and I are currently working to gather more information regarding these potential alignments and will return with a recommendation and a request regarding surveying in the future. GLENSHIRE BRIDGE-TRUCKEE RIVER CROSSING Dokken Engineering is currently working on the design of the pipeline across the bridge under a contract previously approved by the Board. GLENSHIRE DRIVE BRIDGE TO THE GLENSHIRE SUBDIVISION Three potential alignments were identified for the area east of the Glenshire Drive Bridge. These three potential alignments are shown on Figure 1. • Alignment A runs across property owned by the US Forest Service near the Truckee River • Alignment B runs across the adjacent property owned by the San Francisco Bay Flycasting Club • Alignment C runs along Glenshire Drive After meetings with the local manager for the US Forest Service, Alignment A was considered the least favorable from a permitting and environmental standpoint. A full Environmental Assessment would be required. Due to the time involved in completing such a study, and then moving through the public input process, it would not be possible to construct a pipeline across Forest Service land during 2002. In addition, there may be Federal regulations prohibiting the District from obtaining an easement because a feasible alternate route exists nearby. Telephone conversations were held with a representative of the San Francisco Bay Flycasting Club. The Flycasting Club expressed a strong reluctance to grant easements to the District. Furthermore, an initial examination of the property identified areas that might potentially be considered wetlands and would require further investigation. Construction of a pipeline across this property might be feasible in 2002, provided that the required environmental reviews could be completed in a timely manner. Based on conversations with the local utility companies, it appears that two potential alignments exist along Glenshire Drive. All of the existing utilities (sewer, power, natural gas and fiber optics) are located along the edge of pavement on either side of the roadway. There appears to be a potential alignment that is located outside of the existing utilities. There not any utilities located directly under the pavement of Glenshire Drive, so this routing also appears possible, but significantly more expensive due to traffic control and pavement restoration issues. Considering that Glenshire Drive is an existing roadway, it is anticipated that a Negative Declaration or Mitigated Negative Declaration can be achieved and that appropriate mitigation measures can be incorporated into the pipeline design. Andregg, Inc. previously performed topographic surveys and aerial mapping of this area as part of the Truckee River Legacy Trail and has numerous survey control points in the area. The background photo in Figure 1 was created by Andregg. I am recommending that District enter into a contract with Andregg Inc. in an amount not to exceed $21,800 for the survey work described in the attached proposal. The $21,800 is based on the proposed amount of $19,810 plus a 10% contingency. This survey work will allow the District to completely define the locations of existing utilities and the edge of right- of-way for Alignment C and determine if adequate space exists for a pipeline, or if it will be necessary to construct the pipeline within the Glenshire Drive pavement section. This survey would also be used as the basis for the pipeline design along this alignment. APR-23-2002 15:47 FROM ANDREGG INC. TO 5871189 P.01i01 ANDREGG INC. April 23, 2002 Truckee Donner Public Utilities District P.O. Box 309 Phone 530-582-3969 Truckee, CA 961.60 Fax 530-587-1189 Attention: Neil Kaufman Re: Glenshire Road Utilities&Boundary Survey Truckee,Nevada County,CA (Revision 1 -Extended Length) As requested per our phone conversation and your fax this date,herewith is our revised proposal for surveying and mapping to locate all visible utilities within the apparent right-of-way of Glenshire Road from 300 feet West of the bridge crossing the Truckee River to the intersection at Dorchester Drive in the Glenshire subdivision,approximately 5900 feet. The horizontal datum shall be NAD83 (1991.35)California State Plane Coordinate System,Zone 2 and the vertical datum shall be NGVD29 and shall match the mapping previously done for the proposed Truckee River Bike Trail. Task 1-Utility Locations Suryev Survey the position of all visible utilities,culvert crossings and inverts and USA pre-marks for underground utilities along the route.No manholes to be opened or inverts to be measured. Utility positions and descriptions shall be plotted in AutoCAD drawing file suitable to overlay onto the Truckee River Bike Trail mapping. Total Estimated Fees ............................................................ $7,250.00 Task 2-Boundary Surveys Field and office work to determine Right-of-Way boundary lines for Glenshire Road_ Prepare AutoCAD map with boundary lines and utility survey points. Total Estimated Fees ............................................................ $12,560.00 The above estimated fees shall not be exceeded without prior authorization from client and shall remain valid for 30 days. Our current schedule would enable us to begin work within 10 days of your notice to proceed,weather permitting, and be completed within 30 days thereafter. If you would like us to proceed,please sign and return one copy of this letter agreeing to the scope of work,the fee, and the"Standard Provisions of Agreement Between Client and Consultant" attached hereto. Thank you for this opportunity. If you have any questions or need additional information,please call. Sincerely, ANDREGG,INC. 170�leop� Mark J. Bardakjian,PLS Chief Operations Officer r \ \%jxhk,ys\PR0P0SAL\MJB\GImAire Rd UQtie>&Ddt Pe Ldne Y. I andreggBandregg.com L.AT 380 SW 13"N/LONG 1210 Oa'88"W TOTAL P.01