Loading...
HomeMy WebLinkAbout7 Tahoe Donner Pipeline Replacement Project Agenda Item # Memorandum To: Board of Directors From: Peter Holzmeister Date: August 30, 2002 Subject: Tahoe Donner Pipeline Replacement Project The Tahoe Donner Pipeline Replacement Project is complete. It is time for the board to consider a closeout change order and a resolution accepting the project. This project resulted in replacement of leaking six-inch water mains with new eight-inch water mains on portions of Skislope Way, Pinnacle Loop, Northwoods Boulevard, Saint Moritz, Gyrfalcon, and across the Golf Course third fairway in Tahoe Donner. We also replaced a leaking portion of the water main on Old Mill Road in Sierra Meadows. Attached for your review are the change order and resolution. Recommodation: a) Consideration of contract change order Number 1 to the Tahoe Donner Pipeline Replacement Project— 2002 b) Consideration of a resolution accepting the Tahoe Donner Pipeline Replacement Project—2002 as complete and authorizing the filing of the notice of completion. TDPUD MEMORANDUM August 28, 2002 TO: Board of Directors FROM: Neil Kaufman, Water System Engineer SUBJECT: TAHOE DONNER PIPELINE REPLACEMENT - 2002 CHANGE ORDER #1 AGENDA # BACKGROUND: The Board of Directors previously awarded the Contract for construction of the TAHOE DONNER PIPELINE REPLACEMENT — 2002 project to S&R Snow Removal and Excavation. The project has been completed. I am requesting a Change Order to the Contract for issues covered under four general items. Item 1: The contract was based on a unit price bid. The attached table shows the differences between bid totals and the amounts actually constructed. This analysis results in $33,087.86 owed to S&R from to the District. Item 2: Along St. Moritz Lane, it was necessary to perform some blasting in order to remove some large boulders along the pipeline alignment. Blasting is considered Extra Work under the Contract and S&R is due $3,135.50 form this extra work. Item 3: The Bid Schedule requires the Contractor to provide a unit price for pavement restoration. The unit price is based on a pavement thickness up to 4-inches. There were two locations where it was necessary to place 6- inches of pavement to meet Town of Truckee requirements. These locations cover 2,573 square feet and S&R is due $4,477.02 based on an additional cost of $1.74 per square foot. Item 4: There were eight service laterals within the project area that had been previously replaced by District crews or property owners. At these locations S&R only had to connect the existing service lateral to the new pipeline. There was not an item in the Bid Schedule to cover this work and a unit price of $360 per location was agreed to with S&R. Therefore, S&R is owed $2,880 for this work. Page 1 RECOMMENDATION: I recommend that the Board authorize Contract Change Order #1, in the amount of a $43,580.38 payment to S&R from the District. Attachment-Contract Change Order #1 Page 2 ffilm Change Order Uffi - a- Contract Name: TAHOE DONNER PIPELINE REPLACEMENT- 2002 Contract Change Order No: 1 Orig. Contract Amt. $ 597,648.45 Days NA Date: August 28, 2002 Prev. Apprd Changes$ 0 Days NA Contractor: S&R Snow Removal & Excavation This Change$ 43,580.38 Days NA Revised Contract Amt. $ 641,228.83 Days NA This Change Order covers changes to the subject Contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and District. Increase in (Decrease) Contract Time Contract in Contract Extension Description of Changes Amount M Amount $ (days) 1) Adjustment of Bid Units vs. Actual Construction $33,087.86 NA 2) Blasting $3,135.50 NA 3) Additional Pavement Thickness $4,477.02 NA 4) Connect of Existing Services $2880.00 NA Totals $43,580.38 Net change in contract amount (increase or decrease) $43,580.38 The amount of the Contract will be increased by the sum of $43,580.38 and the Contract Time shall not be extended. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the District. Accepted "cy /Contractor Date: (Signature) Approved: /District Date: (Signature) Analysis of Bid Quantities vs.Actual Quantities Constructed Tahoe Donner Pipeline Replacement-2002 Contractor: S&R Excavation &Snow Removal Bid Quantities Actual Quantities Bid Item Description Quantity I Units Unit Price Subtotal Quantity Units I Unit Price Subtotal 1 Mobilization 1 LS $ 5,000.00 $ 5,000.00 1 LS $ 5,000,00 $ 5,000.00 1A 8"DI Water Main 911 FT $ 38.00 $ 34,618.00 940 FT $ 38.00 $ 35,720.00 1B Fire Hydrant Assemblies 2 EA $ 2,800.00 $ 5,600.00 2 EA $ 2,800.00 $ 5,600,00 IC Connections to Existing 8"Piping 2 EA $ 2,400.00 $ 4,800,00 2 EA $ 2,400.00 $ 4,800.00 1D AC Pavement 4,250 SO FT $ 3.48 $ 14,790.00 5,769 SO FT $ 3.48 $ 20,076.12 1 E All Other Work Required by the Contract Documents 1 LS $ 375.00 $ 375.00 1 LS $ 375.00 $ 375.00 1 F AC Dike 0 FT $ 9.50 $ - 8.5 FT $ 9.50 $ 80.75 2A 8"DI Water Main 1,002 FT $ 41,90 $ 41,983.80 1040 FT $ 41.90 $ 43,576.00 2B 1.5"PE Service Lateral 390 FT $ 31.55 $ 12,304.50 252 FT $ 31.55 $ 7,950.60 2C Double Water Service 8 EA $ 1,400.00 $ 11,200.00 7 EA $ 1,400,00 $ 9,800.00 2D 2"Blowoff Assembly i EA $ 780.00 $ 780.00 1 EA $ 780.00 $ 780.00 2E 8"Gate Valve Assembly 3 EA $ 650.00 $ 1,950.00 4 EA $ 650.00 $ 2,600.00 2F Fire Hydrant Assemblies 2 EA $ 2,755.00 $ 5,510.00 2 EA $ 2,755.00 $ 5,510.00 2G Connections to Existing 6"DI Piping 3 EA $ 2,680.00 $ 8,040.00 3 EA $ 2,680.00 $ 8,040.00 2H Connections to Existing 6"Steel Piping 1 EA $ 2,680.00 $ 2,680.00 1 EA $ 2,680.00 $ 2,680,00 21 AC Pavement 4,275 SO FT $ 3.48 $ 14,877.00 5,772 SO FT $ 3.48 $ 20,086.56 2J AC Dike 200 FT $ 9,50 $ 1,900.00 55.5 FT $ 9.50 $ 527.25 2K All Other Work Required by the Contract Documents 1 LS $ 500.00 $ 500.00 1 LS $ 500,00 $ 500.00 3A Single 8"PVC Water Main 275 FT $ 44,55 $ 12,251.25 303 FT $ 44.55 $ 13,498.65 3B Double 8"PVC Water Main 700 FT $ 53.00 $ 37,100.00 582 FT $ 53.00 $ 30,846.00 3C 1.5"PE Service Lateral 70 FT $ 31.55 $ 2,208.50 10 FT $ 31.55 $ 315.50 3D Double Water Service 1 EA $ 1,400.00 $ 1,400.00 - EA $ 1,400.00 $ - 3E Single Water Service 2 EA $ 1,375.00 $ 2,750,00 2 EA $ 1,375.00 $ 2,750.00 3F 8"Gate Valve Assembly 2 EA $ 650.00 $ 1,300.00 2 EA $ 650.00 $ 1,300.00 3G 6"Gate Valve Assembly 1 EA $ 525.00 $ 525.00 2 EA $ 525.00 $ 1,050.00 3H 2"Pipe End Blowoff Assemblies 1 EA $ 1,200.00 $ 1,200.00 - EA $ 1,200,00 $ - 31 Connection to Existing 6"Pipe at Station 0+00 1 LS $ 2,980.00 $ 2,980.00 1 LS $ 2,980.00 $ 2,980.00 3J Connection to Existing 6"Pipe at Station 1+29 1 LS $ 3,620.00 $ 3,620.00 1 LS $ 3,620.00 $ 3,620.00 3K Connection to Two Existing 8"Pipes at Station 4+93 1 LS $ 480.00 $ 480.00 1 LS $ 480.00 $ 480.00 3L Connection to Two Existing 8"Pipes at Station 6+01 1 LS $ 480.00 $ 480.00 1 LS $ 480.00 $ 480.00 3M Connection to Existing 6"Pipe at Station 8+98 1 LS $ 2,980.00 $ 2,980.00 1 LS $ 2,980.00 $ 2,980.00 3N Connection to Existing 8"Pipe at Station 10+83 1 LS $ 4,025,00 $ 4,025.00 1 LS $ 4,025.00 $ 4,025.00 30 AC Pavement 330 SO FT $ 3.48 $ 1,148.40 947 SO FT $ 3.48 $ 3,295.56 3P Revegetation 9,000 SO FT $ 0.25 $ 2,250.00 26,700 SO FT $ 0,25 $ 6,675.00 3Q All Other Work Required by the Contract Documents 1 LS $ 1,000.00 $ 1,000.00 1 LS $ 1,000.00 $ 1,000.00 4A 8"DI Water Main 952 FT $ 41.90 $ 39,888.80 954 FT $ 41,90 $ 39,972.60 4B 1.5"PE Service Lateral 420 FT $ 31.55 $ 13,251.00 365 FT $ 31.55 $ 11,499.98 4C Double Water Service 8 EA $ 1,400,00 $ 11,200.00 8 EA $ 1,400.00 $ 11,200,00 4D Single Water Service 1 EA $ 1,375.00 $ 1,375.00 1 EA $ 1,375.00 $ 1,375.00 4E 8"Gate Valve Assembly 1 EA $ 650.00 $ 650.00 1 EA $ 650.00 $ 650,00 4F Fire Hydrant Assemblies 2 EA $ 2,755.00 $ 5,510.00 2 EA $ 2,755.00 $ 5,510.00 4G 1"Air Valve Assembly i EA $ 1,000.00 $ 1,000.00 1 EA $ 1,000.00 $ 1,000.00 4H Connections to Existing 6"Piping 2 EA $ 2,680.00 $ 5,360.00 - EA $ 2,680.00 $ - Analysis of Bid Quantities vs.Actual Quantities Constructed Tahoe Donner Pipeline Replacement-2002 Contractor: S&R Excavation &Snow Removal Bid Quantities Actual Quantities Bid Item Description Quantity Units Unit Price Subtotal Quantity I Units I Unit Price Subtotal 41 AC Pavement 4,440 SO FT $ 3.48 $ 15,451.20 5,602 SO FT $ 3.48 $ 19,494.96 4J All Other Work Required by the Contract Documents 1 LS $ 500,00 $ 500.00 1 LS $ 500.00 $ 500.00 5A 8"DI Water Main 1,802 FT $ 41.00 $ 73,882.00: 1,872 FT $ 41.00 $ 76,752.00 56 1.5"PE Service Lateral 630 FT $ 31.55 $ 19,876.50 541 FT $ 31.55 $ 17,052.78 5C Double Water Service 15 EA $ 1,400.00 $ 21,000,00 15 EA $ 1,400.00 $ 21,000.00 5D 8"Gate Valve Assembly 4 EA $ 650.00 $ 2,600.00 - EA $ 650.00 $ - 5E Fire Hydrant Assemblies 3 EA $ 2,755.00 $ 8,265.00 3 EA $ 2,755.00 $ 8,265.00 5F Connections to Existing 6"Piping 3 EA $ 2,680.00 $ 8,040.00 3 EA $ 2,680.00 $ 8,040.00 5G AC Pavement 8,400 SO FT $ 3.48 $ 29,232.00 15,731 SQ FT $ 3.48 $ 54,743.88 5H AC Dike 200 FT $ 9.50 $ 1,900.00 155 FT $ 9.50 $ 1,472,50 51 All Other Work Required by the Contract Documents 1 LS $ 500,00 $ 500.00 1 LS $ 500.00 $ 500.00 6A 8"PVC Water Main 940 FT $ 41.90 $ 39,386.00 961 FT $ 41.90 $ 40,265.90 6B 1.5"PE Service Lateral 350 FT $ 31,55 $ 11,042.50 297 FT $ 31.55 $ 9,354.58 6C Double Water Service 8 EA $ 1,400.00 $ 11,200.00 7 EA $ 1,400.00 $ 9,800,00 6D Single Water Service 2 EA $ 1,375.00 $ 2,750,00 3 EA $ 1,375.00 $ 4,125.00 6E 8"Gate Valve Assembly 2 EA $ 650.00 $ 1,300.00 - EA $ 650.00 $ - 6F Fire Hydrant Assemblies 2 EA $ 2,755.00 $ 5,510.00 2 EA $ 2,755.00 $ 5,510.00 6G 2"Pipe End Blowoff Assembly 1 EA $ 1,200.00 $ 1,200.00 1 EA $ 1,200.00 $ 1,200.00 6H Connections to Existing 6"DI Piping 1 EA $ 2,680.00 $ 2,680.00 1 EA $ 2,680.00 $ 2,680.00 61 Connections to Existing 6"Steel Piping 1 EA $ 2,680.00 $ 2,680.00 1 EA $ 2,680.00 $ 2.680.00 6J AC Pavement 4,400 SO FT $ 3.48 $ 15,312.00 7,642 SQ FT $ 3.48 $ 26,594.16 6K All Other Work Required by the Contract Documents 1 LS $ 500.00 1 $ 500 1 LS $ 500.00 $ 500.00 $597,64810; $630,736.32 Difference Owed to S&R $ 33,087.86 III TRUCKEE DONNER PF Public Utility District Resolution No. 2002- AUTHORIZING THE ACCEPTANCE OF THE TAHOE DONNER PIPELINE REPLACEMENT PROJECT - 2002 AND DIRECTING FILING OF THE NOTICE OF COMPLETION WHEREAS, the Board of Directors of the Truckee Donner Public Utility District made the determination to undertake the Tahoe Donner Pipeline Replacement Project- 2002; and WHEREAS, S&R Snow Removal & Excavation, was selected by the District to perform the work; and WHEREAS, the District's Water Utility Manager, Ed Taylor, has recommended that the work be accepted by the District; NOW THEREFORE BE IT RESOLVED by the Board of Directors of the District as follows: 1. That the District hereby accepts the Tahoe Donner Pipeline Replacement Project as complete. 2. That the Clerk of the District be directed to file with the County of Nevada the Notice of Completion, a copy of which is attached hereto. 3. That 35 days following the filing of the Notice of Completion, the 10% retained from the contractor payments be released to the contractor if no claims have been made to the District by material suppliers or laborers. PASSED AND ADOPTED by the Board of Directors at a meeting duly called and held within the District on the 4r" day of September 2002 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Nelson Van Gundy, President of the Board ATTEST: Peter L. Holzmeister, Clerk of the Board RECORDING REQUESTED BY: Truckee Donner Public Utility District WHEN RECORDED, RETURN TO: TRUCKEE DONNER PUBLIC UTILITY DISTRICT Post Office Box 309 Truckee, CA 96160 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN: 1. That the name and address of the public entity for whom the improvement project was done, as owner thereof, is the Truckee Donner Public Utility District, Post Office Box 309, Truckee, CA 9616& 2. That on September 4, 2002 the hereinafter described improvements were accepted as complete pursuant to a resolution of the Truckee Donner Public Utility District, the awarding authority. 3. That the subject improvements of the Notice are generally described and identified as follows: Tahoe Donner Pipeline Replacement Project- 2002. 4. That the name and address of the contractor for such project was: S&R Snow Removal&Excavation, P.O. Box 9053, Truckee, Ca. 96162 1 certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Peter L. Holzmeister, General Manager