Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda Packet 2026-06-03 REVISED
Board of Directors T R U C K E E D O N N E R General Manager Jeff Bender PUBLIC UTILITY DISTRICT Brian C. Wright Christa Finn r4 Executive Leadership Tony Laliotis Chad J. Reed Courtney Murrell REGULAR BOARD MEETING Mike Swanson Steve Randall 11570 DONNER PASS ROAD, TRUCKEE, Michael Salmon CA 96161 Steven Poncelet 6:00 PM, Wednesday, June 3, 2026 Scott Crow AGENDA Jillian Steward Martina Rochefort 1. Call to Order 2. Roll Call 3. Pledge of Allegiance 4. Changes to the agenda 5. Public Comment— This is time set aside for the public to address the Board on any matter not on the agenda. Testimony related to any agendized matter should be addressed at the time that that item is considered. (The public may comment on any subject that is not on the agenda. Each speaker will be limited to three minutes, but speaker time may be reduced at the discretion of the Board President if there are a large number of speakers on any given subject.) DIRECTOR UPDATE 6. This item provides time for Directors to comment on any item within the purview of the District. DEPARTMENT UPDATES 7. This item provides time for each Department to update the Board of Directors. PUBLIC HEARING 8. Conduct Public Hearing Regarding Adoption of the Truckee Water System 2025 Urban Water Management Plan Conduct a Public Hearing and consider adoption of the Truckee Water System 2025 Urban Water Management Plan (UWMP). CONSENT CALENDAR These items are generally interpreted as routine in nature or the subject matter has been previously presented to the Board for discussion. They are intended to be acted a .®. MIKU . A SPECIAL I .i..... LEADERSHHIPP FaU FORNNIION 11570 Donner Pass Road,Truckee,CA 96161 Phone-530-587-3896-www.tdpud.or Page 1 of 563 upon by the Board without additional discussion. Any Board Member may request an item to be removed from the Consent Calendar for discussion prior to voting on the Consent Calendar. 9. Board Meeting Minutes Consider approval of the May 6, 2026 Board Meeting Minutes 10. Treasurer's Report, June 2026 Consider Approval of the Treasurer's Report for June 2026 including: a. Fund Balances for the Month of March 2026 b. Disbursements for the Month of April 2026 11. Consideration of a Contract With Industrial Electrical Company for Electric Motor Repair Services Authorize the General Manager to execute a contract and associated documents with Industrial Electrical Company for water utility electric motor repair services for a total amount not to exceed $90,000. 12. Consideration of Annual Resolutions for Special Tax: Gray's Crossing and Old Greenwood Communities Facilities Districts a) Adopt Resolution 2026-10 requesting Nevada County to collect the special taxes for the Gray's Crossing 04-1 Community Facilities District; and b) Adopt Resolution 2026-11 requesting Nevada County to collect the special taxes for the Old Greenwood 03-1 Community Facility District. 13. Consideration of Appointing Brian Wright as Northern California Power Agency (NCPA) Commissioner Appointment Appoint Brian Wright, General Manager, as the District's designee for Northern California Power Agency (NCPA) Commissioner. ACTION ITEMS 14. Consideration to Accept the Audited Financial Report for FY25. Accept the Audited Financial Report for the fiscal year ending December 31, 2025 and direct staff to file the record. 15. Consideration to Approve the District's 2025 Water Utility Annual Consumer Confidence Reports Review the Truckee Donner Public Utility District's Main System and Hirschdale System's 2025 Water Quality Consumer Confidence Reports and Page 2 of 563 provide feedback to staff and direct staff to file with the State Water Resource Control Boards. 16. Consideration of Approval of a 2026 Q1 Power Cost Adjustment of$0.0019 charge per kWh Billed in June 2026, July 2026, and August 2026. Approve the Power Cost Adjustment for 2026 Q1 of$0.0019 charge per kWh billed in June 2026, July 2026 and August 2026. 17. Consideration of a Multi-Year Support Contract for Firewalls with ePlus Authorize the General Manager to execute a 3-year support contract and associated documents for District firewalls with ePlus using a joint purchasing agreement in the amount of$261,651.44. WORKSHOP 18. Presentation of the District New Website Design Receive this report and provide input and direction to staff. CLOSED SESSION 19. Closed Session Pursuant to Government Code Section 54956.9(d)(1), Conference with Legal Counsel, Existing Litigation, Kuhlemier v. TDPUD, et al., United States District Court, Eastern District of California Case No. 2-24-cv-02951-DC-AC ADJOURNMENT The agenda is available for review at the TDPUD Administrative Office and the District's internet website. Posted on Friday, May 29, 2026. Martina Rochefort, District Clerk A copy of the agenda packet is available for public review, during normal business hours, at the District Administrative Office located at 11570 Donner Pass Road. Public participation is encouraged. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the Districts public meetings. If particular accommodations for the disabled are needed (i.e. disability-related aids, or other services), please contact the District Clerk at (530) 582-3923 or martinar@tdpud.org, at least 24 hours in advance of the meeting. Any person with a disability may submit a request for reasonable modification or accommodation to the above-described means for accessing and offering comment at the meeting to Martina Rochefort, District Clerk, or email at martinar@tdpud.org, who will swiftly resolve such a request. Page 3 of 563 TRUCKEE DON N ER AGENDA ITEM #7 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: SUBJECT: This item provides time for each Department to update the Board of Directors. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: Page 1 of 2 Page 4 of 563 ATTACHMENTS: 1. Water - Department Update 2. Electric - Department Update 3. Administrative Services - Department Update 4. Human Resources & Risk Management - Department Update 5. Public Information & Strategic Affairs - Department Update Page 2 of 2 Page 5 of 563 r TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 FROM: Chad J. Reed,Water Utility Director SUBJECT: Water Department Update Water Supply Figure 1 illustrates water production for the month of November and reflects continued seasonal reductions. The following data highlights our water production trends as we transition into the spring season: • System Efficiency:Water production for April 2026 continues to reflect a positive trend in system efficiency and community-wide conservation. • Year-over-Year Comparison:When compared to April 2025, total water usage decreased by 8%. • Long-term Trends:This decline is even more pronounced over a broader timeline; production for April 2026 was 11% lower than the average production of the past three Aprils (2023-2025). • Community Impact:These figures demonstrate a consistent pattern of mindful water use by our customers as we approach the warmer months and higher production periods. Water Production{Gallons) we Wfi WE Ex Y $ ■2026 Pro—d— • 5 Pr.duc o-3 Y.r Average nee�r sepen.ber a«om Wovemier oere..me Figure 1 Annual Water Production all figures are shown in gallons Page 6 of 563 System Updates The Water Department's field crew remain dedicated to protecting the reliability of our water system through consistent maintenance and quick response efforts. I would like to recognize the Distribution crew for their creative problem-solving and commitment to service. They recently developed an innovative method to keep customers in the upper Prosser Lake area supplied with water while the main line serving the neighborhood was taken offline. By installing temporary connections and renting portable piping, they created a bypass system that significantly reduced service disruptions. Without this solution, hundreds of homes would have experienced an outage; instead, only five homes were briefly affected. Management sincerely appreciates their continued dedication to minimizing any negative impact on our customers. The crew also completed the Alder Creek section job ahead of schedule, allowing the Town of Truckee to move forward with repaving the streets in that area. This effort is an excellent example of multiple agencies working together to better serve our community. • Well 20 Maintenance:Warranty work on Well 20 is currently progressing.We are pleased to report that the well is on track to be fully operational for the high-demand summer season, ensuring our supply remains robust as temperatures rise. q f f s: Sk � Figure 2(Left Photo)crew cutting main with a Getting saw to insert a valve. (Center Photo)Crew"hot-tapping"main to add bypass line,(Right Photo)Alder Creek section job completed ahead of schedule so the town can proceed in repaving Page 7 of 563 2026 Construction Season Preparation The Water Department is actively preparing for the 2026 construction season, advancing several capital projects for Board consideration, bidding, and award. Hirschdale Pipeline Construction Project This project was awarded at the November Board Meeting and is scheduled to proceed in May 2026. The District Engineer is working through the submittal process and the job is still slated to start on time. Martis Woods Pump Station Project The Board of Directors authorized the General Manager to proceed with this project during the January meeting, including updates to the engineering design. Staff is currently refining project requirements and expects to rebid the project within the next month to ensure long- term system reliability. Pipeline Rehabilitation Project As denoted above a large shout out to the Distribution Crew for their"out of the box thinking". Thanks to a mild winter, this project will begin in the first part of May. Authorized by the Board in February, the work involves "slip-lining" several pipeline segments where traditional excavation is not feasible. Key segments include creek crossings and a crossing beneath Highway 89. 2026 Pipeline Replacement Project Work on the remaining pipeline segments serving the Ski Bowl Condominiums is scheduled to start in early June. This timeline allows local groundwater levels to recede, ensuring a smooth construction process. The Board authorized this project in February to complete the work previously started during the Ski Lodge facility improvements. Page 8 of 563 r TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 FROM: Mike Swanson, Director of Electric Operations & Engineering SUBJECT: Electric Engineering & Operations Department Update Reliability and Metrics The District continues to monitor reliability performance using IEEE 1366 metrics, including SAIFI, SAIDI, and CAIDI. Staff tracks outage causes and trends to identify areas for improvement. April System Totals (TDPUD System Only) 2026 YTD TDPUD System Only (Excluding Power Provider YTD 26 YTD 25 Change % Change SAIFI 0.460 0.676 -0.216 -32% SAIDI 68.945 59.737 9.208 15% CAIDI 149.880 88.368 61.512 70% April TDPUD System Only (Excludes Power Provider) Apr-26 Apr-25 Change % Change SAIFI 0.438 0.011 0.427 3882% SAIDI 65.342 1.053 64.289 6105% CAIDI 149.183 95.813 53.370 56% Power Provider Apr-26 SAIFI 0.000 SAIDI 0.000 CAIDI 0.000 • SAIFI, SAIDI, and CAIDI deteriorated compared to April 2025 0 4/2/2026 Tree Fell into line on Northwoods due to snow event 0 4/7/2026 Underground cable failure (2 customers 218+ hours) Page 1 of 2 Page 9 of 563 Key Focus Areas The Electric Department remains focused on the following strategic priorities: • Electric System Master Plan Development and Implementation Continued advancement of the 2026 Electric System Master Plan, which identifies system constraints, prioritizes capital investments, and aligns long- term planning with reliability, wildfire mitigation, and projected growth. • System Hardening and Wildfire Mitigation Execution of system hardening projects, including Northwoods and upcoming projects in final engineering, to reduce wildfire risk and improve system resiliency. • Grid Modernization and Technology Integration Utilizing Gridware devices and weather stations to monitor system conditions and implement protocols to address identified issues. • Reliability Performance Improvement Ongoing focus on improving SAIFI, SAIDI, and CAIDI through targeted investments, operational efficiencies, and proactive maintenance programs. • Capital Project Execution and Delivery Advancing key capital projects, including the Martis Valley Substation and SRIP 6, ensuring projects are delivered efficiently, safely, and aligned with budget and schedule expectations. Page 2 of 2 Page 10 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 FROM: Michael Salmon, Chief Financial Officer SUBJECT: Administration Department Update Customer Service - Billing Information — 2026 YTD April 2026 Account Billing Totals $ in thousands Electric Water Jan $ 31720 $ 11592 Feb 41365 11618 Mar 31494 1585 Apr 31111 1580 YTD $ 14,690 $ 61375 Accounts 14,885 13,773 change to py 0.3% 0.4% Page 1 of 5 Page 11 of 563 - Billing Volumes, All Customer Types — 2026 YTD April • Electricity YTD Avg Billed 2022 2023 2024 2025 2026 KWH/Account/ 1,093 1,219 1,119 1,117 1,046 Month -4.3/0 6° -14.2% -6.5% - .3% <chg to 2026 Average billed kWh per account per month 1,3C0 ■ 1,2C0 V 1,1C0 i 1,000 . ■ f O Sao ■ aoo ■ i � � • ■ 700 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec * 2026 2025 2024 • 2023 0 2022 • Electric kWh average per account per month of 1 ,046 is down 6.3% to last year and down 9.2% to 3-year average (3YA) o YTD April Truckee average temperature of 38.7° is up 2.4° or 7%to last year and up 5.1° or 15% to 3YA and up 4.4° or 13% to 5-year average (5YA). ■ April avg.temp of 39.8° was 112% to last year and 1 5% to 5YA o YTD April Heating Degree Days of 3,160 are down 8% to last year and down 16% to 3YA and down 14% to 5YA ■ April HDD of 757 were up 26% to last year and up 9% to 5YA • Water gallons average per account per month of 3,569 is down 2.8% to last year and down 3.1% to 3-year average Page 2 of 5 Page 12 of 563 Water Gallons per Account per Billing Day Average by Month-Residential and Commercial Combined 600 505 500 428 400 339 300 199 200 126 128 111 120 115 119 114 115 a 112 100 ' 111 111 - 11 Jan Feb Mar Apr May Jun Jul Aug Sep oet Nov Dec ■2026 ■2025 ■3yr Avg - Customer Service Satisfaction Scores - April 2026 Overall, hour satisfied were you with the experience with our customer suppo... LJ 4: Answered:23 Skipped:C 60% SO% 40% 17 349b 20% 10% 0% Extremely Very satisfied Somewhat Not so satisfied Not at all satisfied satisfied satisfied Page 3 of 5 Page 13 of 563 How much time did it take us to address your questions and concerns? L� Answered:23 Skipped:0 40% 30% 20% 10% 0% Much shorter Shorter than About what I Longerthan Much longer than expected expected expected expected than expected Please categorized the reaso ns) for your service cat L� Q Answered:16 Skipped:7 90% 70% 60% 50% 40% 30% 20% 10% 0% Billing Payment New Service Power outage Water leak New question question or Stop Commercial Service to Service existing home Page 4 of 5 Page 14 of 563 Finance and Acccounting • Year-End 2025 audit—finalized audit/ACFR. The audit/ACFR presentation to board planned for this June 3rd regular board meeting (and Finance Corp. board meeting). • Community Facilities District (CFD) Gray's Crossing - The two parcel sale agreement and options for potential new buyer working with CFD attorney • Closed and reported on April financials, Treasurer's Report completed. • June board meeting preparations General Services • Fleet o Mileage — 18,477 Jan, 18,488 Feb, 19,177 Mar, and 22,564 Apr ■ April Mileage Mix — 14.7k / 65% Diesel, 7.5k / 33% Gasoline, 341 / 1.5% BEV, and 6 miles Trailer/Misc o SMOG and weekly BIT inspections completed o CARB ACF and CTC, BAR reporting o Routine maintenance and support projects • Facilities o Public restroom retrofits to unisex o Asphalt replacements performed (Asphhlt maintenance slurry's -throughout summer) o Routine maintenance and support projects • Various projects and procurements—memos, staff reports and bid doc preparations, as applicable Page 5 of 5 Page 15 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 FROM: Jillian Steward, HR & Risk Director SUBJECT: Human Resources and Risk Department Update Staffing • Vehicle Maintenance Foreman — Congratulations to Ryan Clement who promoted from Mechanic to Vehicle Maintenance Foreman • Troubleman — Congratulations to Shannon Hoyt who promoted from Substation Lineman/Inspector to Troubleman • Water Service Technician — Congratulations to Josh Scotvold who promoted from Water Service Technician in Training to Water Service Technician • Seasonal Water Helper Positions — Welcome Stephen Sooter Open Positions: • Electric Engineering Manager • Mechanic • Water Service Technician/Tech in Training • HR Specialist NEOGOV— Insight module implemented, new online application and applicant tracking system now being used Culture • Thunderstorm softball season started in May • 6/03 — June Birthday and Anniversary Celebration • 7/01 —4th of July staff B BQ • 7/10 — Reno Ace's Game Core Value Recognition • Josh Campbell & Nina Krommenhoek —Accountability Staff Development • 6/04 — Active Violence Response Training • 6/24 — District/Family Day • NEOGOV— New learning management software implemented and being used by staff Page 1 of 2 Page 16 of 563 Charging Futures Forward • 6/20 — Truckee Air Show Event Charging Communities Forward • 6/28 — Charging Communities Forward fundraising and event for Hike for Hope Safety and Risk June - National Safety Month events Page 2 of 2 Page 17 of 563 e TRUCKEE DONNER 4o PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 FROM: Steven Poncelet, Public Information and Strategic Affairs Director Alex Spychalsky, Communications Program Manager SUBJECT: Public Information and Strategic Affairs Department Update Communications The District continues to execute on the District's 2026 Communications Plan with emphasis on the upcoming Making Water Conservation a California Way of Life regulation and wildfire/Preemptive Power Shutoff campaigns. Staff and our consultants are focusing on the awareness/education component of the water conservation campaign and are now working towards a single conservation event later this summer.Wildfire season has started early this year due to the mild winter/spring and, in addition to the regular communications regarding NV Energy's wildfire safety deenergization program (PSOM and encroachment), District staff are communicating regarding the District's new Preemptive Power Shutoff (PPS) wildfire safety deenergization program and how this fits with NV Energy's existing programs. This included the annual wildfire public safety partner kick-off meeting on May 28t" attended by over 30 local, regional, and State agencies/organizations active in wildfire and community support. The District continues to partner with the Tahoe Truckee Community Foundation (TTCF)on our annual scholarships for both college bound seniors and workforce/vocational certification. TTCF administers both scholarship programs and has a robust process for applications and then review/selection by an independent committee. The college scholarship process occurs first to time with high school graduation and the college admissions process. This year, the TTCF committee selected Logan Kane who plans to study Business Management and Spanish at Indiana University or San Diego State University. The second awardee is Eden Sacks who plans to study Electrical Engineering at the University of Nevada, Reno. The award ceremony is June 1, 2026 at 6:OOPM. The District participated in the Town of Truckee's State of the Community event on Thursday evening, May 14t". This new event included updates from over 10 local agencies along with a panel on law enforcement with Truckee Police, Nevada County Sheriff, and California Highway Patrol. The District was represented by President Laliotis, who presented an update and provided key accomplishments. District staff also attended the Northwest Public Power Association (NWPPA) annual meeting in Spokane, WA where the district received a community service award for our Charging Futures Forward Campaign. This campaign also recently received an award from the Utah Associated Municipal Power Systems (UAMPS), who recognized the value of the District's many programs to engage our local youth and help develop our workforce for the future. Page 1 of 2 Page 18 of 563 Strategic Affairs District staff continues to engage in Sacramento regarding wildfire mitigation. There have been numerous public hearings and meetings regarding the SB 254 study which, first and foremost, has recommended a reform of the strict liability provisions under which all electric utilities operate today. There is also significant discussion on insurance reform. While no specific legislation has emerged, and it is unclear on the outgoing Governor's appetite to take on controversial issues, all utilities are advocating for meaningful reforms and legislative fixes. District staff were invited to speak at the Wildfire Safety Advisory Board's (WSAB) Utility Wildfire Risk Tools Forum on a panel with Public Owned Utilities (POU). The District's presentation focused on some of the new tools/programs that have been implemented including CloudFire wildfire risk modeling, Preemptive Power Shutoff (PPS), GridWare/GridScope line sensing, and overhead system hardening using metal poles, fiberglass crossarms, and covered conductor. District staff also met with WSAB staff to discuss the District's efforts to complete an update of our Wildfire Mitigation Plan which is on track for submittal to the WSAB by October 1, 2026. Page 2 of 2 Page 19 of 563 TRUCKEE DONNER AGENDA ITEM #8 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Neil Kaufman, System Engineer Chad Reed, Water Utility Director SUBJECT: Conduct Public Hearing Regarding Adoption of the Truckee Water System 2025 Urban Water Management Plan r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Conduct a Public Hearing and consider adoption of the Truckee Water System 2025 Urban Water Management Plan (UWMP). BACKGROUND: The Urban Water Management Planning Act (California Water Code Section 10610) requires that all Urban Water Suppliers prepare urban water management plans and update them every five years. The District is considered an urban water supplier since it serves more than 3,000 customers. The current 2020 UWMP was adopted in June 2021. At the May 6, 2026, Board Meeting, a review of the draft 2025 UWMP was conducted. The Board of Directors also scheduled a Public Hearing on the draft 2025 UWMP for June 3, 2026. ANALYSIS AND BODY: An electronic copy of the draft UWMP was posted on the District's website for public review (Attachment 1). Notices regarding the Public Hearing on the draft 2025 UWMP were placed in the Sierra Sun on May 22 and May 29. Notices of the Public Hearing were also mailed to the appropriate local agencies. As of May 26, the District has not received any comments regarding the draft UWMP. Adoption of the UWMP would be accomplished via ratification of the attached Resolution 2026-12 (Attachment 2). GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. Page 1 of 2 Page 20 of 563 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. FISCAL IMPACT: There is no direct fiscal impact associated with this item ATTACHMENTS: 1. Attachment 1 (Draft 2025 UWMP) 2. Attachment 2 (Resolution 2026-12 UWMP) Page 2 of 2 Page 21 of 563 aUCKEE f Public Utility District A TRUCKEE WATER SYSTEM 2025 URBAN WATER MANAGEMENT PLAN Adopted XXXX, 2026 Board of Directors Jeff Bender Christa Finn Tony Laliotis Courtney Murrell Steve Randall Prepared by: Neil Kaufman Water System Engineer Page 22 of 563 TABLE OF CONTENTS SECTION 1 —INTRODUCTION SUBJECT OF THE PLAN.......................................................................................................... 1-1 UWMP OVERVIEW................................................................................................................... 1-1 PUBLIC PARTICIPATION........................................................................................................ 1-2 INTERAGENCY COORDINATION ......................................................................................... 1-2 ENVIRONMENTAL REVIEW.................................................................................................. 1-4 PLAN ADOPTION...................................................................................................................... 1-4 FORMATOF THE PLAN........................................................................................................... 1-4 SECTION 2—SERVICE AREA DISTRICT HISTORY AND BACKGROUND ..........................................................................2-1 SERVICEAREA.........................................................................................................................2-4 CLIMATE....................................................................................................................................2-4 CURRENT AND PROJECTED POPULATION........................................................................2-4 SECTION 3—EXISTING WATER FACILITIES PRESSURE ZONES....................................................................................................................3-1 GROUNDWATER WELLS........................................................................................................3-1 WATER TREATMENT FACILITIES........................................................................................3-1 OTHER WATER SUPPLY SOURCES......................................................................................3-4 PUMPING STATIONS ...............................................................................................................3-4 STORAGETANKS.....................................................................................................................3-4 CONTROL VALVE STATIONS................................................................................................3-6 PIPELINES..................................................................................................................................3-6 SECTION 4—SYSTEM WATER USE HISTORIC POTABLE WATER DEMANDS ............................................................................4-1 EXISTING WATER DEMANDS...............................................................................................4-1 FUTURE WATER DEMANDS..................................................................................................4-4 CURRENT AND POTENTIAL USE OF RECYCLED WATER..............................................4-5 WATER AUDITS AND NON-REVENUE WATER.................................................................4-6 WATER DEMAND FOR LOW-INCOME HOUSING..............................................................4-7 SECTION 5—SB X7-7 BASELINES AND TARGETS BASELINE WATER USAGE CALCULATION.......................................................................5-1 DEMAND REDUCTION TARGET CALCULATION..............................................................5-1 SBX7-7 COMPLIANCE .............................................................................................................5-3 SECTION 6—WATER SYSTEM SUPPLIES MARTIS VALLEY GROUNDWATER BASIN........................................................................6-1 QUANTITY OF GROUNDWATER IN THE MARTIS VALLEY BASIN..............................6-2 RELIABILITY OF THE WATER SUPPLY...............................................................................6-3 IMPACT OF CLIMATE CHANGE ON GROUNDWATER BASIN RECHARGE................. 6-3 Page i Page 23 of 563 Table of Contents WATER SUPPLY QUALITY.....................................................................................................6-3 GROUNDWATER WITHDRAWALS.......................................................................................6-5 EXISTING PRODUCTION CAPACITY IN RELATION TO PROJECTED DEMANDS.......6-6 WASTEWATER AND RECYCLED WATER...........................................................................6-6 FUTURE WATER SUPPLIES....................................................................................................6-8 BUILDOUT WATER DEMANDS.............................................................................................6-8 ADDITIONAL POTABLE WATER PRODUCTION CAPACITY...........................................6-8 WATER SYSTEM ENERGY USAGE.....................................................................................6-11 SECTION 7—WATER SHORTAGE CONTINGENCY PLANNING WATER SHORTAGE CONTINGENCY PLAN........................................................................ 7-1 POTENTIAL FINANCIAL IMPACTS OF A WATER SHORTAGE....................................... 7-2 ADDITIONAL INFORMATION................................................................................................ 7-3 SECTION 8—WATER DEMAND MANAGEMENT MEASURES WATER WASTE PROVENTION ORDINANCES ...................................................................8-1 WATERMETERING..................................................................................................................8-2 CONSERVATION PRICING .....................................................................................................8-2 PUBLIC EDUCATION AND OUTREACH...............................................................................8-2 PROGRAMS TO ASSESS AND MANAGE DISTRIBUTION SYSTEM REAL LOSS..........8-3 WATER CONSERVATION PROGRAM COORDINATION AND STAFFING SUPPORT .. 8-4 OTHER DEMAND MANAGEMENT MEASURES .................................................................8-4 WATER CONSERVATION DMM EFFECTIVENESS ............................................................8-5 APPENDIX A—TEXT OF THE URBAN WATER MANAGEMENT PLANNING ACT APPENDIX B—WATER CONSERVATION ACT OF 2009 APPENDIX C—MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN APPENDIX D—ORDINANCE NO. 2021-01, FINDING THE NECESSITY FOR AND ADOPTING A WATER SHORTAGE CONTINGENCY PLAN APPENDIX E—RESOLUTION NO. 2026- , ADOPTION OF THE URBAN WATER MANAGEMENT PLAN APPENDIX F—PUBLIC NOTICE DOCUMENTATION APPENDIX G—ANNUAL WATER AUDITS Page ii Page 24 of 563 LIST OF TABLES SECTION 2—SERVICE AREA Table 2-1, Historic Population Data............................................................................................2-5 Table 2-2, Current and Future Population Projections ................................................................2-7 SECTION 3—EXISTING WATER FACILITIES Table 3-1, Summary of Pressure Zone Data................................................................................3-2 Table 3-2, Summary of Data for Active Potable Wells............................................................... 3-4 Table 3-3, Summary of Pumping Station Data............................................................................3-6 Table 3-4, Summary of Storage Tank Data.................................................................................3-8 Table 3-5, Summary of Control Valve Station Data....................................................................3-9 SECTION 4—SYSTEM WATER USE Table 4-1, Historic Potable Water Production, 1980-2025..........................................................4-3 Table 4-2, Demands for Potable Water and Raw Water—Actual—2025...................................4-4 Table 4-3, Demands for Potable Water and Raw Water—Projected...........................................4-4 Table 4-4, Water Audit Loss Reporting, 2015-2024 ...................................................................4-6 Table 4-5, Truckee System Water Loss Performance Standards.................................................4-6 SECTION 5—SB X7-7 BASELINES AND TARGETS Table 5-1, Calculation of Baseline Per Capita Water Usage....................................................... 5-2 Table 5-2, Confirmation of Minimum Reduction for 2020 Target.............................................. 5-2 Table 5-3, Calculation of 2015 Interim Target GPCD ................................................................ 5-3 SECTION 6—WATER SYSTEM SUPPLIES Table 6-1, Groundwater Volume Pumped by the District...........................................................6-5 Table 6-2, Volume Pumped from the Martis Valley Groundwater Basin in 2025......................6-5 Table 6-3, Anticipated Martis Valley Groundwater Basin Withdrawals at Buildout..................6-9 Table6-4, 2025 Energy Usage...................................................................................................6-11 SECTION 7—WATER SYSTEM SUPPLIES Table 7-2, Retail: Normal Year Supply and Use Comparison..................................................... 7-3 Table 7-3, Retail: Single Dry Year Supply and Use Comparison............................................... 7-4 Table 7-4, Retail: Multiple Dry Years Supply and Use Comparison..........................................7-5 Table 7-5, Retail: Five-Year Drought Risk Assessment.............................................................. 7-6 Page iii Page 25 of 563 LIST OF FIGURES SECTION 2—SERVICE AREA Figure2-1, Location Map............................................................................................................2-2 Figure 2-2, Water System Service Areas.....................................................................................2-3 Figure 2-3, Historic And Projected Population, 1980-2045 ........................................................2-6 SECTION 3—EXISTING WATER FACILITIES Figure 3-1, Location of Water Production Facilities...................................................................3-3 Figure 3-2, Location of Pumping Stations...................................................................................3-5 Figure 3-3, Location of Storage Tanks and Control Valve Stations............................................3-7 SECTION 4—SYSTEM WATER USE Figure 4-1, Historic Potable Water Demands, 1985-2025...........................................................4-2 SECTION 6—WATER SYSTEM SUPPLIES Figure 6-1, Donner Summit Snowfall and Snowpack Winters, 1879-2025 ................................ 6-4 Figure 6-2, Projected Potable Water Demand vs. Existing Supply Capacity, 1995-2045........... 6-7 Figure 6-3, Projected Potable Water Demand vs. Proposed Supply Capacity, 1995-2045....... 6-10 Page iv Page 26 of 563 SECTION 1 INTRODUCTION SECTION 1 INTRODUCTION The California Water Code requires all urban water suppliers within the state to prepare urban water management plans and update them every five years. These plans satisfy the requirements of the Urban Water Management Planning Act of 1983 (Act) including amendments that have been made to the Act. Sections 10610 through 10656 of the California Water Code detail the information that must be included in these plans, as well as who must file them. Appendix A contains the text of the Act. Amendments to the Act now require that total projected water use be compared to water supply sources over the next 20 years in 5-year increments. The Act also requires the information be shown for a single dry water year and multiple dry water years. Additionally,the Act requires that all plans include a water recycling analysis that includes a description of the wastewater collection and treatment system within the agency's service area along with current and potential recycled water uses. According to the Act, "The conservation and efficient use of urban water supplies are of statewide concern; however, the planning for that use and the implementation of those plans can best be accomplished at the local level." The Act requires that each urban water supplier,providing water for municipal purposes either directly or indirectly to more than 3,000 customers or supplying more than 3,000 acre-feet of water annually, shall prepare, update and adopt its urban water management plan(UWMP) at least once every five years. In 2009,the Water Conservation Act of 2009(as known as SB X7-7)was adopted. This legislation created additional requirements regarding urban water management plans. These requirements are documented in Section 10608 of the California Water Code. Appendix B contains the text of SB X7-7. SUBJECT OF THE PLAN The Truckee Donner Public Utility District (District) operates two water systems in the Truckee area: the Hirschdale System(PWS CA2910010)and the Truckee System(PWS CA2910003). The Truckee System serves 13,763 accounts. The Hirschdale System serves 25 accounts. The two systems are physically separate and not interconnected. Based upon guidance from the California Department of Water Resources, an UWMP is not required for the Hirschdale system. Therefore, this document addresses the Truckee System only. UWMP OVERVIEW The Truckee Water System provides service to 13,763 customer accounts within the Town of Truckee and surrounding areas. The District uses the Martis Valley Groundwater Basin(MVGB) as its sole source of water supply. At buildout conditions, water usage from the MVGB by the District and other users will be less than the sustainable yield of the MVGB. There is sufficient storage volume available in the MVGB to manage a five-year drought and other water supplies are not necessary. The District has revised its Water Shortage Contingency Plan to comply with State of California requirements. The most likely cause of a water shortage involves a natural disaster such as a flood, earthquake or fire that impacts the water system facilities needed to move water from the Page 1-1 Page 28 of 563 Section 1 -Introduction groundwater wells to the points of service. The District has implemented a number of water demand management measures. The District intends to continue these efforts and will work to identify and implement additional programs if they are cost effective. PUBLIC PARTICIPATION In accordance with the Act, the District is required to make the plan available for public review and to hold a public hearing prior to adoption of the UWMP. This public hearing was held at the District's regularly scheduled Board Meeting on June 3, 2026. Notices of the public hearing were published in the Sierra Sun on May 22 and May 29, 2026. Letters were mailed directly to the following agencies advising them of the public hearing: • Town of Truckee • Nevada County • Placer County • Placer County Water Agency(PCWA) • Northstar Community Services District (NCSD) • Truckee Sanitation District • Tahoe-Truckee Sanitation Agency Prior to the meeting, draft copies of the UWMP were made available for public review on the District's website at www.tdpud.org. INTERAGENCY COORDINATION In accordance with the Act, the District is required to coordinate preparation of its UWMP with other local agencies. In the past,the District has worked cooperatively with NCSD and PCWA to study the available water supplies in the Truckee and Martis Valley area. In October 2015,NCSD took ownership of the PCWA Zone 4 water system in the Martis Valley and PCWA no longer has a local presence as a retail water purveyor. However, PCWA continues to be actively involved in management of the Martis Valley Groundwater Basin. Two major studies that were jointly funded by all three agencies have been completed: • Ground Water Availability In The Martis Valley Ground Water Basin, Nevada And Placer Counties, California,prepared by Nimbus Engineers,Reno,Nevada,March 2001. • Martis Valley Groundwater Management Plan, prepared by Brown and Caldwell and Balance Hydrologics, Reno,Nevada, April 2013. Preparation of the Martis Valley Groundwater Management Plan (GMP)document also included development of a finite element model for the MVGB by the Desert Research Institute. Development of this model was funded by the three local agencies and the US Bureau of Reclamation. This effort is documented in: Page 1-2 Page 29 of 563 Section 1 -Introduction • Integrated Surface and Groundwater Modeling of Martis Valley, California, for Assessment of Potential Climate Change Impacts on Basin-Scale Water Resources, prepared by Desert Research Institute, Reno,Nevada, April 2015. In 2014 California adopted the Sustainable Groundwater Management Act(SGMA). The MVGB was subject to this new regulation as a medium priority basin. In response, implementation of the 2013 GMP was placed on hold. The District, NCSD, PCWA, Town of Truckee, Nevada County and Placer County (Local SGMA Agencies) hired GEI Consultants to prepare an Alternative Submittal to California Department of Water Resources (DWR) as allowed under SGMA. The Alternative Submittal and supporting documentation contain information on SGMA, the requirements for an alternative submittal, and a report certifying that the MVGB has operated within the sustainable yield for at least 25 years. The MVGB Alternative Submittal was submitted to DWR in December, 2016. This effort is documented in: • Martis Valley Groundwater Basin Sustainable Groundwater Management Act Alternative Submittal. Prepared for the Truckee Donner Public Utility District, Placer County Water Agency,Northstar Community Services District, Town of Truckee,Nevada County and Placer County by GEI Consultants, Rancho Cordova, California. December 2016. In early 2019, while the MVGB Alternative Submittal was under review DWR, DWR separately conducted analyses to reconsider basin prioritization which is a criteria for being required to comply with the provisions of SGMA. The MVGB was originally classified as a'Medium'priority. The outcome of the DWR process was that the MVGB was re-prioritized to 'Very Low' and was no longer required to comply with SGMA. The Local SGMA Agencies agreed to formally withdraw the Alternative Submittal from DWR consideration and revert to the 2013 GMP framework, which had been placed on hold due to the passage of SGMA. Implementation of the 2013 GMP would begin in 2019, including the requirements for annual reports and a comprehensive update every five years. The Local Water Agencies engaged GEI Consultants to provide annual reports for the water years of 2018 to 2022. In 2024, the Local Water Agencies began a comprehensive update of the GMP which was completed in 2025, along with the water year 2023 annual report. This process included public hearings on the intent to update a GMP along with public hearings on the intent to adopt an updated GMP. This effort is documented in: • Martis Valley Groundwater Plan 5-Year Update, Summary Report for the Groundwater Management Plan Update Martis Valley Groundwater Basin, and the Martis Valley Groundwater Basin Annual Report Water Year 2025. Prepared for the Truckee Donner Public Utility District, Placer County Water Agency, and Northstar Community Services District by GEI Consultants, Rancho Cordova, California. July 11, 2025. Page 1-3 Page 30 of 563 Section 1 -Introduction A copy of the GMP is included in Appendix C. The District anticipates that it will continue to work cooperatively with NCSD and PCWA on issues related to the Martis Valley Groundwater Basin in the future. ENVIRONMENTAL REVIEW The preparation of an UWMP is specifically exempt from the California Environmental Quality Act (CEQA). Therefore, a CEQA review has not been performed in conjunction with the preparation of this document. However, the exemption only applies to preparation of the UWMP and the District will have to conduct environmental reviews in order to physically construct any of the projects described in this UWMP. PLAN ADOPTION The District's Board of Directors adopted the 2025 Urban Water Man 2026. A cony of the adopting resolution is included in Appen ix E. After adoption, the UWMP was submitted to the California Department of Water Resources and the California State Library. The UWMP was also posted on the District's website. The local public agencies were also informed that the UWMP was adopted and is available on the District's website. FORMAT OF THE PLAN The State of California has developed a number of standard tables to be included in an UWMP. In a number of cases,these standard tables include or discuss data that is not relevant to the District. One example is water used for"saline water intrusion barriers." These unmodified standard tables are included in order to comply with State reporting and filing requirements. Page 1-4 Page 31 of 563 SECTION 2 SERVICE AREA SECTION 2 SERVICE AREA The Truckee Donner Public Utility District (District) provides water service to portions of the town of Truckee, California, along with adjacent unincorporated areas of Nevada and Placer Counties. The District operates two water systems in the Truckee area: the Hirschdale System (PWS CA2910010) and the Truckee System (PWS CA2910003). The general location of the town of Truckee is given in Figure 2-1 and the boundaries of the District's water system service areas are shown in Figure 2-2. DISTRICT HISTORY AND BACKGROUND Public water service in the Truckee area began in 1880, when the Schaeffer Lumber Company developed the Tonini Springs to serve what is now downtown Truckee. In 1883, the McGlashen infiltration gallery was constructed, along with a transmission system to convey water to the downtown area. In 1885, the adjacent McGlashen Springs was developed. In 1927, the Truckee Donner Public Utility District was formed to provide electrical service to the Truckee area. In 1935, the District began providing water service with the purchase of the McGlashen water system. In 1943, the Southside Spring was acquired by the District and in 1953, the Tonini Springs water system was obtained by the District. Originally, the District's water system provided service to only the downtown area. The system was expanded to serve the Gateway and Meadow Park areas in the late 1940s. Significant expansion of the District's service area occurred in the 1960s as new residential subdivisions were constructed in the area. Service was extended to the Olympic Heights area in the early 1960s, and the Sierra Meadows area in the mid-1960s. The Tahoe Donner, Prosser Lakeview and Ponderosa Palisades areas were developed in the late 1960s, and the Armstrong area in the late 1970s. Prior to 2001, there were two other water purveyors in the Truckee area. In the Summer of 2001, the District took possession of the Donner Lake Water System. In February of 2002, the District took possession of the Glenshire Mutual Water Company's system. Significant development occurred during the 2000s. New residential developments included Gray's Crossing, Old Greenwood, Spring Creek and Winter Creek. Non-residential development included the Alder Creek Middle School, Pioneer Commerce Center and the Sierra College campus. A large number of infill homes were also constructed on vacant lots in the older subdivisions. From 2008 to about 2017, there was minimal new development within the service area with growth mainly involving infill construction of new homes within previously created subdivisions. Within the past few years, a number of new multi-phase projects have started. These include the Coldstream(formerly known as PC-1), Joerger Ranch (formerly known as PC- 3) and the Truckee Railyard. Page 2-1 Page 33 of 563 F- TRUCKEE DONNER PUBLIC UTILITY DISTRICT CALIFORNIA NEVADA TRUCKEE 4KENO OUTH LAKE TAHOE *SACRAMENT SAN FRANCISCO LAS VEGAS • BAKERSFIELD LOS LES • o� NORTH O • SAN DIEGO NOT TO SCALE TRUCKEE DONNER Figure 2-1 PublicLocation Map Page 34 of 563 I r,' _ � �1rR�•f" n;i.'°-P'w �'~1� �i! ;;� tit ,, r,w��__ �SMR E',;jss•i•a kti�.t1;F I'r y _ - I -r�`n}�. "+.• T� fir— - 'V��' �a� � .. �'� ' _��._•-� � �u lu. '>�. "���� � .� e�'�^�' e I��i I15sfA 4r f► i''.:7:i•_';...� ■ r L kr ��P �ne1e ti}i I r�Nrry9} � � � - �- ,tr �yf ''�_ ��' ��1��lll Afllh�f �� ■■ I(■Ma^c`s�� - - ei I� - - r� =��_'.►►Illlltl�ir•..1u� [;f•::; �fsE:3f`==Y-�gg.S -a tL'R`.�te:1r_7`y'�� [r-=F;�• - I y:::y'';.;_:� _ - I+ ■ ��r.�.r, _��=�'� =__ :�= . �r Yllll�i �. , � :�� ►ill EVA�l - -- �_ 1'yi f�.�•_ _ - �yBgAh a,liri^A� � n1AIf7fL q� It �,■� _ ilk •,�!'�.:' :Ins•;;:;r'.:-�''�aa�',;�::r.�:-�s�=1'- G.,1uIR � � �1N ice— � �r�l�_.�.�—�lr�'- ..ry .;,_•;:';;•.:, 7p_ r ku !.: yr •1: MA ► + r `i:: hstar-CDmmunity 6rvice District 1�.1� • � p.�iera ?? yi:+■ Ie �w+t+l���fa�1a...sl�1 • C• •. TRUCKEE DONNER • Public Ufility District 1 Section 2—Service Area SERVICE AREA The great majority of the service area consists of detached single-family homes, which make up about 94 percent of the customer accounts. There is additional multi-family development ranging from duplexes to apartment buildings with up to 24 units. Commercial development is concentrated in the downtown Truckee and Gateway areas and is mainly retail stores and small office buildings. There are two relatively large industrial facilities in the area(Teichert Materials Martis Valley aggregate plant & TNT Concrete batch plant) that are served by private wells. Institutional development entails primary and secondary schools along with governmental offices,parks and recreation facilities and public utilities. CLIMATE The District's service area is located in the eastern Sierra Nevada mountains at the east end of Donner Pass. Water system service elevations range from 5700 to over 7300 feet above mean sea level. The area receives substantial amounts of precipitation during the winter as both rain and snow. Average high temperatures range from the low 80s in Summer to the low 40s in Winter. Average low temperatures range from the low 40s in Summer to the mid-teens in Winter. CURRENT AND PROJECTED POPULATION The Town of Truckee and surrounding areas have been experiencing slow to moderate population growth over the past 50 years. The permanent population within the town has increased from 7,631 in 1985 to a current level of 16,928. Table 2-1 shows this historic population data. Figure 2-3 shows this data graphically. The economy of Truckee and the surrounding area relies upon tourism as the main industry. There are a significant number of residential units used as vacation homes that are not occupied on a full-time basis with estimates ranging as high as 75 to 80 percent for certain portions of the service area. The Town of Truckee's current General Plan was adopted in 2023. The General Plan estimated that 50 percent of all housing units are occupied full-time on a town-wide basis. The California Department of Finance (CDOF) cited a 49 percent occupancy rate in May of 2025, with an average of 2.44 persons per household for the owner-occupied properties. Given the tourism-based economy and the large number of vacation homes, the actual population of the District's water service area on any given day is likely 2-3 times the official reported California Department of Finance population. The time of year, day of the week and weather conditions significantly impact the number of people in the Truckee area, with the highest local population occurring in the December holiday period around Christmas and New Year's Day and in the early part of July around Independence Day. Other high occupancy periods occur on weekends throughout the winter ski season and throughout the Summer when schools are not in session. The lowest occupancy periods occur during the "shoulder seasons" of April/May and October/November. Page 2-4 Page 36 of 563 Section 2-Service Area Table 2-1. Historic Population Data Year Truckee Area Data Source Population 1985 7,631 1995 Water System Master Plan 1986 7,800 1995 Water System Master Plan 1987 7,950 1995 Water System Master Plan 1988 8,240 1995 Water System Master Plan 1989 8,471 1995 Water System Master Plan 1990 8,912 Town of Truckee General Plan, 1996 1991 9,482 1995 Water System Master Plan 1992 9,975 1995 Water System Master Plan 1993 10,250 1995 Water System Master Plan 1994 11,150 California Department of Finance a 1995 11,800 California Department of Finance a 1996 12,050 California Department of Finance a 1997 12,600 California Department of Finance a 1998 13,000 California Department of Finance a 1999 13,300 California Department of Finance a 2000 13,864 US Census Bureau,Census 2000 2001 14,148 California Department of Finance b 2002 14,583 California Department of Finance b 2003 14,784 California Department of Finance b 2004 15,098 California Department of Finance b 2005 15,448 California Department of Finance b 2006 15,651 California Department of Finance b 2007 15,837 California Department of Finance b 2008 16,085 California Department of Finance b 2009 16,230 California Department of Finance b 2010 16,180 US Census Bureau,Census 2010 2011 16,139 California Department of Finance° 2012 15,968 California Department of Finance° 2013 15,983 California Department of Finance° 2014 16,043 California Department of Finance° 2015 16,205 California Department of Finance° 2016 16,305 California Department of Finance° 2017 16,398 California Department of Finance° 2018 16,535 California Department of Finance° 2019 16,537 California Department of Finance 2020 16,642 US Census Bureau,Census 2020 2021 16,781 California Department of Finance d 2022 16,843 California Department of Finance d 2023 16,744 California Department of Finance d 2024 16,923 California Department of Finance d 2025 1 16,928 1 California Department of Finance d a State of California,Department of Finance,Revised Historical City, County and State Population Estimates, 1991-2000, with 1990 and 2000 Census Counts. Sacramento,California.March 2002. b State of California,Department of Finance,E-4 Population Estimates for Cities,Counties and the State,2001-2010,with 2000 Benchmark. Sacramento,California,May 2010. ° State of California,Department of Finance,E-4 Population Estimates for Cities,Counties and the State,2011-2020,with 2010 Benchmark. Sacramento,California,May 2021. d State of California,Department of Finance,E-4 Population Estimates for Cities,Counties and the State,2021-2025,with 2020 Benchmark. Sacramento,California,May 2025. Page 2-5 Page 37 of 563 Figure 2-3. Historic and Projected Population, 1985-2045 25,000 1 1 1 I I I Historic Population j —A Population Projection Based on 2023 General Plan I I I I I I I I � � � 20,000 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- - ----------------------- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 1 1 I I 1 I I 1 I 1 1 I 1 1 I I I I I I I I 1 I I I I I I I I I 1 I I I I I I I I I 1 I I I I I I I I I I 1 I I I 1 I I 1 I 1 1 I 1 1 15,000 r ------------------------t-------------------------t-------------------------t------------------ ----t-------------------------t-------------------------t-------------------------t-------------------------t-------------------------t-------------------------r-------------------------+------------------------.. I 1 I I 1 I 1 1 I 1 1 I I I I I I I I I I I I I I I I I I I I I I Q I I I I I I I I I I I I I 1 I I 1 I 1 1 I 1 1 I I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 Q I I I I I I I I I I I I I I I I I I I I I I a I I I I I I I I I I I I 1 I I I I I I I 1 I 10,000 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I I 1 I 1 I I 1 I 1 1 I I 1 I 1 I I 1 I 1 1 I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I 1 1 I 1 I I 1 I 1 1 I I 1 I 1 I I 1 I 1 1 I I 1 I I I I I I I I I I I O I I I I I I I I I I I 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 Year Page 38 of 563 Section 2—Service Area The District has conducted correspondence with the California State Water Resources Control Board (SWRCB) regarding this significant transient/tourist population and the SWRCB has agreed to the use of a higher population value when calculating per capita water usage. For consistency when calculating compliance with SB 7X-7, the District used the official CDOF population of 16,228 that was published in the May 2020 edition of E-4. It should be noted that in May 2021, CDOF revised the population estimates for Truckee based upon the official US 2020 Census. This revision covered the period of 2011-2020. These revised values are given in Table 2-1. Appendix B of the General Plan discusses future population growth. This data is summarized in Table 2-2 and is also shown on Figure 2-3. A growth rate of about 1.1% per year is expected with the buildout population of 23,200 permanent residents. Table 2-2. Current and Future Population Projections Year Population 2025 16,928 2030 18,300 2035 18,980 2040 20,100 2045 21,020 2050 22,000 Buildout 23,200 It should be noted that the District's water system service area extends outside the Town of Truckee limits encompassing small adjoining areas of unincorporated Nevada and Placer Counties. There are also small developed areas within the Town of Truckee that utilize private wells and are not supplied water by the District. However, for the purposes of this study, it is assumed that the Town of Truckee's population as determined by the California Department of Finance is equal to the population of the District's water service area. Page 2-7 Page 39 of 563 SECTION 3 EXISTING WATER FACILITIES SECTION 3 EXISTING WATER FACILITIES The District's water system is reasonably complicated with 47 pressure zones, 26 pumping stations, 13 active wells and 33 active storage tanks. All demands in the Truckee systems are currently served by groundwater wells, although natural springs and surface water have been used as a water supply in the past. PRESSURE ZONES There are currently 47 pressure zones in the service area, with service elevations ranging from 5745 feet in the Martis Valley to 7370 feet at the highest point in Tahoe Donner. Static service pressures ranges from a high of about 200 psi to a low of about 20 psi. Approximate minimum and maximum ground elevations and static service pressures in the pressure zones are given in Table 3-1. GROUNDWATER WELLS The District currently has 10 active wells that are used to supply potable water to customers. The total production capacity of the active potable water wells is about 9,935 gpm (14.3 mgd). The wells are located at various locations throughout the distribution system. The locations of the wells are shown in Figure 3-1 and selected well characteristics are shown in Table 3-2. There are three active wells that are used to serve non-potable water demands. The Donner Creek Well is connected to a separate piping system that is used to provide irrigation water to the Coyote Moon Golf Course. The Fibreboard Well is connected to a separate piping system that is used to provide irrigation water to the Gray's Crossing and Old Greenwood golf courses. The Southside No. 1 well is used to supply construction water for contractor use during the Summer construction season. There are two additional wells(A Well, Southside No.2 Well)that were previously used to provide potable water. A Well has been experiencing problems with air entrainment that resulted in customer complaints. Southside Well No. 2 is a relatively shallow well that is near a series of natural springs and may be under the influence of surface water. Both of these wells are considered inactive and the District has been investigating the potential to supply customers that do not require potable water (irrigation and snowmaking uses) from these wells with a corresponding reduction in potable water demand. There are three other wells that have not been operated for at least 25 years. They are the B,Biltz, and Bingham Place wells. All three of these wells are low in capacity and the District does not intend to use these wells in the future. However, they have not been abandoned in accordance with California State requirements and are therefore considered inactive. WATER TREATMENT FACILITIES All of the District's active potable water wells are equipped with disinfection systems utilizing sodium hypochlorite. Water supplied to the District's customers complies with the appropriate federal and State standards. Page 3-1 Page 41 of 563 Section 3—Water System Facilities Table 3-1. Summary of Pressure Zone Data Pressure Zone Target Lowest Service Highest Highest Lowest Static HGL, Elevation,feet Static Service Service Service feet Pressure,psi Elevation,feet Pressure,psi 6040 6040 5838 87 5927 49 6170 6170 5880 125 6050 52 Alder Creek 6610 6300 134 6440 74 Armstrong 6334 5959 162 6200 58 Bennett Flat 6352 6196 68 6225 55 Coldstream 6080 6080 5920 69 5930 65 DL-6124 6124 5940 80 6050 32 DL-6323 6323 5950 161 6245 34 DL-Northeast 6085 5940 63 5975 48 DL-Red Mountain 6260 6020 103 6160 43 DL-Wolfe 6220 6035 80 6140 35 Donner Trails 6160 5932 99 6005 67 Donner View 6894 6612 122 6806 38 Donner View Hydro 6990 6820 74 6890 43 Gateway 6040 5825 93 5990 22 Gateway Hydro 6300 6120 78 6160 61 Glacier 7500 7210 126 7370 56 Glenshire 1 6341 5880 200 6203 60 Glenshire 2 6163 5823 147 6038 54 Heidi Way 6815 6595 95 6645 74 Heights Hydro 6415 6183 100 6325 40 Hillside 6660 6357 131 6526 58 Icknield 6058 5840 94 5850 90 Innsbruck 6493 6157 145 6455 16 Lower Lakeview 6130 5820 134 6040 40 Lower Ski Run 7088 6850 103 6954 58 Lower Skislope 7015 6752 114 6830 80 Martiswoods 6360 6210 65 6255 45 Middle Skislope 7146 6800 150 7010 59 Palisades Hydro 6390 6180 91 6220 74 Pinnacle 6843 6588 110 6756 38 Pinnacle Hydro 6950 6752 86 6820 56 Ponderosa Palisades 6298 6025 118 6220 34 Prosser Heights 6338 6000 146 6180 68 Riverview 6020 5790 100 5875 63 Roundhill Hydro 6790 6618 74 6660 56 Sierra Meadows 6146 5880 115 6030 50 Sitzmark Hydro 6580 6435 63 6440 61 Soma Sierra 6286 6000 124 6200 37 Stockholm 6708 6395 135 6641 29 Town 6024 5745 121 5950 32 Trout Creek 6550 6550 6375 76 6420 56 Upper Lakeview 6230 5975 110 6100 56 Upper Ski Run 7195 6930 115 6950 106 Upper Skislope 7341 7010 143 7240 44 Waterloo 6071 5825 106 5900 74 West Palisades Hydro 6250 6100 65 6210 17 HGL=Hydraulic Grade Line Page 3-2 Page 42 of 563 i i ,Luqpz�, PROSSER ANNEX WELL PR SSER VILLAGE W o IBREBOARD W,ELJ (INACTIVE) (I WELL - (RRIGATION US1 ONLY) ° OLD GR ENWOOD WELL B WELL (INACTIVE) 4 1HOFERT P OSS R FF IGHTS W*L /• SPRINGS (INACTIVE) LL O. 0 L Z SANDERS WELL LENSHIRE RIVE WELL _ 0000� MCGLASHEN\ 00000 000o SPRINGS �• SIDE l (INACTIVE) 00000000�00o ELl HSI 0000®o BILTZ WELL (C RUCTION WATER ONLY) ®0000� (INACTIVE) NORTHSIDE WELL ®®� GR ENPOINT SPRING (INACTIVE) ®o LEGEND \ • ACTIVE POTABLE WATER WELL 1 ARTIS VALLEY • ACTIVE NON-POTABLE WATER WELL S SIDE WELL NO.1 • INACTIVE POTABLE WATER WELL RI • INACTIVE SURFACE WATER SOURCE INA NI NI F R S ACTIVE) NORTH BINGHAM PLACE WELL DONNER CREE WELL_ ❑ Al PORT W (INACTIVE) (IRRIGATION U ON TO SHEEPHER E P NGS(INACTIVE) / (APPROX.3 OUTH ON CA 89) NOT TO SCALE I TRUCKEE DONNER Figure 3-1 PublicLocation of Water Production Facilities Page 43 of 563 Section 3—Water System Facilities Table 3-2. Summary of Data for Active Potable Wells Name Current Ca acit ,gpm Airport 2,370 Glenshire Drive 1,785 Martis Valley Well No. 1 1,745 Northside 510 Old Greenwood 960 Prosser Annex 480 Prosser Heights 430 Prosser Village 825 Sanders 280 Well No. 20 550 Total 9,935 Note: Current capacity given is based on most recent data OTHER WATER SUPPLY SOURCES In the past, the District has used natural springs as water supply sources and has also withdrawn water from Donner Lake. There are four springs: Greenpoint; McGlashen; Southside; and Tonini; at which the District has facilities. These springs are not currently used due to their low capacity and the need to treat the water supply in accordance with the Surface Water Treatment Rule. In addition, the District owns water rights to the Sheepherder Springs and Hofert Springs, although no facilities exist to utilize these supplies. Figure 3-1 shows the locations of these springs. The District has 990 acre-feet per year of surface water rights for withdrawals from Donner Lake. The District has abandoned the Intake Pump Station that was previously used withdraw water from Donner Lake and these rights have not been utilized in recent years. PUMPING STATIONS The Truckee System currently has 26 pumping stations located throughout the distribution system. These pumping stations move water from lower pressure zones to higher pressure zones to serve demands in higher elevations of the service area. The different pumping stations have a variety of configurations, with some facilities taking suction directly from distribution system pipelines, while others are located at storage tank sites and use the storage tank as a forebay. Similarly,there is a variety of vertical turbine, end suction and horizontal split case pumps. All of the pumps are driven by electric motors. Some of the pumping stations are equipped with diesel powered generators as a backup power supply. The locations of the pumping stations are shown in Figure 3-2, and selected pump characteristics are shown in Table 3-3. STORAGE TANKS The Truckee System has 36 storage tanks — 33 active and 3 inactive. Most of the tanks provide gravity pressure to a portion of the distribution system. Some also function as a forebay for a pumping station. The total storage capacity of the active water tanks is about 12.4 mg. Storage tank locations are shown in Figure 3-3 and their characteristics are given in Table 3-4. Page 3-4 Page 44 of 563 i PINNACLE HY ROPNEUMATIC P ION I STOCKHOLM ROUNDHILL HYDROPREUMATIC PUMPING STATION PUMPING STATION A F LCON POINT ALDER CREEK PIMPING STATION PUMPING STATION i SKI L DGE PUM ING STATIO IT MARKHYDROPNEU U FINGSTATON INNSBRUCK R H IGH S I RUN NE MAT C - PUMPING STATION PUMPING STATION - PUM T 1 - J IN AMP ATI N ST ND U PING N JO AGUERA- / - PUMPING STATION HERRINGBONE 00000 PUMPING STATION SOMA SI RRA 0000o DONNER VIEW HYDROPNEUMATIC PUMPIN STATION GA EWAY 00000 00000 00000 000�oo -=PUMPING STATIO H DROPNEUMATIC _ DONN R TRAILS off`c- P MPING STATION ®0000j PUMPI G STATI N HYDROP'/ / PUMPING STF, 0 T i I A AD ES ATIC AIRPORT DROPNEUM LIMPING STATIC, MPING STA ON �J O NORTH RED MOUNTAIN RICHARDS �I HYDROPNEUMATIC PUMPING STATION PUMPING STATION - ST ALI ADES OPN UMATIC SIE S PING S ATION U ON MARTISWOODS NOT TO SCALE PUMPING STATION TRUCKEE DONNER Figure 3-2 PublicLocation of Pumping Stations Page 45 of 563 Section 3—Water System Facilities Table 3-3. Summary of Pumping Station Data Name Suction Pressure Discharge Pressure Number of Total Zone Zone Pumps Power,h Airport --- 6170 4 400 Alder Creek Stockholm Donner View 2 60 China Camp 6170 Prosser Heights 3 90 Donner Trails Gateway Soma Sierra 4 600 Donner View Hydro Donner View Donner View Hydro 3 55 Falcon Point Innsbruck Stockholm 3 225 Gateway Hydro Gateway Gateway Hydro 3 75 Herringbone Stockholm Donner View 3 150 Innsbruck Innsbruck Stockholm 4 200 Joe Aguera 6170 Innsbruck 4 400 Martiswoods Ponderosa Palisades Martiswoods 2 15 Pinnacle Hydro Pinnacle Pinnacle Hydro 2 27.5 Palisades Hydro Ponderosa Palisades Palisades Hydro 5 100 Prosser Heights Hydro Prosser Heights Prosser Heights Hydro 2 70 Red Mountain Hydro DL-6124 Red Mountain 2 20 Richards Boulevard Gateway Armstrong/DL-6323 3 300 Roundhill Hydro Stockholm Roundhill Hydro 2 30 Sierra Meadows 6170/Sierra Meadows Ponderosa Palisades 3 90 Sitzmark Hydro Innsbruck Sitzmark Hydro 2 30 Ski Lodge Donner View Upper Ski Run 2 80 Ski Run Upper Ski Run Upper Glacier 2 50 Soma Sierra Soma Sierra Innsbruck 4 600 Stockholm Stockholm Pinnacle 3 150 Strand 6170/Glenshire 2 Glenshire 1 3 120 West Palisades Hydro Ponderosa Palisades West Palisades Hydro 1 3 Wolfe Hydro DL-6124 Wolfe 2 45 CONTROL VALVE STATIONS There are 41 control valve stations located throughout the Truckee System - 35 active and 6 inactive. These stations provide service to small pressure zones, allow a means to relieve pressure in zones not directly served by a reservoir and provide additional water for fire flow demands. The locations of the stations are shown on Figure 3-3 and selected data on the stations is given in Table 3-5. PIPELINES The existing distribution system consists of about 230 miles of pipeline ranging from 2-inches to 24-inches in diameter. The majority of the pipelines are between 4-inches and 8-inches in diameter. The oldest piping in the system dates to the 1940s. There are a number of different pipeline materials throughout the system. The majority of the distribution pipelines are steel,with large portions of ductile iron and PVC pipe as well. Page 3-6 Page 46 of 563 i ALDER CREEK PRV STATION I PINNACLE TANK � o RAINB PRV STATION I P S TI N\I WEST HILLSIDE PRV STATION PROS I R K ANK I N4 STOCKHOLM TANK STA N EAST HILLSIDE PRV STATION A 10 FALCON POfNT TANK TERLOO " --,'PRV ROUNDHILL TANK GHIRARD PROSSE PRV STATION RV STATION\ LLI 4GTON PRV 'RV S ATION S ILODG TANPROc SERANNEX (INACTITIVr_, TAN 16133 PRV S ATION NORTH E OLD GREENWOO N . LD GREENWOOD FL T PR ST TIO PRV STATION RV STATION T J (INACTIVE) INACTIV ) 13330 PRV- SIT MARK TA K o STATION ^ r DO N NGTON J_ \l TROUT CREEK 665( ER EIGHT FEAT ERST E 5988 TANK p ATION OLD E OD NO.3 KI RUN TANK STATION PRV STATION TAN (INAC IVE) - 14526 PRV � F RV T IIQ STATION LACIER TANK LD G E N OOD NO 4 I � - � - " � RV ST r R G SHI E S INNSBRUCK TAt�IK PP R GL NS IRE AN I S TI NNE BR E-STREET T RV STAT ON 6170 TAN - LENSHIRE DRIVE DONNER VIEW TANK HERRINGBONE TANK _ PRV STATION o� EIDI WAY DONN R TRAILS EAST NORT DE �c�c oo�o_o_V STATION SOMA SIERRA T NK PRV S ATION - DONNE LAKE ILTZ TANK o (IlLTZTIVE)�oL� DONNER TRAIL TANKS GAT WAY TANK N RTHSIDE TANK , �YARC R V ----- 6323 TA K WES NORTHSIDE FCV S ATION LEGEND ®®�-- ARMSTRONG ANK l T •- c DR EWAY / • ACTIVE STORAGE TANK SITE PRV STATI N; V STATION • INACTIVE STORAGE TANK SITE WOLFE TAN PRV STATION INACTIVE / \ ` REYN D • ACTIVE CONTROL VALVE STATION LOCH LEVEN gILTZ PRV STATION • INACTIVE CONTROL VALVE STATION � I J) \\ + ( ) El r S RRA PRV ATI M I ROAD EADOWSTANK WEST REED FCV STATION IV 0 NORTH (9611 E P D OSA SUMMIT DRIVE - ST N PALI DEEST,4 AIRPORT TANK RED MOUNTAIN TANK PRV STATION C LDSTRE 6080 _ P V STATIO RTIS VALLE OAD STATI ONE. MART I WOODS TANK AN NOT TO SCALE MARTI WOODS TOWER TRUCKEE D O R Figure 3-3 Public Utility District Location of Storage Tanks and Control Valve Stations Page 47 of 563 Section 3-Water System Facilities Table 3-4. Summary of Stora a Tank Data Storage Tank Volume, Diameter, Floor Shell Height, Overflow Year mg feet Elevation feet Elevation Built Airport 0.60 70 5886 20 5906 1979 Armstrong 0.10 27 6310 24 6334 1979 Biltza 0.085 25 6350 24 6374 1985 Bridge Street 6170A 1.50 90 6139 32 6171 2002 Bridge Street 6170B 2.25 110 6139 32 6171 2024 Donner Trails 1 0.15 36 6022 20 6042 1973 Donner Trails 2 0.15 36 6022 20 6042 1990 Donner Lake 6323 0.30 40 6291 32 6323 2005 Donner View 0.35 40 6861 32 6893 1973 Falcon Point 0.20 39 6469 24 6493 1974 Featherstone 5988a 0.36 44 5956 32 5988 2002 Gateway 0.45 60 6021 24 6045 1995 Glacier 0.15 36 7476 24 7500 1972 Herringbone 0.30 40 6676 32 6708 1973 Innsbruck 0.20 39 6469 24 6493 1972 Lower Glenshire 1 0.42 55 6139 24 6163 1993 Lower Glenshire 2 0.32 48 6139 24 6163 1972 Martiswoods 0.20 40 6276 22 6298 1982 Martiswoods Tower 0.10 20 6338 22 6360 1982 Northside 0.40 55 6003 24 6027 1974 Pinnacle 0.18 31.5 6811 32 6843 1973 Ponderosa Palisades 0.20 40 6276 22 6298 1972 Prosser Annex 0.215 40 6314 24 6338 1994 Prosser Heights 0.215 40 6314 24 6338 1963 Prosser Lakeviewa 0.25 40 6102 28 6130 1971 Red Mountain 0.21 39 6100 24 6124 2021 Roundhill 0.30 40 6676 32 6708 1974 Sierra Meadows 0.25 34 6110 36 6146 1971 Sitzmark 0.20 39 6469 24 6493 1973 Ski Lodge 0.35 50 6870 24 6894 1971 Ski Run 0.21 39 7171 24 7195 2024 Soma Sierra 0.20 40 6262 24 6286 1972 Stockholm 0.32 42 6676 32 6708 1972 Upper Glenshire 1 0.28 45 6315 24 6339 1991 Upper Glenshire 2 0.21 39 6315 24 6339 1989 Wolfe 0.23 42 6100 24 6124 1993 Total 12.405 a Tank is inactive Page 3-8 Page 48 of 563 Section 3—Water System Facilities Table 3-5. Summary of Control Valve Station Data Name Upstream Pressure Downstream Notes Zone Pressure Zone 13330 Skislope Middle Skislope Lower Skislope 13770 Skislope Upper Skislope Middle Skislope 14526 Skislope Glacier Upper Skislope 16133 Skislope Upper Ski Run Lower Ski Run Alder Creek Stockholm Alder Creek Biltz Biltz Tank Armstrong Inactive Coldstream 6080 DL-6323 Coldstream 6080 College 6170 Gateway Donner Trails Soma Sierra Donner Trails Donnington Glenshire 1 Glenshire 2 East Hillside Stockholm Hillside East Northside 6170 Town Estates 6170 Riverview Gateway 6170 Gateway Ghirard 6170 Lower Lakeview Glenshire Drive 6170 6040 Heidi Way Stockholm Innsbruck Icknield Glenshire 2 Icknield Laurelwood Upper Lakeview Lower Lakeview Inactive Loch Leven DL-6323 DL-Northeast Martis Valley Road Ponderosa Palisades Sierra Meadows Moraine Road Armstrong DL-Northeast Inactive North Bennett Flat Innsbruck Bennett Flat Old Greenwood No. 1 6170 6040 Inactive Old Greenwood No. 2 6170 6040 Inactive Old Greenwood No. 3 6170 6040 Old Greenwood No. 4 6170 6040 Prosser Prosser Heights Upper Lakeview Inactive Railyard 6170 Town Rainbow Prosser Heights Lower Lakeview Reynold 6170 Riverview Snowshoe Prosser Heights Lower Lakeview South Bennett Flat Innsbruck Bennett Flat Summit Drive DL-6323 DL-Northeast Trout Creek 6550 Stockholm Trout Creek 6550 Tudor Glenshire 2 Icknield Waterloo Glenshire 2 Waterloo Wellington Glenshire 2 Waterloo West Hillside Stockholm Hillside West Northside 6170 Gateway West Reed DL-6323 DL-6124 Page 3-9 Page 49 of 563 SECTION 4 SYSTEM WATER USE SECTION 4 SYSTEM WATER USE This section describes the historic and future water demands for the Truckee System. HISTORIC POTABLE WATER DEMANDS Potable water demand in the Truckee System reached a historic peak in 2007 with an average day demand of 6.67 mgd and a maximum day demand of 14.84 mgd. Since 2007, there has been a significant reduction in potable water usage with an average day demand of 3.61 mgd and a maximum day demand of 6.95 mgd for the year 2025. Figure 4-1 shows the historical trend of water demand for the Truckee System and Table 4-1 gives this information in tabular form. As shown in Figure 4-1, the maximum demand for 2025 continued the general downward trend that has been observed since about 2010. The maximum day demand of 9.64 mgd for 2013 is considered anomalous because the Fibreboard Well was out of service on the maximum day (July 24, 2013) and two golf courses that normally receive untreated irrigation water from the Fibreboard Well were instead supplied from the potable water system. Otherwise, the maximum day demand for 2013 was 8.68 mgd on July 5, 2013. Average demand has been essentially flat for the past ten years. There was a noticeable increase for 2020 and 2021. There are two factors that likely contributed to this increase: 1) September and October of 2020 were drier and warmer than the previous few years. This resulted in above normal irrigation demands during this September-October period that affected the overall water demand for that calendar year. 2) As noted in Section 2, about half of the residential units in the Truckee area are normally used as vacation homes. With the impact of COVID-19 resulting in schools using remote learning and businesses using work from home arrangements when feasible, many property owners relocated to their vacation properties in the Truckee area to avoid restrictions implemented in more urbanized areas of California. However, water demand has decreased for the past few years. Precipitation for this period has been at least average with the winter of 2022-23 extremely heavy. This has resulted in reduced irrigation demands compared to prior years. It is also likely that some of the owners with multiple properties that relocated to Truckee during the COVID-19 pandemic have returned to other locations with the lifting of restrictions. EXISTING WATER DEMANDS Potable water production for the year 2025 averaged 3.61 million gallons per day (mgd) with a peak of 6.95 mgd that occurred on July 3, 2025. Total potable water production was about 1,319 million gallons. An additional 236 million gallons of raw water was produced to serve golf course irrigation demands. About 760,000 gallons of raw water was produced to serve construction water demands. Table 4-2 gives a breakdown of this demand by customer category. Page 4-1 Page 51 of 563 Figure 4-1. Historic Potable Water Demands, 1985 - 2025 16.0 Historic Average Day Demand 14.0 Historic Maximum Day Demand -------Estimated Maximum Day Demand A Historic Minimum Day Demand 12.0 ----------------------------------------------......-------------.... 10.0 -----------------------------------------......_..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._...__..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._. CD E c 8.0 _..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._... .._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._... ..._..._..._.. ..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._... _..._. E 4.0 _..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._. ----------------------------------- ...-------------... -- .._..._..._..._..._..._..._..._..._. 2.0 _... ..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._..._... _.. _..._..._..._..._.. ..._..._..._..._..._..._..._..._..._......_..._..._..._.. ..._.. ..._..._..._......_..._..._... ... ..._..._..._..._..._..._..._..._..._..._..._..._..._... .. .. ..._..._..._..._..._..._..._..._..._. 0.0 1985 1990 1995 2000 2005 2010 2015 2020 2025 Year Page 52 of 563 Section 4-System Water Use Table 4-1. Historic Potable Water Production, 1980-2025 Aver a a Dav Maximum Day Peaking Year an d gpm an d gpm Factor 1985 1.91 1,328 NA NA NA 1986 1.95 1,353 NA NA NA 1987 2.32 1,611 NA NA NA 1988 2.31 1,606 NA NA NA 1989 2.56 1,775 NA NA NA 1990 2.89 2,005 NA NA NA 1991 3.07 2,131 NA NA NA 1992 2.61 1,810 NA NA NA 1993 2.81 1,954 NA NA NA 1994 3.28 2,277 6.78 4,708 2.07 1995 3.10 2,150 5.78 4,016 1.86 1996 3.47 2,407 6.49 4,505 1.87 1997 3.52 2,445 6.64 4,611 1.89 1998 3.47 2,413 7.22 5,014 2.08 1999 4.08 2,833 7.63 5,299 1.87 2000 4.33 3,004 8.46 5,877 1.96 2001 4.65 3,228 8.76 6,085 1.88 2002 6.09a 4,229 11.47a 7.965 1.88 2003 6.05 4,204 11.50 7,986 1.90 2004 6.64 4,614 12.61 8,759 1.90 2005 6.11 4,244 12.66 8,790 2.07 2006 6.50 4,514 13.01 9,034 2.00 2007 6.67 4,631 14.84 10,304 2.23 2008 6.29 4,371 12.65 8,783 2.01 2009 5.63 3,913 12.71 8,826 2.26 2010 4.53 3,149 9.53 6,616 2.10 2011 4.25 2,952 8.72 6,055 2.05 2012 4.35 3,019 8.42 5,847 1.94 2013 4.50 3,124 9.64 6,692 2.14 2014 3.98 2,761 8.13 5,643 2.04 2015 3.26 2,266 7.72 5,362 2.37 2016 3.57 2,481 8.06 5,598 2.26 2017 3.57 2,478 7.46 5,181 2.09 2018 3.73 2,591 7.45 5,175 2.00 2019 3.55 2,466 7.32 5,081 2.06 2020 4.06 2,817 7.18 4,989 1.77 2021 4.02 2,790 7.74 5,372 1.93 2022 3.72 2,582 6.93 4,814 1.86 2023 3.70 2,568 6.79 4,716 1.84 2024 3.77 2,616 7.31 5,073 1.94 2025 3.61 2,509 6.95 4,823 1.92 a Large increase in production for 2002 results from acquisition of Donner Lake and Glenshire Water Systems Page 4-3 Page 53 of 563 Section 4—System Water Use Table 4-2. Demands for Potable Water and Raw Water—Actual—2025 Use Type Additional Level of Volume Descri tion Treatment milliongals) Single-Family Drinking Water 672 Multi-Family Drinking Water 86 Commercial Drinking Water 115 Industrial Drinking Water 0 Institutional/Governmental Drinking Water 60 Landscape Drinking Water 42 Saline Water Intrusion Barrier Drinking Water 0 Agricultural Irrigation Drinking Water 0 Wetlands or Wildlife Habitat Drinking Water 0 Sales/Transfers to Other Agencies Drinking Water 0 Losses Drinking Water 343 Other Irrigation Raw Water 236 Other Construction Water Raw Water 1 Total 1,555 FUTURE WATER DEMANDS Water demand projections for buildout conditions have been calculated based upon anticipated development of all currently vacant parcels. Currently developed parcels were assumed to continue into the future with no change in land use. A projected buildout demand was then calculated for each vacant parcel based on the anticipated land use and the size of the parcel. This analysis resulted in a buildout average day potable water demand of 7.76 mgd and a buildout maximum day potable water demand of 14.26 mgd. Detailed information regarding these buildout projections is given in the report entitled Buildout Water Demand Projections, July 2025. Table 4-3 gives the projected breakdown of future water demand by category in 5- year increments. Table 4-3. Demands for Potable Water and Raw Water—Projected Volume(milliongals) Use Type Additional 2030 2035 2040 2045 Description Single-Family Drinking Water 821 990 1,159 1,327 Multi-Family Drinking Water 105 127 148 170 Commercial Drinking Water 140 169 198 227 Industrial Drinking Water 0 0 0 0 Institutional/Governmental Drinking Water 73 88 103 118 Landscape Drinking Water 77 88 98 109 Saline Water Intrusion Barrier Drinking Water 0 0 0 0 Agricultural Irrigation Drinking Water 0 0 0 0 Wetlands or Wildlife Habitat Drinking Water 0 0 0 0 Sales/Transfers Drinking Water 0 0 0 0 Losses Drinking Water 339 335 331 327 Other—Non Potable Irrigation Raw Water 240 240 240 240 Other—Non Potable Const.Water Raw Water 1 1 1 1 Total 1,796 2,038 2,278 2,519 Page 4-4 Page 54 of 563 Section 4—System Water Use CURRENT AND POTENTIAL USE OF RECYCLED WATER In November 1990, the Truckee-Carson-Pyramid Lake Water Rights Settlement Act, Title II of Public Law 101-618 [104 Stat. 3289, 3294] was signed into law by the US Government. Section 204.c.1.G of that Act essentially prohibits the reduction in return flow of treated wastewater to the Truckee River and thereby precludes use of recycled water in the Truckee area. The text of the Section is given below: G) if the Tahoe-Truckee Sanitation Agency or its successor (hereafter 'TTSA') changes in whole or in part the place of disposal of its treated wastewater to a place outside the area between Martis Creek and the Truckee River below elevation 5800 NGVD Datum, or changes the existing method of disposing of its wastewater, which change in place or method of disposal reduces the amount or substantially changes the timing of return flows to the Truckee River of the treated wastewater, TTSA shall: (i) acquire or arrange for the acquisition of preexisting water rights to divert and use water of the Truckee River or its tributaries in California or Nevada and discontinue the diversion and use of water at the preexisting point of diversion and place of use under such rights in a manner legally sufficient to offset such reduction in the amount of return flow or change in timing, and California's Truckee River basin gross diversion allocation shall continue to be charged the amount of the discontinued diversion; or (ii) in compliance with California law, extract and discharge into the Truckee River or its tributaries an amount of Truckee River basin groundwater in California sufficient to offset such reduction or change in timing, subject to the following conditions: (a) extraction and discharge of Truckee River Basin groundwater for purposes of this paragraph shall comply with the terms and conditions of subparagraphs 204(c)(1) (B) and (D) and shall not be deemed use of Truckee River basin groundwater within the State of Nevada within the meaning of subparagraph 204(c)(1)(D); and (b) California's Truckee River basin gross diversion allocation shall be charged immediately with the amount of groundwater discharged and, when California's Truckee River Basin gross diversion allocation equals 22,000 acre-feet or when the total of any reductions resulting from the changes in the place or method of disposal exceed 1000 acre-feet,whichever occurs first,the California Truckee River basin gross diversion allocation shall thereafter be charged with an additional amount of water required to compensate for the return flows which would otherwise have accrued to the Truckee River basin from municipal and industrial use of the discharged groundwater. In no event shall the total of California's Truckee River gross diversions and extractions exceed 32,000 acre-feet. (iii) For purposes of this paragraph, the existing method of disposal shall include, in addition to underground leach field disposal, surface spray or sprinkler infiltration of treated wastewater on the site between Martis Creek and the Truckee River referred to in this subsection. (iv) The provisions of this paragraph requiring the acquisition of water rights or the extraction and discharge of groundwater to offset reductions in the amount or timing of return flow to the Truckee River shall also apply to entities other than TTSA that may treat and dispose of wastewater within the California portion of the Truckee River basin, but only if and to the extent that the treated wastewater is not returned to the Truckee River or its tributaries, as to Page 4-5 Page 55 of 563 Section 4-System Water Use timing and amount, substantially as if the wastewater had been treated and disposed of by TTSA in its existing place of disposal and by its existing method of disposal. The provisions of this paragraph shall not apply to entities treating and disposing of the wastewater from less than eight dwelling units. WATER AUDITS AND NON-REVENUE WATER In accordance with State regulations, the District is required to prepare a water audit for each calendar year. One purpose of the water audit is to identify water losses within the water distribution system. Table 4-4 gives a summary of water losses for the 2015-2024 period as determined by this water audit process. It should be noted that the audit is a separate requirement from the UWMP. The water audit submittal date is October 1 of the following calendar year and water audit for 2025 has not been completed yet. Table 4-4. Water Audit Loss Reporting, 2015-2024 Volume of Water Loss, Year millions of gallons 2015 345.2 2016 325.3 2017 296.5 2018 296.6 2019 317.2 2020 366.3 2021 388.2 2022 351.3 2023 423.0 2024 323.7 The California State Water Resources Control Board has developed performance standards for non-revenue water (NRW). These performance standards are based upon specific water system characteristics and are different for each water system throughout the state. The standards for the District's Truckee System are given in Table 4-5. The District recognizes the need to reduce its NRW and intends to continue its efforts in the areas of water main replacement, leak detection surveys and leak repairs. Table 4-5. Truckee System Water Loss Performance Standards Real Water Loss Standard 23.5 gpscd Number of Connections 13,763 Actual Volume of Real Loss 263.1 MG Real Loss Per Unit 52.4 gpscd Apparent Water Loss Standard 2.3 gpscd Number of Connections 13,763 Actual Volume of Apparent Loss 60.6 MG Apparent Loss Per Unit 12.1 gpscd gpscd= gallons per service connection per day Page 4-6 Page 56 of 563 Section 4—System Water Use WATER DEMAND FOR LOW-INCOME HOUSING The current Town of Truckee Housing Element was adopted on August 13, 2019. According to that document, there is a need for 1,182 low-income housing units. This demand is included in the existing and future water demands described earlier in this section. The Town of Truckee is working on an update to the Housing Element with adoption of the final document currently expected in the summer of 2027. Page 4-7 Page 57 of 563 SECTION 5 SBX7-7 BASELINES AND TARGETS SECTION 5 SB X7-7 BASELINE, TARGETS AND 2020 COMPLIANCE The Water Conservation Act of 2009, also known as the SB X7-7, set a goal of reducing statewide urban water use by 20 percent by the year 2020. Each retail urban water supplier is required to determine water use during its baseline period and target water use for the years 2015 and 2020 in order to help the State achieve the 20 percent reduction. BASELINE WATER USAGE CALCULATION SB X7-7 requires calculation of per capita water usage for a continuous 10-year period ending no earlier than December 31, 2004 and no later than December 31, 2010. As discussed in Section 2, the District acquired the Donner Lake Water System in May 2001 and the Glenshire Water System in February 2002. The District does not have accurate records regarding production and water usage in the Donner Lake area for early 2001 and prior years. Additionally, the District does not have accurate historical data regarding population in different parts of Truckee for 2001. Therefore, the nine-year period of 2002 to 2010 is utilized for the baseline calculation. The District has accurate data for this time period and the water system service area during this time more closely matches the Town of Truckee limits and its corresponding population estimates. The baseline water usage is 407 gallons per capita per day(gpcd) as documented in Table 5-1. It should be noted that the baseline water usage value is significantly higher than the 243 gpcd baseline established by the Department of Water Resources for the North Lahontan region. One main reason for this difference is that the calculation methodology does not adjust for the part- time population in the Truckee area. It only considers the permanent population. As noted in Section 2, the Town of Truckee has estimated that about half of the housing stock in the Truckee area is occupied on a part time basis. This part-time population can easily lead to a doubling of the number of people served at any given time, along with a significant increase in water demand. Additionally, there are numerous part-time occupancy properties that are equipped with timer-controlled irrigation systems. These properties exert an irrigation demand even though there is no corresponding population. DEMAND REDUCTION TARGET CALCULATION SB X7-7 requires that a water supplier develop a year 2020 water use target and a year 2015 interim target using one of four methods. These targets are intended to meet the goal of reducing statewide per capita water consumption by 20 percent by the year 2020, as established by the California Legislature. As defined in SB X7-7, there are four allowable methods for determining the 2020 target. The District has selected Method 1, which is "Eighty percent of the water supplier's baseline per capita water use." Therefore, the District's water demand targets are: 2015: 407 x 90% = 367 gpcd 2020: 407 x 80% = 326 gpcd Page 5-1 Page 59 of 563 Section 5—SB X7-7 Baselines and Targets Table 5-1. Calculation of Baseline Per Capita Water Usage Baseline Year Service Area Gross Water Use Daily Per Capita Population millions ofgallons) Water Use GPCD 10 to 15 Year Baseline GPCD Year 1 2002 14,583 2,307 433 Year 2 2003 14,784 2,272 421 Year 3 2004 15,098 2,505 455 Year 4 2005 15,448 2,271 403 Year 5 2006 15,651 2,457 430 Year 6 2007 15,837 2,526 437 Year 7 2008 16,085 2,396 408 Year 8 2009 16,230 2,163 365 Year 9 2010 16,180 1,852 314 10-15 Year Average Baseline GPCD 407 5 Year Baseline GPCD Baseline Year Service Area Gross Water Use Daily Per Capita Population millions ofgallons) Water Use GPCD Year 1 2006 15,651 2,457 430 Year 2 2007 15,837 2,526 437 Year 3 2008 16,085 2,396 408 Year 4 2009 16,230 2,163 365 Year 5 2010 16,180 1,852 314 5 Year Average Baseline GPCD 391 2015 Compliance Year GPCD 2015 16,205 1,384 234 SB X7-7 also requires the determination of a minimum water use reduction. This calculation is documented in Table 5-2. Table 5-2. Confirmation of Minimum Reduction for 2020 Target 5 Year Maximum 2020 Calculated Confirmed Baseline GPCD Target* 2020 Target 2020 Target 391 371 326 326 * Maximum 2020 Target is 95%of the 5 Year Baseline GPCD With the minimum water use reduction being met, demand reduction targets are calculated for the years 2015 and 2020 as shown in Table 5-3. Page 5-2 Page 60 of 563 Section 5—SB X7-7 Baselines and Targets Table 5-3. Calculation of 2015 Interim Target GPCD Confirmed 10-15 year 2015 Interim 2020 Target Baseline GPCD Target GPCD 326 407 367 There have not been any significant changes to the District's service area since 2002 and the baselines and targets described above remain unchanged from the District's 2010 and 2015 UWMPs. SB X7-7 COMPLIANCE Total water usage during the year 2020 was 1,712 million gallons. As noted in Table 2-1, the current service area population is estimated at 16,642. Therefore: 1,712,000,000 gallons- 365 days- 16,642 =282 gpcd The District's 2020 water usage is below the target value of 326 gpcd and the District is in compliance with SB X7-7. It should be noted that the population values for 2015 and 2020 used in this section differ slightly from the population values given in the discussion of SBX7-7 Baseline, Targets and 2020 Compliance in the District's 2020 Urban Water Management Plan. As discussed in Section 2, the California Department of Finance (CDOF) revised population estimates for the period of 2011-2020 based upon the 2020 Census. The calculations given in this section are based upon the revised CDOF values. Page 5-3 Page 61 of 563 SECTION 6 WATER SYSTEM SUPPLIES SECTION 6 WATER SYSTEM SUPPLIES This section provides a discussion of the available water supplies to meet the existing and future water demands through buildout of the District's service area. MARTIS VALLEY GROUNDWATER BASIN The District currently obtains its all of its water supply through the pumping of groundwater from the Martis Valley Groundwater Basin (MVGB). The MVGB is a multiple aquifer system consisting of basin-fill sedimentary units and interlayered basin-fill volcanic units. Detailed information regarding geology of the MVGB can be found in a number of sources, including: • Availability of Ground Water. Prepared for the Truckee Donner Public Utility District by Hydro-Search Inc. Reno,Nevada. February 1975. • Truckee and Vicinity Ground-Water Resource Evaluation. Prepared for Dart Resorts Inc. by Hydro-Search Inc. Reno,Nevada. April 1980. • Ground-Water Management Plan, Phase 1, Martis Valley Ground-Water Basin, Basin No. 6-67,Nevada and Placer Counties. Prepared for the Truckee Donner Public Utility District by Hydro-Search Inc. Reno,Nevada. January 1995. • Ground Water Resource Evaluation. Prepared For The Truckee Donner Public Utility District by Nimbus Engineers. Reno,Nevada. November 2000. • Ground Water Availability In The Martis Valley Ground Water Basin,Nevada and Placer Counties, California. Prepared for the Truckee Donner Public Utility District, Placer County Water Agency and Northstar Community Services District by Nimbus Engineers. Reno,Nevada. March 2001. • Supplemental Report to California's Groundwater—Bulletin 118, Update 2003. Prepared by the California Department of Water Resources. Sacramento, California. October 2003. • Martis Valley Groundwater Management Plan. Prepared for the Truckee Donner Public Utility District, Placer County Water Agency and Northstar Community Services District by Brown and Caldwell and Balance Hydrologics, Reno,Nevada,April 2013. • Martis Valley Groundwater Basin Sustainable Groundwater Management Act Alternative Submittal. Prepared for the Truckee Donner Public Utility District, Placer County Water Agency, Northstar Community Services District, Town of Truckee, Nevada County and Placer County by GEI Consultants, Rancho Cordova, California. December 2016. • Martis Valley Groundwater Plan 5-Year Update, Summary Report for the Groundwater Management Plan Update Martis Valley Groundwater Basin, and the Martis Valley Groundwater Basin Annual Report Water Year 2025. Prepared for the Truckee Donner Page 6-1 Page 63 of 563 Section 6—Water System Supplies Public Utility District, Placer County Water Agency, and Northstar Community Services District by GEI Consultants, Rancho Cordova, California. June - July 2025. The California Department of Water Resources has not determined that the MVGB is being overdrafted and there are not any known instances of subsidence or contamination of the MVGB. In accordance with the Martis Valley Groundwater Management Plan, annual reports covering water years from 2016 through 2025 have been prepared. These reports further document that that MVGB is not being overdrafted. The MVGB is currently unadjudicated and none of the groundwater users has expressed a desire to have the basin adjudicated. QUANTITY OF GROUNDWATER IN THE MARTIS VALLEY BASIN A number of studies have been conducted to investigate and quantify the amount of water available in the MVGB. As knowledge regarding the geologic characteristics of the MVGB has improved over the years, the estimates of available water have been refined and therefore, the most recent studies are considered to have the best information regarding water availability. The 1975 study by Hydro-Search estimated annual recharge to the MVGB at 18,200 acre-feet per year (AFY) with a total subsurface storage volume of 1,050,000 acre-feet. The 1975 study also concluded that 13,000 AFY was available for consumptive uses. The 1980 and 1995 studies were essentially updates of the 1975 study and provided additional information regarding the MVGB. However, a new evaluation of groundwater availability was not conducted as part of those efforts. The 2001 study represented the first reconsideration of the MVGB water availability since the 1975 study. This 2001 study concluded that total subsurface storage volume is 484,000 acre-feet, with an annual recharge of 29,165 AFY. Additional water is recharged to the upper layer of the MVGB by the Tahoe-Truckee Sanitation Agency's (TTSA's) wastewater treatment plant. This 2001 study concluded that the sustainable yield of the MVGB is 24,000 AFY. In 2002, a study entitled Independent Appraisal of Martis Valley Ground Water Availability, Nevada and Placer Counties was conducted by Kennedy/Jenks Consultants. This study agreed with the sustainable yield estimate of 24,000 AFY by Nimbus Engineers in 2001. The Kennedy/Jenks study also concluded that the 24,000 AFY likely underestimates the amount of water available on a sustainable basis since the 2001 Nimbus study underestimated both basin recharge and ground water discharge to tributary streams. In April 2003, a study conducted by InterFlow Hydrology and Cordilleran Hydrology entitled Measurement of Ground Water Discharge to Streams Tributary to the Truckee River in Martis Valley,Nevada and Placer Counties, California examined the issue of ground water discharge to tributary streams and concluded that about 34,000 AFY of water is available on a sustainable basis. In 2016, in support of the Martis Valley Groundwater Basin Sustainable Groundwater Management Act Alternative Submittal, GEI Consultants performed a water budget analysis of the MVGB. This work estimated a sustainable yield of about 22,000 AFY. As noted above, the MVGB is unadjudicated and will likely remain unadjudicated in the future. Therefore, it is reasonable to assume that, at a minimum, the 22,000 AFY (7,168 million gallons) Page 6-2 Page 64 of 563 Section 6—Water System Supplies of water cited in the GEI Consultants study is available to support development in Truckee and the surrounding areas. RELIABILITY OF THE WATER SUPPLY The great majority of groundwater basin recharge results from snowfall and snowmelt during the winter period. Summer thunderstorms can produce high intensity rainfall events of short duration. However,these storms do not make a significant contribution to basin recharge. Figure 6-1 shows historic snowfall and snowpack data at Donner Summit for the period of 1879-2025 as measured by the Central Sierra Snow Laboratory. As shown in this graph snowfall(and corresponding basin recharge) can vary significantly from year to year. The driest single year occurred in 2015 with total snowfall of about 11 feet. The 3-year period with the minimum snowfall occurred in 2013- 2015 with a total of about 45 feet. The 2016 water budget analysis determined that inflows to the MVGB average about 578,800 AFY (188,000 million gallons) and outflows average about 564,300 AFY. Considering the large amount of water in storage in relation to the projected buildout demand, one year (or even five years)of below average precipitation and basin recharge would not have a significant impact upon the water supply. Therefore, the 22,000 AFY(7,168 million gallons)noted above also considered the 5-year minimum water supply. IMPACT OF CLIMATE CHANGE ON GROUNDWATER BASIN RECHARGE In December 2015, the United States Bureau of Reclamation published a document entitled the Truckee Basin Study. This study examined the potential impact of climate change throughout the entire Truckee River basin from south of Lake Tahoe in California,through the Martis Valley,and ending in Pyramid Lake in Nevada. In regards to groundwater recharge in the Martis Valley, the climate change analysis projected about a 10% increase in groundwater recharge under the warmer-wetter scenario and about a 25% decrease in groundwater recharge in the hotter-drier scenario by the end of the century. Given the uncertainty associated with these climate change projections, and the fact that current groundwater withdrawals are still significantly below the sustainable yield, the previously identified 22,000 AFY is used with no adjustments. While a 25% decrease in basin recharge would be significant, the associated sustainable yield is still well above the projected buildout demands and it would be manageable given the long time frame. The District will continue to monitor the situation and work with other users of the basin to conduct additional studies as necessary. WATER SUPPLY QUALITY As noted in the District's 2025 Water Quality Report, all water supplied to potable water customers is in compliance with State and Federal regulations. In the past, the District operated a treatment system at the Northside well to remove excess levels of arsenic. That treatment system is currently in a stand-by mode and the District has been able to comply with the arsenic MCL through a combination of operational changes, well pump modifications and more frequent water quality testing. The quality of the existing sources has been consistent and the District does not anticipate any future changes in the quality of its existing sources. Page 6-3 Page 65 of 563 Danner Summit Snowfall and Snowpack UC Berkeley Central Sierra Snow Lab Maximum Snow Depth il Total Snowfall TG b0 40 i 20 II winter Page 66 of 563 Section 6—Water System Supplies GROUNDWATER WITHDRAWALS The major producers of water in the MVGB are the District, the Northstar Community Services District, five golf courses and Teichert Aggregates. There are also a number of small wells supporting individual residences along with some other uses such as the Martis Creek Campground and the TNT Materials concrete plant. For 2025, withdrawals from the MVGB by the District totaled 1,318 million gallons for potable water purposes and an additional 237 million gallons of raw water for irrigation and construction water purposes. Historic groundwater pumping by the District is summarized in Table 6-1. Total groundwater withdrawals from the MVGB for 2025 for all users are estimated at 2,704 million gallons. This data is summarized in Table 6-2. Table 6-1. Groundwater Volume Pum ed by the District Groundwater Type Location or Basin 2021 2022 2023 2024 2025 Name Alluvial Basin Martis Valley 1,715 1,579 1,535 1,620 1,555 TOTAL (millions of gallons) 1,715 1,579 1,535 1,620 1,555 Table 6-2. Volume Pumped from the Martis Valley Groundwater Basin in 2025 Estimated Data Source/Notes Treatment Withdrawal (millions of Entity gallons) Former PCWA Zone 4 Potable 174 Eric Martin,NCSD,March 2026 Northstar CSD Potable 52 Eric Martin,NCSD,March 2026 TDPUD Potable 1,318 TDPUD—Golf Course Irrigation Non-Potable 236 TDPUD—Construction Water Non-Potable 1 Tahoe Donner Golf Course Non-Potable 79 Estimated based on 2022-2024 TROA Annual Reports Ponderosa Golf Course Non-Potable 22 Estimated based on 2022-2024 TROA Annual Reports Martis Camp Golf Course Non-Potable 115 Estimated based on 2022-2024 TROA Annual Reports Lahontan Golf Course Non-Potable 94 Estimated based on 2022-2024 TROA Annual Reports Schaeffer's Mill Golf Course Non-Potable 66 Estimated based on 2022-2024 TROA Annual Reports Northstar Ski Area Snowmaking Non-Potable 77 Estimated based on 2022-2024 TROA Annual Reports Individual Wells 70 Estimated based on 2022-2024 TROA Annual Reports State&Federal 21 Antonucci, 2001 Total(millions of gallons) 2,325 Page 6-5 Page 67 of 563 Section 6-Water System Supplies EXISTING PRODUCTION CAPACITY IN RELATION TO PROJECTED DEMANDS The current maximum day potable water demand for the Truckee System is 6.95 mgd. It is anticipated that this maximum day potable water demand will increase to 8.1 mgd and 9.3 mgd by the years 2030 and 2035,respectively. Average day potable water demand will increase from 3.95 mgd currently to 4.3 mgd in the year 2030 and 5.0 mgd in the year 2035. The anticipated growth in maximum day potable water demand is shown graphically in Figure 6-2. The District currently operates 10 potable water wells. The total capacity of these wells is about 9,935 gpm(14.3 mgd). The overall system potable water production capacity is adequate to serve projected demands through the year 2055. However, the firm capacity of these existing facilities will be exceeded in the year 2042,since a failure of Airport Well would leave a production capacity of only 10.9 mgd. WASTEWATER AND RECYCLED WATER The District does not provide either wastewater collection or treatment to customers within its service area. The great majority of the District's water customers are served by a centralized wastewater collection system owned by the Truckee Sanitary District (TSD). This TSD maintained system collects the wastewater and conveys it to the Tahoe-Truckee Sanitation Agency's (TTSA) regional water reclamation plant. The remainder of the District's water customers is not served by centralized wastewater collection and treatment. Water customers in the Olympic Heights, Prosser Heights, Prosser Lakeview, Ponderosa Palisades and Martiswoods areas are served by individual septic tank and leachfield systems. TSD also provides wastewater conveyance service for portions of Placer County outside of the District's service area. All wastewater collected by TSD is conveyed to the TTSA Water Reclamation Plant for treatment. The TTSA plant has a peak capacity of 9.6 mgd and treats wastewater from the entire Truckee/North Lake Tahoe area within the state of California. During 2025, TSD conveyed about 607 million gallons of wastewater to the treatment plant. About 80 percent of TSD's current total wastewater flow is generated within the District's water service territory. No data is available to quantify the amount of wastewater treated by individual septic tank and leachfield systems. The treatment process at the TTSA plant involves full tertiary treatment including phosphorus and nitrogen removal. Treated effluent is discharged into the uppermost layer of the groundwater aquifer using subsurface percolation. Sludge generated by the wastewater treatment process is conveyed to either Orient Farms in Gerlach, Nevada, or the Lockwood Regional Landfill for disposal. During 2025, the TTSA plant processed about 1,205 million gallons of wastewater. Page 6-6 Page 68 of 563 Figure 6-2. Projected Potable Water Demand vs. Existing Production Capacity, 1995-2045 25.0 Historic Maximum Day Demand Projected Maximum Day Demand Potable Water Production Capacity 20.0 Firm Potable Water Production Capacity 15.0 _.._.._.._.._.._.._.._.._.._.._.._.._.._.. _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. E c E i G i 10.0 ------------.. --------------.. -- y.. .._.._.._.._.._.._.._.._.._.._=F i i i 5.0 0.0 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 Year Page 69 of 563 Section 6—Water System Supplies FUTURE WATER SUPPLIES Currently,the District uses groundwater as its sole source of supply. In the past,a number of local springs were utilized. Their use was discontinued due to the limited capacity and need for more extensive treatment as required by the Surface Water Treatment Rule. Construction of a surface water treatment plant to utilize surface water from Donner Lake was undertaken by a developer in the early 1970s, but was halted due to political issues and questions regarding the status of water rights. The District does not currently use recycled water and does not anticipate using recycled water in the future as discussed in Section 4. The use of surface water, either through a treatment plant or wells with filtration, requires that a number of technical, legal and environmental issues be investigated and addressed. There is sufficient groundwater available to meet the District's needs at buildout conditions and the District anticipates that groundwater will remain its main supply source. Importation of water from other areas, water transfers and water exchanges have not been investigated since they are unnecessary. Similarly, the use of desalinated water has not been investigated. Considering that the Truckee area is about 200 miles from the ocean,the use of desalination is considered extremely unpractical. BUILDOUT WATER DEMANDS As discussed in Section 4, buildout potable water demand for the Truckee System is estimated to be 2,832 million gallons per year. An additional 240 million gallons per year of non-potable water demand is also expected. When other users of the MVGB are considered, total withdrawals at buildout conditions are estimated to be 4,295 million gallons as noted in Table 6-3. With a total water supply of at least 22,000 AFY (7,168 million gallons), there is adequate water supply to meet the projected buildout conditions. There are 484,000 acre-feet (157,701 million gallons) of water in storage in the MVGB. The projected total demand of 4,295 million gallons at buildout is equal to about three percent of the capacity of the MVGB and there is adequate water to provide for over 36 years worth of demand even if no recharge of the basin were to occur. ADDITIONAL POTABLE WATER PRODUCTION CAPACITY The available production capacity is sufficient to meet current demands. Based upon the projected growth, the potable water production facilities will be unable to meet projected maximum day demands in the year 2055. However, the firm capacity will be exceeded in 2042. Based on the 10.9 mgd of available firm capacity, an additional 0.8 mgd of production capacity is needed over the next 20 years to meet projected demands and to provide adequate firm capacity to the system. For the purposes of water supply planning, it is assumed that new wells will have a capacity of 850 gpm each. Therefore, it is expected that one new water supply well will be needed in the period of 2040 to 2045, with two more wells required to meet buildout conditions. These wells should be constructed as growth and increases in water demand dictate. Figure 6-3 gives the relationship of projected demand to the recommended water production improvements. If the capacity of new wells differs significantly from the assumed 850 gpm value,the recommendations given herein should be adjusted accordingly. Page 6-8 Page 70 of 563 Section 6—Water System Supplies Table 6-3. Anticipated Martis Valley Groundwater Basin Withdrawals at Buildout Estimated Data Source/Notes Treatment Withdrawal (millions of Entity gallons) Former PCWA Zone 4 Potable 261 PCWA 2010 UWMP Northstar CSD Potable 391 Eric Martin,NCSD,March 2026 TDPUD Potable 2,832 TDPUD—Golf Course Irrigation Non-Potable 240 Tahoe Donner Golf Course Non-Potable 80 Estimated based on 2022-2024 TROA Annual Reports Ponderosa Golf Course Non-Potable 25 Estimated based on data from TDRPD Martis Camp Golf Course Non-Potable 115 Estimated based on 2022-2024 TROA Annual Reports Lahontan Golf Course Non-Potable 100 Estimated based on 2022-2024 TROA Annual Reports Schaeffer's Mill Golf Course Non-Potable 75 Estimated based on 2022-2024 TROA Annual Reports Northstar Ski Area Snowmaking Non-Potable 80 Estimated based on 2022-2024 TROA Annual Reports Individual Wells 75 Estimated based on 2022-2024 TROA Annual Reports State&Federal 21 Antonucci, 2001 Total(millions of gallons) 4,295 In 2002 and 2003, the District drilled a number of exploration wells in order to identify locations for future groundwater wells. As a result of this exploration well program, the District acquired four well sites. The Prosser Village Well was constructed in 2004 and the Old Greenwood Well was constructed in 2006 at two of these sites. The Fibreboard Well was constructed in 2009 at the third site. The water produced by this well exceeds the MCL for arsenic and is considered non-potable water. However,this water is perfectly suited for irrigation purposes and supplies water to the Gray's Crossing and Old Greenwood golf courses. This well allowed for the removal of about 1.3 mgd of maximum day demand from the potable water system. There is one remaining well site where property rights have been secured by the District. Additional investigations using the finite element model developed by Brown and Caldwell should be conducted to provide information regarding behavior of the groundwater basin. Once this work is completed, the District should have sufficient information to identify additional well sites and can investigate the drilling of additional test wells. Page 6-9 Page 71 of 563 Figure 6-3. Projected Potable Water Demand vs. Proposed Production Capacity, 1995-2045 25.0 Historic Maximum Day Demand Projected Maximum Day Demand Potable Water Production Capacity 20.0 -Firm Potable Water Production Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.0 _.._.._.._.._.._.._.._.._.._.._.._.._.._.. _.. .._.. .._. .._.. .._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. .._.._.._.._.._.._.._. E c E i G i � 10.0 _.._.._.._.._.._.._.._.._.._.. _.._.._.._.._.._.._.._.._.._.._.._.._.._.. _.._._________ _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._y.. .._.._.._.._.._.._.._.._.._.._. i i i 5.0 0.0 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 Year Page 72 of 563 Section 6—Water System Supplies It should also be noted that some of the existing wells may be reaching the end of their useful lives towards the year 2030. Production from the wells should be monitored over time and redevelopment of existing wells may be necessary to maintain an adequate water supply. Of particular concern is the long-term viability of the existing Airport Well. The existing wellhole and casing are not completely vertical and there is a significant offset in the casing. As a result of this offset, the well shaft experiences accelerated wear and requires replacement every four years. WATER SYSTEM ENERGY USAGE Water suppliers are required to report the amount of energy utilized in the production, treatment and conveyance of water to customers. If possible, energy usage should be broken down into five categories: • Extraction and diversion • Raw water storage • Raw water conveyance • Water treatment • Water distribution Considering that the District pumps water from the MVGB directly into the distribution system, the raw water storage and raw water conveyance categories are not applicable. All water treatment (which is only disinfection) occurs at the well head and the energy used for this purpose cannot be distinguished from the energy used by the wells to pump water. The energy usage for the year 2025 is summarized in Table 6-4. The District does not have any hydropower generation within its water system. Table 6-4. 2025 Energy Usage Extraction and Water Diversion Distribution Total Volume of water(mil. gallons) 1,318 1,318 1,318 Energy usage kWh 3,199,128 1,986,179 1 5,185,307 Energy Intensi kWh/mil. Gallons) 2,427 1,507 3,934 Page 6-11 Page 73 of 563 SECTION 7 WATER SHORTAGE CONTINGENCY PLANNING SECTION 7 WATER SHORTAGE CONTINGENCY PLANNING The effective management of water supply shortages is an important responsibility of water agencies. Shortages may be caused by drought, failures of major water supply facilities, natural disasters, or other adverse conditions. Therefore, it is necessary to have an effective management program to mitigate water supply shortages. As described in Section 6, the District uses groundwater as its sole source of supply. The Martis Valley Groundwater Basin has a storage volume of about 484,000 acre-feet (157,701 million gallons) and is able support annual withdrawals of at least 22,000 acre-feet (7,168 million gallons) per year. Based upon current withdrawals of about 7,136 acre-feet (2,325 million gallons)per year, there is over 67 years of water supply available even if there was zero recharge of the groundwater basin. A rive-year minimum supply of 22,000 AFY has been assumed. The most likely cause of a water supply shortage would be the failure of a major water supply facility such as a well, pump station or transmission pipeline. Such an occurrence could be caused by a number of factors including earthquake, fire or major equipment failure. As a result, water supply shortages are expected to be somewhat short in duration (days or possibly weeks), but may occur without any warning. The District's water system consists of five major components: control valve stations, groundwater wells, pipelines, pump stations and storage tanks. In May 2004, the District completed a Vulnerability Assessment that identified the number of customers that would be impacted by major failure of a given facility. In conjunction with the Vulnerability Assessment, the District periodically updates its Emergency Response Plan which identifies actions to be taken in the event of a major failure of a given facility. The District is a participant in the Nevada County Local Hazard Mitigation Plan, which was most recently updated in December 2024. Action items identified for the District involved forest fuel reductions to be undertaken by the District's Electric Department. These items are an acknowledgement of the community's vulnerability to a wildfire. Historically, the water supply system has been most impacted by power outages. In response, the District has installed permanently-mounted diesel-powered backup generators at 20 pump station sites and three wells. The three wells have a combined capacity of about 7.1 mgd. All of the facilities with permanently-mounted generators are equipped with automatic transfer switches and the generators will activate in the event of a power outage. The District has installed external generator connections and manual transfer switches at all of its pump stations and well sites without a permanently-mounted generator. The District currently owns three large trailer-mounted portable generators that can be mobilized to any of the District's pump facilities in the event of a power outage. CURRENT WATER SHORTAGE CONTINGENCY PLAN On June 2, 2021, the District adopted Ordinance 2021-01 which describes the District's current Water Shortage Contingency Plan (WSCP) to be implemented in the event of a water supply or drought emergency. A copy of this ordinance (which includes the WSCP) can be found in Appendix D. Page 7-1 Page 75 of 563 Section 7—Water Shortage Contingency Planning In 2025, the WSCP was reviewed. It was determined that the WSCP is current and that no updates are required. POTENTIAL FINANCIAL IMPACTS OF A WATER SHORTAGE In 2009, the District retained HDR to perform a water rate study and assist in the development of the District's new metered rate structure. This new rate structure became effective in January of 2010. One of the major objectives in developing this new rate structure was to closely match the District's variable revenue stream with its variable expenses and to match its fixed revenue stream with its fixed expenses. About 85 percent of the Water Department's expenses are fixed and do not vary with the amount of water sold to customers. The remaining 15 percent of expenses is for the costs of pumping and treatment and will vary with customer usage. HDR performed water rate study updates in 2013, 2015, 2020 and 2025. Water rates were adjusted based upon these studies but the basic concept of matching variable revenues with variable expenses and fixed revenues with fixed expenses was maintained. In October 2014, the District implemented Stage 2 of its Water Shortage Contingency Plan. This was followed by the implementation of Stage 4 in June 2015. These actions were taken in response to mandates issued by the State of California. The District had adequate water supplies and was not experiencing a water shortage during this entire period. For 2015, the financial impact of these actions was a reduction in revenue of about $172,500 for decreased water sales. This was about two percent of budgeted water sales revenue. There was corresponding reduction in operational expenses of about $197,000. This was about four percent of budgeted operational expenses. The District also incurred an additional $120,000 in expenses mainly related to increased public education efforts and increased labor for customer notification and customer service. These costs were covered by a reduction in planned capital expenditures and the use of reserves. In the event that a prolonged Stage 5 conservation requirement (50 percent reduction in water usage) was imposed for a significant length of time (a number of months), the District would expect to see a revenue reduction of about six percent. Similar to 2015, there would be additional costs associated with public education, customer notification and customer service. There would also be a corresponding reduction in operational expenses associated with less water being treated and pumped to customers. Any remaining differences between revenue and expenses would likely be covered through the use of reserves. The District would then have to evaluate its overall financial situation during the next annual budget cycle. At that time, the District would review whether rate adjustments were necessary to ensure the financial stability of the Water Department. In the event of a major water supply facility failure, unforeseen expenses can be expected. District staff and/or outside contractors may be required to work overtime and weekends to repair the damaged facility, install a temporary facility or adjust system operations in order to maintain water service to District customers. Similar to a drought-related water shortage, it is expected that the immediate cost impacts would be covered through the use of reserve funds. The District would then review its financial situation once the facility has been repaired. Page 7-2 Page 76 of 563 Section 7—Water Shortage Contingency Planning ADDITIONAL INFORMATION The California Water Code (CWC) describes the requirements elements of an Urban Water Management Plan. The information presented in the following tables is required by the CWC, but does not correspond to the discussions presented previously. The numbering of these tables is based upon a template published by the California Department of Water Resources. TableSubmittal . . . . Use Comparison Water Code Section 10635 2030 2035 2040(MG) 2045 (MG) 2050 (MG) (MG) (MG) Supply totals (autofill from Submittal 7,820 7,820 7,820 7,820 0 Table 6-9 R) Use totals (autofill from Submittal 1,796 2,038 2,278 2,519 0 Table 4-2 R) Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 0 WSCP -use reduction savings benefit 0 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 DWR NOTES:Units of measure(AF,CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. NOTES: Page 7-3 Page 77 of 563 Section 7—Water Shortage Contingency Planning SupplySubmittal Table 7-3 Retail: Single Dry Year . . Water Code Section 10635(a) 2030 2035 2040 2045 2050 (MG) (MG) (MG) (MG) (MG) Supply totals 7,820 7,820 7,820 7,820 0 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 OPTIONAL WSCP -supply 0 0 0 0 0 augmentation benefit WSCP -use reduction 0 0 0 0 0 savings benefit Revised 6,024 5,782 5,542 5,301 0 Surplus/(shortfall) DWR NOTES:Units of measure(AF,CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. NOTES Page 7-4 Page 78 of 563 Section 7-Water Shortage Contingency Planning Submittal Table 7-4 Retail:Multiple Dry Years Supply . Use Comparison Water Code Section1. 2030(MG) 2035(MG) 2040(MG) 2045(MG) 2050(MG) Supply totals 7,820 7,820 7,820 7,820 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 First year OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 WSCP-use reduction savings benefit 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 Supply totals 7,820 7,820 7,820 7,820 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 Second year OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 WSCP-use reduction savings benefit 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 Supply totals 7,820 7,820 7,820 7,820 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 Third year OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 WSCP-use reduction savings benefit 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 Supply totals 7,820 7,820 7,820 7,820 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 Fourth year OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 WSCP-use reduction savings benefit 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 Supply totals 7,820 7,820 7,820 7,820 Use totals 1,796 2,038 2,278 2,519 Surplus/(shortfall) 6,024 5,782 5,542 5,301 0 Fifth year OPTIONAL WSCP-supply augmentation benefit 0 0 0 0 WSCP-use reduction savings benefit 0 0 0 0 Revised Surplus/(shortfall) 6,024 5,782 5,542 5,301 DWR NOTES:Units of measure(AF,CCF,MG)must remain consistent throughout the UWMP as reported in Submittal Table 2-3. NOTES: Page 7-5 Page 79 of 563 Section 7—Water Shortage Contingency Planning Submittal Table 7-5 Retail:Five-Year Drought Risk Assessment Water Code Section 0. Total Water Use(MG) 1,606 Total Supplies(MG) 7,820 Surplus/Shortfall w/o WSCP Action 6,214 OPTIONAL Planned WSCP Actions(use reduction and su WSCP-supply augmentation benefit(MG) 0 WSCP-use reduction savings benefit(MG) 0 Revised Surplus/(shortfall) 6,214 Total Water Use(MG) 1,654 Total Supplies(MG) 7,820 Surplus/Shortfall w/o WSCP Action 6,166 OPTIONAL Planned WSCP Actions(use reduction and supply WSCP-supply augmentation benefit(MG) 0 WSCP-use reduction savings benefit(MG) 0 Revised Surplus/(shortfall) 6,166 Total Water Use(MG) 1,701 Total Supplies(MG) 7,820 Surplus/Shortfall w/o WSCP Action 6,119 OPTIONAL Planned WSCP Actions(use reduction and su WSCP-supply augmentation benefit(MG) 0 WSCP-use reduction savings benefit(MG) 0 "Moog Revised Surplus/(shortfall) 6,119 Total Water Use(MG) 1,749 Total Supplies(MG) 7,820 Surplus/Shortfall w/o WSCP Action 6,071 OPTIONAL Planned WSCP Actions(use reduction and supply WSCP-supply augmentation benefit(MG) 0 WSCP-use reduction savings benefit(MG) 0 Revised Surplus/(shortfall) 6,071 t Total Water Use(MG) 1,796 Total Supplies(MG) 7,820 Surplus/Shortfall w/o WSCP Action 6,024 OPTIONAL Planned WSCP Actions(use reduction and su WSCP-supply augmentation benefit(MG) 0 WSCP-use reduction savings benefit(MG) 0 Revised Surplus/(shortfall) 6,024 DWR NOTES:Units of measure(AF,CCF,MG)must remain consistent throughout the UWMP as reported in Submittal Table 2-3. NOTES: Page 7-6 Page 80 of 563 SECTION 8 WATER DEMAND MANAGEMENT MEASURES SECTION 8 WATER DEMAND MANAGEMENT MEASURES Demand management, or water conservation, is frequently the lowest-cost resource available to a water agency. The goals of the District's water conservation program are to reduce demand for water at peak times, demonstrate continued commitment to appropriate demand management measures (DMMs), and to ensure a reliable future water supply. The California Water Code requires that an Urban Water Management Plan discuss DMMs in seven areas: • Water waste prevention ordinances • Metering • Conservation pricing • Public education and outreach • Programs to assess and manage distribution system real loss • Water conservation program coordination and staffing support • Other demand management measures that have a significant impact on water use as measured in gallons per capita per day, including innovative measures, if implemented WATER WASTE PREVENTION ORDINANCES The District's Codes and Policies contain a provision whereby the District may disconnect water service to a customer that is found to be wasting water. Section 5.07.03.1 reads as follows: 5.07.03 Disconnection of Electric and/or Water Service by the District 5.07.03.11 With Notice the District may disconnect Electric or Water Service for any one or more of the reasons contained in this Section. Except as otherwise specifically provided here, Public Utilities Code Sections 16481, 16481.1, 16482, 16482.1, and 16483, and any subsequent amendments thereto, shall apply regarding any disconnect of Service. Except for a disconnect qualifying under Section 5.07.03.2(E),water billings will continue. 5.07.03.1(A)Non-payment of Bills - The District may disconnect or refuse service if a Customer has not paid their bill for Electric or Water Service rendered, reconnection charges, and/or cash deposit as required by the District. Refer to Section 5.07.01.7 Termination for Non-Payment. 5.07.03.1(A)(1) Default on Amortization or Payment Agreements— The District may disconnect Electric or Water Service if a Customer has failed to meet the terms of said agreement. 5.07.03.1(A)(2)Negligent or wasteful use of water,as determined by the District. 5.07.03.1(A)(3) Where a Customer receives Electric and/or Water Service at more than one location and the Bill or charges for Service at any one location is not paid prior to delinquency, Electric and/or Water Service at all locations may be disconnected. 5.07.03.1(A)(4) Failure to provide documents or payment as requested by a Notice to Comply. Requested items may include, but are not limited to, service applications, signed payment agreement and payment by cash or money order for an item returned by the bank. The District does not have any direct prohibitions on specific types of water usage and does not have an ordinance banning water softeners. Hardness and TDS levels in the District's water supply are low and the District is not aware of any water softeners installed by customers. Page 8-1 Page 82 of 563 Section 8—Water Demand Management Measures The Town of Truckee has also adopted water efficient landscape standards as required by California AB 1881. These requirements are given in Section 18.40.060 of the Town of Truckee Development Code. WATER METERING In 2010, the District began reading all of its existing water meters as required by AB 2572. As of January 1, 2026, all customer accounts are equipped with a water meter. The District has implemented volume-based billing for those customers equipped with a meter. For residential customers, the volume-based rate has a two-tier inclining block structure. For commercial customers,the volume-based rate has a single tier. There is no usage allowance for either customer class and all water used is billed to the customer. CONSERVATION PRICING As discussed above, the District has implemented volume-based billing for all customers. For residential customers, the volume-based rate has a two-tier inclining block structure consistent with the requirements of Proposition 218. For commercial customers, the volume-based rate has a single tier. There is no usage allowance for either customer class and all water used is billed to the customer. The District's water rates are based on cost of service as determined by an outside, expert consulting firm. PUBLIC EDUCATION AND OUTREACH The District conducts public education and information programs on water conservation through a number of means: • Water Conservation Education/Handouts: The District has developed water conservation information packets and brochures for community-wide distribution. Charts and handouts are also available that determine how much water is needed to water grasses Spring through Fall. • Print Advertising: The District has developed a print ad series on Water Wise Landscaping practices that is published in local newspapers (Sierra Sun, Moonshine Ink, etc). • School Education Programs: The District funds the purchase of landscape water conservation educational materials that are distributed to local children through the Tahoe- Truckee Unified School District. In recent years, the District has partnered with the Sierra Watershed Education Partnership (SWEP) and the Truckee High School `Envirolution Club' to distribute water-saving measures and information to every elementary school and middle school child in the District's territory through an innovative, and award winning, `Trashion Show' format. The `Trashion Shows' are general assembly presentations by the Envirolution Club members who make fashion outfits out of garbage and recycled materials with each outfit delivering an interpretive message on living sustainably (including water conservation). Page 8-2 Page 83 of 563 Section 8—Water Demand Management Measures • Demonstration Garden: The District maintains a demonstration garden at its main office complex. The garden showcases ideas for creating a water-efficient garden and landscape plan using native and drought tolerant plants,bunch grass meadow replacements for lawns, hardscaping/mulching techniques, and water efficient irrigation. The District has also posted information and links regarding efficient landscaping on its web site. The District also collaborated on the creation of a native species demonstration garden at Truckee High School. • Water-Wise Gardening Web-Based Resource: In conjunction with the demonstration gardens, a web-based resource has been developed. This resource details the garden design, plant and material lists, gardening techniques, and other information intended to assist customers in conserving water for landscaping. • Landscaping and Irrigation Seminars: In cooperation with local landscapers and nurseries, the District conducts periodic seminars on landscaping and irrigation practices appropriate for the local climate. PROGRAMS TO ASSESS AND MANAGE DISTRIBUTION SYSTEM REAL LOSS The District conducts a number of programs to identify and reduce water system losses: • The District has an active leak repair program.Any reported or suspected leaks are verified by testing the water for chlorine residual. The leak is then excavated and repaired. • For a number of years, the District retained an outside contractor to perform distribution system leak surveys. In 2022, the District contracted with Asterra to perform a satellite- based L-band synthetic aperture radar analysis of the service area. • The District has purchased a number of remote leak detection correlators. These correlators perform leak detection measurements on a daily basis and report the location of potential leaks within the deployment area. The District has implemented a program whereby these correlators are moved on a periodic basis to areas where leaking pipelines are suspected. • The District has an ongoing pipeline replacement program. Each Summer, the District awards one or more construction contracts for the replacement or rehabilitation of existing water pipelines that are in poor condition. • The District has installed water meters and pressure monitors on all of its wells and pump stations. It is currently working on installing water meters at control valve stations. Once these metering and monitor devices are installed, the District conducts area-specific mass- balances on a monthly basis to identify areas of concern. This information is used to set priorities for the field technician assigned to leak detection surveys. Page 8-3 Page 84 of 563 Section 8—Water Demand Management Measures WATER CONSERVATION PROGRAM COORDINATION AND STAFFING SUPPORT The District has a Conservation Department consisting of a Senior Conservation Analyst and a Conservation Customer Service Specialist that manage both energy and water conservation programs. The department is supported by the Customer Service Department who also educate and deliver programs. The Senior Conservation Analyst serves as the Water Conservation Coordinator. OTHER DEMAND MANAGEMENT MEASURES The District conducts a number of other water conservation programs. These include: • Residential Ultra-Low-Flush Toilet Replacement Program: The District offers a $100 rebate to those customers that replace an existing older toilet with a new toilet that uses 1.28 gallons per flush (GPF). A rebate of$125 for is offered for a 1.1 GPF or dual-flush toilet. Customers are required to provide the District with evidence that the old toilet has been removed from service and disposed of. The District has also created a partnership with a local plumbing supply company (Sierra Mountain Pipe and Supply) where customers can bring their old toilet to the store and exchange it for a new water efficient replacement at no cost. There are two options available for direct exchange, or the customer may apply the $1004125 value towards the purchase of a more expensive toilet. • Water Leak Repair Rebate: With early implementation of the automated meter reading system,the District has been able to identify leaks on customer-owned piping. The District has developed procedures for notifying customers by telephone or letter depending upon the severity of the leak. The District has a Customer Leak Repair Rebate program to encourage customers to repair leaks on the customer-side of the meter. The District offers a rebate of up to $300 as an incentive towards repair of these leaks. To qualify for this rebate, customers must have received prior notification from the District regarding the leak, they must provide documentation regarding the leak itself and the cost to repair it,and the District must verify that the leak has been corrected. • Residential Plumbing Retrofit: Upon request,the District provides to its customers, at no charge, the following water conservation devices: • Low-flow showerheads • Faucet aerators • Sprinkler/rainfall measurement gauges • Low-flow outside hose nozzles For a number of years, the District also has sponsored a booth at the annual Truckee Day event in early June. The District distributes water conservation literature, low-flow showerheads and sprinkler/rainfall measurement gauges at this booth along with information regarding the District's electricity conservation programs. The District has Page 8-4 Page 85 of 563 Section 8—Water Demand Management Measures also maintained a table at `Truckee Thursdays. This is a weekly event held in downtown Truckee during the summer to promote the local merchants and other local events. • Large Landscape Conservation Programs and Incentives: The District distributes sprinkler/rainfall measurement gauges free of charge. Upon request of the property owner, the District will also make recommendations regarding landscaping and plants that are appropriate to the local climate. The District's primary mechanism for landscape initiatives is through educations with emphasis on the Patricia S. Sutton conservation garden and on- going engagement is local landscape supply companies and customers. WATER CONSERVATION DMM EFFECTIVENESS As discussed in Section 4, there has been a decreasing trend in potable water production over the past 15 years. As discussed in Section 5, the District has met its water demand reduction requirements under SB X7-7. The District intends to continue the DMMs and programs described above. In addition,the District will continue to identify additional water conservation programs and implement these programs when they are cost effective. Page 8-5 Page 86 of 563 APPENDIX A TEXT OF THE URBAN WATER MANAGEMENT PLANNING ACT Appendix A California Water Code—Urban Water Management Planning Urban Water Management Planning Act This section contains information extracted from Water Code Division 6, Conservation, Development, and Utilization of State Water Resources, Part 2.6, Urban Water Management Planning. Click on any section header below to read Water Code directly at the California Legislative Information website. Chapter 1. General Declaration and Policy, Sections 10610-10610.4 Section 10610. This part shall be known and may be cited as the "Urban Water Management Planning Act." Section 10610.2. (a) The Legislature finds and declares all of the following: (1) The waters of the state are a limited and renewable resource subject to ever-increasing demands. (2) The conservation and efficient use of urban water supplies are of statewide concern; however, the planning for that use and the implementation of those plans can best be accomplished at the local level. (3) A long-term, reliable supply of water is essential to protect the productivity of California's businesses and economic climate, and increasing long-term water conservation among Californians, improving water use efficiency within the state's communities and agricultural production, and strengthening local and regional drought planning are critical to California's resilience to drought and climate change. (4) As part of its long-range planning activities, every urban water supplier should make every effort to ensure the appropriate level of reliability in its water service sufficient to meet the needs of its various categories of customers during normal, dry, and multiple dry water years now and into the foreseeable future, and every urban water supplier should collaborate closely with local land-use authorities to ensure water demand forecasts are consistent with current land-use planning. (5) Public health issues have been raised over a number of contaminants that have been identified in certain local and imported water supplies. (6) Implementing effective water management strategies, including groundwater storage projects and recycled water projects, may require Informational Purposes Only January 2026 A-39 Page 88 of 563 Appendix A California Water Code—Urban Water Management Planning specific water quality and salinity targets for meeting groundwater basins water quality objectives and promoting beneficial use of recycled water. (7) Water quality regulations are becoming an increasingly important factor in water agencies' selection of raw water sources, treatment alternatives, and modifications to existing treatment facilities. (8) Changes in drinking water quality standards may also impact the usefulness of water supplies and may ultimately impact supply reliability. (9) The quality of source supplies can have a significant impact on water management strategies and supply reliability. (b) This part is intended to provide assistance to water agencies in carrying out their long-term resource planning responsibilities to ensure adequate water supplies to meet existing and future demands for water. Section 10610.4. The Legislature finds and declares that it is the policy of the state as follows: (a) The management of urban water demands and efficient use of water shall be actively pursued to protect both the people of the state and their water resources. (b) The management of urban water demands and efficient use of urban water supplies shall be a guiding criterion in public decisions. (c) Urban water suppliers shall be required to develop water management plans to achieve the efficient use of available supplies and strengthen local drought planning. Chapter 2. Definitions, Sections 10611-10618 Section 10611. Unless the context otherwise requires, the definitions of this chapter govern the construction of this part. Section 10611.3. "Customer" means a purchaser of water from a water supplier who uses the water for municipal purposes, including residential, commercial, governmental, and industrial uses. Informational Purposes Only January 2026 A-40 Page 89 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10611.5. "Demand management" means those water conservation measures, programs, and incentives that prevent the waste of water and promote the reasonable and efficient use and reuse of available supplies. Section 10612. "Drought risk assessment" means a method that examines water shortage risks based on the driest five-year historic sequence for the agency's water supply, as described in subdivision (b) of Section 10635. Section 10613. "Efficient use" means those management measures that result in the most effective use of water so as to prevent its waste or unreasonable use or unreasonable method of use. Section 10614. "Person" means any individual, firm, association, organization, partnership, business, trust, corporation, company, public agency, or any agency of such an entity. Section 10615. "Plan" means an urban water management plan prepared pursuant to this part. A plan shall describe and evaluate sources of supply, reasonable and practical efficient uses, reclamation and demand management activities. The components of the plan may vary according to an individual community or area's characteristics and its capabilities to efficiently use and conserve water. The plan shall address measures for residential, commercial, governmental, and industrial water demand management as set forth in Article 2 (commencing with Section 10630) of Chapter 3. In addition, a strategy and time schedule for implementation shall be included in the plan. Section 10616. "Public agency" means any board, commission, county, city and county, city, regional agency, district, or other public entity. Section 10616.5. "Recycled water" means the reclamation and reuse of wastewater for beneficial use. Informational Purposes Only January 2026 A-41 Page 90 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10617. "Urban water supplier" means a supplier, either publicly or privately owned, providing water for municipal purposes either directly or indirectly to more than 3,000 customers or supplying more than 3,000 acre-feet of water annually. An urban water supplier includes a supplier or contractor for water, regardless of the basis of right, which distributes or sells for ultimate resale to customers. This part applies only to water supplied from public water systems subject to Chapter 4 (commencing with Section 116275) of Part 12 of Division 104 of the Health and Safety Code. Section 10617.5. "Water shortage contingency plan" means a document that incorporates the provisions detailed in subdivision (a) of Section 10632 and is subsequently adopted by an urban water supplier pursuant to this article. Section 10618. "Water supply and demand assessment" means a method that looks at current year and one or more dry year supplies and demands for determining water shortage risks, as described in Section 10632.1. Chapter 3. Urban Water Management Plans Article 1. General Provisions, Sections 10620-10621 Section 10620. (a) Every urban water supplier shall prepare and adopt an urban water management plan in the manner set forth in Article 3 (commencing with Section 10640). (b) Every person that becomes an urban water supplier shall adopt an urban water management plan within one year after it has become an urban water supplier. (c) An urban water supplier indirectly providing water shall not include planning elements in its water management plan as provided in Article 2 (commencing with Section 10630) that would be applicable to urban water suppliers or public agencies directly providing water, or to their customers, without the consent of those suppliers or public agencies. (d) (1) An urban water supplier may satisfy the requirements of this part by participation in areawide, regional, watershed, or basinwide urban water Informational Purposes Only January 2026 A-42 Page 91 of 563 Appendix A California Water Code—Urban Water Management Planning management planning where those plans will reduce preparation costs and contribute to the achievement of conservation, efficient water use, and improved local drought resilience. (2) Notwithstanding paragraph (1), each urban water supplier shall develop its own water shortage contingency plan, but an urban water supplier may incorporate, collaborate, and otherwise share information with other urban water suppliers or other governing entities participating in an areawide, regional, watershed, or basinwide urban water management plan, an agricultural management plan, or groundwater sustainability plan development. (3) Each urban water supplier shall coordinate the preparation of its plan with other appropriate agencies in the area, including other water suppliers that share a common source, water management agencies, and relevant public agencies, to the extent practicable. (e) The urban water supplier may prepare the plan with its own staff, by contract, or in cooperation with other governmental agencies. (f) An urban water supplier shall describe in the plan water management tools and options used by that entity that will maximize resources and minimize the need to import water from other regions. Section 10621. (a) Each urban water supplier shall update its plan at least once every five years on or before July 1, in years ending in six and one, incorporating updated and new information from the five years preceding each update. (b) Every urban water supplier required to prepare a plan pursuant to this part shall, at least 60 days before the public hearing on the plan required by Section 10642, notify any city or county within which the supplier provides water supplies that the urban water supplier will be reviewing the plan and considering amendments or changes to the plan. The urban water supplier may consult with, and obtain comments from, any city or county that receives notice pursuant to this subdivision. (c) An urban water supplier regulated by the Public Utilities Commission shall include its most recent plan and water shortage contingency plan as part of the supplier's general rate case filings. (d) The amendments to, or changes in, the plan shall be adopted and filed in the manner set forth in Article 3 (commencing with Section 10640). (e) Each urban water supplier shall update and submit its 2015 plan to the department by July 1, 2016. Informational Purposes Only January 2026 A-43 Page 92 of 563 Appendix A California Water Code—Urban Water Management Planning (f) Each urban water supplier shall update and submit its 2020 plan to the department by July 1, 2021. Article 2. Contents of Plans, Sections 10630-10634 Section 10630. It is the intention of the Legislature, in enacting this part, to permit levels of water management planning commensurate with the numbers of customers served and the volume of water supplied, while accounting for impacts from climate change. Section 10630.5. Each plan shall include a simple lay description of how much water the agency has on a reliable basis, how much it needs for the foreseeable future, what the agency's strategy is for meeting its water needs, the challenges facing the agency, and any other information necessary to provide a general understanding of the agency's plan. Section 10631. A plan shall be adopted in accordance with this chapter that shall do all of the following: (a) Describe the service area of the supplier, including current and projected population, climate, and other social, economic, and demographic factors affecting the supplier's water management planning. The projected population estimates shall be based upon data from the state, regional, or local service agency population projections within the service area of the urban water supplier and shall be in five-year increments to 20 years or as far as data is available. The description shall include the current and projected land uses within the existing or anticipated service area affecting the supplier's water management planning. Urban water suppliers shall coordinate with local or regional land use authorities to determine the most appropriate land use information, including, where appropriate, land use information obtained from local or regional land use authorities, as developed pursuant to Article 5 (commencing with Section 65300) of Chapter 3 of Division 1 of Title 7 of the Government Code. (b) Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier over the same five-year increments described in subdivision (a), providing supporting and related information, including all of the following: (1) A detailed discussion of anticipated supply availability under a normal water year, single dry year, and droughts lasting at least five years, as well as more frequent and severe periods of drought, as described in the Informational Purposes Only January 2026 A-44 Page 93 of 563 Appendix A California Water Code—Urban Water Management Planning drought risk assessment. For each source of water supply, consider any information pertinent to the reliability analysis conducted pursuant to Section 10635, including changes in supply due to climate change. (2) When multiple sources of water supply are identified, a description of the management of each supply in correlation with the other identified supplies. (3) For any planned sources of water supply, a description of the measures that are being undertaken to acquire and develop those water supplies. (4) If groundwater is identified as an existing or planned source of water available to the supplier, all of the following information: (A) The current version of any groundwater sustainability plan or alternative adopted pursuant to Part 2.74 (commencing with Section 10720), any groundwater management plan adopted by the urban water supplier, including plans adopted pursuant to Part 2.75 (commencing with Section 10750), or any other specific authorization for groundwater management for basins underlying the urban water supplier's service area. (B) A description of any groundwater basin or basins from which the urban water supplier pumps groundwater. (C) For basins that a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the urban water supplier has the legal right to pump under the order or decree. For a basin that has not been adjudicated, information as to whether the department has identified the basin as a high- or medium-priority basin in the most current official departmental bulletin that characterizes the condition of the groundwater basin, and a detailed description of the efforts being undertaken by the urban water supplier to coordinate with groundwater sustainability agencies or groundwater management agencies listed in subdivision (c) of Section 10723 to maintain or achieve sustainable groundwater conditions in accordance with a groundwater sustainability plan or alternative adopted pursuant to Part 2.74 (commencing with Section 10720). (D) A detailed description and analysis of the location, amount, and sufficiency of groundwater pumped by the urban water supplier for the past five years. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records. (E) A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the urban water Informational Purposes Only January 2026 A-45 Page 94 of 563 Appendix A California Water Code—Urban Water Management Planning supplier. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records. (c) Describe the opportunities for exchanges or transfers of water on a short-term or long-term basis. (d) (1) For an urban retail water supplier, quantify, to the extent records are available, past and current water use, over the same five-year increments described in subdivision (a), and projected water use, based upon information developed pursuant to subdivision (a), identifying the uses among water use sectors, including, but not necessarily limited to, all of the following: (A) Single-family residential. (B) Multifamily. (C) Commercial. (D) Industrial. (E) Institutional and governmental. (F) Landscape. (G) Sales to other agencies. (H) Saline water intrusion barriers, groundwater recharge, or conjunctive use, or any combination thereof. (I) Agricultural. (J) Distribution system water loss. (2) The water use projections shall be in the same five-year increments described in subdivision (a). (3) (A) The distribution system water loss shall be quantified for each of the five years preceding the plan update, in accordance with rules adopted pursuant to Section 10608.34. (B) The distribution system water loss quantification shall be reported in accordance with a worksheet approved or developed by the department through a public process. The water loss quantification worksheet shall be based on the water system balance methodology developed by the American Water Works Association. (C) In the plan due July 1, 2021, and in each update thereafter, data shall be included to show whether the urban retail water supplier met Informational Purposes Only January 2026 A-46 Page 95 of 563 Appendix A California Water Code—Urban Water Management Planning the distribution loss standards enacted by the board pursuant to Section 10608.34. (4) (A) Water use projections, where available, shall display and account for the water savings estimated to result from adopted codes, standards, ordinances, or transportation and land use plans identified by the urban water supplier, as applicable to the service area. (B) To the extent that an urban water supplier reports the information described in subparagraph (A), an urban water supplier shall do both of the following: (i) Provide citations of the various codes, standards, ordinances, or transportation and land use plans utilized in making the projections. (i i) Indicate the extent that the water use projections consider savings from codes, standards, ordinances, or transportation and land use plans. Water use projections that do not account for these water savings shall be noted of that fact. (a) Provide a description of the supplier's water demand management measures. This description shall include all of the following: (1) (A) For an urban retail water supplier, as defined in Section 10608.12, a narrative description that addresses the nature and extent of each water demand management measure implemented over the past five years. The narrative shall describe the water demand management measures that the supplier plans to implement to achieve its water use targets pursuant to Section 10608.20. (B) The narrative pursuant to this paragraph shall include descriptions of the following water demand management measures: (i) Water waste prevention ordinances. (i i) Metering. (iii) Conservation pricing. (iv) Public education and outreach. (v) Programs to assess and manage distribution system real loss. (vi) Water conservation program coordination and staffing support. (vii) Other demand management measures that have a significant impact on water use as measured in gallons per capita per day, including innovative measures, if implemented. Informational Purposes Only January 2026 A-47 Page 96 of 563 Appendix A California Water Code—Urban Water Management Planning (2) For an urban wholesale water supplier, as defined in Section 10608.12, a narrative description of the items in clauses (ii), (iv), (vi), and (vii) of subparagraph (B) of paragraph (1), and a narrative description of its distribution system asset management and wholesale supplier assistance programs. (f) Include a description of all water supply projects and water supply programs that may be undertaken by the urban water supplier to meet the total projected water use, as established pursuant to subdivision (a) of Section 10635. The urban water supplier shall include a detailed description of expected future projects and programs that the urban water supplier may implement to increase the amount of the water supply available to the urban water supplier in normal and single-dry water years and for a period of drought lasting five consecutive water years. The description shall identify specific projects and include a description of the increase in water supply that is expected to be available from each project. The description shall include an estimate with regard to the implementation timeline for each project or program. (g) Describe the opportunities for development of desalinated water, including, but not limited to, ocean water, brackish water, and groundwater, as a long-term supply. (h) An urban water supplier that relies upon a wholesale agency for a source of water shall provide the wholesale agency with water use projections from that agency for that source of water in five-year increments to 20 years or as far as data is available. The wholesale agency shall provide information to the urban water supplier for inclusion in the urban water supplier's plan that identifies and quantifies, to the extent practicable, the existing and planned sources of water as required by subdivision (b), available from the wholesale agency to the urban water supplier over the same five- year increments, and during various water-year types in accordance with subdivision (f). An urban water supplier may rely upon water supply information provided by the wholesale agency in fulfilling the plan informational requirements of subdivisions (b) and (f). Section 10631.1. (a) The water use projections required by Section 10631 shall include projected water use for single-family and multifamily residential housing needed for lower income households, as defined in Section 50079.5 of the Health and Safety Code, as identified in the housing element of any city, county, or city and county in the service area of the supplier. (b) It is the intent of the Legislature that the identification of projected water use for single-family and multifamily residential housing for lower income households will assist a supplier in complying with the requirement under Informational Purposes Only January 2026 A-48 Page 97 of 563 Appendix A California Water Code—Urban Water Management Planning Section 65589.7 of the Government Code to grant a priority for the provision of service to housing units affordable to lower income households. Section 10631.2. (a) In addition to the requirements of Section 10631, an urban water management plan shall include any of the following information that the urban water supplier can readily obtain: (1) An estimate of the amount of energy used to extract or divert water supplies. (2) An estimate of the amount of energy used to convey water supplies to the water treatment plants or distribution systems. (3) An estimate of the amount of energy used to treat water supplies. (4) An estimate of the amount of energy used to distribute water supplies through its distribution systems. (5) An estimate of the amount of energy used for treated water supplies in comparison to the amount used for nontreated water supplies. (6) An estimate of the amount of energy used to place water into or withdraw from storage. (7) Any other energy-related information the urban water supplier deems appropriate. (b) The department shall include in its guidance for the preparation of urban water management plans a methodology for the voluntary calculation or estimation of the energy intensity of urban water systems. The department may consider studies and calculations conducted by the Public Utilities Commission in developing the methodology. (c) The Legislature finds and declares that energy use is only one factor in water supply planning and shall not be considered independently of other factors. Section 10632. (a) Every urban water supplier shall prepare and adopt a water shortage contingency plan as part of its urban water management plan that consists of each of the following elements: (1) The analysis of water supply reliability conducted pursuant to Section 10635. (2) The procedures used in conducting an annual water supply and demand assessment that include, at a minimum, both of the following: (A) The written decision making process that an urban water supplier will use each year to determine its water supply reliability. Informational Purposes Only January 2026 A-49 Page 98 of 563 Appendix A California Water Code—Urban Water Management Planning (B) The key data inputs and assessment methodology used to evaluate the urban water supplier's water supply reliability for the current year and one dry year, including all of the following: (i) Current year unconstrained demand, considering weather, growth, and other influencing factors, such as policies to manage current supplies to meet demand objectives in future years, as applicable. (ii) Current year available supply, considering hydrological and regulatory conditions in the current year and one dry year. The annual supply and demand assessment may consider more than one dry year solely at the discretion of the urban water supplier. (iii) Existing infrastructure capabilities and plausible constraints. (iv) A defined set of locally applicable evaluation criteria that are consistently relied upon for each annual water supply and demand assessment. (v) A description and quantification of each source of water supply. (3) (A) Six standard water shortage levels corresponding to progressive ranges of up to 10, 20, 30, 40, and 50 percent shortages and greater than 50 percent shortage. Urban water suppliers shall define these shortage levels based on the suppliers' water supply conditions, including percentage reductions in water supply, changes in groundwater levels, changes in surface elevation or level of subsidence, or other changes in hydrological or other local conditions indicative of the water supply available for use. Shortage levels shall also apply to catastrophic interruption of water supplies, including, but not limited to, a regional power outage, an earthquake, and other potential emergency events. (B) An urban water supplier with an existing water shortage contingency plan that uses different water shortage levels may comply with the requirement in subparagraph (A) by developing and including a cross- reference relating its existing categories to the six standard water shortage levels. (4) Shortage response actions that align with the defined shortage levels and include, at a minimum, all of the following: (A) Locally appropriate supply augmentation actions. (B) Locally appropriate demand reduction actions to adequately respond to shortages. (C) Locally appropriate operational changes. Informational Purposes Only January 2026 A-50 Page 99 of 563 Appendix A California Water Code—Urban Water Management Planning (D) Additional, mandatory prohibitions against specific water use practices that are in addition to state- mandated prohibitions and appropriate to the local conditions. (E) For each action, an estimate of the extent to which the gap between supplies and demand will be reduced by implementation of the action. (5) Communication protocols and procedures to inform customers, the public, interested parties, and local, regional, and state governments, regarding, at a minimum, all of the following: (A) Any current or predicted shortages as determined by the annual water supply and demand assessment described pursuant to Section 10632.1. (B) Any shortage response actions triggered or anticipated to be triggered by the annual water supply and demand assessment described pursuant to Section 10632.1. (C) Any other relevant communications. (6) For an urban retail water supplier, customer compliance, enforcement, appeal, and exemption procedures for triggered shortage response actions as determined pursuant to Section 10632.2. (7) (A) A description of the legal authorities that empower the urban water supplier to implement and enforce its shortage response actions specified in paragraph (4) that may include, but are not limited to, statutory authorities, ordinances, resolutions, and contract provisions. (B) A statement that an urban water supplier shall declare a water shortage emergency in accordance with Chapter 3 (commencing with Section 350) of Division 1. (C) A statement that an urban water supplier shall coordinate with any city or county within which it provides water supply services for the possible proclamation of a local emergency, as defined in Section 8558 of the Government Code. (8) A description of the financial consequences of, and responses for, drought conditions, including, but not limited to, all of the following: (A) A description of potential revenue reductions and expense increases associated with activated shortage response actions described in paragraph (4). Informational Purposes Only January 2026 A-51 Page 100 of 563 Appendix A California Water Code—Urban Water Management Planning (B) A description of mitigation actions needed to address revenue reductions and expense increases associated with activated shortage response actions described in paragraph (4). (C) A description of the cost of compliance with Chapter 3.3 (commencing with Section 365) of Division 1. (9) For an urban retail water supplier, monitoring and reporting requirements and procedures that ensure appropriate data is collected, tracked, and analyzed for purposes of monitoring customer compliance and to meet state reporting requirements. (10) Reevaluation and improvement procedures for systematically monitoring and evaluating the functionality of the water shortage contingency plan in order to ensure shortage risk tolerance is adequate and appropriate water shortage mitigation strategies are implemented as needed. (b) For purposes of developing the water shortage contingency plan pursuant to subdivision (a), an urban water supplier shall analyze and define water features that are artificially supplied with water, including ponds, lakes, waterfalls, and fountains, separately from swimming pools and spas, as defined in subdivision (a) of Section 115921 of the Health and Safety Code. (c) The urban water supplier shall make available the water shortage contingency plan prepared pursuant to this article to its customers and any city or county within which it provides water supplies no later than 30 days after adoption of the water shortage contingency plan. Section 10632.1. An urban water supplier shall conduct an annual water supply and demand assessment pursuant to subdivision (a) of Section 10632 and, on or before July 1 of each year, submit an annual water shortage assessment report to the department with information for anticipated shortage, triggered shortage response actions, compliance and enforcement actions, and communication actions consistent with the supplier's water shortage contingency plan. An urban water supplier that relies on imported water from the State Water Project or the Bureau of Reclamation shall submit its annual water supply and demand assessment within 14 days of receiving its final allocations, or by July 1 of each year, whichever is later. Section 10632.2. An urban water supplier shall follow, where feasible and appropriate, the prescribed procedures and implement determined shortage response actions in its water shortage contingency plan, as identified in subdivision (a) of Section 10632, or reasonable alternative actions, provided that descriptions of the alternative actions are submitted with the annual water shortage assessment report pursuant to Section 10632.1. Nothing in this section prohibits an urban water supplier from Informational Purposes Only January 2026 A-52 Page 101 of 563 Appendix A California Water Code—Urban Water Management Planning taking actions not specified in its water shortage contingency plan, if needed, without having to formally amend its urban water management plan or water shortage contingency plan. Section 10632.3. It is the intent of the Legislature that, upon proclamation by the Governor of a state of emergency under the California Emergency Services Act (Chapter 7 (commencing with Section 8550) of Division 1 of Title 2 of the Government Code) based on drought conditions, the board defer to implementation of locally adopted water shortage contingency plans to the extent practicable. Section 10632.5. (a) In addition to the requirements of paragraph (3) of subdivision of Section 10632, beginning January 1, 2020, the plan shall include a seismic risk assessment and mitigation plan to assess the vulnerability of each of the various facilities of a water system and mitigate those vulnerabilities. (b) An urban water supplier shall update the seismic risk assessment and mitigation plan when updating its urban water management plan as required by Section 10621. (c) An urban water supplier may comply with this section by submitting, pursuant to Section 10644, a copy of the most recent adopted local hazard mitigation plan or multihazard mitigation plan under the federal Disaster Mitigation Act of 2000 (Public Law 106- 390) if the local hazard mitigation plan or multihazard mitigation plan addresses seismic risk. Section 10633. The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier. The preparation of the plan shall be coordinated with local water, wastewater, groundwater, and planning agencies that operate within the supplier's service area, and shall include all of the following: (a) A description of the wastewater collection and treatment systems in the supplier's service area, including a quantification of the amount of wastewater collected and treated and the methods of wastewater disposal. (b) A description of the quantity of treated wastewater that meets recycled water standards, is being discharged, and is otherwise available for use in a recycled water project. (c) A description of the recycled water currently being used in the supplier's service area, including, but not limited to, the type, place, and quantity of use. Informational Purposes Only January 2026 A-53 Page 102 of 563 Appendix A California Water Code—Urban Water Management Planning (d) A description and quantification of the potential uses of recycled water, including, but not limited to, agricultural irrigation, landscape irrigation, wildlife habitat enhancement, wetlands, industrial reuse, groundwater recharge, indirect potable reuse, and other appropriate uses, and a determination with regard to the technical and economic feasibility of serving those uses. (e) The projected use of recycled water within the supplier's service area at the end of 5, 10, 15, and 20 years, and a description of the actual use of recycled water in comparison to uses previously projected pursuant to this subdivision. (f) A description of actions, including financial incentives, which may be taken to encourage the use of recycled water, and the projected results of these actions in terms of acre-feet of recycled water used per year. (g) A plan for optimizing the use of recycled water in the supplier's service area, including actions to facilitate the installation of dual distribution systems, to promote recirculating uses, to facilitate the increased use of treated wastewater that meets recycled water standards, and to overcome any obstacles to achieving that increased use. Section 10634. The plan shall include information, to the extent practicable, relating to the quality of existing sources of water available to the supplier over the same five-year increments as described in subdivision (a) of Section 10631, and the manner in which water quality affects water management strategies and supply reliability. Article 2.5. Water Service Reliability, Section 10635 Section 10635. (a) Every urban water supplier shall include, as part of its urban water management plan, an assessment of the reliability of its water service to its customers during normal, dry, and multiple dry water years. This water supply and demand assessment shall compare the total water supply sources available to the water supplier with the long-term total projected water use over the next 20 years, in five-year increments, for a normal water year, a single dry water year, and a drought lasting five consecutive water years. The water service reliability assessment shall be based upon the information compiled pursuant to Section 10631, including available data from state, regional, or local agency population projections within the service area of the urban water supplier. (b) Every urban water supplier shall include, as part of its urban water management plan, a drought risk assessment for its water service to its customers as part of information considered in developing the demand management measures and water supply projects and programs to be included Informational Purposes Only January 2026 A-54 Page 103 of 563 Appendix A California Water Code—Urban Water Management Planning in the urban water management plan. The urban water supplier may conduct an interim update or updates to this drought risk assessment within the five- year cycle of its urban water management plan update. The drought risk assessment shall include each of the following: (1) A description of the data, methodology, and basis for one or more supply shortage conditions that are necessary to conduct a drought risk assessment for a drought period that lasts five consecutive water years, starting from the year following when the assessment is conducted. (2) A determination of the reliability of each source of supply under a variety of water shortage conditions. This may include a determination that a particular source of water supply is fully reliable under most, if not all, conditions. (3) A comparison of the total water supply sources available to the water supplier with the total projected water use for the drought period. (4) Considerations of the historical drought hydrology, plausible changes on projected supplies and demands under climate change conditions, anticipated regulatory changes, and other locally applicable criteria. (c) The urban water supplier shall provide that portion of its urban water management plan prepared pursuant to this article to any city or county within which it provides water supplies no later than 60 days after the submission of its urban water management plan. (d) Nothing in this article is intended to create a right or entitlement to water service or any specific level of water service. (e) Nothing in this article is intended to change existing law concerning an urban water supplier's obligation to provide water service to its existing customers or to any potential future customers. Article 3. Adoption and Implementation of Plans, Sections 10640-10645 Section 10640. (a) Every urban water supplier required to prepare a plan pursuant to this part shall prepare its plan pursuant to Article 2 (commencing with Section 10630). The supplier shall likewise periodically review the plan as required by Section 10621, and any amendments or changes required as a result of that review shall be adopted pursuant to this article. (b) Every urban water supplier required to prepare a water shortage contingency plan shall prepare a water shortage contingency plan pursuant to Section 10632. The supplier shall likewise periodically review the water shortage contingency plan as required by paragraph (10) of subdivision (a) of Informational Purposes Only January 2026 A-55 Page 104 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10632 and any amendments or changes required as a result of that review shall be adopted pursuant to this article. Section 10641. An urban water supplier required to prepare a plan or a water shortage contingency plan may consult with, and obtain comments from, any public agency or state agency or any person who has special expertise with respect to water demand management methods and techniques. Section 10642. Each urban water supplier shall encourage the active involvement of diverse social, cultural, and economic elements of the population within the service area prior to and during the preparation of both the plan and the water shortage contingency plan. Prior to adopting either, the urban water supplier shall make both the plan and the water shortage contingency plan available for public inspection and shall hold a public hearing or hearings thereon. Prior to any of these hearings, notice of the time and place of the hearing shall be published within the jurisdiction of the publicly owned water supplier pursuant to Section 6066 of the Government Code. The urban water supplier shall provide notice of the time and place of a hearing to any city or county within which the supplier provides water supplies. Notices by a local public agency pursuant to this section shall be provided pursuant to Chapter 17.5 (commencing with Section 7290) of Division 7 of Title 1 of the Government Code. A privately owned water supplier shall provide an equivalent notice within its service area. After the hearing or hearings, the plan or water shortage contingency plan shall be adopted as prepared or as modified after the hearing or hearings. Section 10643. An urban water supplier shall implement its plan adopted pursuant to this chapter in accordance with the schedule set forth in its plan. Section 10644. (a) (1) An urban water supplier shall submit to the department, the California State Library, and any city or county within which the supplier provides water supplies a copy of its plan no later than 30 days after adoption. Copies of amendments or changes to the plans shall be submitted to the department, the California State Library, and any city or county within which the supplier provides water supplies within 30 days after adoption. (2) The plan, or amendments to the plan, submitted to the department pursuant to paragraph (1) shall be submitted electronically and shall Informational Purposes Only January 2026 A-56 Page 105 of 563 Appendix A California Water Code—Urban Water Management Planning include any standardized forms, tables, or displays specified by the department. (b) If an urban water supplier revises its water shortage contingency plan, the supplier shall submit to the department a copy of its water shortage contingency plan prepared pursuant to subdivision (a) of Section 10632 no later than 30 days after adoption, in accordance with protocols for submission and using electronic reporting tools developed by the department. (c) (1) (A) Notwithstanding Section 10231.5 of the Government Code, the department shall prepare and submit to the Legislature, on or before July 1, in the years ending in seven and two, a report summarizing the status of the plans and water shortage contingency plans adopted pursuant to this part. The report prepared by the department shall identify the exemplary elements of the individual plans and water shortage contingency plans. The department shall provide a copy of the report to each urban water supplier that has submitted its plan and water shortage contingency plan to the department. The department shall also prepare reports and provide data for any legislative hearings designed to consider the effectiveness of plans and water shortage contingency plans submitted pursuant to this part. (B) The department shall prepare and submit to the board, on or before September 30 of each year, a report summarizing the submitted water supply and demand assessment results along with appropriate reported water shortage conditions and the regional and statewide analysis of water supply conditions developed by the department. As part of the report, the department shall provide a summary and, as appropriate, urban water supplier specific information regarding various shortage response actions implemented as a result of annual supplier-specific water supply and demand assessments performed pursuant to Section 10632.1. (C) The department shall submit the report to the Legislature for the 2015 plans by July 1, 2017, and the report to the Legislature for the 2020 plans and water shortage contingency plans by July 1, 2022. (2) A report to be submitted pursuant to subparagraph (A) of paragraph (1) shall be submitted in compliance with Section 9795 of the Government Code. (d) The department shall make available to the public the standard the department will use to identify exemplary water demand management measures. Informational Purposes Only January 2026 A-57 Page 106 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10645. (a) Not later than 30 days after filing a copy of its plan with the department, the urban water supplier and the department shall make the plan available for public review during normal business hours. (b) Not later than 30 days after filing a copy of its water shortage contingency plan with the department, the urban water supplier and the department shall make the plan available for public review during normal business hours. Chapter 4. Miscellaneous Provisions, Sections 10650- 10657 Section 10650. Any actions or proceedings, other than actions by the board, to attack, review, set aside, void, or annul the acts or decisions of an urban water supplier on the grounds of noncompliance with this part shall be commenced as follows: (a) An action or proceeding alleging failure to adopt a plan or a water shortage contingency plan shall be commenced within 18 months after that adoption is required by this part. (b) Any action or proceeding alleging that a plan or water shortage contingency plan, or action taken pursuant to either, does not comply with this part shall be commenced within 90 days after filing of the plan or water shortage contingency plan or an amendment to either pursuant to Section 10644 or the taking of that action. Section 10651. In any action or proceeding to attack, review, set aside, void, or annul a plan or a water shortage contingency plan, or an action taken pursuant to either by an urban water supplier on the grounds of noncompliance with this part, the inquiry shall extend only to whether there was a prejudicial abuse of discretion. Abuse of discretion is established if the supplier has not proceeded in a manner required by law or if the action by the water supplier is not supported by substantial evidence. Section 10652. The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) does not apply to the preparation and adoption of plans pursuant to this part or to the implementation of actions taken pursuant to Section 10632. Nothing in this part shall be interpreted as exempting from the California Environmental Quality Act any project that would significantly affect water supplies for fish and wildlife, or any project for implementation of the Informational Purposes Only January 2026 A-58 Page 107 of 563 Appendix A California Water Code—Urban Water Management Planning plan, other than projects implementing Section 10632, or any project for expanded or additional water supplies. Section 10653. The adoption of a plan shall satisfy any requirements of state law, regulation, or order, including those of the board and the Public Utilities Commission, for the preparation of water management plans, water shortage contingency plans, or conservation plans; provided, that if the board or the Public Utilities Commission requires additional information concerning water conservation, drought response measures, or financial conditions to implement its existing authority, nothing in this part shall be deemed to limit the board or the commission in obtaining that information. The requirements of this part shall be satisfied by any urban water demand management plan that complies with analogous federal laws or regulations after the effective date of this part, and which substantially meets the requirements of this part, or by any existing urban water management plan which includes the contents of a plan required under this part. Section 10654. An urban water supplier may recover in its rates the costs incurred in preparing its urban water management plan, its drought risk assessment, its water supply and demand assessment, and its water shortage contingency plan and implementing the reasonable water conservation measures included in either of the plans. Section 10655. If any provision of this part or the application thereof to any person or circumstances is held invalid, that invalidity shall not affect other provisions or applications of this part which can be given effect without the invalid provision or application thereof, and to this end the provisions of this part are severable. Section 10656. An urban water supplier is not eligible for a water grant or loan awarded or administered by the state unless the urban water supplier complies with this part. Section 10657. The department may adopt regulations regarding the definitions of water, water use, and reporting periods, and may adopt any other regulations deemed necessary or desirable to implement this part. In developing regulations pursuant to this section, the department shall solicit broad public participation from stakeholders and other interested persons. Informational Purposes Only January 2026 A-59 Page 108 of 563 APPENDIX B WATER CONSERVATION ACT OF 2009 Appendix A California Water Code—Urban Water Management Planning Water Conservation Act of 2009 (SB X7-7) This section contains information extracted from Water Code Division 6, Conservation, Development, and Utilization of State Water Resources, Part 2.55, Sustainable Water Use And Demand Reduction. Click on any section header below to read Water Code directly at the California Legislative Information website. Chapter 1. General Declarations and Policy, Sections 10608-10608.8 Section 10608. The Legislature finds and declares all of the following: (a) Water is a public resource that the California Constitution protects against waste and unreasonable use. (b) Growing population, climate change, and the need to protect and grow California's economy while protecting and restoring our fish and wildlife habitats make it essential that the state manage its water resources as efficiently as possible. (c) Diverse regional water supply portfolios will increase water supply reliability and reduce dependence on the Delta. (d) Reduced water use through conservation provides significant energy and environmental benefits, and can help protect water quality, improve streamflows, and reduce greenhouse gas emissions. (e) The success of state and local water conservation programs to increase efficiency of water use is best determined on the basis of measurable outcomes related to water use or efficiency. (f) Improvements in technology and management practices offer the potential for increasing water efficiency in California over time, providing an essential water management tool to meet the need for water for urban, agricultural, and environmental uses. (g) The Governor has called for a 20 percent per capita reduction in urban water use statewide by 2020. (h) The factors used to formulate water use efficiency targets can vary significantly from location to location based on factors including weather, patterns of urban and suburban development, and past efforts to enhance water use efficiency. (i) Per capita water use is a valid measure of a water provider's efforts to reduce urban water use within its service area. However, per capita water use is less Informational Purposes Only January 2026 A-3 Page 110 of 563 Appendix A California Water Code—Urban Water Management Planning useful for measuring relative water use efficiency between different water providers. Differences in weather, historical patterns of urban and suburban development, and density of housing in a particular location need to be considered when assessing per capita water use as a measure of efficiency. Section 10608.4. It is the intent of the Legislature, by the enactment of this part, to do all of the following: (a) Require all water suppliers to increase the efficiency of use of this essential resource. (b) Establish a framework to meet the state targets for urban water conservation identified in this part and called for by the Governor. (c) Measure increased efficiency of urban water use on a per capita basis. (d) Establish a method or methods for urban retail water suppliers to determine targets for achieving increased water use efficiency by the year 2020, in accordance with the Governor's goal of a 20- percent reduction. (e) Establish consistent water use efficiency planning and implementation standards for urban water suppliers and agricultural water suppliers. (f) Promote urban water conservation standards that are consistent with the California Urban Water Conservation Council's adopted best management practices and the requirements for demand management in Section 10631. (g) Establish standards that recognize and provide credit to water suppliers that made substantial capital investments in urban water conservation since the drought of the early 1990s. (h) Recognize and account for the investment of urban retail water suppliers in providing recycled water for beneficial uses. (i) Require implementation of specified efficient water management practices for agricultural water suppliers. (k) Support the economic productivity of California's agricultural, commercial, and industrial sectors. (1) Advance regional water resources management. Section 10608.8. (a) (1) Water use efficiency measures adopted and implemented pursuant to this part or Part 2.8 (commencing with Section 10800) are water conservation measures subject to the protections provided under Section 1011. Informational Purposes Only January 2026 A-4 Page 111 of 563 Appendix A California Water Code—Urban Water Management Planning (2) Because an urban agency is not required to meet its urban water use target until 2020 pursuant to subdivision (b) of Section 10608.24, an urban retail water supplier's failure to meet those targets shall not establish a violation of law for purposes of any state administrative or judicial proceeding prior to January 1, 2021. Nothing in this paragraph limits the use of data reported to the department or the board in litigation or an administrative proceeding. This paragraph shall become inoperative on January 1, 2021. (3) To the extent feasible, the department and the board shall provide for the use of water conservation reports required under this part to meet the requirements of Section 1011 for water conservation reporting. (b) This part does not limit or otherwise affect the application of Chapter 3.5 commencing with Section 11340), Chapter 4 (commencing with Section 11370), Chapter 4.5 (commencing with Section 11400), and Chapter 5 (commencing with Section 11500) of Part 1 of Division 3 of Title 2 of the Government Code. (c) This part does not require a reduction in the total water used in the agricultural or urban sectors, because other factors, including, but not limited to, changes in agricultural economics or population growth may have greater effects on water use. This part does not limit the economic productivity of California's agricultural, commercial, or industrial sectors. (d) The requirements of this part do not apply to an agricultural water supplier that is a party to the Quantification Settlement Agreement, as defined in subdivision (a) of Section 1 of Chapter 617 of the Statutes of 2002, during the period within which the Quantification Settlement Agreement remains in effect. After the expiration of the Quantification Settlement Agreement, to the extent conservation water projects implemented as part of the Quantification Settlement Agreement remain in effect, the conserved water created as part of those projects shall be credited against the obligations of the agricultural water supplier pursuant to this part. Chapter 2. Definitions, Section 10608. 12 Section 10608.12. Unless the context otherwise requires, the following definitions govern the construction of this part: (a) "Affordable housing" has the same meaning as defined in Section 34191.30 of the Health and Safety Code. (b) "Agricultural water supplier" means a water supplier, either publicly or privately owned, providing water to 10,000 or more irrigated acres, excluding recycled water. "Agricultural water supplier" includes a supplier or contractor Informational Purposes Only January 2026 A-5 Page 112 of 563 Appendix A California Water Code—Urban Water Management Planning for water, regardless of the basis of right, that distributes or sells water for ultimate resale to customers. "Agricultural water supplier" does not include the department. (c) "Base daily per capita water use" means any of the following: (1) The urban retail water supplier's estimate of its average gross water use, reported in gallons per capita per day and calculated over a continuous 10-year period ending no earlier than December 31, 2004, and no later than December 31, 2010. (2) For an urban retail water supplier that meets at least 10 percent of its 2008 measured retail water demand through recycled water that is delivered within the service area of an urban retail water supplier or its urban wholesale water supplier, the urban retail water supplier may extend the (3) calculation described in paragraph (1) up to an additional five years to a maximum of a continuous 15-year period ending no earlier than December 31, 2004, and no later than December 31, 2010. (4) For the purposes of Section 10608.22, the urban retail water supplier's estimate of its average gross water use, reported in gallons per capita per day and calculated over a continuous five-year period ending no earlier than December 31, 2007, and no later than December 31, 2010. (d) Baseline commercial, industrial, and institutional water use" means an urban retail water supplier's base daily per capita water use for commercial, industrial, and institutional users. (e) "CII water use" means water used by commercial water users, industrial water users, institutional water users, and large landscape water users. (f) "Commercial water user" means a water user that provides or distributes a product or service. (g) "Common area" means that portion of a common interest development or of a property owned or managed by a homeowners' association or a community service organization or similar entity that is not assigned or allocated to the exclusive use of the occupants of an individual dwelling unit within the property. (h) "Common interest development" has the same meaning as in Section 4100 of the Civil Code. (i) "Community service organization or similar entity" has the same meaning as in Section 4110 of the Civil Code. (j) "Community space" means an area designated by a property owner or a governmental agency to accommodate human foot traffic for civic, ceremonial, or other community events or social gatherings Informational Purposes Only January 2026 A-6 Page 113 of 563 Appendix A California Water Code—Urban Water Management Planning (k) Compliance daily per capita water use" means the gross water use during the final year of the reporting period, reported in gallons per capita per day. (1) "Disadvantaged community" means a community with an annual median household income that is less than 80 percent of the statewide annual median household income. (m) "Functional turf" means a ground cover surface of turf located in a recreational use area or community space. Turf enclosed by fencing or other barriers to permanently preclude human access for recreation or assembly is not functional turf. (n) "Gross water use" means the total volume of water, whether treated or untreated, entering the distribution system of an urban retail water supplier, excluding all of the following: (1) Recycled water that is delivered within the service area of an urban retail water supplier or its urban wholesale water supplier. (2) The net volume of water that the urban retail water supplier places into long-term storage. (3) The volume of water the urban retail water supplier conveys for use by another urban water supplier. (4) The volume of water delivered for agricultural use, except as otherwise provided in subdivision (f) of Section 10608.24. (o) "Homeowners' association" means an "association" as defined in Section 4080 of the Civil Code. (p) "Industrial water user" means a water user that is primarily a manufacturer or processor of materials as defined by the North American Industry Classification System code sectors 31 to 33, inclusive, or an entity that is a water user primarily engaged in research and development. (q) "Institutional water user" means a water user dedicated to public service. This type of user includes, among other users, higher education institutions, schools, courts, churches, hospitals, government facilities, and nonprofit research institutions. (r) "Interim urban water use target" means the midpoint between the urban retail water supplier's base daily per capita water use and the urban retail water supplier's urban water use target for 2020. (s) "Large landscape" means a nonresidential landscape as described in the performance measures for CII water use adopted pursuant to Section 10609.10. (t) "Locally cost effective" means that the present value of the local benefits of implementing an agricultural efficiency water management practice is greater Informational Purposes Only January 2026 A-7 Page 114 of 563 Appendix A California Water Code—Urban Water Management Planning than or equal to the present value of the local cost of implementing that measure. (u) "Nonfunctional turf" means any turf that is not functional turf, and includes turf located within street rights-of-way and parking lots. (v) "Performance measures" means actions to be taken by urban retail water suppliers that will result in increased water use efficiency by CII water users. Performance measures may include, but are not limited to, educating CII water users on best management practices, conducting water use audits, and preparing water management plans. Performance measures do not include process water. (w) "Potable reuse" means direct potable reuse, indirect potable reuse for groundwater recharge, and reservoir water augmentation as those terms are defined in Section 13561. (x) "Potable water" means water that is suitable for human consumption. (y) "Process water" means water used by industrial water users for producing a product or product content or water used for research and development. Process water includes, but is not limited to, continuous manufacturing processes, and water used for testing, cleaning, and maintaining equipment. Water used to cool machinery or buildings used in the manufacturing process or necessary to maintain product quality or chemical characteristics for product manufacturing or control rooms, data centers, laboratories, clean rooms, and other industrial facility units that are integral to the manufacturing or research and development process is process water. Water used in the manufacturing process that is necessary for complying with local, state, and federal health and safety laws, and is not incidental water, is process water. Process water does not mean incidental water uses. (z) "Public water system" has the same meaning as defined in Section 116275 of the Health and Safety Code. (aa) "Recreational use area" means an area designated by a property owner or a governmental agency to accommodate human foot traffic for recreation, including, but not limited to, sports fields, golf courses, playgrounds, picnic grounds, or pet exercise areas. This recreation may be either formal or informal. (ab) "Recycled water" means recycled water, as defined in subdivision (n) of Section 13050. (ac) "Regional water resources management" means sources of supply resulting from watershed-based planning for sustainable local water reliability or any of the following alternative sources of water: (1) The capture and reuse of stormwater or rainwater. (2) The use of recycled water. Informational Purposes Only January 2026 A-8 Page 115 of 563 Appendix A California Water Code—Urban Water Management Planning (3) The desalination of brackish groundwater. (4) The conjunctive use of surface water and groundwater in a manner that is consistent with the safe yield of the groundwater basin. (ad) "Reporting period" means the years for which an urban retail water supplier reports compliance with the urban water use targets. (ae) "Turf" has the same meaning as defined in Section 491 of Title 23 of the California Code of Regulations (af) "Urban retail water supplier" means a water supplier, either publicly or privately owned, that directly provides potable municipal water to more than 3,000 end users or that supplies more than 3,000 acre-feet of potable water annually at retail for municipal purposes. (ag) "Urban water supplier" has the same meaning as defined in Section 10617. (ah) "Urban water use objective" means an estimate of aggregate efficient water use for the previous year based on adopted water use efficiency standards and local service area characteristics for that year, as described in Section 10609.20. (ai) "Urban water use target" means the urban retail water supplier's targeted future daily per capita water use. (aj) "Urban wholesale water supplier" means a water supplier, either publicly or privately owned, that provides more than 3,000 acre- feet of water annually at wholesale for potable municipal purposes. Chapter 2.5. Nonfunctional Turf Section 10608.14. (a) The use of potable water for the irrigation of nonfunctional turf located on commercial, industrial, and institutional properties, other than a cemetery, and on properties of homeowners' associations, common interest developments, and community service organizations or similar entities is prohibited as of the following dates: (1) All properties owned by the Department of General Services, beginning January 1, 2027. (2) All properties owned by local governments, local or regional public agencies, and public water systems, except those specified in paragraph (5), beginning January 1, 2027. (3) All other institutional properties and all commercial and industrial properties, beginning January 1, 2028. Informational Purposes Only January 2026 A-9 Page 116 of 563 Appendix A California Water Code—Urban Water Management Planning (4) All common areas of properties of homeowners' associations, common interest developments, and community service organizations or similar entities, beginning January 1, 2029. (5) All properties owned by local governments, local public agencies, and public water systems in a disadvantaged community, beginning January 1, 2031, or the date upon which a state funding source is made available to fund conversion of nonfunctional turf on these properties to climate- appropriate landscapes, whichever is later. (b) Notwithstanding subdivision (a), the use of potable water is not prohibited by this section to the extent necessary to ensure the health of trees and other perennial nonturf plantings, or to the extent necessary to address an immediate health and safety need. (c) The board may, upon a showing of good cause for reasons including economic hardship, critical business need, and potential impacts to human health or safety, postpone a compliance deadline in subdivision (a) by up to three years for certain persons, institutions, and businesses, and may create a form to be used for compliance certification to the board by property owners. (d) Public water systems shall, by no later than January 1, 2027, revise their regulations, ordinances, or policies governing water service to include the requirements of subdivisions (a) and (b), as revised by the board pursuant to subdivision (c), and shall communicate the requirements to their customers on or before that date. (e) (1) An owner of commercial, industrial, or institutional property with more than 5,000 square feet of irrigated area other than a cemetery shall certify to the board, commencing June 30, 2030, and every three years thereafter through 2039, that their property is in compliance with the requirements of this chapter. (2) An owner of a property with more than 5,000 square feet of irrigated common area that is a homeowners' association, common interest development, or community service organization or similar entity shall certify to the board, commencing June 30, 2031, and every three years thereafter through 2040, that their property is in compliance with the requirements of this chapter. (f) Noncompliance by a person or entity with this chapter or regulations adopted thereunder shall be subject to civil liability and penalties set forth in Section 1846, or to civil liability and penalties imposed by an urban retail water supplier pursuant to a locally adopted ordinance or policy. Informational Purposes Only January 2026 A-10 Page 117 of 563 Appendix A California Water Code—Urban Water Management Planning (g) (1) A public water system, city, county, or city and county may enforce the provisions of this chapter. (2) To avoid duplication of enforcement, any entity identified in paragraph (1) that is not a retail public water system shall notify the retail public water system 30 days prior to enforcement of the provisions of this chapter against a property served by such system. (3) Nothing in paragraph (2) shall preclude enforcement by any entity identified in paragraph (1) once adequate notice is given. (h) The department shall, when using funds appropriated for water conservation for turf replacement, prioritize financial assistance for nonfunctional turf replacement to public water systems serving disadvantaged communities and to owners of affordable housing. (i) The department shall utilize the saveourwater.com internet website and outreach campaign to provide information and resources on converting nonfunctional turf to native vegetation. (j) The Governor's Office of Business and Economic Development shall support small and minority-owned businesses that provide services that advance compliance with this chapter. Chapter 3. Urban Retail Water Suppliers, Sections 10608. 16-10608.44 Section 10608.16. (a) The state shall achieve a 20-percent reduction in urban per capita water use in California on or before December 31, 2020. (1) The state shall make incremental progress towards the state target specified in subdivision (a) by reducing urban per capita water use by at least 10 percent on or before December 31, 2015. Section 10608.20. (a) (1) Each urban retail water supplier shall develop urban water use targets and an interim urban water use target by July 1, 2011. Urban retail water suppliers may elect to determine and report progress toward achieving these targets on an individual or regional basis, as provided in subdivision (a) of Section 10608.28, and may determine the targets on a fiscal year or calendar year basis. Informational Purposes Only January 2026 A-11 Page 118 of 563 Appendix A California Water Code—Urban Water Management Planning (2) It is the intent of the Legislature that the urban water use targets described in paragraph (1) cumulatively result in a 20-percent reduction from the baseline daily per capita water use by December 31, 2020. (b) An urban retail water supplier shall adopt one of the following methods for determining its urban water use target pursuant to subdivision (a): (1) Eighty percent of the urban retail water supplier's baseline per capita daily water use. (2) The per capita daily water use that is estimated using the sum of the following performance standards: (A) For indoor residential water use, 55 gallons per capita daily water use as a provisional standard. Upon completion of the department's 2017 report to the Legislature pursuant to Section 10608.42, this standard may be adjusted by the Legislature by statute. (B) For landscape irrigated through dedicated or residential meters or connections, water efficiency equivalent to the standards of the Model Water Efficient Landscape Ordinance set forth in Chapter 2.7 (commencing with Section 490) of Division 2 of Title 23 of the California Code of Regulations, as in effect the later of the year of the landscape's installation or 1992. An urban retail water supplier using the approach specified in this subparagraph shall use satellite imagery, site visits, or other best available technology to develop an accurate estimate of landscaped areas. (C) For commercial, industrial, and institutional uses, a 10- percent reduction in water use from the baseline commercial, industrial, and institutional water use by 2020. (3) Ninety-five percent of the applicable state hydrologic region target, as set forth in the state's draft 20x2020 Water Conservation Plan (dated April 30, 2009). If the service area of an urban water supplier includes more than one hydrologic region, the supplier shall apportion its service area to each region based on population or area. (4) A method that shall be identified and developed by the department, through a public process, and reported to the Legislature no later than December 31, 2010. The method developed by the department shall identify per capita targets that cumulatively result in a statewide 20- percent reduction in urban daily per capita water use by December 31, 2020. In developing urban daily per capita water use targets, the department shall do all of the following: (A) Consider climatic differences within the state. (B) Consider population density differences within the state. (C) Provide flexibility to communities and regions in meeting the targets. Informational Purposes Only January 2026 A-12 Page 119 of 563 Appendix A California Water Code—Urban Water Management Planning (D) Consider different levels of per capita water use according to plant water needs in different regions. (E) Consider different levels of commercial, industrial, and institutional water use in different regions of the state. (F) Avoid placing an undue hardship on communities that have implemented conservation measures or taken actions to keep per capita water use low. (c) If the department adopts a regulation pursuant to paragraph (4) of subdivision (b) that results in a requirement that an urban retail water supplier achieve a reduction in daily per capita water use that is greater than 20 percent by December 31, 2020, an urban retail water supplier that adopted the method described in paragraph (4) of subdivision (b) may limit its urban water use target to a reduction of not more than 20 percent by December 31, 2020, by adopting the method described in paragraph (1) of subdivision (b). (d) The department shall update the method described in paragraph (4) of subdivision (b) and report to the Legislature by December 31, 2014. An urban retail water supplier that adopted the method described in paragraph (4) of subdivision (b) may adopt a new urban daily per capita water use target pursuant to this updated method. (e) An urban retail water supplier shall include in its urban water management plan due in 2010 pursuant to Part 2.6 (commencing with Section 10610) the baseline daily per capita water use, urban water use target, interim urban water use target, and compliance daily per capita water use, along with the bases for determining those estimates, including references to supporting data. (f) When calculating per capita values for the purposes of this chapter, an urban retail water supplier shall determine population using federal, state, and local population reports and projections. (g) An urban retail water supplier may update its 2020 urban water use target in its 2015 urban water management plan required pursuant to Part 2.6 (commencing with Section 10610). (h) (1) The department, through a public process and in consultation with the California Urban Water Conservation Council, shall develop technical methodologies and criteria for the consistent implementation of this part, including, but not limited to, both of the following: (A) Methodologies for calculating base daily per capita water use, baseline commercial, industrial, and institutional water use, compliance daily per capita water use, gross water use, service area Informational Purposes Only January 2026 A-13 Page 120 of 563 Appendix A California Water Code—Urban Water Management Planning population, indoor residential water use, and landscaped area water use. (B) Criteria for adjustments pursuant to subdivisions (d) and (e) of Section 10608.24. (2) The department shall post the methodologies and criteria developed pursuant to this subdivision on its internet website, and make written copies available, by October 1, 2010. An urban retail water supplier shall use the methods developed by the department in compliance with this part. (h) (1) The department shall adopt regulations for implementation of the provisions relating to process water in accordance with Section 10608.12, subdivision (e) of Section 10608.24, and subdivision (d) of Section 10608.26. (2) The initial adoption of a regulation authorized by this subdivision is deemed to address an emergency, for purposes of Sections 11346.1 and 11349.6 of the Government Code, and the department is hereby exempted for that purpose from the requirements of subdivision (b) of Section 11346.1 of the Government Code. After the initial adoption of an emergency regulation pursuant to this subdivision, the department shall not request approval from the Office of Administrative Law to readopt the regulation as an emergency regulation pursuant to Section 11346.1 of the Government Code. (J) (1) An urban retail water supplier is granted an extension to July 1, 2011, for adoption of an urban water management plan pursuant to Part 2.6 (commencing with Section 10610) due in 2010 to allow the use of technical methodologies developed by the department pursuant to paragraph (4) of subdivision (b) and subdivision (h). An urban retail water supplier that adopts an urban water management plan due in 2010 that does not use the methodologies developed by the department pursuant to subdivision (h) shall amend the plan by July 1, 2011, to comply with this part. (2) An urban wholesale water supplier whose urban water management plan prepared pursuant to Part 2.6 (commencing with Section 10610) was due and not submitted in 2010 is granted an extension to July 1, 2011, to permit coordination between an urban wholesale water supplier and urban retail water suppliers. Informational Purposes Only January 2026 A-14 Page 121 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10608.22. Notwithstanding the method adopted by an urban retail water supplier pursuant to Section 10608.20, an urban retail water supplier's per capita daily water use reduction shall be no less than 5 percent of base daily per capita water use as defined in paragraph (3) of subdivision (c) of Section 10608.12. This section does not apply to an urban retail water supplier with a base daily per capita water use at or below 100 gallons per capita per day. Section 10608.24. (a) Each urban retail water supplier shall meet its interim urban water use target by December 31, 2015. (b) Each urban retail water supplier shall meet its urban water use target by December 31, 2020. (c) An urban retail water supplier's compliance daily per capita water use shall be the measure of progress toward achievement of its urban water use target. (d) (1) When determining compliance daily per capita water use, an urban retail water supplier may consider the following factors: (A) Differences in evapotranspiration and rainfall in the baseline period compared to the compliance reporting period. (B) Substantial changes to commercial or industrial water use resulting from increased business output and economic development that have occurred during the reporting period. (C) Substantial changes to institutional water use resulting from fire suppression services or other extraordinary events, or from new or expanded operations, that have occurred during the reporting period. (2) If the urban retail water supplier elects to adjust its estimate of compliance daily per capita water use due to one or more of the factors described in paragraph (1), it shall provide the basis for, and data supporting, the adjustment in the report required by Section 10608.40. (e) When developing the urban water use target pursuant to Section 10608.20, an urban retail water supplier that has a substantial percentage of industrial water use in its service area may exclude process water from the calculation of gross water use to avoid a disproportionate burden on another customer sector. (f) (1) An urban retail water supplier that includes agricultural water use in an urban water management plan pursuant to Part 2.6 (commencing with Section 10610) may include the agricultural water use in determining Informational Purposes Only January 2026 A-15 Page 122 of 563 Appendix A California Water Code—Urban Water Management Planning gross water use. An urban retail water supplier that includes agricultural water use in determining gross water use and develops its urban water use target pursuant to paragraph (2) of subdivision (b) of Section 10608.20 shall use a water efficient standard for agricultural irrigation of 100 percent of reference evapotranspiration multiplied by the crop coefficient for irrigated acres. (2) An urban retail water supplier, that is also an agricultural water supplier, is not subject to the requirements of Chapter 4 (commencing with Section 10608.48), if the agricultural water use is incorporated into its urban water use target pursuant to paragraph (1). Section 10608.26. (a) In complying with this part, an urban retail water supplier shall conduct at least one public hearing to accomplish all of the following: (1) Allow community input regarding the urban retail water supplier's implementation plan for complying with this part. (2) Consider the economic impacts of the urban retail water supplier's implementation plan for complying with this part. (3) Adopt a method, pursuant to subdivision (b) of Section 10608.20, for determining its urban water use target. (b) In complying with this part, an urban retail water supplier may meet its urban water use target through efficiency improvements in any combination among its customer sectors. An urban retail water supplier shall avoid placing a disproportionate burden on any customer sector. (c) For an urban retail water supplier that supplies water to a United States Department of Defense military installation, the urban retail water supplier's implementation plan for complying with this part shall consider the conservation of that military installation under federal Executive Order 13514. (d) (1) Any ordinance or resolution adopted by an urban retail water supplier after the effective date of this section shall not require existing customers as of the effective date of this section, to undertake changes in product formulation, operations, or equipment that would reduce process water use, but may provide technical assistance and financial incentives to those customers to implement efficiency measures for process water. This section shall not limit an ordinance or resolution adopted pursuant to a declaration of drought emergency by an urban retail water supplier. (2) This part shall not be construed or enforced so as to interfere with the requirements of Chapter 4 (commencing with Section 113980) to Chapter 13 (commencing with Section 114380), inclusive, of Part 7 of Informational Purposes Only January 2026 A-16 Page 123 of 563 Appendix A California Water Code—Urban Water Management Planning Division 104 of the Health and Safety Code, or any requirement or standard for the protection of public health, public safety, or worker safety established by federal, state, or local government or recommended by recognized standard setting organizations or trade associations. Section 10608.28. (a) An urban retail water supplier may meet its urban water use target within its retail service area, or through mutual agreement, by any of the following: (1) Through an urban wholesale water supplier. (2) Through a regional agency authorized to plan and implement water conservation, including, but not limited to, an agency established under the Bay Area Water Supply and Conservation Agency Act (Division 31 (commencing with Section 81300)). (3) Through a regional water management group as defined in Section 10537. (4) By an integrated regional water management funding area. (5) By hydrologic region. (6) Through other appropriate geographic scales for which computation methods have been developed by the department. (b) A regional water management group, with the written consent of its member agencies, may undertake any or all planning, reporting, and implementation functions under this chapter for the member agencies that consent to those activities. Any data or reports shall provide information both for the regional water management group and separately for each consenting urban retail water supplier and urban wholesale water supplier. Section 10608.32. All costs incurred pursuant to this part by a water utility regulated by the Public Utilities Commission may be recoverable in rates subject to review and approval by the Public Utilities Commission, and may be recorded in a memorandum account and reviewed for reasonableness by the Public Utilities Commission. Section 10608.34. (a) (1) On or before January 1, 2017, the department shall adopt rules for all of the following: (A) The conduct of standardized water loss audits by urban retail water suppliers in accordance with the method adopted by the American Water Works Association in the third edition of Water Audits and Loss Informational Purposes Only January 2026 A-17 Page 124 of 563 Appendix A California Water Code—Urban Water Management Planning Control Programs, Manual M36 and in the Free Water Audit Software, version 5.0. (B) The process for validating a water loss audit report prior to submitting the report to the department. For the purposes of this section, "validating" is a process whereby an urban retail water supplier uses a technical expert to confirm the basis of all data entries in the urban retail water supplier's water loss audit report and to appropriately characterize the quality of the reported data. The validation process shall follow the principles and terminology laid out by the American Water Works Association in the third edition of Water Audits and Loss Control Programs, Manual M36 and in the Free Water Audit Software, version 5.0. A validated water loss audit report shall include the name and technical qualifications of the person engaged for validation. (C) The technical qualifications required of a person to engage in validation, as described in subparagraph (B). (D) The certification requirements for a person selected by an urban retail water supplier to provide validation of its own water loss audit report. (E) The method of submitting a water loss audit report to the department. (2) The department shall update rules adopted pursuant to paragraph (1) no later than six months after the release of subsequent editions of the American Water Works Association's Water Audits and Loss Control Programs, Manual M36. Except as provided by the department, until the department adopts updated rules pursuant to this paragraph, an urban retail water supplier may rely upon a subsequent edition of the American Water Works Association's Water Audits and Loss Control Programs, Manual M36 or the Free Water Audit Software. (b) (1) On or before October 1 of each year until October 1, 2023, each urban retail water supplier reporting on a calendar year basis shall submit a completed and validated water loss audit report for the previous calendar year or the previous fiscal year as prescribed by the department pursuant to subdivision (a). (2) On or before January 1 of each year until January 1, 2024, each urban retail water supplier reporting on a fiscal year basis shall submit a completed and validated water loss audit report for the previous fiscal year as prescribed by the department pursuant to subdivision (a). (3) On or before January 1, 2024, and on or before January 1 of each year thereafter, each urban retail water supplier shall submit a completed and Informational Purposes Only January 2026 A-18 Page 125 of 563 Appendix A California Water Code—Urban Water Management Planning validated water loss audit report for the previous calendar year or previous fiscal year as part of the report submitted to the department pursuant to subdivision (a) of Section 10609.24 and as prescribed by the department pursuant to subdivision (a). (4) Water loss audit reports submitted on or before October 1, 2017, may be completed and validated with assistance as described in subdivision (c). (c) Using funds available for the 2016-17 fiscal year, the board shall contribute up to four hundred thousand dollars ($400,000) towards procuring water loss audit report validation assistance for urban retail water suppliers. (d) Each water loss audit report submitted to the department shall be accompanied by information, in a form specified by the department, identifying steps taken in the preceding year to increase the validity of data entered into the final audit, reduce the volume of apparent losses, and reduce the volume of real losses. (e) At least one of the following employees of an urban retail water supplier shall attest to each water loss audit report submitted to the department: (1) The chief financial officer. (2) The chief engineer. (3) The general manager. (f) The department shall deem incomplete and return to the urban retail water supplier any final water loss audit report found by the department to be incomplete, not validated, unattested, or incongruent with known characteristics of water system operations. A water supplier shall resubmit a completed water loss audit report within 90 days of an audit being returned by the department. (g) The department shall post all validated water loss audit reports on its internet website in a manner that allows for comparisons across water suppliers. The department shall make the validated water loss audit reports available for public viewing in a timely manner after their receipt. (h) Using available funds, the department shall provide technical assistance to guide urban retail water suppliers' water loss detection programs, including, but not limited to, metering techniques, pressure management techniques, condition-based assessment techniques for transmission and distribution pipelines, and utilization of portable and permanent water loss detection devices. (i) No earlier than January 1, 2019, and no later than July 1, 2020, the board shall adopt rules requiring urban retail water suppliers to meet performance standards for the volume of water losses. In adopting these rules, the board shall employ full life-cycle cost accounting to evaluate the costs of meeting the performance standards. The board may consider establishing a minimum Informational Purposes Only January 2026 A-19 Page 126 of 563 Appendix A California Water Code—Urban Water Management Planning allowable water loss threshold that, if reached and maintained by an urban water supplier, would exempt the urban water supplier from further water loss reduction requirements. Section 10608.35. (a) The department, in coordination with the board, shall conduct necessary studies and investigations and make a recommendation to the Legislature, by January 1, 2020, on the feasibility of developing and enacting water loss reporting requirements for urban wholesale water suppliers. (b) The studies and investigations shall include an evaluation of the suitability of applying the processes and requirements of Section 10608.34 to urban wholesale water suppliers. (c) In conducting necessary studies and investigations and developing its recommendation, the department shall solicit broad public participation from stakeholders and other interested persons. Section 10608.36. Urban wholesale water suppliers shall include in the urban water management plans required pursuant to Part 2.6 (commencing with Section 10610) an assessment of their present and proposed future measures, programs, and policies to help achieve the water use reductions required by this part. Section 10608.40. Urban water retail suppliers shall report to the department on their progress in meeting their urban water use targets as part of their urban water management plans submitted pursuant to Section 10631. The data shall be reported using a standardized form developed pursuant to Section 10608.52. Section 10608.42. (a) The department shall review the 2015 urban water management plans and report to the Legislature by July 1, 2017, on progress towards achieving a 20- percent reduction in urban water use by December 31, 2020. The report shall include recommendations on changes to water efficiency standards or urban water use targets to achieve the 20- percent reduction and to reflect updated efficiency information and technology changes. (b) A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code. Informational Purposes Only January 2026 A-20 Page 127 of 563 Appendix A California Water Code—Urban Water Management Planning Section 10608.43. The department, in conjunction with the California Urban Water Conservation Council, by April 1, 2010, shall convene a representative task force consisting of academic experts, urban retail water suppliers, environmental organizations, commercial water users, industrial water users, and institutional water users to develop alternative best management practices for commercial, industrial, and institutional users and an assessment of the potential statewide water use efficiency improvement in the commercial, industrial, and institutional sectors that would result from implementation of these best management practices. The taskforce, in conjunction with the department, shall submit a report to the Legislature by April 1, 2012, that shall include a review of multiple sectors within commercial, industrial, and institutional users and that shall recommend water use efficiency standards for commercial, industrial, and institutional users among various sectors of water use. The report shall include, but not be limited to, the following: (a) Appropriate metrics for evaluating commercial, industrial, and institutional water use. (b) Evaluation of water demands for manufacturing processes, goods, and cooling. (c) Evaluation of public infrastructure necessary for delivery of recycled water to the commercial, industrial, and institutional sectors. (d) Evaluation of institutional and economic barriers to increased recycled water use within the commercial, industrial, and institutional sectors. (e) Identification of technical feasibility and cost of the best management practices to achieve more efficient water use statewide in the commercial, industrial, and institutional sectors that is consistent with the public interest and reflects past investments in water use efficiency. Section 10608.44. Each state agency shall reduce water use at facilities it operates to support urban retail water suppliers in meeting the target identified in Section 10608.16. Chapter 5. Sustainable Water Management, Section 10608.50 Section 10608.50. (a) The department, in consultation with the board, shall promote implementation of regional water resources management practices through increased incentives and removal of barriers consistent with state and federal law. Potential changes may include, but are not limited to, all of the following: Informational Purposes Only January 2026 A-21 Page 128 of 563 Appendix A California Water Code—Urban Water Management Planning (1) Revisions to the requirements for urban and agricultural water management plans. (2) Revisions to the requirements for integrated regional water management plans. (3) Revisions to the eligibility for state water management grants and loans. (4) Revisions to state or local permitting requirements that increase water supply opportunities, but do not weaken water quality protection under state and federal law. (5) Increased funding for research, feasibility studies, and project construction. (6) Expanding technical and educational support for local land use and water management agencies. (b) No later than January 1, 2011, and updated as part of the California Water Plan, the department, in consultation with the board, and with public input, shall propose new statewide targets, or review and update existing statewide targets, for regional water resources management practices, including, but not limited to, recycled water, brackish groundwater desalination, and infiltration and direct use of urban stormwater runoff. Chapter 6. Standardized Data Collection, Section 10608.52 Section 10608.52. (a) The department, in consultation with the board, the California Bay-Delta Authority or its successor agency, the State Department of Public Health, and the Public Utilities Commission, shall develop a single standardized water use reporting form to meet the water use information needs of each agency, including the needs of urban water suppliers that elect to determine and report progress toward achieving targets on a regional basis as provided in subdivision (a) of Section 10608.28. (b) At a minimum, the form shall be developed to accommodate information sufficient to assess an urban water supplier's compliance with conservation targets pursuant to Section 10608.24 and an agricultural water supplier's compliance with implementation of efficient water management practices pursuant to subdivision (a) of Section 10608.48. The form shall accommodate reporting by urban water suppliers on an individual or regional basis as provided in subdivision (a) of Section 10608.28. Informational Purposes Only January 2026 A-22 Page 129 of 563 Appendix A California Water Code—Urban Water Management Planning Chapter 7. Funding Provisions, Sections 10608.56- 10608.60 Section 10608.56. (a) On and after July 1, 2016, an urban retail water supplier is not eligible for a water grant or loan awarded or administered by the state unless the supplier complies with this part. (b) On and after July 1, 2013, an agricultural water supplier is not eligible for a water grant or loan awarded or administered by the state unless the supplier complies with this part. (c) Notwithstanding subdivision (a), the department shall determine that an urban retail water supplier is eligible for a water grant or loan even though the supplier has not met the per capita reductions required pursuant to Section 10608.24, if the urban retail water supplier has submitted to the department for approval a schedule, financing plan, and budget, to be included in the grant or loan agreement, for achieving the per capita reductions. The supplier may request grant or loan funds to achieve the per capita reductions to the extent the request is consistent with the eligibility requirements applicable to the water funds. (d) Notwithstanding subdivision (b), the department shall determine that an agricultural water supplier is eligible for a water grant or loan even though the supplier is not implementing all of the efficient water management practices described in Section 10608.48, if the agricultural water supplier has submitted to the department for approval a schedule, financing plan, and budget, to be included in the grant or loan agreement, for implementation of the efficient water management practices. The supplier may request grant or loan funds to implement the efficient water management practices to the extent the request is consistent with the eligibility requirements applicable to the water funds. (e) Notwithstanding subdivision (a), the department shall determine that an urban retail water supplier is eligible for a water grant or loan even though the supplier has not met the per capita reductions required pursuant to Section 10608.24, if the urban retail water supplier has submitted to the department for approval documentation demonstrating that its entire service area qualifies as a disadvantaged community. (f) The department shall not deny eligibility to an urban retail water supplier or agricultural water supplier in compliance with the requirements of this part and Part 2.8 (commencing with Section 10800), that is participating in a multiagency water project, or an integrated regional water management plan, developed pursuant to Section 75026 of the Public Resources Code, solely on the basis that one or more of the agencies participating in the project or plan Informational Purposes Only January 2026 A-23 Page 130 of 563 Appendix A California Water Code—Urban Water Management Planning is not implementing all of the requirements of this part or Part 2.8 (commencing with Section 10800). Section 10608.60. (a) It is the intent of the Legislature that funds made available by Section 75026 of the Public Resources Code should be expended, consistent with Division 43 (commencing with Section 75001) of the Public Resources Code and upon appropriation by the Legislature, for grants to implement this part. In the allocation of funding, it is the intent of the Legislature that the department give consideration to disadvantaged communities to assist in implementing the requirements of this part. (b) It is the intent of the Legislature that funds made available by Section 75041 of the Public Resources Code, should be expended, consistent with Division 43 (commencing with Section 75001) of the Public Resources Code and upon appropriation by the Legislature, for direct expenditures to implement this part. Chapter 9. Urban Water Use Objectives and Water Use Reporting, Sections 10609-10609.38 Section 10609. (a) The Legislature finds and declares that this chapter establishes a method to estimate the aggregate amount of water that would have been delivered the previous year by an urban retail water supplier if all that water had been used efficiently. This estimated aggregate water use is the urban retail water supplier's urban water use objective. The method is based on water use efficiency standards and local service area characteristics for that year. By comparing the amount of water actually used in the previous year with the urban water use objective, local urban water suppliers will be in a better position to help eliminate unnecessary use of water; that is, water used in excess of that needed to accomplish the intended beneficial use. (b) The Legislature further finds and declares all of the following: (1) This chapter establishes standards and practices for the following water uses: (A) Indoor residential use. (B) Outdoor residential use. (C) CII water use. (D) Water losses. Informational Purposes Only January 2026 A-24 Page 131 of 563 Appendix A California Water Code—Urban Water Management Planning (E) Other unique local uses and situations that can have a material effect on an urban water supplier's total water use. (2) This chapter further does all of the following: (A) Establishes a method to calculate each urban water use objective. (B) Considers recycled water quality in establishing efficient irrigation standards. (C) Requires the department to provide or otherwise identify data regarding the unique local conditions to support the calculation of an urban water use objective. (D) Provides for the use of alternative sources of data if alternative sources are shown to be as accurate as, or more accurate than, the data provided by the department. (E) Requires annual reporting of the previous year's water use with the urban water use objective. (F) Provides a bonus incentive for the amount of potable recycled water used the previous year when comparing the previous year's water use with the urban water use objective, of up to 10 percent of the urban water use objective. (3) This chapter requires the department and the board to solicit broad public participation from stakeholders and other interested persons in the development of the standards and the adoption of regulations pursuant to this chapter. (4) This chapter preserves the Legislature's authority over long- term water use efficiency target setting and ensures appropriate legislative oversight of the implementation of this chapter by doing all of the following: (A) Requiring the Legislative Analyst to conduct a review of the implementation of this chapter, including compliance with the adopted standards and regulations, accuracy of the data, use of alternate data, and other issues the Legislative Analyst deems appropriate. (B) Stating legislative intent that the director of the department and the chairperson of the board appear before the appropriate Senate and Assembly policy committees to report on progress in implementing this chapter. (C) Providing one-time-only authority to the department and board to adopt water use efficiency standards, except as explicitly provided in this chapter. Authorization to update the standards shall require separate legislation. Informational Purposes Only January 2026 A-25 Page 132 of 563 Appendix A California Water Code—Urban Water Management Planning (c) It is the intent of the Legislature that the following principles apply to the development and implementation of long-term standards and urban water use objectives: (1) Local urban retail water suppliers should have primary responsibility for meeting standards-based water use targets, and they shall retain the flexibility to develop their water supply portfolios, design and implement water conservation strategies, educate their customers, and enforce their rules. (2) Long-term standards and urban water use objectives should advance the state's goals to mitigate and adapt to climate change. (3) Long-term standards and urban water use objectives should acknowledge the shade, air quality, and heat-island reduction benefits provided to communities by trees through the support of water-efficient irrigation practices that keep trees healthy. (4) The state should identify opportunities for streamlined reporting, eliminate redundant data submissions, and incentivize open access to data collected by urban and agricultural water suppliers. Section 10609.2. (a) The board, in coordination with the department, shall adopt long-term standards for the efficient use of water pursuant to this chapter on or before June 30, 2022. (b) Standards shall be adopted for all of the following: (1) Outdoor residential water use. (2) Outdoor irrigation of landscape areas with dedicated irrigation meters in connection with CII water use. (3) A volume for water loss. (c) When adopting the standards under this section, the board shall consider the policies of this chapter and the proposed efficiency standards' effects on local wastewater management, developed and natural parklands, and urban tree health. The standards and potential effects shall be identified by May 30, 2022. The board shall allow for public comment on potential effects identified by the board under this subdivision. (d) The long-term standards shall be set at a level designed so that the water use objectives, together with other demands excluded from the long-term standards such as CII indoor water use and CII outdoor water use not connected to a dedicated landscape meter, would exceed the statewide conservation targets required pursuant to Chapter 3 (commencing with Section 10608.16). Informational Purposes Only January 2026 A-26 Page 133 of 563 Appendix A California Water Code—Urban Water Management Planning (e) The board, in coordination with the department, shall adopt by regulation variances recommended by the department pursuant to Section 10609.14 and guidelines and methodologies pertaining to the calculation of an urban retail water supplier's urban water use objective recommended by the department pursuant to Section 10609.16. Section 10609.4. (a) (1) Until January 1, 2025, the standard for indoor residential water use shall be 55 gallons per capita daily. (2) Beginning January 1, 2025, and until January 1, 2030, the standard for indoor residential water use shall be 47 gallons per capita daily. (3) Beginning January 1, 2030, the standard for indoor residential water use shall be 42 gallons per capita daily. (b) (1) The department, in coordination with the board, shall conduct necessary studies and investigations to assess and quantify the economic benefits and impacts of the 2030 indoor residential use standard on water, wastewater, and recycled water systems and shall include saturation end- use studies. The studies and investigations shall build on the standards and potential effects identified pursuant to subdivision (c) of Section 10609.2 and shall also consider, and as appropriate incorporate, other regional and statewide studies that quantify the impacts on water, wastewater, and recycled water systems, and evaluate the long-term effects of telework. To facilitate these studies and investigations, the board may request necessary and relevant information from wastewater agencies, including monthly influent flow, actions taken to reassess treatment processes, and the impact of the implementation of this chapter on wastewater operations, maintenance, and capital investment. The department, in coordination with the board, shall summarize the findings of these studies and investigations in a report to the Legislature on or before October 1, 2028. The report shall be submitted in compliance with Section 9795 of the Government Code. (2) If the department, in coordination with the board, determines that the 2030 indoor residential use standard is likely to unduly impact affordability of water and wastewater services, the department and the board may jointly recommend to the Legislature an alternate date on which the 2030 indoor residential use standard shall take effect. This determination shall be made using at least two years of data reflecting application of the 2025 indoor residential use standard. Informational Purposes Only January 2026 A-27 Page 134 of 563 Appendix A California Water Code—Urban Water Management Planning (3) Based upon the studies and investigations conducted pursuant to paragraph (1), the department shall consider whether to recommend, for adoption by the board, additional variances to accommodate unique challenges related to residential indoor water use pursuant to Section 10609.2. Variance options may include, but are not limited to, stranded assets, impacts on disadvantaged communities, impacts to environmental flows, or adverse impacts to wastewater or recycled water operations. (4) The studies, investigations, and report described in paragraph (1) shall include timely and inclusive collaboration with, and input from, a broad group of stakeholders, including, but not limited to, environmental groups, experts in indoor plumbing, water, wastewater, and recycled water agencies. (c) An urban retail water supplier shall not be subject to enforcement pursuant to this chapter solely for failing to meet the indoor residential use standard. Section 10609.6. (a) (1) The department, in coordination with the board, shall conduct necessary studies and investigations and recommend, no later than October 1, 2021, standards for outdoor residential use for adoption by the board in accordance with this chapter. (2) (A) The standards shall incorporate the principles of the model water efficient landscape ordinance adopted by the department pursuant to the Water Conservation in Landscaping Act (Article 10.8 (commencing with Section 65591) of Chapter 3 of Division 1 of Title 7 of the Government Code). (B) The standards shall apply to irrigable lands. (C) The standards shall include provisions for swimming pools, spas, and other water features. Ornamental water features that are artificially supplied with water, including ponds, lakes, waterfalls, and fountains, shall be analyzed separately from swimming pools and spas. (b) The department shall, by January 1, 2021, provide each urban retail water supplier with data regarding the area of residential irrigable lands in a manner that can reasonably be applied to the standards adopted pursuant to this section. (c) The department shall not recommend standards pursuant to this section until it has conducted pilot projects or studies, or some combination of the two, to ensure that the data provided to local agencies are reasonably accurate for the Informational Purposes Only January 2026 A-28 Page 135 of 563 APPENDIX C MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN GE1 L�o4lnsjultants C Consulting Engineers and Scientists Martis Valley Groundwater Management Plan 5-Year Update Nevada and Placer Counties, California July 11 , 2025 Prepared for: Truckee Donner Public Utility District . �Z-TRUCKEE DONNER r PUBLIC UTILITY DISTRICT k i I r�- • -' J� - +�a On behalf of Truckee Donner �•.' A Public Utility District, Northstar Community Service District, and Placer County Water - Agency collectively referred to `a as the MVGB Agencies. r� - Page 137 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUMMARY REPORT— MARTIS VALLEY GROUNDWATER BASIN GEI Certifications and Seals This report and analysis was prepared by the following GEI Consultants Inc. professional geologists. Report sections contained herein based on available data and were prepared by: Date: July 11, 2025 can Storey Geologist-In-Training No. 812 NAI.GFO`O w''4'�► � 84 * HYDROY CZL AS-1F�P Date: July 112025 Richard W. Shatz Principal Hydrogeologist California Certified Hydrogeologist C.H.G. No. 84 This report and analysis was reviewed by the following Balance Hydrologics, Inc. professional geologist for technical accuracy and surface water data. Q� S. David Shaw No. 8210 ` Q Cps,1 Date: November 26, 2024 David Shaw Professional Geologist No. 8210 Page 138 of 563 GMP Nevada and Placer Counties,California June 2025 Table of Contents Record of Revisions vi Acronyms and Abbreviations vii 1. Introduction 1 1.1. Purpose of the Groundwater Management Plan 1 1.2. Groundwater Management Plan Authority and Administration 2 1.3. Groundwater Management Plan Development Process 4 1.4. Basin Management Objectives 6 1.5. Plan Components 7 1.6. Area Covered by the GMP 9 1.7. Public Outreach and Education 9 1.8. Groundwater Model 10 1.9. Document Organization 10 2. Physical Setting 11 2.1. Topography 11 2.2. Climate 11 2.2.1. Climate Variability 14 2.2.2. Climate Change 16 2.3. Surface Water Hydrology 16 2.3.1. Truckee River 16 2.3.2. Martis Creek 21 2.3.3. Donner and Cold Creeks 21 2.3.3.1. Cold Creek 21 2.3.4. Trout Creek 22 2.3.5. Prosser Creek 22 2.3.6. Reservoir releases for flood control typically occur between September 1 and October 31 (Berris and others, 2001), as reflected in the pattern of average monthly flows depicted in Figure 2-6. Truckee Corridor 22 2.3.7. Other Impoundments 22 2.4. Geology 23 2.4.1. Geologic Database Development 23 2.4.2. Stratigraphy 30 2.4.3. Structure 30 2.5. Groundwater Occurrence and Movement 33 2.5.1. Water-bearing Units and Properties 33 2.5.2. Surface-Groundwater Interaction 35 2.5.3. Groundwater Levels 36 GEI Consultants, Inc. i Page 139 of 563 GMP Nevada and Placer Counties,California June 2025 2.5.4. Land Subsidence 40 2.6. Groundwater Well Infrastructure 40 2.7. Groundwater Quality 43 2.8. Land Use 44 2.9. Groundwater Recharge 45 2.10. Water Use 50 3. Plan Implementation 51 3.1. Implementation Actions that Support BMO #1 - Manage Groundwater to Maintain Established and Planned Uses 51 3.1.1. Develop and implement a summary report every five years 51 3.1.2. Compile an annual summary of groundwater monitoring data 52 3.1.3. Partner agencies to meet annually to discuss GMP implementation 52 3.1.4. Support TROA provisions associated with well construction, repair, modification, and destruction 52 3.1.5. Evaluate and consider taking a position on relevant water resources-related policies, programs, and projects under consideration by local, State, and Federal agencies 53 3.1.6. Pursue opportunities for improved groundwater basin monitoring and reporting with local, State, and Federal agencies 53 3.1.7. Evaluate the need for programs to facilitate saline intrusion control, mitigate the migration of contaminated groundwater, facilitate conjunctive use, and to mitigate overdraft 53 3.1.8. Consider development of contamination cleanup, recharge, storage, conservation and water recycling projects 54 3.1.9. Pursue funding sources for implementation of plan policies, programs, reporting and projects 54 3.1.10. Participate in the evaluation of relevant local projects to maintain groundwater quantity and quality 54 3.1.11. Summary of BMO#1 Actions 55 3.2. Implementation Actions that Support BMO #2 — Manage Groundwater within the Provisions of TROA 55 3.2.1. Continue coordination and collaboration with TROA agencies on groundwater management issues and source well development 56 3.2.2. Summary of BMO#2 Actions 56 3.3. Implementation Actions that Support BMO #3 - Collaborate and Cooperate with Groundwater Users and Stakeholders in the Martis Valley Groundwater Basin 56 3.3.1. Formalize and institute a Stakeholder Working Group to meet at least annually or as needed on GMP implementation activities and updates 57 GEI Consultants, Inc. ii Page 140 of 563 GMP Nevada and Placer Counties,California June 2025 3.3.2. Collaborate with the LRWQCB to limit the migration of contaminated groundwater and in development of large scale contamination clean up programs 57 3.3.3. Work cooperatively with local stakeholders and local, State and Federal agencies on groundwater management activities, projects, and studies 57 3.3.4. Identify opportunities for public involvement during GMP implementation 57 3.3.5. Summary of BMO#3 Actions 57 3.4. Implementation Actions that Support BMO #4— Protect Groundwater Quantity and Quality 58 3.4.1. Establish and maintain a California Statewide Groundwater Elevation Monitoring compliant monitoring program 58 3.4.2. Continue and Encourage Water Conservation Activities and Public Education 60 3.4.3. Work with local stakeholders and DWR to identify areas that may need additional groundwater level and groundwater quality monitoring based on identified data gaps or negative performance trends 60 3.4.4. Coordinate with other agencies, including DWR and the USGS to identify opportunities for land subsidence monitoring 60 3.4.5. Evaluate the need for, and advocate for, as necessary, a wellhead protection, groundwater recharge area protection, and other programs as necessary in MVGB 61 3.4.6. Map and share groundwater recharge zones 61 3.4.7. Provide relevant information to land use agencies regarding groundwater availability 61 3.4.8. Summary of BMO#4 Actions 62 3.5. BMO #5 - Pursue and use the best available science and technology to inform the decision making process. 62 3.5.1. Work with State and Federal agencies to attempt to secure funding for expansion of the partner agencies' monitoring grid 63 3.5.2. Maintain relationship with DWR for groundwater monitoring and database management activities 63 3.5.3. Identify opportunities for collecting water quality monitoring data 63 3.5.4. Use and consider updating the hydrologic model to improve understanding of groundwater in the MVGB 64 3.5.5. Seek new tools, technology, and information that may improve the understanding of the water resources in the MVGB and watershed 65 3.5.6. Summary of BMO#5 Actions 65 3.6. Implementation Actions that Support BMO #6 - Consider the environment and participate in the stewardship of groundwater resources 65 3.6.1. Consider local, State, or Federal riparian, surface water, or surface water- groundwater interaction investigations, studies or programs in the MVGB 66 GEI Consultants, Inc. iii Page 141 of 563 GMP Nevada and Placer Counties,California June 2025 3.6.2. Continue support and collaboration with local groups that identify, coordinate, or implement projects that support the overall sustainability of the MVGB 66 3.6.3. Summary of BMO #6 Actions 66 4. References 67 List of Tables Table 1-1. Stakeholder Working Group Members 4 Table 1-2. Required Components and Associated Report Section 8 Table 1-3. Voluntary Components and Associated Report Section 8 Table 1-4. Recommended Components and Associated Report Section 9 Table 2-1. Average Monthly Streamflow on the Truckee River and Select Tributaries (2004-2023) 19 Table 2-2. Estimated Yield of Public Agency Production Wells 42 Table 2-3. Summary of Average Annual Groundwater Recharge Estimates for the MVGB 45 Table 2-4. Five-year Average Groundwater Production 50 Table 3-1. Summary BMO#1 Supporting Implementation Actions 55 Table 3-2. Summary BMO#2 Supporting Implementation Actions 56 Table 3-3. Summary BMO#3 Supporting Implementation Actions 58 Table 3-4. Summary BMO#4 Supporting Implementation Actions 62 Table 3-5. Summary BMO#5 Supporting Implementation Actions 65 Table 3-6. Summary BMO#6 Supporting Implementation Actions 66 List of Figures Figure 1-1. Groundwater Management Plan Area 3 Figure 1-2. Groundwater Management Plan Development Process 5 Figure 2-1. Groundwater Basin Location and Physiography 12 Figure 2-2. Mean Annual Precipitation 13 Figure 2-3. Mean Monthly Precipitation, Truckee Ranger Station 14 Figure 2-4. Percent Deviation from Mean Annual Precipitation at the Truckee Ranger Station and Total Annual Streamflow at Farad 15 Figure 2-5. Hydrography and Long-term Monitoring Stations 18 Figure 2-6. Mean Monthly Streamflow in the Middle Truckee River Watershed (2004-2023) 20 Figure 2-7. Stratigraphic Column showing Primary Hydrostratigraphic Units 24 Figure 2-8. Well Locations 25 Figure 2-9. Geology and Cross-section Locations 26 Figure 2-10. Cross-section A-A' 27 Figure 2-11. Cross-section B-B' 28 Figure 2-12. Cross-section C-C' 29 Figure 2-13. Locations of Springs and Mapped Faults 32 Figure 2-14a. Lousetown Volcanic Outcrop 34 Figure 2-14b. Prosser Formation Outcrop Underlying Glacial Outwash 35 GEI Consultants, Inc. iv Page 142 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-15. Water Levels in Long-term Groundwater Monitoring Wells 38 Figure 2-16. Monitoring Wells and Select Hydrographs 39 Figure 2-17. Groundwater Well Infrastructure and Level Monitoring Network 41 Figure 2-18. Depth Distribution of Wells in the Martis Valley Groundwater Basin 43 Figure 2-19. Average Annual Groundwater Recharge 1983-2011 47 Figure 2-20. Annual Groundwater Recharge 1988 48 Figure 2-21. Annual Groundwater Recharge 1995 49 Figure 3-1. CASGEM and DWR Groundwater Monitoring Wells 59 Appendices Appendix A: Resolutions of Intent to Adopt a Groundwater Management Plan Appendix B: Resolutions Adopting the Groundwater Management Plan Appendix C: CASGEM Monitoring Plan Appendix D: Groundwater Quality Reports Appendix E: DRI Technical Note GEI Consultants, Inc. v Page 143 of 563 GMP Nevada and Placer Counties,California June 2025 Record of Revisions Identification Date Description of Issued and/or Revision GEI Consultants 11/15/2024 Draft 5-Year Update GMP Partners 11/27/2024 Revisions and group discussion comments Revisions and additions based upon complete GEI Consultants 5/8/2025 revisions and data. GEI Consultants 5/22/2025 Final Review Document GEI Consultants 6/10/2025 Final Document GEI Consultants 7/11/2025 Public Comments incorporated GEI Consultants, Inc. vi Page 144 of 563 GMP Nevada and Placer Counties,California June 2025 Acronyms and Abbreviations AB 3030 Assembly Bill 3030 ac-ft/yr acre-feet per year Basin Martis Valley Groundwater Basin BMOs Basin Management Objectives CASGEM California Statewide Groundwater Elevation Monitoring cfs cubic feet per second CWC California Water Code DDW Division of Drinking Water DOI U.S. Department of the Interior DRI Desert Research Institute DWR California Department of Water Resources DWSAP Drinking Water Source Assessment Program GAMA Groundwater Ambient Monitoring and Assessment GCM general circulation model GMP Groundwater Management Plan gpm gallons per minute GSFLOW Ground-water and Surface-water Flow Model IRWMP Integrated Regional Water Management Plan LGA Local Groundwater Assistance LLNL Lawrence Livermore National Laboratory LRWQCB Lahontan Regional Water Quality Control Board LUST leaking underground storage tank MCL Maximum Contaminant Level mgd million gallons per day MODFLOW Modular Three-Dimensional Finite-Difference Groundwater Flow Model msl mean sea level MVGB Martis Valley Groundwater Basin NCSD Northstar Community Services District NOAA National Oceanic and Atmospheric Association PCWA Placer County Water Agency PRMS Precipitation Runoff Modeling System PUC Public Utilities Commission Reclamation Bureau of Reclamation SB Senate Bill SWG Stakeholder Working Group SWRCB State Water Resources Control Board TDPUD Truckee Donner Public Utility District TMWA Truckee Meadows Water Authority TROA Truckee River Operating Agreement T-TSA Tahoe-Truckee Sanitation Agency GEI Consultants, Inc. vii Page 145 of 563 GMP Nevada and Placer Counties,California June 2025 USACE United States Army Corps of Engineers USFS United State Forest Service USGS United States Geologic Survey UZF Unsaturated Zone Flow GEI Consultants, Inc. viii Page 146 of 563 GMP Nevada and Placer Counties,California June 2025 1. Introduction In 199Z the State Legislature enacted the California Groundwater Management Act through Assembly Bill 3030(AB 3030) to encourage local public agencies to adopt plans to manage groundwater resources within their jurisdictions. Provisions were created in the California Water Code(CWC)Sections 10750 et.seq. to manage the safe production, quality, and proper storage of groundwater and AB 3030 codified voluntary components of a Groundwater Management Plan (GMP). In 2002, Senate Bill 1938(SB 1938) was signed into law which amended the CWC with required components of a GMP for any public agency seeking State funds administered through the California Department of Water Resources(DWR)for groundwater projects. In 2003, DWR published Bulletin 118—Update 2003, California's Groundwater which includes seven recommended components of a GMP. This GMP includes the following components: the partner agencies'authority, physical setting including groundwater conditions, management goals and Basin Management Objectives(BMOs), and GMP implementation activities. 1.1. Purpose of the Groundwater Management Plan The Truckee Donner Public Utility District(TDPUD), Northstar Community Services District(NCSD), and Placer County Water Agency(PCWA)have voluntarily partnered to develop the Mortis Valley GMP, a collaborative planning tool that assists the partner agencies with efforts to ensure long term quality and availability of shared groundwater resources in the Mortis Valley Groundwater Basin (MVGB). This GMP is a "living document"that includes an overall goal, BMOs, and implementation actions that will be periodically updated to reflect changes in groundwater management and progress in meeting its goal and objectives. The purpose of the Mortis Valley GMP is to improve the understanding and management of the groundwater resource in Mortis Valley, while providing a framework for the partner agencies to align policy and implement effective and sustainable groundwater management programs. This GMP is not: • mandatory, • regulatory, • an enforcement effort, or • land use or zoning ordinances Older groundwater management plans by TDPUD(1995), PCWA (1998), and TDPUD, NCSD and PCWA (2013)are herein updated by this GMP which has been designed to meet the requirements set by SB 1938, addresses the voluntary and recommended components included in AB 3030, as well as address recommendations outlined in Bulletin 118-2003. The area covered by the Mortis Valley GMP, as shown in Figure 1-1, includes each partner agencies'jurisdictional boundaries within Nevada and Placer Counties. GEI Consultants, Inc. 1 Page 147 of 563 GMP Nevada and Placer Counties,California June 2025 1.2. Groundwater Management Plan Authority and Administration Each partner agency is an authorized groundwater management agency within the meaning of CWC §10753(a). In April of 2011, each partner agency adopted respective resolutions of intent to develop a GMP; the resolutions are included as Appendix A. Beginning January 1, 2015, a new plan shall not be adopted and an existing plan shall not be renewed, except if the basin is prioritized as a low or very low priority basin CWC§10750.1 (a and b). In 2018, DWR re-evaluated the Basin and changed its priority to very low priority. The MVGB Agencies recognize the importance of groundwater management and have voluntarily continued to implement the 2013 GMP and manage the groundwater resources in the Basin. GEI Consultants, Inc. 2 Page 148 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 1-1.Groundwater Management Plan Area Preclpitation Station O T-T$A Plant F Creeks and Rivers Truckee-Danner Public Utility District(TDPUD) Northstar Community Service District(NCSD) y I ,'« stampede _!Cily of Truckee Boundary County Boundary _)-11 QMartis Valley Groundwater Basin ,x SIERRA COUNTY -- --. .. --- ------- — _.ti— —NEVADA COUNTY TI � } F� l r 0 I ::z � -� ]1_,� t' NEVADACouJ;Ty." --_—_— _—_ -----_—_—_— _ l PLACER COUNT'f A 4 Northstar Resort do A j N ❑ 2.5 5 14, Loki,W--- 4 o C a p Mlles Source:aarlal,baseadata,etc. Marks Valley Malis Valley Groundwater 6a5in Groundwalor Managemenl Plan 5-Year Updale Groundwater Management Plan Area Nevada and Plamr Counlles,California Truckee-Donner Public Utility District G E I NOVEMBER 2024 FIGURE 1-1 GEI Consultants, Inc. 3 Page 149 of 563 GMP Nevada and Placer Counties,California June 2025 1.3. Groundwater Management Plan Development Process During the course of preparing the 2013 GMP,various entities were involved in developing, approving, and adopting the GMP. In addition to the partner agencies, a Stakeholder Working Group (SWG) was created to provide local knowledge, data and information, opinions, and review and comment on material prepared by the GMP team.The SWG was comprised of representatives of Federal, State, and local governments, environmental and special interest groups, and local land use interests. The partner agencies followed the five main steps for the development of the GMP, as defined under CWC§10753.2 through 10753.6.The five steps are described below and are illustrated on Figure 1-2. Except as otherwise provided in CWC§ 10753 (d),the process for developing and adopting a revised GMP shall be the same as the process for developing and adopting a new GMP. Documentation of the steps the partner agencies' actions is provided with each of the steps below. Unless the annual monitoring report indicates that updates to the GMP are necessary,the period for adopting a new or revised GMP will be every 10 years or as needed. A SWG meetings and a public meeting was held with the partner agencies during GMP update development. SWG members and the agency represented are presented in Table 1-1. Table 1-1. Stakeholder Working Group Members Working Group Participant Representing Jen Callaway Town of Truckee Jan Zabriskie Town of Truckee Becky Bucar Town of Truckee Scott Bower Martis Camp Amy Irani Nevada County Michelle Prestowitz Truckee River Watershed Council Christina Hanson Placer County Jared Deck Placer County Richard Anderson Trout Unlimited Tom Scott CA Dept of Water Resources—TROA Division Barrett Kasssa CA Dept of Water Resources—Regional CASGEM Richard Pallante Tahoe Truckee Sanitation Agency Jonathan Cook Fisher United States Forest Service—Truckee District Jerusha Hall Vail Resorts John Marlin Schaffer's Mill Rick Stephens Lahontan Hayes Parzybok Tahoe Mountain Club Annie Rosenfeld Tahoe Donner Association John Shaffer Truckee Donner Rec and Parks District Alexis 011ar Mountain Area Preservation GEI Consultants, Inc. 4 Page 150 of 563 GMP Nevada and Placer Counties,California June 2025 Step 1—Provide public notification of a hearing on whether or not to adopt a resolution of intention to draft a GMP and subsequently complete a hearing on whether or not to adopt a resolution of intention to draft a GMP. For future GMP updates, notification shall include the attempt to directly contact all stakeholder working group agencies/organizations. Following the hearing, draft a resolution of intention to draft a GMP.The agencies provided public notification and held their respective hearings in February 2025. Copies of newspaper notifications are included in Appendix A. Step 2—Adopt a resolution of intention to draft a GMP and publish the resolution of intention in accordance with public notification. The partner agencies' adopted their respective resolutions of intention to update a GMP in June 2025.The resolutions are included as Appendix A. Figure 1-2.Groundwater Management Plan Development Process The AB 3030 CWMP Development Process 1 1 Govidunt Ez Public- Hearing on ffie intent to drOt GWMP YIintentioniadopt a , 1 GWMP Prvp;)Fi! lechnlcal Components -marWalo 1addmssing all . -Suggestestad Umponants -Voluntary 1 Resolutlen to adopt GWMe Y 1 Y r 1 5 A Y { bot GIMP GEI Consultants, Inc. 5 Page 151 of 563 GMP Nevada and Placer Counties,California June 2025 Step 3—Prepare a draft GMP within two years of resolution of intention adoption. For future GMP updates, at the initiation of the update process, seek to understand the concerns of stakeholders through one or more meetings. Provide to the public a written statement describing the manner in which interested parties may participate in developing the GMP. The agencies provided notification and held one SWG meetings where meeting attendees gave input on the GMP goal, BMOs, and implementation actions.The agencies also held a public meeting on June 3, 2025 to receive public input. Both meetings were attended by staff from GEI Consultants who prepared this report. Step 4—Provide public notification of a hearing on whether or not to update the GMP,followed by holding a hearing on whether or not to adopt the GMP. Public notices of the scheduled hearings were provided in the Auburn Journal and the Sierra Sun newspapers and proof of publications are included in Appendix B. Step 5—The plan may be adopted within 35 days after the completion of Step 4 above if protests are received for less than 50 percent of the assessed value of property in the plan area. If protests are received for greater than 50 percent of the assessed value of the property in the plan area,the plan will not be adopted. Public comments were received during the public comment period. In June 2025, each partner agency adopted the Martis Valley GMP and their respective resolutions are included in Appendix B. Groundwater Management Goal The GMP's goal provides the overarching purpose of the GMP, is used to identify the desired outcome of GMP implementation, is general in nature, and does not include quantitative components: The goal of the Martis Valley GMP is to ensure long term quality and availability of groundwater in the Martis Valley Groundwater Basin. 1.4. Basin Management Objectives The BMOs provide more specific direction to the GMP;they are generally protective of the groundwater resource and the environment, and each BMO identifies a distinct portion of the overarching goal which provides specific areas for focus. Summarized below are six primary areas that are emphasized and embodied in the BMO's that support the GMP goal: 1. Manage groundwater to maintain established and planned uses. Because the MVGB is the primary source of water to multiple users under separate jurisdictions, this objective encourages the partner agencies to pursue management of groundwater that is within their jurisdiction in order to protect existing uses. 2. Manage groundwater use within the provisions of the Truckee River Operating Agreement. The Truckee-Carson-Pyramid Lake Water Rights Settlement Act (Settlement Act), Public Law 101- 618 (1990), established entitlements to the waters of Lake Tahoe,the Truckee River and its tributaries and how the storage reservoirs of the Truckee River are operated. Section 205 of the Settlement Act directs the Secretary of the Department of the Interior (DOI)to negotiate an GEI Consultants, Inc. 6 Page 152 of 563 GMP Nevada and Placer Counties,California June 2025 operating agreement for the operation of Truckee River reservoirs, between California, Nevada, Truckee Meadows Water Authority(as the successor to Sierra Pacific Power Company), Pyramid Tribe, and the United States.The operating agreement is known as the Truckee River Operating Agreement (TROA) and was implemented December 1, 2015, effectively establishing the interstate allocation and the reporting requirements.TROA also includes a maximum depletion requirement for the Truckee River Basins, including Martis Valley. Depletion refers to the amount of water that is used or consumed but is not ultimately replenished into the watershed's streams or groundwater aquifers through percolation,treatment, etc. California's total annual allocation from surface and groundwater sources within the Lake Tahoe Basin is 23,000 acre-feet.The total annual allocation from the Truckee River Basin sources for use in California is 32,000 acre-feet, of which no more than 10,000 acre-feet can be from surface water sources. Additionally,the calculated annual depletion within the Truckee River Basin must not exceed 17,600 acre-feet, as determined by depletion calculations prescribed in TROA. This objective documents the partner agencies' commitment to continue to comply with provisions of the TROA. Some provisions in TROA apply to groundwater and water wells within the Truckee River Basin (which includes the Martis Valley)to address potential adverse impacts to surface water. 3. Collaborate and cooperate with groundwater users and stakeholders in the MVGB. Collaborating and sharing information and resources with other groundwater users in the MVGB helps promote GMP goals.This objective encourages the partner agencies to reach out to other groundwater users within the MVGB. 4. Protect groundwater quantity and quality. Groundwater performs an integral function in a watershed, one of which is satisfying water supply needs. Improving the understanding of the groundwater basin is a critical step in protecting and sustaining the Martis Valley groundwater supply. 5. Pursue and use the best available science and technology to inform the decision-making process. Science and technology continue to develop new tools that may improve the understanding of the MVGB. This objective encourages the partner agencies to take actions that work with the best available science to help make informed agency decisions. 6. Consider the environment and participate in the stewardship of groundwater resources. The partner agencies are dedicated to stewardship of groundwater resources and this BMO ensures that stewardship is part of the GMP. 1.5. Plan Components Required GMP components and their location in the GMP are summarized in Table 1-2,Voluntary GMP components and their location in the GMP are summarized in Table 1-3, and recommended GMP components and their location in the GMP are summarized in Table 1-4. GEI Consultants, Inc. 7 Page 153 of 563 GMP Nevada and Placer Counties,California June 2025 Table 1-2. Required Components and Associated Report Section Category Report GMP Components Required Components:(10753.7.) Required Section 1 Establish Basin Management Objectives(BMOs) 1.5 2 Include components relating to the monitoring and management of groundwater 3.4 levels,groundwater quality, and inelastic land subsidence Include components relating to changes in surface flow and surface water quality 3 that directly affect groundwater levels or quality or are caused by groundwater 3.2 pumping in the basin Include description of how recharge areas identified in the GMP substantially 4 2'9 contribute to the replenishment of the groundwater basin Prepare a GMP that enables the partner agencies to work cooperatively with other 3.1 5 public entities whose service area falls within the plan area and overlies the groundwater basin 3.4 6 Prepare a map that details the area of the groundwater basin,the area subject to 1.1 the GMP,and the boundaries of other local agencies that overlie the basin 7 Prepare a map identifying the recharge areas for the groundwater basin 2.9 Adopt monitoring protocols that detect changes in groundwater levels,groundwater 8 quality, inelastic land subsidence, and surface water flow or quality that affects 3.4 groundwater or groundwater pumping that affects surface water flow or quality If the GMP area includes areas outside a groundwater basin as defined in Bulletin Throughout 9 118,the partner agencies will use the required components, and geologic and GMP hydrologic principles appropriate for the area Table 1-3.Voluntary Components and Associated Report Section Category Report GMP Components Required Components:(10753.8.) Required Section 1 Control of saline intrusion 3.1 2 Identification and management of wellhead protection 3.4 3 Regulation of the migration of contaminated groundwater 3.1 3.2 4 Administration of a well abandonment and well destruction program 3.1 5 Mitigation of conditions of overdraft 3.1 6 Replenishment of groundwater extracted by water producers 3.1 7 Monitoring of groundwater levels and storage 3.4 8 Facilitating conjunctive use operations 3.1 9 Identification of well construction policies 3.4 10 Construction and operation by the partner agencies of groundwater contamination 3.1 cleanup, recharge, storage, conservation,water recycling,and extraction projects 3.2 3.1 11 Development of relationships with State and Federal regulatory agencies 3.2 3.5 Review of land use plans and coordination with land use planning agencies to assess 12 3.4 activities that create a reasonable risk of groundwater contamination GEI Consultants, Inc. 8 Page 154 of 563 GMP Nevada and Placer Counties,California June 2025 Table 1-4. Recommended Components and Associated Report Section Category GMP Components Report Required Recommended Components(From Bulletin 118-2003) Section Document public involvement and ability of the public to participate in development 1 of the GMP,this may include a Technical Advisory Committee(Stakeholder Working 1.3 Group) Establish an advisory committee of stakeholders within the plan area that will help 1.3 2 guide the development and implementation of the GMP and provide a forum for the resolution of controversial issues 3.1 Describe the area to be managed under the GMP including: • The physical structure of the aquifer system • A summary of available historical data and issues of concern related to 3 groundwater levels,groundwater quality, inelastic land subsidence,and surface 2 water flow or quality that effects groundwater or groundwater pumping that effects surface water flow or quality • A general discussion of historical and projected water demands and supplies 4 Establish management objectives(MOs)for the groundwater basin subject to the 1.5 GMP 5 Describe the GMP's monitoring program 3.4 6 Describe efforts to coordinate with land use,zoning,or water management planning 3.4 agencies or activities 7 Create a summary of monitoring locations with frequency of wells monitored Appendix C Provide periodic reports summarizing groundwater conditions and management activities including: • A summary of monitoring results,with a discussion of historical trends • A summary of management actions during the period covered by the report 8 • A discussion of whether actions are achieving progress towards meeting BMOs 3.1 • A summary of proposed management actions for the future • A summary of any GMP changes that occurred during the period covered by the report • A summary of actions taken 9 Provide for the periodic re-evaluation of the entire plan by the managing entity 3.1 1.6. Area Covered by the GMP The Martis Valley GMP includes the service areas of the TDPUD, PCWA, and NCSD that overlay and extend beyond the MVGB boundary, as well as the Nevada and Placer County portion of the MVGB. It is important to note that at the time of GMP development,there were no other agencies within the Placer County portion of the MVGB that fall within the service area of another local agency, water corporation regulated by the Public Utility Commission (PUC), or mutual water company without the agreement of the overlying agency, as defined in the CWC(CWC§ 10750.7(a)). Figure 1-1 shows the Martis Valley GMP area. 1.7. Public Outreach and Education The partner agencies developed a Public Outreach Plan to guide development of the GMP Update. Public outreach included working with the existing Stakeholder Working Group to provide input on GMP update,two informative public meetings, and publicly noticed public hearings(Appendix A) on the intent GEI Consultants, Inc. 9 Page 155 of 563 GMP Nevada and Placer Counties,California June 2025 to update and adopt the GMP. For future GMP updates,the Public Outreach Plan shall be shared with the stakeholders at a meeting as described in Section 1.3. Groundwater Model The partner agencies collaborated with the U.S. Bureau of Reclamation (Reclamation) and their subcontractor, Desert Research Institute (DRI), to develop an integrated watershed-groundwater model in conjunction with the Martis Valley 2013 GMP.The geologic investigation conducted and documented in Section 2 of this report has been used to develop a geologic framework database, which was used to guide the conceptual and numerical model components for the hydrogeology components (groundwater model) of the integrated watershed model.The integrated watershed model was under development in parallel with the 2013 GMP. The integrated watershed model is comprised of a Precipitation Runoff Modeling System (PRMS) and Modular Three-Dimensional Finite-Difference Groundwater Flow Model (MODFLOW) coupled together using an Unsaturated Zone Flow (UZF) package. PRMS is used to model surface water within the watershed,whereas MODFLOW is used to model groundwater within the MVGB.The UZF model package is a kinematic wave vadose zone model used to simulate the interaction between surface water and groundwater. Each model was calibrated separately, and then calibrated together over a 10-year period using a coupled ground-water and surface-water Flow Model (GSFLOW). Predictive model simulations were performed using multiple general circulation model (GCM) projections of precipitation and temperature to estimate the influence of future climate on water resources within the MVGB. Calibration targets for fully coupled, GSFLOW model included head values measured from wells, meadow, and spring locations, streamflow's, measured snow depth, and remotely sensed snow cover. The integrated model's model domain covered the entire Martis Valley Watershed,which includes the MVGB, as well as the watersheds that contribute surface water to the region, including Lake Tahoe.The model grid's cells are 300 by 300 meters in size. DRI used the PRMS component of the integrated modeling tool to estimate groundwater recharge across the MVGB and is discussed in more detail in Section 2.9. 1.8. Document Organization The Martis Valley GMP is organized into the following sections: • Section 2 Physical Setting: describes the physical setting of Martis Valley including items such as geologic setting, land use, water sources, and well infrastructure • Section 3 Plan Implementation: discusses the implementation actions included in the Martis Valley GMP • Section 4 References • Appendices GEI Consultants, Inc. 10 Page 156 of 563 GMP Nevada and Placer Counties,California June 2025 2. Physical Setting The MVGB is located in the transition zone between the Sierra Nevada and the Basin and Range Geomorphic Provinces, east of the Sierra Nevada crest and part of the larger Tahoe-Truckee River Basin of California and Nevada. Martis Valley is the principal topographic feature within the MVGB.The surrounding landscape is mountainous, underlain by volcanic and,to some extent, granitic bedrock, with apparent faulting and some portions that have been glaciated. A significant portion of the land within the MVGB boundary is privately owned with some areas managed as forest, open space and/or for recreation by special districts or agencies, including the U.S. Forest Service.This section of the GMP characterizes the physical setting of the MVGB, including:topography, climate, surface water hydrology, geology, hydrogeology, and water use. 2.1. Topography The MVGB encompasses roughly 57 square miles, and lies within the Middle Truckee River Watershed. Elevations of the valley floor range from 5,700 to 5,900 feet above mean sea level (msl). The valley is accented by hills rising above the valley floor and mountains to the south and east of the valley. High points within or immediately adjacent to the MVGB include Bald Mountain at an elevation of 6,760 feet and Alder Hill at 6,733 feet, located on the western margin of the MVGB, and Lookout Mountain at 8,104 feet and Mt. Pluto at 8,617 feet, located on its the southern fringe. Martis Peak, further to the east, is at 8,742 feet. Figure 2-1 illustrates the MVGB location and topography. 2.2. Climate The Tahoe-Truckee region experiences warm and dry summers, and cold, wet and snowy winters. Elevation and rain shadow play major roles in the spatial distribution of temperature and precipitation. Precipitation is highest at upper elevations in the western portion of the basin, toward the Sierra Crest, and decreases with elevation in the eastern portion of the basin (Figure 2-2). Mean annual precipitation (as snow water equivalent) ranges from approximately 30 inches below 6,500 feet to over 45 inches above 6,500 feet. Precipitation falls mostly as snow between October and April,though runoff and streamflow also responds to periodic mid-winter rain-on-snow events. Annual peak streamflow typically occurs during spring snowmelt in May or June. A small proportion of the total annual precipitation falls during brief thunderstorms in the summer months.The mean annual precipitation, as recorded at the USFS Truckee Ranger Station No. 049043 near the center of the watershed, for the period 1904 through 2023, is 29.78 inches. However, since about 2000,there appears to be more dry years and fewer wet years with more extreme precipitation events.The average for the last 20 years is less than the long- term average at about 28.08 inches.Average monthly precipitation is shown in Figure 2-3 for the period 2004 through 2023.This period was selected as potentially being more representative of current climate conditions. Monthly precipitation records are available that extend back to 1935.Average temperatures range from daily lows of 15°F in December and January to daily highs of 787 in July, as recorded at SNOTEL Station Truckee#2 (1904 through 2023). In the last twenty years those same temperatures in December and January rose to 247 and in July 80°F (2004 through 2023). GEI Consultants, Inc. 11 Page 157 of 563 sMp Nevada and Placer Counties,California Junezozs Figure 2'1. Groundwater Basin Location and Physiography wit 6.733 feet ckee Martis Valley Groundwater Basin Square Miles: 57 6.160 le el tGokout Min LF I a.1�4 feet Miles Legood Martis Valley Groundwater Basin. California Figure 2-1 Groundwater Basin Location and Physiography GE| Consultants, Inc. 12 Page 158of563 GMP Nevada and Placer Counties,California June 2025 Figure 2-2. Mean Annual Precipitation s,o,xd���orJai WL 0 6g • 'l - Marts Valley GrowYdwatur Basm O • h7Ntl/Y O 'a �cm 1wckPe,Rrrncjer Stl-1+1rn1v Donn Wumorrol,tata Par.( SNO11L Sikes IJL:cken f�I 1. t"Errd Mean annual Precipa#lvn(inubes) . 14-4-241 �4.i-744 �4.4-i48 M.1-000 5 As(1�.F94 70.}•904 ■ Rai.Gam i o rr'r-ce 9ND7E'L Mit 2 1 Q 2 es E PFI.= IHM 9-7-12 '4D 9i Martis Valley Groundwater Basin, California Figure mLE 2.2 Mean Annual Precipitation u. I, GEI Consultants, Inc. 13 Page 159 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-3. Mean Monthly Precipitation,Truckee Ranger Station 6.00 5.00 t U C c 4.00 o ■1904-2023 Q ■2004-2023 v 3.00 a c co v t 2.00 — s= 0 1.00 0.00 pet Qell oell 2.2.1. Climate Variability The region experiences a wide range in climate variability. Variability is marked by periods of greater than average precipitation ('wet periods') and periods of below average precipitation or drought periods. Droughts have been historically common in the Sierra Nevada; Figure 2-4 illustrates the annual percent deviation from mean annual precipitation in Truckee and annual streamflow recorded at Farad from 1904 to 2023.The data shows that recent dry periods (periods of below average precipitation)generally have longer duration (e.g., 1987-1994, 2012-2016 and 2020-2022)than wet periods, which are typically short-lived and more extreme (e.g., 1982-1983, 2016-2017, 2018-2019, 2022-2023).This change in climate appears to have started about 2000. The worst drought in the 110 records of recorded streamflows at Farad was from 1987 to 1994. A similar pattern is recorded in tree-ring data since 1600 (Fritts and Gordon, 1980), with longer, more extreme droughts recorded. Lindstr6m and others (2000) have described climate changes and details of wet and dry periods over the past 10,000 years, noting evidence of several dry periods when Lake Tahoe, and Donner and Independence Lakes dropped below their natural rims for consecutive years or decades (700-500 years ago and 200-100 years ago). GEI Consultants, Inc. 14 Page 160 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-4. Percent Deviation from Mean Annual Precipitation at the Truckee Ranger Station and Total Annual Streamflow at Farad Period Number of Years Average Predpitation(inches) 1904-2023 120 29.78 ,a 1994-2023 30 29.45 _ U 2004-2023 20 28.08 a 2014-2023 10 28.73 t 2019-2023 5 26.68 c 'a Wet v One Standard Deviation __--- _ Above_Mean no O Above Normal 2 m N O N o gg pt gg �y gg gg,, gg g $$ gg 0 9Jill Q e-i E O Below Normal i° C ........................... ---------- __—___ _ —�....._.............. ....... - - O One Standard Deviation Below Mean } Q Dry Water Year O O O CD N U V v O O O r4 O O 1 M r4 O QO M O N V1 C r4 C(Ij O C O 7 C7 C � C 0 I I �11 I� I;t ri 00 Ln N M c.D M O r-- r 00 Ln N a) sD M O r-I rl N M M It- Ln CD CD rR 00 00 a] O O r-I N a7 at at a7 at ci at M at M a7 a7 rn at O O O O r-I r-I r-I r-I r-I r-I r-I r-I GEI Consultants, Inc. 15 Page 161 of 563 GMP Nevada and Placer Counties,California June 2025 2.2.2. Climate Change The National Oceanic and Atmospheric Association (NOAA), Coats and others (2010), and Dettinger, M. (2018) predicted a future shift from snowfall to rain in the next century in this region as a result of projected increases in average, minimum, and maximum air temperatures. Associated changes in surface water hydrology include potential increases in the frequency and magnitude of major flooding, such that more water may leave the basin as runoff, rather than infiltrating and recharging groundwater resources. NOAA has also predicted that climate change may result in increased drought frequency, and generally reduced water supplies (U.S. Bureau of Reclamation, 2011). The U.S. Bureau of Reclamation manages water supply in the Truckee River Basin (from Lake Tahoe to Pyramid Lake in Nevada) and has undertaken a number of studies to evaluate the degree to which water supply and demand may be impacted by future changes in climate.This includes the Truckee Basin Study, Basin Study Report(2015) as well as funding researchers at DRI to develop an integrated groundwater, surface water, and climate change model of the MVGB (Rajagopal, et al. 2015).While changes in average annual precipitation are uncertain, increases in temperature are likely (Reclamation, 2011b).Temperature alone has important effect of both supplies and demands—increases in temperature could amplify evaporation and evapotranspiration and diminish the portion of winter precipitation that accumulates as snow and could also cause earlier runoff. Projections for average annual temperature is anticipated to increase by up to 5 to 6 degrees Fahrenheit by the end of the 21s'century(Reclamation 2011a, 2011b). Annual precipitation may decrease slightly by the end of the 21"century. Potential increases or decreases in average annual precipitation would directly influence the availability of water supplies by changing the amount of water running off as well as the amount of water recharging groundwater resources (Rajagopal, et al. 2015). 2.3. Surface Water Hydrology The Truckee River bisects the MVGB,with several tributaries upstream, within, and downstream of the MVGB.This section provides a brief discussion of the flow regimes of the Truckee River and the primary tributaries within the MVGB. Watershed areas are based on data available from CalAtlas, but sub- watersheds shown have been modified in places for consistency with other regional studies, including the Water Quality Assessment and Modeling of the California portion of the Truckee River Basin (McGraw and others, 2001),the Truckee River Water Quality Monitoring Plan (Nichols Engineers, 2008), the Martis Watershed Assessment (Shaw and others, 2012). 2.3.1. Truckee River The Middle Truckee River'flows out of Lake Tahoe at Tahoe City with a number of tributaries contributing streamflow upstream of Martis Valley, including Bear, Squaw, Deer, Pole, Silver, and Cabin Creeks.The Truckee River then enters the MVGB near the junction of State Highway 89 and Interstate 80, 'Definitions of the Upper, Middle,and Lower Truckee River vary among numerous published studies. The definition used in this report of the"Middle Truckee River"definition used in this report conforms to nomenclature used by the California Lahontan Regional Water Quality Control Board, but differs from that used by the U.S. Bureau of Reclamation. GEI Consultants, Inc. 16 Page 162 of 563 GMP Nevada and Placer Counties,California June 2025 flows west to east across Martis Valley before exiting the basin near Boca,just upstream of its confluence with the Little Truckee River. Main tributaries within Martis Valley are Donner, Cold 2,Trout, Martis and Prosser Creeks(Figure 2-5). Below Boca,the Truckee River descends into the Truckee Canyon before flowing through Reno and Sparks, Nevada, and terminating at Pyramid Lake. Streamflow from Lake Tahoe, Donner Lake, Martis Creek, and Prosser Creek is controlled by major dams or impoundments,with the timing of releases and streamflows guided by a number of court decrees, agreements, and regulations that govern the flow rate from California to Nevada. These streamflow rates are known as 'Floriston Rates' and measured at Farad, California just upstream of the State line.The Truckee River is currently operated according to the Truckee River Operating Agreement (USBOR, 2008). The Truckee River falls under the jurisdiction of TROA, which is further discussed in Section 3.2. Z Though it is not a direct tributary to the Truckee River,Cold Creek flows into Donner Creek below Donner Lake, approximately 1.5 miles upstream of the confluence with the Truckee River,and therefore accounts for a significant portion of the unregulated flow into the MVGB. GEI Consultants, Inc. 17 Page 163 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-5. Hydrography and Long-term Monitoring Stations • r} -�1 P:055ar CrB e?k Truckee cur. � r 4 qmp lraul Creek: 'tc 1 k Truckee I k�� "L -�r�nerlGol4 Greeks �� 1_n _ 1 Legend El COEC GagIng5lnuons _ USGS Gaging Statons - + DWR longte"monitoring wells - ❑ Martls Valet'Groundwe[er 8asln - ® lrur=kee River f Cold Slreem--L'alle Tmckee lilrer ti r► � � Danner Creek Mar[IR Crae15 - . Rp55prGreek � �� Squaw GreekTluckBeRiVer ~ Q NORTH � E . Trout Creek Ml Fles Truckee River rrr: L"Iry.L d L}. L,e r�rt•r•, 00 ii-x.:usa taosei Martis Valley Groundwater Basin, Californla Figure lm. 2-5 Hydrography and longterm monitoring stations Ll pdaled by GEI,2112d GEI Consultants, Inc. 18 Page 164 of 563 GMP Nevada and Placer Counties,California June 2025 Table 2-1 summarizes historical monthly and average annual flow of the Truckee River and its tributaries, and Figure 2-6 correspondingly shows the average monthly streamflow at a number of gaging stations in the Truckee Basin.This data illustrates how the regulation of streamflows in the Truckee Basin alters the timing of discharge. Unregulated streams in this region tend to experience seasonal low flows in the late summer and early fall, with the bulk of total annual runoff occurring as snowmelt in May and June. This pattern is illustrated by monthly streamflow data collected at Sagehen Creek, an unregulated watershed approximately 5 miles north of the MVGB. In contrast, streams in the MVGB tend to have the total annual streamflow more uniformly distributed during the year, due to timed releases from the various impoundments. Table 2-1.Average Monthly Streamflow on the Truckee River and Select Tributaries(2004-2023) Donner Prosser Martis Truckee Creek Creek Creek Truckee Truckee Truckee Sagehen River below below below River River River Below Creek Donner near Prosser Martis at Boca at Farad Martis Creek Truckee Lake Dam Dam USGS Station 10343500 10338500 10338000 10340500 10339400 10344505 10346000 10339410 ID Watershed 10.5 14.3 553.0 52.9 39.9 873 932 639 Size(sq mi) Period of 2004- 2004 2004- 2004 record 2023 2023 2004 2023 2004 2023 2004 2023 2023 2023 2016 2023 (cfs) Oct 3 31 79 60 7 341 378 119 Nov 3 23 114 36 8 308 338 224 Dec 6 31 150 50 17 364 402 272 Jan 6 37 129 57 26 390 439 286 Feb 7 40 156 64 30 446 493 371 Mar 9 45 268 96 49 711 774 647 Apr 23 59 474 147 70 1190 1,300 1250 May 37 84 530 159 50 1340 1,500 1220 Jun 21 40 437 91 20 917 1,070 840 Jul 6 8 273 70 7 554 639 325 Aug 2 5 227 64 5 459 508 230 Sept 2 37 123 67 5 415 457 157 Mean annual 10 37 247 80 24 620 692 495 (cfs) Mean annual 7,469 26,488 178,662 57,978 17,661 448,558 500,623 358,424 (ac-ft) Note:Table updated by Balance Hydrologic November 2024;cfs:cubic feet per second;ac-ft:acre-feet;sq mi=square mile Source: U.S.Geological Survey;U.S.Army Corps of Engineers. GEI Consultants, Inc. 19 Page 165 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-6. Mean Monthly Streamflow in the Middle Truckee River Watershed (2004-2023) 65agehen Creek(unregulated snowmelt hydrology,2004-2023) 5 4 3 2 1 A p Q 0 ❑ ❑ ❑ ® -- — ® Q. I Donner Creek below Donner Lake:USGS Station 10338500(regulated,2004-2023) 6 5 4 3 2 — — Cr 0 N w Truckee River near Truckee:USGS Station 10338000(regulated.2004-2023) v 6 — �. 5 O 4 3 L N 2 w A 0 Q ❑ r C Prosser Creek below Prosser Dam:USGS Station 10340500(regulated,2004-2023) E 6 d 0) 5 n� A 4 a 3 2 1 0 Truckee River at Farad:USGS Station 10346000(regulated,2004-2023) B 5 4 — 3 2 o r— , IZCZ�❑ ❑ ❑-0 F-1 ❑ Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Note: Figure updated by Balance Hydrologic November 2024 GEI Consultants, Inc. 20 Page 166 of 563 GMP Nevada and Placer Counties,California June 2025 2.3.2. Martis Creek Martis Creek generally flows from south to north in the southern portion of the groundwater basin, with four named tributaries- Martis, West, Middle, and East Martis Creeks comprising the majority of its 42.7 square-mile watershed. Martis Creek Dam was completed in 1972 in order to provide storage for flood control, recreation, and potential water supply(USACE, 1985). Shortly following construction, seepage was observed in the dam face, posing a significant failure risk. As a result,the reservoir has rarely been filled to capacity, and is now maintained at a minimum pool elevation located entirely within the boundaries of the MVGB. The maximum outlet capacity of the dam is 580 cubic feet per second (cfs) prior to spilling and 4,640 cfs at maximum spilling capacity.The United States Army Corps of Engineers (USACE) currently operates the dam in a 'gates wide open' position, such that minimal regulation or disruptions in the timing of streamflow occurs under most circumstances. The United States Geologic Survey (USGS) maintained a streamflow gaging station on Martis Creek between Martis Dam and the Truckee River from October 1959 through September 2010 and transferred the gage to the USACE in October 2010. Since Martis Dam was constructed in 1972, these data have been used by the USACE, along with Martis Reservoir water level data and stage-storage information,to develop a record of inflow to Martis Reservoir. Daily reservoir inflow indicates average annual runoff into and out of the reservoir to be on the order of 19,630 acre-feet(about 27 cfs). Placer County operates streamflow gaging stations on lower West Martis Creek(since 2012), Middle Martis Creek (since 2015) and upper West Martis Creek (since 2020)for the purposes of calculating pollutant loadings as part of the Truckee River Water Quality Monitoring Program (Nichols Consulting Engineers, 2008). Data from these stations are reported annually and available in PDF format on the Placer County website as most recently described in the 2023 Annual Monitoring Report(CDM-Smith, 2024). 2.3.3. Donner and Cold Creeks Donner Lake has a watershed area of approximately 14.3 square miles, all of which lies west of the MVGB boundary. The lake discharges into Donner Creek near the western boundary of the groundwater basin, and then flows toward the east and into the Truckee River(Figure 2-5). A dam was constructed at the lake outlet in 1928 (Berris and others, 2001) allowing for a reservoir capacity of 9,500 ac-ft.The Donner Lake dam is operated by the Nevada Energy(formerly Sierra Pacific Power Company),with a typical release season to provide flood control space from September 1 to November 15. TDPUD holds rights to 990 acre-feet in Donner Lake (TDPUD, 2021).The USGS has maintained a streamflow station on Donner Creek below Donner Lake (Station 10338500) since 1931. Average annual streamflow is 25,794 acre-feet (35.9 cfs), and Figure 2-6 illustrates the effect of dam operations on the timing of streamflow during the year. 2.3.3.1. Cold Creek Cold Creek has a watershed area of approximately 12.5 square miles and flows from Coldstream Canyon into Donner Creek in the western portion of the groundwater basin.The confluence of these streams historically migrated across the Coldstream Canyon alluvial fan, but now both channels area confined by transportation infrastructure and historical aggregate mining operations. Cold Creek is the largest GEI Consultants, Inc. 21 Page 167 of 563 GMP Nevada and Placer Counties,California June 2025 unregulated watershed that flows into the MVGB; with a runoff regime typical of a snowmelt-dominated system,with peak flows in May and June and low flows in the late summer and early fall. A streamflow gage was installed on Cold Creek by Balance Hydrologics for the Truckee River Watershed Council in October, 2010 and operated until September 30, 2014 (Hastings and Shaw, 2014). Cold Creek is the only significant tributary to Donner Creek between USGS gaging station 10338000 (Donner Creek at Donner Lake) and 10338700 (Donner Creek at Highway 89),therefore, historical streamflow estimates are made by calculating the difference in streamflow between these stations. Based on these data, average annual streamflow from Cold Creek for the period from 2004 to 2023 is approximately 26,982 ac-ft (37.3 cfs). 2.3.4. Trout Creek With a watershed area of approximately 5 square miles,Trout Creek is the only other unregulated stream (besides Cold Creek) which flows into the MVGB.The headwaters of Trout Creek are located within the Tahoe-Donner residential subdivision, part of the Town of Truckee and largely within the boundaries of the MVGB.The runoff regime is predominately snow-melt dominated, but with portions of the watershed covered with impervious surfaces such as roads and rooftops, rainfall events result in slightly more runoff and less infiltration and recharge from this watershed compared to others. A streamflow gage on Trout Creek was installed in January 2011 for the Truckee River Watershed Council and discontinued in July 2014(Hastings and Shaw, 2014), so long-term streamflow statistics are not available. 2.3.5. Prosser Creek Prosser Creek's approximately 32 square-mile watershed area includes Alder Creek and lies largely outside the MVGB. Prosser Creek Reservoir however, is entirely within the groundwater basin and is operated by the U.S. Bureau of Reclamation for water supply and flood control under the conditions provided in TROA. The reservoir provides up to 20,000 acre-feet of storage for flood control but is capable of storing as much as 29,800 acre-feet for flood control, recreation, and improvement of fishery flows in the Truckee River (Hastings and others, 2022). 2.3.6. Reservoir releases for flood control typically occur between September 1 and October 31 (Berris and others, 2001), as reflected in the pattern of average monthly flows depicted in Figure 2-6. Truckee Corridor The Truckee Corridor includes intervening areas that do not drain to the tributaries mentioned above. This includes the Union Creek sub-watershed, which encompasses much of the Glenshire subdivision in the eastern portion of the MVGB, as well as urban and open space areas within the Town of Truckee. 2.3.7. Other Impoundments A number of small impoundments are located within the boundaries of the MVGB, including Union Mills Pond in the Glenshire subdivision, Dry Lake adjacent to the Waddle Ranch Preserve, and Gooseneck GEI Consultants, Inc. 22 Page 168 of 563 GMP Nevada and Placer Counties,California June 2025 Reservoir, near the Lahontan Golf Club. Though originally constructed for cattle-grazing and/or millpond operations,these impoundments are now managed primarily for open space, recreational/aesthetic, or wildlife purposes. 2.4. Geology The Martis Valley is located in the Sierra Nevada physiographic region, which is composed primarily of igneous and metamorphic rocks,with sedimentary rocks in its valleys. The MVGB's complex geology is dominated by sedimentary deposits left by glaciations,volcanic rocks, and faulting. A component of the Martis GMP was the development of geologic cross-sections to improve the understanding of MVGB geology and stratigraphy. 2.4.1. Geologic Database Development Approximately 200 well logs obtained from the DWR,TDPUD, PCWA, NCSD, and the Tahoe-Truckee Sanitation Agency(T-TSA)were interpreted to better understand depths and thicknesses of the various geologic formations comprising the MVGB. The filtered geologic and selected well data were entered into an ESRI ArcGIS Geodatabase, a spatially-referenced database. The benefit of the Geodatabase allowed a visual representation of the geologic data and was also used as the geologic framework for the DRI groundwater model that provides consistency between the GMP geologic interpretation and the groundwater model. The geochronology and stratigraphic relationships of water-bearing formations was based on Birkeland's (1961; 1963; 1964)work, as well as subsequent investigations by Latham (1985), and Hydro-Search (1995), and mapping published by Saucedo (2005) and Melody(2009).The stratigraphic relationships, lithologies, and formation locations described in these studies, as well as through field observations, formed the basis for the designation of the primary hydrostratigraphic units, as displayed in Figure 2-7. Figure 2-8 shows the approximate locations of wells (available through 2013) used to develop the geologic database. GEI Consultants, Inc. 23 Page 169 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-7. Stratigraphic Column showing Primary Hydrostratigraphic Units Eknaliaa GE-al agica I Frrt� Stratigr-Jphrc; Description QaO Clme al Crrtra lh sand. and allt wlttr glarlel flll- '"-3 QJf Jurpipor PIWI llluvlurn(alanwhGral QPC Prop Crook Alldvlum In-toditering len&L-&of gmhule gra%LeJ,aand, and silt.pa ruy all LrvLal ana portir lacustfm$, 7Ctf _ ~' C" 4auaotvwn Veftm Ic and A _ IM#urb"dgd laMumrib Bawit, andes�te, lathe,and linnitL tuff deposrls Mai 1QP6 Lausatown Yoiranie S&CIRMO A Unnamed gravels,sand.and elftntLum 7fl6 atioo _ Tt Truek4r Fowmartlan lntafj1r1 141&:,5klt,-GlaV,5end r3na � gavel Wnslas Tv Tartiartr vairAnluk _ llr.rJc.;tc fanws,arrdesl;rl#nfErtcra J Kgr Cralsceeuo Cranllics Stratigraphic interpretations shown in Figure 2-7 and in Section 2.4.3 (below) are consistent with published geologic maps of the basin (Birkeland, 1961; 1963; Saucedo, 2005; Melody, 2009), and delineate four primary water-bearing stratigraphic units that make up the aquifer, and underlying rocks that are considered to be relatively water-limited (see Figure 2-9). The primary units shown in Figure 2-7 include a number of subunits mapped by previous investigators and shown on Figure 2-9 and noted in parenthesis with the descriptions below. When available, information regarding potentially confining (fine grained)or water-bearing (coarse) subunits are also delineated. Following well log interpretation, three representative geologic cross-sections were located and developed. Figure 2-9 shows the cross- section locations; Figure 2-10 shows cross-section A-A'; Figure 2-11 shows cross-section B-B', and Figure 2-12 shows cross-section C-C'. It should be noted that Figure 2-9, a geologic map of the MVGB and surrounding areas, is based on published geologic mapping by Saucedo (2005), Melody(2009), and Saucedo and Wagner(1992).The Saucedo and Wagner(2009) mapping was completed at a statewide scale and is therefore, less precise than other portions of the map and geological cross-sections. Accordingly, portions of the geologic map in Figure 2-9 do not correspond to the more detailed geological mapping and cross-sections. GEI Consultants, Inc. 24 Page 170 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-8.Well Locations Well Locations f.wr�,• °"`' o Unknown , o Dom eslic c Industrial,Irrigation-Agriculture 5 TDPUD Municipal Well P CASGEM Well t ({erir`r+rr . t —Cross 5ectlans •; ,�f., Creeks and Rivers - 1 QMartis valley Groundwater Basin era _ _ V' Y Cb 00 - %0 dfi a MO v fl t3 aQ ;Lr1u l,ee'.�ii,',r O d °z o 0 a ° 00 L9urriu, l ` o o a t. _. ... .. � o Al _ m _ 00 �✓' � - rl on r f � r ry 2.5 5 10 t ieki 7;lh,,v R S Miles ° Bola Source:aerial,hasaadata,ft- Marti$valley Martls Valley Groundwater Basin Groundwater Managemeni Plan 5-Year Update Well LocationsNevada and Placer Counfes,Callfomia Truckee-Donner public Utility t]Istrict G E I c- NDVEMBER 2024 FIGURE 2-8 GEI Consultants, Inc. 25 Page 171 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-9.Geology and Cross-section Locations Geology Legend Halllo-'.hlw Glo�n7+rrtb rja Gyn-[ ipren aopa.Yr - P"-MalwN m^o r Mk.M.n Kv IP":ram •7-Li�d4WFM 04ckw*f Qp CY'ti._..:'Wrt4nna9 �I IdqmP _ FLLff-Mall n0.b I�IUGi�Nt QF-LJIIh71"O'O"IF(hId0WOon's PIFYAmww) CA-IhelgxenhaW ruHs.edC ltjnerrnapl U..-LJrm,.wa1.4A tk—Il_.b__ fl.x W run SFbomne rd Prebew�er q.he-9nd End UO;A l 3-4H.-O hn gep-lh(Holovrltna 4r-xft—Fl.eb.Wrn I R-mim i T,-Txllw�r.voh.,c le.rnar .41Yf c") Ylrtlt-7wrLle9le tlA1P AJ'I:ie IOM Ib�Wrhe} 40c-Fhoesx C—h yYxurn 1CIanYxx,p {Sn-4uAc+,aePve�e 2l-�axax.�d Iorl Pkeoocrs.h . F' QKH-Hrltldlw ellym lylll IPlYWerx IAY-IHIM1.11.rLt}<M�;Y+Iepwhe}el.l4wY.7.FYlFG IIYIwY.IF •s.•TiL p aukd6 h7 '� pl .leli� GINO-6-1 UPA L0=10 ALMA IP'WOWLLW1O 4NP-Rn{bwmlLRI lakoym awn M10LYIw l CW-T.h0e a.iwlY17 1a11 RahtYo .f. . k •]lua-OYN+..Y 91�PYki L'P+a .L oarY IPYpuna a-lo lal M1 gaga-Giraalq q..xtr�mnmaou(xc�um:q Jcy-TYI P p.Pda0■i—■oiPYxa I J-htwwo•bW.wwl.4l MYIh1Y4.hY4 MEE CAMPO Ptah-AII.Yxh..a1 newt I P.6 n.} m•$ClIIIISranY Fhrnr.cvwrbCnaearmlll IT 4 fLo ka,arvgq plFr p 4pa CU f Ov Qm a0gO TYp Rv pi Cft TV l F 41n kiYa Ow Mva ova PWMIN Gvh _ 411 pvb PrVO ... i - fYi UVA rYiI1 O 4pc Q O'�Yda QPvd4 Mal Qvbm als ell` T[dsk � Yy - Ply�„6.- pPxd1 Tr. rrrprSr.r I ,r- dpyd2 Opt .:. G h * a Ofa Opc. .A gvbmcs 7 pa9 mva} Will O ;KIYat LF11 3 has 0 NORT}i I0.00O 6momm'111111mmommommid OP9 be . hlvdl Pva OI Pra 3aeicej Pw IAWrs,ae�o x 5eucreo aos PVA 9aeaap C J eM'Al 7y-.D L �y P1f i Ilkr•?f.1rr.� 7 fBP e4 hntY. �laox[T s{>E Ldos91 Mortis Valley Groundwater Basin,California Figure rrrLE 2-9 Geology and Crass-section Locations GEI Consultants, Inc. 26 Page 172 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-10. Cross-section A-A' A A' Norlh $oath 7600 75M it vl I u 1 S,Q+tea rY� Mon 2.1 i i T ` 7000 IS 1 1 FkOU yr Crt=:Y Pla"iiN Cfimk F431005 FOUill 4J L XnIEiSIC]le W 1nfCSE-u Piv m 51 irlsCY:£fLT93rW-E r--mmOrruo SILWI! Fails lBnE I,Yr:e7vc7il ki�l'r'sl 1 1 NPGIM Rc.�re 76T 1 r � 1 d50p I r SSW s� } r 4 [ n4 7 IN i z - _ -_- Z Irr 4 550p - ❑e 4 —?--t- - °"- T ~ —�� -- - —. R-' - ?-- 2 U -- 'J E4 - F d rwl ri — r 1 4i00 1 I � � --I t 1 a540 dtlpp Vertkal lxayyerauorY-•Sx � a I a.mo 2= 5k "tr dI51r,4CE H MET rJ=: FPrrfe- - . I hppronn to c rL.A1 ea ygerabc i-�a a F,.. I ��.,rv,x r al�r.•-..mr c.hase.J r+ Mar al Lary Tina C4slrl,.. Hnv.3arJ-- 1'=;_^-�Lcc.eie FLx r OP[he Timm.rc�-hm-bb ril L Yke Tahu•e-CaWr—w,�o bgiul Si:-"rrl Mn- ca 2 [Ir A-6 prahle.Ioti�k dirnro 30-nvsrr�ir,��r.�l •r-.:+r_I. .. .' .'r' Al'.•t,2011. + : .1 , I159-14EA a1c*ry11L a J.d+rain MUL ral rk�A� Cat—i 1,rvrFl 5j.,ce.dm 200K. MunrG,L'_ I' ..I- I F.,x,Z an 3., J eurxden,G.W.-20J I.LOA.'-ari-key IdsrrtlM1carlun ul an aukwe 1-Itr71i,rfte, p,[tp: -een:e�.u,y-�v¢irbe.pfiQ I.,:I ai Lidr9.y dtr156 aWJwn where Wt vJ in ndl Ina, I P 11 1.. t6e 5—i—kxil"5nxcy LJ Anienra,Y. J01.r 3.V. 1 I G2 I JS I 3 %Vd1 1o.L .,;h.n GDO ie t whole rc,[ed ri Ihe11 YJgj- Lafhan- =. a_=.-- -- F h, •,r3 rt�re,and°—hiamatry 4`1-Plim.4 .ena v d—rjic ruck.of d-rr n 5j-rn—riangi, rlrk• r - I I ,'np blol,ed&o±—1 wteerraL�rY,,U.-twit,,o! na.,s,3S 1 F N[nlp,n,k. .._ -. -_IL-., IJ l}ula�ry pak,�H, r."r cf Shr T—k—Ta,IM:T—r.nprih of Tr Ink �Irurnl+,r� Ti:-i -':II 5s.r.Ur,-'nry.. CA J I p 5—trd- i G/.F*3 jIr Map r*Lake TaYn Crrorrlur an3 Wrv*df.Calm 5�rary,lanrver"-rimrCKuhN,r.MapSa*M1MapLdr, d 1 194.004wWc LEgend I C10 I Graclal 1111�%Walnf: ® Tertiary Volcanlrs LlthIDIDplc Cvrtta0 �J —?— Ynferred LitholIDKeO Cantacr Glacial Bulwa9h aepoolts Sands and Gravels rau1r,difhttidn el di-p nuen.enl ® Prosiser Citak allkwurn -- IJ 1dalhed wlticre Infer,ti, rP Fit!FstoonnLS Clay Bed ® L01191H[OW n VUICanlCf. ® TuEflAsh `' IPhe oea Satne! 4 Well 18g Martin Valley Groundwater BasIn,CaOfomto Louaatown Intelrbeddad Sedlrrenlra Interbedded Basalt — IUrinamed gral+a49.sand and airuviurnl © and Andesite Basalt it LL IPrivsana and iorl Ploi!5tflgnn10 �---' Cr HONA-X - Truohae Forrharlon Fracture Zone (Lake and Stream Beposits) — � • Ekl.sck B'F"i? Figure Swce. m2012 Beim meHydrologla.loc. 2-10 GEI Consultants, Inc. 27 Page 173 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-11. Cross-section B-B' 0 13, Wesl EUSI 7Sp0 75W a I m 0. F39hw+ay!?? i Palvis FwIY % T-uekot�Ri4eI > 08 — y I z d r 4500 TL - _ 1 6500 < _ rs r.i I aLU I riv 0 '. h Olf all"� t 60fJ<3 r H Q40 r+2 J �1 Tv =(100 Ti It i _ 1t � � lihrtirrl Eeagglrrilid�•Sx. 4000 0 10.000 20,000 30!OW 40. DISTANCE IN FEET a Iereriro-; 1 ,F+Irnn.rlr r-+{"O -9. d. ` r% Lxaw—arr nprn rin kr,hoc,id rm 5--ki.'C-1, .Map d l,k.T_--12—," 9lrvl-K P W.. 194+_'.}+-•tic nir ill r y ra End Tr krr Irma.n—th M Vrr.Tahnr.P—ld u,Go Inge ,i - ty nl hnip- 2.E6 V7b—p-h. front 30 ir=Wri ender, 2003 unt Nrew and okhe„_.201 1 tullehn, .44 1453 14C4- rliwlikxl,W Fm kFJkuaIJ1[revar—9+ku 1.k 5.5.ni .-ap A qg-Inl J 1—`3,ri Llo.2005 r1 nf-,L r,11r Hdr-.J r_F.__e_S.1 L}arrlen,G A 201 I•IV— 4 A .:_rrl,rI•�- - :.I, -�,.Tr+�:.,-_. IHktp:S�amW_."s. eti*uLtr_"J. L 51gnd-irn-i+rrl. MEd elJy lei;jk,.Mrt xhui a rl At in&di ILAn uF tilt S mVIu71G1r ti -rely r3 A.mera. - n.: 3.WO"-!1 iuk—rie ar-_jpp,v ,L,wrthn GbL Iert =.l'I7CtIifT■rxrti ehwm xhelr.nure,{rt—11 Ilxr_ LEH—l 5. 1 q&-,, 1 alencilem N..%1'i,• - -I. - rink.--.-I. _ i�I ':�•.In an,i-..r-, pna-rI-_nes Tmr.lr,=Cyllrvrrro,�q>tibl �do�rra' :GlMxna I .. p . MI•,Wj� .P., %"1419.6.11bl.)-d 41 uLC r A y F;6.rr*VrJ7,::• k-.-I i-:I _'rare rvrtk -- L:jbfmnp.M5 Th—rkr-Mc idk SLL4r Llnr.er5[y.ri,rndaled,CA 71 F r,+ 5.jpgam 6.4..2005,Gmgir-kt+p ci 4*r..T.hnr 15,. n,C I .I. it ldw,G1lrcrrw LEgBr1d Geda�ul am—y Reg-1 r L",LA.W Sears.F.fry r I. -1, 1 100,OWAc Louselown Iniazdeetlen sonimonis ]nterkreddad Basalt ® Goarwl 1111/hSorarne {llnnamod aravets,sand and alruvlumi Fn and Ande5lte Basalt (piioi;4r7p and k01I 2raFStRagnel EM Gkaael Ouiweeh uepmlis Trunkee Formallory ® IFraCltYr$ $4np iLnkt�and Srrnarn aepasizsl KLandsr143e tlapawts ® Tertiary YolcanlCS LllfioloarC Contact Juniper FIa1 a4iuvlum —?— InTerrad Lilnelegie CdtlIbeL FPlrltltoterlc; $arFGS allii GraVIs p SITE III F13kilt,dirgcllon of dlygamj;e rent Martls Valley Groundwater Basin,Calillornla Rrd5C9r Crook allavlurn al I IPkekstooene) CYay BEp [Bashed whtera IniorredY nrLE 011`05 r3 n B-F f � I Louse lawn Yoroanips LC IPleFstacerufY TuffjIi Well Up, "M �iLaipe 57•12 Figure a 8i[4loe PROJECT -11 Suul4T01tRn+anseHydrolagres.lrerp$o� GEI Consultants, Inc. 28 Page 174 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-12. Cross-section C-C' C C' West East 75M 7500 aP �4 tOnoa frtti'tlin0 �"' uuG1cDE-TOhaLx M+.r Ih�rrrtr ,._ ,'F, 7= '^r Adpodi PCiOr!Feel! M 7= k P son PaT r TT t] 60M r;r} + Q�4 r rti h h - 6DTb Cu W F .f^ Ld U ofw - jS5SI0 - ��- - - r-m A7 L � Liw 1 Tr f J - IT Tv 1 1 i L 1 P Vertical Fxoggr�ion,5x 1ppl) 1 40111 ❑I$TANCJ IN J M rf17TFS: Kdr.r- - I.J1Pgri.xnnrde.ritiul r.�,}yerat�u.+_ems- I -..k L�ukrm�+rr-apPls11+7at�6a5cd x r3,iLrn-k�.'T,r_�IuaJ._hA.p,�I�kr.Talu7r.6r,in,• 6u4i:1,,.._. r Y4' I�'GJ Ph:�tr yL:4+ilr�Y rA Lhr.Tni tic■rr�.nir'fli d ly4r-T„hr�r. Cal�ftn faa.F,rrJcyrul S-"-..-�.�rf hRrn,� 2.Ul,!,A+cn ProlkG v Lapad Fr+nm 30-mrkef-.49U clr aGm mrnlrl. -2005 wal fi-f9w aru;,Altirf„gyp!i %A.F 1453-I11G4 .*;w ikva_-J Pe.-Uwt-ma P.Irjtwn Ode-1 S.5L heal.�da.3y:Punka Lti h-aa mauce Sa,21105 HLr�el'.LE.,triiwlr,/�„R+rr_R.5-an1 6a..i,-iL C,,,W,2L'I I,Li45P- ■y.�3r-n�Jelit�h,�r Kn>ar�n�Ywr-fork ee+r 711v�, (ht a+l�ranvrw,.,ng•..q�dW:ks.P•hf'� G.5rdndiram wA,dlrawl.artJ oLay hrAn N:'p wlrrr.rnlr k rL well L-qn Q.'AY,vA.DWk.WL rd thr•;r5AC1nqhAI 5,.?rhr 0 a+naxa.4. 101,P.3,p, I 62.1 761 3 WAl ILA Li-twiK.pry x'prcrmvkr wNthm LJ7C1 hark 7.Fra,:Uro AvY -WpAi al-m w-h Lrga, srh�M1.T S, 1995,5tra;uJi'a r.irnnYLre,arsd LJsrwhrnYSkry iF PIII s rlKftrlumy veJearl�m.-L of th.h+:u.rn d+:i•AIW�arlyA ?rctihxe,nrAr Tmrtee.Canrexma.„nlxihkslrrd do*orsl dPssertamn.r.hrrrrrlity eA[_hbnb.s-Uwj.3,41 p- h drx}rr,A.,20M.k-WE!14e11`49*M rUTAM mrf prakrA)khrikMy nh vrr rmirier Fauk 2,3nu moth I rrar.4rx,L.IhPmnu.P.5 T"n_n limprldd`titr LJnvrm,rV,Hanwldt.CA V I P 5A'L-L'O-G.J..2W!'r C&�"v.rA..p tr Lane Tawi5 oasm-C-Armrra diva Neac.dd.CauParaa Legend Srologcw 5u"V,kt-lrnal ae-Dog,c WFr 5encs,Map No d. 1.1{1Q,OGp xc.Lle ® 0610clal111W+I4rarne Terclary Volcanles LltholoBiC Conlacl !n}Nrred LV[ nlog,-n Contact ninclel Out ash Qepnelts Sands and Gravetls Fault,direction of disp+Jrcornnnt Prosser Cinew alluvium Sdsahed Nhrre Inferredp PPekstoonnEJ Clay Bed LoamAcivon llulcanlca IP1e15t4Cunr:! 7uCflAsh � `,++e11 log �1TE Martis Valley Groundwater Basin, California Lounctomm Intnrbacdad 6adlrnanta Interbedded Basalt ar Unl, md xravols.sand and alluYiurnl anti Andesite 9asalt mT�E IPPLOGanm and iffrl PlekatgCnnpl Cross-section C-C' truokan Farrnallon Fracture Zone ua1E rLJaAa arrd Slream BrgoaitsS EIr`rStk�'� 9'7'12 Figure SlhIICe C)2bJ 1 l-iPnlle>r Hydrolaglcs.Inc. 2-12 i�p$y1 GEI Consultants, Inc. 29 Page 175 of 563 GMP Nevada and Placer Counties,California June 2025 2.4.2. Stratigraphy The uplift along the faults that created the MVGB probably began during the late Pliocene and into the early Pleistocene,with relatively low-permeability Tertiary volcanics forming the bottom of the basin (considered basement rocks in this report). Prior to and throughout the middle Pliocene, the sedimentary material of the Truckee Formation was deposited in the MVGB, directly overlying andesite tuff breccias, andesite flows, and intrusive rocks of Tertiary age. Following deformation, the general topography of the Martis Valley was probably somewhat similar to today's topography(Birkeland, 1963), with the Truckee River flowing out of the MVGB near where it does today, cutting a canyon through the pre-Pleistocene rocks of the Carson Range. During the Pleistocene, a series of volcanic flows occurred in the regional Truckee area.At least 20 distinct flows have been recognized (Birkeland, 1961), mostly (but not exclusively) consisting of fine- grained latites and basalts, and are noted as being fairly local in extent. Flows found in the MVGB include the Dry Lake Flows (QPvd),the Bald Mountain olivine latite (Qvbm), Alder Hill Basalt, Polaris olivine latite, and Hirschdale olivine latite. Collectively,these units are referred to as Lousetown volcanics(Qv) based on Birkeland's (1963)correlation to other Lousetown flows in the Carson Range. Also included within the in the Lousetown Formation are interbedded Lousetown sediments (Qps);fluvial (stream) and lacustrine (lake) deposits accumulating, and thereby raising land surface elevation, in the valley between flow events. As volcanic activity waned, one of the last flows, the Hirschdale Olivine Latite,flowed across the Truckee River Canyon, damming the basin and causing widespread sediment accumulation and deposition of the Prosser Creek Alluvium (Qpc), a partly-lacustrine and partly fluvial sedimentary unit (Birkeland, 1963). Brown (2010) has subdivided the Prosser Formation into Upper, Middle, and Lower Members. For geodatabase development purposes, interbedded Lousetown sediments are defined as being capped by volcanics,while the Prosser Formation is not. It is recognized however,that the lower Prosser Formation may have been deposited concurrently with the interbedded Lousetown sediments, and in some cases, may be correlated to these upper sediments where capping volcanics pinch out laterally. During this same period,Juniper Flat alluvium was being deposited in the Glenshire area with sediment derived from the paleo-Juniper Creek watershed and alluvium derived from the west. The Prosser Formation and volcanics in other areas are capped by glacial deposits, derived from glacial advances and retreats during a number of glacial episodes (Birkeland, 1961). In the MVGB, most of the deposits consist of glacial outwash deposits of varying age (Qgo). The outwash deposits consist of loose and unconsolidated boulder, cobble, gravel, and sand. In the vicinity of the Truckee River, three distinct outwash deposits (Qogo, Qtao, and Qti) are apparent and form terraces along the course of the river (Birkeland, 1961). A number of glacial moraines were also deposited, and are visible today in the vicinity of Donner Lake,the Tahoe-Donner residential neighborhood, and the Gateway Neighborhood of Truckee. 2.4.3. Structure The MVGB lies within the Truckee Basin, a structural trough formed at the boundary of the Sierra Nevada and Basin and Range Geomorphic Provinces.Tectonics in this zone are complex and include active right- GEI Consultants, Inc. 30 Page 176 of 563 GMP Nevada and Placer Counties,California June 2025 lateral (strike-slip) shear associated with the Pacific-North American Plate boundary and North Walker Lane Belt, as well as extensional (normal)faulting associated with the Basin and Range Province. The uplift along the faults that created the basin probably began during the late Pliocene and into the early Pleistocene (Birkeland, 1963), while right-lateral faulting is inferred to have occurred into the Holocene (Melody, 2009; Brown, 2010; Hunter and others, 2011). Most recently,the Polaris Fault has been mapped as an active North-South Holocene fault across the center of the MVGB. It is unknown if all of the faults in the MVGB are acting as a barrier to groundwater flow.A subsidiary fault associated with and parallel to the Polaris Fault has been demonstrated by groundwater elevation differences (30-40 feet)to be at least a partial barrier to groundwater flow in the valley(InterFlow Hydrology, 2014). Identified faults are shown in Figure 2-13. GEI Consultants, Inc. 31 Page 177 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-13. Locations of Springs and Mapped Faults C) Natural Spring :!z-.1 .104' Fault Zone •• Uncertain Location _+yam `•' --Good Certainty in Location ,Cross Sectlons `' 'p," 9omyed& r ,. Creeks and Riversrip - CDMartis Valley Groundwater Basin { rr :—. We .� _.. k _ V. 10• �� it � �P'oia its - Fault 'f IS I c/ i1 A 1 r rr A' Or, � f r ry } O r _ 2.5 5 10 Miles i a5:IN baseadsta,etc. MarUs vanes r�� Martls Valley Groundwater Basin Groundwater Managamenl Plan 5-Year Updwn [�;,,�j Locations of Springs and Mapped Faults Nevada and Placer Countles.Callfomta Truckee-Bonner Puhllc Utility❑Istrict G rr L I NOVEMBER 2024 FIGURE 2-13 GEI Consultants, Inc. 32 Page 178 of 563 GMP Nevada and Placer Counties,California June 2025 2.5. Groundwater Occurrence and Movement The geologic units described above are interlayered, with complex spatial relationships, and as such,the occurrence and movement of groundwater within and between these units is variable. For this report, the low-permeability Miocene (Tertiary)volcanic rocks are considered the bottom of the MVGB. This section discusses where groundwater occurs,groundwater and surface water interaction, and water levels over time. 2.5.1. Water-bearing Units and Properties The Truckee Formation (Tt) is composed of interlayered silts, sands, and clays, and therefore has variable groundwater availability. Well driller's logs document sands and gravels within the Truckee Formation in the center of the basin, near the Truckee Tahoe Airport, at depths of approximately 900 to 1,000 feet, and from 200 to 700 feet in the southern portion of the basin near Shaffer's Mill and Lahontan Golf Clubs. Well yields in the Truckee Formation range from 280 gallons per minute (gpm) in the eastern portion of the basin (Hydro-Search, 1995)to more than 1,000 gpm in faulted areas underlying the Bald Mountain volcanics in the southwestern portions of the MVGB (Herzog, 2001). Water is found along faults and fractures within the Lousetown volcanics (Qv), though portions of the volcanic flows are massive and unfractured. Figure 2-14a is a photo of a Lousetown volcanic outcrop and illustrates the range of fracture concentrations that can occur in this unit. In most cases,water encountered in this fractured system is pressurized, rising to a static level several hundred feet higher than where initially encountered, suggesting the presence of confining units above these fracture zones. The higher initial groundwater levels are indicative of groundwater recharge entering the fractures at much higher elevations than where a boring has intersected them.The confining unit(s) are not well defined or apparently continuous across the Basin.The confining unit(s) maybe unfractured Lousetown volcanic layers, Lousetown Interbedded Sediments (clay or ash layers) or Prosser Creek alluvium.The cross-sections, shown on Figures 2-9 through 2-11 do not show this confining unit to be continuous across the entire Basin. Wells located in the southern portion of the groundwater basin have been found to be artesian, or flowing, along fractures interpreted as faults (Herzog and Whitford, 2001), with yields ranging from approximately 250 to 1,000 gpm. A number of distinct fault blocks are present in this area,with unique and heterogeneous aquifer properties where faults serve as barriers to groundwater flow (ECO:LOGIC, 2006; ECO:LOGIC, 2007; Bugenig, 2007; 2006; Peck and Herzog, 2008). Groundwater discharge areas in the form of seeps and springs are also found within these areas and along the periphery of the MVGB (Figure 2-13), including thermal springs in the vicinity of the recently-mapped Polaris Fault (Hunter and others, 2011). The Prosser Formation overlies the Lousetown volcanics. The Prosser Formation (Qpc) includes interlayered silts, sands, and clays and has variable water bearing capacity. Figure 2-14b shows an outcrop of the Prosser Formation, where coarser materials such as sand and gravel are present, and moderate groundwater yields may be encountered. Water-bearing portions of the Prosser Formation may also be hydrologically connected to overlying glacial outwash and potentially surface water bodies as well. Fine grained materials such as silts and clays may locally produce confining conditions in the GEI Consultants, Inc. 33 Page 179 of 563 GMP Nevada and Placer Counties,California June 2025 underlying Lousetown volcanics. Well yields in these coarse grained alluvial sediments typically range from 12 to 100 gpm,though larger-diameter production wells have estimated yields as high as 500 gpm according to State well driller's logs (DWR). Hydraulic properties of the glacial moraines contrast sharply with those of the glacial outwash deposits; the moraines consist of poorly-sorted clay to boulder-size materials,while the glacial outwash deposits are primarily well-sorted sands and gravels.As a result,the glacial outwash tends to transmit water relatively easily,while moraines are typically water-limited. Figure 2-14a. Lousetown Volcanic Outcrop r_;t i si Y I #�t +4 •x y i. 'F�. s.'•- .f 'S t GEI Consultants, Inc. 34 Page 180 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-15. Prosser Formation Outcrop Underlying Glacial Outwash - 1■F h 2.5.2. Surface-Groundwater Interaction Generalized groundwater flow directions were inferred by Hydro-Search (1995) and were based on static water levels reported in State well drillers reports and DWR's long-term well monitoring data and indicated groundwater flow directions are toward the Truckee River.The Truckee River is the topographic low in the Basin and as long as groundwater elevations are above the riverbed,groundwater would discharge to the river. A more detailed surface water and groundwater interaction study(Interflow Hydrology, 2003) was completed for the TDPUD for tributaries to the Truckee River.The Interflow Hydrology study provides estimates of the magnitude of stream losses and gains to and from groundwater across the Martis Valley during summer 2002, in the middle of a multi-year dry period. Observations made during the course of the study showed Martis Creek to be a 'gaining stream' (receiving groundwater discharge) across the Lahontan Golf Club, upstream of Martis Valley; West Martis Creek was found to be a 'losing stream' as it enters Martis Valley, recharging groundwater between the Northstar Golf Course and its confluence with Martis Creek; and Middle Martis Creek showed no loss or gain across the valley floor. Groundwater discharge in the form of springs generally support perennial flows in Lower East Martis and Dry Lake Creeks, as well as from the hillside adjacent to Martis Reservoir. Interflow Hydrology (2003) computed a basic water balance based on late season low flow measurements in the watershed and found that in October 2002,total streamflow losses across the Martis Valley floor were on the order of 0.65 cfs (approximately 9%of the total baseflow into the MVGB from Martis Creek),while losses at Martis Creek Lake were on the order of 1.55 cfs (approximately 29% of the total flow at that point). Evaporation and evapotranspiration by plants were not measured as part GEI Consultants, Inc. 35 Page 181 of 563 GMP Nevada and Placer Counties,California June 2025 of the study; however,these data suggest that the Martis Valley floor potentially serves as a groundwater recharge area during the late summer and fall months. Beginning in 2023, NCSD began working with the Truckee River Watershed Council to evaluate surface water and groundwater interaction in southern portions of the MVGB, with a goal of detailing the spatial and temporal variation in surface and groundwater interaction in the vicinity of NCSD production wells. This work is in progress and uses the best available science (implementing BMO#5) including multiple lines of evidence to evaluate these interactions, including: comparison of general chemistry and isotopes in surface and groundwater, depth-to-water interpolation and mapping of surface water that is interconnected with groundwater, and synoptic streamflow measurements along Prosser, West Martis, Middle Martis, and East Martis Creeks to identify losing and gaining reaches. In addition, Interflow Hydrology(2003) identified groundwater recharge occurring where Prosser Creek enters the MVGB,just upstream of Prosser Reservoir.All other tributaries, including Cold, Donner, and Trout Creeks were concluded to be supported by groundwater discharge. 2.5.3. Groundwater Levels Groundwater levels have been generally stable in the Martis Valley with some declines occurring in specific regions. Figure 2-15 presents groundwater level monitoring data throughout much of the MVGB since 1990 in a single set of hydrographs.This graph shows that overall groundwater levels have been stable in the MVGB, including during the drought of the early 1990s, and the wet years of the late 1990s. Groundwater levels are measured by the partner agencies and DWR and are reported to the California Statewide Groundwater Elevation Monitoring (CASGEM) program. Historically,groundwater level measurements were taken in the spring and fall. In 2017,the MVGB Agencies voluntarily implemented monthly monitoring of groundwater levels for all wells in the CASGEM program, implementing BMO#5. This proactive move to monthly monitoring was, in part, to investigate and address uncertainties in seasonal variations. Monthly groundwater measurements illustrated that peak summer-time groundwater pumping temporarily lowers groundwater levels below the previous fall measurements, as would be expected, but are not depleting reserves, even with decreased precipitation within the last 20 years. Figure 2-16 shows the locations of the 13 monitoring wells and selected respective hydrographs.The hydrographs indicate that groundwater is locally variable in the MVGB, as levels may decline in some wells and rise in other wells over the same period of time.These data suggest that there may be several water-bearing zones in the MVGB that may or not be hydraulically connected.The hydrographs also provides the following well specific information: • Well 17N16E11F001M (northeast of downtown Truckee) experienced a nearly 50-foot rise in water level in the late 1990s, and then declined steadily over the following decade before rising again in 2011 and continuing until winter of 2022 when water levels reached record heights.This rise coincides with above-average precipitation and streamflow (Figure 2-4). • Levels in Well 171\117E296001M (Northstar) was relatively steady throughout the early monitoring period until summer 2007, when seasonal fluctuations began to occur due to GEI Consultants, Inc. 36 Page 182 of 563 GMP Nevada and Placer Counties,California June 2025 development and groundwater production. Water levels had declined between 2007 and 2012 but recovered close to pre-development levels in 2017 and has remained consistent in recovery and use since then. • Groundwater levels in well 17N17E05D001M (Truckee River east of Truckee) have increased steadily over the period of record, rising over 10 feet from 1990 to 2012, and has remained consistent to present at these levels with wet and dry periods showing temporary rises and declines. • In well 17N1E17F002M (Donner Creek area),groundwater levels fluctuated seasonally but generally remained constant year to year) and have increased slightly over time to present. • In the nested wells 17N16E13K001M (deep) and 17N16E13K003M (shallow),water levels in both wells were matching until late 2003, at which time a divergence occurred causing water levels in the deep well to rise significantly, while water levels in the shallow dropped slightly.This divergence and slow increase of groundwater levels continued until December 2022 when the water levels within the deeper well dropped to pre-2003 levels and shallow well rose simultaneously to match with identical groundwater measurements.These water levels will be tracked and acted upon if needed. • TH-Fibreboard and TH-Martis Valley wells have seen fluctuations based on the type of water year and has risen slightly overall.TH-Prosser Village has seen these same fluctuations, but groundwater levels have declined on average over the same period, likely due to complications with the nearby Polaris fault to the west. • Groundwater levels in well 18N17E33L001M had been consistent up until 2019 when levels started to decline slowly during the 2020 and 2021 drought period and has not recovered to pre- 2019 levels. GEI Consultants, Inc. 37 Page 183 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-16.Water Levels in Long-term Groundwater Monitoring Wells �st Monthly Mei Wpments 17N16E17FW2M 17NIMIROOIM S 8�0 -I8N1GE221MO1M -17N 16E 11FOO1M 5 - -17N17EO7PODUA C 0 v_ -17N 17E18CO6IM 5,750 - -1 SNI7F331 O0I M l7 -I'MIGE13ROO11Y I i -TH-g6rehoard �IH Prmsor Vil loge 5.650 - I I -TH-Marrm Valley -I7N 16E13R003M -17N17EMSOOOIM S,i5O a a a a a a a a a a n3 3 3 a 3 a a Z 3 3 a a 3 3 a 2- 2- 2- — — S a 3 3 4Vafrr 10r-ar Dom cnlleuted from https:��rrvnv.rasgem.�vater.w.go� GEI Consultants, Inc. 38 Page 184 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-16. Monitoring Wells and Select Hydrographs CASGEM Well s_ . Fault Zane - r • Uncertain Location -~ —Good Certainly in Location = - Creeks and Rivers •- I �- L_;County QMartis Valley Groundwater Basin _ 15� �ti• ._� ��r 'iQ '!;!ll:E.11tl![!!S![ll�isii::sti?:• f 18N ME-22H001M ti ADACGUNTY 1p 7 17E3 LDD1iN Pr 6rMiiagJJ ti 17N17Etl517DDiM f r. 17N16E11FDD Fibre h' and TH V,,l 7N�17E07PD01M 1111111[t1111!lIIt4'' 17ai37Eyecoalr� Ma is Val y TH 17N16E13K043M 17NIIAE17F 6 r r ------- --------- 2M ter-- -- --�7N�GE'13KD41M_•---� �'� 17N1+�7E291P fM XQ43rd shaltaw i8I ri I ,S n..An.,.',.'ti., f�,�51V1�Y li+R��-.r•' �. _ o' 1111l111!!11![Il!!lllilll[!11l1111 j11111111111111111111111U 1111[11: -�'±= ���� i I , � - KQQ1ld ~llltllk!l11111[Ilj�lllflllil.ililli deep - � a * N U 2-5 5 S Miles ° I{c. AS8rli5 Valley Am Ir Maros Valley Groundwater Basin Groundwalar Management Plan 5-Year Update DWR Monitoring Wells and Select Hydrographs Ni_ akee-D nnerr Public Utility N�1IEMBE Num Truckee-Donner G E I . , R;#02d FIGURE 2-18 Source: DWR 2024 GEI Consultants, Inc. 39 Page 185 of 563 GMP Nevada and Placer Counties,California June 2025 2.5.4. Land Subsidence Permanent land subsidence can occur when groundwater is removed by pumpage or drainage due to irreversible compression of aquitard materials.The potential for subsidence is low because there are no regionally continuous clay units which act as aquitards and the groundwater levels, for the most part have remained stable. No indications of land subsidence have been reported in the documents reviewed as part of this evaluation. 2.6. Groundwater Well Infrastructure TDPUD, NCSD, hundreds of domestic pumpers, and a number of golf courses rely on groundwater in the MVGB for drinking water and irrigation supplies.The TDPUD provides water service to portions of the Town of Truckee and adjacent unincorporated areas of Nevada and Placer Counties. The TDPUD currently has 13 active production wells for potable water service, plus three wells to serve non-potable water demands. PCWA's former Eastern Water System (Zone 4) currently includes three production wells, Wells#1,#2, and#3,to serve the Lahontan Golf Club, Shaffer's Mill Golf Club, Hopkins Ranch, and Martis Camp Residences. PCWA transferred ownership and operating responsibilities to NCSD in 2015. NCSD supplies water to residents and guests in the Northstar community, producing water from two production wells (TH-1 and TH-2). Figure 2-17 shows the general location of the well infrastructure and the groundwater level monitoring network.Table 2-2 summarizes the estimated yields and production rates associated with these wells. GEI Consultants, Inc. 40 Page 186 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 2-17. Groundwater Well Infrastructure and Level Monitoring Network TDPUD Municipal Well - 4 -Ok Northstsr(NCSD)Municipal Well x r CASGEM Well Creeks and Fivers SIERRA COUNTY County d. C31I Valley Groundwater Bas#ri m Re■5irwrrii + " �: - 44* - f. - ---- --• .1$N16E32H00dhd ,h NE DACOUNTY y 11 N17E33111 01W1 ;k - f Prosser Village-T#1 rmex 1 i xNt7E4SDODIM �. =ties Weiyhts Old GFee n wand if Fibre board-TH -- 17 N 18E11 F.041 AA - _ aa7ders !'rr l:Ri••Rirr 17N17E0713401M � North We 17N17E76C0.41M._J M y artis Valle TH 17N16E13KO03M-4�, n ------- --------- 17N16E17F002M ,�_ -_-17N16E131(OO.1M_ - .ifurri.,f i•A J �r + ___. c 4:rporl all 2 f TN1 { 17 7E29B f } Well 1 X.ell 3 H 2 r� a i � c IL • a- NI \ IL ra PLACER COUNTY *~ dF r ' �i ! I a m AL ,r U 2.5 5 10 Mlles Source;eerlal,baseada zta,etc. z. Marlis Valley Martis Valley Groundwo1ar Basrn Groundwaler Management Plan 5-Yeaf Update Groundwater Well InfrasLructure and Level Monitoring Network Nevada and Placer Countles.California [mil Truckee-Donner Public Utility District V E I EN-OVEMBEIR 2024 FIGURE 2-17 GEI Consultants, Inc. 41 Page 187 of 563 GMP Nevada and Placer Counties,California June 2025 Table 2-2. Estimated Yield of Public Agency Production Wells Well Name Estimated Maximum Yield (gpm) NCSD TH-2 850 TH-1 850 Well 1 1,250 Well 2 1,250 Well 3 250 TDPUD A Well N/A Airport 2,600 Glenshire Drive 1,685 Martis Valley No. 1 1,640 Northside 540 Southside No. 2 N/A Southside No. 1 (non-potable) 258 Sanders 290 Old Greenwood 1,045 Hirschdale 35 Prosser Annex 510 Prosser Heights 430 Prosser Village 860 Well No. 20 600 Fibreboard (non-potable) 1,430 Donner Creek(non-potable) 569 Tahoe Donner GC(non-potable) N/A *Well Yield information from TDPUD,2021)and provided by NCSD,N/A=No pump installed A number of private wells are distributed across the basin, and a number of residential neighborhoods or tracts have relatively higher concentrations of wells. Martis Camp operates three irrigation wells for their own use and provides Northstar Ski Resort with water from these wells for snowmaking and irrigation purposes as well (Josh Detwiler, NCSD, pers. comm.).At higher elevations in the eastern portion of the basin,the Juniper Hills area (near Well No. 20) includes a number of estates, most of which rely on private wells drilled deep (typically 500-800 feet) into uplifted Lousetown volcanics and/or deeper volcanics. In the center of the MVGB, a high density of relatively shallow (200-300 feet deep) private wells have been drilled and are in use along Prosser Dam Road. Many of these are drilled into shallow Lousetown volcanics, while others are drilled into glacial outwash and the Prosser Formation. In the northwestern portion of the MVGB a number of homes located on Alder Hill have domestic wells drilled primarily into uplifted Lousetown volcanics and range in depth from 300 to 800 feet. Figure 2-18 is a cumulative frequency plot derived from DWR data and shows the number of public and domestic wells drilled at various depths in the MVGB through 2013.These data show that the vast majority of domestic wells drilled in the area are relatively shallow,with 50 percent of domestic wells GEI Consultants, Inc. 42 Page 188 of 563 GMP Nevada and Placer Counties,California June 2025 being installed at depths of 400 feet below ground surface or less, while the public production wells range widely in depth. About 330 wells (Domestic, Public Water Supply, Irrigation, and Agricultural) have been constructed in the Basin through 2012. Since 2012, an additional 19 domestic, and 2 public supply wells, have been constructed in the Basin. Figure 2-17. Depth Distribution of Wells in the Martis Valley Groundwater Basin 100% 90% - 807i I aar 40 Domestic Wells r0% �Pubkc Wells y� —CumulaUvo kequenay SO%17 c S i 3; U 30% 20% 1e 1(m 0% 0 �n n n n n n ..Jr n n n n n n n n n n n n n n n n f(�l1 t- uQ, -Rrl ear grl r.�y, .a N'I /f1 rIC4 - • '1.1 Li u�,�i ip P il 1➢1 1 ¢2.2 AOI d O Oei eiWM CIC fF Well Depth Range(25tt1ntervall 2.7. Groundwater Quality Groundwater quality in the MVGB is generally of good quality and is currently monitored as part of the agencies' agreements with the State Water Resources Control Board (SWRCB), Division of Drinking Water (DDW). Each agency releases an annual water quality report for their service areas in the MVGB;the 2023NCSD and 2024 TDPUD annual reports are included in Appendix D.The USGS carried out groundwater monitoring activities in the MVGB in cooperation with the SWRCB as part of the California Groundwater Ambient Monitoring and Assessment (GAMA) Program (Fram and others, 2007) and sampled 14 wells in the MVGB for a wide range of constituents during summer 2007.The concentrations of most constituents detected in these samples were below drinking-water thresholds,with some exceptions: a) concentrations of arsenic were above the Maximum Contaminant Level (MCL) in four of the 14 wells sampled, and b) manganese concentrations were elevated above the MCL in one well. Arsenic levels above the MCL have also been reported by the TDPUD. Singleton and others (2013) used dissolved gas and isotopic tracers to estimate the age,flow pathways, and interactions between groundwater and surface water in the MVGB. Isotopic sampling results from June and September revealed that Summer samples more closely matched the signature of meteoric waters while Fall samples matched more regional, mixed-water signals indicating a shift in groundwater source between Summer and Fall in the MVGB. Results were variable but generally indicated that recharge to production wells, springs, and surface water baseflow is sustained by snowmelt of mixed or young age that recharges at lower elevations and through alluvium (rather than fractured bedrock),with GEI Consultants, Inc. 43 Page 189 of 563 GMP Nevada and Placer Counties,California June 2025 minimal contributions from very recent snowmelt. Water pumped from wells tends to increase in age as wells are pumped over the course of a season. In contrast to many of the other production wells in the MVGB, NCSD's deep production well TH-2 (Well "K" in the study) consistently draws very old water, apparently from the predominately deeper aquifer. Finally,the authors pointed to the Polaris Fault as a potential source of very deep water, as indicated by the presence of mantle helium in samples from wells near the fault. The T-TSA operates a water reclamation plant which includes the discharge of tertiary-treated effluent into glacial outwash and Prosser Formation alluvium downstream of the Town of Truckee on the south side of the Truckee River. Hydrogeologic investigations in the vicinity of the plant indicate that effluent flows laterally toward the Truckee River and Martis Creek, discharging to these water bodies after a minimum 50-day travel time (CH2MHi11, 1974). DWR (2003) noted that a water quality monitoring program is in place to evaluate potential changes to ground-and surface-water quality. Seventy-three leaking underground storage tank (LUST) cleanup sites have been identified by the SWRCB's GeoTracker database in the MVGB. Of these 73 sites, cleanup actions for 71 are documented as "completed",while two are listed as "open"with one of those considered "inactive" and the other in an "assessment& interim remedial action" status. All the sites are located in the Town of Truckee. 2.8. Land Use Prior to the 1950s, land use in Martis Valley and the Truckee area was primarily ranching and timber related (Shaw and others, 2012). During the 1950s, 60s, and 70s,the rural ranching-and timber-based economy began shifting to more recreational and community development.Today,the primary land uses in the MVGB are residential and ski and/or golf resort related communities with commercial centers in and near downtown Truckee and at the Truckee Airport.Timber and sand and gravel mining operations still continue to operate on a seasonal basis(GEI, 2023, Shaw and others, 2012). The Truckee population has and will rely on groundwater as its source of supply. The Town of Truckee, in Nevada County, developed its 2040 General Plan which includes project land use changes (Town of Truckee, 2019). It includes: • Coldstream Specific Plan—is located between Donner Lake and State Route 89, south of Interstate 80.The plan was adopted by the Town of Truckee in 2014 with mixed-use development. • Joerger Ranch Specific Plan—is located at the intersection of State Route 267 and Brockway Road and Soaring Way near the Truckee Tahoe Airport.The Specific Plan was adopted in 2015 and amended in 2021. • Railyard Master Plan—encompasses the eastern end of downtown Truckee.The plan was updated in 2016 and includes mixed residential and commercial land use. • Hilltop Master Plan—was adopted in 2008 and guides mixed-use residential and commercial land use development. GEI Consultants, Inc. 44 Page 190 of 563 GMP Nevada and Placer Counties,California June 2025 Projections of population growth for the Town of Truckee from 2020 to 2040 with a projected population of about 18,500 (TDPUD UWMP, 2021). Projected build-out for the Town of Truckee would be reached sometime after year 2100 with a conservative permanent population estimate of about 28,800. Placer County developed a Housing Element for the period of 2021 to 2029 for its General Plan.The plan showed limited residential growth. Planned/Approved infill projects will continue in the Schaffer's Mill (134 units) and Hopkins Village (40 units) (Placer County, 2021). 2.9. Groundwater Recharge Several previous studies estimated groundwater recharge within the MVGB using water balance and empirical data, resulting in a range from 18,000 to 34,560 acre-feet per year(ac-ft/yr). Recently, DRI has developed annual groundwater recharge estimates using the physically-based PRMS.Table 2-3 summarizes previous and current studies including the study's author,year, and average annual groundwater recharge estimates. Table 2-3. Summary of Average Annual Groundwater Recharge Estimates for the MVGB Author Year Recharge(ac-ft/yr) 1974, Hydro-Search 1980, 18,000 1995 Nimbus Engineers 2001 24,700 Kennedy/Jenks Consultants 2001 none Interflow Hydrology, Inc. and Cordilleran Hydrology, Inc 2003 34,560 DRI, PRMS estimate 2012 32,745 DRI, modified Maxey-Eakin method 2012 35,168 DRI outlines its scientific and technical methods, including the climate data used,the PRMS method, and total recharge estimates in a Technical Note, which is included in Appendix E. PRMS simulates land surface hydrologic processes of evapotranspiration, runoff, infiltration, and interflow by balancing energy and mass budgets of the plant canopy, snowpack, and soil zone on the basis of distributed climate information.The PRMS computed recharge consists of the sum of shallow infiltrated water that discharges into the Truckee River and its tributaries as well as deep percolation of ground water to deeper aquifers with water supply wells(Rajagopal and others, 2012). DRI's study"...also applied a modified Maxey-Eakin (1949) method to estimate recharge which relates mean annual precipitation to recharge using recharge coefficients applied to precipitation amounts" The PRMS is modeled for the years 1983 to 2011 with annual recharge estimates ranging from 12,143 ac- ft/yr(dry year)to 56,792 ac-ft/yr(wet year),with an average annual recharge estimate of 32,745 ac- ft/yr. Because annual precipitation drives recharge,the PRMS simulated recharge varies from year to year. DRI included in its Technical Note annual recharge efficiency, or the ratio of annual recharge to annual precipitation. For the MVGB,the calculated annual recharge efficiency is 18 to 26 percent. Groundwater recharge to the MVGB occurs throughout most of the valley to some extent. Figure 2-19 shows the average annual groundwater recharge as simulated by the PRMS model,for a period of record GEI Consultants, Inc. 45 Page 191 of 563 GMP Nevada and Placer Counties,California June 2025 from 1983 to 2011. Figure 2-20 shows the annual recharge for the year 1988, a dry year. Figure 2-21 shows the annual recharge for the year 1995, a wet year.The figures indirectly show where the most permeable soils occur by the amount of recharge.The figures show consistently that there is very little recharge in the eastern portion of the MVGB (orange color). The most permeable areas (green color) appear to be near Shaffer's Mill, north of Interstate 80 near the western edge of the MVGB and south of Truckee along State Route 267 corridor. The models were also used to predict the effects of precipitation and the availability of surface water and groundwater supplies. Four simulations were run (Warmer-Drier, Hotter-Drier, Hotter-Wetter, Warmer-Wetter) were run and compared to Reference conditions. The Central Tendency is the average of these four simulations.Average annual groundwater recharge would change with changes in precipitation, however a direct comparison between Historical and Reference supply conditions cannot be made because a record of historical recharge data does not exist for the Truckee Basin. Recharge decreases in the Martis Valley under drier climates (up to 23 %) and increases under wetter climates (up to 9 %)would occur compared to the Reference supply condition. Hotter climates would also affect groundwater recharge, although to a lesser extent than precipitation changes. The Hotter-Drier climate would decrease Martis Valley groundwater recharge an additional 10 percent beyond the Warmer-Drier climate due to decreases in the extent of snowpack and a faster snowmelt season.The Central Tendency predicts about a 5 percent reduction in the average annual recharge in the Martis Valley, or about 800 acre-feet, with the Hotter-Drier conditions reducing recharge by about 2,000 acre-feet per year. A more detailed study was developed for just the Martis Valley(Rajagopal, et al, 2015). Despite differences in the reported absolute values for recharge between the two studies,the trends identified in the Truckee Basin Study are considered valid and appropriate for describing the sensitivities of recharge to changes in climate.This additional detailed study predicted a decline in groundwater recharge likely due to the shift from snow melt to precipitation which increases runoff and decreases recharge. One of the most significant findings from this study is the potential reduction of groundwater recharge and discharge to streams, not including the capture of groundwater discharge to streams due to pumping. Even with lower precipitation recorded within the last 20 years, groundwater levels are remaining stable. In addition to natural recharge,treated water from the T-TSA is recharged into the MVGB groundwater system through subsurface leach fields located on the south side of the Truckee River. Hydrogeologic investigations in the vicinity of the plant indicate that effluent flows laterally toward the Truckee River and Martis Creek, discharging to these water bodies after a minimum 50-day travel time. Wastewater treated by T-TSA is from the Truckee Sanitary District and North Lake Tahoe area.About 30 percent of the potable water served by TDPUD and NCSD is treated and recharged into MVGB (GEI, 2024). GEI Consultants, Inc. 46 Page 192 of 563 1 r IF �t NEW I 0 AN a' u :'' ■airy#C ! ■■ P, � ■ `. I■ ■■■�1■r ter'w■:"■ ME ink, ma m pp main + ■■ ■■w:i r■■■ ■■■■ I� _ mom N 41111 mom 11111m.11111101K moo ■■■ E rin■d�■■■■■ ■■■=a■m■■FWr■■■■■■■■ ■■■■■■immm= i►'i■�■■■■■ E■■■■■■■■■■ S ■■■■ �r J ■■ ■E■■ ■■EEF 1 `L ■■■■■■ a EE■■■ate ■■ ■ri■E�i■■■a ■no -r ■FF■■■■■ 'J-�r' r■ ■■ ■If■■■■■EE■ ■i ■ ■■■ EE ■■I■ E■■aC�� ■ ph ' 7\■�:: ;5 E■z= !^�ri ■■■■ ■'■■■ �■■i■■■■■■■ .sarrtv JsMon. T- ■E■■E■■■■ !■■R■:lrE■ -■■ h7#■ ■ ■T ■■rEi■■ .WIr . a.■ .. EEE�,aEa■■■■r■E■ ���■ 1 dIai i1� ■ a■■.•\E■■■EE!■a■■■q■■n ■i� �■■■■�■E■ ■■. y� +■ ■■■ ■■■■ ■■ ■■■■■■i 11116028 Room Y �E■■!■�Eo ■ ■1RM 1■ ■ ■+ 1� y ■E■■■ ■ fi 1■r■ E■■ ■ Mom ■ on ■ � -- ■ ■ iF, ' EE■■■xw ■ le- d ■ , 1. +� AcbMw Martis Valley Groundwater Basin. California t _ Y. :i ii5.1 1 ®Brown AND Catdwelt AverageRecharge r �t ■� i !!R C it ■g■ ■ r, ■ f■■■■■ ■ jai ■ ■ tiT.■�! ■�� ■! ■■■ •sarnv� '�, ■■ � "�C b ■ ■■bra■■'::■■■f■ ■� ■� !■ I■!■'S!■■■■■■ '■ ii■�ii iw■ ■T ■■■ ■ JcbINkw NORTH - a■■■i■■A■M�P- : ''V ■■■■■■■�!a■ I Brown AND Caldwell1988 r �t Now Elk iiii ■ ■■■ Elk war y ■ ■ ■ in i■i IEEE r W ■E ■S,■ ■■■F aM ■ r MORE■! M1■■■■ A ■■■ 1 ■■■■ ■■ ■MM■ a ■■■ROE■■■ ;f6 ■■O1•. ■I! ■■■ i ap r an ■. Omar �■ r.a■i ■ ■■ R — } a ■■\■■■■■ - ._ ■■C■ ■■■■ E■ _ A■■■ 1 a■ FWj .sue,va .r_ny � ■ ■ a ■ORE "MMANAMMEM.-M ■ ■ on ■■ M4.10.111010■ ■■ a■■■ ■■!7E a ■a i ■ E■■ EVEN No A■ 6110 Nor no E1■a■■■E ■ Wartis Valley 1 ■ ■a •JJ . a 1 � d 1 ® Groundwater • Brawn AND Caldwell Annual Groundwater GMP Nevada and Placer Counties,California June 2025 2.10. Water Use Groundwater use in the MVGB is primarily for municipal, domestic, and recreational uses.The TDPUD summarized their water supply and demand as part of 2020 Urban Water Management Plan.Average potable day demand served by the TDPUD in 2020 was reported to be 4.53 million gallons per day(mgd); 5,073 ac-ft/yr). NCSD meets demand primarily from its Big Springs collection system, outside of the MVGB, and uses water pumped from wells TH-1 and TH-2 in the MVGB to augment this supply. Demand on the MVGB imposed by NCSD varies by year due to climatic conditions and during the 2012 through 2016 drought, the average volumes pumped by NCSD ranged from 0.11 to 0.19 mgd or 193 to 340 ac-ft/yr. In wet year 2023,the wells produced 154 ac-ft. From 2009 to 2023, production from Wells 1 through 3 (formerly PCWA owned wells and now reported by NCSD as Martis Valley wells) have increased from an average daily demand of 0.13 to 1.13 mgd (141-412 ac-ft/yr) due to development of the Schaffer's Mill and Hopkins Village developments which began construction in 2005. Nine golf courses depend on the MVGB for irrigation supply; five are supplied by TDPUD (one uses a potable supply counted in the TDPUD production totals, as well as non-potable supply and the other three are non-potable), one is supplied by NCSD (potable), and three are supplied privately and assumed to be all non-potable. Using the partner agencies records of non-potable water pumped and supplied to the majority of the courses, the average non-potable demands range from 0.02 to 0.28 mgd (21-314 ac- ft/yr),with an average of 0.19 mgd (208 ac-ft/yr).This average demand rate of 0.19 mgd is applied to the four privately-supplied courses for an estimated production of 1,876 ac-ft/yr. Based on the available data and summarized in Table 2-4, current annual average production from the MVGB is estimated to be approximately 7,455 ac-ft/yr. TDPUD UWMP estimates that the total withdrawals at buildout conditions including other water users in the Basin, is estimated to be 13,300 ac- ft/yr but this will not likely occur until after year 2100 (TDPUD UWMP, 2021). The sustainable yield of the Basin was estimated to be about 24,000 AF (GEI, 2016).As discussed in Section 2.9 recharge to the Basin might decrease about 800 acre-feet with the Central Tendency projections and up to 2,000 ac-ft/yr with the Hotter-Drier conditions.This could reduce the sustainable yield to 20,000 to 21,200 ac-ft/yr.At build- out the Basin would still be within its estimated sustainable yield. Table 2-4. Five-year Average Groundwater Production mgd ac-ft/yr TDPUD Potable-Average(WY2019-2023) 3.79 4,950 Golf Course(non-potable)—Average(WY2019-2023) 0.02 26 NCSD Potable-Average(WY2019-2023) 0.48 628 Privately Supplied Golf Courses Total estimated non-potable production 1.43 1,876 Estimated Total Demand 5.719 7,455 GEI Consultants, Inc. 50 Page 196 of 563 GMP Nevada and Placer Counties,California June 2025 3. Plan Implementation The partner agencies are already performing many of the groundwater management activities associated with an AB 3030 GMP.Through GMP implementation,the partner agencies formalize their groundwater management goal, BMOs, and implementation actions that elaborate on both current actions and planned future actions under the GMP. As discussed in Section 1.6 and shown on Tables 1-2, 1-3, and 1-4, a number of required,voluntary, and suggested components constitute a GMP. This chapter discusses implementation actions that are grouped under each BMO.The BMOs are fully described in Section 1.5, and are listed below: 1. Manage groundwater to maintain established and planned uses. 2. Manage groundwater use within the provisions of the Truckee River Operating Agreement. 3. Collaborate and cooperate with groundwater users and stakeholders in the Martis Groundwater Basin. 4. Protect groundwater quantity and quality. 5. Pursue and use the best available science and technology to inform the decision-making process. 6. Consider the environment and participate in the stewardship of groundwater resources. 3.1. Implementation Actions that Support BMO #1 - Manage Groundwater to Maintain Established and Planned Uses The MVGB is the primary source of water to multiple users under separate jurisdictions. BMO#1 encourages the partner agencies to pursue management of groundwater that is within their jurisdiction in order to protect existing uses. Implementation actions identified as falling under BMO#1 facilitate the management of groundwater in the MVGB.These implementation actions are focused on regular communication and consideration of future programs intended to protect the groundwater resource from degradation and depletion. 3.1.1. Develop and implement a summary report every five years This action is intended to concentrate and document GMP activity, data, and management decisions into periodic reports for use by partner agencies, Stakeholders, and local planning agencies for continual groundwater management decisions and maintenance. This implementation action provides a report every five years that summarizes groundwater conditions and management activities and presents an opportunity to update and improve the GMP as needed.The 5-year summary report will also replace the annual report for the final year of the summary period.The summary report will include: • A summary of monitoring results with a discussion of historical trends. GEI Consultants, Inc. 51 Page 197 of 563 GMP Nevada and Placer Counties,California June 2025 • A summary of management actions during the period covered by the report. • A discussion of whether actions are achieving progress towards meeting BMOs. • A summary of proposed management actions for the future. • A summary of any GMP changes that occurred during the period covered by the report. • A summary of actions taken to coordinate with other water and land agencies and other government agencies. • Recommendation of updates and changes to the GMP. 3.1.2. Compile an annual summary of groundwater monitoring data This action will compile, organize and evaluate groundwater level elevation and groundwater quality monitoring data collected during the previous year.The annual summary of monitoring data will include groundwater level monitoring information from the partner agencies water level monitoring efforts, and water quality data collected by the partner agencies from production wells.The annual summary of groundwater monitoring data will be used by the agencies at the annual GMP implementation meeting described in Section 3.1.3 to evaluate the need to implement other portions of the GMP that are contingent on monitoring data.The annual summary of groundwater monitoring data for the fifth year of the summary period will be included in the 5-year summary report and will replace the annual report for that year. 3.1.3. Partner agencies to meet annually to discuss GMP implementation This action will require the partnership agencies to meet at least once annually to discuss GMP implementation. Currently,the partner agencies meet in the Truckee area annually and GMP implementation will be added as an agenda item during this annual meeting. 3.1.4. Support TROA provisions associated with well construction, repair, modification, and destruction The Settlement Act may eventually establish additional requirements for the siting and construction of wells drilled in the Truckee River Basin,which includes the MVGB. Section 6.E of TROA outlines Truckee River basin allocation procedures including well construction, repair, modification and destruction to address groundwater-surface water interactions within the Truckee River Basin including areas of Martis Valley. Section 204(c)(1)(B) of the Settlement Act provides that, "...all new wells drilled after the date of enactment of this title shall be designed to minimize any short-term reductions of surface streamflows to the maximum extent feasible."This implementation action supports the implementation of TROA's well construction guidelines. Coordinate with Placer and Nevada counties Environmental Health Department to be notified of permit applications in MVGB. GEI Consultants, Inc. 52 Page 198 of 563 GMP Nevada and Placer Counties,California June 2025 3.1.5. Evaluate and consider taking a position on relevant water resources-related policies, programs, and projects under consideration by local, State, and Federal agencies Throughout the state, surface water and groundwater resource management are becoming critical components of meeting growing water supply demands. As part of this implementation action,the partner agencies will actively evaluate and consider policies, programs and projects that may impact water resources quality and/or quantity within the Martis Valley. 3.1.6. Pursue opportunities for improved groundwater basin monitoring and reporting with local, State, and Federal agencies This implementation action prompts the partner agencies to continuously pursue opportunities and funding that may provide additional groundwater data collection and/or reporting. Groundwater monitoring is a critical component in understanding the physical condition of the groundwater basin and is further described in Section 3.3.1. 3.1.7. Evaluate the need for programs to facilitate saline intrusion control, mitigate the migration of contaminated groundwater, facilitate conjunctive use, and to mitigate overdraft This implementation action includes evaluation of a variety of potential programs to manage groundwater within the jurisdiction of the partner agencies.As part of this action,the agencies will evaluate the need for saline intrusion controls, mitigation of the migration of contaminated groundwater, conjunctive use programs, and overdraft mitigation. Currently,the groundwater supply in Martis Valley is not threatened by saline intrusion, contaminant plumes, or in a state of overdraft that would warrant immediate steps for mitigation. Saline intrusion is a primary concern along coastal areas with intruding sea water,which is high in Total Dissolved Solids (TDS)that may threaten fresh groundwater supplies. Saline conditions may also occur in interior basins due to industrial, agricultural or wastewater disposal activities. In the Martis Valley,groundwater monitoring (discussed under Section 3.4),will assist in identifying saline issues. Should future monitoring indicate that saline intrusion is a potential problem in the MVGB,the partner agencies will evaluate development of a saline intrusion control program. Groundwater contamination in the MVGB falls under the jurisdiction of the Lahontan Regional Water Quality Control Board (LRWQCB). Should monitoring indicate a large scale groundwater contamination issue, the partner agencies will share knowledge of the issue and collaborate with the LRWQCB. If monitoring indicates that contaminated groundwater is migrating,the partner agencies will further collaborate with the LRWQCB to mitigate the migration, if possible, without interrupting water supply deliveries. Conjunctive use is the management of surface water and groundwater to optimize the yield of the overall water resource. One method would be to rely primarily on surface water in wet years and groundwater in dry years. Other methods employ artificial recharge, where surface water is intentionally GEI Consultants, Inc. 53 Page 199 of 563 GMP Nevada and Placer Counties,California June 2025 stored into aquifers for later use. NCSD currently manages both its spring water and groundwater supply and TDPUD currently relies solely on groundwater but maintains water rights to several springs.The partner agencies will evaluate opportunities to increase the use of conjunctive management as they arise within the MVGB. Groundwater overdraft occurs when pumping exceeds recharge to a groundwater basin. If monitoring indicates through declining groundwater levels that groundwater overdraft is occurring,the partner agencies will consider development of programs to mitigate the groundwater overdraft. 3.1.8. Consider development of contamination cleanup, recharge, storage, conservation and water recycling projects This implementation action includes evaluation of a variety of potential programs to manage groundwater within the jurisdiction of the partner agencies.As part of this action,the partner agencies will consider development of projects that cleanup contamination, increase groundwater recharge and storage, or increase conservation and water recycling. The LRWQCB is responsible for developing and enforcing water quality objectives and plans that best protect the State's waters within its hydrologic area. Should monitoring indicate that contaminated groundwater is a threat to groundwater supplies,the partner agencies will consider collaborating with the LRWQCB. During GMP implementation, opportunities may arise for the partner agencies to engage in activities related to groundwater recharge, storage, conservation and recycling. As those opportunities arise, the agencies will consider participating in projects to improve groundwater recharge, storage, conservation and recycling efforts. 3.1.9. Pursue funding sources for implementation of plan policies, programs, reporting and projects This implementation action directs the partner agencies to pursue funds from Federal, State and other sources as they become available and are beneficial to pursue. Funding sources may include Local Groundwater Assistance (LGA) grants and Integrated Regional Water Management Planning(IRWMP) grants from DWR, grants from the California State Water Resources Control Board, various funds available through collaboration with the U.S. Bureau of the Interior,Truckee River Watershed Council, and other agencies. 3.1.10. Participate in the evaluation of relevant local projects to maintain groundwater quantity and quality Local groups and local, State or Federal agencies may develop opportunities that seek support or assistance for projects that affect groundwater quantity and/or quality in the Martis Valley.This action directs the partner agencies to participate in relevant local projects as appropriate and reasonable. GEI Consultants, Inc. 54 Page 200 of 563 GMP Nevada and Placer Counties,California June 2025 3.1.11. Summary of BMO #1 Actions Table 3-1 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#1 including the anticipated schedule of implementation. Table 3-1. Summary BM0#1 Supporting Implementation Actions Description of Action Implementation Schedule Develop and implement a summary report every ten years that includes: A summary of monitoring results,with a discussion of historical trends A summary of management actions during the period covered by the report A discussion of whether actions are achieving progress towards meeting BMOs 1-1 A summary of proposed management actions for the future Once every ten A summary of any GMP changes that occurred during the period covered by the years report A summary of actions taken to coordinate with other water and land agencies and other government agencies Review of the GMP and consider updates to the GMP 1-2 Compile an annual summary of groundwater monitoring data Annually 1-3 Partner agencies to meet annually to discuss GMP implementation Annually 1-4 Support TROA provisions associated with well construction, repair, modification,and As Needed destruction Evaluate and consider taking a position on relevant water resource-related policies, 1 5 As Needed programs,and projects under consideration by local,State and Federal agencies 1-6 Pursue opportunities for improved groundwater basin monitoring and reporting with As Needed local,State,and Federal agencies Evaluate the need for programs to facilitate saline intrusion control, mitigate the 1-7 migration of contaminated groundwater,facilitate conjunctive use, and to mitigate As Needed overdraft 1 8 Consider development of contamination cleanup, recharge,storage,conservation As Needed and water recycling projects 1 9 Pursue funding sources for implementation of plan policies, programs, reporting and Ongoing projects g g 1-10 Participate in the evaluation of relevant local projects to maintain groundwater As Needed quantity and quality 3.2. Implementation Actions that Support BMO #2 - Manage Groundwater within the Provisions of TROA The Settlement Act, Public Law 101-618 (1990), established entitlements to the waters of Lake Tahoe, the Truckee River and its tributaries, and how the storage reservoirs of the Truckee River are operated. Section 205 of the Settlement Act directs the Secretary of the Department of the Interior to negotiate an operating agreement for the operation of Truckee River reservoirs, between DWR, Nevada,Truckee Meadows Water Authority(formerly Sierra Pacific Power Company and Nevada Energy), Pyramid Tribe, and the United States Bureau of Reclamation.The operating agreement is known as TROA. GEI Consultants, Inc. 55 Page 201 of 563 GMP Nevada and Placer Counties,California June 2025 Section 204(c)(1) of the Settlement Act outlines the allocation of 32,000 acre-feet of water(both surface and groundwater)to the State of California from within the Truckee River Basin.The Settlement Act may eventually establish additional requirements for the siting and construction of wells drilled in the Truckee River Basin,which includes the MVGB. Section 6.E of TROA outlines Truckee River Basin allocation procedures including surface water diversions and water accounting procedures.Article 10 of TROA identifies well construction, repair, modification and destruction to address groundwater-surface water interactions within the Truckee River Basin including areas of Martis Valley. Section 204(c)(1)(B) of the Settlement Act provides that, "...all new wells drilled after the date of enactment of this title shall be designed to minimize any short-term reductions of surface streamflows to the maximum extent feasible."Article 10 of TROA requires that new water supply wells be designed to minimize impacts to surface water and outlines siting and design processes. Wells drilled or under construction before May 1, 1996 are presumed to comply with the Settlement Act. This BMO documents the partner agencies' commitment to continue to comply with provisions of TROA. There are provisions in TROA that apply to groundwater and water wells within the Truckee River Basin (which includes the Martis Valley)to address potential adverse impacts to surface water. 3.2.1. Continue coordination and collaboration with TROA agencies on groundwater management issues and source well development This implementation action directs the partner agencies to coordinate and collaborate with TROA agencies as necessary to be compliant with the Settlement Act.To meet this implementation action,the agencies will continue regular contact with TROA agencies as appropriate. 3.2.2. Summary of BMO #2 Actions Table 3-2 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#2 including the anticipated schedule of implementation. Table 3-2. Summary BM0#2 Supporting Implementation Actions Description of Action Implementation Schedule Continue coordination and collaboration with TROA agencies on groundwater 2 1 management issues and source well development Ongoing 3.3. Implementation Actions that Support BMO #3 - Collaborate and Cooperate with Groundwater Users and Stakeholders in the Martis Valley Groundwater Basin With one common groundwater supply it makes sense to share information and resources toward similar goals.This objective encourages the partner agencies to reach out to other agencies and groundwater users within the MVGB. GEI Consultants, Inc. 56 Page 202 of 563 GMP Nevada and Placer Counties,California June 2025 3.3.1. Formalize and institute a Stakeholder Working Group to meet at least annually or as needed on GMP implementation activities and updates The SWG has been a key component of the GMP development process and will be continued into the implementation phase.This implementation action directs the partner agencies to continue using working groups during implementation of the GMP.The SWG will continue to work cooperatively with the partner agencies and will meet at least once a year to discuss GMP implementation. 3.3.2. Collaborate with the LRWQCB to limit the migration of contaminated groundwater and in development of large scale contamination clean up programs This implementation action directs the partner agencies to communicate, collaborate, and coordinate with the LRWQCB on groundwater contamination issues.There are no currently identified large scale groundwater contamination issues in the Martis Valley at this time. Communication with the LRWQCB allows for collaboration in the event of the identification of groundwater contamination and collaboration with the LRWQCB on the prevention of contaminant migration. 3.3.3. Work cooperatively with local stakeholders and local, State and Federal agencies on groundwater management activities, projects, and studies Strong relationships with Federal, State, and local agencies and stakeholders are critical in developing and implementing many of the GMP's implementation actions.The partner agencies are already working cooperatively with local stakeholders and agencies on groundwater management, as evidenced by the use of the SWG during GMP development.This implementation action directs the partner agencies to communicate and work cooperatively with local groundwater interests, and includes outreach activities aimed to educate agencies and stakeholders on groundwater management opportunities and activities in the MVGB. 3.3.4. Identify opportunities for public involvement during GMP implementation Informing the public of GMP implementation activities increases local understanding and support of GMP activities.This implementation action encourages the partner agencies to inform and invite the public to participate in GMP implementation activities. Public information and involvement may take place in the form of a specific webpage designed to communicate GMP implementation actions, public meetings, and at agency board meetings, as well as other activities. 3.3.5. Summary of BMO #3 Actions Table 3-3 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#3 including the anticipated schedule of implementation. GEI Consultants, Inc. 57 Page 203 of 563 GMP Nevada and Placer Counties,California June 2025 Table 3-3. Summary BM0#3 Supporting Implementation Actions Description of Action Implementation Schedule 3-1 Formalize and institute a Stakeholder Working Group to meet at least annually Annually or as needed on GMP implementation activities and updates. Collaborate with the LRWQCB to limit the migration of contaminated 3-2 groundwater and in development of large scale contamination clean up As Needed programs Work cooperatively with local stakeholders and local,State and Federal 3-3 agencies on groundwater management activities, projects and studies Ongoing 3-4 Identify opportunities for public involvement during plan implementation I Ongoing 3.4. Implementation Actions that Support BMO #4 - Protect Groundwater Quantity and Quality Groundwater performs an integral function in a watershed, one of which is satisfying water supply needs. Improving the understanding of the regional supplies is a critical step in protecting and sustaining the Martis Valley groundwater supply. The collection, evaluation and analysis of groundwater monitoring data including water quality and water levels on a regular basis is the cornerstone in understanding the MVGB's groundwater resources and provides critical information for management decisions. Groundwater level monitoring can identify areas of overdraft, enabling appropriate management decisions and responses. Groundwater quality monitoring can help identify areas of degrading water quality, potentially identifying specific water quality issues. Ongoing groundwater monitoring provides information needed to document current conditions, assess long-term trends, and to support development and implementation of GMP components. Groundwater data is collected by both DWR and the partner agencies on a regular basis; and by the USGS on a less regular basis.Accumulating, processing, evaluating, summarizing and reporting the available data for discussion and distribution will be required to make informed decisions regarding continued groundwater supply and demand. Additionally, surface water data is collected by local, State, and Federal agencies and is evaluated by the appropriate agency for their own purpose.These data are critical and can be used in conjunction with the accumulated groundwater data to help improve the understanding of surface water-groundwater relationships. 3.4.1. Establish and maintain a California Statewide Groundwater Elevation Monitoring compliant monitoring program This implementation action directs the partner agencies to continue their California Statewide Groundwater Elevation Monitoring (CASGEM) compliant monitoring program (included as Appendix C). Figure 3-1 shows the locations of CASGEM monitoring wells in the MVGB. CASGEM monitoring results will be used in the annual groundwater monitoring summary prepared under implementation action 1-2. GEI Consultants, Inc. 58 Page 204 of 563 GMP Nevada and Placer Counties,California June 2025 Figure 3-1.CASGEM and DWR Groundwater Monitoring Wells County and DWR Monitored Wells w� T` CASGITM Well Creeks and Rivers Yi'A J=Martls Valley Groundwater Basle' +P _ I jtr:4y1�'tlir OFr - orrf 18N16E22H001M 18N17E tA01M� �. Prosser Village TH �.17N17,Et1_6l]OQi 17N16E11FO41M Fibreboard ti ti f rrreh•r•lri i' r z 17N17E07P041M 17M16F17F002M 17N17E18C001M Zvi mprtrrl,- `- :+ 1706E131(003M } Maros Valley TH + 171416E13KO01M�A idn N 1 96 R �. 77N17EZg9U01M .Y CS 1 E r �9 F}orZhstar N' t � t f � qi o •r I r N r r' N... - O 2.5 5 10 I.,JR. ')i+hrF• T 1 Wiles ! Source,serlal,baseadam etr. z Merlls Valley Martis Valley Groundwater Basin Groutidwaier Man"gemeni Plan 5-Year Updato CASGEM and DWR Groundwater Monitoring Walls Nevada and Placer Courllles.California [���'--- Truckee-Donner Public Utility District V E I NOVEMBER 2024 FIGURE 3-1 GEI Consultants, Inc. 59 Page 205 of 563 GMP Nevada and Placer Counties,California June 2025 3.4.2. Continue and Encourage Water Conservation Activities and Public Education The partner agencies currently implement significant water conservation and public outreach programs per State requirements. All three agencies hold public board meetings and maintain informative websites for public outreach purposes at the following web addresses: • www.tdpud.org • www.pcwa.net • www.northstaresd.org This implementation action encourages the partner agencies to continue to implement conservation activities and continue public outreach activities as opportunities become available. 3.4.3. Work with local stakeholders and DWR to identify areas that may need additional groundwater level and groundwater quality monitoring based on identified data gaps or negative performance trends Currently, groundwater is monitored by the partner agencies under CASGEM, and by DWR,who monitors a number of wells in the MVGB. DWR monitoring wells are shown in Figure 3-1.This implementation action requires the partner agencies to work with local stakeholders and DWR to identify areas in need of additional monitoring.The SWG includes representatives from DWR and California Department of Fish and Wildlife.Through the SWG,the partner agencies will be working with local stakeholders and DWR and will discuss identification of additional monitoring areas at the SWG annual meetings. 3.4.4. Coordinate with other agencies, including DWR and the USGS to identify opportunities for land subsidence monitoring Inelastic land subsidence is caused by dewatering of aquifers and the compressing of clays.As water is removed from the aquifer, it is transported through interconnected pore spaces between grains of sand and gravel. If an aquifer has intervals of clay or silt within it,the lowered water pressure in the sand and gravel results in the slow drainage of water from the clay and silt beds.The decreased water pressure reduces the support for the clay and silt beds. Because these beds are compressible,they compact (become thinner) and the effects are seen as a lowering of the land surface.The lowering of the land surface elevation from this process is often permanent(inelastic). Recharge of the aquifer will not result in an appreciable recovery of the land-surface elevation. The partner agencies have not developed a network of extensometers to measure inelastic land subsidence. Groundwater level monitoring indicates that groundwater levels have not been significantly lowered, a condition required for land subsidence due to groundwater extraction to occur. Additionally, the geology(Section 2.4) in the MVGB does not consist of large layers of clay to be compressed and is unlikely to experience inelastic land subsidence even if groundwater levels begin to decline. Based on a GEI Consultants, Inc. 60 Page 206 of 563 GMP Nevada and Placer Counties,California June 2025 review of groundwater elevation trends over time, it can reasonably be assumed that significant land subsidence has not occurred on a regional scale due to groundwater extraction within the MVGB. Under this implementation action,the partner agencies will coordinate with DWR and the USGS to identify opportunities for collaboration to detect land subsidence. Because inelastic land subsidence is tied to groundwater levels,the primary means for early detection include: • Monitor and analyze groundwater levels,watching for significant declines • Inspect wells for anecdotal evidence of subsidence during groundwater level monitoring Monitoring groundwater levels with concurrent inspections for anecdotal evidence of subsidence is the least expensive, and least reliable, method to monitor for land subsidence. Declines in groundwater levels can be a precursor to land subsidence. Staff performing water level monitoring can inspect the monitoring well for indicators of subsidence. Anecdotal subsidence indicators include cracks in the well pad, elevation of the well casing in comparison to the ground surface, and cracks in the ground surface. 3.4.5. Evaluate the need for, and advocate for, as necessary, a wellhead protection,groundwater recharge area protection, and other programs as necessary in MVGB Wellhead protection is a component of the Drinking Water Source Assessment and Protection (DWSAP) program administered by the DDW.The purpose of the DWSAP program is to protect groundwater sources of public drinking water supplies from contamination,thereby eliminating the need for costly treatment to meet drinking water standards.There are three major components to the DWSAP program, including: Delineation of capture zones around source wells, inventory of potential contaminating activities within protection areas, and analysis of vulnerabilities. The partner agencies are in compliance with the DWSAP program, will work to comply with the DWSAP program into the future, and will consider supporting programs that will protect groundwater quality in the MVGB. 3.4.6. Map and share groundwater recharge zones This GMP identifies preliminary areas of groundwater recharge in the MVGB in Section 2.9. This implementation action encourages the partner agencies to share the recharge zone maps in this GMP with local land use agencies to consider in land use decisions. 3.4.7. Provide relevant information to land use agencies regarding groundwater availability Through GMP implementation activities, such as CASGEM monitoring, groundwater monitoring summary reports and annual meetings of the SWG,the partner agencies will develop water resources information about the MVGB.As development increases in the MVGB, local land use agencies will be faced with decisions regarding zoning and permitting. In Placer County,the Community Development Resource Agency leads development of the County's general plan and land development activities.The GEI Consultants, Inc. 61 Page 207 of 563 GMP Nevada and Placer Counties,California June 2025 Nevada County Community Development Agency is responsible for the Nevada County General Plan and zoning, and the Town of Truckee has developed its own general plan and zoning.This implementation action directs the partner agencies to communicate relevant groundwater information to the appropriate planning agencies to assist them in making informed land use decisions. 3.4.8. Summary of BMO #4 Actions Table 3-4 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#3 including the anticipated schedule of implementation. Table 3-4. Summary BMO#4 Supporting Implementation Actions Description of Action Implementation Schedule 4-1 Establish and maintain a CASGEM compliant monitoring program Ongoing 4-2 Continue and encourage water conservation activities and public education Ongoing Work with local stakeholders and DWR to identify areas that may need additional 4-3 groundwater level and groundwater quality monitoring based on identified data Annually gaps or negative performance trends Coordinate with other agencies, including DWR, USGS and the Federal Aviation 4-4 As Needed Administration to identify opportunities for land subsidence monitoring Evaluate the need for, and advocate for,as necessary,a wellhead protection, 4-5 groundwater recharge area protection,and other programs as necessary in As Needed MVGB 4-6 Map and share groundwater recharge zones Ongoing 4-6 Provide relevant information to land use agencies regarding groundwater As Needed availability 3.5. BMO #5 - Pursue and use the best available science and technology to inform the decision making process. Science and technology continue to develop new tools that may improve our understanding of the MVGB.This objective encourages the partner agencies to take actions that work with the best available science to help make informed agency decisions. The partner agencies have worked to develop the best groundwater science available by collaborating with the Bureau of Reclamation (Reclamation) and DRI to develop an integrated watershed-groundwater model in conjunction with the Martis Valley GMP.The geologic investigation conducted and documented in Section 2 of this report has been used to shape a bi-modal geologic framework which was used to develop the conceptual model for the hydrogeology of the subsurface components of the integrated watershed model.The integrated model was developed in parallel with the GMP and has been incorporated into this GMP update. The integrated watershed model is comprised of a PRMS and MODFLOW coupled together using an UZF package.The PRMS is used to model surface water within the watershed, the MODFLOW is used to model groundwater within the MVGB, and UZF is a kinematic wave vadose zone model used to model the interaction between surface water and groundwater. Each model will be calibrated separately, and GEI Consultants, Inc. 62 Page 208 of 563 GMP Nevada and Placer Counties,California June 2025 then calibrated together over a ten-year period using a coupled GSFLOW. Calibrations will be conducted using multiple GCM projections of precipitation and temperature to investigate the influence of future climate on water resources. Calibration targets for GSFLOW will include head values measured from wells, meadow and spring locations, streamflows, measured snow depth, and remotely sensed snow cover. The integrated model's model domain covers the entire MVGB, and the watersheds that contribute surface water to the region up to Lake Tahoe.The model grid's cells are 300 by 300 meters in size. The partner agencies have obtained a copy of the groundwater model component for future use. 3.5.1. Work with State and Federal agencies to attempt to secure funding for expansion of the partner agencies'monitoring grid Increasing the number of monitoring points and frequency of monitoring provides for better long-term understanding of groundwater trends in the MVGB. Monitoring locations can be added by drilling new, dedicated monitoring wells, and by reaching agreements with well owners that have wells suitable for monitoring activities. Suitable wells will have a driller's log that describes well construction and sediments encountered, a short screened interval, a sanitary seal to prevent surface water from entering the well, and cannot be municipal supply wells. This implementation action directs the partner agencies to collaborate with State agencies such as DWR, SWRCB, DDW, and others, as well as Federal agencies such as Reclamation,to acquire funding for improvements to the groundwater monitoring grid in the MVGB. 3.5.2. Maintain relationship with DWR forgroundwater monitoring and database management activities The partner agencies are a designated monitoring entity under DWR's CASGEM program. DWR staff have been an integral part of the SWG during GMP development and their contribution in the SWG is anticipated during GMP implementation. This implementation action directs the partner agencies to continue to maintain a collaborative relationship with DWR for monitoring and database management activities in the MVGB.A continued relationship with DWR benefits the GMP by continuing the monitoring of long-term monitoring wells (especially those with long periods of records) and ensures that DWR groundwater expertise is involved during plan implementation activities through the SWG. 3.5.3. Identify opportunities for collecting water quality monitoring data The purpose of water quality monitoring as a GMP implementation action is to assess regional trends in water quality that may be caused by changes in groundwater-related activities. For example, groundwater pumping may induce groundwater flow from deeper aquifers or hard rock areas that are less desirable, such as water with a high mineral content or arsenic. Groundwater quality monitoring from a basin-wide perspective is focused on information that is indicative of overall groundwater basin GEI Consultants, Inc. 63 Page 209 of 563 GMP Nevada and Placer Counties,California June 2025 conditions and not focused on individual anthropogenic contaminants. Localized anthropogenic groundwater quality contaminants fall under the jurisdiction of the LRWCQB. Groundwater quality is currently monitored as part of the agencies' agreements with DDW. Each agency releases an annual water quality report for their service areas in the MVGB and maintains databases of water quality information. Partner agency annual water quality reports are included in Appendix D. Additional opportunities exist to collect groundwater quality information by collaborating with other State and Federal programs, such as the USGS funded California Groundwater Ambient Monitoring and Assessment Special Studies Program (GAMA).The 2007 GAMA study collected water quality data in the MVGB from 52 groundwater wells.The GAMA fact sheet for the MVGB is included in Appendix D. Another example of how the partner agencies optimize collaboration opportunities occurred in February, 2012.The partner agencies teamed with Lawrence Livermore National Laboratory (LLNL)to conduct a water aging study to help improve the understanding of how the MVGB functions.The LLNL study is funded by the GAMA Special Studies Program. Results of the LLNL study will supplement and validate the DRI integrated Martis Valley surface-groundwater model. This implementation action encourages the partner agencies to continue to identify opportunities, both within the agencies' operations and by collaborating with State and Federal agencies to improve groundwater quality data collection in the MVGB. Data collected for GMP implementation will be focused on identifying long-term water quality trends as they are related to groundwater use. 3.5.4. Use and consider updating the hydrologic model to improve understanding of groundwater in the MVGB The implementation action directs the partner agencies to use the groundwater model component of the integrated watershed model to improve local hydrogeologic understanding within the MVGB.This may be achieved by revising the future regional groundwater model to include the following: • Development of a focused MVGB hydrogeologic conceptual model; • Refinement of the numerical groundwater model grid size and model extent; • Revisions to numerical groundwater model layering and parameterization to reflect updates in the conceptual model; and, • Establishment of appropriate stress periods and time scales for transient model simulations. Incorporation of these revisions to the DRI-developed groundwater model will improve the tool so that it can be used to characterize groundwater flow patterns originating from key recharge zones; to quantify potential impacts on groundwater resources resulting from localized extractions; and to evaluate current and future impacts on base flows within the Truckee River as a result of groundwater pumping within the MVGB. GEI Consultants, Inc. 64 Page 210 of 563 GMP Nevada and Placer Counties,California June 2025 3.5.5. Seek new tools, technology, and information that may improve the understanding of the water resources in the MVGB and watershed The partner agencies strive to have the best possible understanding of water resources in the MVGB and prepare reports on water resources such as urban water management plans, water shortage contingency plans, water supply analyses, and water master plans in accordance to State requirements. This implementation action directs the partner agencies to actively seek out tools,technology, and compiled information in order to improve the understanding of water resources in the MVGB.The agencies will share and compare their water resources planning documents to identify similarities and differences.Additionally the agencies will continue to be proactive in looking for methods, approaches, and analysis that improves understanding of water in the MVGB. 3.5.6. Summary of BMO #5 Actions Table 3-5 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#5 including the anticipated schedule of implementation. Table 3-5. Summary BM0#5 Supporting Implementation Actions Description of Action Implementation Schedule Work with State and Federal agencies to attempt to secure funding for expansion 5-1 of the Partner Agencies monitoring grid Ongoing 5 2 Maintain relationship with DWR for groundwater monitoring and database Ongoing management activities g g 5-3 Identify opportunities for collecting water quality monitoring data As Available Use and consider updating the hydrologic model to improve understanding of 5-4 groundwater in the MVGB Ongoing 5-5 Seek new tools,technology,and information that may improve the understanding Ongoing of the water resources in the MVGB and watershed g g Use the best available data to inform and link agency interdependent planning 5-6 documents(i.e. urban water management plans, water shortage contingency Ongoing plans,water supply analyses, and water master plans) 3.6. Implementation Actions that Support BMO #6 - Consider the environment and participate in the stewardship of groundwater resources The partner agencies are dedicated stewards of the Martis Valley groundwater resources.The partner agencies' mission statements reflect the importance of managing their respective agencies in an environmentally sound manner, such as minimizing negative impacts of operations on the environment. This BMO directs the partner agencies to continue their leadership in the stewardship of the groundwater, watershed and natural infrastructure. GEI Consultants, Inc. 65 Page 211 of 563 GMP Nevada and Placer Counties,California June 2025 3.6.1. Consider local, State, or Federal riparian, surface water, or surface water-groundwater interaction investigations, studies or programs in the MVGB This implementation action directs the partner agencies to consider existing and future studies and investigations of riparian habitat, surface water, and surface-groundwater interaction investigations. Wetlands and riparian areas play an important role in protecting water quality and reducing adverse water quality impacts (EPA, 2005).This implementation action,while not solely focused on pollution prevention, may address issues with such through traditional point sources and non-point sources. Many pollutants are delivered to surface waters and to groundwater from diffuse sources, such as urban runoff, agricultural runoff, and atmospheric deposition of contaminants. Pollution of surface water can impact groundwater quality and conversely pollution of groundwater can impact surface water.The agencies will evaluate the need to consider studies,guidance documents, and programs that investigate the linkages between ground and surface waters. 3.6.2. Continue support and collaboration with local groups that identify, coordinate, or implement projects that support the overall sustainability of the MVGB This implementation action directs the partner agencies to support and collaborate with local groups that improve sustainability in the MVGB. The partner agencies will continue support and collaboration with groups and agency members of the SWG, and through public involvement and outreach, identify additional groups to include in GMP implementation. 3.6.3. Summary of BMO #6 Actions Table 3-6 presents a summary of implementation actions to be undertaken by the partner agencies that support BMO#3 including the anticipated schedule of implementation. Table 3-6. Summary BM0#6 Supporting Implementation Actions Description of Action Implementation Schedule Consider local,State,or Federal riparian,surface water,or surface 6-1 As Needed water/groundwater interaction investigations,studies or programs in the MVGB. Continue support and collaboration with local groups that identify,coordinate,or 6 2 implement projects that support the overall sustainability of the MVGB. Ongoing GEI Consultants, Inc. 66 Page 212 of 563 GMP Nevada and Placer Counties,California June 2025 4. References Berris, S.N., Hess, G.W., and Bohman, L.R., 2001, River and Reservoir Operations Model,Truckee River Basin, California and Nevada, 1998, U.S. Geological Survey Water-Resources Investigations Report 01-4017, 137 p. + plate. Birkeland, P.W., 1961, Pleistocene history of the Truckee area, north of Lake Tahoe, California: Stanford University, Ph.D. dissertation, 126 p. + plates Birkeland, P.W., 1963, Pleistocene volcanism and deformation of the Truckee Area, north of Lake Tahoe, California, Geological Society of America Bulletin, v. 64, p. 1453-1464. Birkeland, P.W., 1964, Pleistocene glaciation of the northern Sierra Nevada, north of Lake Tahoe, California,The Journal of Geology,v. 72 n. 6, p. 810-825. Brown,V.E., 2010, Geotechnical Investigations at Martis Creek Dam,Truckee, California, Proceedings of the 30th annual USSD Conference: Collaborative Management of Integrated Watersheds, Sacramento, California, April 12-16, 2010. Bugenig, D., 2007,Analysis of pumping test data for the August 27 through 31, 2007 test of Timilick Well #3: ECO:LOGIC Engineering technical memo prepared for Leslie Gault, PE, Placer County Water Agency, 19 p. + location map.Bugenig, D., and Hanneman, M., 2006, Review of Eaglewood Well #3 construction and testing report: ECOLOGIC Engineering technical memo prepared for PCWA Lahontan, 9 p. California Department of Water Resources(DWR), 2003, California's Groundwater: Bulletin 118— Update 2003, 213 p. +figures, tables, and appendices. CDM-Smith, 2024, Annual Monitoring Report for: Implementation of the Truckee River Water Quality Monitoring Plan, Water Year 2023: consulting report prepared for County of Placer, 172 p. + appendices. Downloaded from https://www.placer.ca.gov/ArchiveCenter/ViewFile/Item, on November 12, 2024. Coats, R., Reuter,J., Dettinger, M., Riverson,J., Sahoo, G., Schladow, G.,Wolfe, B., and Costa-Cabral, M., 2010,The effects of climate change on Lake Tahoe in the 21st Century: Meteorology, hydrology, loading and lake response. Dettinger, M. (2018). Sierra Nevada Regional Report. California's Fourth Climate Change Assessment. Publication number: SUMCCC4A-2018-004. Report prepared for Pacific Southwest Research Station,Tahoe Environmental Science Center, Incline Village, NV., 200 p. GEI Consultants, Inc. 67 Page 213 of 563 GMP Nevada and Placer Counties,California June 2025 CH2MHill, 1974, Hydrogeological investigation of land disposal of reclaimed wastewater near Truckee, California: report prepared for Tahoe-Truckee Sanitation Agency.Placer County, 2021, Adopted May 11. Placer County Housing Element 2021-2029. https://www.placer.ca.gov/DocumentCenter/View/54538/Placer-County-Housing-Element-2021- 2029-Ado pte d-5-11-2021-P D F Environmental Protection Agency, 2005, National Management Measures to Protect and Restore Wetlands and Riparian Areas for the Abatement of Nonpoint Source Pollution, EPA 841-B-05-003, July, 2005.Available at www.epa.gov/owow/nps/wetmeasures/ Fram, M.S., Munday, C., Belitz, K., 2007, Groundwater quality data for the Tahoe-Martis Study Unit, 2007: Results from the California GAMA Program, US Geological Survey Data Series 432, 88 p. Available at http://pubs.usgs.gov/ds/432/ Fritts, H.C., and Gordon, G.A., 1980,Annual precipitation for California since 1600 reconstructed from western North American tree rings: Laboratory of Tree-Ring Research, University of Arizona, Tucson, under California Department of Water Resources Agreement No. B53367,July 1980,45 p. GEI Consultants, Inc., 2016. Martis Valley Groundwater Basin Sustainable Yield Estimate. Hastings, B., and Shaw, D., 2014, Middle Truckee River Total Maximum Daily Load (TMDL)suspended sediment monitoring reports, water year 2014, Nevada County, California: Balance Hydrologics consulting report prepared for the Truckee River Watershed Council, 39 p. +forms,figures and tables, accessed at https://www.truckeeriverwc.org/images/documents/210011/`20WY2014%20TMDL%20Monitoring %20Report%2012-12-2014.pdf on November 12, 2024 Hastings, B.,Jacquet,J., Hecht, B., Wacker, M., Pimentel, E., Romansic,J., Kramer, S., Lee, R., Cahill, K., Wolf, K., Gibson,A., and Lindstrom, S., 2022, Prosser Creek Watershed Assessment, Nevada County, California: Balance Hydrologics consulting report prepared for the Truckee River Watershed Council, 3 chapters+tables,figures, and appendices.Accessed at https://www.truckeeriverwc.org/wp-content/upIoads/2023/04/220029-Prosser-Watershed- Assessment-FINAL-REPORT-6-3-22-optimized-reduced.pdf, on November 12, 2024. Herzog, D.J., and Whitford,W.B., 2001, Summary of hydrogeological Services, Phase 2 Water Resources Investigation, Northstar-at-Tahoe,Truckee, California: Kleinfelder consulting report prepared for Auerbach Engineering Group, 11 p. +tables, plates, and appendices. Hunter, L.E., Howle,J.F., Rose, R.S., and Bawden, G.W., 2011, LiDAR-Assisted identification of an active fault near Truckee, California, Bulletin of the Seismological Society of America,v.101 n.3, p.1162-1181. Hydro-Search, Inc., 1995. Ground Water Management Plan Phase 1 Martis Valley Ground-Water Basin No. 6-67 Nevada and Placer counties, California. Prepared for Truckee Donner Public Utility District January 31, 1995. GEI Consultants, Inc. 68 Page 214 of 563 GMP Nevada and Placer Counties,California June 2025 Interflow Hydrology and Cordilleran Hydrology, 2003, Measurement of ground water discharge to streams tributary to the Truckee River in Martis Valley, Placer and Nevada Counties, California: consulting report prepared for Placer County Planning Department, 30 p. +tables,figures, and appendices. Interflow Hydrology, Inc., 2014, Prosser Dam Road Domestic Well Water Level Monitoring Memorandum. Josh Detwiler, NCSD, personal communication, May 2012 Kaufman, N., 2011,Truckee Donner Public Utility District Urban Water Management Plan, Adopted June 1, 2011, 122 p. incl.tables, figures+appendices.Lath ham,T.S., 1985, Stratigraphy, structure, and geochemistry of Plio-Pleistocene volcanic rocks of the western Basin and Range Province, near Truckee, California, unpublished doctoral dissertation, University of California, Davis, 341 p. Lindstrom, S., Rucks, P., and Wigand, P., 2000, A contextual overview of human land use and environmental conditions: in Lake Tahoe Watershed Assessment, Volume 1, Dennis Murphy and Christopher M.Knopp (eds.). U.S. Forest Service General Technical Report PSW-GTR-174. Maxey, G.B., and T.E. Eakin, 1949. Ground water in White River Valley, White Pine, Nye, and Lincoln counties, Nevada. State of Nevada, Office of the State Engineer, Water Resources Bulletin 8.Melody, A., 2009, Active faulting and Quaternary paleohydrology of the Truckee Fault Zone north of Truckee, California; MS thesis, Humbolt State University, Humbolt, CA 71 p. Nichols Consulting Engineers, 2008,Truckee River Water Quality Monitoring Plan, Final Plan: consulting report prepared for Placer County and the Town of Truckee, 267 p. +appendices. Nimbus Engineers, 2001, Ground water availability in the Martis Valley Groundwater Basin, Nevada and Placer Counties, California: consulting report prepared for Truckee Donner Public Utility District, Placer County Water Agency, and Northstar Community Services District42 p. +tables and figures. Peck, B.J., and Herzog, D.J., 2008, Response to ECOLOGIC Memos dated October 18, 2007 and January 3, 2008 review of Eaglewood No.4 construction and testing report: Kleinfelder letter report prepared for Mr. Roger Cook, 10 p. + plates. Rajagopal, S., Reeves, D.M., Huntington,J., Pohll, G., 2012, Desert Research Institute Technical Note to PCWA: Estimates of Ground Water Recharge in the Martis Valley Ground Water Basin: prepared for PCWA. Rajagopal, S.,J.L. Huntington, R. Niswonger, G Pohl, M. Gardner, C. Morton,Y. Zhang, D.M. Reeves 2015, Integrated Surface and Groundwater Modeling of Martis Valley, California,for Assessment of Potential Climate Change Impacts on Basin-Scale Water Resources, Desert Research Institute Publication No.41261. https://cawaterlibrary.net/document/integrated-surface-and-groundwater- modeling-of-martis-valley-caIifornia-for-assessment-of-potential-climate-change-impacts-on-basin- sca I e-wate r-reso u rces/ GEI Consultants, Inc. 69 Page 215 of 563 GMP Nevada and Placer Counties,California June 2025 Saucedo, G.J., 2005, Geologic Map of the Lake Tahoe Basin, California and Nevada, 2005, California Department of Conservation California Geological Survey Regional Geologic Map Series, Map No. 4, 1:100,000 scale. Saucedo, G.J., and Wagner, D.L., 1992, Geologic Map of the Chico Quadrangle, 1:250,000: California Division of Mines and Geology Regional Map Series, v. 7A Shaw, D., Hastings, B., Drake, K., Hogan, M., and Lindstrom, S., 2012, Martis Watershed Assessment: Balance Hydrologics consulting report prepared for the Truckee River Watershed Council. 66 p. + figures,tables, and appendices. Singleton M.J.,J.E. Moran,A. Visser, S.H. Uriostegui, D.C. Segal, E. DeRubeis, and B.K. Esser, 2014. California GAMA Special Study: Climate Change Impacts to Recharge in a High-Elevation Groundwater Basin. Lawrence Livermore National Laboratory, LLNL-TR-548931, 55 p. Town of Truckee, 2019 2040 General Plan. https://www.townoftruckee.gov/307/2040-General-Plan Town of Truckee, 2019.Town of Truckee 2019-2027 Housing Element. https://www.townoftruckee.gov/DocumentCenter/View/660/Chapter-S---Housing-Element-PDF Truckee Donner Public Utility District (TDPUD), 2021.Truckee Water System 2020 Urban Water Management Plan. https://www.tdpud.org/home/showpublisheddocument/9076/637606470189500000 U.S. Department of the Interior, Bureau of Reclamation, 2008.Truckee River Operating Agreement, Final Rule. 43CFR Part 419. Federal Register, Rules and Regulations, December 5, 2008. Volume 73, No 235. U.S. Army Corps of Engineers, 1985,Truckee River Basin Reservoirs,Truckee River, Nevada and California: Water Control Manual, 71 p. +Tables, Plates, and Exhibits U.S. Army Corps of Engineers, 2002,Truckee River Basin, California/Nevada, Martis Creek Spillway Adequacy Study, Hydrology Office Report, 16 p.+Tables, Figures, Charts, and Plates.U.S. Department of the Interior Bureau of Reclamation, 2011,Truckee Basin Study Plan of Study. 22 p. +appendices and attachments. U.S. Department of the Interior Bureau of Reclamation, 2015,Truckee Basin Study Report. 55 p. https://cawaterlibrary.net/document/truckee-basin-study-basin-study-report/ U.S. Environmental Protection Agency, 2005, National Management Measure to Protect and Restore Wetlands and Riparian Areas for the Abatement of Nonpoint Source Pollution, EPA-841-B-05-003. U.S. Forest Service, 2011, Monthly and annual precipitation records (1904-2010)for Truckee ranger station,Truckee, California,station#49043 GEI Consultants, Inc. 70 Page 216 of 563 G M P Nevada and Placer Counties, California June 2025 Appendix A - Resolutions of Intent to Adopt a Groundwater Management Plan Page 217 of 563 Docusign Envelope ID: D64B14EA-89C4-4885-9BA4-FCD89780A82C Public Resolution No. 2025-02 Notice of Intent to Update the Current Martis Valley Groundwater Management Plan WHEREAS, in 2013, the Board of Directors of the Truckee Donner Public Utility District (District) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP) in collaboration with Northstar Community Services District (NCSD) and Placer County Water Agency (PCWA); and WHEREAS, In 2014, the State of California implemented the Sustainable Groundwater Management Act (SGMA) which applied to Medium and High Priority basins of which the Martis Valley Groundwater Basin was categorized as Medium Priority by the California Department of Water Resources (DWR); and WHEREAS, in 2014 the District, NCSD, and PCWA agreed to stop the implementation of the GMP and take the steps necessary to comply with SGMA; and WHEREAS, in 2019, DWR conducted the five-year review of basin status, and the Martis Valley Groundwater Basin was reprioritized to Very Low and was no longer required to comply with SGMA; and WHEREAS, in 2019, the District, NCSD, and PCWA agreed that the GMP was a good framework for local watershed stewardship and basin management and voluntarily restarted implementation of the GMP; and WHEREAS, in 2024, the District, NCSD, and PCWA agreed to conduct a 5-year update of the GMP and follow the public process and notification required by DWR when updating a GMP which includes notification when intending to update a GMP and notification when intending to adopt an updated GMP; and WHEREAS, on January 15, 2025, the Board of Directors of the District took action to set a public hearing for February 5, 2025 at 6:00 p.m. or soon thereafter at the District's regularly scheduled board meeting for the intent to update the current Martis Valley Groundwater Management Plan; and WHEREAS, on January 17, 2025 and January 24, 2025, the District advertised the public hearing in the Sierra Sun. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The District intends to update the current Martis Valley Groundwater Management Plan. 2. The District shall publish the notice of intent Resolution 2025-01 twice in the Sierra Sun and shall have one meeting with the existing Martis Valley Groundwater Management Plan stakeholder working group and one meeting with the public during the update of the current Martis Valley Groundwater Management Plan. 3. Certified copies of this Resolution are to be forwarded to the California Department of Water Resources within 30 days of adoption. Page 218 of 563 Docusign Envelope ID: D64B14EA-89C4-4885-9BA4-FCD89780A82C PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within the District on February 5, 2025 by the following roll call vote: AYES: Murrell, Randall, Laliotis, Finn NOES: None ABSENT: Bender TRUCKEE DONNER PUBLIC UTILITY DISTRICT Signed by:,{� L � a �"1111.1/1. By A1F5DD2E6BFC4EC... Christa Finn, President ATTEST: Signed by: I� " rOG"Vf 4A979F9597BO4E9... Martina Rochefort, District Clerk Page 219 of 563 S ierra Su n See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: 8CD07 MARTIS VALLEY GROUNDWATER MANAGEMENT PL Legal Account Allison McEneaney 11570 Donner Pass Road State of Florida, County of Orange,ss: Justin Mattos, being first duly sworn, deposes and says:That(s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on Jan. 17,2025,and ending on Jan.24,2025, all days inclusive. PUBLICATION DATES: Jan. 17, 2025 Jan. 24, 2025 I certify, under penalty of perjury,the forgoing is true and correct. (signed) VERIFICATION State of Florida County of Orange Subscribed in my presence and sworn to before me on this: 01/27/202 Notary Public Notarized remotely online using communication technology via Proof. 8CD07 MARTIS VALLEY GROUNDWATER MANAGEMENT PL - Page 1 of 2 Page 220 of 563 VA� .. PUBLIC HEARING NOTICE OFTRUCKEE DONNER PUD BOARD OF DIRECTORS ON THE DISTRICTS INTENT TO UPDATE THE CURRENT MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN Notice is hereby given:the Board of Directors of the Truckee Donner Public Utility District will hold a public hearing on February 5, 2025, at S:OD PM or soon thereafter at the regularly scheduled Board meeting, to receive comment(s) on TDPUD's notice of intent to update the current Martis Valley Groundwater Management Plan.Additional information is available on the web site tdpud.org,or at the District office. Interested parties are invited to express their views during the meeting in written or oral form,or to submit written views prior to the time of the public hearing at the District office or by mail. Steven Poncel at,PI &Strategic Affairs TRUCKEE DONNER PUBLIC UTILITY DISTRICT 11570 Donner Pass Road Truckee,CA 96161 (530)587-3B96 Published:January 17,24,2026 8CD07 MARTIS VALLEY GROUNDWATER MANAGEMENT PL - Page 2 of 2 Page 221 of 563 guard of Directors Warren"Chip"Brown,president JohnRadanovirh N1sCeS * D Nancy Ives Marilyn Forni Northstar Community Services District Michael"Spoon"Witherspoon 900 Northstar Drive,Truckee,CA 96161 Y,530.562,0747-F:530.562.1505•www.northstaresd.org Mike G aryHanag�er Mike Geary BOARD OF DIRECTORS NORTHSTAR COMMUNITY SERVICES DISTRICT RESOLUTION NO. 25-02 NOTICE OF INTENT TO UPDATE THE CURRENT MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN WHEREAS, in 2013, the Board of Directors of the Northstar Community Services District (District) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP) in collaboration Truckee Donner Public Utility District (TDPUD) and Placer County Water Agency(PCWA); and WHEREAS, In 2014, the State of California implemented the Sustainable Groundwater Management Act (SGMA) which applied to Medium and High Priority basins of which the Martis Valley Groundwater Basin was categorized as Medium Priority by the California Department of Water Resources (DWR); and WHEREAS, in 2014 the District, TDPUD, and PCWA agreed to stop the implementation of the GMP and take the steps necessary to comply with SGMA; and WHEREAS, in 2019, DWR conducted the five-year review of basin status, and the Martis Valley Groundwater Basin was reprioritized to Very Low and was no longer required to comply with SGMA; and WHEREAS, in 2019,the District, TDPUD, and PCWA agreed that the GMP was a good framework far local watershed stewardship and basin management and voluntarily restarted implementation of the GMP; and WHEREAS, in 2024, the District, TDPUD, and PCWA agreed to conduct a 5-year update of the GMP and follow the public process and notification required by DWR when updating a GMP which includes notification when intending to update a GMP and notification when intending to adopt an updated GMP; and WHEREAS, on January 15, 2025, the Board of Directors of the District took action to set a public hearing far February 19, 2025 at 9:00 a.m. or soon thereafter at the ❑istrict's regularly scheduled board meeting for the intent to update the current Martis Valley Groundwater Management Plan; and WHEREAS, on January 24, 2025 and January 31, 2025, the District advertised the public hearing in the Sierra Sun. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Northstar Community Services District as follows: 1. The District intends to update the current Martis Valley Groundwater Management Plan. 2. The District shall publish the notice of intent Resolution 25-02 twice in the Sierra Sun and shall have one meeting with the existing Martis Valley Groundwater Management Plan stakeholder working group Page 222 of 563 and one meeting with the public during the update of the current Martis Valley Groundwater Management Plan. 3. Certified copies of this Resolution are to be forwarded to the California Department of Water Resources within 30 days of adoption. PASSED AND ADOPTED on February 19, 2025, by the following roll call vote: AYES: �,r�W� F(]�`+F1 i 1 v� PCiG�C�r�[�•1 C �.� , 11��k�(►�+f'7rX�'�—' NOES: nSrz ABSENT: tNC- N•E Warren Brown Presidem, Board of Directors ATTEST: Llif n�_ Julie Zang Secretary of t ` Boa d NORTHSTAR COMMUNITY SERVICES DISTRICT 900 NORTHSTAR DRIVE, NORTHSTAR, CA 96161 • PAGE 2 OF 2 Page 223 of 563 Sierra Sun See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: Notice of Public Hearing-GMP Legal Account Julie Zangara 900 Northstar Drive State of Florida, County of Orange, ss: Jesse Sassaman, being first duly sworn, deposes and says: That (s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on Jan.24,2025, and ending on Jan. 31,2025, all days inclusive. PUBLICATION DATES: Jan. 24, 2025 Jan. 31, 2025 I certify, under penalty of perjury,the forgoing is true and correct. le-cse SAcraimaft (Signed) VERIFICATION State of Florida County of Orange Subscribed in my presence and sworn to before me on this: 02/03/202 imm Notary Public Notarized remotely online using communication technology via Pro f. Notice of Public Hearing - GMP - Page 1 of 2 Page 224 of 563 Northstar Community Services District Notice of Public Hearing Notice is hereby given:the Board of Directors of the Northstar Community Services District (NCSD) will hold a Public Hearing on February 19,2025,at 9:00 AM or shortly thereafter at the regularly scheduled meeting of the Board of Directors,to receive comments on NCSD's Notice of Intent to Update the current Martis Valley Groundwater Management Plan. Additional information is available at northstaresd.org,or at the District office. Interested parties are invited to express their views during the meeting In Written a oral form,or to submit written views Prior to the time of the public hearing at the District office or by mail. Joshua Detwiler,Technical Program Administrator Northstar Community Services District 900 Northstar Drive Truckee,CA 96161 (530)550-6123 Published:January 24,31,2026 Notice of Public Hearing - GMP - Page 2 of 2 Page 225 of 563 RESOLUTION 25-07 OF THE BOARD OF DIRECTORS OF THE PLACER COUNTY WATER AGENCY NOTICE OF INTENT TO UPDATE THE CURRENT MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN WHEREAS, in 2013, the Board of Directors of the Placer County Water Agency (Agency) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP)in collaboration with the Truckee Donner Public Utility District (TDPUD) and the Northstar Community Services District (NCSD), hereinafter referred to as "Partners"; and WHEREAS, In 2014, the State of California enacted the Sustainable Groundwater Management Act (SGMA) which required Medium and High Priority basins to develop a Groundwater Sustainability Plan (GSP); and WHEREAS, in 2019, the California Department of Water Resources (DWR) reprioritized the Martis Valley Groundwater Basin to Very Low and no longer required to comply with SGMA; and WHEREAS, although a GSP was no longer required, the Partners agreed to reestablish the Martis Valley GMP framework for local watershed stewardship and basin management and voluntarily restarted implementation of the Martis Valley GMP; and WHEREAS, the 2019 Martis Valley GMP recommended five-year updates, and in 2024 the Partners agreed to complete a comprehensive update of the plan; and WHEREAS, the Partners intend to conduct a public process to update the Martis Valley GMP which will include one Stakeholder Working Group meeting and one public meeting to review the study with the community and key stakeholders; and WHEREAS, to fully comply with the California Water Code, the Agency must follow a formal process to publicly notice and hold a hearing to consider its intent to update a GMP; and WHEREAS, on February 6, 2025 the Board took action to set a public hearing for March 6, 2025, at 2:00 p.m. or soon thereafter at the Agency's regularly scheduled board meeting for the intent to update the current Martis Valley GMP; and WHEREAS, the public hearing scheduled for March 6, 2025, was properly noticed in advance in the Auburn Journal and the Sierra Sun consistent with Gov't Code 6066. NOW BE IT RESOLVED THAT: 1. The Board hereby finds and determines that the foregoing recitals are true and correct; and Page 1 of 2 Page 226 of 563 2. The Agency intends to update the current Martis Valley Groundwater Management Plan; and 3. The Board directs staff to publish this Resolution of Intent to Update the Martis Valley Groundwater Management Plan in the Auburn Journal and Sierra Sun in the same manner that notice for the hearing was published; and 4. The Board directs staff to submit certified copies of this Resolution to the California Department of Water Resources within 30 days of adoption. This Resolution was duly adopted at a meeting of the Board of Directors of the Placer County Water Agency held on the 6th day of March 2025, by the following vote on roll call: AYES: Primo Santini, III, Chris Wilson, Joshua Alpine, and Vice Chair Graham "Gray" Allen NOES: none ABSTAINED: none ABSENT: Chair Robert Dugan Signed and approved by me after its adoption this 6"day of March 2025. Vice ,hair of the Board Placer County Water Agency ATTEST: 6Ke4,44UA-4� CEP'NFICATION Clerk to the 46ard The foregoing instrument is a correct copy of the original on Fite at L►ie Placer County Water Agency,Auoum,California. ATTEST:� Ik Print Name:-1 0y1_ Clerk to the bo:;rd of Directbrs Date: Lfra/c/T 61 2,426- Page 2 of 2 Page 227 of 563 119881 PUBLIC NOTICE 119881 NOTICE OF PUBLIC HEARING BEFORE THE BOARD OF DIRECTORS OF THE PLACER COUNTY WATER AGENCY ON A RESOLUTION OF INTENTION TO UPDATE THE CURRENT MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN NOTICE IS HEREBY GIVEN that the Board of Directors of the Placer County Water Agency(PCWA)will hold a public hearing on Thursday,March 6,2025,at 2:00 p.m.,or as soon thereafter as it can be heard,at the PCWA Business Center, 144 Ferguson Road,Auburn,California,for the purpose of considering whether to adopt a resolution of intention to update the current Martis Valley Groundwater Management Plan for purposes of implementing the updated plan and groundwater management program. Additional information can be obtained from PCWA's The above space is reserved for Court/County Filed Date Stamp Office of the General Manager,at(530)823-4850 or the address noted above.All persons interested in this subject should attend the hearing at which oral and written PROOF OF PUBLICATION presentations may be made. After the hearing,which may (2015.5 C.C.P.) be continued by the Board as necessary,the Board will consider for adoption a resolution of intention to update the Martis Valley Groundwater Management Plan. STATE OF CALIFORNIA Dated:February 6,2025 County of Placer Lori Young I am a citizen of the United States and employed by a publication Clerk to the Board in the County aforesaid. I am over the age of eighteen years,and Placer County Water Agency not a party to the mentioned matter. I am the principal clerk of PUBLISHED IN THE AUBURN JOURNAL,FEBRUARY The Auburn Journal, a newspaper of general circulation, in the 08,15,2025 City of Auburn,which is printed and published in the County of Placer. This newspaper has been judged a newspaper of general circulation by the Superior Court of the State of California, in and for the County of Placer, on the date of May 26, 1952 (Case Number 17407). The notice, of which the attached is a printed copy(set in type not smaller than nonpareil) has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates,to-wit: FEBRUARY 08,15,2025 I certify,under penalty of perjury,that the foregoing is true and correct. Lq'W L CHRISTINE WERNER Dated in Auburn,California FEBRUARY 15,2025 PROOF OF PUBLICATION AUBURNJOURNAL 1030 High Street Auburn,CA 95603 P.O. Box 5910 Auburn,CA 95604 Page 228 of 563 Sierra Sun See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: 8CD07 Public Hearing on a Resolution of Inte Legal Account Lori Young PO Box 6570 State of Florida, County of Broward, ss: Rachel Cozart, being first duly sworn, deposes and says: That(s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on Feb. 7,2025, and ending on Feb. 14, 2025,all days inclusive. PUBLICATION DATES: Feb. 7, 2025 Feb. 14, 2025 I certify, under penalty of perjury,the forgoing is true and correct. (signed) VERIFICATION State of Florida County of Broward Subscribed in my presence and sworn to before me on this: 02/19/202 Notary Public Notarized remotely online using communication technology via Pro f. 8CD07 Public Hearing on a Resolution of Inte - Page 1 of 2 Page 229 of 563 NOTICE OF PUBLIC HEARING BEFORE THE BOARD OF DIRECTORS OF THE PLACER COUNTY WATER AGENCY ON A RESOLUTION OF INTENTION TO UPDATE THE CURRENT MARTS VALLEY GROUNDWATER MANAGEMENT PLAN NOTICE IS HEREBY GIVEN that the Board of Directors of the Placer County Water Agency(PCWA) will hold a public hearing on Thursday,March 6,2025, at 2:00 p.m.,or as soon thereafter as it can be heard, at the PCWA Business Center, 144 Ferguson Road, Auburn, California, for the purpose of considering whether to adopt a resolution of intention to update the current Martis Valley Groundwater Management Plan for purposes of implementing the updated plan and groundwater management program. Additional information can be obtained from PCWA's Office of the General Manager, at(530)8234850 or the address noted above.All persons interested in this subject should attend the hearing at which oral and written presentations may be made. After the hearing, which may be continued by the Board as necessary, the Board will consider for adoption a resolution of Intention to update the Martis Valley Groundwater Management Plan. Dated:February S,2025 Lori Young Clerk to the Board Placer County Water Agency Published.February 7,14,2025 8CD07 Public Hearing on a Resolution of Inte - Page 2 of 2 Page 230 of 563 G M P Nevada and Placer Counties, California June 2025 Appendix B - Resolutions Adopting the Groundwater Management Plan Page 231 of 563 Docusign Envelope ID: B4A974EE-2DF1-4A44-891E-4C984COBA676 Pr I Resolution No. 2025-15 Adoption of the Updated Martis Valley Groundwater Management Plan WHEREAS, in 2013, the Board of Directors of the Truckee Donner Public Utility District (District) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP) in collaboration with Northstar Community Services District (NCSD) and Placer County Water Agency (PCWA); and WHEREAS, In 2014, the State of California implemented the Sustainable Groundwater Management Act (SGMA)which applied to Medium and High Priority basins of which the Martis Valley Groundwater Basin was categorized as Medium Priority by the California Department of Water Resources (DWR); and WHEREAS, in 2014 the District, NCSD, and PCWA agreed to stop the implementation of the GMP and take the steps necessary to comply with SGMA; and WHEREAS, in 2019, DWR conducted the five-year review of basin status, and the Martis Valley Groundwater Basin was reprioritized to Very Low and was no longer required to comply with SGMA; and WHEREAS, in 2019, the District, NCSD, and PCWA agreed that the GMP was a good framework for local watershed stewardship and basin management and voluntarily restarted implementation of the GMP; and WHEREAS, in 2024, the District, NCSD, and PCWA agreed to conduct a 5-year update ofthe GMP and follow the public process and notification required by DWR when updating a GMP which includes notification when intending to update a GMP and notification when intending to adopt an updated GMP; and WHEREAS, on January 15, 2025, the Board of Directors of the District took action to set a public hearing for February 5, 2025 at 6:00 p.m. or soon thereafter at the District's regularly scheduled board meeting for the intent to update the current Martis Valley Groundwater Management Plan; and WHEREAS, on January 17, 2025 and January 24, 2025, the District advertised the public hearing in the Sierra Sun. WHEREAS, on February 5, 2025, the Board of Directors of the District held a public hearing for the intent to update the current Martis Valley Groundwater Management Plan and took action adopting Resolution 2025-02 for the intent to update the current Martis Valley Groundwater Management Plan; and WHEREAS, the District, NCSD, and PCWA have updated the GMP and associated reports; and WHEREAS, on May 21, 2025, the Board of Directors of the District took action to set a public hearing for June 18, 2025 at 6:00 p.m. or soon thereafter at the District's regularly scheduled board meeting for the intent to adopt the updated Martis Valley Groundwater Management Plan; and 1 Page 232 of 563 Docusign Envelope ID: B4A974EE-2DF1-4A44-891E-4C984COBA676 WHEREAS, on May 30, 2025 and June 6, 2025, the District advertised the public hearing in the Sierra Sun; and WHEREAS, on June 3, 2025 the District, NCSD, and PCWA held a Stakeholder Working Group and public meeting to present and receive input on the updated GMP; and WHEREAS, on June 18, 2025 the District held a public hearing for the intent to adopt the updated Martis Valley Groundwater Management Plan; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The District hereby adopts the updated Martis Valley Groundwater Management Plan in substantially the form presented at the meeting. 2. Certified copies of this Resolution are to be forwarded to the California Department of Water Resources along with the adopted updated Martis Valley Groundwater Management Plan. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within the District on June 18, 2025 by the following vote: AYES: Murrell, Randall, Bender, Laliotis, Finn NOES: none ABSENT: none ABSTAIN: none TRUCKEE DONNER PUBLIC UTILITY DISTRICT Signed by:�1 V1�6L �",{� 1111.1/1. A1F5DD2E6BFC4EC... By Christa Finn, President ATTEST: Signed by: n W k6A, Qcncd tlm'A&ea 7�9'&P.EM3 C74 F 8... Brian Wright, General Manager 2 Page 233 of 563 Sierra Sun See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: 8CD06-PH - Martis GMP Intent to Adopt Legal Account Allison McEneaney 11570 Donner Pass Road State of Florida, County of Orange, ss: Ankit Sachdeva, being first duly sworn, deposes and says: That (s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on May.30, 2025,and ending on Jun. 6,2025, all days inclusive. PUBLICATION DATES: May. 30, 2025 Jun. 6, 2025 I certify, under penalty of perjury,the forgoing is true and correct. (signed) , 'r VERIFICATION State of Florida County of Orange Subscribed in my presence and sworn to before me on this: 06/10/202 im M Notary Public Notarized remotely online using communication technology via Pro f. 8CD06 - PH - Martis GMP Intent to Adopt - Page 1 of 2 Page 234 of 563 PUBLIC HEARING NOTICE OFTRUCKEE DONNER PUD BOARD OF DIRECTORS ON THE DISTRICTS INTENTTO ADOPT AN UPDATED MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN Notice is hereby given:the Board of Directors of the Truckee Donner Public Utility District will hold a public hearing on June 18,2025,at 6:00 PM or soon thereafter at the regularly scheduled Board meeting, to receive comments) on TDPi notice of intent to adopt an updated Martis Halley Groundwater Management Plan. Additional information is available on the web site tdpud.org,or at the District office. Interested parties are invited to express their views during the meeting in written or oral form,or to submit written views prior to the time of the public hearing at the District office or by mail. Steven Poncelet,PIQ&Strategic Affairs TRUCKEE DONNER PUBLIC UTILITY DISTRICT 11570 Donner Pass Road Truckee,CA 96161 (530)587-3896 TRUCKEE sPublic Utility ONNER istrict Pubthshedr May 30.June 6.2025 8CD06 - PH - MartiS GMP Intent to Adopt - Page 2 of 2 Page 235 of 563 Board of Directors Warren'Chi p"Brawn,President John Radanovich N C SeD Nancy Ives Marilyn fami Northstar Community Services District Midiael"Spoon"Witherspoon 900 Northstar Drive,Truckee,CA 96161 General Manager P:530.562.4147•R 530.562.15115•www.north#arad.org Mike Geary BOARD OF DIRECTORS NORTHSTAR COMMUNITY SERVICES DISTRICT RESOLUTION NO. 25-05 TO UPDATE THE MARTIN VALLEY GROUNDWATER MANAGEMENT PLAN WHEREAS, in 2013, the Board of Directors of the Northstar Community Services District (District) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP) in collaboration Truckee Donner Public Utility District (TDPUD) and Placer County Water Agency (PCWA); and WHEREAS, In 2014, the State of California implemented the Sustainable Groundwater Management Act (SGMA) which applied to Medium and High Priority basins of which the Martis Valley Groundwater Basin was categorized as Medium Priority by the California Department of Water Resources (DWR); and WHEREAS, in 2014 the District, TDPUD, and PCWA agreed to stop the implementation of the GMP and take the steps necessary to comply with SG MA; and WHEREAS, in 2019, DWR conducted the five-year review of basin status, and the Martis Valley Groundwater Basin was reprioritized to Very Low and was no longer required to comply with SGMA; and WHEREAS, in 2019, the District,TDPUD, and PCWA agreed that the GMP was a good framework for local watershed stewardship and basin management and voluntarily restarted implementation of the GMP; and WHEREAS, in 2024, the District, TDPUD, and PCWA agreed to conduct a 5-year update of the GMP and follow the public process and notification required by DWR when updating a GMP which includes notification when intending to update a GMP and notification when intending to adopt an updated GMP; and WHEREAS, on January 15, 2025, the Board of Directors of the District took action to set a public hearing for February 19, 2025 at 9:00 a.m. or soon thereafter at the District's regularly scheduled board meeting for the intent to update the current Martis Valley Groundwater Management Plan; and WHEREAS, on January 24, 2025 and January 31, 2025, the District advertised the public hearing in the Sierra Sun. WHERAS, on February 19, 2025, the Board of Directors of the District held a public hearing at 9:00 a.m. and passed Resolution 25-02: Notice of Intent to Update the Current Martis Valley Groundwater Management Plan; and WHEREAS, on May 21, 2025, the Board of Directors of the District tools action to set a public hearing for June 18, 2025 at 9:00 a.m, or soon thereafter at the District's regularly scheduled board meeting to consider adoption of the update to the current Martis Valley Groundwater Management Plan; and WHEREAS, on May 30, 2025 and June 6, 2025, the ❑istrict advertised the public hearing in the Sierra Sun. Page 236 of 563 WHEREAS, on June 3, 2025 at 3:00 p.m., a Martis Valley Groundwater Basin Stakeholder Working Group meeting was held to present the proposed updated Groundwater Management Plan. WHEREAS, on June 3, 2025 at 6:00 p.m., a public meeting was held to present the proposed updated Groundwater Management Plan. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Northstar Community Services District as follows: 1. The District hereby adopts the updated Martis Valley Groundwater Management Plan. 2. Certified copy of this Resolution is to be forwarded to the California Department of Water Resources along with the adopted updated Martis Valley Groundwater Management Plan. PASSED AND ADOPTED on June 18,2025, by the following roll calf vote: AYES: � � Ir0tz0►1 NES VNDPI�►c-kA NOES: T'1ope- ABSENT: IAf l Vlfarren Brown President, Board of Directors ATTEST: Juli Zan ra Secretary, f the'UL �u NORTHSTAR COMMUNITY SERVICES DISTRICT • 900 NORTHSTAR DRIVE, NORTHSTAR, CA 96161 ' PAGE 2 of 2 Page 237 of 563 Sierra Sun See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: Notice of Public Hearing Legal Account Julie Zangara 900 Northstar Drive State of Florida, County of Orange, ss: Edmar Corachia, being first duly sworn, deposes and says:That (s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on Jun. 6,2025, and ending on Jun. 13, 2025,all days inclusive. PUBLICATION DATES: Jun. 6, 2025 Jun. 13, 2025 I certify, under penalty of perjury,the forgoing is true and correct. �dwr f orolchiq (Signed) r 'r VERIFICATION State of Florida County of Orange Subscribed in my presence and sworn to before me on this: 06/13/20 5 im M Notary Public Notarized remotely online using communication technology via Pro f. Notice of Public Hearing - Page 1 of 2 Page 238 of 563 Northstar Community Services District Notice at Public Hearing Notice is hereby given:the Board of Directors of the Northstar Community Services District (NCSD) will hold a Public Hearing on June 18,2025,at 9:00 AM or shortly thereafte r at the regularly scheduled meeting of the Board of Directors, to receive comments on NCSD's Notice of Intent to Adopt an updated Martis Valley Groundwater Management Plan. Additional information is available at northstarcad.org,or at the District office. Interested parties are invited to express their views during the meeting In written a oral form,or to submit written views Prior to the time of the public hearing at the District office or by mail. Joshua Detwiler,Technical Program Administrator Northstar Community Services District 900 Northstar Drive Truckee,CA 96161 (530)550-6123 Published:June 6,13,2026 Notice of Public Hearing - Page 2 of 2 Page 239 of 563 123180 PUBLIC NOTICE 123180 NORTHSTAR COMMUNITY SERVICES DISTRICT NOTICE OF PUBLIC HEARING Notice is hereby given The Board of Directors of Northstar Community Services District will hold a Public Hearing on June 18,2025,at 9:00 A.M.or shortly thereafter at the regularly scheduled meeting of the Board of Directors,to receive comments on the NCSD's Notice of Intent to Adopt an update to the Martis Valley Groundwater Management Plan. Additional information is available at northstaresd.org,or at the District office. Interested parties are invited to express their views during the public hearing in written or oral form,or to submit written views prior to the time of the public hearing at the District office or by mail.Written correspondence may be addressed to Josh Detwiler,Technical Program Administrator,Northstar Community Services District,900 Northstar Drive,Truckee,CA 96161. PUBLISHED IN AUBURN JOURNAL ON JUNE 04,2025 The above space is reserved for Court/County Filed Date Stamp PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA County of Placer I am a citizen of the United States and employed by a publication in the County aforesaid. I am over the age of eighteen years,and not a party to the mentioned matter. I am the principal clerk of The Auburn Journal, a newspaper of general circulation, in the City of Auburn, which is printed and published in the County of Placer. This newspaper has been judged a newspaper of general circulation by the Superior Court of the State of California, in and for the County of Placer, on the date of May 26, 1952 (Case Number 17407). The notice, of which the attached is a printed copy(set in type not smaller than nonpareil) has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates,to-wit: JUNE 04,2025 I certify,under penalty of perjury,that the foregoing is true and correct. kwd -wvwx CHRISTINE WERNER Dated in Auburn,California JUNE 04,2025 PROOF OF PUBLICATION AUBURNJOURNAL 1030 High Street Auburn, CA 95603 P.O. Box 5910 Auburn, CA 95604 Page 240 of 563 RESOLUTION 25-15 OF THE BOARD OF DIRECTORS OF THE PLACER COUNTY WATER AGENCY ADOPTION OF THE UPDATED MARTIS VALLEY GROUNDWATER MANAGEMENT PLAN WHEREAS, in 2013, the Board of Directors of the Placer County Water Agency (Agency) duly adopted the 2013 Martis Valley Groundwater Management Plan (GMP)in collaboration with the Truckee Donner Public Utility District(TDPUD) and the Northstar Community Services District (NCSD), hereinafter referred to as "Partners"; and WHEREAS, In 2014, the State of California enacted the Sustainable Groundwater Management Act (SGMA) which required Medium and High Priority basins to develop a Groundwater Sustainability Plan (GSP); and WHEREAS, in 2019, the California Department of Water Resources (DWR) reprioritized the Martis Valley Groundwater Basin to Very Low and no longer required to comply with SGMA; and WHEREAS, although a GSP was no longer required, the Partners agreed to reestablish the Martis Valley GMP framework for local watershed stewardship and basin management and voluntarily restarted implementation of the Martis Valley GMP; and WHEREAS, the 2019 Martis Valley GMP recommended five-year updates, and in 2024 the Partners agreed to complete a comprehensive update; and WHEREAS, on March 6, 2025, the Agency Board of Directors held a public hearing and adopted Resolution 2025-07 for the intent to update the current Martis Valley GMP; and WHEREAS, the Agency, TDPUD, and NCSD have updated the Martis Valley GMP and associated reports; and WHEREAS, on June 3, 2025, the Agency, TDPUD, and NCSD held a Stakeholder Working Group and public meeting to present and receive input on the updated Martis Valley GMP; and WHEREAS, on July 3, 2025, the Board of Directors took action to set a public hearing for August 7, 2025, for the intent to adopt the updated Martis Valley GMP; and WHEREAS, on August 7, 2025,the Agency held a public hearing for the intent to adoptthe updated Martis Valley GMP; and WHEREAS, the public hearing scheduled for August 7, 2025, was properly noticed in advance in the Auburn Journal and the Sierra Sun consistent with Gov't Code 6066. Page 1 of 2 Page 241 of 563 NOW BE IT RESOLVED THAT: 1. The Board hereby finds and determines that the foregoing recitals are true and correct; and 2. The Board hereby adopts the updated Martis Valley Groundwater Management Plan in substantially the form presented at the meeting; and 3. The Board directs staff to submit certified copies of this Resolution along with the adopted updated Martis Valley Groundwater Management Plan to the California Department of Water Resources. This Resolution was duly adopted at a meeting of the Board of Directors of the Placer County Water Agency held on the 71h day of August 2025, by the following vote on roll call: AYES: Graham "Gray" Allen, Primo Santini, III, Christ Wilson, Joshua Alpine, Chair Robert Dugan NOES: none ABSTAINED: none ABSENT: none Signed and approved by me after its adoption this 7kh August 2D25. Robert Dugan, Chair of the Board Placer County Water Agency ATTEST: �(m& Vibeke Figueroa Deputy Clerk to the Board Page 2 of 2 Page 242 of 563 Sierra Sun See Proof on Next Page AFFIDAVIT OF PUBLICATION Customer Account#: Reference: 8CD06-Intent to Adopt an Updated MVGMP Legal Account Lori Young PO Box 6570 State of Florida, County of Orange, ss: Edmar Corachia, being first duly sworn, deposes and says:That (s)he is a duly authorized signatory of Column Software, PBC, duly authorized agent of The Sierra Sun now is, and during all times herein named,was a corporation duly organized and existing under the laws of the State of California, and now is, and during all times herein named was the printer of The Sierra Sun, a newspaper of general circulation, as defined by section 6000 of the Government Code of the State of California, printed and published daily (Sundays excepted) in the City of Truckee, County of Nevada, State of California, and that affiant is the principal clerk of said Nevada County Publishing Co. That the printed advertisement hereto annexed was published in the said The Sierra Sun,for the full required period of 2 time(s) commencing on Jul. 11,2025,and ending on Jul. 18, 2025, all days inclusive. PUBLICATION DATES: Jul. 11, 2025 Jul. 18, 2025 1 certify, under penalty of perjury,the forgoing is true and correct. �dwr f orolchiq (Signed) ' 1 - VERIFICATION State of Florida County of Orange Subscribed in my presence and sworn to before me on this: 07/18/202 W— Notary Public Notarized remotely online using communication technology via Pro f. 8CD06 - Intent to Adopt an Updated MVGMP - Page 1 of 2 Page 243 of 563 PUBLIC HEARING NOTICE OFTHE BOARD OF DIRECTORS OF THE PLACER COUNTY WATER AGENCY ON THE AGENCY'S INTENT TO ADOPT AN UPDATED MARTS VALLEY GROUNDWATER MANAGEMENT PLAN NOTICE IS HEREBY GIVEN that the Board of Directors of the Placer County Water Agency(PCWA) will hold a public hearing on Thursday, August 7, 2025,at 2.00 p.m.,or as soon thereafter as it can be heard, at the PCWA Business Center, 144 Ferguson Road, Auburn, California, to receive cornment(s) on PCWA's notice of intent to adopt an updated Martis Valley Groundwater Management Plan. Additional information can be found at https:// docs.pcwa.neVmvgmp-update-2025 or obtained from PCWA's Office of the General Manager,at(530)823- 4660 or the address noted above.All persona interested In this subject should attend the hearing at which oral and written presentations may be made. After the hearing, which may be continued by the Board as necessary,the Board will consider a resolution to adopt the updated Martls Valley Groundwater Management Plan. Lori Young Clerk to the Board Placer County Water Agency Dated:July 8,2025 Published:July 11,18,2025 8CD06 - Intent to Adopt an Updated MVGMP - Page 2 of 2 Page 244 of 563 G M P Nevada and Placer Counties, California June 2025 Appendix C — CASGEM Monitoring Plan Page 245 of 563 Martis Valley Groundwater Monitoring Program California Statewide Groundwater Elevation Monitoring (CASGEM) P CWA TRUCKEE * ' . 1,111c er ( ounh- Truckee Donner \orthstar Community Watcr .L;;caq- Public Utilities District Services District December 2011 Revised July 42, 2042 Page 246 of 563 Table of Contents TABLE OF CONTENTS 1.0 INTRODUCTION....................................................................................................1-1 2.0 BACKGROUND.....................................................................................................2-1 3.0 MONITORING NETWORK ....................................................................................3-1 4.0 MONITORING EQUIPMENT AND PREPARATION ..............................................4-1 5.0 DEPTH-TO-GROUNDWATER PROCEDURES AND FREQUENCY OF MONITORING AND REPORTING...............................................................................5-1 6.0 RECORDING OF MONITORING DATA, DATA MANAGEMENT AND THE CASGEM REQUIREMENTS........................................................................................6-1 APPENDICES Appendix A— CASGEM Guidelines Appendix B — CASGEM Monitoring Plan Summary i Page 247 of 563 Introduction 1.0 INTRODUCTION This Martis Valley (MV) Groundwater Monitoring Program(Monitoring Program) report serves to describe the activities related to the monitoring of groundwater elevations in the MV area, as shown on Figure 1-1. The elevation data gathered as part of this program will be included as part of the California Statewide Groundwater Elevation Monitoring (CASGEM) Program recently adopted by the California Department of Water Resources (DWR) as part of their mandated monitoring requirements under Senate Bill (SB) 61 of the State Water Code. This report strongly encourages the reader to review and understand the full text of the CASGEM Well Monitoring Guidelines, attached as Appendix A. This Monitoring Program pulls together the efforts completed to date in the identification of existing and future well monitoring sites that satisfy the local and state requirements for a monitored groundwater basin. In addition, the Monitoring Program prepares the MV groundwater users to initiate a semi-annual monitoring event,which started with its first measurements in fall of 2011. Placer County Water Agency(PCWA), Truckee Donner Public Utilities District(TDPUD), and Northstar Community Services District(NCSD) are the three partners in MV area, in which their respective services areas are presented in Figure 1-1. All field forms and measurement methods are included herein for the sole purpose of providing monitoring staff with easy access to printing and using these forms as part of their monitoring activities. The MV Monitoring Program report is a living document subject to change over time as more information is collected on the wells, and as technologies change to provide the best measurement of groundwater levels and water quality, and as more wells become available. SIB 6 requires collaboration between local monitoring parties,or entities, and DWR to collect groundwater elevations statewide and that this information is made available to the public. SIB 6 provides that: • Local parties may assume responsibility for monitoring and reporting groundwater elevations. • DWR work cooperatively with local Monitoring Entities to achieve monitoring programs that demonstrate seasonal and long-term trends in groundwater elevations. • DWR accept and review prospective Monitoring Entity submittals,then determine the designated Monitoring Entity, notify the Monitoring Entity, and make that information available to the public. • DWR perform groundwater elevation monitoring in basins where no local party has agreed to perform the monitoring functions. • If local parties(for example, counties)do not volunteer to perform the groundwater monitoring functions, and DWR assumes those functions,then those parties become ineligible for water grants or loans from the State. 1-1 Page 248 of 563 Introduction PrecOlation Station pot r, - Q T-TSA Plane r� Cracks and Rivers .. Truckoo-Donner Public Wily Chunct(TDPUD) - Horthstar Community Service Dislrict(NCSD) . s ; r—+t Rriav�,rii 1 .Cily of Trucker, BOsmaary .+• t County&-,undssry • hl&-V*Valksy GroIX Rater Bassin �J SIERRA_COl1NTY Y -ii y r• 3 � 'e'er�• R � i - �1 wn -- �� , •., i,rr Iasi -------i p --- is T -- ------- ------------- •�—' ---- i ri --- fZEVAI]A _4 1tSY. -- I�LAC£R C0014 e h r itasort N _- D 2.6 5 10 , - �� s Mon J FIGURE 1-1. MAP OF GROUNDWATER BASIN TO BE MONITORED Updated in June 2025 1-2 Page 249 of 563 Introduction 1.1 ORGANIZATION OF REPORT The Monitoring Program will be described in the sections summarized below: • Section 1. Introduction—An initial summary of the report's contents and goals while highlighting the reasons for the Monitoring Program. • Section 2. Background—A brief understanding of the groundwater aquifer is provided to ensure a minimum level of understanding by field staff of the conditions taking place below the ground. • Section 3. Monitoring Network—Criteria for selection of monitoring wells is described and the current list of wells to be monitored is provided. • Section 4. Monitoring Equipment and Preparation—Each monitoring event requires an inventory of the equipment that will be taken out into the field and to have staff trained to conduct the measurement and interface with the well owners. • Section 5. Depth-to-Groundwater Procedures and Frequency of Monitoring and Reporting—The resolution of measurement data is described with a brief discussion of the pros and cons of high and low sampling frequency. • Section 6. Recording of Monitoring Data,Data Management and the CASGEM Requirements—Once data is brought back from the field (and laboratory); all data will need to be uploaded to the State. DWR will allow batch uploading and downloading using the CASGEM database and graphical user interface. 1-3 Page 250 of 563 Background 2.0 BACKGROUND This section briefly describes the MV groundwater basin. The MV basin is located beneath the Truckee River, near Truckee, CA, in which the Truckee River crosses the basin from south to east in a shallow, incised channel. Principal tributaries to the Truckee River are Donner Creek, Martis Creek, and Prosser Creek. Major surface water storage reservoirs include Donner Lake, Martis Creek Lake, and Prosser Creek Reservoir. State driller logs required as part of the well construction process provide the lithology(i.e., soil types and thickness)to characterize the water-bearing formations. Figure 1 delineates the MV groundwater basin along with overlying geography and the alignment of three basin cross sections. These cross sections are presented in Plates 1, 2, and 3. The geological formations in the MV basin include basement rocks, sedimentary deposits, and volcanic deposits. The two types of basement rock in this region are Cretaceous-Jurassic plutonic/metamorphic rocks and Miocene volcanic units. Plutonic/metamorphic rocks appear east of the basin and Miocene volcanic units which ranges from andesite to basalt appear adjacent to the basin. These basement rocks contain a very small portion of the groundwater. Sedimentary deposits which include stream/lake deposits and alluvial material provide storage for groundwater. Volcanic deposits include basaltic andesite lava, tuff breccia and volcaniclastic deposits, and also provide storage for groundwater. Municipal and private wells in the basin primarily extract from the Prosser Creek Alluvium and Truckee Formation, with some Shallow wells also extracting from Outwash Deposits. 2-1 Page 251 of 563 Background Wall locations O Unknown . o Domestic l .r �•�_ o industrial,Irr►gatoon•Agricutturo `• ,01 TDPUD Munripal Well r * r� �uwprdr •'• CASGEiA INN Rrrkn+�dr —Gross ScOonS tip Crocks aryl Wfars _ IM M-artis Valley Grounctwa&er Basin r rp A .f• - ' i r ,l� � Mgr 4 AIM I o l O r O � oQg Q Q � q W V 00 C' G C►+ •_ X 1 tl taxi• O » 0 �_ t °o .I r �' N o 2.5 5 so !l .ter"W CIF.►Saacd► ,.rrul,beswjd",q*, Cross Section Locations Updated in June 2025 2-2 Page 252 of 563 A North 7500 m� U� m c I I Nevada Placer °—I OI yl UI 7000 of of u Prosser Creek Prosser Creek Polaris Fault U I Interstate SO Truckee River V I Truckee-Tahoe California State Fault Zone Reservoir Reservoir I I Airport Route 267 I I 6500 Co I I > O I h M 1LO Z °� I a N CO w 6000 M O h N I W M O I N M I � I O �— V Qgo--- 0 F Qv _I Qpc Qpc . I r 5500 Qv QPs --?— I ? QPs I Q > -J I W —I— Qv _ �F— QV — 7 - 5000 _ I — — Tt ------ 1 I --- Tv 1 7 Tv 4500 1 I I —1 - - - - - - -�- � -117 - - - - -?- - - - - - �- � J�f I I Jf 4000 0 10,000 20,000 30,000 40,000 DISTANCE IN FEET NOTES: References: I.Approximate vertical exaggeration= 5x. 4.Fault Iocation5 are approximate,based on 5aucedo,"Geologic Map of Lake Tahoe Ba5m," Birkeland,P.W., 19G3 Pleistocene History of the Truckee area,n( 2.Elevation profile developed from 30-meter digital elevation model, 2005 and Hunter and others,201 1. Bulletin,v.G4,p. 1453-14G4. downloaded from National Elevation Data5et 5.Surficial geology inferred from 5aucedo,2005. Hunter,L.E.,Howie,J.F.,Rose,R.S.,and Bawden,G.W.,201 1, (http://5eamle55.u5g5.gov/index.php). G.51grnficant sand,gravel,and clay beds shown where noted in well Iog5. California,Bulletin of the 5ei5moiogical 5ociety of Americ 3.Well log location5 are approximate within GOO feet. 7.Fracture zones shown where noted in well Iog5. Latham,T.S., 1985,5tratigraphy,structure,and geochemistry of Province,near Truckee,California,unpubh5hed doctoral d15 Melody,A.,2009,Active faulting and Quaternary paleohydrology The5i5,Humboldt State University,Humboldt,CA 71 p. 5aucedo,G.J.,2005,Geologic rg da �'T Califorr Geological Survey Regional P" log'i'c`�ap```7��er``ie``5,,%ap No B West 7500 al al _ol 7000 ° h I h Cl) Highway 89 i Polaris Fault Truckee River h N �00 o I N 6500 f!l Tt N 00 I a Q I Z Qg° IhM� M °pa o, co o � �^ h W \ QV �'`=•[�:::,. INM� Off. OM O h N M M 6000 "' IM`�°p NN w N Qjf Z \ I Qgo Qpc Qv _ — o_ 1 " — --- - - --- Qg° Qv- ,: \? 1 p I - ---- p Q Tv Qpc Qpc - -- J5500 5000 — i ' Tt \ Tt - -?— Tv 4500 �_— — I j] _ I 1 r Jf TV 4000 0 10,000 20,000 30,000 NOTES: DISTANCE IN FEET References: 1. Approximate vertical exaggeration = 5x. 4. Fault locations are approximate, based on Saucedo, "Geologic Map of Lake Tahoe Ba5m," Birkeland, P.W., 19G3 Pleistocene History of the Truckee 2. Elevation profile developed from 30-meter digital elevation model, 2005 and Hunter and others, 201 1. Bulletin,v. G4, p. 1 453-1 4G4. downloaded from National Elevation Dataset 5. Surficial geology inferred from Saucedo, 2005. Hunter, L.E., HOWIe,J.F., Rose, R.S.,and Bawden, G.W., (http://seamle55.U5CJ5.gov/index.php). G. Significant sand, gravel,and clay beds shown where noted in well logs. California, Bulletin of the Seismological Society of 3. Well log lCCatlon5 are approximate within GOO feet. 7. Fracture zones shown where noted in well logs. Latham,T.S., 1385,Stratigraphy,structure,and geocherr Province, near Truckee gEr f F,4nlof64&&doct Melody,A., 2009,Active faulting and Quaternary paleohy� C West 7500- .0 Tahoe Moraine Truckee-Tahoe Martis Creek 7000 H i Airport Polaris Fault Q) Q) 'IN U Iui 6500- 00 0 CON Q) —1Z C-N "zr Cn Nt "It z C\4 Qgo IC0\1 6000- \0_ Tt LU Qg Qgo LU _,Qgo z PC I 0 F— Q S QV QPC < 5500- QV > QPs t LU TV LUJI Qv 5000- 4-I— - TV Tt TV - -———————— TV I ------------ ------------------- 4500- TV 4000 30,1 000 0 10,000 20,000 DISTANCE IN FEET NOTE5: References: I.Approximate vertical exaggeration = 5x. 4. fault location5 are approximate, ba5CCI on 5auceclo, "Geologic Map of Lake Tahoe-Ba5ln," Birkeland, P.W., I 9G3 Pleistocene History of the Truckee a 2. Elevation profile developed from 30-meter digital elevation model, 2005 and Hunter and others, 201 1. Bulletin,v. G4, p. 1 453-1 4G4. downloaded from National Elevation Data5& 5.5urficial geology contacts inferred from 5aucedo, 2005. Hunter, L.E., HOWIC,J.F., P05C, P.5.,and Eawden,G.W., 2 (http://5CaMIC55.U5CJ5.,3ov/inclex.Ighp). G.Significant sand,gravel,and Clay I?Cd5 shown where noted in well 10,35. California, bulletin of th�eC15M�MLCal!� 3.Well log locations are approximate within GOO feet. 7. Fracture zones shown where rioted in well lo,35. Latham,T.5., 1985,5tr t4c h co r Al! Province, near Truckee,California, unpubli5hed docto Monitoring Network 3.0 MONITORING NETWORK The following sections describe the rationale for selection of monitoring wells to be included in the monitoring network. Because surface water and groundwater may interact, the monitoring network may need to be expanded at some future date to include data available from surface water monitoring of major rivers and local streams. The partners involved in this Monitoring Program are also underway in preparing an updated Groundwater Management Plan (GMP) and groundwater model. It is anticipated that knowledge gained from that effort will help inform the partners and the State on where additional monitoring points, in the ground and at the surface, should be located. If existing wells are not available at such locations, the partners will seek opportunities to construct new ones in data gap areas. 3.1 RATIONALE OF MONITORING NETWORK In order to manage groundwater resources for long-term sustainability, key issues in the basin that need to be documented include: • Identification of sources of recharge and the protection of recharge areas • Changes in groundwater elevations that affect groundwater storage • Groundwater quality and changes over time The following sections describe the rationale for selecting the MV monitoring network well sites. MV groundwater monitoring wells will be selected to provide regional coverage that can be economically accomplished yet provide high quality, reliable data that adequately characterizes basin conditions over time. The location and spacing of the MV monitoring wells are expected to vary, dependent upon a group of selected characteristics (i.e., geographic location, accessibility, age, well construction, well log availability, etc.). The approach described herein is intended to assist in the selection of monitoring locations that are sufficiently distinct from each other and address the issues bulleted above. 3.2 GROUNDWATER WELL NETWORK DEVELOPMENT PROCESS A database of wells in Martis Valley was developed as part of the GMP and modeling effort. The State well logs provided more than 700 wells; however, these were filtered to omit wells that had limited information available, shallow depths, and other factors that rendered them not useful for hydrogeologic evaluation. The database includes 197 wells that are presented in Figure 3-1, in which wells owned and operated by the three partners are distinguished from the others. These wells include municipal and private, monitoring and production, and are generally concentrated in the lowland areas of the basin surrounding the Truckee River and other surface waters. In addition to these wells, wells currently monitored by the State Department of Water Resources (DWR) are presented. 3-1 Page 256 of 563 Monitoring Network .� TDPVQ Municipal Well + Northswr(NCSD)Wnicipal VNell ' 4$� CASGEM Wom y '' r` -wL' Greeks anU Rfrers SIERRA COONTY -� bCounly _ �� 5uwesp141 Mans,Valley Groundwawr Bas+l 10 AZ r - .Y � * _ 1$likl 001 Hirsct=d 4 - r s. . Proastr Vlaape'TH oxxar e,.,q xj 71i 17EO$a11OO1 AR r _ ��IP 1 L ` x ' 47i11 E11FGd Al Fibreboard TH # 5!►rider%- y, 17H17E47POOM []ar�nr NortTtsldo 17H17E16CODlM _ 17"16E131CO03Md# "Mary Valley TH 1�CU031Y1 .]Lk - - +ar y Airport ti Wall 1 K!I r r E 7 2 l _ r � r e H O :�.5 � to _ E�xkrlruler rBk+y 1�r8 tuCli=C4:�W'.7'.idSOi�OrR,41c, ;! FIGURE 3-1. EXISTING WELLS IN MARTIS VALLEY Updated in June 2025 3-2 Page 257 of 563 Monitoring Network Development of a full well monitoring network will be a long-term process that is based on the scientific knowledge gained from the GMP and modeling effort that is currently underway. The network is currently limited to monitoring wells owned by TDPUD. This network includes a total of three wells that are presented in Table 3-1 along with pertinent well information. It is expected that ideal monitoring locations as related to the issues bulleted above will be scientifically resolved in the next few years. If existing wells, such as those shown in Figure 3-1, meet the monitoring well requirements described below and can be made available, they will be used. If existing wells cannot be used, the partners will seek funding and property rights to construct designated monitoring wells in these locations. It is anticipated that desired new monitoring sites will be prioritized based on value, availability of existing wells, feasibility of installing new wells, and cost. This prioritization will ensure optimal value relative to these constraints in establishing new monitoring locations until the full network is established. 3.3 MONITORING WELL REQUIREMENTS The following are criteria for selecting monitoring wells in the MV groundwater basin. Wells selected for monitoring should have: • A State Well Driller Log that describes the well construction details and a description of the sediments encountered • A detailed description of the well's location • A brief description of the well's use (i.e. irrigation,residential) • A relatively short screen interval in only one aquifer • A sanitary seal to prevent surface water from entering the well • Wells cannot be municipal (public)production wells for water supply The most desirable wells to be included in the monitoring network are wells with short screen intervals completed within a specified aquifer. However, some wells with longer screen intervals may need to be initially included in the network when no others are available. Wells with long screen intervals may also be designated for monitoring because their long historic records provide valuable trending information. Data obtained from the longer screen wells usually represents an average of groundwater elevations across the unconfined and semi-confined aquifers. 3-3 Page 258 of 563 Table 3-1 Selected Information for current Monitoring Wells in MVGB Reference Ground Point Casing Total State Well Number Elevation Surface Well Use Well Latitude Longitude Completion Diameter Depth Screen WCR Year Status Intervals Number Drilled (Top of Elevation Type (in.) (ft) Casing) (ft msl) Prosser Village TH 5843 5839 Monitoring Active 39.354541 -120.143770 Single 8 1197 360-620, 733242 2000 760-1160 Fibreboard TH 5904 5900 Monitoring Active 39.344834 -120.156033 Single 6 1220 120-160, E008043 2003 200-240 Martis Valley TH 5796 5792 Monitoring Active 39.325769 -120.143471 Single 8 1040 315-633, 733241 2000 707-978 17N17E19K001M 5866.84 5864.04 Observation Inactive 39.3072 -120.1315 Single 2 201 187-197 12318 1990 18N17E33L001M 5922.5 5920 Observation Active 39.3653 -120.0990 Single 2 200 180-190 365669 1990 17N16E11 F001 M 5957.74 5958.322 Observation Active 39.3401 -120.1724 Single 2 227 210-220 9866 1990 17N16E13K001M 5901.303 5901.003 Observation Active 39.3212 -120.1502 Multi 2 500 475-485 10488 1990 17N16E13K003M 5901.483 5901.003 Observation Active 39.3212 -120.1502 Multi 2 274 264-274 11933 1990 17N17E05D001M 5682.510 5678.854 Observation Active 39.3575 -120.1200 Single 2 109 99-109 9807 1990 17N17E29B001M 5889.113 5886.219 Observation Active 39.3006 -120.1122 Single 2 100 90-100 35737 1990 18N16E22H001M 5871.86 5869.243 Observation Active 39.3983 -120.1835 Single 2 200 170-180 9864 1990 18N17E33L001M 5946.524 5946.629 Observation Active 39.3653 -120.0990 Single 2 195 180-190 9865 1990 17N16E17F002M 5934.337 5930.978 Unknown Active 39.3227 -120.2283 Single N/A N/A N/A 22746 1990 17N17E18C001M 5775.809 5773.911 Unknown Active 39.3295 -120.1368 Single N/A 64 N/A N/A 1991 Page 259 of 563 Monitoring Network 3.4 REQUIRED STEPS IN SELECTING A NEW MV MONITORING WELL Upon selection of any new well, that is not currently a MV monitoring well, to be potentially included in the monitoring network, a site visit will be necessary to assess the field conditions. The conditions necessary for a well to be used in the network include: • A well owner(and tenant) who will allow access for monitoring. • All-weather access, key to locked gates or fences, and no guard dogs. • Ability to survey the ground elevation and reference point elevation of the well. See Page 9 of the DWR Groundwater Elevation Monitoring Guidelines for details establishing the reference point. • A clear access point through the pump or well casing for water-level sounders. Figure 3- 2 shows a typical well sounding location detail. • An assessment to determine if lubrication oil from a turbine pump has accumulated in the well or if there are obstructions in the well that would prevent obtaining repeat and reliable measurements. • If currently in use, to have access in shutting a well down for a minimum 2-hour period (24-hous preferred) for reaching quasi-equilibrium. • For wells that are owned by others,private or public, the protocols discussed below shall be followed for explaining the project purpose and establishing rights for access. • If a new monitoring well is to be installed, appropriate hydrogeologic investigation shall be made, a design that considers the specific needs of monitoring shall be prepared, and the well shall be drilled under the observation and direction of a hydrogeologist. 3-5 Page 260 of 563 fdoniioring \I F-mork r i W. r ' = M on itorin g AQcess Point F;M10:A domestic via&ammo the weJ ca1WV.e-J,rer.and oorWeganee sXslem. The wal is lambed Wmda a thud%iLh a core le*lkxK. FIGURE 3-2. ,ACCESS POINT ON A WELL Beibre knocking on the door of potential well -owners, every dlbrt should be magic to j Usti i y the need for the owner's well in the nem-crrk_ Sta ff ghall cocrOinate w i rh Right-of-Way personnel to arrange a field visit if the owner allows it_ The reason for mmitori ng and the benefits to I-ong- term sustainability sha 11 be d-ascribed_ Additionally, practical detai 1s about sit-c access and how mcasurerricnis are made shall be disc:usscd. If the owner is inter-cmd in allowing their wel1 Into she nelwurk, the well shal I be inspected Ibr adequacy baser) on the bu[]elcd criteria above. 1I•the well is adtquate, formal rights of entry shall be prtMved by R i ght-o May person net before proceeding. Any special contact inf'orniatimn tG perform the anon itoring should also be noted along with infonrlation related to sites where a tenant is renting from the property owner_ These steps will cnsurc cons]-stem monitoring even though monitoring staff', tenants and WO site ac.Tcss may change ovcr tirnu, 3-43 Page 261 of 563 Monitoring Equipment and Preparation 4.0 MONITORING EQUIPMENT AND PREPARATION This section provides the MV monitoring entities with a"how to"manual for accessing monitoring wells and, taking depth-to-groundwater measurements and water quality samples. The range of equipment and protocols covered in this section will assist monitoring staff with the challenges that exist in the field. Each time a well is accessed as part of a monitoring event, staff needs to conduct themselves in a professional manner by being prepared with the right equipment and looking prepared with the correctly labeled vehicle and clothing, and pertinent staff identification. Staff should also strive to maintain a good relationship with the well owners and demonstrate genuine courtesy. This section also provides relevant portions of the CASGEM Groundwater Elevation Monitoring Guidelines (Guidelines) handbook attached as Appendix A. The CASGEM handbook is intended for the following purpose: ...Guidelines were developed to assist DWR by establishing criteria for the selection and measurement of monitoring wells in the event that DWR is required to perform the groundwater monitoring functions in lieu of a local monitoring agency pursuant to Water Code Section 10933.S(a). The Guidelines also imply that a local agency that wishes to take over an existing monitoring well or create a new monitoring well should follow a documented consistent approach for each well over the life of the well. Given the unique location, construction technique, and down-hole equipment installation, measurement of each well should endeavor to follow the Guidelines knowing that field conditions may require slight deviations. This endeavor leads to the need of having a specialized documented procedure for each monitoring well that ensures a consistent measurement technique over time (some wells dating back to the 1930s). Changes in the well setting, use, and equipment may change over time, requiring changes in monitoring techniques. Wells constructed for and devoted to monitoring the groundwater can also change depending on activities around the well that may artificially change the static condition of groundwater levels (e.g., construction and use of a nearby high-production municipal well) or the elevation of the well head(e.g., well is located in proposed paved area where the well head will be cut below grade with a sealed and locked access chamber flush to pavement). 4.1 PERSONNEL TRAINING All well monitoring programs are subject to turnover in agency staff. The best and most effective way of transitioning and training new staff is to have new staff work alongside the experienced staff during a transition period. Absent this on-the-job-training, thorough record keeping, periodic updating of the monitoring plan, and review of this document will expose new staff to the wells and the protocols followed from previous measurements. 4-1 Page 262 of 563 Monitoring Equipment and Preparation 4.2 WELL MONITORING LOG BOOK (WMLB) The WMLB is the definitive field document that contains the following: • Well owner and contact information • Special entrance instructions (e.g., call at gate, honk horn, or dog off leash) • A schematic identifying the location of the well (high-resolution aerial imagery can also be used if the monitoring well can be clearly identified) • Pictures of the well including reference point and access port(See Figure 4-1) • Checklist of special instructions based on well owner requirements or special conditions (i.e. —closed gates,protected wetlands, electrical power shut off, etc.) • Equipment needed for measurement (i.e., some wells require walking a fair distance into the field, wrench to remove access plug) • Ground and reference point elevations and source of measurement • List of historical measurements and codes identifying questionable measurements or field conditions making measurements impossible Multiple wells can be in the same WMLB for convenience out in the field. This will likely be the case if multiple agencies will be making measurements within their respective jurisdiction. An example of the minimum data form and information kept for each well is taken from the CASGEM Guidelines, as shown on Figure 4-1. 4.2.1 Required Equipment The monitoring agency will need to compile a set of tools and have them stored in a designated location at the monitoring agency's premises. The equipment should be in a locked toolbox that can easily be carried by one person, if needed. The CASGEM Guidelines include a list of field equipment needed for the initial well measurements, as shown on Figure 4-2. Once all wells have established reference points and measurement conditions, a shorter list of supplies can be assembled for field measurements as follows: • Digital camera • Crescent wrench (large and small) • Channel lock pliers (large and small) • Small hammer and rubber mallet 4-2 Page 263 of 563 Monitoring Equipment and Preparation State of CaEifoslia DEPARTMENT OF WATER RESOURCES Calilorrsa NaEuraS Resources Agency WELL DATA State No. District .............. t _ OWNER 1 STATE NO. w.... .... m_..... _... _-----____...._. ADDRESS 01HER NO. _.....�.... ........... .............. TENANT -------------- -- -- ADDRESS - TYPE OF WELL [ SPECIAL STE:DIEES ❑MONTHLY SFfhf ANNUAL, ❑WATFR 0L)AE IT LOCATION.COUNTY WWWW' BASIN _. NO. U-S-G-S.QUAD. QUAD NO. tl]E2 SE.CTsON TWP RGE. h� 5F.8haEiRlotAv COORDINATES X: Y7 SOURC . DESCRIF'I EON M. m.. .m _...... REFERENCE POINT DESCRIPTION m WHICH IS FT. FBDVF 0 E3%L61"i LAND SURFACE. GROUND EL.EVAI'ION FT {3!FE:.RL:EdCE POINT ELEVATION FT- L]ETERM,1NED FROM mM ......................... -----{ .... .............. .............................. WELL:USE CONDIT ION DEPTH FT CASING,SIZE IN- �YLRFORA11ONS w. .......... _... r.� MEASURFMENI S E3Yt ElDWR 0 L'SGS ©USBR ©COUNTY ©IRR DfST- MWATER DIST. ©CANS.iJ'.Sf CHEF AQUIFER NAMEDEi'E TQ TOP AQ. DEPTH i#'p BOT.ACk. w....................... TYPE Of'MATERIAL i PERM RATSNG rHICKNE'.SS m �.... m . GRAVEL PACKED? �YES LINO j DEPTH TO IOP GR. DEPTH TO BOT GR. SUPP.AQUIFER DEPTH TO T OP AD. DEP TH TO BUT.AD 1 DRILLER T,}RTF pR€;.L£D: LOG vtl nE3FR: € ..w............ .----------- --- ------------------------------ --------- E.QUIPML:NT:PUMP,TYPE � MAKE SERIAE,NO. SIZE oiz DISC�(AR C PIP!: IN] V'ATE ANAL,YSIS�?.IIN.{i} � SAN.123 Iasi.{.3} ;...- ................-. ---......---.............. .............._.._.......... ..,,,..,................. .--- -- ..... f—....................... POWER,KIND MAKE1 'NA'f E:LE VE1 S AVAIE FoBtE: YES(1) NO H.f. 1.4C3TOR SERIAL No PE#isOD OF�E CDf�D:E?EG[N E ND m m m_ ------------- El-EC.METER NO TRANSORMFR NO. COLLECTING AGENCY- YIELD G,P.M.PUMPING I,E VEL Fl, PROD.REC-(1) PUMP TESL(2) YIELD(3) SKETCH REFJA KS. RECORDED BY: DATE: ............................... DWR 429(Rev.1;09) Source: Table 3. General Well Data Form, CASGEM Guidelines, DWR, December 2010 FIGURE 4-1. GENERAL WELL DATA FORM (DWR FORM 429) 4-3 Page 264 of 563 Monitoring Equipment and Preparation FIGURE 4-2. CASGEM FIELD EQUIPMENT LIST Equipment and supplies needed far(a)all measurements,(b)establishing permanent RP,(c)steel tape method,(d)electric sounding tape method,(e)sonic water-level meter,and(f)automated measurements with pressure transducer. (a)Alt measurements GPS instrument:digital carnera,watch,calculator,and maps General well data farm(OVVR Form 420;see TaNe 3) Pens,ballpoint with non-erasable blue or black ink,for writing on field forms and equipment log books Wei€file with previous measurements Measuring tape,graduated in feet,tenths,and hundredths of feet Tvw wretiches with adjustable jaws and other tools for removing veefl cap Koy(s)for opening locks and clean rags (b)Establishing a permanent reference point Steel tape,graduated in feet,tenths,and hundredths of feet Calibration and maintenance log book for steel tape Paint(bright co€ar),permanent rnarker,chisel:punch,and(or)casing-notching tool (c)Steel tape method DWR field form 1213(see Table 5) Steel tape,graduated in feet,tenths,and hundredths of feet Calibration and maintenance log book for steel tape Weight{stainless steel,iron,or other nonconta min atin g material—do not use lead} Strong ring and wire,for attaching weight to end of tape.Wire should be strong enough to hold weight securely,but not as strong as the tape,so that d the weight becomes lodged in the we It the tape can still be pulled free. Carpenters'chalk(blue)of sidewalk chalk Disinfectant wipes,and deionized or tap water for cleaning tape. (d)Electric sounding tape method ------------—----- .--------------------—--------------------- --------—------------—•.... — DWR fie€d form 1213(see Fable 5) Steel tape,graduated in feet,tenths:and hundredths of feet An electric tape,double-wired and graduated In feet,tenths,and hundredths of feet,accurate to 0.01 ft.Electric sounding tapes commonly are mounted on a hand-cranked and povve red supply reel that contains space for the batteries and some device("indicator'')for signaling when the circuit is closed. Electric-tape calibration and maintenance log book;manufacturer's instructions- ---------------------sinfectent wipes,and deionized or tap water for cleaning tape �---------------- Di Replacement batteries,charged. (a)Sonic water-level meter method DWR field form 1213(see Table 5) Temperature probe wish readout and cable Sonic vrater-level meter vvith factory cover plate Custom sized cover p€ates for larger well diameters Replacement batteries (f)Autornated measurements with pressure transducer Transducer field form(see Figures 1 and 2 in©rust,2005.httpllpubs.usgs.govfof)2005/11261pdf1ofr2p051126.pdf} Transducer,data logger,cables,suspension system,and power supply. Data readout device(i.e.,laptop computer loaded with correct softvafe)and data storage modules. Spare desiccant,and replacement batteries. Well cover or recorder shelter with key Steel tape(with b€ue carpenters'chalk or sidewalk chalk)or e€ectric sounding tape,both graduated in hundredths of feet. Tools,including high-impedance(digita€)mu9iimeter,connectors,crimping tool,and contact-burnishing toot or artist's eraser. Source: Table 4-Equipment and Supply List, CASGEM Guidelines, DWR, December 2010 4-4 Page 265 of 563 Monitoring Equipment and Preparation • Keys for gates and monitoring well covers • Stop watch • Wasp or hornet nest spray • Twelve-foot tape measure • Pencil and graph paper • First aid kit Minimum Tools needed for actual in the field depth-to-groundwater measurements include: • 200-foot well sounding steel tape measure • Blue chalk for metal tape • 200-foot electronic well sounding probe (See Figure 4-3) • Soap, high-purity water, and spray bottle for cleaning tape and probe • Sterilizer solution for tape and probe to prevent introducing contaminants to a the well 4 5 1 i FIGURE 4-3. WELL SOUNDING PROBE AND TAPE 4-5 Page 266 of 563 Monitoring Equipment and Preparation 4.3 CHALLENGES TO BE PREPARED FOR The steps necessary to complete a measurement of depth to groundwater are different for each monitoring well. See Pages 14 through 28 of the DWR Groundwater Elevation Monitoring guidelines for details on measuring water levels. Monitoring staff will need to understand these steps before accessing the well's property location. The WMLB will include a written and graphical stepwise illustration to fully inform monitoring staff. Consideration of how diversified the steps could be are illustrated in the following real-life examples: • Well is located on hilly terrain with no defined access trail or markers—This type of well benefits from training new staff for at least two monitoring events. Absent the on- the-job experience the WMLB should be detailed enough in its descriptions and images to find the well. Steeper terrain may also require several trips to the vehicle for equipment to ensure free hands are available in case of a fall. • Well has no access port or casing bolt—Many of the older wells and private domestic wells were not designed for dropping a tape measure or probe into the well. In these cases, the monitoring staff should clearly identify the access point by using orange utility marking spray paint while being careful to not get paint overspray into the well itself. Absent the paint identifier, the tape chalk can be used as well,but it may disappear over time due to rain and wind. Wells with only a small slit at the base of the concrete casing interface will require a tape measurement. • Well can only be accessed when owner is home—This occurs in many cases where the well owner has to unlock a gate or simply wants to be home when the monitoring event occurs. In this case, an appointment is made by phone providing owner with a 1 hour or less window when monitoring staff will show up. In cases where this is needed to open a locked gate, the owner may allow access and then request that the gate be closed and locked when finished. Review the checklist in the WMLB before leaving the monitoring well. • Well is running when monitoring staff arrive—If the well is a municipal production well or large agricultural well, it is best to work with the well owner to allow a 24-hour period of off-time before taking a measurement. If the well owner is not responsive to this request, ask to turn off the well upon arrival and monitor recovery. If the well is a private domestic well, ask if the water use can be turned off(typically a hydropneumatic tank will allow small quantities of water use without the well turning on) and monitor recovery as explained in next chapter. • Well casing is set flush to the ground—This occurs when a well uses a submersible pump or no pump and no onsite hydropneumatic tank—in most cases this is a private well that may be abandoned or the tank is located away from well. In addition, wells with no visible casing can become covered with vegetation or debris and be difficult to find. In both cases, monitoring staff should stake the well and paint the wood stake orange. 4-6 Page 267 of 563 Monitoring Equipment and Preparation • Reference point is missing or the wellhead has been replaced—This occurs if the reference point is not a permanent mark such as a cut or welded steel marker. This will also occur when a well is deepened or redrilled and the upper casing has been replaced. Monitoring staff will need to select a permanent mark(e.g., top of casing, monitoring hole)where the depth to groundwater can be measured. Monitoring staff should also measure the distance between the new reference point and the ground elevation at the base of the well. This measurement should be noted in the logbook.2 2 The elevation of the new reference point will be calculated by the assigned data entry personnel using the ground elevation from the original survey and the reference point distance measured by field staff. The data entry personnel will need to be careful if the groundwater elevation is an automated calculation (i.e., past measurements will need to keep the old reference point)in a spreadsheet or DMS. 4-7 Page 268 of 563 Depth-to-groundwater Procedures and Frequency of Monitoring and Reporting 5.0 DEPTH-TO-GROUNDWATER PROCEDURES AND FREQUENCY OF MONITORING AND REPORTING The following section describes the frequency for monitoring and reporting and describes the depth-to-groundwater measurement during each of the designated monitoring periods. Figure 5- 1 provides a form for documenting these described field measurements. An alternate form can be used if desired as long as the salient information is included. See also Pages 5 through 7 of the DWR Groundwater Elevation Monitoring Guidelines for additional details. 5.1 SEMIANNUAL GROUNDWATER-LEVEL MONITORING Groundwater levels from all designated monitoring wells listed in Table 3-1 will be measured in the spring and fall (semiannually). Spring is generally considered to be the first week in May. Fall is generally considered to be the first week of November. If possible, all groundwater-level measurements should be taken within a 2-week period and, if possible, coordinate groundwater- level monitoring with DWR and its semiannual measurements. 5.2 DEPTH-TO-GROUNDWATER MONITORING PROCEDURES DWR's Groundwater Elevation Monitoring Guidelines (see Appendix A)provide a complete set of procedures for measuring the depth to groundwater. The following procedures are included to supplement the CASGEM's broader guidelines. Over time, as monitoring staff become familiar with the well sites, a customized list can be documented. Staff will find that steps and monitoring equipment identified in the Guidelines do not apply to the wells being measured in the MV region or additional steps are required. The one exception to the MV monitoring wells is those that are measured through a continuous data logger. It is expected that the agency owning these wells will be downloading data collected by these devices separately from the MV Monitoring Program. This section focuses on measuring the depth to groundwater at designated MV monitoring well sites using a sounding probe or metal tape. Water-level measurements will be collected semiannually to assess the groundwater flow direction and to detect trends that can lead to improved management of the groundwater resources. Each well has been assigned a unique Well Log identification(ID) number. The numbers and pertinent information for each well are listed in Table 3-1. Figure 6-1 (DWR Form 429, Page 11) extracted from the DWR's CASGEM Monitoring Guideline Handbook, along with the time and date of the measurement is recorded with groundwater-level measurements during the semiannual monitoring event. 5-1 Page 269 of 563 Depth-to-groundwater Procedures and Frequency of Monitoring and Reporting E � LU/§ , LL w H � § k � �k�� §��A L %LL AkLULO f $ D . 2 § � C3 ■ / � �z — « Lp ■ 1 1 �P / « § 2 _j U zz m}&}/ ! LU U@ - 3 d k § tg Ll ; J IF 96 & �& � P f ■-�COS Rf a It ■ Uj§ f � § � T 4 w:I § 3--� •® a 2L _ ) ■ 2 - ? a� § � LLI 2 f /k C / 2 2 ( E 2ILCL J 0__n_ FIGURE5-1. GROUNDWATER-LEVEL DATA FORM FOR MANUAL MEASUREMENTS S2 Page 270 of 563 Depth-to-groundwater Procedures and Frequency of Monitoring and Reporting The depth-to-static-groundwater level will be obtained at each well using an electric water-level sounder with a cable graduated in increments of 0.01 foot. Before measurement, monitoring staff will need to review the WMLB for the location of the reference point and measurement access port. A crescent wrench may be needed to access the well casing for measurement. Monitoring staff will need to also review past measurements in the WMLB to allow for careful lowering of the probe or tape.3 To obtain a depth-to-water measurement, the electric sounder cable or tape will be lowered into the well to within 20 feet short of past measurements taken in the same season of the year, spring or fall. Monitoring staff will continue to slowly lower the probe through the access port until the sounder indicates submergence by either a beeping sound or a light, depending on the type of signal installed for that particular model. At this point, the sampling personnel will note the depth to water(to the nearest 0.01 foot) from the reference point. The depth will be confirmed by lifting the sounder above the water surface by about 2 to 3 feet and then remeasuring the depth to water. If the depth remains constant, the depth to water will be recorded on Figure 6-1 (DWR Form 1213, Page 18). If measurements are showing change with each measurement, the monitoring staff will indicate the issue on the form and, with it, attach a graphic curve of the variable nature of the measurement, and its possible cause (e.g., bouncing, recovering water level). 5.3 QUALITY CONTROL After completing their field work, the monitoring staff will enter the data into an electronic database management system. The monitoring staff will review the groundwater-level and water quality data for accuracy within 5 days of obtaining the measurements. Should a measurement appear suspicious, a groundwater level confirmation reading will be obtained. 3 Tape measurements will require chalking of the tape and repeated measurements as per the CASGEM Guidelines (Page 15). 5-3 Page 271 of 563 Recording of Monitoring Data, Data Management and the CASGEM Requirements 6.0 RECORDING OF MONITORING DATA, DATA MANAGEMENT AND THE CASGEM REQUIREMENTS Once data is brought back from the field it will need to be digitized and loaded onto the CASGEM website. The partners will be collecting data from their respective wells and distributing it to the plan administrator,which is currently Placer County Water Agency. The Agency will function as the clearinghouse of all data that is relevant to the MV groundwater basin. In addition, the Agency will be the primary point of contact for the CASGEM Program and will upload all relevant data in a timely manner. The steps laid out currently for CASGEM participation are described as follows (see Appendix C, On-line Submittal System Manual): Phase 1 of the CASGEM System was released in December, 2010, and allows prospective Monitoring Entities to do the following: • Create, edit, and submit notifications to become a Monitoring Entity • Create and manage user accounts • Create and manage agency information • Submit GIS shapeftles of mapped monitoring areas Phase 2 of the CASGEM System, released in May, 2011, makes the following additional functions available to prospective Monitoring Entities: • Submittal of groundwater monitoring plans • Submittal of well construction and location information on monitoring wells proposed to be monitored • Allow corrections to initial Monitoring Entity notifications or submittal of additional information requested by DWR • Ability to view and query maps of groundwater basins,proposed monitoring areas, monitored wells, and other geographic information associated with the CASGEMProgram Phase 3 of the CASGEM System, scheduled for release in late fall, 2011, will allow designated Monitoring Entities to do the following: 6-1 Page 272 of 563 Recording of Monitoring Data, Data Management and the CASGEM Requirements • Submit groundwater elevation measurement data • View and update their CASGEM data, as needed With Phase 3 of the CASGEM System,public access to the Statewide CASGEM data will be available. Users will be able to download data and view spatial and temporal groundwater elevation trends in the GIS viewer application. (URL:hLtp://www.water.ca. o�v//,Qroundwater/cas em/submittal system.cfm,On-line Submittal System,DWR) The Agency has already completed Phase 1 of the CASGEM Program. The next step requires entry of data for each of the monitoring wells included as part of this Monitoring Program. Figure 6-1 is taken from the CASGEM On-line System manual. The manual states that"Data may be entered on a well-by-well basis on a system data entry screen, or users can do a batch upload of information from multiple wells (using a spreadsheet template available for download within the system)." The latter will likely be the best method for entering the data given that most of the well information is already captured in an Excel Workbook. Data entry for groundwater elevations is not fully described but will likely be similar to the well inventory where a spreadsheet template can be uploaded for all groundwater-elevation data. The conversion of groundwater-elevation data from a database (including GIS)platform is typically straight forward with a copy-and-paste step or a small routine that outputs the data in the desired format. The inventory of Martis Valley well data will be based on DWR's CASGEM Monitoring Plan Summary attached as Appendix B. The set of data fields used for each well will require a decision on its need based on Appendix B requirements. 6-2 Page 273 of 563 Recording of Monitoring Data, Data Management and the CASGEM Requirements CASGEM C�sCIEM Online Submittal System n.. OW fOf wr DM WOW CO Al L3T.:apt Identification Cgati w LOCA 006"1w 1*rnr M fNM VMO e7' /M 10 NO L�MMI' 577�07tq v= s VOW wu■ow NNw**c60 SnMNtt�il7Fl1AI�Rt cob ow wttart hr"a Im y Cp lliCll'- MOMw1Rt �d• >wr�� - r�rn�tr lift ftf�SWQ*WFd Surface Won canitruction Ga'Myw"t w• SN'a Vw J TOW Dpirr :®thaw h!'�M1hi Ali�G1flafhbA flltlT Tii*IIIE is7p" ,-- F 0"W�IMfk%q&3 MOtfIPM- 4-r ■ — —_ TOP 6—A IF F npartnwsar7' MV 1tiy Oofflom$w!dp[Rt■ A'FiftUdid 9"EM GOyit�r wft NEW, CW-", im a& 4%5 Add1tim2J]n fei nFat.an I FIGURE 6-1. CASGEM'S WELL INVENTORY INPUT FORM 6-3 Page 274 of 563 Appendix A CASGEM Guidelines Page 275 of 563 Department of Water Resources Groundwater Elevation Monitoring Guidelines December 2010 DWR Groundwater Elevation Monitoring Guidelines Page 276 of 563 saW u'a - Best Management Practices for the Sustainable, Management of Groundwater Monitoring Protocols Standards, and Sites - ;; 77, � Ce. F- December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP State of California Edmund G. Brown Jr., Governor California Natural Resources Agency John Laird, Secretary for Natural Resources Department of Water Resources Mark W. Cowin, Director Carl A. Torgersen, Chief Deputy Director Office of the Chief Counsel Public Affairs Office Government and Community Liaison Spencer Kenner Ed Wilson Anecita S. Agustinez Office of Workforce Equality Policy Advisor Legislative Affairs Office Stephanie Varrelman Waiman Yip Kasey Schimke, Ass't Dir. Deputy Directors Gary Bardini Integrated Water Management William Croyle Statewide Emergency Preparedness and Security Mark Anderson State Water Project John Pacheco (Acting) California Energy Resources Scheduling Kathie Kishaba Business Operations Taryn Ravazzini Special Initiatives Division of Integrated Regional Water Management Arthur Hinojosa Jr., Chief Prepared under the direction of.- David Gutierrez, Sustainable Groundwater Management Program Manager Rich Juricich, Sustainable Groundwater Management Branch Prepared by: Trevor Joseph, BMP Project Manager Timothy Godwin Dan McManus Mark Nordberg Heather Shannon Steven Springhorn With assistance from: DWR Region Office Staff Page 278 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Groundwater Monitoring Protocols, Standards, and Sites Best Management Practice 1. OBJECTIVE The objective of this Best Management Practice (BMP) is to assist in the development of Monitoring Protocols. The California Department of Water Resources (the Department or DWR) has developed this document as part of the obligation in the Technical Assistance chapter (Chapter 7) of the Sustainable Groundwater Management Act (SGMA) to support the long-term sustainability of California's groundwater basins. Information provided in this BMP provides technical assistance to Groundwater Sustainability Agencies (GSAs) and other stakeholders to aid in the establishment of consistent data collection processes and procedures. In addition, this BMP can be used by GSAs to adopt a set of sampling and measuring procedures that will yield similar data regardless of the monitoring personnel. Finally, this BMP identifies available resources to support the development of monitoring protocols. This BMP includes the following sections: 1. Objective. A brief description of how and where monitoring protocols are required under SGMA and the overall objective of this BMP. 2. Use and Limitations. A brief description of the use and limitations of this BMP. 3. Monitoring Protocol Fundamentals. A description of the general approach and background of groundwater monitoring protocols. 4. Relationship of Monitoring Protocols to other BMPs. A description of how this BMP is connected with other BMPS. 5. Technical Assistance. Technical content providing guidance for regulatory sections. 6. Key Definitions. Descriptions of definitions identified in the GSP Regulations or SGMA. 7. Related Materials. References and other materials that provide supporting information related to the development of Groundwater Monitoring Protocols. California Department of Water Resources 1 Page 279 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP 2. USE AND LIMITATIONS BMPs developed by the Department provide technical guidance to GSAs and other stakeholders. Practices described in these BMPs do not replace the GSP Regulations, nor do they create new requirements or obligations for GSAs or other stakeholders. In addition, using this BMP to develop a GSP does not equate to an approval determination by the Department. All references to GSP Regulations relate to Title 23 of the California Code of Regulations (CCR), Division 2, Chapter 1.5, and Subchapter 2. All references to SGMA relate to California Water Code sections in Division 6, Part 2.74. 3. MONITORING PROTOCOL FUNDAMENTALS Establishing data collection protocols that are based on best available scientific methods is essential. Protocols that can be applied consistently across all basins will likely yield comparable data. Consistency of data collection methods reduces uncertainty in the comparison of data and facilitates more accurate communication within basins as well as between basins. Basic minimum technical standards of accuracy lead to quality data that will better support implementation of GSPs. 4. RELATIONSHIP OF MONITORING PROTOCOL TO OTHER BMPs Groundwater monitoring is a fundamental component of SGMA, as each GSP must include a sufficient network of data that demonstrates measured progress toward the achievement of the sustainability goal for each basin. For this reason, a standard set of protocols need to be developed and utilized. It is important that data is developed in a manner consistent with the basin setting, planning, and projects/management actions steps identified on Figure 1 and the GSP Regulations. The inclusion of monitoring protocols in the GSP Regulations also emphasizes the importance of quality empirical data to support GSPs and provide comparable information from basin to basin. Figure 1 provides a logical progression for the development of a GSP and illustrates how monitoring protocols are linked to other related BMPs. This figure also shows the context of the BMPs as they relate to various steps to sustainability as outlined in the GSP Regulations. The monitoring protocol BMP is part of the Monitoring step identified in Figure 1. California Department of Water Resources 2 Page 280 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Itrrreased The BMPs and Guidance Sustaittabilin, Guidance Documents inform various steps in SNIPS Documents the workflow toward increased sustainability. •.SMrErrrnrrngFrwomh. Monitoring Sranda►ds,and Vfcs These steps may be •Monrraving Nri~ks and repeated or re-ordered kknrrfaca="°"°6�c'r°Gaps as a basin approaches Useexis its sustainability goal. Projects and tiriga►rdlaseveio�ne►vpvojc�c rscmd mmnagerrrent dcti0uls to achieve sus[alndbAly. Mana"nt Actiom Irom existlriy pW&ns may lncrude kd drL'm actions r+rated ra:GMK NWAA,0VA4Px WhIP4 AWMPs •Estabaishirtg sus[auno6le Mav�aQemertr C►i[eriv Planning •Modeh'ng •N"Wotion Checkk$(for GSP sub wrtat •GSPAmwaredOufte •Nyr!►ogea�jrc Basin Setting conceplua)MOM •ftler pudget •En-;tVementwFrh r►Mbdi Outreach Goven menrs• •StoMtorde►Engagensetrr `utdC�omrnemiwtran' In Development Figure I — Logical Progression of Basin Activities Needed to Increase Basin Sustainability California Department of Water Resources 3 Page 281 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP 5. TECHNICAL ASSISTANCE 23 CCR §352.2. Monitoring Protocols. Each Plan shall include monitoring protocols adopted by the Agency for data collection and management, as follows: (a)Monitoring protocols shall be developed according to best management practices. (b) The Agency may rely on monitoring protocols included as part of the best management practices developed by the Department, or may adopt similar monitoring protocols that will yield comparable data. (c) Monitoring protocols shall be reviewed at least every five years as part of the periodic evaluation of the Plan, and modified as necessary. The GSP Regulations specifically call out the need to utilize protocols identified in this BMP, or develop similar protocols. The following technical protocols provide guidance based upon existing professional standards and are commonly adopted in various groundwater-related programs. They provide clear techniques that yield quality data for use in the various components of the GSP. They can be further elaborated on by individual GSAs in the form of standard operating procedures which reflect specific local requirements and conditions. While many methodologies are suggested in this BMP, it should be understood that qualified professional judgment should be used to meet the specific monitoring needs. The following BMPs may be incorporated into a GSP's monitoring protocols section for collecting groundwater elevation data. A GSP that adopts protocols that deviate from these BMPs must demonstrate that they will yield comparable data. PROTOCOLS FOR ESTABLISHING A MONITORING PROGRAM The protocol for establishment of a monitoring program should be evaluated in conjunction with the Monitoring Network and Identification of Data Gaps BMP and other BMPs. Monitoring protocols must take into consideration the Hydrogeologic Conceptual Model, Water Budget, and Modeling BMPs when considering the data needs to meet GSP objectives and the sustainability goal. It is suggested that each GSP incorporate the Data Quality Objective (DQO) process following the U.S. EPA Guidance on Systematic Planning Using the Data Quality Objectives Process (EPA, 2006). Although strict adherence to this method is not required, it does provide a robust approach to consider and assures that data is collected with a specific purpose in mind, and efforts for monitoring are as efficient as possible to achieve the objectives of the GSP and compliance with the GSP Regulations. California Department of Water Resources 4 Page 282 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP The DQO process presents a method that can be applied directly to the sustainability criteria quantitative requirements through the following steps. 1. State the problem - Define sustainability indicators and planning considerations of the GSP and sustainability goal. 2. Identify the goal-Describe the quantitative measurable objectives and minimum thresholds for each of the sustainability indicators. 3. Identify the inputs - Describe the data necessary to evaluate the sustainability indicators and other GSP requirements (i.e. water budget). 4. Define the boundaries of the study - This is commonly the extent of the Bulletin 118 groundwater basin or subbasin, unless multiple GSPs are prepared for a given basin. In that case, evaluation of the coordination plan and specifically how the monitoring will be comparable and meet the sustainability goals for the entire basin. 5. Develop an analytical approach - Determine how the quantitative sustainability indicators will be evaluated (i.e. are special analytical methods required that have specific data needs). 6. Specify performance or acceptance criteria - Determine what quality the data must have to achieve the objective and provide some assurance that the analysis is accurate and reliable. 7. Develop a plan for obtaining data - Once the objectives are known determine how these data should be collected. Existing data sources should be used to the greatest extent possible. These steps of the DQO process should be used to guide GSAs to develop the most efficient monitoring process to meet the measurable objectives of the GSP and the sustainability goal. The DQO process is an iterative process and should be evaluated regularly to improve monitoring efficiencies and meet changing planning and project needs. Following the DQO process, GSAs should also include a data quality control and quality assurance plan to guide the collection of data. Many monitoring programs already exist as part of ongoing groundwater management or other programs. To the extent possible, the use of existing monitoring data and programs should be utilized to meet the needs for characterization, historical record documentation, and continued monitoring for the SGMA program. However, an evaluation of the existing monitoring data should be performed to assure the data being collected meets the DQOs, regulatory requirements, and data collection protocol described in this BMP. While this BMP provides guidance for collection of various California Department of Water Resources 5 Page 283 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP regulatory based requirements, there is flexibility among the various methodologies available to meet the DQOs based upon professional judgment (local conditions or project needs). At a minimum, for each monitoring site, the following information or procedure should be collected and documented: • Long-term access agreements. Access agreements should include year-round site access to allow for increased monitoring frequency. • A unique identifier that includes a general written description of the site location, date established, access instructions and point of contact (if necessary), type of information to be collected, latitude, longitude, and elevation. Each monitoring location should also track all modifications to the site in a modification log. PROTOCOLS FOR MEASURING GROUNDWATER LEVELS This section presents considerations for the methodology of collection of groundwater level data such that it meets the requirements of the GSP Regulations and the DQOs of the specific GSP. Groundwater levels are a fundamental measure of the status of groundwater conditions within a basin. In many cases, relationships of the sustainability indicators may be able to be correlated with groundwater levels. The quality of this data must consider the specific aquifer being monitored and the methodology for collecting these levels. The following considerations for groundwater level measuring protocols should ensure the following: • Groundwater level data are taken from the correct location, well ID, and screen interval depth • Groundwater level data are accurate and reproducible • Groundwater level data represent conditions that inform appropriate basin management DQOs • All salient information is recorded to correct, if necessary, and compare data • Data are handled in a way that ensures data integrity California Department of Water Resources 6 Page 284 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP General Well Monitoring Information The following presents considerations for collection of water level data that include regulatory required components as well as those which are recommended. • Groundwater elevation data will form the basis of basin-wide water-table and piezometric maps, and should approximate conditions at a discrete period in time. Therefore, all groundwater levels in a basin should be collected within as short a time as possible, preferably within a 1 to 2 week period. • Depth to groundwater must be measured relative to an established Reference Point (RP) on the well casing. The RP is usually identified with a permanent marker, paint spot, or a notch in the lip of the well casing. By convention in open casing monitoring wells, the RP reference point is located on the north side of the well casing. If no mark is apparent, the person performing the measurement should measure the depth to groundwater from the north side of the top of the well casing. • The elevation of the RP of each well must be surveyed to the North American Vertical Datum of 1988 (NAVD88), or a local datum that can be converted to NAVD88. The elevation of the RP must be accurate to within 0.5 foot. It is preferable for the RP elevation to be accurate to 0.1 foot or less. Survey grade global navigation satellite system (GNSS) global positioning system (GPS) equipment can achieve similar vertical accuracy when corrected. Guidance for use of GPS can be found at USGS http://water.usgs.gov/osw/gps/. Hand-held GPS units likely will not produce reliable vertical elevation measurement accurate enough for the casing elevation consistent with the DQOs and regulatory requirements. • The sampler should remove the appropriate cap, lid, or plug that covers the monitoring access point listening for pressure release. If a release is observed, the measurement should follow a period of time to allow the water level to equilibrate. • Depth to groundwater must be measured to an accuracy of 0.1 foot below the RP. It is preferable to measure depth to groundwater to an accuracy of 0.01 foot. Air lines and acoustic sounders may not provide the required accuracy of 0.1 foot. • The water level meter should be decontaminated after measuring each well. California Department of Water Resources 7 Page 285 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Where existing wells do not meet the base standard as described in the GSP Regulations or the considerations provided above, new monitoring wells may need to be constructed to meet the DQOs of the GSP. The design, installation, and documentation of new monitoring wells must consider the following: • Construction consistent with California Well Standards as described in Bulletins 74-81 and 74-90, and local permitting agency standards of practice. • Logging of borehole cuttings under the supervision of a California Professional Geologist and described consistent with the Unified Soil Classification System methods according to ASTM standard D2487-11. • Written criteria for logging of borehole cuttings for comparison to known geologic formations, principal aquifers and aquitards/aquicludes, or specific marker beds to aid in consistent stratigraphic correlation within and across basins. • Geophysical surveys of boreholes to aid in consistency of logging practices. Methodologies should include resistivity, spontaneous potential, spectral gamma, or other methods as appropriate for the conditions. Selection of geophysical methods should be based upon the opinion of a professional geologist or professional engineer, and address the DQOs for the specific borehole and characterization needs. • Prepare and submit State well completion reports according to the requirements of §13752. Well completion report documentation should include geophysical logs, detailed geologic log, and formation identification as attachments. An example well completion as-built log is illustrated in Figure 2. DWR well completion reports can be filed directly at the Online System for Well Completion Reports (OSWCR) httl2://water.ca.gov/oswcr/index.cfm. California Department of Water Resources 8 Page 286 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP 10 G�ate**h—Afiso ftxe+AEPN�T osmff am?orwA a nkoolxria ��I•ortr+1�+ IADhT 1�}ao-uYl c nln�xun�rl EMNA E LnjIL122Er inn c om LngU22 AM1 HU Gino- H9_h.Ny E6L_ zj5dz t+�G•IY�o- I;F,br.;& }.imA&h Idj—" AqA x— SST.711n 0 # 'X$ pp�iblrl to H& kLK!`jr} rh1'n 6611A O" w wl>a M gm wnls ",1116 IWINowl MI. bm M ]h U3 h=rro-4 t I7rI,;*VI1gNNHfbffi: *. M ao- 318 I�IFfF �41 PAYI�11��llll* 11�1rM•f6�a null p1R'SG0626A p13n PPWfM r3 Im— plm� 'y µw L407W Y+h1Yrh1 l4.+ r--n ti S41G Ir> 4741E IIrwM a}adln a.-w?K: n�• ! fn.� M+n�*_FrtF Im� �YIIII� I1n�n F�v�i Aarzx�, Y�IIr1�d��1� Mu EY Irold� InflTrFllYrii-!1!l��rrrl�YNlr TPlf#17#R!M frP Mrk'4r1�M" ■ho4 R �W'IFI. e OW% r �W+f*A• +q RR�CIAD �� ee �t ri�a����•• �It^I�l�1 +�li l4 r.lw^ 1 it�ir i �•I�rWiYi�� �rtMi•+-F�WiRIY ti� ^.4FI 7w a I 4r�Y� Q !P - kr i++R m*wd4- v.r ca-•a ^-T +L tip+■ Y�a �.a P� I id 1l+vnM1 a �� 1111114IfM 7r P�Er +._. •rnllrlaaltl rl���_ � f— +MriTMSC+eY r..t� 40- ItlC Ir�•�.�.+..�..: IAA w � �AawW�`FY gay _ �. Y+i��a Ali iFllb llrl4b 1�1 Tw•a E—r`PI h N 0+1F�ti1�1Flr•�-{4T�k SS�M�5=14 d l 1L 7r1e� � r I"Ps f11Y * 1Lyi 2U'D I Q'A'_'rt� Figure 2- Example As-Built Multi-Completion Monitoring Well Log California Department of Water Resources 9 Page 287 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Measuring Groundwater Levels Well construction, anticipated groundwater level, groundwater level measuring equipment, field conditions, and well operations should be considered prior collection of the groundwater level measurement. The USGS Groundwater Technical Procedures (Cunningham and Schalk, 2011) provide a thorough set of procedures which can be used to establish specific Standard Operating Procedures (SOPs) for a local agency. Figure 3 illustrates a typical groundwater level measuring event and simultaneous pressure transducer download. i - - r ti Figure 3 — Collection of Water Level Measurement and Pressure Transducer Download The following points provide a general approach for collecting groundwater level measurements: • Measure depth to water in the well using procedures appropriate for the measuring device. Equipment must be operated and maintained in accordance with manufacturer's instructions. Groundwater levels should be measured to the nearest 0.01 foot relative to the RP. • For measuring wells that are under pressure, allow a period of time for the groundwater levels to stabilize. In these cases, multiple measurements should be collected to ensure the well has reached equilibrium such that no significant changes in water level are observed. Every effort should be made to ensure that a representative stable depth to groundwater is recorded. If a well does not stabilize, the quality of the value should be appropriately qualified as a California Department of Water Resources 10 Page 288 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP questionable measurement. In the event that a well is artesian, site specific procedures should be developed to collect accurate information and be protective of safety conditions associated with a pressurized well. In many cases, an extension pipe may be adequate to stabilize head in the well. Record the dimension of the extension and document measurements and configuration. • The sampler should calculate the groundwater elevation as: GWE = RPE — DTW Where: GWE =Groundwater Elevation RPE=Reference Point Elevation DTW=Depth to Water The sampler must ensure that all measurements are in consistent units of feet, tenths of feet, and hundredths of feet. Measurements and RPEs should not be recorded in feet and inches. Recording Groundwater Levels • The sampler should record the well identifier, date, time (24-hour format), RPE, height of RP above or below ground surface, DTW, GWE, and comments regarding any factors that may influence the depth to water readings such as weather, nearby irrigation, flooding, potential for tidal influence, or well condition. If there is a questionable measurement or the measurement cannot be obtained, it should be noted. An example of a field sheet with the required information is shown in Figure 4. It includes questionable measurement and no measurement codes that should be noted. This field sheet is provided as an example. Standardized field forms should be used for all data collection. The aforementioned USGS Groundwater Technical Procedures offers a number of example forms. • The sampler should replace any well caps or plugs, and lock any well buildings or covers. • All data should be entered into the GSA data management system (DMS) as soon as possible. Care should be taken to avoid data entry mistakes and the entries should be checked by a second person for compliance with the DQOs. California Department of Water Resources 11 Page 289 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP STATE OF CALIFORNA THE RESOURCES AGENCY DEPARTMENT OF WATER RESOURCES WELL DATA STATE WELL NUMBER COUNTY REFERENCE MEASURING AGENCY POINT ELEV. ❑WR NO MEASUREMENT QUESTIONABLE MEASUREMENT 0. Measurement di s€onti nued 0. Caved or deepened 1. Pumping 1. Pumping 2. Pump house locked 2-Nearby pump operating 3. Tape hung up 3-Casing leaky or wet 4. Can't get tape in casi ng 4.Pu mped re€ently S. Unable to-locate well 5-Air or pressure gauge mea suremant 6. WL41 has been destroyed 6-Other 7. Special 7.ReCharga operation at or nearby wel I S. Casing leaky or w4t &Oil in casing 9. Temporarily inaccessible DATE N Q TAPE AT TAPE AT RP to WS 0135R COMMENTS M M RP WS VR Figure 4—Example of Water Level Well Data Field Collection Form California Department of Water Resources 12 Page 290 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Pressure Transducers Groundwater levels and/or calculated groundwater elevations may be recorded using pressure transducers equipped with data loggers installed in monitoring wells. When installing pressure transducers, care must be exercised to ensure that the data recorded by the transducers is confirmed with hand measurements. The following general protocols must be followed when installing a pressure transducer in a monitoring well: • The sampler must use an electronic sounder or chalked steel tape and follow the protocols listed above to measure the groundwater level and calculate the groundwater elevation in the monitoring well to properly program and reference the installation. It is recommended that transducers record measured groundwater level to conserve data capacity; groundwater elevations can be calculated at a later time after downloading. • The sampler must note the well identifier, the associated transducer serial number, transducer range, transducer accuracy, and cable serial number. • Transducers must be able to record groundwater levels with an accuracy of at least 0.1 foot. Professional judgment should be exercised to ensure that the data being collected is meeting the DQO and that the instrument is capable. Consideration of the battery life, data storage capacity, range of groundwater level fluctuations, and natural pressure drift of the transducers should be included in the evaluation. • The sampler must note whether the pressure transducer uses a vented or non- vented cable for barometric compensation. Vented cables are preferred, but non- vented units provide accurate data if properly corrected for natural barometric pressure changes. This requires the consistent logging of barometric pressures to coincide with measurement intervals. • Follow manufacturer specifications for installation, calibration, data logging intervals, battery life, correction procedure (if non-vented cables used), and anticipated life expectancy to assure that DQOs are being met for the GSP. • Secure the cable to the well head with a well dock or another reliable method. Mark the cable at the elevation of the reference point with tape or an indelible marker. This will allow estimates of future cable slippage. • The transducer data should periodically be checked against hand measured groundwater levels to monitor electronic drift or cable movement. This should happen during routine site visits, at least annually or as necessary to maintain data integrity. California Department of Water Resources 13 Page 291 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP • The data should be downloaded as necessary to ensure no data is lost and entered into the basin's DMS following the QA/QC program established for the GSP. Data collected with non-vented data logger cables should be corrected for atmospheric barometric pressure changes, as appropriate. After the sampler is confident that the transducer data have been safely downloaded and stored, the data should be deleted from the data logger to ensure that adequate data logger memory remains. PROTOCOLS FOR SAMPLING GROUNDWATER QUALITY The following protocols can be incorporated into a GSP's monitoring protocols for collecting groundwater quality data. More detailed sampling procedures and protocols are included in the standards and guidance documents listed at the end of this BMP. A GSP that adopts protocols that deviate from these BMPs must demonstrate that the adopted protocols will yield comparable data. In general, the use of existing water quality data within the basin should be done to the greatest extent possible if it achieves the DQOs for the GSP. In some cases it may be necessary to collect additional water quality data to support monitoring programs or evaluate specific projects. The USGS National Field Manual for the Collection of Water Quality Data (Wilde, 2005) should be used to guide the collection of reliable data. Figure 5 illustrates a typical groundwater quality sampling setup. f Figure 5 -Typical Groundwater Quality Sampling Event California Department of Water Resources 14 Page 292 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP All analyses should be performed by a laboratory certified under the State Environmental Laboratory Accreditation Program. The specific analytical methods are beyond the scope of this BMP, but should be commiserate with other programs evaluating water quality within the basin for comparative purposes. Groundwater quality sampling protocols should ensure that. • Groundwater quality data are taken from the correct location • Groundwater quality data are accurate and reproducible • Groundwater quality data represent conditions that inform appropriate basin management and are consistent with the DQOs • All salient information is recorded to normalize, if necessary, and compare data • Data are handled in a way that ensures data integrity The following points are general guidance in addition to the techniques presented in the previously mentioned USGS National Field Manual for the Collection of Water Quality Data. Standardized protocols include the following. • Prior to sampling, the sampler must contact the laboratory to schedule laboratory time, obtain appropriate sample containers, and clarify any sample holding times or sample preservation requirements. • Each well used for groundwater quality monitoring must have a unique identifier. This identifier must appear on the well housing or the well casing to avoid confusion. • In the case of wells with dedicated pumps, samples should be collected at or near the wellhead. Samples should not be collected from storage tanks, at the end of long pipe runs, or after any water treatment. • The sampler should clean the sampling port and/or sampling equipment and the sampling port and/or sampling equipment must be free of any contaminants. The sampler must decontaminate sampling equipment between sampling locations or wells to avoid cross-contamination between samples. • The groundwater elevation in the well should be measured following appropriate protocols described above in the groundwater level measuring protocols. • For any well not equipped with low-flow or passive sampling equipment, an adequate volume of water should be purged from the well to ensure that the groundwater sample is representative of ambient groundwater and not stagnant water in the well casing. Purging three well casing volumes is generally California Department of Water Resources 15 Page 293 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP considered adequate. Professional judgment should be used to determine the proper configuration of the sampling equipment with respect to well construction such that a representative ambient groundwater sample is collected. If pumping causes a well to be evacuated (go dry), document the condition and allow well to recover to within 90% of original level prior to sampling. Professional judgment should be exercised as to whether the sample will meet the DQOs and adjusted as necessary. • Field parameters of pH, electrical conductivity, and temperature should be collected for each sample. Field parameters should be evaluated during the purging of the well and should stabilize prior to sampling. Measurements of pH should only be measured in the field, lab pH analysis are typically unachievable due to short hold times. Other parameters, such as oxidation-reduction potential (ORP), dissolved oxygen (DO) (in situ measurements preferable), or turbidity, may also be useful for meeting DQOs of GSP and assessing purge conditions. All field instruments should be calibrated daily and evaluated for drift throughout the day. • Sample containers should be labeled prior to sample collection. The sample label must include: sample ID (often well ID), sample date and time, sample personnel, sample location, preservative used, and analytes and analytical method. • Samples should be collected under laminar flow conditions. This may require reducing pumping rates prior to sample collection. • Samples should be collected according to appropriate standards such as those listed in the Standard Methods for the Examination of Water and Wastewater, USGS National Field Manual for the Collection of Water Quality Data, or other appropriate guidance. The specific sample collection procedure should reflect the type of analysis to be performed and DQOs. • All samples requiring preservation must be preserved as soon as practically possible, ideally at the time of sample collection. Ensure that samples are appropriately filtered as recommended for the specific analyte. Entrained solids can be dissolved by preservative leading to inconsistent results of dissolve analytes. Specifically, samples to be analyzed for metals should be field-filtered prior to preservation; do not collect an unfiltered sample in a preserved container. • Samples should be chilled and maintained at 4 °C to prevent degradation of the sample. The laboratory's Quality Assurance Management Plan should detail appropriate chilling and shipping requirements. California Department of Water Resources 16 Page 294 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP • Samples must be shipped under chain of custody documentation to the appropriate laboratory promptly to avoid violating holding time restrictions. • Instruct the laboratory to use reporting limits that are equal to or less than the applicable DQOs or regional water quality objectives/screening levels. Special protocols for low-flow sampling equipment In addition to the protocols listed above, sampling using low-flow sample equipment should adopt the following protocols derived from EPA's Low flow (minimal drawdown) ground-water sampling procedures (Puls and Barcelona, 1996). These protocols apply to low-flow sampling equipment that generally pumps between 0.1 and 0.5 liters per minute. These protocols are not intended for bailers. Special protocols for passive sampling equipment In addition to the protocols listed above, passive diffusion samplers should follow protocols set forth in USGS Fact Sheet 088-00. PROTOCOLS FOR MONITORING SEAWATER INTRUSION Monitoring seawater intrusion requires analysis of the chloride concentrations within groundwater of each principal aquifer subject to seawater intrusion. While no significant standardized approach exists, the methodologies described above for degraded water quality can be applied for the collection of groundwater samples. In addition to the protocol described above, the following protocols should be followed: • Water quality samples should be collected and analyzed at least semi-annually. Samples will be analyzed for dissolved chloride at a minimum. It may be beneficial to include analyses of iodide and bromide to aid in determination of salinity source. More frequent sampling may be necessary to meet DQOs of GSP. The development of surrogate measures of chloride concentration may facilitate cost-effective means to monitor more frequently to observe the range of conditions and variability of the flow dynamics controlling seawater intrusion. • Groundwater levels will be collected at a frequency adequate to characterize changes in head in the vicinity of the leading edge of degraded water quality in each principal aquifer. Frequency may need to be increased in areas of known preferential pathways, groundwater pumping, or efficacy evaluation of mitigation projects. • The use of geophysical surveys, electrical resistivity, or other methods may provide for identification of preferential pathways and optimize monitoring well placement and evaluation of the seawater intrusion front. Professional judgment California Department of Water Resources 17 Page 295 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP should be exercised to determine the appropriate methodology and whether the DQOs for the GSP would be met. PROTOCOLS FOR MEASURING STREAMFLOW Monitoring of streamflow is necessary for incorporation into water budget analysis and for use in evaluation of stream depletions associated with groundwater extractions. The use of existing monitoring locations should be incorporated to the greatest extent possible. Many of these streamflow monitoring locations currently follow the protocol described below. Establishment of new streamflow discharge sites should consider the existing network and the objectives of the new location. Professional judgment should be used to determine the appropriate permitting that may be necessary for the installation of any monitoring locations along surface water bodies. Regular frequent access will be necessary to these sites for the development of ratings curves and maintenance of equipment. To establish a new streamflow monitoring station special consideration must be made in the field to select an appropriate location for measuring discharge. Once a site is selected, development of a relationship of stream stage to discharge will be necessary to provide continuous estimates of streamflow. Several measurements of discharge at a variety of stream stages will be necessary to develop the ratings curve correlating stage to discharge. The use of Acoustic Doppler Current Profilers (ADCPs) can provide accurate estimates of discharge in the correct settings. Professional judgment must be exercised to determine the appropriate methodology. Following development of the ratings curve a simple stilling well and pressure transducer with data logger can be used to evaluate stage on a frequent basis. A simple stilling well and staff gage is illustrated in Figure 6. Streamflow measurements should be collected, analyzed, and reported in accordance with the procedures outlined in USGS Water Supply Paper 2175, Volume 1. — Measurement of Stage Discharge and Volume 2. — Computation of Discharge. This methodology is currently being used by both the USGS and DWR for existing streamflow monitoring throughout the State. California Department of Water Resources 18 Page 296 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP t. Figure 6- Simple Stilling Well and Staff Gage Setup PROTOCOLS FOR MEASURING SUBSIDENCE Evaluating and monitoring inelastic land subsidence can utilize multiple data sources to evaluate the specific conditions and associated causes. To the extent possible, the use of existing data should be utilized. Subsidence can be estimated from numerous techniques, they include: level surveying tied to known stable benchmarks or benchmarks located outside the area being studied for possible subsidence; installing and tracking changes in borehole extensometers; obtaining data from continuous GPS (CGPS) locations, static GPS surveys or Real-Time-Kinematic (RTK) surveys; or analyzing Interferometric Synthetic Aperture Radar (InSAR) data. No standard procedures exist for collecting data from the potential subsidence monitoring approaches. However, an approach may include: • Identification of land subsidence conditions. o Evaluate existing regional long-term leveling surveys of regional infrastructure, i.e. roadways, railroads, canals, and levees. o Inspect existing county and State well records where collapse has been noted for well repairs or replacement. o Determine if significant fine-grained layers are present such that the potential for collapse of the units could occur should there be significant depressurization of the aquifer system. California Department of Water Resources 19 Page 297 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP o Inspect geologic logs and the hydrogeologic conceptual model to aid in identification of specific units of concern. o Collect regional remote-sensing information such as InSAR, commonly provided by USGS and NASA. Data availability is currently limited, but future resources are being developed. • Monitor regions of suspected subsidence where potential exists. o Establish CGPS network to evaluate changes in land surface elevation. o Establish leveling surveys transects to observe changes in land surface elevation. o Establish extensometer network to observe land subsidence. An example of a typical extensometer design is illustrated in Figure 7. There are a variety of extensometer designs and they should be selected based on the specific DQOs. Various standards and guidance documents for collecting data include: • Leveling surveys must follow surveying standards set out in the California Department of Transportation's Caltrans Surveys Manual. • GPS surveys must follow surveying standards set out in the California Department of Transportation's Caltrans Surveys Manual. • USGS has been performing subsidence surveys within several areas of California. These studies are sound examples for appropriate methods and should be utilized to the extent possible and where available: o httj2://ca.water.usgs.gov/land subsidence/california-subsidence- measuring.html • Instruments installed in borehole extensometers must follow the manufacturer's instructions for installation, care, and calibration. • Availability of InSAR data is improving and will increase as programs are developed. This method requires expertise in analysis of the raw data and will likely be made available as an interpretative report for specific regions. California Department of Water Resources 20 Page 298 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP tky*+.•.. •� * Ma who% Mtn Figure 7— Simplified Extensometer Diagram California Department of Water Resources 21 Page 299 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP 6. KEY DEFINITIONS The key definitions and sections related to Groundwater Monitoring Protocols, Standards, and Sites outlined in applicable SGMA code and regulations are provided below for reference. Groundwater Sustainability Plan Regulations (California Code of Regulations �351) • §351(h) 'Best available science" refers to the use of sufficient and credible information and data, specific to the decision being made and the time frame available for making that decision, that is consistent with scientific and engineering professional standards of practice. • §351(i) 'Best management practice" refers to a practice, or combination of practices, that are designed to achieve sustainable groundwater management and have been determined to be technologically and economically effective, practicable, and based on best available science. Monitoring Protocols Reference §352.2. Monitoring Protocols Each Plan shall include monitoring protocols adopted by the Agency for data collection and management, as follows: (a) Monitoring protocols shall be developed according to best management practices. (b) The Agency may rely on monitoring protocols included as part of the best management practices developed by the Department, or may adopt similar monitoring protocols that will yield comparable data. (c) Monitoring protocols shall be reviewed at least every five years as part of the periodic evaluation of the Plan, and modified as necessary. SGMA Reference §10727.2. Required Plan Elements (f) Monitoring protocols that are designed to detect changes in groundwater levels, groundwater quality, inelastic surface subsidence for basins for which subsidence has been identified as a potential problem, and flow and quality of surface water that directly affect groundwater levels or quality or are caused by groundwater extraction in the basin. The monitoring protocols shall be designed to generate information that promotes efficient and effective groundwater management. California Department of Water Resources 22 Page 300 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP 7. RELATED MATERIALS CASE STUDIES Luhdorff & Scalmanini Consulting Engineers, J.W. Borchers, M. Carpenter. 2014. Land Subsidence from Groundwater Use in California. Full Report of Findings prepared for California Water Foundation. April 2014. 151 P. httj2://ca.water.usgs.gov/land subsidence/california-subsidence-cause-effect.html Faunt, C.C., M. Sneed, J. Traum, and J.T. Brandt, 2015. Water availability and land subsidence in the Central Valley, California, USA. Hydrogeol J (2016) 24: 675. doi:10.1007/sl0040-015-1339-x. https://12ubs.er.us sg gov/publication/701605 Poland, J.F., B.E. Lofgren, R.L. Ireland, and R.G. Pugh, 1975. Land subsidence in the San Joaquin Valley, California, as of 1972; US Geological Survey Professional Paper 437-H; prepared in cooperation with the California Department of Water Resources, 87 p. http://Vubs.usgs.gov/2p/0437h/report.12df Sneed, M., J.T. Brandt, and M. Solt, 2013. Land subsidence along the Delta-Mendota Canal in the northern part of the San Joaquin Valley, California, 2003-10; USGS Scientific Investigations Report 2013-5142, prepared in cooperation with U.S. Bureau of Reclamation and the San Luis and Delta-Mendota Water Authority. htti2s://pubs.er.us sg gov/publication/sir20135142 Sneed, M., J.T. Brandt, and M. Solt, 2014. Land subsidence, groundwater levels, and geology in the Coachella Valley, California, 1993-2010: U.S. Geological Survey, Scientific Investigations Report 2014-5075, 62 p. http://dx.doi.org/10.3133/sir20145075. STANDARDS California Department of Transportation, various dates. Caltrans Surveys Manual. httj2://www.dot.ca.gov/liq/row/landsurveys/SurveysManual/Manual TOC.html U.S. Environmental Protection Agency, 2006. Guidance on Systematic Planning Using the Data Quality Objectives Process, EPA QA/G-4 htti2s://www.epa.gov/sites/production/files/documents/guidance systematic planning_ dqo process.pdf California Department of Water Resources 23 Page 301 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP Rice, E.W., R.B. Baire, A.D. Eaton, and L.S. Clesceri ed. 2012. Standard methods for the examination of water and wastewater. Washington, DC: American Public Health Association, American Water Works Association, and Water Environment Federation. GUIDANCE Barcelona, M.J., J.P. Gibb, J.A. Helfrich, and E.E.Graske. 1985. Practical Guide for Ground- Water Sampling. Illinois State Water Survey, Champaign, Illinois, 103 pages. www.orau.org_/12tl2/PTP%20Library/library/el2a/samplings/]2racgw.p df Buchanan, T.J., and W.P. Somers, 1969. Discharge measurements at gaging stations; techniques of water-resources investigations of the United States Geologic Survey chapter A8, Washington D.C. http://pubs.usgs.gov/twri/twri3a8/htmlzpdf.html Cunningham, W.L., and Schalk, C.W., comps., 2011, Groundwater technical procedures of the U.S. Geological Survey: U.S. Geological Survey Techniques and Methods 1—A1. httj2s://12ubs.usgs.gov/tm/lal/12df/tml-al.pdf California Department of Water Resources, 2010. Groundwater elevation monitoring guidelines. http://www.water.ca.gov/groundwater/casgem/pdfs/CASGEM%20DWR%20GW%20Gu idelines%20Final%20121510.12df Holmes, R.R. Jr., P.J. Terrio, M.A. Harris, and P.C. Mills, 2001. Introduction to field methods for hydrologic and environmental studies, open-file report 01-50, USGS, Urbana, Illinois, 241 p. https://pubs.er.us sg gov/publication/ofr0150 Puls, R.W., and Barcelona, M.J., 1996, Low-Flow (Minimal Drawdown) Ground-Water Sampling Procedures; US EPA, Ground Water Issue EPA/540/S-95/504. https://www.epa.gov/sites/production/files/2015-06/documents/lwflw2a.pdf Rantz, S.E., and others, 1982. Measurement and computation of streamflow; U.S. Geological Survey, Water Supply Paper 2175. http://pubs.usgs.gov/ws]2/ws]22175/#table Subcommittee on Ground Water of the Advisory Committee on Water Information, 2013. A national framework for ground-water monitoring in the United States. httj2://acwi.gov/sogw/ngwmn framework report july2013.12df Vail, J., D. France, and B. Lewis. 2013. Operating Procedure: Groundwater Sampling SESDPROC-301-R3. California Department of Water Resources 24 Page 302 of 563 December 2016 Groundwater Monitoring Protocols, Standards,and Sites BMP https://www.epa.gov/sites/production/files/2015-06/documents/Groundwater- Sampling.pdf Wilde, F.D., January 2005. Preparations for water sampling (ver. 2.0): U.S. Geological Survey Techniques of Water-Resources Investigations, book 9, chap. Al, httl2://water.usgs.gov/owq/FieldManual/compiled/NFM complete.pdf ONLINE RESOURCES Online System for Well Completion Reports (OSWCR). California Department of Water Resources. httj2://water.ca.gov/oswcr/index.cfm Measuring Land Subsidence web page. U.S. Geological Survey. httl2://ca.water.usgs.gov/land subsidence/california-subsidence-measuring html USGS Global Positioning Application and Practice web page. U.S. Geological Survey. httj2://water.usgs.gov/osw/gj2s California Department of Water Resources 25 Page 303 of 563 G M P Nevada and Placer Counties, California June 2025 Appendix D - Groundwater Quality Reports Page 304 of 563 DONNE' Public District General Manager Brian C.Wright TRUCKEE DONNER PUBLIC UTILITY DISTRICT Executive 2024 PUBLIC HEALTH GOALS REPORT Leadership Team Chad J.Reed Water Utility Director Jared Carpenter Background Electric Utility Director Scott crow Provisions of the California Health and Safety Code specify that larger 1TDirectorICIO (>10,000 service connections) water utilities prepare a special report by July 1, Steven Poncelet 2024 if water quality measurements have exceeded any Public Health Goals NO&Strategic Affairs (PHGs). PHGs are non-enforceable goals established by the California Director Environmental Protection Agency's (Cal-EPA) Office of Environmental Health Michael Salmon Hazard Assessment (OEHHA). The regulation also requires that where OEHHA Chief Financial Officer has not adopted a PHG for a constituent, the water suppliers are to use the Jillian Steward Maximum Contaminant Level Goals (MCLG) adopted by the United States Director of Human Resources and Environmental Protection Agency (USEPA). Only constituents which have a Risk Management California primary drinking water standard and for which either a PHG or MCLG Board of Directors has been set are to be addressed. Joseph Aguera Jeff Bender There are a few constituents that are routinely detected in water Christa Finn systems at levels usually well below the drinking water standards for which no Kim Harris PHG nor MCLG have been adopted by OEHHA or USEPA including Total Tony Laliotis Trihalomethanes. These will be addressed in a future required report after a PHG has been adopted. The regulation specifies what information is to be provided in the report. If a constituent was detected in the Truckee Donner Public Utility District's (TDPUD) water supply between 2021 and 2024, at a level exceeding an applicable PHG or MCLG, this report provides the information required under the regulation. Included is the numerical public health risk associated with the Maximum Contaminant Level (MCL) and the PHG or MCLG, the category or type of risk to health that could be associated with each constituent, the best treatment technology available that could be used to reduce the constituent level, and an estimate of the cost to install that treatment if it is appropriate and feasible. What Are PHGs? PHGs are set by the California Office of Environmental Health Hazard Assessment (OEHHA) which is part of Cal-EPA and are based solely on public health risk considerations. None of the practical risk-management factors that are considered by the USEPA or the California Department of Health Services (CDHS) in setting drinking water standards are considered in setting the PHGs. PUELiC :, 11570 Donner Pass Road,Truckee,CA 96161 i (530)587-3896 i tdpud.org a, �L MMEMIP�WMM .a ... ..,, Page 305 of 563 These factors include analytical detection capability, treatment technology available, benefits and costs. The PHGs are not enforceable and are not required to be met by any public water system. MCI-Gs are the federal equivalent to PHGs. Water Quality Data Considered All of the water quality data collected by the TDPUD water utility between 2021 and 2024, for purposes of determining compliance with drinking water standards was considered. This data was all summarized in our 2021, 2022, and 2023 Annual Water Consumer Confidence Reports which were posted on the TDPUD website for customers to review by July 1st of each subsequent year. Guidelines Followed The Association of California Water Agencies (ACWA) formed a workgroup which prepared guidelines for water utilities to use in preparing these newly required reports. The ACWA and California Department of Public Health guidelines were used in the preparation of this report. Best Available Treatment Technology and Cost Estimates Both the USEPA and CDHS adopt what are known as BATs or Best Available Technologies which are the best known methods of reducing contaminant levels to the MCL. Costs can be estimated for such technologies. However, since many PHGs and all MCLGs are set much lower than the MCL, it is not always possible nor feasible to determine what treatment is needed to further reduce a constituent downward to or near the PHG or MCLG, many of which are set at or close to zero. Estimating the costs to reduce a constituent to zero is difficult, if not impossible because it is not possible to verify by analytical means that the level has been lowered to zero. In some cases, installing treatment to try and further reduce very low levels of one constituent may have adverse effects on other aspects of water quality. Constituents Detected That Exceed a PHG or a MCLG The following is a discussion of constituents that were detected in one or more of the TDPUD's drinking water sources at levels above the PHG, or if no PHG, above the MCLG. Arsenic: The MCL for arsenic is 10 parts per billion (ppb), the PHG and MCLG for arsenic is 0.004ppb. We have detected arsenic in 6 of our 10 wells, Martis Valley Well 9.8, Glenshire Dr Well 9.0, Airport Well 7.3, Prosser Village Well 2.4, Sanders Well 8.8, and Old Greenwood Well 10. It is important to note that the Glenshire Drive Well, Old Greenwood Well and Prosser Village Well are delivered through a California State Water Resources Control Board (SWRCB) Page 306 of 563 approved blending permit maintaining post blend water deliveries with arsenic concentrations below the MCL. The category of health risk associated with arsenic, and the reason that a drinking water standard was adopted for it, is that continuous long-term exposures to drinking water containing arsenic levels above the MCL may increase the risk of cancer. The California Office of Environmental Health Hazard Assessment (OEHHA) has set the PHG at 0.004ppb. The PHG is based on a level that will result in not more than 1 excess cancer in 1 million people who drink 2 liters daily of this water for 70 years. The actual cancer risk may be lower or zero. The BAT that we are using for this report to lower the level below the MCL to .004ppb is fixed bed adsorption system. The estimated cost to install and operate such a treatment system on all 6 Wells that would reliably reduce the Arsenic level to .004ppb would be approximately $8,505,000 initial construction cost with additional estimated 0&M cost of an $7,245,000 per year. This would result in an assumed increased cost for each customer of approximately$528 per year. Lead: The MCL for Lead in drinking water is 15ppb, while the PHG and MCLG is 0.2ppb. The current PHG for Lead was established in 2009, lowered from the previous PHG of 2.Oppb established in 1997, based upon calculated carcinogenic health effects and neurobehavioral deficits. The District conducts sampling for the presence of lead every three years in accordance with the Lead and Copper Rule (LCR). Action levels for lead is based on 90th percentile concentration levels from first draw residential sample taps. The District's last LCR monitoring period and sample collection was in 2016, in which sample testing results indicated a 90th percentile level of 7.Oppb. Levels of lead in surface and groundwater throughout the United States typically range between 5 and 30 ppb (OEHHA, 2009). In drinking water, the major source of lead is due to the leaching from residential plumbing and solder used in pipe joints. The leaching of lead from residential plumbing is of particular concern in circumstance where older plumbing infrastructure is exposed to aggressive water quality conditions. Lead is listed as a carcinogen and as a reproductive and developmental toxic chemical under the Safe Drinking Water and Toxic Enforcement Act of 1986 (California Health and Safety Code). The calculated health risk for lead at the MCL (15ppb) is two per million. The calculated health risk at the PHG (0.2ppb) is not available. BAT for drinking water systems exceeding the 90th percentile for the action level of lead concentrations (15ppb) is "optimized corrosion control". For systems in which the lead concentration levels are above the PHG of 0.2ppb, it is not clear what additional steps could be considered, particularly without causing other potential water quality problems. Without further comprehensive study, it is uncertain if a true assessment of the cost of mitigation for lead concentrations well below the action level can be determined with any degree of accuracy. Page 307 of 563 RECOMMENDATIONS FOR FURTHER ACTION The drinking water quality of the Truckee Donner Public Utility District at this time meets all California State Water Resources Control Board and USEPA drinking water standards set to protect public health. To further reduce the levels of the constituents identified in this report that are already below the health-based MCLs established to provide "safe drinking water", additional costly treatment processes would be required. The effectiveness of the treatment processes to provide any significant reductions in constituent levels at these already low values is uncertain. The health protection benefits of these further hypothetical reductions are not at all clear and may not be quantifiable. Therefore, no action is proposed. The money that would be required for these additional treatment processes might provide greater public health protection benefits if spent on other water system operation, surveillance, and monitoring programs. Page 308 of 563 024 7 %M ILUY r' Customer Views Are Welcome: The Truckee Donner Public Utility District encourages community partici- IiLJ pation in the public process. If you are interested in participating in the J TDPUD's decision-making process, you are welcome to attend Board rif H i►r z►r i►r ` i Meetings. The Board of Directors meets at 6:00 PM on the first and third Wednes- day of each month in the TDPUD Board room, located at 11570 Donner In This Document Pass Road, Truckee, California. Agendas for upcoming meetings may be obtained on our website or from the Deputy District Clerk's office, (530) . Water Quality General 582-3980. Information For More Information: . Source Water Assessment . Where Our Water Comes 0 About this report or the water treatment process, contact Truckee From Donner Public Utility District's Senior Water Quality Technician, Clay Walker at (530)582-3926. Lead In Home Plumbing 0 About water conservation and efficiency, the TDPUD has water con- • Radon servation programs that will help customers save water and save money. Information can be found on our website or by calling (530) • Definitions 587-3896. - Ah • r I��'.a��.S 1111�I i II I II I [ iti In�l l I1l ltf III III I l,tt II Ill t f 1It if IltHttl WWI �E urnirmm �I j �I �I�tC� .� �! IIIIII Glllll Iltlll 111111 IIIIII Illlll IIIIII A01111111tIll IM111111fil[fnr�prlmr iRr hL Este informe contiene informacion muy importante sobre su agua potable. Traduzcalo o hable con alguien que to entienda bien. Pa a 09 of 563 Water Quality Truckee Donner Public Utility District(TDPUD) is dedicated to providing its cus- tomers with the highest quality drinking water. Our water quality team works dili- gently to exceed State and U.S. Environmental Protection Agency(USEPA) standards. Each year,we collect and analyze 520 routine bac-t samples, along with additional monitoring required under Title 22.All samples are tested by a certified Environmental Laboratory Accreditation Program (ELAP)laboratory using methodologies mandated by State and Federal regulations.This report provides a snapshot of the water quality delivered to TDPUD customers in 2024. It includes details about your local water sources,water monitoring data, and how it com- pares to State and USEPA standards.We believe that well-informed customers play a vital role in maintaining high drinking water standards.That's why we are committed to transparency about your water supply and ongoing efforts to im- prove its quality. It is important to note,that while the TDPUD meets all State and Federal drinking water standards, certain individuals may be more vulnerable to contaminants than the general population. People with weakened immune sys- Source Water tems such as those undergoing cancer treatment, individuals who have received organ transplants, people with HIV/AIDS or other immune disorders, some elderly Assessment individuals, and infants, may be at a higher risk of infection.These individuals should consult their healthcare providers for guidance on drinking water safety. A source water assessment was prepared in For more information on reducing the risk of infection from Cryptosporidium and 2002 for the wells serving the Truckee area. other microbiological contaminants, refer to guidelines from the USEPA and the The wells are located throughout the town of Centers for Disease Control (CDC).You can access this information by calling the Truckee and Glenshire.The District owns Safe Drinking Water Hotline at(800)426-4791 or visiting httl)s://www.epa.gov/ and operates 10 wells varying in depth from 120ft to 500ft. The complete source water ground-water-and-drinking-water/safe-drinking-water-hotline. assessment and known vulnerabilities may be viewed at the Truckee Donner Public Utility District office, located at 11570 Donner Lead in Residential Plumbing Pass Road, Truckee, California, or by calling Chad Reed at(530)582-3984. If present, elevated levels of lead in drinking water can pose serious health risks, particularly for pregnant women and young children.When lead is detected, it typically originates from materials and components in service lines and residential plumbing rather than from the water source itself. While TDPUD ensures the de- livery of high-quality water,we cannot control the plumbing materials used in pri- vate properties. If water has been sitting in your pipes for an extended period, you can reduce potential lead exposure by flushing your tap for 30 seconds to 2 minutes before using water for drinking or cooking. TDPUD conducts routine lead sampling every three years.The most recent testing, performed in 2022,con- firmed that all sampled sites were below the Federal action level for lead.The next AWL round of testing is scheduled for summer 2025. More information about lead in drinking water,testing methods, and steps you can take to minimize exposure visit www.epa.gov/lead. Where Our Water Comes From e The drinking water supplied to Truckee Donner Public Utility District(TDPUD) customers in the Truckee system comes from 10 deep groundwater wells.Thanks to natural filtration,the underlying aquifer is well-protected from surface water Lead Line Service contamination, ensuring a high-quality drinking water supply. Inventory Cryptosporidium and Giardia A lead service line material inventory was Recognizing that our potable water sources are exclusively deep groundwater conducted and prepared in 2024 . There are wells,the presence of microscopic organisms such as Cryptosporidium and Giar- no lead lines in the distribution system. A dia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can detailed inventory is available here. cause diarrhea,fever, and other gastrointestinal symptoms. https://www.tdpud.org/departments/water/ water-quality Page 310 of 563 Arsenic In 2001 the United States Environmental Protection Agency (USEPA) implemented stricter standards for arsenic in drink- ing water, reducing the maximum contaminant level (MCL) from 50 parts per billion (ppb) to 10 ppb To put this into per- ' spective, 1 ppb is equivalent to 1 second in 32 years—an ex- F tremely small measurement. The drinking water provided by Truckee Donner Public Utility District (TDPUD) meets all cur- rent Federal and State standards for arsenic. However, the ; USEPA continues to research the potential health effects of prolonged exposure to low levels of arsenic, a naturally occur- ring mineral linked to an increased risk of cancer, as well as —' potential skin and circulatory issues. Water Source Blending: The TDPUD operates the Glen- shire Drive Well, Prosser Village Well and Old Greenwood Well under a State Water Resources Control Board (SWRCB) approved blending permit. This blending process helps re- duce detectable arsenic concentrations before the water en- Water Hardness ters the distribution system Recent arsenic monitoring results Occasionally, a water user will need to adjust an from the blending point ranged from 4.6 ppb to 9.4 ppb, with appliance, such as a dishwasher or water sof- an average of 7.1 ppb—well below the 10 ppb MCL set by the USEPA. tener, to a particular setting based upon the hardness of the water served to their home or Radon business. Radon is a radioactive gas that is colorless, tasteless, and Please use the information provided below to odorless. It is found throughout the United States and can help with water hardness questions. enter homes through cracks and openings in foundations, accumulating indoors regardless of a home's age or con- struction type. Radon can also be released into indoor air from household water use, such as showering, washing dishes, or other activities. However, compared to radon en- tering through the ground, exposure from drinking water is Water Softener /Appliance Setting far less common and occurs at much lower levels. Radon In 2022 testing, TDPUD had an average hard- is a known human carcinogen, and long-term exposure to ness result of 71.0 mg/L. That translates to an airborne radon has been linked to lung cancer. Drinking wa- average of 4.1 grains per gallon. One grain per ter containing radon may also increase the risk of stomach gallon equals 17.1 mg/L. cancer. If you are concerned about radon levels in your home, testing is recommended. It is generally affordable and easy to perform, and mitigation is advised for concentrations exceeding 4 picocuries per liter (pCi/L) of air. Many radon Grains per Gallon ppm (or mg/ issues can be resolved with cost-effective solutions. For Degree of Hardness (gpg) Q more information, contact: Your State Radon Program (1-800-745-7236) Soft < 1.0 < 17.0 USEPA Safe Drinking Water Hotline (1-800-426-4791) Slightly Hard 1.0- 3.5 17.1-60 National Safety Council Radon Hotline (1-800-SOS- Moderately Hard 3.5 - 7.0 60- 120 RADON). Hard 7.0- 10.5 120- 180 Very Hard > 10.5 > 180 age 3 1 1 o Substances That Could Be In Water Definitions Drinking water—whether from tap or bottled Maximum Contaminant Level (MCL): The highest sources—comes from rivers, lakes, streams, level of a contaminant that is allowed in drinking wa- ponds, reservoirs, springs, and wells. As wa- ter. Primary MCLs are set as close to the PHGs (or ter moves across the land or through the _j MCLGs) as is economically and technologically fea- ground, it can dissolve naturally occurring . " sible. Secondary MCLs are set to protect the odor, minerals and radioactive materials and may taste, and appearance of drinking water. also pick up substances from human activi- ties or animal presence. , i Maximum Contaminant Level Goal (MCLG): The level of a contaminant in drinking water below which To ensure the safety of tap water, the U.S. there is no known or expected risk to health. MCLGs Environmental Protection Agency (USEPA) k are set by the U.S. Environmental Protection Agency and the State Water Resources Control (USEPA). Board (State Board)establish regulations that 9-F.K in limit the presence of certain contaminants in Public Health Goal (PHG): The level of a contami- public water systems. Similarly, State Board regulations set contaminant limits nant in drinking water below which there is no known for bottled water to provide the same level of public health protection. or expected risk to health. PHGs are set by the Cali- fornia Environmental Protection Agency. It is important to note that all drinking water, including bottled water, may con- tain small amounts of contaminants. However,their presence does not neces- Maximum Residual Disinfectant Level (MRDL): sarily indicate a health risk. The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of Contaminants that may be present in source water include: a disinfectant is necessary for control of microbial Microbial Contaminants, such as viruses and bacteria, that may come from contaminants. sewage treatment plants, septic systems, agricultural livestock operations, and Maximum Residual Disinfectant Level Goal wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the rally occurring or can result from urban stormwater runoff, industrial or domes- tic wastewater discharges, oil and gas production, mining, or farming; use of disinfectants to control microbial contami- nants. Pesticides and Herbicides, that may come from a variety of sources such as Primary Drinking Water Standards (PDWS): MCLs agriculture, urban stormwater runoff, and residential uses; and MRDLs for contaminants that affect health along Organic Chemical Contaminants, including synthetic and volatile organic with their monitoring and reporting requirements, and chemicals, which are by-products of industrial processes and petroleum water treatment requirements. production, and which can also come from gas stations, urban stormwater Secondary Drinking Water Standards (SDWS): runoff, agricultural applications, and septic systems; MCLs for contaminants that affect taste, odor, or Radioactive Contaminants, that can be naturally occurring or can be the re- appearance of the drinking water. Contaminants with sult of oil and gas production and mining activities. SDWSs do not affect the health at the MCL levels. More information about contaminants and potential health effects can be Regulatory Action Level (AL):The concentration of obtained by calling the USEPA's Safe Drinking Water Hotline at(800)426- a contaminant which, if exceeded, triggers treatment 4791. or other requirements that a water system must fol- low. Table Key N/A: not applicable N/D: not detectable at testing limit ppm: parts per million or milligrams per liter(mg/L) ppb: parts per billion or micrograms per liter(pg/1) ppt: parts per trillion or nanograms per liter(ng/L) - pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter Page 312 of 563 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drink- ing water regulations. Some data may be more than one year old. Based upon Federal and State requirements, the moni- toring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annual- ly, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1 - SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Highest No. Microbiological Contam- No. of months in viola- inants of Detec- tion MCL MCLG Typical Source of Bacteria tions More than 5%of Naturally present in the envi- Total Coliform Bacteria 0 0 samples in a month 0 ronment with a detection TABLE 2 -DISINFECTION BYPRODUCTS #Samples, Average MCLG Typical Source of Contami- Contaminant Frequency Level Range MCL(MDRL) (MDRLG) nant 40-50 per Drinking water disinfectant Chlorine Residual(ppm) month 0.38 .36-.42 4 4 added for treatment By-product of drinking water Haloacetic Acids(ppb) 2 on 8/21/24 1.1 0-2..2 60 N/A disinfection Total Trihalomethanes By-product of drinking water (ppb) 2 on 8/21/24 12.05 7.1-17 80 N/A disinfection TABLE 3 -DISTRIBUTION CUSTOMER TAP SAMPLING FOR LEAD AND COPPER No. of sam- 90th No. sites Date Last percentile Typical Source of Contami- Lead and Copper Sampled Ples collect- level de- exceeding AL PHG nant ed tected AL Internal corrosion of household Lead(ppb) August 32 7.0 0 15 0.2 plumbing systems; discharges 2022 from industrial manufac- tures,erosion of natural deposits Internal corrosion of household Copper(ppm) August 32 0.180 0 1.3 0.3 plumbing systems; erosion of 2022 natural deposits; leaching from wood preservatives Page 313 of 563 TABLE 4- LEAD SAMPLING FOR SCHOOL DISTRICT No. of Schools Re- No. sites Contaminant Dated questing Range exceeding AL PHG Typical Source of Contami- pleLead Sam- AL nant pling Internal corrosion of household Lead(ppb) Dec-18 8 <0.2 0 15.0 0.2 plumbing systems; erosion of natural deposits; leaching from wood preservatives TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Average Level Range of Detec- PHG Typical Source of Contami- (reporting units) Sampled Detected tions MCL (MCLG) nant Alkalinity(as CaCO3) 2022 77 69-88 N/A N/A Naturally present in water (ppm) Bicarbonate Alkalinity(as 2022 77 69-88 N/A N/A Naturally present in water HCO3) (ppm) Calcium(ppm) 2022 15 11-33 N/A N/A Naturally occurring Potassium(ppm) 2022 3.3 2.1-8.3 N/A N/A Leaching of natural depo TABLE 6 -DETECTION OF CONTAMINANTS PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Average Level Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled Detected tions (MCLG) nant Arsenic (ppb) 2022 4.70 N/D - 10 10 0.004 Erosion of natural deposits Barium(ppb) 2022 17.70 7.1-29 1000 2000 Erosion of natural deposits Chromium, Total(ppb) 2022 0.50 N/D- 1.4 100 100 Erosion of natural deposits Chromium,Hexavalent 2023 .8 .29-1.4 10 .1 Erosion of natural deposits (ppb) Fluoride(ppm) 2022 0.01 N/D - 0.63 2 1 Erosion of natural deposits Runoff and leaching from ferti- Nitrate as N(ppm) 2024 0.30 N/D - 0.50 10 10 lizer use; leaching from septic tanks and sewage; erosion of natural deposits Turbidity(NTU) 2022 0.20 N/D - 0.45 5 5 Soil runoff Gross Alpha Particle 2007-2018 0.7 N/D -4.6 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2004 90.8 N/D-560 N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon.The EPA has an advisory MCL of 4000 Page 314 of 563 TABLE 7 —DETECTION OF CONTAMINANTS SECONDARY DRINKING WATER STAND- ARD Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant Chloride(ppm) 2022 11.7 1-62 250 N/A Leaching of natural deposits Odor-Threshold(TON) 2022 0.4 N/D- 1 3 N/A Naturally-occurring organic materials pH 2O22 8.1 8-8.2 6.5 - 8.5 6.5 - 8.5 Leaching of natural deposits Specific Conductance 2019 182 110- 380 1600 N/A Substances that form ions when (µS/cm) in water. Total Dissolved Solids 2019 122 110-230 500 N/A Leaching of natural deposits (ppm) TABLE 8 — Fifth Unregualted Contaminant Monitoring Rule (UCMR 5) Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant PFHxA 2023 .0006 N/D-.0044 N/A .003 Leaching of anthropogenic sub- stance PFPeA 2023 .0007 N/D-.0046 N/A .003 Leaching of anthropogenic sub- stance PFNA 2023 .0004 N/D-.0046 N/A .004 Leaching of anthropogenic sub- stance Lithium 2023 7.7 N/D-32 N/A 9 Naturally-occurring elements Page 315 of 563 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A. The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of water quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. age 616 of 563 11111::1111 111111111114-MIA .111111111 W TER, A LITY-RUEP-0-R.-T 0 Customer Views Are Welcome The Truckee Donner Public Utility District encourages community partici- pation in the public process. If you are interested in participating in the TDPUD's decision-making process, you are welcome to attend Board Meetings. The TDPUD Board of Directors meets at 6:00 PM on the first and third Wednesday of each month in the TDPUD Board room, located at 11570 � ' Donner Pass Road, Truckee, California. Agendas for upcoming meetings may be obtained on our website or from the Deputy District Clerk's office, (530)582-3980. For More Information: 0 About this report or the water treatment process, contact Truckee ' ' ' i Donner Public Utility District's Senior Water Quality Technician, Clay 3 j For more J Walker at (530)582-3926. � information about I us, please visit our 0 About water conservation and efficiency, the TDPUD has water website at conservation programs that will help customers save water and save www.tdpud.org . —� money. Information can be found on our website or by calling (530) 587-3896. i� F-i i v► 0 0 00� ' i HIRSCHDALE WATER SYSTEM In This Document • Water Quality General Information r • Source Water Assessment • Where Our Water Comes From � r ` • Lead In Drinking Water Definitions s ` + •� Sampling Results Page 317 of 563 Water Quality �T Truckee Donner Public Utility District (TDPUD) is committed to delivering high quality drinking water to its customers. Our water quality team strives to exceed 1; T State and U.S. Environmental Protection Agency(USEPA)standards by conducting . 12 routine bacteriological samples annually, along with additional monitoring re- quired under Title 22.All samples are analyzed by a certified Environmental Labora- tory Accreditation Program (ELAP) laboratory using methodologies mandated by T- State and Federal regulations. This report provides a snapshot of the water quality delivered to TDPUD customers in 2024. It includes details about local water sources, annual water quality sampling data, and how our water compares to State and USEPA standards. We believe that well-informed customers play a crucial role in maintaining high drinking water standards. That's why TDPUD is dedicated to transparency and communication about your water supply. It is important to note R that while TDPUD meets all State and Federal drinking water standards, some indi- viduals may be more vulnerable to contaminants than the general population.Those at higher risk include immunocompromised individuals—such as cancer patients undergoing chemotherapy, organ transplant recipients, people with HIV/AIDS or Source Water other immune disorders, some elderly individuals, and infants. These individuals Assessment should consult their healthcare providers for guidance on drinking water safety. A source water assessment has been For more information on reducing the risk of infection from Cryptosporidium and completed for the well serving the other microbiological contaminants, refer to guidelines from the USEPA and the Hirschdale area. The well is located in the Centers for Disease Control (CDC). You can access this information by calling the town of Hirschdale. The District owns and Safe Drinking Water Hotline at (800) 426-4791 or visiting https://www.epa.gov/ operates the single well which is 270ft in ground-water-and-drinking-water/safe-drinking-water-hotline. depth. A copy of the complete assessment may be viewed at the Truckee Donner Public Utility District office, located at 11570 Lead in Residential Plumbing Donner Pass Road, Truckee, California, or by calling Chad Reed at(530)582-3984. Elevated levels of lead in drinking water can pose serious health risks, particularly for pregnant women and young children. When lead is detected, it typically origi- nates from service lines and residential plumbing materials, rather than from the water source itself. While Truckee Donner Public Utility District (TDPUD) provides high-quality water, we cannot control the plumbing materials used in private proper- �� f ties. If water has been sitting in your pipes for an extended period, you can reduce IMM_r,; potential lead exposure by flushing your tap for 30 seconds to 2 minutes before T � i ' I• using it for drinking or cooking. TDPUD conducts lead testing every three years.The most recent sampling, performed in 2022, confirmed that all tested sites were below the Federal action level for lead. For more information on lead in drinking water, testing methods, and ways to minimize exposure,visitwww.epa.gov/lead. K - 7 - Where Our Water Comes From ;;;,;,,;,;,,,,,,;, The drinking water supplied to our Hirschdale customers comes from a deep aquifer Lead Line Service well. Before reaching your home, this water is filtered to remove iron, manganese, and arsenic, ensuring its safety and quality.Thanks to natural filtration,the ground- Inventory water aquifer is well-protected from surface water contamination, providing a high- quality drinking water supply. A lead service line material inventory was conducted and prepared in 2024 . There are no lead lines in the distribution system. A Cryptosporidium and Giardia detailed inventory is available here. Recognizing that our potable water sources are exclusively drawn from a deep groundwater well, the presence of microscopic organisms such as Cryptosporidium 1 and Giardia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can cause diarrhea,fever, and other gastrointestinal symptoms. Page 318 of 563 Substances That May Be Found In Water Definitions Drinking water sources—both tap and bot- (MCL): The highest tled—include rivers, lakes, streams, ponds, level of a contaminant that is allowed in drinking water. reservoirs, springs, and wells. As water Primary MCLs are set as close to the PHGs (or MCLGs) moves over land or through the ground, it as is economically and technologically feasible. dissolves naturally occurring minerals and, in Secondary MCLs are set to protect the odor, taste, and some cases, radioactive materials, and can appearance of drinking water. also pick up substances from animals or hu- 4L man activities. ', (MCLG): The level of a contaminant in drinking water below which there is To ensure the safety of tap water, the U.S. " no known or expected risk to health. MCLGs are set by Environmental Protection Agency (USEPA) the U.S. Environmental Protection Agency(USEPA). and the State Water Resources Control Board (State Board) establish regulations (PHG): The level of a contaminant that limit the amount of certain contaminants in drinking water below which there is no known or in water provided by public systems. While drinking water, including bottled expected risk to health. PHGs are set by the California water, may contain small amounts of some contaminants, the presence of Environmental Protection Agency. many contaminants does not necessarily mean the water poses a health risk. ■ I (MRDL): The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of a Examples of contaminants that may be present in source water include: disinfectant is necessary for control of microbial contaminants. Microbial Contaminants, such as viruses and bacteria, that may come from stormwater or wastewater, septic systems, agricultural livestock operations, ORP and wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the use of rally occurring or can result from erosion, urban stormwater runoff, industrial or disinfectants to control microbial contaminants. domestic wastewater discharges, oil and gas production, mining, or farming; (PDWS): MCLs Pesticides and Herbicides, that may come from a variety of sources such as and MRDLs for contaminants that affect health along agriculture, urban stormwater runoff, and residential uses; with their monitoring and reporting requirements, and Organic Chemical Contaminants, including synthetic and volatile organic water treatment requirements. chemicals, which are by-products of industrial processes and petroleum Secondary Drinking Water Stand, (SDWS): MCLs production, and which can also come from gas stations, urban stormwater for contaminants that affect taste, odor, or appearance runoff, agricultural applications, and septic systems; of the drinking water. Contaminants with SDWSs do not Radioactive Contaminants, that can be naturally occurring or can be the affect the health at the MCL levels. result of oil and gas production and mining activities. (AL): The concentration of a More information about contaminants and potential health effects can be contaminant which, if exceeded, triggers treatment or obtained by calling the U.S. EPA's Safe Drinking Water Hotline at (800) 426- other requirements that a water system must follow. 4791. I Table Key N/A: not applicable N/D: not detectable at testing limit - - ppm: parts per million or milligrams per liter(mg/L) ppb: parts per billion or micrograms per liter(pg/L) ppt: parts per trillion or nanograms per liter(ng/L) pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter (NTU): nephelometric turbidity unit(measures water cloudiness) Page 319 of 563 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drinking water regulations. Some data may be more than one year old. Based upon Federal and State requirements,the monitoring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annually, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1—SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Microbiological Contami- Highest No. No.of months in nants of Detec- violation MCL MCLG Typical Source of Bacteria tions More than 5%of samples Total Coliform Bacteria 0 0 in a month with a detec- 0 Naturally present in the environment tion TABLE 2—DISINFECTION BY-PRODUCTS Contaminant #Samples, Average Range MCL(MRDL) MCLG Typical Source of Contaminant Frequency Level (MRDLG) Chlorine Residual(ppm) 1 per month 0.48 .40-.56 4 4 Drinking water disinfectant added for treatment Total Trihalomethanes 1 on 24 N/A 80 N/A By-product of drinking water (ppb) 8/21/24 disinfection Haloacectic Acids(ppb) 1 on 3.2 N/A 60 N/A By-product of drinking water 8/21/24 disinfection TABLE 3—DISTRIBUTION SYSTEM CUSTOMER TAP SAMPLING FOR LEAD AND COPPER 90th per- No.of No.sites Date Last centile Lead and Copper Sampled samples level de- exceeding AL PHG Typical Source of Contaminant collected tected AL Internal corrosion of household water Lead(ppb) 8/11/22 5 .02 0 15 0.2 plumbing systems;discharges from industrial manufacturers;erosion of natural deposits Internal corrosion of household Copper(ppm) 8/11/22 5 0.046 0 1.3 0.3 plumbing systems;erosion of natu- ral deposits;leaching from wood preservatives TABLE 4—SAMPLING RESULTS FOR SODIUM AND HARDNESS Chemical or Constituent Date Last Level De- PHG (reporting units) Sampled tected Range of Detections MCL (MCLG) Typical Source of Contaminant Sodium(ppm) 2022 40 N/A N/A N/A Salt present in the water and is general- ly naturally occurring Sum of polyvalent cations present Hardness(as CaCO3)(ppm) 2022 91 N/A N/A N/A in the water,generally magnesium and calcium,and are usually natu- rally occurring TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant Alkalinity(as CaCO3)(ppm) 2022 150 N/A N/A N/A Erosion of natural deposits Bicarbonate Alkalinity(as 2022 180 N/A N/A N/A Leaching of natural deposits HCO3)(ppm) Calcium(ppm) 2022 15 N/A N/A N/A Erosion of natural deposits Magnesium(ppm) 2022 13 N/A N/A N/A Erosion of natural deposits Potassium(ppm) 2022 7.1 N/A N/A N/A Erosion of natural deposits Page 320 of 563 _ TABLE 6—DETECTION OF CONTAMINANTS WITH A PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tiions MCL (MCLG) Typical Source of Contaminant Inorganic Contaminants Arsenic(ppb) 2023 .63 N/D-1.8 10 0.004 Erosion of natural deposits Barium(ppm) 2022 87 N/A 1000 2000 Erosion of natural deposits Fluoride(ppm) 2022 0.096 N/A 2 1 Erosion of natural deposits Turbidity(NTU) 2022 3 N/A 5 5 Soil runoff Radioactive Contaminants Gross Alpha Particle 2018 N/D 3 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2005 570 N/A N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon. The EPA has an advisory MCL of 4000 pCi/L for Radon. TABLE 7—DETECTION OF CONTAMINANTS WITH A SECON NDAR Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant Chloride(ppm) 2022 7.6 N/A 250 N/A Leaching of natural deposits Iron(ppb) 2022 9.5 N/A 300 N/A Leaching of natural deposits Manganese(ppb) 2022 13 N/A 50 N/A Leaching of natural deposits pH 2O22 7.9 7.7- 8.0 6.5- 8.5 N/A Erosion of natural deposits Specific)Conductance 2022 350 N/A 1600 N/A Substances that form ions when in (µS/cm Sulfate 2022 14 N/A 250 N/A Leaching of natural deposits Total Dissolved Solids 2022 250 N/A 500 N/A Leaching of natural deposits (ppm) Page 321 of 563 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A.The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of wa- ter quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. Page 322 of 563 SAMPLING RESULTS SHOWING TREATMENT OF SURFACE WATER SOURCES Treatment Technique Pall membrane microfiltration with chlorination. (Type of approved filtration technology used) _ Turbidity of the filtered water must: Turbidity Performance Standards N 1—Be less than or equal to 0.3 NTU in 95%of measurements in a month. (that must be met through the water treatment process) 2—Not exceed 1.0 NTU for more than eight consecutive hours. 3—Not exceed 1 NTU at any time. Lowest monthly percentage of samples that met Turbidity Perfor- 100% mance Standard No. 1. Highest single turbidity measurement during the year 0.051 f r• °i�'` Number of violations of any surface water treatment requirements 0 __r:-- __ —. ►_ (a) Turbidity(measured in NTU)is a measurement of the cloudiness of water and is a good indicator of water quality and filtration performance. •_� ; Turbidity results which meet performance standards are considered to be in compliance with filtration requirements. .'L 1. i i� Measurements reported here were collected in 2023 (unless otherwise noted). In accordance with federal regulations, data is from the most recent tests.The District is allowed to monitor for certain contaminants less than once per year because concentrations of these contaminants do Northstar Community Services District not change frequently. Northstar Water System Drinking water,including bottled water,may reasonably be expected to contain at least small amounts of some contaminants. The presence of Annual Water Quality Report contaminants does not necessarily indicate that the water poses a health risk. More information about contaminants and potential health c,3 2023 v,) effects can be obtained by calling the USEPA's Safe Drinking Water Hotline(1-800-426-4791). _ Some people may be more vulnerable to contaminants in drinking water than the general population. Immuno-compromised persons such as This state-mandated annual report contains important persons with cancer undergoing chemotherapy,persons who have undergone organ transplants,people with HIV/AIDS or other immune sys- information about the quality of your drinking water. tem disorders,some elderly,and infants can be particularly at risk from infections.These people should seek advice about drinking water from their health care providers.USEPA/Centers for Disease Control(CDC)guidelines on appropriate means to lessen the risk of infection by Cryptos- poridium and other microbial contaminants are available from the Safe Drinking Water Hotline(1-800-426-4791). The sources of drinking water(both tap water and bottled water)include rivers,lakes,streams,ponds,reservoirs,springs,and wells. As water travels over the surface of the land or through the ground,it dissolves naturally-occurring minerals and,in some cases,radioactive material, and can pick up substances resulting from the presence of animals or from human activity. In order to ensure that tap water is safe to drink,the USEPA and the State Water Resources Control Board(State Board)prescribe regulations that limit the amount of certain contaminants in water provided by public water systems.State Board regulations also establish limits for con- taminants in bottled water that provide the same protection for public health. Contaminants that may be present in source water include: • Microbial contaminants,such as viruses and bacteria,that may come from sewage treatment plants,septic systems,agricultural livestock operations,pets and wildlife. • Inorganic contaminants,such as salts and metals that can be naturally-occurring or result from urban stormwater runoff,industrial or domestic wastewater discharges,oil and gas production,mining,or farming. • Pesticides and herbicides that may come from a variety of sources such as agriculture,urban stormwater runoff,and residential uses. • Organic chemical contaminants, including synthetic and volatile organic chemicals,that are byproducts of industrial processes and petrole- um production,and can also come from gas stations,urban stormwater runoff,agricultural application,and septic systems. • Radioactive contaminants that can be naturally-occurring or be the result of oil and gas production and mining activities. If present,elevated levels of lead can cause serious health problems,especially for pregnant women and young children. Lead in drinking wa- ter is primarily from materials and components associated with service lines and home plumbing. The NCSD is responsible for providing high quality drinking water,but cannot control the variety of materials used in plumbing components. When your water has been sitting for several hours,you can minimize the potential for lead exposure by flushing your tap for 30 seconds to 2 minutes before using water for drinking or •%Ilunuauaoo aaS ul a nw �(tllenb ayt N aqi a a saolnaas ollgnd aaoo cooking. If you are concerned about lead in your water,you may wish to have your water tested. Information on lead in drinking water, saanllap�ola�sld saolnaas/��IunuauaoD ae�sy�aoN aql:�uauaa;e;s uolsslW anp testing methods,and steps you can take to minimize exposure is available from the Safe Drinking Water Hotline or at http://www.epa.gov/ safewater/lead. i T9T96 VD aaN:)nal While your drinking water meets the federal and state standard for arsenic,it does contain low levels of arsenic. The arsenic standard balances @AIJQ Je4Sg4JON 006 the current understanding of arsenic's possible health effects against the cost of removing arsenic from drinking water. The U.S. Environmental pu4sia S2:)IAJ@S )Qunu.woD Je4Sg4JoN Protection Agency continues to research the health effects of low levels of arsenic,which is a mineral known to cause cancer in humans at high concentrations and is linked to other health effects such as skin damage and circulatory problems. Page 323 of 563 uear Cl11 merz NCSD WATER QUALITY TEST RESULTS THROUGH DECEMBER 31, 2023 SAMPLING RESULTS FOR COLIFORM BACTERIA The Northstar Community Services District (NCSD) is proud to provide some of the nation's cleanest drink- Microbiological Numberof Numberof ing water. In 2023, as in years past, our water met or exceeded all federal and state standards for drinking Contaminant detections months in MCL MCLG Typical Source of Bacteria violation water. The State of California mandates that we send this Annual Water Quality Report to you, which in- Total Coliform (In a mo.) More than 1 sample in a month with a Naturally present in the cludes important information about your drinking water. Bacteria 0 0 detection 0 environment The NCSD draws its source water from four locations. Two sources are natural mountain springs located in Fecal Coliform (In the year) A routine sample and a repeat sample Human and animal fecal 0 detect total coliform and either sample 0 waste the mid-mountain region of the Northstar California Resort. The water is collected in the Big Springs collet- or E. tali 0 also detects fecal coliform or E. coh lion system and Sawmill Flat Springs collection system and then treated at the District's state-of-the-art Water Treatment Facility prior to being delivered to the customers' tap. The other two sources are wells SAMPLING RESULTS FOR LEAD AND COPPER (TH-1 and TH-2) located in the Martis Valley that were developed in 2013 and 2007, respectively, to help Constituent Units Sample Year Level AL PHG Typical Source of Contaminant meet future water demands as the community continues to expand. I Source I I Detected Lead uglL Distribution 2021 4.40 15 0.2 Internal corrosion of household plumbing We are committed to delivering the highest quality drinking water, ensuring that our customers receive clean, safe water from their taps. In 2023, the District delivered roughly 160 million gallons of drinking wa- Copper mg/L Distribution 2021 0.238 1.3 0.3 Internal corrosion of household plumbing ter through 30 miles of pipeline to over 950 residential and commercial services throughout the Northstar SAMPLING RESULTS FOR UNREGULATED SUBSTANCES community. Sample Level Constituent Units Source Year Detected MCL PHG Typical Source of Contaminant Should you have any questions or would like to obtain additional information, please contact the Northstar Sodium mg/L Big Springs 2018017 22 .8 4 none none Runoff I leaching from natural deposits Community Services District or go to our website at www.northstaresd.org Big Springs 2017 57 Hardness mg/L TH1 1 TH2 2018/2017 59193 none none Runoff I leaching from natural deposits In case of a water or sewer emergency, please call 530-562-0747 DETECTION OF CONTAMINANTS WITH A PRIMARY DRINKING WATER STANDARD Constituent Units Sou Sample Year Detected Level MCL PHG Typical Source of Contaminant Want More Information? Big Springs 2017 ND Arsenic uglL 10 0 Erosion of natural deposits The NCSD Board of Directors meets regularly TH1 l TH2 2023/2023 5.3 l 2.2 Big Springs 2023 0.047 TH1 1 TH2 NIA 12023 NIA 11.53 each month. Please feel free to participate in Gross Alpha pCi1L 15 0 Erosion of natural deposits '-' - these meetings.For meeting dates,times and Big Springs 2017 0.099 locations please contact our main office at Radium 228 pCi1L TH1 1 TH2 NIA 12023 N/A 10.34 5 0 Erosion of natural deposits (530)562-0747. You may also find more infor- mation by visiting our website: DETECTION OF CONTAMINANTS WITH A SECONDARY DRINKING WATER STANDARD www.northstaresd.org Constituent Units Sample Year Level MCL PHG Typical Source of Contaminant Este informe contiene informacion muy i - Source Detected m portante sabre su agua potable. Chloride mglL Big Springs 2017 0.7 500 none Runoff 1 leaching from natural deposits TH1 /TH2 2018/2017 8.2/4.0 Traduzcalo o habla con alguien que to en- Specific Big Springs 2017 134 Conductance PS/cm TH1 1 TH2 2018/2017 259/266 1600 Wane Substances that form ions when in water DEFINITIONS: Understanding Your Water Quality Report Sulfate mg/L Big TH SpTH2 2018rings 017 11017.2 500 none Runoff 1 leaching from natural deposits MCL:Maximum Contaminant Level.The highest level of a contaminant that is Primary Drinking Water Standard.MCL's and MRDL's for contaminants that Total Dissolved Big Springs 2017 91 allowed in drinking water.Primary MCL's are set as close to the PHG's(or affect health along with their monitoring and reporting requirements,and water mg/L 1000 none Runoff 1 leaching from natural deposits MCLG's)as is economically and technologically feasible.Secondary MCL's are treatment requirements. Solids TH1 1 TH2 2018/2017 180/ 197 set to protect the odor,taste and appearance of drinking water. PHG:Public Health Goal.The level of a contaminant in drinking water below MCLG:Maximum Contaminant Level Goal.The level of a contaminant in which there is no known or expected risk to health.PHG's are set by the California drinking water below which there is no known or expected risk to health.Set by Environmental Protection Agency. DISINFECTANTS & DISINFECTION BYPRODUCTS IN THE DISTRIBUTION SYSTEM the U.S.Environmental Protection Agency. AL:Action Level.The concentration of a contaminant,which if exceeded,triggers MRDL:Maximum Residual Disinfectant Level.The highest level of a treatment or other requirements which a water system must follow. disinfectant allowed in drinking water.There is convincing evidence that addition NTU:Ne helometric Turbidity Units.A measure of the clarityof water.TurbiditySample Level M R D L M R D L G of a disinfectant is necessary for control of microbial contaminants. p ty Constituent Units Source Year Detected (MCL) MCLG) Typical Source of Contaminant 'S' is monitored because it is a good indicator of water quality.High turbidity can MRDLG:Maximum Residual Disinfectant Level Goal.The level of a drinking hinder the effectiveness of disinfectants. water disinfectant below which there is no known or expected risk to health. pCi/L:picocuries per liter.A measure of radiation. Chlorine mg/L Distribution 2023 0.43-0.73 4.0 4 Water additive used to control microbes MRDLG's do not reflect the benefits of the use of disinfectants to control microbial contaminants. mg/L:milligrams per liter or parts per million(ppm) AL:Action Level. ug/L:micrograms per liter or parts per billion(ppb) Theconcentrationofacontaminant,whichifexceeded, Trihalomethanes uglL Distribution 2023 ND-2.$ ($0) (NIA) Byproduct of drinking water disinfection triggers treatment or other requirements which a water system must follow. uS/cm:MicroSiemens per centimeter TT:Treatment Technique.A required process intended to reduce the level of a ND:ND or Non-Detected:An analysis result below detectable levels. contaminant in drinking water. NA:Non-Applicable Haloacetic Acids ug/L Distribution 2023 ND-2.7 (60) (NIA) Byproduct of drinking water disinfection Page 324 of 563 G M P Nevada and Placer Counties, California June 2025 Appendix E — DRI Technical Note Page 325 of 563 SCIENCE• ENVIRONMENT•SOLUTIONS - CDRI Division of Hydrologic Sciences Desert Research Institute Technical Note To: Tony Firenzi, Placer County Water Agency; Tina Bauer, Brown and Caldwell From: Seshadri Rajagopal,Donald M. Reeves,Justin Huntington, Greg Pohll (Desert Research Institute) Date: September 10, 2012 Re: Estimates of Ground Water Recharge in the Martis Valley Ground Water Basin Purpose and Scope This technical note provides spatially-distributed estimates of annual ground water recharge in the Martis Valley Ground Water Basin using a physically-based hydrologic model: Precipitation Runoff Modeling System(PRMS).PRMS simulates land surface hydrologic processes of evapotranspiration, runoff,infiltration, and interflow by balancing energy and mass budgets of the plant canopy, snowpack, and soil zone on the basis of distributed climate information(Leavesley et al., 1983), and has been used in several other basins to estimate ground water recharge(e.g.,Lichty and McKinley, 1995;Vaccaro and Olsen,2007; Cherkauer and Ansari,2005; Cherkauer,2004). Recharge in the current study is defined as the infiltration of water to the subsurface beyond the root zone(where present)or the soil zone, in case of bare soil absent of vegetation(Figure 1). Thus,the recharge estimates contained within this report represent total annual recharge within the delineated Martis Valley Ground Water Basin. The Martis Valley Ground Water Basin was first delineated by Hydro-Search, Inc. and was later adopted by the California DWR as the official ground water basin. In this report we refer to this region as the HSI ground water basin or Martis Valley Ground Water Basin(Figure 2). Total recharge consists of both recharge to the deep ground water system and shallow recharge that ultimately discharges into streams. The technical note describes the use of climate data in PRMS,the PRMS method used to compute recharge, and recharge estimates. Recharge estimates from previous studies and an additional method are provided to place the PRMS computed results in the context of other estimates. Previous Estimates of Recharge for Martis Valley Past studies primarily relied on empirical and water balance methods to estimate recharge within the Martis Valley Ground Water Basin(Figure 2). One of the earliest recharge studies was conducted by Hydro-Search,Inc. (1974)which was subsequently updated in 1980 and 1995. Hydro-Search Inc. (HSI) 2215 Raggio Parkway,Reno,Nevada 89512-1095 755 E.Flamingo Road,Las Vegas,Nevada 89119-7363 Phone(775)673-730o Fax(775)673-7363 Phone(702) 862-540o Fax(702) 862-5427 Page 326 of 563 utilized a water balance method to estimate ground water recharge to the Martis Valley Ground Water Basin of approximately 18,000 ac-ft/yr. In 2001 Nimbus Engineers used a water balance approach to compute a recharge value of 24,700 ac-ft/yr to the ground water basin. Kennedy/Jenks Consultants in 2001 published a report titled"Independent Appraisal of Martis Valley Ground Water Availability, Nevada and Placer Counties, California"where they concluded that the earlier studies by Hydro-Search, Inc (1974 and updates)and Nimbus Engineers(2001)were conservative, as the total amount of ground water discharge to streams was considered under predicted; however,updated recharge estimates were not provided in this report. Interflow Hydrology, Inc. and Cordilleran Hydrology, Inc.prepared a 2003 report indicating that ground water discharge to tributary Truckee River streams in the Martis Valley Ground Water Basin is 34,560 ac-ft/yr, of which approximately 24,240 ac-ft/yr is contributed by high altitude areas of the basin(e.g., in the vicinity of Northstar) and the remaining 10,320 ac-ft/yr occurs in lower elevation areas. In summary,previous recharge estimates based on water balance approaches range from 18,000 to 34,560 ac-ft/yr. Description of PRMS Recharge Method The PRMS model(Leavesley et al., 1983) is driven by daily values of precipitation and maximum and minimum air temperature, and simulates snow accumulation,ablation, canopy interception, evapotranspiration, surface runoff, infiltration,water storage in the soil zone and deep percolation through the bottom of the root or soil zone—PRMS recharge is defined as the model computed excess water leaving the root or soil zone after abstractions for surface runoff and evapotranspiration are accounted for(Figure 1). The system is modeled in its natural transient state from 1981 to 2011.Reservoir operations,irrigation within the basin, septic drainfields,and diversion of effluent to the Truckee Tahoe Sanitation Agency and subsequent release of treated effluent to the Truckee River are not explicitly simulated in the model. However,the Martis Valley PRMS model utilizes naturalized flows that remove the effects of reservoir operations during model calibration. The current PRMS model developed for Martis Valley encompasses the entire Martis Valley hydrologic basin(Figure 2), and is subdivided into 14 watersheds for model calibration to internal stream gauges. Computation of recharge for the Martis Valley Ground Water Basin requires aggregation of the PRMS results for all cells within the delineated ground water basin(Figure 3). The model domain was discretized into square grid cells of 300 in resolution; each of these cells represents a hydrologic response unit(HRU). The model is parameterized from the National Elevation Dataset(NED), STATSGO soils database, and USGS land use land cover(LULL) dataset. The depth of the root or soil zone is determined by the LULC of the HRU.Five categories of LULC are used to assign these depths viz. bare soils, grasses, shrubs,trees,and water. For the category water,recharge is assumed zero. Daily weather data from the Truckee#2 SNOTEL site is used to drive the PRMS model. This station is used to develop monthly ratios based on PRISM maps to distribute precipitation over the entire basin. To account for days when temperature inversions within the valley occur, an additional weather station,Mt. Rose SNOTEL, is implemented. PRMS Recharge Estimates The estimated mean annual ground water recharge for the Martis Valley Ground Water Basin computed from PRMS is presented in Figure 4. PRMS simulated recharge varies from year to year based Page 2 of 11 Page 327 of 563 on annual cycles of precipitation(Figure 5). The annual average recharge estimate from the PRMS model is 32,745 ac-ft,which is slightly lower than the Interflow Hydrology 2003 estimate of 34,560 ac-ft. We also applied a modified Maxey-Eakin(1949)method to estimate recharge which relates mean annual precipitation to recharge using recharge coefficients applied to precipitation amounts (Figure 3) (Epstein et al.,2010). Epstein et al., 2010 computed revised Maxey-Eakin coefficients that are based on the PRISM precipitation distribution(Daly et al., 1994),which was used in this study. As shown in Figure 3,the modified Maxey-Eakin estimate of 35,168 ac-ft/yr is very close to the Interflow Hydrology estimate. Figure 6 shows the ratio of recharge computed by the PRMS model to annual precipitation. This ratio,which we term as `recharge efficiency', can be used to describe the fraction(or percentage) of precipitation that is converted to recharge. Computed recharge efficiencies for the Martis Valley ground water basin varies annually within a range of 18-26%. Discussion of Recharge Estimates PRMS computed recharge presented in Figures 4, 6 and 8 show that recharge to the Martis Valley Ground Water Basin varies both spatially and temporally. The spatial variability in recharge is primarily driven by precipitation trends (Figures 7 and 8). This is clearly observed in Figure 7 where the higher elevation areas,in general,receive greater amounts of precipitation than the rest of the basin.Note that the PRMS recharge shown in Figure 8 represents infiltrated water given the processes presented in Figure 1. The PRMS model neglects the influence of low permeable bedrock areas on the potential reduced rate of infiltration of precipitation. For example,the highest infiltration rates correspond to areas with the most precipitation. In reality,the highest elevation areas within the basin that receive the greatest amount of precipitation are located in the low-permeability mountain block. The low-permeability of the mountain block restricts the amount of infiltrating water, and forces water to redistribute as run-off and infiltrate downslope near the `bench' areas of the slope with deposits of higher permeability alluvium. This redistribution has been simulated in integrated models(e.g.,Huntington et al. 2012, in press)and inferred from ground water isotopes(Singleton et al., 2010). Thus,the spatial distribution of recharge, as shown in Figure 8,will change once the PRMS modeled recharge is combined with MODFLOW. This spatial redistribution will primarily change the pattern of recharge in the mountain block watersheds with only minimal changes to the lower elevation areas, and minimal changes in the total volume of recharge. Previous recharge estimates by Interflow Hydrology(34,560 ac-ft/yr),the Maxey-Eakin method (35,168 ac-ft/yr),and mean annual PRMS (32,745 ac-ft/yr)estimates are very similar and in agreement. Only the PRMS estimates provide insight as to annual variability in recharge with a range between 12,143 and 56,792 ac-ft/yr(Figure 4). These fluctuations in annual ground water recharge estimates are natural and primarily based on fluctuations in annual precipitation(Figure 5). Perhaps most importantly are the water years when the amount of recharge is lower than the mean(-33,000 ac-ft).As shown in Figure 4, this variability can be significant with `wet' and `dry' year-end members. Pumpage during dry years may deplete the ground water basin as water is extracted from storage,whereas wet years increase the storage of water in the basin. If the number of wet and dry years and the amount of recharge oscillates evenly, then the mean recharge estimates from Interflow,modified Maxey-Eakin and PRMS methods are suitable for mean annual water budget analysis. However, future changes in temperature and/or precipitation(both timing and annual quantity)can disrupt the balance between pumping and basin storage. The PRMS computed recharge consists of the sum of shallow infiltrated water that discharges into the Truckee River and its tributaries as well as deep percolation of ground water to deeper aquifers Page 3 of 11 Page 328 of 563 with water supply wells. Perennial basin yield,defined by the State of Nevada as the maximum amount of groundwater that can be salvaged each year over the long term without depleting the ground water reservoir,is not an appropriate metric to determine sustainable basin pumpage as values of perennial yield for a basin are usually limited to the maximum amount of natural discharge.Natural discharge from Martis Valley Basin consists of groundwater evapotranspiration, groundwater discharge to the Truckee River, along with a small quantity of groundwater outflow. As an alternative,we suggest that an analysis that utilizes the Martis Valley ground water model to define the `capturable' amount of streamflow by pumping within the basin(e.g.,Leake and Haney, 2010)would better quantify the relationship between sustainable pumpage and natural discharge. Evapotranspiration Air Solar PRECIPITATION- Temperature Precipitation Radiation RUNOFF MODELING SYSTEM Evaporation Interception Sublimation Through fall now pack Rain Sublimation p Evaporation Snowmelt Rain Surface runoff Impervious-zone reservoir Surface runoff Evaporation Recharge zone Transpiration Soil-zone Lower zone reservoir Transpiration Soil-zone Subsurface recharge Ground-water recharge Subsurface reservoir Subsurface flow Ground-water recharge Ground-water reservoir Ground-water flow Streamflow Ground water sink Figure 1. PRMS conceptual model schematic highlighting all simulated hydrologic processes and how ground water recharge is computed in the model(based on Leavesley et al., 1983). Page 4 of 11 Page 329 of 563 • r .J AI t ti f pr��J �- e�� ros er e r it �. Donner Lake V F �c Ma tis ese CO 5�1 Legend Streamgage N Streams W�E S Figure 2. PRMS model domain with 14 sub-watersheds denoted by color. Stream gauges used in the PRMS calibration are denoted by triangles. Page 5 of 11 Page 330 of 563 r p r- ro�,,e - `�� ros r e r Donner Lak Ma tis es G° Legend Streams x HSi Ground Water Basin W E 's1 Figure 3. PRMS model domain with a portion of the sub-watersheds combined to adhere to the delineated Martis Valley Ground Water Basin inset(blue). All recharge estimates in this study are computed over the blue area.The Martis Valley Ground Water Basin area was delineated by Hydro Search Inc. (HSI). Page 6 of 11 Page 331 of 563 Martis Valley GWB Recharge in Ac-Ft 60000 PRMS Variable Recharge Estimate 50000 PRMS Mean Recharge v 40000 Estimate Q -- - --—--- - ----- -—— -- -- - h `-' ......... ........................................ ........................... .... Maxey Eakin Recharge � 30000 Estimate 20000 - Nimbus Engg Estimate (2001) 10000 Interflow Hydrology& Cordilleran Hydrology Inc 0 Estimate (2003) 1980 1985 1990 1995 2000 2005 2010 2015 Figure 4. Annual recharge volumes computed by PRMS with comparison to recharge estimates from other methods and past studies. Martis Valley GWB Precipitation in Ac-Ft 250000 200000 LL Q150000 CI. •75 100000 �7 L CL 5DDDD 0 1980 1985 1990 1995 2000 2005 2010 2015 Figure 5. Annual precipitation volume over the Martis Valley Ground Water Basin Page 7 of 11 Page 332 of 563 Percent Recharge (Recharge/Precipitation) 30.00 25.00 0 C 41 u L Q 20.00 15.00 1980 1985 1990 1995 2000 2005 2010 2015 Figure 6. Value of recharge efficiency computed as the ratio of annual recharge to annual precipitation. The mean recharge efficiency value is 23%. Page 8 of 11 Page 333 of 563 fir► 1 h Are" � "Os er e r ti Donner Lake �Z Ma tis ese ,, v. ti ` is 40 T� Legend Streams Mean annual precip, inches High :70.0 Low: 22.9 { ! Figure 7. Mean annual precipitation(inches)in the Martis Valley PRMS model domain from PRISM (Daly et al., 1994). Page 9 of 11 Page 334 of 563 ros r e n i) QonfiECP aake- i L �r r■ � Legend Streams Mean annual recharge, inches —MW High :27.9 N I ' Low:0.8 s Figure 8. Mean annual recharge(inches)in the Martis Valley PRMS model domain.Note that the greatest quantities of recharge occurs in the high elevation areas which receive more precipitation(Figure 7). Page 10 of 11 Page 335 of 563 References Cherkauer,D. S., and S.A.Ansari,2005. Estimating ground water recharge from topography, hydrogeology and land cover, Ground Water,43(1), 102-112 Cherkauer,D. S.,2004. Quantifying ground water recharge at multiple scales using PRMS and GIS, Ground Water,42(1), 97-110. Daly, C.,R. P.Neilson, and D. L. Phillips, 1994. A statistical-topographic model for mapping climatological precipitation over mountainous terrain.Journal of Applied Meteorology 33, 140- 158 Epstein,B.J., G.M. Pohll,J. Huntington, and R.W.H. Carroll,2010. Development and uncertainty analysis of an empirical recharge prediction model for Nevada's desert basins,Journal of the Nevada Water Resources Association 5(1). Hardman, G., 1936. Precipitation map of Nevada.Nevada Agricultural Experiment Station. Huntington,J.L. and R.G.Niswonger, 2012. Role of surface water and groundwater interactions on projected baseflows in snow dominated regions: an integrated modeling approach. Water Resources Research,in press. Hydro-Search,Inc., 1995. Ground Water Management Plan Phase 1 Martis Valley Ground-Water Basin No. 6-67 Nevada and Placer counties, California. Prepared for Truckee Donner Public Utility District January 31, 1995. Interflow Hydrology,Inc. and Cordilleran Hydrology,Inc., 2003. Measurement of Ground Water Discharge to Streams Tributary to the Truckee River in Martis Valley,Placer and Nevada Counties, California. IFH Report 2003-02,April 2003. Kennedy/Jenks Consultants,2002. Independent Appraisal of Martis Valley Ground Water Availability Nevada and Placer Counties, California,December 2002. Leake, S.A. and J. Haney,2010. Possible effects of groundwater pumping on surface water in the Verde Valley,Arizona, U.S. Geological Survey Fact Sheet 2010-3108. Leavesley, G.H.,R.W. Lichty,B.M. Troutman, and L.G. Saindon, 1983. Precipitation-runoff modeling system—user's manual.U.S. Geological Survey Water-Resources Investigations Report 83-4238, 207 p., accessed Aug 2012,at http://pubs.er.usgs.gov/usgspubs/wri/wri834238. Lichty,R. W. and P.W. McKinley, 1995. Estimates of ground water recharge rates for two small basins in central Nevada. U.S. Geological Survey Water Resources Investigations Report 94-4104 Maxey,G.B., and T.E. Eakin, 1949. Ground water in White River Valley,White Pine,Nye, and Lincoln counties,Nevada. State of Nevada,Office of the State Engineer, Water Resources Bulletin 8. Nimbus Engineers,2001. Ground Water Availability in the Martis Valley Ground Water Basin.Nimbus Job No. 0043. Singleton,M.J. and J.E. Moran,2010. Dissolved noble gas and isotopic tracers reveal vulnerability of groundwater in a small,high-elevation catchment to predicted climate changes. Water Resources Research,46,WOOF06, doi:10.1029/2009WR008718. Vaccaro,J.J. and T.D. Olsen,2007. Estimates of ground-water recharge to the Yakima River Basin aquifer system,Washington, for predevelopment and current land-use and land-cover conditions. U.S. Geological Survey Scientific Investigations Report 2007-5007, 30 p. Page 11 of 11 Page 336 of 563 APPENDIX D ORDINANCE 2021-01 FINDING THE NECESSITY FOR AND ADOPTING A WATER SHORTAGE CONTINGENCY PLAN DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 Pu blIc Utility District Ordinance No. 2021 - 01 FINDING THE NECESSITY FOR AND ADOPTING A WATER SHORTAGE CONTINGENCY PLAN WHEREAS, California Water Code Sections 375 et. seq. permit public entities which supply water at retail to adopt and enforce a water conservation program to reduce the quantity of water used by the people therein for the purpose of conserving the water supplies of such public entity; WHEREAS, California Water Code Section 10632 requires an urban water supplier to describe the actions to be undertaken in the event of a water supply shortage; WHEREAS, the Board of Directors of Directors of the Truckee Donner Public Utility District has determined that it is necessary to establish a Water Shortage Contingency Plan in the event of any future water supply shortage or drought emergency; WHEREAS, the Board of Directors finds and determines that a water shortage could exist in the event of major failure of one or more components of the water system or drought; WHEREAS, the Board of Directors also finds and determines that the water sources available be put to maximum beneficial use to the extent to which they are capable, and that the waste or unreasonable use, or unreasonable method of use, of water be prevented and that the conservation of such water be encouraged with a view to the maximum reasonable and beneficial use thereof in the interest of the people of the District and for the public welfare. NOW THEREFORE BE IT ENACTED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. The General Manager is hereby authorized and directed to implement the provisions of this ordinance. Additionally,the General Manager is hereby charged with interpretation, regulation and enforcement of the provisions of this ordinance, and authorized to make exceptions to prevent undue hardship or unreasonable restrictions, provided that water shall not be wasted or used unreasonably and the purpose of this ordinance can be accomplished. 2. To the extent that any of the existing and prior ordinances of the District applicable to its water system are inconsistent herewith, all such prior water ordinances shall be deemed revoked upon this ordinance becoming effective to the extent that they are inconsistent. 3. The provisions of this ordinance shall apply to all water served to persons, customers, and property by the District. The District shall declare which portions of the service area are subject to a water supply emergency and the requirements of this ordinance. 4. The provisions of this ordinance are not applicable to the uses of water which are necessary to protect public health and safety or for essential governmental services, such as police, fire and other similar emergency services. 1 Ordinance 2021-01 Page 338 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 5. No person shall knowingly use water or permit the use of water supplied by the District for commercial, industrial,agricultural, governmental, or any other purpose in a manner contrary to any provision of this ordinance, in an amount in excess of the amounts authorized by this ordinance or during any period of time other than the periods of time specified in this ordinance. At no time shall water be wasted or used unreasonably. 6. During the first quarter of each calendar year, the Water Department Shall conduct an annual assessment of water supply and demand as required by the California Water Code. The assessment shall follow the procedure outlined in the District's Water Shortage Contingency Plan. 7. WATER SUPPLY SHORTAGE LEVELS The following water supply shortage levels shall take effect upon declaration as herein provided: (a) Level 1 — Targeted 10% Reduction in Water Usage - Voluntary Compliance: Level 1 applies during periods that the District determines that water usage should be reduced approximately 10% in order to meet all of the water demands of its customers. Specific mandated restrictions in water use for Level 1 are as follows: 1. Irrigation with potable water of ornamental landscapes and turf shall be limited to every other day. 2. The application of potable water to driveways and sidewalks shall be prohibited unless for driveway sealing or construction. 3. The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, shall be prohibited (b) Level 2 — Targeted 20% Reduction in Water Usage - Mandatory Compliance: Level 2 applies during periods that the District determines that water usage should be reduced approximately 20% in order to meet all of the water demands of its customers. Specific mandated restrictions in water use for Level 2 are as follows: 1. Irrigation with potable water of ornamental landscapes and turf shall be limited to every other day. 2. The application of potable water to driveways and sidewalks shall be prohibited unless for driveway sealing or construction. 3. The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, shall be prohibited. 4. Customers may be subject to penalties for failure to comply with this requirement. (c) Level 3 — Targeted 30% Reduction in Water Usage - Mandatory Compliance: Level 3 applies during periods that the District determines that water usage should be reduced approximately 30% in order to meet all of the water demands of its customers. Specific mandated restrictions in water use for Level 3 are as follows: 1. Irrigation of ornamental landscapes and turf shall be limited to three days per week. 2. The application of potable water to driveways and sidewalks shall be prohibited. 3. The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, shall be prohibited. 4. The District may install flow restricting devices on a customer's service. 2 Ordinance 2021-01 Page 339 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 5. Customers maybe subject to penalties for failure to comply with this requirement. (d) Level 4 — Targeted 40% Reduction in Water Usage - Mandatory Compliance: Level 4 applies during periods that the District determines that water usage should be reduced approximately40% in order to meet all of the water demands of its customers. Specific mandated restrictions in water use for Level 4 are as follows: 1. Irrigation of ornamental landscapes and turf shall be limited to two days per week. 2. The application of potable water to driveways and sidewalks shall be prohibited. 3. The use of potable water to wash a motor vehicle, except where the hose is fitted with a shut- off nozzle, shall be prohibited. 4. Any customer leak in plumbing and/or irrigation systems shall be repaired when found, but in any case within ten days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs. 5. The District may install flow restricting devices on a customer's service. 6. Customers may be subject to penalties for failure to comply with this requirement. (e) Level 5 — Targeted 50% Reduction in Water Usage - Mandatory Compliance: Level 5 applies during periods that the District determines that water usage should be reduced approximately 50% in order to meet all of the water demands of its customers. Specific additional mandated restrictions in water use for Level 5 are as follows: 1. All outdoor water uses are prohibited in the area affected by the water conservation requirement. The District may discontinue service to irrigation services. 2. Any customer leak in plumbing system shall be repaired when found, but in any case within ten days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs. 3. The District may install flow restricting devices on a customer's service. 4. The District may implement mandatory water rationing through the use of rolling outages. 5. Customers may be subject to penalties for failure to comply with this requirement. (f) Level 6—Targeted Greater Than 50% Reduction in Water Usage-Mandatory Compliance: Level 6 applies during periods that the District determines that water usage should be reduced approximately 50% in order to meet all of the water demands of its customers. Specific additional mandated restrictions in water use for Level 6 are as follows: 1. All outdoor water uses are prohibited in the area affected by the water conservation requirement. The District may discontinue service to irrigation services. 2. Any customer leak in plumbing system shall be repaired when found, but in any case within ten days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs. 3. The District may install flow restricting devices on a customer's service. 4. The District may implement mandatory water rationing through the use of rolling outages. 3 Ordinance 2021-01 Page 340 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 5. Customers maybe subject to penalties for failure to comply with this requirement. 8. IMPLEMENTATION OF WATER SHORTAGE LEVELS The District shall monitor the projected supply and demand forwater by its customers on a daily basis. In the event of an emergency,the General Manager shall determine the extent of water conservation required through the implementation and/or termination of particular water shortage levels in orderfor the District to prudently plan for and supply water to its customers. Thereafter, the General Manager may order that the appropriate level of water conservation be implemented or terminated in accordance with the applicable provision of this ordinance. Water system customers shall be notified of water conservation stages in accordance with the communication protocols outlined in the District's Water Shortage Contingency Plan. The designated water shortage level shall become effective immediately upon announcement. The declaration of any water shortage shall be reported to the Board of Directors as soon as practicable and convene a special meeting as soon as possible.The Board of Directors shall thereupon declare a water shortage emergency, if necessary. 9. VIOLATIONS In order to protect the health, safety and welfare of the community, the District shall serve any customer found to be violating any provision of this ordinance with written notice, in accordance with Section 12, stating the nature of the violation and providing a reasonable time limit for the satisfactory correction. If a violation is not corrected within the time limit prescribed, the General Manager may exercise his authority to disconnect the water service from the District's system based upon the severity of the violation. Disconnection and reconnection fees shall be assessed per the District's fee schedule. 10. REQUESTS FOR EXEMPTION OR DEVIATION All requests for exemption or deviation from these standards shall be submitted, in writing, by the customer to the General Manager. The customer must obtain written permission and not assume that permission will be forthcoming for exemptions or deviations. The General Manager may temporarily or permanently exempt customers from the provisions of this Ordinance, or impose reasonable conditions in lieu of compliance, if the General Manager finds that any of the following conditions exist: 10.1 Serious Economic Hardship The requirements would cause an unnecessary and undue economic hardship upon the customer, threatening the customer's primary source of income as an individual or a business. 10.2 Adverse Impact on Health and Safety Strict compliance would create an emergency condition, as determined by the General Manager, adversely affecting the health, protection or safety of the customer or the public. 11. APPEALS Any person who is dissatisfied with any determination made under this ordinance may at any time within 30 days after such determination make an appeal. The first appeal will be made to the General Manager in writing. Should the applicant be dissatisfied with the decision of the General Manager, a subsequent appeal may be made to the Board of Directors of Directors within 30 days of the General Manager's decision. 11.1 Appeal to General Manager Any person who is dissatisfied with any determination made under this ordinance may at any time within 30 days after such determination, appeal to the General Manager by giving written notice to the General Manager. The appeal shall set forth the events and circumstances leading to the appeal,the nature of the ruling or interpretation from which relief is sought,the nature of the impact of the ruling on the appellant's property or business, together with any other reasons for the appeal. The General Manager shall investigate the matter appealed and shall make a written decision,which 4 Ordinance 2021-01 Page 341 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 shall be mailed to the appellant within 30 days of receipt of the appeal. If the dispute involves an amount of charges,the appellant shall pay the amount disputed in full when the charges are due. Any charge paid under protest will be refunded to the appellant should the General Manager determine that the charges were wrongfully made. 11.2 Appeal to Board of Directors of Directors Any person who is dissatisfied with any determination made by the General Manager may at any time within 30 days after such determination, appeal to the Board of Directors of Directors by giving written notice to the General Manager and to the Clerk of the Board of Directors of Directors. The appeal shall set forth the events and circumstances leading to the appeal, the nature of the ruling or interpretation from which relief is sought, the nature of the impact of the ruling on the appellant's property or business, together with any other reasons for the appeal. The General Manager shall transmit to the Board of Directors of Directors a report upon the matter appealed. The Board of Directors of Directors may request that the appeal be agendized and consider all testimony and make a decision,which shall be mailed to the appellant within 30 days of the date of the Board of Directors action. The Board of Directors of Directors may, at any time, upon its own motion, revise any determination made by the General Manager. If the dispute involves an amount of charges, the appellant shall pay the amount disputed in full when the charges are due. Any charge paid under protest will be refunded to the appellant should the Board of Directors of Directors determine that the charges were wrongfully made. 12. NOTICE OF VIOLATION If any person fails or refuses to comply with the provisions of this ordinance, the General Manager or the manager's designee shall provide the person with a written notice of the violation and an opportunity to correct the non-compliance. The written notice will: (a) Be posted or presented at the site of the noncompliance (b) Be mailed to the customer (c) State the time, date and place of the violation (d) Provide a general description of the violation (e) State the means to correct the violation (f) State a date by which correction is required (g) State the possible consequences of failing to correct the violation If the violation is not corrected to the District's satisfaction within the time frame specified,the District may restrict the water service to the property or disconnect the service. In addition to correcting the violation, the customer may be billed administrative fees on their account. 12.1 PROCEDURES 12.1.1 First Violation Following adoption of this ordinance,first violations will result in a friendly reminder in the form of a notice posted on or near the front door, personal contact with the customer, a phone call and/or a letter advising the customer of the violation, in accordance with Section 12 a through g. 12.1.2Second Violation For a second violation within one calendar year, the customer will be notified in writing in accordance with Section 12 a through g. If the correction is not made within thirty(30)days of the 5 Ordinance 2021-01 Page 342 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 District's notice to the customer, the customer may be assessed a penalty of$100. The penalty shall be added to the customer's water service charges at the property where the violation occurred. 12.1.3Third Violation For a third violation within one calendar year,the customer will be notified in writing in accordance with Section 12 a through g. The customer may be assessed a penalty of$200. The penalty shall be added to the customer's water service charges at the property where the violation occurred. If not corrected within ten days of written notice, a flow-restricting device may be installed on the customer's service connection, and the costs associated with the installation and removal will be billed on the customer's monthly water billing. 12.1.4 Fourth Violation For the fourth and subsequent violations within one calendar year,the customerwill be notified in writing in accordance with Section 12 a through g and the customer may be assessed a penalty of $500. The penalty shall be added to the customer's water service charges at the property where the violation occurred. In addition, a flow-restricting device may be installed on the customer's service connection, and the costs associated with the installation and removal will be billed to the customer. If not corrected within ten days of written notice,the District may discontinue the customer's water service at the property where the violation occurred in accordance with District procedures. Reconnection shall only be permitted when there is reasonable protection against future violations, as determined by the General Manager. 12.2 ENFORCEMENT COSTS The District may correct any violation of this ordinance and bill the customer for costs and expenses in enforcing the provisions of this ordinance, including staff time for investigation and monitoring for compliance, if the customer refuses to comply. Charges shall be added to the customer's bill for the property where the enforcement costs were incurred. The District may also take such action as may be allowed by statute. 12.3 TERMINATION OF SERVICE Failure to correct the violation may result in termination of water service to the parcel on which the violation occurred. 13. SEVERABILITY If any section, paragraph, sentence, clause or phrase of this ordinance or any part thereof is for any reason held to be invalid, such decision shall not affect the validity of the remaining portions of this ordinance or any part thereof. The Board of Directors hereby declares that it would have passed each section, paragraph, sentence, clause or phrase thereof, irrespective of the fact that any one or more sections, paragraphs, sentences, clauses or phrases be declared invalid. 6 Ordinance 2021-01 Page 343 of 563 DocuSign Envelope ID:64A6F3DF-9744-4F26-92A2-35B6228031C5 PASSED AND ADOPTED by the Board of Directors of Directors at a meeting duly called and held within the District on the second day of June 2021 by the following roll call vote: AYES: Directors: Aguera, Bender, Harris, Vice President Laliotis, and President Finn. NOES: None. ABSTAIN: None. ABSENT: None. TRUCKEE DONNER PUBLIC UTILITY DISTRICT GacuSigned by: B PMsi" FiWW Christi ihin, President of the Board ATTEST: rDocu5igned by: l� rr S .A. ��.U,L�..{A'lt-W anna . Kuhlemier, CMC, District Clerk 7 Ordinance 2021-01 Page 344 of 563 aUCKEE f Rubll[c Utility District WATER SHORTAGE CONTINGENCY PLAN ..W,. r Adopted June 2, 2021 Board of Directors Joseph Aguera Jeff Bender Christa Finn Kim Harris Tony Laliotis Prepared by: Neil Kaufman Water System Engineer Page 345 of 563 EXECUTIVE SUMMARY The mission statement of the Truckee Donner Public Utility District (District) is: "The Mission of Truckee Donner Public Utility District is to provide reliable, high quality water and electrical power services while meeting customer demand, and to manage District resources in a safe, open,responsible, environmentally sound manner at the lowest practical cost." As such,this Water Shortage Contingency Plan (WSCP) has been prepared to further the intent of providing a reliable,high quality water supply and to comply with the requirements the California Water Code. The WSCP consists of twelve sections: 1) Water Supply Reliability Analysis 2) Annual Water Supply and Demand Assessment Procedures 3) Six Standard Water Shortage Stages 4) Shortage Response Actions 5) Communication Protocols 6) Compliance and Enforcement 7) Legal Authorities 8) Financial Consequences of WSCP 9) Monitoring and Reporting 10) WSCP Refinement Procedures 11) Special Water Feature Distinction 12) Plan Adoption, Submittal, and Availability The WSCP is a stand-alone document created separately from the District's Urban Water Management Plan (UWMP). The WSCP can be amended, as needed, without amending the UWMP. Page 1 Page 346 of 563 SECTION 1 -WATER SUPPLY RELIABILITY ANALYSIS The District obtains its all of its water supply through the pumping of groundwater from the Martis Valley Groundwater Basin(MVGB). The MVGB is a multiple aquifer system consisting of basin- fill sedimentary units and interlayered basin-fill volcanic units with a storage volume of about 484,000 acre feet. A number of studies regarding the recharge of the MVGB have been conducted and it has been determined that the sustainable yield of the basin is at least 22,000 acre-feet per year (AFY). Current pumping by all users of the MVGB is about 8,300 AFY, which is about 38 percent of the estimated annual recharge and less than 2 percent of the total storage volume of the basin. Therefore, the overall MVGB supply is more than sufficient to supply the needs of all water users and the basin can withstand a five-year drought with below average groundwater recharge. SECTION 2 - ANNUAL WATER SUPPLY AND DEMAND ASSESSMENT PROCEDURES During the first quarter of each calendar year, the District shall undertake an annual assessment of water supply and demand as required by the California Water Code. The following information shall be gathered and reviewed: • Volume of water produced by the District's water supply sources for the past three years, including identification of the maximum day demands • Total volume of water delivered to customers for the past three years, including identification of the maximum day sales • A listing of expected new development projects to be constructed during the calendar year • The current production capacity of the District's water supply wells • The three most recent Annual Report for the Martis Valley Groundwater Basin Based upon this information,an estimate of unconstrained customer water demand for the calendar year shall be prepared. The estimate shall include both average day and maximum day demands. This estimate of water demand shall be compared to the water production capacity. In the event that projected maximum day demand will exceed the firm production capacity of the District's water supply wells, the estimated exceedence shall be quantified and the following actions shall be taken: 1) District's General Manager shall be informed that a failure of one water supply well during the period of peak demand may require implementation of the Water Shortage Contingency Plan(WSCP). 2) The Water Department Operations Staff shall identify any additional preventative maintenance measures that could be implemented in order to further improve reliability of the water supply wells. Page 2 Page 347 of 563 3) The Water Utility Director shall meet with the Public Information Officer and the Chief Financial Officer to review the WSCP. 4) The Public Information Officer shall prepare draft communications releases(press releases, radio advertisements, e-mail messages, etc) to be sent if necessary. 5) The Chief Financial Officer shall prepare information packages to be given to customer service representatives for communications with customers if necessary. 6) The Water Utility Director shall meet with Water Department staff and review the operational modifications to be implemented. 7) The General Manager shall present the above information to the Board of Directors along with any recommendations regarding the declaration of a water supply shortage. The Board of Directors shall declare a water shortage emergency if appropriate. The District will coordinate with the Town of Truckee, Nevada County and Placer County regarding the possible declaration of a water shortage emergency. The Annual Reports shall be reviewed to identify if there exists a downward trend in groundwater levels and storage volume within the groundwater basin. If an annual downward trend is detected, the procedures identified in the Martis Valley Groundwater Basin Management Plan shall be implemented. SECTION 3 -WATER SUPPLY SHORTAGE LEVELS The State of California has defined six water supply shortage levels: Level Water Supply Level 1 Up to 10%Reduction in Available Water Supply 2 Between 11%and 20%Reduction in Available Water Supply 3 Between 2 1%and 30%Reduction in Available Water Supply 4 Between 3 1%and 40%Reduction in Available Water Supply 5 Between 41%and 50%Reduction in Available Water Supply 6 Greater than 50%Reduction in Available Water Supply As noted in Section 1, the overall MVGB supply is more than sufficient to supply the needs of all water users and the basin can withstand multiple years with below average groundwater recharge. The most likely cause of a water supply shortage would be the failure of a major water supply facility such as a well,pump station or transmission pipeline. Such an occurrence could be caused by a number of factors including earthquake, fire or major equipment failure. As a result, water supply shortages are expected to be somewhat short in duration(days or possibly weeks),but may occur without any warning. Given these conditions, it is quite possible that the District could move directly from Level 0 (normal water supply) to a Level 3 or 4 shortage, bypassing the intervening levels in the event of a catastrophic facility failure. It is also possible that a portion of the service area could be under a Page 3 Page 348 of 563 significant water supply reduction, while other portions of the service area are under normal conditions. The District's Water Department maintains an Emergency Response Plan. This document was originally prepared in 2004 and is reviewed periodically. The main topics addressed in the plan include: chain of command and responsibilities; emergency contact lists; response actions; public notice information and mutual aid contact information. District will be undertaking an update of the Emergency Response Plan to ensure that it meets the requirements of the America's Water Infrastructure Act of 2018. The District is a participant in the Nevada County Local Hazard Mitigation Plan,which was most recently updated in August 2017. Action items identified for the District involved forest fuel reductions to be undertaken by the District's Electric Department. These items are an acknowledgement of the community's vulnerability to a wildfire. SECTION 4 -WATER SUPPLY SHORTAGE RESPONSE ACTIONS Listed below are potential response actions to be implemented in the event of a water supply shortage. Level 1 Water Supply Reduction Applicable during periods where up to 10 percent of the water supply is unavailable. A corresponding reduction in water usage is required. This would be achieved through voluntary measures such as: • Irrigation with potable water of ornamental landscapes and turf would be limited to every other day • The application of potable water to driveways and sidewalks would be prohibited unless for driveway sealing or construction • The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, would be prohibited Level 2 Water Supply Reduction Applicable during periods where up to 20 percent of the water supply is unavailable. A corresponding reduction in water usage would be required. Compliance with water conservation requirements is mandatory for Level 2 and above. Water conservation measures in Level 2 include: • Irrigation with potable water of ornamental landscapes and turf would be limited to every other day • The application of potable water to driveways and sidewalks would be prohibited unless for driveway sealing or construction Page 4 Page 349 of 563 • The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, would be prohibited • Customers may be subject to fines and penalties for failure to comply with these requirements Level 3 Water Supply Reduction Level 3 would apply during periods where up to 30 percent of the water supply is unavailable. A corresponding reduction in water usage would be required. Compliance is mandatory. Water conservation measures in Level 3 include: • Irrigation of ornamental landscapes and turf(using either potable or non-potable water) would be limited to 3-days per week • The application of potable water to driveways and sidewalks would be prohibited • The use of a hose that dispenses potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, would be prohibited • The District may install flow restricting devices on a customer's service • Customers may be subject to fines and penalties for failure to comply with these requirements • Contact Northstar Community Services District (NCSD) regarding the feasibility of obtaining water through the existing emergency interconnections. Purchase water from NCSD if water is available and surplus to NCSD needs. Level 4 Water Supply Reduction Level 4 would apply during periods where up to 40 percent of the water supply is unavailable. A corresponding reduction in water usage would be required. Compliance is mandatory. Water conservation measures in Level 4 include: • Irrigation of ornamental landscapes and turf(using either potable or non-potable water) would be limited to 2-days per week • The application of potable water to driveways and sidewalks would be prohibited • The use of potable water to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle, would be prohibited • Any customer leak in plumbing and/or irrigation systems would be repaired when found, but in any case within ten (10) days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs • The District may install flow restricting devices on a customer's service • Customers may be subject to fines and penalties for failure to comply with this requirement • Contact NCSD regarding the feasibility of obtaining water through the existing emergency Page 5 Page 350 of 563 interconnections. Purchase water from NCSD if water is available and surplus to NCSD needs. Level 5 Water Supply Reduction Level 5 would apply during periods where up to 50 percent of the water supply is unavailable. A corresponding reduction in water usage would be required. Compliance is mandatory. Water conservation measures in Level 5 include: • All outdoor water uses would be prohibited in the area affected by the water conservation requirement. The District may discontinue service to irrigation services • Any customer leak in plumbing and/or irrigation systems would be repaired when found, but in any case within ten (10) days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs • The District may install flow restricting devices on a customer's service • The District may implement mandatory water rationing through the use of forced rolling outages • Customers may be subject to fines and penalties for failure to comply with this requirement • Contact NCSD regarding the feasibility of obtaining water through the existing emergency interconnections. Purchase water from NCSD if water is available and surplus to NCSD needs. Level 6 Water Supply Reduction Level 6 would apply during periods where more than 50 percent of the water supply is unavailable. A corresponding reduction in water usage would be required. Compliance is mandatory. Water conservation measures in Level 5 include: • All outdoor water uses would be prohibited in the area affected by the water conservation requirement. The District may discontinue service to irrigation services • Any customer leak in plumbing and/or irrigation systems would be repaired when found, but in any case within ten (10) days of notice by the District to repair. The District may perform the repair or hire a contractor to perform the repair, and then invoice the customer for those costs • The District may install flow restricting devices on a customer's service • The District may implement mandatory water rationing through the use of forced rolling outages • Customers may be subject to fines and penalties for failure to comply with this requirement • Contact NCSD regarding the feasibility of obtaining water through the existing emergency interconnections. Purchase water from NCSD if water is available and surplus to NCSD needs. Page 6 Page 351 of 563 SECTION 5 - COMMUNICATION PROTOCOLS The District has a long history of water conservation efforts. The District communicates to, and receives information from, its customers and the general public regularly regarding water issues through a variety of channels: • Direct customer contact such as telephone calls and mailers • Notices posted in the customer service portal on the District's website • Traditional media such as direct mail, bill stuffers,print advertising, placards and flyers • Digital engagement such as website, social media, digital signage, digital advertising, e- mail, text and push alerts • Local radio and TV • Press releases and relationships with local media such as Sierra Sun and Moonshine Ink • Direct outreach through schools,local agencies,NGO's,large employers,business groups, and the tourism industry • Participation in industry associations and joint-action groups such as California Municipal Utilities Association (CMUA) and Association of California Water Agencies (ACWA) • Working closely with regional and state governments. • The District also works with the local schools and community support resources (such as Sierra Community House) to engage with the District's disadvantaged and non-English- speaking communities. As a part of local government in the greater Truckee area, the District works closely with sister agencies, key stakeholders, and regional, state, and Federal governments. This includes periodic meetings with the following groups: • Town of Truckee,Nevada County, and Placer County • Area Managers Monthly Meeting • Emergency Managers Meeting(coordinated by Town of Truckee) • Truckee/North Tahoe Joint Information Coordination(JIC) Group • Truckee River Basin Working Group • Regular meetings with other local water agencies (Northstar CSD, Placer County Water Agency, Olympic Valley PSD, Tahoe City PUD, and North Tahoe PUD) The District is located within the greater Lake Tahoe area and has a significant transient population due to the tourism-based economy, a significant number of second homes and a major interstate highway that runs through the area. Considering the mix of full-time and transient populations, it is important to reach all of the below target audiences and to use the appropriate communications channels for each target audience. Key target audiences are listed below: Page 7 Page 352 of 563 • Customers • Disadvantaged and non-English-speaking community • Public • Public officials • Business and civic leaders • Schools • Local agencies,NGO, and community groups • Property managers • Homeowners Associations • Landscape contractors/suppliers/nurseries • Transient populations such as tourists, travelers, and second-home owners • High-use water customers • Regional, state, and Federal governments. The District will use all available communications channels available to reach the target audiences. Priority will be given to public safety(emergency response),then critical infrastructure,then basic needs, then the general use. The District will work closely with other local agencies to coordinate messaging and has the ability to leverage existing emergency communications channels, such as Nixle, reverse 911 and emergency road-side signage. After the declaration of a water supply shortage, the Public Information Officer shall undertake the following actions to inform customers regarding the need to reduce water consumption: Water Supply Communication Protocols: Reduction Level: Level 1 Engage with the appropriate target audiences depending on the specifics of the water shortage - using the available communications channels—to raise awareness, educate, and call to action. Encourage voluntary compliance and overall conservation ethic. Level 2 As per above but communicating the mandatory restrictions. May include direct-mail to customers, targeted outreach to key stakeholders, and community-wide messaging either directly or through partners. Level 3 As per above but communicating the increased level of water shortage and escalating mandatory restrictions and enforcement. Page 8 Page 353 of 563 Level As per above but includes the mandatory requirement for customers to fix leaks and the associated direct outreach to those customers. Level As per above but with community-wide support of communications efforts to ensure compliance. Consider activating local community emergency communication networks (Nixle, Reverse 911, etc). Level 6 As per above plus preparing the community for potential water outages and the needed emergency response. As noted earlier, Truckee is very unlikely to experience a long-term water shortage due to a lack of water supply but more likely to experience a shortage due to a natural or man-made disaster. Given the unknown nature of the event that has caused the water shortage,the District will modify our communications, outreach, and collaborative efforts to match the situation. SECTION 6- COMPLIANCE AND ENFORCEMENT Once a water supply shortage has been declared, the District shall begin monitoring the water usage of customers in regards to compliance with the requirements associated with the given water supply shortage level. The primary method of monitoring will be comparison of metered usage for the same time in prior years and with days prior to implementation of the WSCP. Other monitoring methods may involve include drive-by inspections of customers to verify irrigation practices. Customers with abnormally high usage would be contacted for notification purposes. Notice Of Violation If any person fails or refuses to comply with the provisions of this ordinance,the General Manager or the manager's designee shall provide the person with a written notice of the violation and an opportunity to correct the non-compliance. The written notice will: a) Be posted or presented at the site of the noncompliance b) Be mailed to the customer c) State the time, date and place of the violation d) Provide a general description of the violation e) State the means to correct the violation f) State a date by which correction is required g) State the possible consequences of failing to correct the violation Page 9 Page 354 of 563 If the violation is not corrected to the District's satisfaction within the time frame specified, the District may restrict the water service to the property or disconnect the service. In addition to correcting the violation,the customer may be billed administrative fees on their account. Detailed procedures are listed below: First Violation Following adoption of this WSCP, first violations will result in a friendly reminder in the form of a notice posted on or near the front door, personal contact with the customer, a phone call and/or a letter advising the customer of the violation,. Second Violation For a second violation within one calendar year, the customer will be notified in writing. If the correction is not made within thirty(30) days of the District's notice to the customer,the customer may be assessed a fine of$100. The fee shall be added to the customer's water service charges at the property where the violation occurred. Third Violation For a third violation within one calendar year, the customer will be notified in writing. The customer may be assessed a fine of$200. The fee shall be added to the customer's water service charges at the property where the violation occurred. If not corrected within ten (10) days of written notice, a flow-restricting device may be installed on the customer's service connection, and the costs associated with the installation and removal will be billed on the customer's monthly water billing. Fourth Violation For the fourth and subsequent violations within one calendar year,the customer will be notified in writing and the customer may be assessed a fine of$500. The fee shall be added to the customer's water service charges at the property where the violation occurred. In addition, a flow-restricting device may be installed on the customer's service connection, and the costs associated with the installation and removal will be billed to the customer. If not corrected within ten(10) days of written notice, the District may discontinue the customer's water service at the property where the violation occurred in accordance with District procedures. Reconnection shall only be permitted when there is reasonable protection against future violations, as determined by the General Manager. Enforcement Costs The District may correct any violation of this ordinance and bill the customer for costs and expenses in enforcing the provisions of this ordinance, including staff time for investigation and monitoring for compliance, if the customer refuses to comply. Charges shall be added to the customer's bill for the property where the enforcement costs were incurred. The District may also take such action as may be allowed by statute. Requests For Deviation or Exemption All requests for exemption or deviation from these standards shall be submitted, in writing,by the customer to the General Manager. The customer must obtain written permission and shall not assume that permission will be forthcoming for exemptions or deviations. Page 10 Page 355 of 563 The General Manager may temporarily or permanently exempt customers from the provisions of this WSCP, or impose reasonable conditions in lieu of compliance, if the General Manager finds that any of the following conditions exist: • Serious Economic Hardship: The requirements would cause an unnecessary and undue economic hardship upon the customer, threatening the customer's primary source of income as an individual or a business. • Adverse Impact on Health and Safety: Strict compliance would create an emergency condition,as determined by the General Manager,adversely affecting the health,protection or safety of the customer or the public. Appeals Any person who is dissatisfied with any determination made under this WSCP may at any time within 30 days after such determination make an appeal. The first appeal shall be made to the General Manager in writing. Should the applicant be dissatisfied with the decision of the General Manager, a subsequent appeal may be made to the Board of Directors of Directors within 30 days of the General Manager's decision. Appeal to General Manager Any person who is dissatisfied with any determination made under this ordinance may at any time within 30 days after such determination, appeal to the General Manager by giving written notice to the General Manager. The appeal shall set forth the events and circumstances leading to the appeal, the nature of the ruling or interpretation from which relief is sought, the nature of the impact of the ruling on the appellant's property or business, together with any other reasons for the appeal. The General Manager shall investigate the matter appealed and shall make a written decision, which shall be mailed to the appellant within 30 days of receipt of the appeal. If the dispute involves an amount of charges,the appellant shall pay the amount disputed in full when the charges are due. Any charge paid under protest will be refunded to the appellant should the General Manager determine that the charges were wrongfully made. Appeal to the Board of Directors of Directors Any person who is dissatisfied with any determination made by the General Manager may at any time within 30 days after such determination, appeal to the Board of Directors of Directors by giving written notice to the General Manager and to the Clerk of the Board of Directors of Directors. The appeal shall set forth the events and circumstances leading to the appeal,the nature of the ruling or interpretation from which relief is sought,the nature of the impact of the ruling on the appellant's property or business, together with any other reasons for the appeal. The General Manager shall transmit to the Board of Directors of Directors a report upon the matter appealed. The Board of Directors of Directors may request that the appeal be agendized and consider all testimony and make a decision, which shall be mailed to the appellant within 30 days Page 11 Page 356 of 563 of the date of the Board of Directors action. The Board of Directors of Directors may, at any time, upon its own motion, revise any determination made by the General Manager. If the dispute involves an amount of charges, the appellant shall pay the amount disputed in full when the charges are due. Any charge paid under protest will be refunded to the appellant should the Board of Directors of Directors determine that the charges were wrongfully made SECTION 7-LEGAL AUTHORITIES The District was established in 1927 in accordance with the provisions of the Public Utility District Act. It is governed by a Board of Directors comprised of five members elected on an at-large basis. The District has the legal authority to implement and enforce its WSCP. Section 100 of the California Water Code reads: "It is hereby declared that because of the conditions prevailing in this State the general welfare requires that the water resources of the State be put to beneficial use to the fullest extent of which they are capable, and that the waste or unreasonable use or unreasonable method of use of water be prevented, and that the conservation of such water is to be exercised with a view to the reasonable and beneficial use thereof in the interest of the people and for the public welfare." Section 350 of the California Water Code reads: "The governing body of a distributor of a public water supply,whether publicly or privately owned and including a mutual water company, shall declare a water shortage emergency condition to prevail within the area served by such distributor whenever it finds and determines that the ordinary demands and requirements of water consumers cannot be satisfied without depleting the water supply of the distributor to the extent that there would be insufficient water for human consumption, sanitation, and fire protection." After declaration of a water shortage emergency by the District, additional sections within the California Water Code provide the District with broad powers to implement and enforce the provisions of the WSCP. SECTION 8-FINANCIAL CONSEQUENCES It is the District's intent that the water rate structure closely matches the variable revenue stream with its variable expenses and the fixed revenue stream with fixed expenses. Therefore, a reduction in water usage and water sales revenue would have a corresponding decrease in operational expenses. During the period of a water supply shortage, the General Manager shall report to the Board of Directors on a monthly basis(or more often),the financial impacts associated with the water supply shortage. In the event that the water supply shortage is causing adverse financial impacts upon the District, the General Manager, the Chief Financial Officer and the Water Utility Director shall Page 12 Page 357 of 563 identify potential short—term actions to address the financial impacts such as reductions in operating expenses, reductions in capital expenditures and the use of reserves. As noted previously, the duration of a water supply shortage is most likely to be on the order of days or weeks. Given the requirements of Proposition 218, the short-term adjustment of water rates or the imposition of drought-related surcharges is likely not feasible. During the next annual budget cycle, the overall financial situation of the District shall be evaluated. At that time, the District would review whether rate adjustments were necessary to ensure the financial stability of the Water Department and to maintain compliance with the District's financial goals. The period of late 2014 and 2015 provides an example of this process. In October 2014, the District implemented Stage 2 of its Water Shortage Contingency Plan. This was followed by the implementation of Stage 4 in June 2015. These actions were taken in response to mandates issued by the State of California. The District had adequate water supplies and was not experiencing a water shortage during this entire period. For 2015, the financial impact of these actions was a reduction in revenue o f about $172,500 for decreased water sales. This was about two percent of budgeted water sales revenue. There was corresponding reduction in operational expenses of about$197,000. This was about four percent of budgeted operational expenses. The District also incurred an additional $120,000 in expenses mainly related to increased public education efforts and increased labor for customer notification and customer service. These costs were covered by a reduction in planned capital expenditures and the use of reserves. SECTION 9-MONITORING AND REPORTING The District monitors total water production for all sources on a daily basis. This monitoring would be the primary tool to gauge the effectiveness of the water conservation program. Total water production would be compared with production for the same time in prior years and with days prior to implementation of the WSCP. Other monitoring measures include drive-by inspections of customers to verify irrigation practices and monitoring of customer usage through the District's AMR system. Customers with abnormally high usage would be contacted for notification purposes. SECTION 10-WSCP REFINEMENT AND MODIFICATION PROCEDURES During implementation of the WSCP, the General Manager and the Water Utility Director shall review the effectiveness of the WSCP at least every two weeks. Customer response to required reductions in water usage shall be evaluated. Response actions that are not effective shall be analyzed and modified to improve performance. Required modifications to the WSCP shall be presented to the Board of Directors for consideration, public review and approval in accordance with the California Water Code. Even if the WSCP has not been implemented,it shall be reviewed by the General Manager and the Water Utility Director periodically to identify any necessary changes and ensure compliance with the appropriate regulations. Page 13 Page 358 of 563 SECTION 11 —WATER FEATURES AND POOLS The California Water Code requires water purveyors to analyze water features that are not pools or spas separately from pools and spas in a WSCP. For pools and spas,and any other water features with direct human contact,potable water is needed for health and safety considerations. Therefore,there are no additional restrictions placed on pools and spas beyond that of other potable water users. Decorative water features not intended for direct human contact shall be considered in the same category as outdoor irrigation for the purposes of water supply reductions. SECTION 12—PLAN ADOPTION The draft WSCP was made available for public review on May 10, 2021. A public hearing regarding the draft WSCP was held on June 2, 2021. Mailed notices regarding the public hearing were sent to the following local public agencies: • Nevada County • Northstar Community Services District • Placer County • Placer County Water Agency • Tahoe-Truckee Sanitation Agency • Town of Truckee • Truckee Sanitary District The WSCP was adopted by the Board of Directors on June 2, 2021. The Board of Directors also adopted Ordinance 2021-01, which codified certain elements of the WSCP. After adoption, the WSCP was submitted to the California Department of Water Resources and the California State Library. The WSCP was also posted on the District's website. The local public agencies were also informed that the WSCP was adopted and is available on the District's website. Copies of the WSCP will be made available for public review at the District Office and the Truckee Branch of the Nevada County Library once COVID-19 restrictions have been modified and these locations are open to the public. Page 14 Page 359 of 563 APPENDIX E RESOLUTION 2026-XX ADOPTION OF THE 2025 URBAN WATER MANAGEMENT PLAN TO BE INCLUDED AFTER ADOPTION APPENDIX F PUBLIC NOTICE DOCUMENTATION TO BE INCLUDED IN FINAL DOCUMENT APPENDIX G ANNUAL WATER AUDITS AuditAM Free Water • • Association.American Water Works System Attributes and Performance Indicators Copyright @ 2014,All Rights Reserved. Water Audit Report for:ITruckee Donner Public Utility District Reporting Year:1 2015 11 112015-12/2015 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 74 out of 100*** System Attributes: Apparent Losses: 4.971 MG/Yr + Real Losses: 340.242 MG/Yr = Water Losses: 345.213 MG/Yr Unavoidable Annual Real Losses(UARL): 94.911 MG/Yr Annual cost of Apparent Losses: Annual cost of Real Losses: $371,2041 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Non-revenue water as percent by volume of Water Supplied: 30.2% Financial: Non-revenue water as percent by cost of operating system: 8.3%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 1.07 gal Ions/con nectionlday Real Losses per service connection per day: 72.98 1 gal Ions/con nectionlday Operational Efficiency: Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.87 1 gal Ions/con nectionlday/psi From Above, Real Losses=Current Annual Real Losses(CARE): 340.24 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 3.58 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 365 of 563 ♦ Free Water Audit Software: WAS v5.0 American Water Works Association. I System Attributes andPerformance Reserved. Water Audit Report for: Truckee Donner Public Utility District Reporting Year: 2016 11 1/2016-12/2016 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 52 out of 100*** System Attributes: Apparent Losses: 10.346 MG/Yr + Real Losses: 1 314.912 MG/Yr = Water Losses: 325.258 MG/Yr Unavoidable Annual Real Losses(UARL): 9t.bl jMGNr Annual cost of Apparent Losses: Annual cost of Real Losses: $265,0111 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Non-revenue water as percent by volume of Water Supplied: 25.3% Financial: Non-revenue water as percent by cost of operating system: 4.1%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 2.22 gallons/connection/day Real Losses per service connection per day: 67.55 1 gallons/connection/day Operational Efficiency: Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.80 gallons/connection/day/psi From Above, Real Losses=Current Annual Real Losses(CARE): 314.911 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 3.23 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 366 of 563 ♦ Free Water Audit Software: WAS v5.0 American Water Works Association. + System AttributesandPerformance Water Audit Report for:I Truckee Donner Public Utility District Reporting Year: 2017 1/2017-12/2017 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 52 out of 100*** System Attributes: Apparent Losses: 10.508 MG/Yr + Real Losses: 286.041 MG/Yr = Water Losses: 296.549 MG/Yr Unavoidable Annual Real Losses(UARL): MG/Yr Annual cost of Apparent Losses: Annual cost of Real Losses: $264,5881 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Non-revenue water as percent by volume of Water Supplied: 23.0% Financial: Non-revenue water as percent by cost of operating system: 2.0%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 2.22 gallons/connection/day Real Losses per service connection per day: 60.411 gallons/connection/day Operational Efficiency: Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.72 gallons/connection/day/psi From Above, Real Losses=Current Annual Real Losses(CARE): 286.04 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 2.91 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 367 of 563 AuditAM Free Water Software: AttributesSystem • Performance • • Water Audit Report for:I Truckee Donner Public Utility District (2910003) Reporting Year: 2018 1/2018-12/2018 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 50 out of 100*** System Attributes: Apparent Losses: 8.452 MG/Yr + Real Losses: 1 288.194 MG/Yr = Water Losses: 296.646 MG/Yr A Unavoidable Annual Real Losses(UARL): MG/Yr Annual cost of Apparent Losses: Annual cost of Real Losses: $271,9281 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Financial: Non-revenue water as percent by volume of Water Supplied: 22.2% Non-revenue water as percent by cost of operating system: 1.9%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 1.80 gallons/connection/day Operational Real Losses per service connection per day: 61.36 1 gallons/connection/day Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.73 gallons/connection/day/psi From Above, Real Losses=Current Annual Real Losses(CARE): 288.19 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 2.94 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 368 of 563 n ♦ Free Water Audit Software: WAS v5.0 ter Works Association. System ♦ American • • • • • •• • O 1.4 All Rights Reserved. Water Audit Report for:I Truckee Donner Public Utility District (CA2910003) Reporting Year: 2019 1/2019-12/2019 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 52 out of 100*** System Attributes: Apparent Losses: 10.526 MG/Yr + Real Losses: 1 306.695 MG/Yr = Water Losses: 317.221 MG/Yr Unavoidable Annual Real Losses(UARL): 99.891MGNr Annual cost of Apparent Losses: Annual cost of Real Losses: $299,6961 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Non-revenue water as percent by volume of Water Supplied: 24.7% Financial: Non-revenue water as percent by cost of operating system: 2.2%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 2.20 gallons/connection/day Real Losses per service connection per day: 64.14 1 gallons/connection/day Operational Efficiency: Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.76 gallons/connection/day/psi From Above, Real Losses=Current Annual Real Losses(CARE): 306.69 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 3.07 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 369 of 563 AWWA Free Water Audit • - ' American Water Works Association. System Attributes and Performance Indicators Copyright @ 2014,All Rights Reserved. Water Audit Report for:jTruCkee Donner Public Utility District (CA2910003) Reporting Year:1 2020 11 1/2020-12/2020 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 52 out of 100*** System Attributes: Apparent Losses: 11.978 IMGNr + Real Losses: 354.300 IMGNr = Water Losses: F 366.278 jMGNr Unavoidable Annual Real Losses(UARL): MG/Yr Annual cost of Apparent Losses: Annual cost of Real Losses: $318,9741 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Financial: Non-revenue water as percent by volume of Water Supplied: 25.0% Non-revenue water as percent by cost of operating system: 2.3%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 2.50 gallons/connection/day Operational Efficiency: Real Losses per service connection per day: 74.09 gallonslconnection/day Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.88 gallonslconnection/day/psi From Above, Real Losses=Current Annual Real Losses(CARL): 354.30 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 3.54 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 370 of 563 AuditAWWA Free Water Software: American Water Works Association. System • • Performance IndicatorsCopyrighto 2014,All Rights Reserved. Water Audit Report for:ITruckee Donner Public Utility District (CA2910003) Reporting Year:1 2021 11 1/2021 -12/2021 ***YOUR WATER AUDIT DATA VALIDITY SCORE IS: 58 out of 100*** System Attributes: Apparent Losses: 17.113 IMGNr + Real Losses: 371.080 IMGNr = Water Losses: 388.193 MGIYr Unavoidable Annual Real Losses(UARL): MG/Yr Annual cost of Apparent Losses: Annual cost of Real Losses: $353,9321 Valued at Variable Production Cost Return to Reporting Worksheet to change this assumpiton Performance Indicators: Financial: Non-revenue water as percent by volume of Water Supplied: 26.7% Non-revenue water as percent by cost of operating system: 2.7%1 Real Losses valued at Variable Production Cost Apparent Losses per service connection per day: 3.48 gallons/connection/day Operational Efficiency: Real Losses per service connection per day: 75.41 gallons/connection/day Real Losses per length of main per day*: N/A Real Losses per service connection per day per psi pressure: 0.89 gallons/connection/day/psi From Above, Real Losses=Current Annual Real Losses(CARL): 371.08 million gallons/year Infrastructure Leakage Index(ILI) [CARL/UARL]: 3.64 *This performance indicator applies for systems with a low service connection density of less than 32 service connections/mile of pipeline AWWA Free Water Audit Software v5.0 Performance Indicators 1 Page 371 of 563 WaterA American Copyright o 2020,All Rights Reserved. go to Worksheet go to grading go to references FWAS r Water AuditReport . - Donner Public .it Year: 2022 Calendar01 2022Dec1 Worksheet) Data Validity Key Performance Indicators KPJ result Target(see_ __ .......... Data Validity Score: 58 Data Validity Tier: Tier III(51-70) gauge%iles per validated industry ranges2 See Loss Control Planning for Tier Details 75th%ile 751h%ile 7511 We Tier II(26-50) Tier III(51-70) Median Median Median 25th Tier IV(71-90) %ile o 5m 25th %ile Tier I(<25) (F %ile Tier V(91-100) 101h%ile 9011h%ile loth%ile 901h%ile loth%ile 901h%ile Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate 25.03 $/conn/year 11111PUM$/conn/year .. 2.70 $/conn/year NRW Components Summary Total Volume of NRW=358 MGIYr Total Cost of NRW= Median 75",%ile 751h%ile 75th%ile 400 $400,000 25th $345,8361Yr Median Median %ile 25th / 25h %ile 350 $350,000 %ile 300 $300,000 - - --- c� loth%ile 90th%ile 10tn%ile 90th%ile 10" %ile 90tn%ile Unit Total Losses Unit Apparent Losses Unit Real Losses" 250 $250,000 gal/conn/day 3.0 gal/conn/day gal/conn/day j Average Operating Pressure 200 $200,000 84.3 psi 751n%ile 75th%ile Median Median 150 $150,000 90th%ile 25th 25th %ile %ile 100 $100,000 75th%ile 50 $50,000 Median loth%ile 90th%ile loth%ile 90th%ile Infrastructure Leakage Index(ILI) Unit Real LossesB 25th%ile �dimensionless 3,854 gal/mile/day 0 $0 loth%ile See UARL definition for additional guidance on the ILI Real Losses Unauthorized Consumption (UARL)Unavoidable Annual Real Losses 102.5 MGNr 2=gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Guidance Information for Key Performance Customer Metering Inaccuracies Unbilled Metered Authorized Cons * Tha eight indIcalors shown are the recommended suite per the KPI data by cohorts may be found in VVRF 4 69 5 Guidance AWWA Water Loss Control Committee 2020 Position on KPIs'. Manual,Appendix B(2019r. A suite of KPIs Is necessary,as no single KPI can hot Istically Actual KPI results that fail below 1011'%lie or above 9011,%ile de Volume Value communicate water loss performance fora given water system. not necessarily Imply error,but should be viewed with scrutiny. MGNr $Nr Basis of Valuation See Table 1 below for Uses and Limitations for each KPI, • Percentiles not intended to Imply targets. Targets may he input excerpted from the AWWA Water Loss Control Committee b user for o erational KPIs,if desired,on Worksheet. Apparent Losses 15.1 $31,631 CRUC Report(2020)1.with naming conventions updaled. See UARL and ILI In Defin I tic ns tab for discussion of size and Real Losses 336.2 $308,433 VPC Percentiles I%lies)shown on KPI gauges come from Level 1 pressure limitations. Unbilled Authorized Cons 6.3 $5,772 VPC validated data in the AWWA WLCC Reference WaterAudit Systems that fall on the extreme ends of size or connection Non-Revenue Water 357.6 $345,836 Blended Dataset(2020)1. density should use caution when Interpreting Unit Losses KPIs. • K P I%iles shown above are not segregated by cohorts. Limited AWWA Free Water Audit Software v6.0 Das board 1 Wage 372 of 563 WaterA American Copyright o 2020,All Rights Reserved. AWWA Free Water Audit Software: go to Worksheet go to grading go to references FWAS . 1 Water Audit -.. for: - Donner Public .it Year: 2023 Calendar01 2023Dec1 Actual KPJ result Target(see Worksheet) Data Validity Key Performance Indicators __ .......... Data Validity Score: 59 Data Validity Tier: Tier III(51-70) gauge%iles per validated industry ranges2 See Loss Control Planning for Tier Details 75th%ile 751h%ile 751h We Tier II(26-50) Tier III(51-70) Median 4 3 Median 3 Median Tier IV(71-90) 25tn%ile 2 0'� 25'h %ile Tier I(<25) %ile Tier V(91-100) loth%ile 9011h%ile loth%ile 901h%ile loth%ile 90'h%ile Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate 28.90 $/conn/year 1.21�$/conn/year 27.69 $/conn/year NRW Components Summary Total Volume of NRW=438 MG/Yr Total Cost of NRW= Median 75",voile 75th%ile 4 75'h%iIP4 $406,497/Yr Mediar3 Median 500 $450,000 %5 2f 1e m 450 $400,000 %ile 25tn �/°ile s 400 $350,000 loth%ile 90th%ile loth%ile 9oth%ile 10"'%ile 9oth%ile 350 $300,000 Unit Total Losses Unit Apparent Losses Unit Real Losses" 300 gal/conn/day -gal/conn/day -gal/conn/day j $250,000 Average Operating Pressure 75 /ale 250 84.3 psi Median 75tn%il& Median 75th u 200 $200,000 90th%ile th 2,5 5 150 $150,000 °.le wile 75th%ile 100 $100,000 1% 50 $50,000 Median 10°i%ile 90°'%ile loth%ile 90'h%ile Infrastructure Leakage Index(ILI) Unit Real LossesB 25th%ile �l dimensionless 4,690 gal/mile/day 0 $0 loth%ile See UARL definition for additional guidance on the ILI Real Losses Unauthorized Consumption (UARL)Unavoidable Annual Real Losses 102.5 MGNr 2=gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Guidance Information for Key Performance Customer Metering Inaccuracies Unbilled Metered Authorized Cons * Tha eight indIcalors shown are the recommended suite per the KPI data by cohorts may be found in VVRF 4 69 5 Guidance AWWA Water Loss Control Committee 2020 Position on KPIs'. Manual,Appendix B(2019r. A suite of KPIs Is necessary,as no single KPI can holIstically Actual KPI results that fail below 1011'%lie or above 9011,%ile de Volume Value communicate water loss performance fora given water system. not necessarily Imply error,but should be viewed with scrutiny. MGNr $Nr Basis of Valuation See Table 1 below for Uses and Limitations for each KPI, • Percentiles not intended to Imply targets. Targets may he input Apparent Losses 13.9 $16,384 CRUC excerpted from the AWWA Water Loss Control Committee by user for operational KPIs,if desired,on Worksheet. Report(2020)1.with naming conventions updaled. See UARL and ILI in Defin I tic ns tab for discussion of size and Real Losses 409.1 $376,234 VPC Percentiles I%lies)shown on KPI gauges come from Level 1 pressure limitations. Unbilled Authorized Cons 15.1 $13,878 VPC validated data in the AWWA WLCC Reference WaterAudit Systems that fall on the extreme ends of size or connection Non-Revenue Water 438.1 $406,497 Blended Dataset(2020)1. density should use caution when Interpreting Unit Losses KPIs. • K P I%iles shown above are not segregated by cohorts. Limited AWWA Free Water Audit Software v6.0 Das board 1 Page 373 of 563 WaterA American Copyright o 2020,All Rights Reserved. AWWA Free Water Audit Software: go to Worksheet go to grading go to references FWAS . 1 Water Audit -.. for: - Donner Public .it Year: 2024 Calendar01 2024Dec1 Worksheet) Data Validity Key Performance Indicators Actual KPJ result Target(see__ .......... Data Validity Score: 65 Data Validity Tier: Tier III(51-70) gauge%iles per validated industry ranges2 See Loss Control Planning for Tier Details 75th%ile 751h%ile 7511 We Tier II(26-50) Tier III(51-70) gMedian Median Median 25th Tier IV(71-90) %ile o 5m 25th %ile Tier 1(!525) %ile Tier V(91-100) 101h%ile 9011h%ile loth%ile 901h%ile loth%ile 90th%ile Total Loss Cost Rate Apparent Loss Cost Rate Real Loss Cost Rate 27.93 $/conn/year `$/conn/year L 17.20 $/conn/year NRW Components Summary Total Volume of NRW=337 MG/Yr Total Cost of NRW= Median 75"'%ile 75th%ile 75th%ile $392,153/Yr Median Median 400 $450,000 0o1e m 25th 25 %ile 350 $400,000 %ile 300 $350,000 loth%ile 90th%ile loth%ile _ 9oth%ile 10"'%ile 9oth%ile $300,000 Unit Total Losses Unit Apparent Losses Unit Real Losses" 250 gal/conn/day -gal/conn/day -gal/conn/day E j $250,000 Average Operating Pressure 200 84.3 si 751n%ile 75th%ile $200,000 Median Median 150 90th%ile 25th 25th $150,000 %ile %ile 100 $100,000 75th%ile 50 $50,000 Median 10°i%ile 90°'%ile loth%ile 90°'%ile Infrastructure Leakage Index(ILI) Unit Real LossesB 25th%ile -dimensionless 3,016 gal/mile/day 0 $0 10th%ile See UARL definition for additional guidance on the ILI Real Losses Unauthorized Consumption (UARL)Unavoidable Annual Real Losses 102.5 MGNr 2=gal/conn/day Systematic Data Handling Errors Unbilled Unmetered Auth Cons Guidance Information for Key Performance Customer Metering Inaccuracies Unbilled Metered Authorized Cons * Tha eight indIcalors shown are the recommended suite per the KPI data by cohorts may be found in VVRF 4 69 5 Guidance AWWA Water Loss Control Committee 2020 Position on KPIs'. Manual,Appendix B(2019}I. A suite of KPIs Is necessary,as no single KPI can holIstically Actual KPI results that fail below 1011'%lie or above 9011,%ile de Volume Value communicate water loss performance fora given water system. not necessarily Imply error,but should be viewed with scrutiny. MGNr $Nr Basis of Valuation See Table 1 below for Uses and Limitations for each KPI, • Percentiles not intended to Imply targets. Targets may he input excerpted from the AWWA Water Loss Control Committee b user for o erational KPIs,if desired,on Worksheet. Apparent Losses 60.6 $145,669 CRUC Report(2020)1.with naming conventions updaled. See UARL and ILI In Defin I tic ns tab for discussion of size and Real Losses 263.1 $233,722 VPC Percentiles I%lies)shown on KPI gauges come from Level 1 pressure limitations. Unbilled Authorized Cons 14.4 $12,761 VPC validated data in the AWWA WLCC Reference WaterAudit Systems that fall on the extreme ends of size or connection Non-Revenue Water 338.1 $392,153 Blended Dataset(2020)1. density should use caution when Interpreting Unit Losses KPIs. • K P I%iles shown above are not segregated by cohorts. Limited AWWA Free Water Audit Software v6.0 Das board 1 Page 374 of 563 r ub lic Utility District Resolution No. 2026 - 12 ADOPTION OF THE 2025 URBAN WATER MANAGEMENT PLAN WHEREAS, the California Legislature enacted Assembly Bill 797 (Water Code Section 10610 et seq., known as the Urban Water Management Planning Act) during the 1983-1984 Regular Session, and as amended subsequently, which mandates that every supplier providing water for municipal purposes to more than 3,000 customers or supplying more than 3,000 acre feet of water, prepare an Urban Water Management Plan, the primary objective of which is to plan for the conservation and efficient use of water; and WHEREAS, the District is an urban supplier of water providing water to over 3,000 customers; and WHEREAS, the Plan is periodically reviewed at least once every five years, and the Truckee Donner Public Utility District last reviewed and made amendments or changes to its plan on June 1, 2016; and WHEREAS, the District has prepared and circulated for public review a draft 2025 Urban Water Management Plan, and a properly noticed public hearing regarding said Plan was held by the Truckee Donner Public Utility District on June 3, 2026; and WHEREAS, provided that the Plan is adopted on June 3, 2026, after the public review and hearing, and will be filed with the State of California within thirty days of adoption; and NOW, THEREFORE, BE RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the above recitations are true and correct. 2. That the 2025 Urban Water Management Plan is adopted. 3. That District staff is authorized and directed to file the 2025 Urban Water Management Plan with the State of California within thirty days of adoption. Page 375 of 563 PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on June 3, 2026, by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President ATTEST: Brian Wright, District Clerk Page 376 of 563 TRUCKEE DON N ER AGENDA ITEM #9 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Martina Rochefort, District Clerk/Executive Assistant SUBJECT: Board Meeting Minutes /) r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Consider approval of the May 6, 2026 Board Meeting Minutes BACKGROUND: Draft minutes for May 6, 2026 Board Meeting are attached for review. ANALYSIS AND BODY: GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner FISCAL IMPACT: There is no fiscal impact associated with this item. ATTACHMENTS: 1. Minutes 2026-05-06 DRAFT Page 1 of 1 Page 377 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 1. Call to Order Meeting was called to order at 6:01 p.m. 2. Roll Call Directors Present: Jeff Bender, Christa Finn, Steve Randall, Vice President Courtney Murrell and President Tony Laliotis Staff in attendance: Brian Wright, General Manager; Scott Crow, Chief Information Officer/IT Director/Assistant General Manager; Mike Salmon, Chief Financial Officer; Steven Poncelet, Public Information and Strategic Affairs Director; Mike Swanson, Director of Electric Operations and Engineering; Josh Campbell, Senior Electric Engineer; Brad Wuest, IT Operations Manager; Neil Kaufman, Water System Engineer; Alex Spychalsky, Communications Program Manager; Brian Yohn, Administrative Services Manager; Martina Rochefort, District Clerk/Executive Assistant 3. Pledge of Allegiance Director Bender led the Pledge of Allegiance. 4. Changes to the agenda Consent items 10 and 17 were pulled for discussion at a later meeting. 5. Public Comment No public comment was received. DIRECTOR UPDATE 6. Director Finn updated on her participation in a recent Climate Transformation Alliance meeting and educational session on mass timber at Hobart Mills. President Laliotis shared he will run for re-election. He also thanked staff for their work on board meeting items and crews in the field. DEPARTMENT UPDATES 7. Department updates were presented by Mike Swanson, Director of Electric Engineering and Operations, Chad Reed, Water Utility Director, Brad Wuest, IT Operations Manager and Steven Poncelet, Public Information and Strategic Affairs Director. CONSENT CALENDAR 8. Board Meeting Minutes Consider approval of the March 30, 2026 Special Meeting and April 1, 2026 Regular Meeting minutes. 9. Treasurer's Report, May 2026 Consider Approval of the Treasurer's Report for May 2026 including: 1 Page 378 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 a. Fund Balances for the Month of February 2026 b. Disbursements for the Month of March 2026 10. District Code, Title 2 Revisions Consider approval of District Code, Title 2 revisions as presented. 11. District Code, Title 6 - Chapter 6.56 Revisions Consider approval of District Code, Title 6, Chapter 6.56 revisions 12. Scheduling of a Public Hearing Related to Adoption of the District Urban Water Management Plan Schedule a public hearing at the regularly scheduled District Board Meeting on June 3, 2026, at 6:OOPM, or soon thereafter, to receive input on the adoption of the District 2025 Urban Water Management Plan (UWMP). 13. Consideration of an Updated Firm Electric Service Allocation Assignment Agreement with Plumas Sierra Authorize the Board President to execute an updated Firm Electric Service Allocation Agreement with Plumas Sierra Rural Cooperative 14. Consideration to Contract with Altec Industries Inc. for Custom Vehicle Upfits Authorize the General Manager to execute a contract with Altec Industries Inc. for requested upfits for vehicle no. 299, 2022 Ford F550 AT40G bucket truck in the amount of $36,090, plus a 10% change order authorization, or $3,609, for a total authorization not to exceed amount of $39,699, plus taxes and fees. 15. Consideration of a Contract with GEI Consultants for the Martis Valley GMP Water Year 2023/2024 and 2024/2025 Annual Reports Authorize the General Manager to enter into a contract and associated documents with GEI Consultants for the Martis Valley GMP 2023/2024 and 2024/2025 Annual Reports for an amount of$26,000, plus a 10% change order authorization of $2,600, for a total not to exceed contract amount of $28,600. 16. Consideration to Increase Electric Tool Contract with EDC Builders Approve an increase in the Electric Tools contract authorization with EDC Builders from $100,000 to $140,000, plus a 10% contingency of$14,000, for a total not-to-exceed contract amount of$154,000 for Fiscal Year 2026 17. Consideration of the Donner Creek Transformer Relocation Project Cost Share 2 Page 379 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 Agreement Authorize the General Manager to execute a Cost Sharing Agreement with Truckee River Watershed Council for the relocation of a pad mount transformer associated with the Lower Coldstream Floodplain Restoration Project in substantially the form presented. ACTION: Motion made by Director Randall to approve the Consent Calendar, excluding items 10 and 17, seconded by Director Murrell. AYES: Bender, Finn, Randall, Murrell and Laliotis NAYS: none ABSTAIN: none ABSENT: none Motion passed. WORKSHOP 18. California Municipal Utilities Association Legislative and Regulatory Affairs Update Receive this report and provide input and direction to staff. Derek Dolfie, Senior Director of Energy, and Andrea Abergel, Director of Water, of California Municipal Utilities Association (CMUA), presented the item. Discussion was held. 19. Draft Urban Water Management Plan Workshop This item is a workshop to review the Draft 2025 Urban Water Management Plan. Formal action is not required and staff are seeking input. Neil Kaufman, Water System Engineer, presented the item. Discussion was held. 20. Discussion of the District's 2026 TDPUD Customer Survey and Strategic Questions Receive this report and provide input and direction to staff. Steven Poncelet, Public Information and Strategic Affairs Director, presented the item. Discussion was held. Meeting recessed at 8:35 p.m. Meeting reconvened at 8:44 p.m. ACTION ITEMS 21. Consideration to Approve the Purchase of Electric Department Fleet Equipment 3 Page 380 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 A. Authorize the General Manager to execute a contract and other documents with Empire CAT in Sparks, NV, for the purchase of one (1) CAT 304 Excavator in the amount of$106,722, plus a 10% change order authorization, or $10,672, for a total not to exceed amount of $117,394, plus tax and fees. B. Authorize the General Manager to execute a contract and other documents with Empire CAT in Sparks, NV, for the purchase of one (1) Felling FT20 I equipment trailer in the amount of$22,837, plus a 10% change order authorization, or $2,284, for a total not to exceed amount of $25,121, plus tax and fees. C. Declare vehicles no. 295 and 296 surplus and authorize the General Manager to dispose of the units at public auction, applying sale funds to the Electric Vehicle Reserve Fund. Brian Yohn, General Services Manager, presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Bender to authorize the General Manager to execute a contract and other documents with Empire CAT in Sparks, NV for the purchase of one (1) CAT 304 Excavator in the amount of $106,722, plus a 10% change order authorization, or $10,672, for a total not to exceed amount of $117,394, plus tax and fees; authorize the General Manager to execute a contract and other documents with Empire CAT in Sparks, NV, for the purchase of one (1) Felling FT20 I equipment trailer in the amount of $22,837, plus a 10% change order authorization, or $2,284, for a total not to exceed amount of $25,121, plus tax and fees; and declare vehicles no. 295 and 296 surplus and authorize the General Manager to dispose of the units at public auction, applying sale funds to the Electric Vehicle Reserve Fund, seconded by Director Randall. AYES: Bender, Finn, Randall, Murrell and Laliotis NAYS: none ABSTAIN: none ABSENT: none Motion passed. 22. Consideration to Approve a Construction Services Contract with Creekside Commercial Builders, Inc. for District Headquarters Security Enhancements Authorize the General Manager to execute a construction services contract and associated documents with Creekside Commercial Builders, Inc., for the bid amount of$150,027, plus a change order authorization of 10%, or $15,003, for a total contract authorization not to exceed $165,030. 4 Page 381 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 General Services Manager presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Randall to delay the acceptance of the bid subject to information that shows it is a fair bid and take it up at the next board meeting. No second was made. Motion failed. Discussion was held. ACTION: Motion made by Director Bender to authorize the General Manager to execute a construction services contract and associated documents with Creekside Commercial Builders, inc. for the bid amount of $150,027, plus a change order authorization of 10%, or $15,003, for a total contract authorization not to exceed $165,030, seconded by Director Finn. AYES: Bender, Finn, Murrell and Laliotis NAYS: Randall ABSTAIN: none ABSENT: none Motion passed. Board directed staff to include additional justification on future projects when one bid is received. 23. Consideration of a Contract for Martis Valley Substation Modernization - 2026 Authorize the General Manager to execute a construction services contract with RK Contractors, Inc. for the Martis Valley Substation Modernization - 2026 project in an amount of $2,709,000, plus a 10% change order authorization for a total not to exceed contract amount of $2,979,900. Josh Campbell, Senior Electric Engineer, presented the item. Public comment was received from Tim Ruppert. Discussion was held. ACTION: Motion made by Director Bender to authorize the General Manager to execute a construction services contract with RK Contractors, Inc. for the Martis Valley Substation Modernization — 2026 project in an amount of $2,709,000, plus a 10% change order authorization for a total not to exceed contract amount of $2,979,900, seconded by Director Finn. AYES: Bender, Finn, Murrell and Laliotis NAYS: Randall ABSTAIN: none 5 Page 382 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING MINUTES TDPUD BOARD ROOM, 11570 DONNER PASS ROAD, TRUCKEE, CA 6:00 PM, WEDNESDAY, MAY 6, 2026 ABSENT: none Motion passed. 24. Consideration of Electric Construction Services Contract for System Hardening (SRIP 6) Authorize the General Manager to execute a construction services contract with Herman Weissker Power, Inc., for the District's Electric System Hardening project in the amount of $1 ,170,896.88, plus a change order authorization of 10% or $117,090.12, for a total construction contract not to exceed $1,287,987. Director of Electric Operations and Engineering presented the item. No public comment was received. Discussion was held. ACTION: Motion made by Director Bender to authorize the General Manager to execute a construction services with Herman Weissker Power, Inc., for the District's Electric System Hardening project in the amount of $1,170,896.88, plus a change order authorization of 10% or $117,090.12, for a total construction contract not to exceed $1,287,987, seconded by Director Finn. AYES: Bender, Finn, Randall, Murrell and Laliotis NAYS: Randall ABSTAIN: none ABSENT: none Motion passed. ADJOURNMENT Meeting adjourned at 9:59 p.m. TRUCKEE DONNER PUBLIC UTILITY DISTRICT Tony Laliotis, President Respectfully Submitted, Martina Rochefort, District Clerk 6 Page 383 of 563 TRUCKEE DON N ER AGENDA ITEM #10 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager Michael Salmon, Chief Financial Officer SUBJECT: Treasurer's Report, June 2026 APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Consider Approval of the Treasurer's Report for June 2026 including: a. Fund Balances for the Month of March 2026 b. Disbursements for the Month of April 2026 BACKGROUND: ANALYSIS AND BODY: GOALS AND OBJECTIVES: FISCAL IMPACT: ATTACHMENTS: 1. 2026-06 Treasurer's Report Page 1 of 1 Page 384 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT TREASURER'S REPORT June 3, 2026 Fund Balances for the Month March 31, 2026 And Disbursements for the Month April 30, 2026 (includes Government Code section 53065.5 items) Page 1 of 16 Page 385 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Summary report of fund balances for the month ending March 31, 2026 and disbursements for April 2026. 1) REQUEST FOR APPROVAL OF DISBURSEMENTS and Check Summary The attached listing of checks and ACH payments issued during April 2026 total $4,798,746.14 in disbursements. 2) EMPLOYEE REIMBURSEMENT FOR INDIVIDUAL CHARGES Per Government Code 53065.5: Each special district, as defined by subdivision (a) of Section 56036, shall, at least annually, disclose any reimbursement paid by the district within the immediately preceding fiscal year of at least one hundred dollars ($100) for each individual charge for services or product received. "Individual charge" includes, but is not limited to, one meal, lodging for one day, transportation, or a registration fee paid to any employee or member of the governing body of the district. The disclosure requirement shall be fulfilled by including the reimbursement information in a document published or printed at least annually by a date determined by that district and shall be made available for public inspection. The Disbursements listing referenced in 1) includes above subject reimbursements information, as applicable. 3) STATEMENT OF GENERAL FUND: As of March 31, 2026 the balance in the General Fund was $19,196,954 (Electric $10,772,439 and Water $8,424,516). 4) FUNDS STATUS REPORT: The total of all funds held in cash and on deposit with US Bank, the Local Agency Investment Fund, Placer County Investment Fund, Utah Public Treasurers' Investment Fund, California CLASS, BNY and TVI Investments as of March 31, 2026 was $67,325,708 ($48,356,198 Electric and $18,969,509 Water). 5) INVESTMENT STATUS REPORT: The majority of the District's investments are in California's Local Agency Investment Fund (LAIF), Utah Public Treasurers' Investment Fund (UPTIF), California CLASS, and the Placer County Investment Fund (PCIF). The earnings rates for the last 13 months were: LAIF PCIF UPTIF 1 YR T-BILL TVI CLASS March 2025 4.31% 3.86% 4.49% 3.87% 0.55% 4.40% April 2025 4.28% 4.00% 4.49% 3.71% 0.55% 4.39% May 2025 4.27% 3.88% 4.47% 3.95% 0.55% 4.35% June 2025 4.27% 3.90% 4.48% 3.95% 0.55% 4.34% July 2025 4.26% 3.97% 4.47% 3.94% 0.55% 4.34% August 2025 4.25% 3.86% 4.47% 3.70% 0.55% 4.33% September 2025 4.21% 3.88% 4.38% 3.53% 0.55% 4.27% October 2025 4.15% 3.76% 4.27% 3.56% 0.55% 4.19% November 2025 4.10% 3.91% 4.13% 3.47% 0.55% 4.04% December 2025 4.03% 3.77% 4.01% 3.35% 0.55% 3.88% January 2026 3.93% 3.80% 3.86% 3.35% 0.55% 3.78% February 2026 3.87% 3.99% 3.86% 3.35% 0.55% 3.74% March 2026 3.83% 3.81% 3.86% 3.53% 0.55% 3.70% Page 2 of 16 Page 386 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Request for Approval of Disbursements The disbursements of the Truckee Donner Public Utility District for the month of April 2026 totaled $4,798,746.14. A listing of those disbursements is attached. DISBURSEMENTS METRICS (excludes Payroll): Accounts Payable (A/P) Metrics $ A/P Disbursements 8,000,000.00 7,000,000.00 6,000,000.00 5,000,000.00 — 4,000,000.00 1 oil 3,000,000.00 2,000,000.00 — 1,000,000.00 0.00 — Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 2026 # A/P Payments Issued 350 300 I 250 — 200 150 100 50 0 — Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 2026 # A/P I nvoices Vouchered 1,000 — 800 600 — — 400 200 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ■2022 ■2023 ■2024 ■2025 2026 Page 3 of 16 Page 387 of 563 Truckee Donner Public Utility District Check Register CA April 2026 Gov.Code 53605.5 Checkrrran Date Type Vendor Vendor Name Item Reference Amount 6575 4/1/2026 WIRE 5151 NRECA HEALTH 125 ADMINISTRATIVE FEES $ 472.50 6579 4/1/2026 WIRE 10737 US BANK GOVERNMENT SERVICES CREDIT CARD CHARGES 30,615.35 49734 4/2/2026 DO 1537 AMAZON CAPITAL SERVICES,INC COMPUTER EXPENSES 727.74 49735 4/2/2026 DO 1642 ANCON MARINE ENVIRONMENTAL COMPLIANCE FEES 1,932.90 49736 4/2/2026 DO 524 DE LAGE LANDEN OPERATIONAL SERVICES LLC XEROX COPIER LEASE 2,702.29 49737 4/2/2026 DO 2263 EMPIRE SOUTHWEST,LLC. GENERATOR SERVICES 66,688.26 49738 4/2/2026 DO 5840 FERGUSON ENTERPRISES INC INVENTORY 630.57 49739 4/2/2026 DO 949 FERGUSON ENTERPRISES INC 1423 MATERIALS&SERVICES 755.81 49740 4/2/2026 DO 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 777.57 49741 4/2/2026 DO 3340 GENERAL PACIFIC INC METER PURCHASE 9,090.60 49742 4/2/2026 DO 9654 JESSE LEDESMA* EMPLOYEE DEVELOPMENT 752.80 49743 4/2/2026 DO 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 157.50 49744 4/2/2026 DO 617 MOUNTAIN EAP EMPLOYEE RELATIONS&WELLNESS PROGRAM 225.00 49745 4/2/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 160.27 49746 4/2/2026 DO 1419 MUNICIPAL MAINTENANCE EQUIPMENT REPAIRS&MAINTENANCE 752.44 49747 4/2/2026 DO 5130 NCPA MEMBERSHIP DUES 10,066.00 49748 4/2/2026 DO 1506 NETFILE PROFESSIONAL SERVICES:OTHER 1,500.00 49749 4/2/2026 DO 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 674.85 49750 4/2/2026 DO 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 4,975.94 49751 4/2/2026 DO 5450 PDM STEEL SERVICE CENTERS MATERIALS&SERVICES 304.60 49752 4/2/2026 DO 9924 EMPLOYEE VISION REIMBURSEMENT 500.00 49753 4/2/2026 DO 419 QCS LLC BUILDING MAINTENANCE 7,675.00 49754 4/2/2026 DO 1574 REGIONAL GOVERNMENT SERVICES PROFESSIONAL SERVICES:OTHER 400.92 49755 4/2/2026 DO 349 STRADLING YOCCA CARLSON&RAUTH P.C. GC MELLO ROOS ADMIN COSTS 9,350.57 49756 4/2/2026 DO 1357 SWIFT COMMUNICATIONS OF CALIFORNIA MARKETING 952.00 49757 4/2/2026 DO 6360 THATCHER COMPANY OF NEVADA,INC WATER QUALITY:TREATMENT 9,533.70 49758 4/2/2026 DO 26 THE BANK OF NEW YORK MELLON DEBT PAYMENTS MONTHLY FUNDINGS(3 COPS) 212,078.99 49759 4/2/2026 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 428.00 49760 4/2/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 308.65 49761 4/2/2026 DO 1538 USA FLEET SOLUTIONS MISC PARTS&SUPPLIES 1,461.00 49762 4/2/2026 DO 1546 WATERS CHIROPRACTIC DMV PHYSICAL 300.00 49763 4/2/2026 DO 630 WESTERN AREA POWER ADMINISTRATION ENVIRONMENTAL COMPLIANCE FEES 6,399.61 49764 4/2/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 675.00 136951 4/2/2026 CHK 134 ANIXTER INC. TOOLS 12,649.68 136952 4/2/2026 CHK 1553 CRANMER ENGINEERING INC WATER SAMPLE ANALYSIS 375.00 136953 4/2/2026 CHK 5661 DOORKING,INC BUILDING MAINTENANCE 49.95 136954 4/2/2026 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 16.90 136955 4/2/2026 CHK 348 EDGES ELECTRICAL GROUP MARTIS VALLEY SUBSTATION MODERNIZATION 5,798.80 136956 4/2/2026 CHK 999 EQUILON ENT.LLC DBA SHELL OIL PRODUCTS WO#23644472,10278 HWY 89,REFUND DEPOSI 1,000.00 136957 4/2/2026 CHK 1477 IDEXX DISTRIBUTION,INC MATERIALS&SERVICES 394.11 136958 4/2/2026 CHK 1549 KS TELECOM,INC ENTERPRISE SECURITY PLATFORM 23,585.00 136959 4/2/2026 CHK 6401 LIBERTY UTILITIES ELECTRIC FOR PUMP STATION 1,204.11 136960 4/2/2026 CHK 999 MOUNTAIN TRAIL LLC WO#19644416,DOC DEP REF.MTN LOTUS 1,833.52 136961 4/2/2026 CHK 5151 NRECA APRIL 2026 INSURANCE 16,422.19 136962 4/2/2026 CHK 5150 NRECA GROUP BENEFITS TRUST APRIL 2026 INSURANCE 248,216.17 136963 4/2/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 31,615.20 136964 4/2/2026 CHK 999 RYAN GROUP ARCHITECTS WO#25631304,10242 CHURCH ST,REFUND 393.26 136965 4/2/2026 CHK 11226 SHRED-IT USA LLC OFFICE SUPPLIES 85.00 136966 4/2/2026 CHK 999 SIERRA COMMUNITY HOUSE CHARGING COMMUNITIES FORWARD 350.00 136967 4/2/2026 CHK 9928 KOLBY SILKWOOD* EMPLOYEE DEVELOPMENT 644.78 136968 4/2/2026 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 2,695.10 136969 4/2/2026 CHK 548 THE AUTO&TIRE DOCTOR INC. CONTRACT SERVICES 133.50 136970 4/2/2026 CHK 99999 TRUCKEE SANITARY DISTRICT SOLAR RECONCILIATION 3,864.60 136971 4/2/2026 CHK 7320 TRUCKEE TAHOE LUMBER CO MATERIALS&SERVICES 249.71 136972 4/2/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 1,981.29 136973 4/2/2026 CHK 999 MS MADELINE WILSON WO#25631330,13791 DPR,REFUND 765.75 136974 4/2/2026 CHK 5643 ZORO TOOLS,INC TOOLS 155.99 6544 4/3/2026 CHK PL PAYROLL PAYROLL FINAL CHECK 2,758.44 6566 4/3/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9098 FINAL 1,230.90 6567 4/3/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9098 FINAL 288.67 6578 4/6/2026 WIRE 10360 AFLAC EMPLOYEE PAID INSURANCE 1,232.32 6544 4/9/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 261,968.34 6568 4/9/2026 WIRE 3824 MISSIONSQUARE 457/403A CONTRIBUTIONS PPE 04/03/2026 42,348.60 6569 4/9/2026 WIRE 540 CALIPERS 457 DEFERRED COMP PRGM CALIPERS 457 CONTRIBUTIONS PPE 04/03/2026 28,311.00 6570 4/9/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 04/03/2026 133,022.62 6571 4/9/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 04/03/26 1,267.81 6572 4/9/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE 04/03/2026 29,994.26 6573 4/9/2026 WIRE 1359 CALIPERS OPEB-CERBT MONTHLY CONTRIBUTION 11,667.00 6574 4/9/2026 WIRE 11233 CALIPERS PENSION 77,760.60 49839 4/10/2026 DO 1537 AMAZON CAPITAL SERVICES,INC TOOLS 1,377.97 49840 4/10/2026 DO 10367 CCMEDIA PUBLISHING,LLC. MARKETING 500.00 49841 4/10/2026 DO 577 COOPERATIVE RESPONSE CENTER INC. ANSWERING SERVICE 3,269.85 49842 4/10/2026 DO 1627 EDC BUILDERS,INC. TOOLS 19,564.95 49843 4/10/2026 DO 1167 ERPR,LLC PROFESSIONAL SERVICES:MARKETING 1,000.00 49844 4/10/2026 DO 5840 FERGUSON ENTERPRISES INC INVENTORY 3,340.64 49845 4/10/2026 DO 2254 FULL HEART DESIGN PROFESSIONAL SERVICES:MARKETING 712.50 49846 4/10/2026 DO 1011 GEORGE T.HALL COMPANY,INC. MATERIALS&SERVICES 309.98 49847 4/10/2026 DO 10257 GIVES LLC TOOLS 251.80 49848 4/10/2026 DO 3480 GRAINGER INC. FIELD SUPPLIES 1,154.01 49849 4/10/2026 DO 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 5,294.88 49850 4/10/2026 DO 3820 I BEW LOCAL 1245 UNION DUES-APRIL-EE CONTRIBUTIONS 7,383.11 49851 4/10/2026 DO 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 348.65 49852 4/10/2026 DO 1149 LOOMIS BANKING CHARGES 1,083.43 49853 4/10/2026 DO 1161 MADER SUPPLY,LLC PURCHASE TRANSFORMERS 8,708.16 49854 4/10/2026 DO 9733 ANDREW METROKA• EMPLOYEE DEVELOPMENT 352.36 49855 4/10/2026 DO 1099 MOANA NURSERY PROFESSIONAL SERVICES:OTHER 325.00 Page l of Page 4 of 16 Page 388 of 563 Truckee Donner Public Utility District Check Register CA April 2026 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 49856 4/10/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 131.12 49857 4/10/2026 DD 490 MSA SAFETY SALES LLC MATERIALS&SERVICES 739.02 49858 4/10/2026 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 394.40 49859 4/10/2026 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 192,271.30 49860 4/10/2026 DD 9923 EMPLOYEE VISION REIMBURSEMENT 380.96 49861 4/10/2026 DD 5730 PORTER SIMON LEGAL SERVICES 8,697.40 49862 4/10/2026 DD 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 191,411.40 49863 4/10/2026 DD 9936 EMPLOYEE VISION REIMBURSEMENT 791.67 49864 4/10/2026 DD 1606 SAAS E SOLUTIONS,LLC PROFESSIONAL SERVICES:PROGRAM DELIVERY 5,000.00 49865 4/10/2026 DD 602 SAFETY ON SITE SAFETY SUPPLIES 1,482.63 49866 4/10/2026 DD 7313 TAHOE SUPPLY COMPANY FACILITY SUPPLIES 385.62 49867 4/10/2026 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 2,093.00 49868 4/10/2026 DD 10584 UAMPS PURCHASED POWER-LAMPS 1,043,430.17 49869 4/10/2026 DD 10380 ULINE MATERIALS&SERVICES 142.40 49870 4/10/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 308.65 49871 4/10/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 765.30 49872 4/10/2026 DD 7820 WESTERN NEVADA SUPPLY CO MATERIALS&SERVICES 105.73 49873 4/10/2026 DD 60 XEROX BUSINESS SOLUTIONS XEROX COPIER LEASE 11.45 136976 4/10/2026 CHK 99999 JONATAN AGUIRRE CUSTOMER REFUND-CLOSED ACCOUNT 50.37 136977 4/10/2026 CHK 134 ANIXTER INC. INVENTORY 38,992.58 136978 4/10/2026 CHK 657 AT&T COMMUNICATIONS 635.16 136979 4/10/2026 CHK 240 AUDIO ON-HOLD ON-HOLD PHONE SYSTEM 79.00 136980 4/10/2026 CHK 44444 GLENN BORCHARDT INCENTIVES-DUCT LEAK MITIGATION&TEST 1,300.00 136981 4/10/2026 CHK 99999 STACY BRENES CUSTOMER REFUND-CLOSED ACCOUNT 194.86 136982 4/10/2026 CHK 10489 CORELOGIC INFORMATION SOLUTIONS INC LICENSING,MAINTENANCE&SUPPORT 553.44 136983 4/10/2026 CHK 1539 D&H WATER SYSTEMS MATERIALS&SERVICES 344.46 136984 4/10/2026 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 65.26 136985 4/10/2026 CHK 44444 REBEKKA FINE INCENTIVES-ELEC PANEL UPGRADES 1,000.00 136986 4/10/2026 CHK 10168 GREENBRAE TROPHY CENTER OFFICE SUPPLIES 102.50 136987 4/10/2026 CHK 99999 NATHAN HEINTZ CUSTOMER REFUND-CLOSED ACCOUNT 122.34 136988 4/10/2026 CHK 99999 KEN HERLIHY CUSTOMER REFUND-CLOSED ACCOUNT 277.30 136989 4/10/2026 CHK 44444 JENNIFER HONIOTES INCENTIVES-FLOOR INSULATION 840.00 136990 4/10/2026 CHK 10932 J&L FOOD MART&CARWASH REPAIRS&MAINTENANCE 70.00 136991 4/10/2026 CHK 44444 EMMA MEDARA INCENTIVES-FLOOR INSULATION 1,000.00 136992 4/10/2026 CHK 99999 MELILAH ASCHUCH TRUST CUSTOMER REFUND-CLOSED ACCOUNT 281.93 136993 4/10/2026 CHK 2258 NEVADA COUNTY SHERIFF WAGE GARNISHMENT PPE 04/03/2026 482.98 136994 4/10/2026 CHK 1054 NEVADA VISION GROUP VISION REIMBURSEMENT 1,073.00 136995 4/10/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 21.41 136996 4/10/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 32,068.44 136997 4/10/2026 CHK 10331 RENO BUSINESS INTERIORS OFFICE SUPPLIES 2,076.45 136998 4/10/2026 CHK 669 STATE WATER RESOURCES CONTROL BOARD MEMBERSHIP DUES-J.SCOTVOLD D3 90.00 136999 4/10/2026 CHK 669 STATE WATER RESOURCES CONTROL BOARD MEMBERSHIP DUES-J.FLOWERS D4 105.00 137000 4/10/2026 CHK 6940 TAHOE TRUCKEE SANITATION AGENCY WATER SAMPLE ANALYSIS 25.00 137001 4/10/2026 CHK 6920 TAHOE TRUCKEE SIERRA DISPOSAL LANDFILL CHARGES 3,287.90 137002 4/10/2026 CHK 99999 MICHAEL TESTA CUSTOMER REFUND-CLOSED ACCOUNT 308.70 137003 4/10/2026 CHK 548 THEAUTO&TIRE DOCTOR INC. CONTRACT SERVICES 66.75 137004 4/10/2026 CHK 7175 TRANSWORLD SYSTEMS INC COLLECTION SERVICES 37.11 137005 4/10/2026 CHK 99999 DUSTIN WALSH CUSTOMER REFUND-CLOSED ACCOUNT 327.79 137006 4/10/2026 CHK 9983 CLAYTON WISE 53605.5 MEMBERSHIP DUES 105.00 137007 4/10/2026 CHK 99999 JESSICA ZIMLICH CUSTOMER REFUND-CLOSED ACCOUNT 70.92 6577 4/14/2026 WIRE 6731 CALIFORNIA DEPARTMENT OF TAX AND FEE USE TAX PAYABLE 47.00 49874 4/16/2026 DD 1619 ALL ELECTRIC MOTORS,INC MATERIALS&SERVICES 8,493.06 49875 4/16/2026 DD 1537 AMAZON CAPITAL SERVICES,INC OFFICE SUPPLIES 762.90 49876 4/16/2026 DD 9096 SCOTT BOTN* MEETING EXPENSES 394.00 49877 4/16/2026 DD 515 BRAGG CRANE SERVICE NORTHWOODS REBUILD 2,931.50 49878 4/16/2026 DD 9155 EMPLOYEE VISION REIMBURSEMENT 430.00 49879 4/16/2026 DD 10367 CCMEDIA PUBLISHING,LLC. MARKETING 1,250.00 49880 4/16/2026 DD 1432 DOWL,LLC MARTIS WOODS PUMP STATION REPLACEMENT 1,656.25 49881 4/16/2026 DD 1633 EZ STAK 2025 CHEW 2500HD W/RACK 3,789.57 49882 4/16/2026 DD 5840 FERGUSON ENTERPRISES INC MATERIALS&SERVICES 1,726.95 49883 4/16/2026 DD 3349 GLOBALRENTALCOINC RENTAL VEHICLE 8,850.66 49884 4/16/2026 DD 3480 GRAINGER INC. FIELD SUPPLIES 129.49 49885 4/16/2026 DD 9388 TREY GRIFFIN* EMPLOYEE DEVELOPMENT 368.00 49886 4/16/2026 DD 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 60.63 49887 4/16/2026 DD 289 NISC MARCH 2O26 PRINT SERVICES 22,455.34 49888 4/16/2026 DD 970 NORTHERN CALIFORNIA JOINT POLE ASSN MEMBERSHIP DUES 22.97 49889 4/16/2026 DD 10207 NRECA OFFICE SUPPLIES 387.00 49890 4/16/2026 DD 494 NVS,INC. VARIOUS PROJECTS 213,075.41 49891 4/16/2026 DD 1079 O'REILLY AUTO PARTS MISC PARTS&SUPPLIES 90.97 49892 4/16/2026 DD 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 18,791.44 49893 4/16/2026 DD 775 ONLINE INFORMATION SERVICES CREDIT CHECK SERVICES 153.20 49894 4/16/2026 DD 9932 CHADJ REED* MEETING EXPENSES 316.00 49895 4/16/2026 DD 9962 GRANT SACKS* CELL PHONE CHARGES 1/26 T03/26 180.00 49896 4/16/2026 DD 1584 STARTING FROM SCRATCH CAFE,LLC BOARD MEETING EXPENSES 592.96 49897 4/16/2026 DD 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 83.93 49898 4/16/2026 DD 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 768.00 49899 4/16/2026 DD 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 514.79 49900 4/16/2026 DD 7380 UNITED PARCEL SERVICE UPS CHARGES 226.85 49901 4/16/2026 DD 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 991.40 137008 4/16/2026 CHK 134 ANIXTER INC. INVENTORY 3,650.19 137009 4/16/2026 CHK 657 AT&T COMMUNICATIONS 3,243.23 137010 4/16/2026 CHK 1527 AT&T MOBILITY CELL PHONE CHARGES 3,481.34 137011 4/16/2026 CHK 381 CAL-NEVADA TOWING REPAIRS&MAINTENANCE 290.00 137012 4/16/2026 CHK 1489 CAROLLO ENGINEERS DONNER TRAILTANK#2 REHAB 13,624.39 137013 4/16/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 27.95 137014 4/16/2026 CHK 999 G COFFEEBAR TRUCKEE,LLC 25631305,10242 CHURCH ST#101 REFUND 407.07 Paget of Page 5 of 16 Page 389 of 563 Truckee Donner Public Utility District Check Register CA April 2026 Gov.Code 53605.5 Checkrrran Date Type Vendor Vendor Name Item Reference Amount 137015 4/16/2026 CHK 186 GRANITE CONSTRUCTION COMPANY MATERIALS&SERVICES 786.22 137016 4/16/2026 CHK 1242 GRATEFUL GARDENS BUILDING MAINTENANCE 2,835.00 137017 4/16/2026 CHK 412 JOINT APPRENTICESHIP&TRAINING COMMITEE EMPLOYEE DEVELOPMENT 3,700.00 137018 4/16/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 435.87 137019 4/16/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 35,380.27 137020 4/16/2026 CHK 6273 SAILERS ENGINEERING INC SITZMARK PUMP STATION REPLACEMENT 25,937.00 137021 4/16/2026 CHK 99999 STATE OF CALIFORNIA CSD-HEAP PROGRAM CUSTOMER REFUND-CLOSED ACCOUNT 5.02 137022 4/16/2026 CHK 99999 MICHAEL SUKHAR CUSTOMER REFUND-CLOSED ACCOUNT 603.61 137023 4/16/2026 CHK 11041 TRUCKEE PAINT MART INC. MATERIALS&SERVICES 1,090.00 137024 4/16/2026 CHK 999 TRUCKEE TAHOE AIRPORT DISTRICT 26631325,12116 CHANDELLE WAY/WHS REFUND 1,486.93 137025 4/16/2026 CHK 526 WESTERN INDUSTRIAL PARTS INC. MISC PARTS&SUPPLIES 502.59 137026 4/16/2026 CHK 5643 ZORO TOOLS,INC FIELD SUPPLIES 148.13 6544 4/23/2026 PL PL PAYROLL PAYROLL DIRECT DEPOSIT 272,073.88 6582 4/23/2026 WIRE 3824 MISSIONSQUARE 457/403A CONTRIBUTIONS PPE O4/17/2026 42,647.44 6583 4/23/2026 WIRE 905 HEALTHEQUITY INC. EMPLOYEE HSA CONTRIBUTIONS PPE 04/17/26 1,267.81 6584 4/23/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING PPE O4/17/2026 31,285.78 6585 4/23/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING PPE 04/17/2026 136,261.34 6586 4/23/2026 WIRE 540 CALPERS 457 DEFERRED COMP PRGM CALPERS 457 CONTRIBUTIONS PPE 04/17/2026 27,660.44 6587 4/23/2026 WIRE 11233 CALPERS PENSION 79,831.14 49981 4/23/2026 DO 1393 ACWAIPIA INSURANCE PREMIUM 307,589.77 49982 4/23/2026 DO 1537 AMAZON CAPITAL SERVICES,INC COMPUTER EXPENSES 380.32 49983 4/23/2026 DO 2257 BAKER TILLY US,LLP PROFESSIONAL SERVICES:AUDIT 6,300.00 49984 4/23/2026 DO 10650 EUROFINS EATON ANALYTICAL INC. WATER SAMPLE ANALYSIS 46.68 49985 4/23/2026 DO 848 FASTENAL MATERIALS&SERVICES 58.45 49986 4/23/2026 DO 5840 FERGUSON ENTERPRISES INC INVENTORY 9,426.55 49987 4/23/2026 DO 3340 GENERAL PACIFIC INC EMPLOYEE UNIFORM 201.47 49988 4/23/2026 DO 3515 GRAYBAR ELECTRIC CO INC MATERIALS&SERVICES 50.70 49989 4/23/2026 DO 1577 HUNT&SONS,LLC FUEL/OIL FOR VEHICLES 9,762.12 49990 4/23/2026 DO 1305 JW WELDING SUPPLIES&TOOLS MATERIALS&SERVICES 291.10 49991 4/23/2026 DO 1647 MCCANDLESS TRUCK CENTER LLC REPAIRS&MAINTENANCE 4,397.43 49992 4/23/2026 DO 11025 MOONSHINE INK MARKETING 444.00 49993 4/23/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 237.03 49994 4/23/2026 DO 820 ONESOURCE SUPPLY SOLUTIONS INVENTORY 18,599.76 49995 4/23/2026 DO 9924 RYAN PURSEL* EMPLOYEE DEVELOPMENT 276.00 49996 4/23/2026 DO 890 QUALUS,LLC MARTIS VALLEY SUBSTATION MODERNIZATION 34,266.75 49997 4/23/2026 DO 552 RK CONTRACTORS INC. CIVIL CONTRACTOR 4,171.09 49998 4/23/2026 DO 1638 ROAD SAFETY INC. NORTHWOODS REBUILD-A44 TO SNOWPEAK 4,806.25 49999 4/23/2026 DO 1371 RUPPERT,INC. 2026 PIPELINE REHABILITATION 47,737.50 50000 4/23/2026 DO 6604 SPIEGEL&MC DIARMID PROFESSIONAL SERVICES:FERC ISSUES 5,482.50 50001 4/23/2026 DO 1297 TANTALUS SYSTEMS HARDWARE PURCHASES 9,795.20 50002 4/23/2026 DO 712 TRUCKEE DONNER PUD PURCHASED POWER-STAMPEDE HYDRO GEN 32,333.89 50003 4/23/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 303.00 50004 4/23/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 675.00 137027 4/23/2026 CHK 99999 BERNADINE ANGELI CUSTOMER REFUND-CLOSED ACCOUNT 289.96 137028 4/23/2026 CHK 134 ANIXTER INC. INVENTORY 3,967.60 137029 4/23/2026 CHK 99999 BLACKBIRD MOUNTAIN GUIDES LLC CUSTOMER REFUND-CLOSED ACCOUNT 104.83 137030 4/23/2026 CHK 10472 CHAMPION CHEVROLET REPAIRS&MAINTENANCE 2,027.61 137031 4/23/2026 CHK 99999 WARD DONNELLY CUSTOMER REFUND-CLOSED ACCOUNT 268.90 137032 4/23/2026 CHK 193 EASTERN REGIONAL LANDFILL LANDFILL CHARGES 16.90 137033 4/23/2026 CHK 348 EDGES ELECTRICAL GROUP INVENTORY 98.58 137034 4/23/2026 CHK 2258 NEVADA COUNTY SHERIFF WAGE GARNISHMENT PPE O4/17/2026 151.66 137035 4/23/2026 CHK 5222 ODP BUSINESS SOLUTIONS LLC OFFICE SUPPLIES 943.01 137036 4/23/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 44,847.19 137037 4/23/2026 CHK 10573 PURCHASE POWER PREPAID POSTAGE 1,046.99 137038 4/23/2026 CHK 675 SHERWIN-WILLIAMS MATERIALS&SERVICES 69.52 137039 4/23/2026 CHK 5673 SONETICS CORPORATION MATERIALS&SERVICES 518.45 137040 4/23/2026 CHK 7320 TRUCKEE TAHOE LUMBER CO VEHICLE VS.TDPUD EQUIPMENT 255.72 137041 4/23/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 175.14 137042 4/23/2026 CHK 5643 ZORO TOOLS,INC MATERIALS&SERVICES 43.36 6544 4/28/2026 CHK PL PAYROLL PAYROLL FINAL CHECK 650.83 6589 4/28/2026 WIRE 7310 INTERNAL REVENUE SERVICE FEDERAL/FICA WITHHOLDING 9905 FINAL 123.98 6590 4/28/2026 WIRE 3094 EMPLOYMENT DEV DEPT SDI/STATE WITHHOLDING 9905 FINAL 16.20 50005 4/30/2026 DO 1537 AMAZON CAPITAL SERVICES,INC FIELD SUPPLIES 1,475.56 50006 4/30/2026 DO 9503810 CDW GOVERNMENT INC. HARWARE REFRESH 21,697.95 50007 4/30/2026 DO 9205 SHANE CHRISTIAN* MEETING EXPENSES 258.00 50008 4/30/2026 DO 524 DE LAGE LANDEN OPERATIONAL SERVICES LLC XEROX COPIER LEASE 2,702.29 50009 4/30/2026 DO 893 DEBBIE MADERACLEANING SERVICE BUILDING CLEANING 7,004.00 50010 4/30/2026 DO 1627 EDC BUILDERS,INC. TOOLS 4,303.66 50011 4/30/2026 DO 1656 EMERSON LLLP METERS PURCHASE 3,524.08 50012 4/30/2026 DO 5840 FERGUSON ENTERPRISES INC METERS PURCHASE 34,522.65 50013 4/30/2026 DO 361 FIRST CHOICE SERVICES FACILITY SUPPLIES 255.65 50014 4/30/2026 DO 1659 INSOURCE SOFTWARE SOLUTIONS,INC. LICENSING,MAINTENANCE&SUPPORT 5,840.00 50015 4/30/2026 DO 109 J.L.WINGERT CO. MATERIALS&SERVICES 9,833.46 50016 4/30/2026 DO 3520 JOHNSON CONTROLS FIRE PROTECTION LP BUILDING MAINTENANCE 219.59 50017 4/30/2026 DO 115 KIMBALL-MIDWEST MISC PARTS&SUPPLIES 113.72 50018 4/30/2026 DO 1618 MOBILE DIESEL EMISSIONS TESTING HAZARDOUS MATERIAL COMPLIANCE 700.00 50019 4/30/2026 DO 4720 MOUNTAIN HARDWARE AND SPORTS MATERIALS&SERVICES 98.94 50020 4/30/2026 DO 490 MSA SAFETY SALES LLC MATERIALS&SERVICES 273.50 50021 4/30/2026 DO 6403 NEVADA POWER COMPANY PURCHASED POWER-SPPC&NEVADA POWER 44,592.13 50022 4/30/2026 DO 161 NEW PIG CORPORATION MATERIALS&SERVICES 1,197.96 50023 4/30/2026 DO 1079 O'REILLY AUTO PARTS REPAIRS&MAINTENANCE 183.73 50024 4/30/2026 DO 820 ONESOURCE SUPPLY SOLUTIONS MATERIALS&SERVICES 67,949.55 50025 4/30/2026 DO 552 RK CONTRACTORS INC. CIVIL CONTRACTOR 7,982.86 50026 4/30/2026 DO 602 SAFETY ON SITE SAFETY SUPPLIES 413.23 50027 4/30/2026 DO 6402 SIERRA PACIFIC POWER CO PURCHASED POWER-SPPC&NEVADA POWER 55,273.80 50028 4/30/2026 DO 349 STRADLING YOCCA CARLSON&RAUTH P.C. GC MELLO ROOS ADMIN COSTS 376.50 Page of Page 6 of 16 Page 390 of 563 Truckee Donner Public Utility District Check Register CA April 2026 Gov.Code 53605.5 Check/Tran Date Type Vendor Vendor Name Item Reference Amount 50029 4/30/2026 DO 6880 TAHOE INSTANT PRESS OFFICE SUPPLIES 89.15 50030 4/30/2026 DO 6360 THATCHER COMPANY OF NEVADA,INC WATER QUALITY:TREATMENT 2,311.20 50031 4/30/2026 DO 1176 TRUCKEE FAMILY EYECARE OPTOMETRY,INC VISION REIMBURSEMENT 1,817.00 50032 4/30/2026 DO 2236 UNIFIRST EMPLOYEE UNIFORM CLEANING SERVICES 303.75 50033 4/30/2026 DO 1528 UNISYS CORPORATION LICENSING,MAINTENANCE&SUPPORT 1,573.31 50034 4/30/2026 DO 643 UNITED SITE SERVICES OF NEVADA NORTHWOODS REBUILD 702.60 50035 4/30/2026 DO 320 W&TGRAPHIX SCREEN PRINTING& EMPLOYEE UNIFORM 89.93 50036 4/30/2026 DO 1546 WATERS CHIROPRACTIC DMV PHYSICAL 300.00 50037 4/30/2026 DO 816 WESTERN ENVIRONMENTAL TESTING WATER SAMPLE ANALYSIS 881.90 50038 4/30/2026 DO 10678 WILLDAN FINANCIAL SERVICES OG&GC MR ANNUAL ADMIN COSTS 2,395.60 137044 4/30/2026 CHK 1507 ALESHIRE&WYNDER LLP PROFESSIONAL SERVICES:OTHER 4,875.00 137045 4/30/2026 CHK 657 AT&T COMMUNICATIONS 96.39 137046 4/30/2026 CHK 5661 DOORKING,INC BUILDING MAINTENANCE 49.95 137047 4/30/2026 CHK 78 FEDERAL EXPRESS CORPORATION FEDERAL EXPRESS CHARGES 158.29 137048 4/30/2026 CHK 592 NORTHERN SIERRAAIR QUALITY ENVIRONMENTAL COMPLIANCE FEES 3,983.53 137049 4/30/2026 CHK 1540 P31 ENTERPRISES CONTRACT SERVICES:ROW TREE CLEARING 48,881.06 137050 4/30/2026 CHK 11302 SAGE LAND SURVEYING INC. 2026 PIPELINE REPLACEMENT 980.00 137051 4/30/2026 CHK 10712 SCHWEITZER ENGINEERING LABS ELECTRIC SCADA UPGRADE 2,476.23 137052 4/30/2026 CHK 11226 SHRED-IT USA LLC OFFICE SUPPLIES 102.00 137053 4/30/2026 CHK 10761 SOUTHWEST GAS CORP. UTILITIES:NATURAL GAS 2,202.13 137054 4/30/2026 CHK 11041 TRUCKEE PAINT MART INC. MATERIALS&SERVICES 376.54 137055 4/30/2026 CHK 682 VERIZON WIRELESS CELL PHONE CHARGES 1,924.11 280 $ 4,798,746.14 *Denotes employee reimbursement containing multiple Items with no Individual Item charge of$100 or greater. Page 4of4 Page 7 of 16 Page 391 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT STATEMENT OF GENERAL FUND Activity for the Month Ended 3/31/2026 Page 1 of 2 Electric Dept Water Dept Total Balance in General Fund 2/28/2026 $9,312,295 $7,643,370 $16,955,665 Receipts: Revenue received 4,537,657.20 $1,847,415 $6,385,072 Retired employees medical insurance 25,390 - 25,390 Record interest earned 20,109 172 20,282 FF Funding&DL Surcharge Reimbursement for 2006 COP - 38,250 38,250 Cash clearing accounts(timing-prior month reversal) (153,479) - (153,479) Cash clearing accounts(timing-current month) 292,412 - 292,412 Total Receipts $4,722,089 $1,885,838 $6,607,926 Disbursements: Accounts payable/payroll disbursements $3,173,858 $1,020,297 $4,194,155 Voided checks (351) - (351) Distribute UPTIF interest 19,508 10,056 29,564 Transfer to Vehicle Reserve - 22,800 22,800 Restrict facilities fees 6,605 42,229 48,834 Restrict Donner Lake surcharge - 9,310 9,310 Section 125 benefit disbursement 48,331 - 48,331 Bank charges 13,994 - 13,994 Total Disbursements $3,261,944 $1,104,692 $4,366,636 Balance in General Fund 3/31/2026 $10,772,439 $8,424,516 $19,196,954 4/27/2026 4:11 PM I:\Treasurers Repo rt\Statement of General Fund\2026\2026-03 GF Page 8 of 16 Page 392 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT Funds Status Report Activity for the Month Ended 3/31/2026 Page 2 of 2 Electric Dept Water Dept Total Distribution of Operating Funds At Month-End: Customer Services Operating Funds $2,400 $0 $2,400 Operating clearing accounts 292,412 - 292,412 U.S. Bank-General Fund 2,224,375 - 2,224,375 LAIF, UPTIF, PCIF, CLASS&TVI-General Fund 8,253,252 8,424,516 16,677,768 Total Operating Funds $10,772,439 $8,424,516 $19,196,954 Distribution of Designated&Restricted Funds at Month-End: LAIF, UPTIF, PCIF,TVI &CLASS $37,370,221 $9,579,043 $46,949,264 UPTIF-Donner Lake Assessment District - 92,053 92,053 2015 COP Water Bonds, Principal Payment Fund - 433,082 433,082 2022 COP Issuance/Payment Fund 166,308 369,094 535,401 U S Bank-Donner Lake Assessment District 00-1 - 43,171 43,171 Total Designated&Restricted Funds $37,536,528 $10,516,443 $48,052,971 Total Market Adjustments 47,231 28,551 75,782 Total Funds Available $48,356,198 $18,969,509 $67,325,708 4/27/2026 4:11 PM I:\Treasurers Repo rt\Statement of General Fund\2026\2026-03 GF Page 9 of 16 Page 393 of 563 INVESTMENT STATUS REPORT Activity for the Month Ended 3/31/2026 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 2/28/2026 Activity 3/31/2026 ELECTRIC FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-3.83%(3.87%) General Fund 1..136.1 $ 1,097,556 $ 3,450,023 $ 166,796 $ 3,616,819 Consolidate cash (827,118) LAIF transfer 993,914 Capital Replacement Fund 1..136.41 9,659,626 9,760,093 - 9,760,093 Electric Rate Reserve Fund 1..136.35 510,640 515,942 - 515,942 AB 32 Cap&Trade Fund 1..136.58 341,584 345,127 - 345,127 Deferred Liabilites Reserve 1..136.42 2,369,514 2,394,140 - 2,394,140 LCFS Credits 1..136.59 117,132 1,001,671 6,086 1,007,757 Funds transfer to/from GF 6,086 Total LAIF Electric Investments 14,096,052 17,466,997 172,882 17,639,879 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.86%(3.86%) General Fund 1..136.12 1,146,456 147,584 (26,618) 120,966 Distribute UPTIF interest (19,508) Restrict facility fees (6,605) Record monthly interest 3,410 TVI interest receivable (3,915) Facilities Fees 1..136.9 388,734 403,106 7,803 410,909 Restrict facilites fees 6,605 Record monthly interest 1,198 Electric Rate Reserve Fund 1..136.45 2,007,961 2,173,177 7,763 2,180,940 Record monthly interest 6,458 TVI interest receivable 1,305 Capital Replacement Fund 1..136.46 532,775 536,413 4,204 540,617 Record monthly interest 1,594 TVI interest received 2,610 Electric Vehicle Reserve 1..136.13 1,843,672 2,703,082 8,033 2,711,115 Record monthly interest 8,033 Total UPTIF Electric Investments 5,919,597 5,963,361 1,185 5,964,546 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.81%(3.99%) Electric General Fund PC 1..136.49 507,597 510,867 1,565 512,432 Record monthly interest 1,565 Electric Rate Reserve Fund 1..136.47 1,596,394 1,606,675 4,920 1,611,595 Record monthly interest 4,920 Capital Replacement Fund 1..136.48 1,387,992 1,396,932 4,279 1,401,211 Record monthly interest 4,279 Total PCIF County Electric Investments 3,491,983 3,514,474 10,764 3,525,238 TVI INVESTMENTS- 0.55°%(0.55%) Capital Replacement Fund 1..136.43 1,366,550 1,366,550 - 1,366,550 Electric Rate Reserve Fund 1..136.44 700,000 700,000 - 700,000 Total TVI Electric Investments 2,066,550 2,066,550 2,066,550 4/27/20264:10 PM Investments Status Report Page 10 of 16 r tmen \7reasor,,,Report\invest stain:Report,\2o26\2n26-oR i„�es<me„ts stains Report Page 1 of 4 Page 394 of 563 INVESTMENT STATUS REPORT Activity for the Month Ended 3/31/2026 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 2/28/2026 Activity 3/31/2026 CLASS INVESTMENTS- 3.70%(3.74%) General Fund 1..136.16 4,266,101 3,990,511 12,524 4,003,035 Record monthly interest 12,524 Electric Rate Reserve Fund 1..136.22 2,392,046 2,406,768 7,553 2,414,321 Book transfer between funds 7,553 Vehicle Reserve Fund 1..136.23 525,608 528,843 1,660 530,503 Record monthly interest 1,660 Capital Reserve Fund 1..136.24 9,391,939 9,449,743 29,657 9,479,400 Record monthly interest 29,657 Total CLASS Electric Investments 16,575,693 16,375,865 51,393 16,427,258 Total Electric Investments $ 42,149,874 $ 45,387,248 $ 236,225 $ 45,623,473 4/27/20264:10 PM Investments Status Report Page 11 of 16 1:\7r....—,Report\inves tment stain,Report,\2026\2026-03 Im,,t,,nts stains Report Page 2 of 4 Page 395 of 563 INVESTMENT STATUS REPORT Activity for the Month Ended 3/31/2026 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 2/28/2026 Activity 3/31/2026 WATER FUNDS LOCAL AGENCY INVESTMENT FUND(LAIF)-3.83%(3.87%) General Fund 2..136.1 4,512,859 5,189,161 784,889 5,974,050 Consolidate cash 827,118 Restrict facility fees (42,229) Facilities Fees 2..136.90 1,407,058 1,467,542 42,229 1,509,771 Restrict facility fees 42,229 Capital Replacement Fund 2..136.41 4,155,814 4,182,376 - 4,182,376 Reserve funding @ budget - Total LAIF Water Investments 10,075,732 10,839,079 827,118 11,666,197 UTAH PUBLIC TREASURERS'INVESTMENT FUND(UPTIF)- 3.86%(3.86%) General Fund 2..136.12 1,485,549 1,058,038 (3,744) 1,054,294 Transfer to DLAD surcharge (9,310) Distribute UPTIF interest (10,056) DL Surcharge Reimbursement for 2006 COP 29,917 FF Funding portion of 2006 COP 8,333 Transfer to VR for vehicle sales (22,800) Record monthly interest 172 Facilities Fees 2..136.25 197,734 139,151 (29,503) 109,648 Record monthly interest 414 Transfer to GF for FF Funding portion of 2006 COP (29,917) West River St.Assessment District 2..136.31 45,074 45,382 135 45,517 Record monthly interest 135 Prepaid Connection Fees 2..136.7 39,312 39,580 118 39,698 Record monthly interest 118 Transfer to GF-MW PR connections - Donner Lake Assessment District Fund 2..136.84 91,158 91,780 273 92,053 Record monthly interest 273 Donner Lake Assessment District Surcharge Fund 2..136.61 247,713 251,385 1,723 253,109 DLAD surcharge collections 9,310 DL Surcharge reimbursement to GF for 2006 COP (8,333) Record monthly interest 747 TSA SAD II Improvement Fund 2..136.85 21,745 21,893 65 21,958 Record monthly interest 65 Water Vehicle Reserve 2..136.13 503,750 999,457 25,770 1,025,227 Record monthly interest 2,970 Transfer to GF for vehicle purchases 22,800 Deferred Liabilites Reserve 2..136.42 125,787 126,646 376 127,022 Record monthly interest 376 Capital Replacement Fund 2..136.46 141,318 142,283 423 142,706 Record monthly interest 423 Total UPTIF Water Investments 2,899,140 2,915,596 (4,364) 2,911,233 PLACER COUNTY INVESTMENT FUND(PCIF)- 3.81%(3.99%) Total PCIF Water Investments TVI INVESTMENTS- 0.55%(0.55%) Water General Fund TVI 2..136.15 1,396,171 1,396,171 - 1,396,171 Total TVI Water Investments 1,396,171 1,396,171 1,396,171 CLASS INVESTMENTS- 3.70%(3.74%) Water Vehicle Reserve 2..136.24 2,102,432 2,115,372 6,639 2,122,010 Record monthly interest 6,639 Total CLASS Water Investments 2,102,432 2,115,372 6,639 2,122,010 Total Water Investments $ 16,473,474 $ 17,266,218 $ $29,393 $ 18,095,612 4/27/20264:10 PM Investments Status Report Page 12 of 16 I:\Treasu rers Report\Inves tment Status Reports\2026\2026-03 Investments Status Report Page 3 of 4 Page 396 of 563 INVESTMENT STATUS REPORT Activity for the Month Ended 3/31/2026 Balance Beg.Balance Month End Balance %Current Month(%Last Month) 12/31/2025 2/28/2026 Activity 3/31/2026 ELECTRIC&WATER INVESTMENTS,COMBINED TOTALS Pre-Market Adjustments Total LAIF Investments 46% 24,171,783 28,306,077 1,000,000 29,306,077 Total UPTIF Investments 14% 8,818,737 8,878,957 (3,178) 8,875,779 Total PCIF Investments 6% 3,491,983 3,514,474 10,764 3,525,238 Total TVlInvestments 5% 3,462,722 3,462,722 - 3,462,722 Total CLASS Investments 29% 18,678,124 18,491,237 58,032 18,549,269 Total Investments 100% Month End Bal.Mix $ 58,623,349 $ 62,653,467 $ 1,065,617 $ 63,719,084 Market Adjustments Total LAIF Investments 52,730 52,730 - 52,730 Total UPTIF Investments 20,180 20,180 20,180 Total PCIF Investments 17,355 17,355 - 17,355 Total TVlInvestments (17,366) (17,451) (43) (17,494) Total CLASS Investments 3,011 3,011 3,011 Total Investments $ 75,910 $ 75,825 $ (43) $ 75,781 Post-Market Adjustments Total LAIF Investments 46% 24,224,514 28,358,807 1,000,000 29,358,807 Total UPTIF Investments 14% 8,838,916 8,899,137 (3,178) 8,895,959 Total PCIF Investments 6% 3,509,338 3,531,829 10,764 3,542,593 Total TVlInvestments 5% 3,445,356 3,445,271 (43) 3,445,227 Total CLASS Investments 29% 18,681,135 18,494,247 58,032 18,552,279 Total Investments 100% Month End Bal.Mix $ 58,699,258 $ 62,729,291 $ 1,065,575 $ 63,794,865 4/27/2026 4:10 PM Investments Status Report Page 13 of 16 I:\Treasurers Report\Investment Status Reports\2026\2026-03 Investments Status Report Page 4 of 4 Page 397 of 563 TRUCKEE DONNER PUD INVESTMENT BALANCES as of March 31,2026 Placer County Utah Public California TVI Fidelity Mmkt Morgan Stanley Dreyfus BNY US Bank Cash/ LAIF Invest Fund Invest Fund CLASS Investments Govt 57 Treas Sec Port Treas Security Treas Cash Res Checking Cash Clearings Total 131.1 ELECTRIC FUNDS General Fund $ 3,616,819 $ 512,432 $ 120,966 $ 4,003,035 $ $ $ $ $ $ 2,224,375 $ 294,812 $ 10,772,439 Facilities Fees - - 410,909 - - - 410,909 Rate Reserve Fund 515,942 1,611,595 2,180,940 2,414,321 700,000 7,422,798 Capital Reserve Fund 9,760,093 1,401,211 540,617 9,479,400 1,366,550 22,547,871 Deferred Liabilites Reserve/POB Fund 2,394,140 - - - - 2,394,140 Electric Vehicle Reserve Fund - 2,711,115 530,503 3,241,617 AB 32 Fund 345,127 - - 345,127 LCFS Credits 1,007,757 1,007,757 COP Project Fund - - COP Issuance/Payment Fund - - - 166,308 166,308 Market Adjustments 30,741 17,355 13,546 2,692 17,103 47,231 Total Electric Investments 17,670,620 3,542,593 5,978,092 16,429,951 2,049,448 166,308 2,224,375 294,812 48,356,198 WATER FUNDS General Fund $ 5,974,050 $ - $ 1,054,294 $ $ 1,396,171 $ $ $ $ $ $ 8,424,516 Facilities Fees 1,509,771 109,648 - 1,619,419 Capital Reserve Fund 4,182,376 142,706 2,122,010 6,447,093 2015 COP Funds - - - 433,082 433,082 West River St.Assessment District 45,517 - 45,517 Deferred Liabilites Reserve 127,022 127,022 Prepaid Connection Fees 39,698 39,698 DLAD Fund 92,053 43,171 135,224 DLAD Surcharge 253,109 - 253,109 TSA SAD II Improvement Fund 21,958 21,958 Water Vehicle Reserve 1,025,227 1,025,227 COP Issuance/Payment Fund - - - - 369,094 369,094 Market Adjustments 21,989 6,634 318 391 28,551 Total Water Investments 11,688,187 2,917,867 2,122,329 1,395,780 433,082 369,094 43,171 18,969,509 Electric and Water,subtotal 29,358,807 3,542,593 8,895,959 18,552,279 3,445,228 433,082 535,401 2,267,546 294,812 67,325,708 MELLO ROOS-OLD GREENWOOD - - - - - - 233,027 344,713 - - - 577,740 Total Mello Roos-Old Greenwood 233,027 344,713 577,740 MELLO ROOS-GRAY'S CROSSING 1,848,957 - - 878,939 2,727,895 Total Mello Roos-Gray's Crossing 1,848,957 878,939 2,727,895 Total Investments $ 31,207,764 $ 3,542,593 $ 8,895,959 $ 18,552,279 $ 3,445,228 $ 433,082 $ 233,027 $ 344,713 $ 1,414,340 $ 2,267,546 $ 294,812 $ 70,631,343 202602 Last Month End Balances 30,188,419 3,531,829 8,838,916 18,494,247 3,445,356 341,022 232,398 457,891 1,913,046 1,100,601 155,879 63,487,630 Change from last month 1,019,344 10,764 57,043 58,032 (127) 92,060 628 (113,178) (498,706) 1,166,944 138,933 7,143,713 202503 PY Month End Balances 25,303,357 3,374,794 8,897,508 10,671,828 7,219,488 417,711 262,264 181,596 1,258,091 4,667,406 523,356 62,777,399 Change from PY Month 5,904,406 167,799 (1,550) 7,880,452 (3,774,259) 15,371 (29,237) 163,117 156,249 (2,399,860) (228,544) 7,853,944 202512 PYE Balances 26,054,126 3,509,338 8,838,916 18,681,135 3,445,356 157,539 230,979 86 269,360 2,116,400 184,397 63,487,630 Change from PYE 5,153,638 33,255 57,043 (128,856) (127) 275,544 2,048 344,627 1,144,980 151,145 110,415 7,143,713 I:\Treasurers Report\2026\2026-06 Treasurer's ReportWll Imertm-202603 5 S Page 14 of 16 Page 398 of 563 Ai&I., TRUCKEE DONNER March 2026 Public Utility District Electric Utility - Key Reserve Balances $ thousands $24,000 $22,s48 $19,000 $14,000 ■ ■ ■ 0 ■ $10,772 $9,000 ■ ■ ■ ■ ■ $7,423 ■ u ■ ■ $4,000 r$0 ■ -$1,000 YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Rate Reserve ■ Capital Reserve 2022 COP Project Funds 5/7/2026 3:48 PM Page 15 of 16 0 FR Report Pack 2026 03 MFS Sec A(3.4) Page 399 of 563 TRUCKEE DONNER March 2026 Public Utility District Water Utility - Key Reserve Balances $ thousands $14,000 $12,000 $10,000 $8,000 ■ ■ ■ $8,425 ■ ■ $6,447 ■ $6,000 ■ ■ $4,000 ■ $2,000 • • • • • • • • $1,619 ■ ■ ■ ■ ■ $1,025 $0 $0 YE 2021 YE 2022 YE 2023 YE 2024 YE 2025 PY Same Last Current YE YE GOAL Month Month Month FORECAST ■ Operating Reserve ■ Vehicle Reserve ■ Capital Reserve 2022 COP Project Funds ° • Facility Fees ° 5/7/2026 3:48 PM Page 16 of 16 0 FR Report Pack 2026 03 MFS Sec A(3.4) Page 400 of 563 TRUCKEE DON N ER AGENDA ITEM #11 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: TJ Dwyer, Water Operations Manager Chad Reed, Water Utility Director SUBJECT: Consideration of a Contract With Industrial Electrical Company for Electric Motor Repair Services APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a contract and associated documents with Industrial Electrical Company for water utility electric motor repair services for a total amount not to exceed $90,000. BACKGROUND: Timely procurement for repair(s) of electric motors is essential to the District's maintenance and operational requirements. By establishing formal service contracts, the District significantly minimizes the downtime of critical pump and motor equipment during unexpected failures or emergency situations. The Water Department relies on these electric motors to pump groundwater to necessary elevations and maintain consistent water pressure for our customers. Any failure in these motors directly impacts the District's ability to distribute water and could potentially compromise fire protection capabilities. Consequently, the efficiency and speed of these repairs are vital to ensuring uninterrupted service. ANALYSIS AND BODY: Public bid advertising for the 2026 Electric Motor Repair services commenced on April 14, 2026, with the official bid opening held on Thursday, May 7, 2026. The District received two responsive bids for this project. Following a detailed review for compliance with District standards and responsiveness, the results are as follows: Bidder Location Bid Total Responsive Page 1 of 2 Page 401 of 563 Industrial Electrical Company Modesto, CA$19,500 Yes II Electric Motors INC. Auburn, CA $21,714 Yes Staff reviewed all received bids and Industrial Electrical Company was determined to be the apparent low bidder. Based on this evaluation, staff recommends awarding the contract to Industrial Electrical Company. This bid was drafted with a "market basket approach" where bidders were asked to provide pricing on the repair of several different motor sizes and types so we could equitably compare the bids. The Water Department is not able to predict all motors that will require repairs during calendar year 2026 and the nature of Electric Motor Repair is often reactive. For this reason, the Water Department is seeking additional procurement authorization, so time-sensitive work can be completed in a timely manner, eliminating the need to bring each individual motor repair to the Board for consideration. GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The lowest responsive bid for the electric motor repair services is Industrial Electrical Company. Funding for these services is provided within the Board-approved FY26 Water Utility budget (GL 2.7.681.00.670), which previously allocated $90,000 for such repair services. In 2025, the Water Department spent $19,118 associated with motor repairs. ATTACHMENTS: None Page 2 of 2 Page 402 of 563 TRUCKEE DONNER AGENDA ITEM #12 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager Michael Salmon, Chief Financial Officer SUBJECT: Consideration of Annual Resolutions for Special Tax: Gray's Crossing and Old Greenwood Communities Facilities Districts APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: a) Adopt Resolution 2026-10 requesting Nevada County to collect the special taxes for the Gray's Crossing 04-1 Community Facilities District; and b) Adopt Resolution 2026-11 requesting Nevada County to collect the special taxes for the Old Greenwood 03-1 Community Facility District. BACKGROUND: This item concerns requesting Nevada County to collect special taxes in the Old Greenwood No. 03-1 and Gray's Crossing No. 04-1 Communities Facilities Districts by the adoption of standard resolutions. District Resolution No. 9723 adopted on November 5, 1997 authorized the execution of a standard form tax collection services contract on behalf of the District with the County of Nevada. The contract states that the District must adopt an annual resolution requesting placement of special taxes, special assessments and/or parcel charges on the County of Nevada tax rolls. On October 14, 2003, the District adopted Ordinance No. 2003-04, authorizing the levy of a special tax within the Old Greenwood Community Facilities District No. 03-1. On July 21, 2004, the District adopted Ordinance No. 2004-02, authorizing the levy of a special tax within the Gray's Crossing Community Facilities District No. 04-1. On January 15, 2014, the Board authorized the District to refinance the bonds of Old Greenwood Community Facilities District No. 03-1, saving the Old Greenwood property owners over $3 million over the term of the bond ending in 2032, and at no cost to the District. ANALYSIS AND BODY: Page 1 of 2 Page 403 of 563 This matter comes before the Board each year at this time. The District utilizes Nevada County to collect special taxes as line items on the annual property tax bills. The attached Resolutions facilitate these tax collections by the County. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency FISCAL IMPACT: The special tax dollars collected are deposited into the Old Greenwood and Gray's Crossing Communities Facilities District funds on deposit with the Trustee, Bank of New York Mellon. These funds are used to pay principal and interest payments on the related bonds sold. The assessments for the 2025-2026 assessment period were $893,524 for Old Greenwood and $3,501,867 for Gray's Crossing. These Resolution's assessments for the 2026-2027 assessment period are $926,881 for Old Greenwood and $3,862,352 for Gray's Crossing. There is no fiscal impact on the District's electric or water utilities. ATTACHMENTS: 1. R2026-10 Assess ment-FY2627 GraysCrossing CFD 04-1 NevadaCnty 2. R2026-11 Assess ment-FY2627 OldGreenwood CFD 03-1 NevadaCnty Page 2 of 2 Page 404 of 563 Attachment 1 TRUCKEE DONNER Public Utility District Resolution No. 2026-10 Fixing and Placing a Special Tax Levy on Community Facilities District No. 04-1 (Gray's Crossing) for Collection by the County of Nevada WHEREAS, on July 21, 2004, the Board of Directors of the Truckee Donner Public Utility District duly adopted Ordinance No. 2004-02, authorizing the levy of a special tax within said Community Facilities District No. 04-1 (Grays Crossing) and providing a means for collection thereof; and WHEREAS, by Resolution No. 9723 adopted November 5, 1997, the Board of Directors of the Truckee Donner Public Utility District approved execution of a continuous Standard Form Tax Collection Services Contract with the County of Nevada; and WHEREAS, the District has now determined the lands affected thereby and the charges to be assessed, levied and collected on the lands and parcels within Tax Rate Area 003- 047; and WHEREAS, the taxes on each parcel shall be billed on the secured tax roll bills for the fiscal year 2026-2027. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the Board of Supervisors of the County of Nevada, State of California, levy a special tax against the parcels and owners of record listed on the computer itemization of parcels kept and maintained in the Administrative Services Department of the District and made a part hereof by reference, and that the County Auditor and Tax Collector be instructed to levy and collect said charges in the same manner as County taxes as by law and in said ordinance provide. Upon completion and correction of the current list through June 30, 2026, a copy will be forwarded to the Auditor Controller of the County. For a complete listing of direct charges for fiscal year 2026-2027, see Exhibit A. 2. The District warrants and represents that charges imposed by the District and being requested to be collected by Nevada County comply with all requirements of state law, including but not limited to Articles XIIIC and XIIID of the California Constitution (Proposition 218). 1 Page 405 of 563 Attachment 1 3. That a certified copy of this resolution be forwarded to the County Auditor of the County of Nevada. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on June 3, 2026 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President ATTEST: Brian Wright, General Manager 2 Page 406 of 563 Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-370-041-000 $46,629.18 019-870-038-000 $5,797.42 043-010-002-000 32,181.34 019-870-039-000 5,604.16 043-010-003-000 75,787.42 019-880-001-000 6,183.90 043-010-004-000 6,600.76 019-880-002-000 6,377.16 043-010-006-000 132,964.64 019-880-003-000 5,990.66 043-010-008-000 15,032.54 019-880-004-000 6,183.90 019-770-003-000 4,637.92 019-880-005-000 6,377.16 019-770-004-000 4,483.34 019-880-006-000 5,990.66 019-770-005-000 4,483.34 019-880-007-000 5,797.42 019-770-006-000 4,483.34 019-880-008-000 5,797.42 019-770-007-000 4,483.34 019-880-009-000 5,797.42 019-770-008-000 4,483.34 019-880-010-000 5,797.42 019-770-009-000 4,483.34 019-880-011-000 5,604.16 019-770-010-000 4,483.34 019-880-012-000 5,604.16 019-770-011-000 4,483.34 019-880-013-000 5,990.66 019-770-012-000 4,483.34 019-880-014-000 5,990.66 019-770-013-000 4,483.34 019-880-015-000 6,183.90 019-770-014-000 4,483.34 019-880-016-000 5,797.42 019-770-015-000 4,483.34 019-880-017-000 5,797.42 019-770-016-000 4,328.74 019-880-018-000 5,990.66 019-770-017-000 4,328.74 019-890-002-000 5,797.42 019-770-018-000 4,328.74 019-890-003-000 5,797.42 019-780-001-000 4,637.92 019-890-004-000 5,797.42 019-780-002-000 4,637.92 019-890-005-000 5,990.66 019-780-003-000 4,637.92 019-890-006-000 5,797.42 019-780-004-000 4,637.92 019-890-007-000 5,797.42 019-780-005-000 4,947.12 019-890-008-000 6,183.90 019-780-006-000 4,637.92 019-890-009-000 5,797.42 019-780-007-000 5,101.72 019-890-010-000 5,797.42 019-780-008-000 4,792.52 019-890-011-000 5,604.16 019-780-009-000 4,637.92 019-890-012-000 5,604.16 019-780-010-000 4,792.52 019-890-013-000 5,604.16 019-780-011-000 4,483.34 019-890-014-000 5,990.66 019-780-012-000 4,637.92 019-890-015-000 5,604.16 019-780-014-000 4,637.92 019-890-016-000 5,604.16 019-780-015-000 4,792.52 019-890-017-000 5,797.42 019-780-016-000 4,637.92 019-890-018-000 5,604.16 019-780-017-000 4,792.52 019-900-002-000 5,990.66 019-780-018-000 4,792.52 019-900-003-000 5,797.42 019-780-019-000 4,637.92 019-900-004-000 5,604.16 019-780-020-000 4,792.52 019-900-005-000 5,604.16 019-780-021-000 4,637.92 019-900-006-000 5,604.16 019-780-022-000 4,483.34 019-900-007-000 5,604.16 019-780-023-000 4,483.34 019-900-008-000 5,604.16 019-780-024-000 4,483.34 019-900-009-000 5,604.16 019-780-025-000 4,483.34 019-900-010-000 5,797.42 019-780-026-000 4,483.34 019-900-011-000 5,797.42 019-780-027-000 4,483.34 019-900-012-000 6,377.16 019-780-028-000 4,483.34 019-900-013-000 6,377.16 Willdan Financial Services Page 1 of 5 Page 407 of 563 Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-780-029-000 4,637.92 019-900-014-000 5,990.66 019-790-002-000 4,483.34 019-900-017-000 5,604.16 019-790-003-000 4,637.92 019-900-018-000 5,604.16 019-790-004-000 4,637.92 019-900-019-000 6,183.90 019-790-005-000 4,483.34 019-900-020-000 6,183.90 019-790-006-000 4,483.34 019-900-021-000 5,797.42 019-790-007-000 4,483.34 019-900-022-000 6,377.16 019-790-008-000 4,947.12 019-900-023-000 6,377.16 019-790-009-000 4,483.34 019-900-024-000 6,183.90 019-790-010-000 4,483.34 019-900-025-000 5,990.66 019-790-011-000 4,792.52 019-900-026-000 5,797.42 019-790-012-000 4,792.52 019-900-027-000 6,377.16 019-790-013-000 4,483.34 019-910-001-000 5,604.16 019-790-014-000 4,483.34 019-910-002-000 6,183.90 019-790-015-000 4,637.92 019-910-003-000 5,990.66 019-790-016-000 4,483.34 019-910-004-000 5,410.92 019-790-017-000 4,483.34 019-910-005-000 5,604.16 019-790-018-000 4,483.34 019-910-006-000 5,604.16 019-790-019-000 5,101.72 019-910-007-000 5,990.66 019-790-020-000 4,483.34 019-910-008-000 5,604.16 019-790-021-000 4,483.34 019-910-009-000 5,604.16 019-790-022-000 4,792.52 019-910-010-000 5,410.92 019-790-023-000 4,792.52 019-910-011-000 5,410.92 019-790-024-000 4,637.92 019-910-012-000 5,604.16 019-790-025-000 4,637.92 019-910-013-000 5,410.92 019-790-026-000 4,328.74 019-910-014-000 5,604.16 019-790-027-000 4,637.92 019-910-015-000 5,990.66 019-800-001-000 4,792.52 019-910-016-000 5,990.66 019-800-002-000 4,483.34 019-910-017-000 5,604.16 019-800-003-000 4,483.34 019-910-018-000 5,797.42 019-800-004-000 4,637.92 019-910-019-000 6,183.90 019-800-005-000 4,328.74 019-910-020-000 5,604.16 019-800-030-000 5,101.72 019-910-021-000 5,604.16 019-800-008-000 4,637.92 043-020-003-000 6,183.90 019-800-009-000 4,637.92 043-020-006-000 5,797.42 019-800-010-000 4,483.34 043-020-007-000 6,183.90 019-800-011-000 4,483.34 043-020-008-000 5,990.66 019-800-012-000 4,947.12 043-020-009-000 5,797.42 019-800-015-000 4,792.52 043-020-010-000 5,797.42 019-800-016-000 4,637.92 043-020-011-000 5,797.42 019-800-017-000 4,637.92 043-020-012-000 5,797.42 019-800-020-000 4,792.52 043-020-013-000 5,797.42 019-800-021-000 4,637.92 043-020-014-000 6,377.16 019-800-022-000 4,483.34 043-020-017-000 5,797.42 019-800-023-000 4,483.34 043-020-018-000 6,183.90 019-800-024-000 4,483.34 043-020-019-000 6,377.16 019-800-025-000 4,792.52 043-020-020-000 6,377.16 019-800-026-000 4,637.92 043-020-021-000 6,377.16 019-800-027-000 4,637.92 043-020-022-000 5,990.66 Willdan Financial Services Page 2 of 5 Page 408 of 563 Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-800-028-000 4,637.92 043-020-023-000 5,604.16 019-800-029-000 4,637.92 043-020-024-000 5,217.68 019-800-031-000 9,121.28 043-020-025-000 5,990.66 019-800-032-000 9,739.66 043-020-026-000 5,797.42 019-840-001-000 5,797.42 043-020-027-000 5,990.66 019-840-002-000 5,797.42 043-020-028-000 5,990.66 019-840-003-000 5,604.16 043-020-029-000 6,183.90 019-840-004-000 5,797.42 043-020-030-000 6,183.90 019-840-005-000 5,410.92 043-030-001-000 5,797.42 019-840-006-000 5,604.16 043-030-002-000 5,604.16 019-840-007-000 5,604.16 043-030-003-000 5,990.66 019-840-008-000 5,797.42 043-030-004-000 6,183.90 019-840-009-000 5,797.42 043-030-005-000 6,377.16 019-840-010-000 5,797.42 043-030-007-000 6,377.16 019-840-011-000 5,797.42 043-030-008-000 6,183.90 019-840-012-000 5,990.66 043-030-009-000 5,604.16 019-840-013-000 5,990.66 043-030-010-000 5,604.16 019-840-014-000 5,990.66 043-030-011-000 5,604.16 019-840-015-000 5,604.16 043-030-012-000 5,990.66 019-840-016-000 5,604.16 043-030-013-000 6,377.16 019-840-017-000 5,604.16 043-030-014-000 6,377.16 019-840-018-000 5,604.16 043-030-015-000 6,377.16 019-840-019-000 5,604.16 043-030-016-000 6,377.16 019-840-020-000 5,604.16 043-030-017-000 6,377.16 019-840-021-000 5,604.16 043-030-018-000 6,377.16 019-840-022-000 5,604.16 043-030-019-000 6,377.16 019-840-023-000 5,604.16 043-030-020-000 6,377.16 019-840-024-000 5,604.16 043-030-021-000 6,377.16 019-840-025-000 5,604.16 043-030-022-000 6,377.16 019-840-026-000 5,797.42 043-030-023-000 6,183.90 019-840-027-000 5,797.42 043-040-003-000 5,604.16 019-840-028-000 5,604.16 043-040-004-000 5,797.42 019-840-029-000 5,604.16 043-040-005-000 5,797.42 019-840-030-000 5,990.66 043-040-006-000 5,797.42 019-850-002-000 5,797.42 043-040-007-000 5,990.66 019-850-003-000 5,797.42 043-040-008-000 6,377.16 019-850-004-000 5,797.42 043-040-009-000 6,377.16 019-850-005-000 5,797.42 043-040-010-000 6,377.16 019-850-006-000 5,797.42 043-040-011-000 6,377.16 019-850-007-000 5,797.42 043-040-012-000 6,377.16 019-850-008-000 5,797.42 043-040-013-000 6,377.16 019-850-009-000 5,604.16 043-040-014-000 6,377.16 019-850-010-000 5,604.16 043-040-015-000 6,377.16 019-850-011-000 5,604.16 043-040-016-000 6,377.16 019-850-012-000 5,604.16 043-040-017-000 6,377.16 019-850-013-000 5,797.42 043-040-018-000 6,183.90 019-850-014-000 5,604.16 043-040-019-000 5,990.66 019-850-015-000 5,604.16 043-040-020-000 6,183.90 019-850-016-000 5,604.16 043-040-021-000 5,990.66 Willdan Financial Services Page 3 of 5 Page 409 of 563 Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-850-017-000 6,183.90 043-040-022-000 5,990.66 019-850-018-000 5,797.42 043-040-023-000 6,183.90 019-850-019-000 5,604.16 043-040-024-000 6,377.16 019-850-020-000 5,604.16 043-040-025-000 6,377.16 019-850-021-000 5,604.16 043-040-026-000 6,377.16 019-850-022-000 5,604.16 043-040-027-000 5,797.42 019-850-023-000 5,604.16 043-040-028-000 5,797.42 019-850-024-000 5,604.16 043-040-029-000 6,183.90 019-850-025-000 5,604.16 043-040-030-000 6,377.16 019-850-026-000 5,604.16 043-040-031-000 6,377.16 019-850-027-000 5,797.42 043-040-032-000 5,990.66 019-860-002-000 5,990.66 043-040-033-000 5,797.42 019-860-003-000 6,183.90 043-040-034-000 5,604.16 019-860-004-000 5,990.66 043-050-002-000 2,782.76 019-860-005-000 5,990.66 043-050-003-000 2,782.76 019-860-006-000 5,990.66 043-050-004-000 2,782.76 019-860-007-000 5,797.42 043-050-005-000 2,782.76 019-860-008-000 5,990.66 043-050-007-000 2,782.76 019-860-009-000 5,990.66 043-050-008-000 2,782.76 019-860-010-000 5,604.16 043-050-009-000 2,782.76 019-860-011-000 5,604.16 043-050-017-000 2,782.76 019-860-012-000 5,604.16 043-050-018-000 2,782.76 019-860-013-000 5,604.16 043-050-019-000 2,782.76 019-860-014-000 5,604.16 043-050-020-000 2,782.76 019-860-015-000 5,604.16 043-050-011-000 2,782.76 019-860-016-000 5,604.16 043-050-012-000 2,782.76 019-860-017-000 5,797.42 043-050-013-000 2,782.76 019-860-018-000 5,797.42 043-050-014-000 2,782.76 019-860-019-000 5,797.42 043-050-015-000 2,782.76 019-860-020-000 5,797.42 019-770-002-000 399,326.54 019-870-002-000 5,990.66 043-010-005-000 185,594.84 019-870-003-000 5,990.66 043-010-007-000 318,433.16 019-870-004-000 6,183.90 043-050-025-000 7,845.84 019-870-005-000 6,377.16 043-050-026-000 13,527.32 019-870-006-000 6,377.16 043-050-027-000 12,174.58 019-870-007-000 6,183.90 043-060-009-000 15,150.60 019-870-008-000 5,604.16 043-060-010-000 9,198.56 019-870-009-000 5,797.42 043-060-011-000 382,973.94 019-870-010-000 5,604.16 043-060-014-000 2,782.76 019-870-011-000 5,604.16 043-060-015-000 2,782.76 019-870-012-000 5,604.16 043-060-016-000 2,782.76 019-870-013-000 5,604.16 043-060-017-000 2,782.76 019-870-014-000 5,604.16 043-060-018-000 2,782.76 019-870-015-000 5,797.42 043-060-019-000 2,782.76 019-870-016-000 5,604.16 043-060-020-000 2,782.76 019-870-017-000 6,183.90 043-060-021-000 2,782.76 019-870-018-000 5,604.16 043-060-022-000 2,782.76 019-870-019-000 5,604.16 043-060-023-000 2,782.76 019-870-020-000 5,604.16 043-060-024-000 2,782.76 Willdan Financial Services Page 4 of 5 Page 410 of 563 Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-870-021-000 5,797.42 043-060-025-000 2,782.76 019-870-022-000 5,604.16 043-060-026-000 2,782.76 019-870-023-000 5,604.16 043-060-027-000 2,782.76 019-870-024-000 5,797.42 043-070-003-000 15,962.24 019-870-025-000 5,797.42 043-070-008-000 11,131.04 019-870-026-000 5,604.16 043-070-010-000 26,784.08 019-870-027-000 5,797.42 043-070-012-000 2,782.76 019-870-028-000 5,797.42 043-070-013-000 2,782.76 019-870-029-000 5,797.42 043-070-014-000 2,782.76 019-870-030-000 5,604.16 043-070-015-000 2,782.76 019-870-031-000 5,797.42 043-070-016-000 2,782.76 019-870-032-000 5,797.42 043-070-017-000 2,782.76 019-870-033-000 5,797.42 043-070-018-000 2,782.76 019-870-034-000 5,604.16 043-070-019-000 2,782.76 019-870-035-000 5,604.16 043-070-020-000 2,782.76 019-870-036-000 5,797.42 043-070-021-000 2,782.76 019-870-037-000 5,797.42 Total Fiscal Year 2026-2027 Special Tax Levy: $3,862,351.64 Total Parcel Count: 425 Willdan Financial Services Page 5 of 5 Page 411 of 563 Attachment 2 ■ UCKEE r ■ iblic Utility District Resolution No. 2026-11 Fixing and Placing a Special Tax Levy on Community Facilities District No. 03-1 (Old Greenwood) for Collection by the County of Nevada WHEREAS, on October 14, 2003, the Board of Directors of the Truckee Donner Public Utility District duly adopted Ordinance No. 2003-04, authorizing the levy of a special tax within said Community Facilities District No. 03-1 (Old Greenwood) and providing a means for collection thereof; and WHEREAS, by Resolution No. 9723 adopted November 5, 1997, the Board of Directors of the Truckee Donner Public Utility District approved execution of a continuous Standard Form Tax Collection Services Contract with the County of Nevada; and WHEREAS, the District has now determined the lands affected thereby and the charges to be assessed, levied and collected on the lands and parcels within Tax Rate Area 003- 047; and WHEREAS, the taxes on each parcel shall be billed on the secured tax roll bills for the fiscal year 2026-2027. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Truckee Donner Public Utility District as follows: 1. That the Board of Supervisors of the County of Nevada, State of California, levy a special tax against the parcels and owners of record listed on the computer itemization of parcels kept and maintained in the Administrative Services Department of the District and made a part hereof by reference, and that the County Auditor and Tax Collector be instructed to levy and collect said charges in the same manner as County taxes as by law and in said ordinance provided. Upon completion and correction of the current list through June 30, 2026 a copy will be forwarded to the Auditor Controller of the County. For a complete listing of direct charges for fiscal year 2026-2027, see Exhibit A. 2. The District warrants and represents that charges imposed by the District and being requested to be collected by Nevada County comply with all requirements of state law, including but not limited to Articles XIIIC and MID of the California Constitution (Proposition 218). 1 Page 412 of 563 Attachment 2 3. That a certified copy of this resolution be forwarded to the County Auditor of the County of Nevada. PASSED AND ADOPTED by the Board of Directors of the Truckee Donner Public Utility District at a meeting held within said District on June 3, 2026 by the following roll call vote: AYES: NOES: ABSENT: TRUCKEE DONNER PUBLIC UTILITY DISTRICT By Tony Laliotis, President ATTEST: Brian Wright, General Manager 2 Page 413 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-720-007-000 $3,943.10 930-041-105-000 $262.86 019-720-008-000 3,943.10 930-041-107-000 262.86 019-720-009-000 3,943.10 930-041-109-000 262.86 019-720-010-000 3,943.10 930-041-111-000 262.86 019-730-010-000 4,468.84 930-041-113-000 262.86 019-730-043-000 4,468.84 930-041-122-000 262.86 019-730-044-000 4,468.84 930-041-124-000 262.86 019-730-046-000 4,468.84 930-041-126-000 262.86 019-730-047-000 4,468.84 930-041-128-000 262.86 019-730-049-000 4,468.84 930-041-130-000 262.86 019-730-050-000 4,468.84 930-041-132-000 262.86 019-730-051-000 4,468.84 930-041-134-000 262.86 019-740-006-000 3,943.10 930-041-136-000 262.86 019-740-007-000 3,943.10 930-041-138-000 262.86 019-740-008-000 3,943.10 930-041-152-000 262.86 019-740-009-000 3,943.10 930-055-101-000 270.82 019-740-010-000 3,943.10 930-055-103-000 270.82 019-740-011-000 3,943.10 930-055-105-000 270.82 019-740-012-000 3,943.10 930-055-107-000 270.82 019-740-013-000 3,943.10 930-055-109-000 270.82 019-740-014-000 3,943.10 930-055-111-000 270.82 019-740-015-000 3,943.10 930-055-113-000 270.82 019-740-016-000 3,943.10 930-055-122-000 270.82 019-740-017-000 3,943.10 930-055-124-000 270.82 019-740-018-000 3,943.10 930-055-126-000 270.82 019-740-019-000 3,943.10 930-055-128-000 270.82 019-740-020-000 3,943.10 930-055-130-000 270.82 019-740-021-000 3,943.10 930-055-132-000 270.82 019-740-022-000 3,943.10 930-055-134-000 270.82 019-740-023-000 3,943.10 930-055-136-000 270.82 019-740-024-000 3,943.10 930-055-138-000 270.82 019-740-025-000 3,943.10 930-055-152-000 270.82 019-740-026-000 3,943.10 930-055-201-000 270.82 019-740-027-000 3,943.10 930-055-203-000 270.82 019-740-028-000 3,943.10 930-055-205-000 270.82 019-740-029-000 3,943.10 930-055-207-000 270.82 019-740-031-000 3,943.10 930-055-209-000 270.82 019-740-032-000 3,943.10 930-055-211-000 270.82 019-740-033-000 3,943.10 930-055-213-000 270.82 019-740-034-000 3,943.10 930-055-222-000 270.82 019-740-035-000 3,943.10 930-055-224-000 270.82 019-740-036-000 3,943.10 930-055-226-000 270.82 019-740-037-000 3,943.10 930-055-228-000 270.82 019-740-038-000 3,943.10 930-055-230-000 270.82 019-740-039-000 3,943.10 930-055-232-000 270.82 019-740-040-000 3,943.10 930-055-234-000 270.82 Willdan Financial Services Page 1 of 14 Page 414 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-740-041-000 3,943.10 930-055-236-000 270.82 019-740-042-000 3,943.10 930-055-252-000 270.82 019-740-043-000 3,943.10 930-058-101-000 273.60 019-740-044-000 3,943.10 930-058-103-000 273.60 019-740-045-000 3,943.10 930-058-105-000 273.60 019-740-046-000 3,943.10 930-058-107-000 273.60 019-740-047-000 3,943.10 930-058-109-000 273.60 019-740-048-000 3,943.10 930-058-111-000 273.60 019-740-049-000 3,943.10 930-058-113-000 273.60 019-740-050-000 3,943.10 930-058-122-000 273.60 019-740-051-000 3,943.10 930-058-124-000 273.60 019-740-052-000 3,943.10 930-058-126-000 273.60 019-740-053-000 3,943.10 930-058-128-000 273.60 019-740-069-000 4,468.84 930-058-130-000 273.60 019-740-070-000 4,468.84 930-058-132-000 273.60 019-740-071-000 4,468.84 930-058-134-000 273.60 019-740-073-000 4,468.84 930-058-136-000 273.60 019-740-074-000 4,468.84 930-058-138-000 273.60 019-740-075-000 3,943.10 930-058-152-000 273.60 019-740-076-000 3,943.10 930-058-201-000 273.60 019-740-077-000 3,943.10 930-058-203-000 273.60 019-740-078-000 3,943.10 930-058-205-000 273.60 019-740-079-000 3,943.10 930-058-207-000 273.60 019-740-080-000 3,943.10 930-058-211-000 273.60 019-740-081-000 3,943.10 930-058-213-000 273.60 019-740-082-000 3,943.10 930-058-224-000 273.60 019-740-083-000 3,943.10 930-058-226-000 273.60 019-740-084-000 3,943.10 930-058-228-000 273.60 019-740-085-000 3,943.10 930-058-230-000 273.60 019-740-086-000 3,943.10 930-058-232-000 273.60 019-740-087-000 3,943.10 930-058-234-000 273.60 019-740-088-000 3,943.10 930-058-236-000 273.60 019-740-089-000 3,943.10 930-058-238-000 273.60 019-740-090-000 3,943.10 930-058-252-000 273.60 019-741-001-000 3,943.10 930-058-301-000 273.60 019-741-002-000 3,943.10 930-058-303-000 273.60 019-741-003-000 3,943.10 930-058-305-000 273.60 019-741-004-000 3,943.10 930-058-307-000 273.60 019-741-005-000 3,943.10 930-058-309-000 273.60 019-741-006-000 3,943.10 930-058-311-000 273.60 019-741-007-000 3,943.10 930-058-313-000 273.60 019-741-008-000 3,943.10 930-058-322-000 273.60 019-750-002-000 3,943.10 930-058-324-000 273.60 019-750-003-000 3,943.10 930-058-326-000 273.60 019-750-004-000 3,943.10 930-058-328-000 273.60 019-750-005-000 3,943.10 930-058-330-000 273.60 Willdan Financial Services Page 2 of 14 Page 415 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-750-006-000 3,943.10 930-058-332-000 273.60 019-750-007-000 3,943.10 930-058-334-000 273.60 019-750-008-000 3,943.10 930-058-336-000 273.60 019-750-010-000 3,943.10 930-058-338-000 273.60 019-750-011-000 3,943.10 930-058-352-000 273.60 019-750-012-000 3,943.10 930-059-101-000 279.30 019-750-013-000 3,943.10 930-059-103-000 279.30 019-750-014-000 3,943.10 930-059-105-000 279.30 019-750-015-000 3,943.10 930-059-107-000 279.30 019-750-016-000 3,943.10 930-059-109-000 279.30 019-750-017-000 3,943.10 930-059-111-000 279.30 019-750-018-000 3,943.10 930-059-113-000 279.30 019-750-019-000 3,943.10 930-059-122-000 279.30 019-750-020-000 3,943.10 930-059-124-000 279.30 019-750-021-000 3,943.10 930-059-126-000 279.30 019-750-022-000 3,943.10 930-059-128-000 279.30 019-750-023-000 3,943.10 930-059-130-000 279.30 019-750-024-000 3,943.10 930-059-132-000 279.30 019-750-025-000 3,943.10 930-059-134-000 279.30 019-750-026-000 3,943.10 930-059-136-000 279.30 019-750-027-000 3,943.10 930-059-138-000 279.30 019-750-028-000 3,943.10 930-059-152-000 279.30 019-750-029-000 3,943.10 930-059-201-000 279.30 019-750-031-000 3,943.10 930-059-203-000 279.30 019-750-032-000 3,943.10 930-059-205-000 279.30 019-750-033-000 3,943.10 930-059-207-000 279.30 019-750-034-000 3,943.10 930-059-209-000 279.30 019-750-035-000 3,943.10 930-059-211-000 279.30 019-750-036-000 3,943.10 930-059-224-000 279.30 019-750-037-000 3,943.10 930-059-226-000 279.30 019-750-038-000 3,943.10 930-059-228-000 279.30 019-750-039-000 3,943.10 930-059-230-000 279.30 019-750-040-000 3,943.10 930-059-232-000 279.30 019-750-041-000 3,943.10 930-059-234-000 279.30 019-750-042-000 3,943.10 930-059-236-000 279.30 019-750-043-000 3,943.10 930-059-238-000 279.30 019-750-045-000 3,943.10 930-059-252-000 279.30 019-760-010-000 3,943.10 930-060-101-000 262.86 019-760-011-000 3,943.10 930-060-103-000 262.86 019-760-012-000 3,943.10 930-060-105-000 262.86 019-760-013-000 3,943.10 930-060-107-000 262.86 019-760-014-000 3,943.10 930-060-109-000 262.86 019-760-015-000 3,943.10 930-060-111-000 262.86 019-760-016-000 3,943.10 930-060-113-000 262.86 019-760-017-000 3,943.10 930-060-122-000 262.86 019-760-026-000 4,468.84 930-060-124-000 262.86 Willdan Financial Services Page 3 of 14 Page 416 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 019-760-028-000 4,468.84 930-060-126-000 262.86 019-760-030-000 4,468.84 930-060-128-000 262.86 019-760-031-000 4,468.84 930-060-130-000 262.86 019-760-032-000 4,468.84 930-060-132-000 262.86 019-940-004-000 4,468.84 930-060-134-000 262.86 019-940-005-000 4,468.84 930-060-136-000 262.86 019-940-006-000 4,468.84 930-060-138-000 262.86 019-940-007-000 4,468.84 930-060-152-000 262.86 019-940-008-000 4,468.84 930-060-201-000 262.86 019-940-009-000 4,468.84 930-060-203-000 262.86 019-940-010-000 4,468.84 930-060-205-000 262.86 019-940-011-000 4,468.84 930-060-207-000 262.86 019-940-012-000 4,468.84 930-060-209-000 262.86 019-940-013-000 4,468.84 930-060-211-000 262.86 019-940-014-000 4,468.84 930-060-213-000 262.86 019-940-015-000 4,468.84 930-060-222-000 262.86 019-940-016-000 4,468.84 930-060-224-000 262.86 019-940-017-000 4,468.84 930-060-226-000 262.86 019-940-018-000 4,468.84 930-060-228-000 262.86 930-006-101-000 262.86 930-060-230-000 262.86 930-006-103-000 262.86 930-060-232-000 262.86 930-006-105-000 262.86 930-060-234-000 262.86 930-006-107-000 262.86 930-060-236-000 262.86 930-006-109-000 262.86 930-060-238-000 262.86 930-006-111-000 262.86 930-060-252-000 262.86 930-006-113-000 262.86 930-061-101-000 270.82 930-006-122-000 262.86 930-061-103-000 270.82 930-006-124-000 262.86 930-061-105-000 270.82 930-006-126-000 262.86 930-061-107-000 270.82 930-006-128-000 262.86 930-061-109-000 270.82 930-006-130-000 262.86 930-061-111-000 270.82 930-006-132-000 262.86 930-061-113-000 270.82 930-006-134-000 262.86 930-061-122-000 270.82 930-006-136-000 262.86 930-061-124-000 270.82 930-006-138-000 262.86 930-061-126-000 270.82 930-006-152-000 262.86 930-061-128-000 270.82 930-007-101-000 262.86 930-061-130-000 270.82 930-007-103-000 262.86 930-061-132-000 270.82 930-007-105-000 262.86 930-061-134-000 270.82 930-007-107-000 262.86 930-061-136-000 270.82 930-007-109-000 262.86 930-061-138-000 270.82 930-007-111-000 262.86 930-061-152-000 270.82 930-007-113-000 262.86 930-061-203-000 270.82 930-007-122-000 262.86 930-061-205-000 270.82 930-007-124-000 262.86 930-061-207-000 270.82 930-007-126-000 262.86 930-061-209-000 270.82 Willdan Financial Services Page 4 of 14 Page 417 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-007-128-000 262.86 930-061-211-000 270.82 930-007-130-000 262.86 930-061-213-000 270.82 930-007-132-000 262.86 930-061-222-000 270.82 930-007-134-000 262.86 930-061-224-000 270.82 930-007-136-000 262.86 930-061-226-000 270.82 930-007-138-000 262.86 930-061-228-000 270.82 930-007-152-000 262.86 930-061-230-000 270.82 930-008-101-000 297.92 930-061-232-000 270.82 930-008-103-000 297.92 930-061-234-000 270.82 930-008-105-000 297.92 930-061-236-000 270.82 930-008-107-000 297.92 930-061-238-000 270.82 930-008-109-000 297.92 930-061-252-000 270.82 930-008-113-000 297.92 930-062-101-000 273.60 930-008-124-000 297.92 930-062-103-000 273.60 930-008-126-000 297.92 930-062-105-000 273.60 930-008-128-000 297.92 930-062-107-000 273.60 930-008-130-000 297.92 930-062-109-000 273.60 930-008-132-000 297.92 930-062-111-000 273.60 930-008-134-000 297.92 930-062-124-000 273.60 930-008-136-000 297.92 930-062-126-000 273.60 930-008-138-000 297.92 930-062-128-000 273.60 930-008-152-000 297.92 930-062-130-000 273.60 930-009-103-000 297.92 930-062-132-000 273.60 930-009-105-000 297.92 930-062-134-000 273.60 930-009-107-000 297.92 930-062-136-000 273.60 930-009-111-000 297.92 930-062-138-000 273.60 930-009-113-000 297.92 930-062-152-000 273.60 930-009-122-000 297.92 930-062-201-000 273.60 930-009-124-000 297.92 930-062-203-000 273.60 930-009-126-000 297.92 930-062-205-000 273.60 930-009-128-000 297.92 930-062-207-000 273.60 930-009-130-000 297.92 930-062-209-000 273.60 930-009-132-000 297.92 930-062-211-000 273.60 930-009-134-000 297.92 930-062-213-000 273.60 930-009-136-000 297.92 930-062-222-000 273.60 930-009-138-000 297.92 930-062-224-000 273.60 930-009-152-000 297.92 930-062-226-000 273.60 930-011-101-000 297.92 930-062-228-000 273.60 930-011-103-000 297.92 930-062-230-000 273.60 930-011-105-000 297.92 930-062-232-000 273.60 930-011-107-000 297.92 930-062-234-000 273.60 930-011-111-000 297.92 930-062-236-000 273.60 930-011-113-000 297.92 930-062-238-000 273.60 930-011-122-000 297.92 930-062-252-000 273.60 930-011-124-000 297.92 930-062-301-000 273.60 930-011-126-000 297.92 930-062-303-000 273.60 Willdan Financial Services Page 5 of 14 Page 418 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-011-128-000 297.92 930-062-305-000 273.60 930-011-130-000 297.92 930-062-307-000 273.60 930-011-132-000 297.92 930-062-309-000 273.60 930-011-134-000 297.92 930-062-311-000 273.60 930-011-136-000 297.92 930-062-313-000 273.60 930-011-152-000 297.92 930-062-322-000 273.60 930-012-101-000 262.86 930-062-324-000 273.60 930-012-103-000 262.86 930-062-326-000 273.60 930-012-105-000 262.86 930-062-328-000 273.60 930-012-107-000 262.86 930-062-330-000 273.60 930-012-109-000 262.86 930-062-332-000 273.60 930-012-111-000 262.86 930-062-334-000 273.60 930-012-113-000 262.86 930-062-336-000 273.60 930-012-122-000 262.86 930-062-338-000 273.60 930-012-124-000 262.86 930-062-352-000 273.60 930-012-126-000 262.86 930-063-101-000 262.86 930-012-128-000 262.86 930-063-103-000 262.86 930-012-130-000 262.86 930-063-105-000 262.86 930-012-132-000 262.86 930-063-107-000 262.86 930-012-134-000 262.86 930-063-109-000 262.86 930-012-136-000 262.86 930-063-111-000 262.86 930-012-138-000 262.86 930-063-113-000 262.86 930-012-152-000 262.86 930-063-122-000 262.86 930-013-101-000 262.86 930-063-124-000 262.86 930-013-103-000 262.86 930-063-126-000 262.86 930-013-105-000 262.86 930-063-128-000 262.86 930-013-107-000 262.86 930-063-130-000 262.86 930-013-109-000 262.86 930-063-132-000 262.86 930-013-111-000 262.86 930-063-134-000 262.86 930-013-113-000 262.86 930-063-136-000 262.86 930-013-122-000 262.86 930-063-138-000 262.86 930-013-124-000 262.86 930-063-152-000 262.86 930-013-126-000 262.86 930-063-201-000 262.86 930-013-128-000 262.86 930-063-203-000 262.86 930-013-130-000 262.86 930-063-205-000 262.86 930-013-132-000 262.86 930-063-207-000 262.86 930-013-134-000 262.86 930-063-209-000 262.86 930-013-136-000 262.86 930-063-211-000 262.86 930-013-138-000 262.86 930-063-213-000 262.86 930-013-152-000 262.86 930-063-222-000 262.86 930-014-101-000 262.86 930-063-224-000 262.86 930-014-103-000 262.86 930-063-226-000 262.86 930-014-105-000 262.86 930-063-228-000 262.86 930-014-107-000 262.86 930-063-230-000 262.86 930-014-109-000 262.86 930-063-232-000 262.86 930-014-111-000 262.86 930-063-234-000 262.86 Willdan Financial Services Page 6 of 14 Page 419 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-014-113-000 262.86 930-063-236-000 262.86 930-014-122-000 262.86 930-063-238-000 262.86 930-014-124-000 262.86 930-063-252-000 262.86 930-014-126-000 262.86 930-064-101-000 262.86 930-014-128-000 262.86 930-064-103-000 262.86 930-014-130-000 262.86 930-064-105-000 262.86 930-014-132-000 262.86 930-064-107-000 262.86 930-014-134-000 262.86 930-064-109-000 262.86 930-014-136-000 262.86 930-064-111-000 262.86 930-014-138-000 262.86 930-064-113-000 262.86 930-014-152-000 262.86 930-064-122-000 262.86 930-015-101-000 262.86 930-064-124-000 262.86 930-015-103-000 262.86 930-064-126-000 262.86 930-015-105-000 262.86 930-064-128-000 262.86 930-015-107-000 262.86 930-064-130-000 262.86 930-015-109-000 262.86 930-064-132-000 262.86 930-015-111-000 262.86 930-064-134-000 262.86 930-015-113-000 262.86 930-064-136-000 262.86 930-015-122-000 262.86 930-064-138-000 262.86 930-015-124-000 262.86 930-064-152-000 262.86 930-015-126-000 262.86 930-064-201-000 262.86 930-015-128-000 262.86 930-064-203-000 262.86 930-015-130-000 262.86 930-064-205-000 262.86 930-015-132-000 262.86 930-064-207-000 262.86 930-015-134-000 262.86 930-064-209-000 262.86 930-015-136-000 262.86 930-064-211-000 262.86 930-015-138-000 262.86 930-064-213-000 262.86 930-015-152-000 262.86 930-064-222-000 262.86 930-016-101-000 279.30 930-064-224-000 262.86 930-016-103-000 279.30 930-064-226-000 262.86 930-016-105-000 279.30 930-064-228-000 262.86 930-016-107-000 279.30 930-064-230-000 262.86 930-016-109-000 279.30 930-064-232-000 262.86 930-016-113-000 279.30 930-064-234-000 262.86 930-016-122-000 279.30 930-064-236-000 262.86 930-016-124-000 279.30 930-064-238-000 262.86 930-016-126-000 279.30 930-064-252-000 262.86 930-016-128-000 279.30 930-064-301-000 262.86 930-016-130-000 279.30 930-064-303-000 262.86 930-016-132-000 279.30 930-064-305-000 262.86 930-016-134-000 279.30 930-064-307-000 262.86 930-016-136-000 279.30 930-064-309-000 262.86 930-016-138-000 279.30 930-064-311-000 262.86 930-016-152-000 279.30 930-064-313-000 262.86 930-017-103-000 279.30 930-064-322-000 262.86 930-017-105-000 279.30 930-064-324-000 262.86 Willdan Financial Services Page 7 of 14 Page 420 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-017-107-000 279.30 930-064-326-000 262.86 930-017-109-000 279.30 930-064-328-000 262.86 930-017-111-000 279.30 930-064-330-000 262.86 930-017-113-000 279.30 930-064-332-000 262.86 930-017-122-000 279.30 930-064-334-000 262.86 930-017-124-000 279.30 930-064-336-000 262.86 930-017-126-000 279.30 930-064-338-000 262.86 930-017-128-000 279.30 930-064-352-000 262.86 930-017-130-000 279.30 930-065-101-000 270.82 930-017-132-000 279.30 930-065-103-000 270.82 930-017-134-000 279.30 930-065-105-000 270.82 930-017-136-000 279.30 930-065-107-000 270.82 930-017-138-000 279.30 930-065-109-000 270.82 930-017-152-000 279.30 930-065-111-000 270.82 930-018-101-000 297.92 930-065-113-000 270.82 930-018-103-000 297.92 930-065-122-000 270.82 930-018-105-000 297.92 930-065-126-000 270.82 930-018-107-000 297.92 930-065-128-000 270.82 930-018-109-000 297.92 930-065-130-000 270.82 930-018-113-000 297.92 930-065-132-000 270.82 930-018-122-000 297.92 930-065-134-000 270.82 930-018-124-000 297.92 930-065-136-000 270.82 930-018-126-000 297.92 930-065-138-000 270.82 930-018-128-000 297.92 930-065-152-000 270.82 930-018-130-000 297.92 930-065-201-000 270.82 930-018-132-000 297.92 930-065-203-000 270.82 930-018-134-000 297.92 930-065-205-000 270.82 930-018-136-000 297.92 930-065-207-000 270.82 930-018-152-000 297.92 930-065-209-000 270.82 930-019-101-000 279.30 930-065-211-000 270.82 930-019-103-000 279.30 930-065-213-000 270.82 930-019-105-000 279.30 930-065-222-000 270.82 930-019-107-000 279.30 930-065-224-000 270.82 930-019-111-000 279.30 930-065-226-000 270.82 930-019-113-000 279.30 930-065-228-000 270.82 930-019-122-000 279.30 930-065-230-000 270.82 930-019-124-000 279.30 930-065-232-000 270.82 930-019-126-000 279.30 930-065-234-000 270.82 930-019-128-000 279.30 930-065-236-000 270.82 930-019-130-000 279.30 930-065-238-000 270.82 930-019-132-000 279.30 930-065-252-000 270.82 930-019-134-000 279.30 930-066-101-000 268.12 930-019-136-000 279.30 930-066-105-000 268.12 930-019-138-000 279.30 930-066-107-000 268.12 930-019-152-000 279.30 930-066-109-000 268.12 930-020-101-000 262.86 930-066-111-000 268.12 Willdan Financial Services Page 8 of 14 Page 421 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-020-103-000 262.86 930-066-113-000 268.12 930-020-105-000 262.86 930-066-122-000 268.12 930-020-107-000 262.86 930-066-124-000 268.12 930-020-109-000 262.86 930-066-126-000 268.12 930-020-111-000 262.86 930-066-128-000 268.12 930-020-113-000 262.86 930-066-130-000 268.12 930-020-122-000 262.86 930-066-132-000 268.12 930-020-124-000 262.86 930-066-134-000 268.12 930-020-126-000 262.86 930-066-136-000 268.12 930-020-128-000 262.86 930-066-138-000 268.12 930-020-130-000 262.86 930-066-152-000 268.12 930-020-132-000 262.86 930-066-201-000 268.12 930-020-134-000 262.86 930-066-203-000 268.12 930-020-136-000 262.86 930-066-205-000 268.12 930-020-138-000 262.86 930-066-207-000 268.12 930-020-152-000 262.86 930-066-209-000 268.12 930-021-101-000 297.92 930-066-211-000 268.12 930-021-103-000 297.92 930-066-213-000 268.12 930-021-105-000 297.92 930-066-222-000 268.12 930-021-107-000 297.92 930-066-224-000 268.12 930-021-109-000 297.92 930-066-226-000 268.12 930-021-113-000 297.92 930-066-228-000 268.12 930-021-122-000 297.92 930-066-230-000 268.12 930-021-124-000 297.92 930-066-232-000 268.12 930-021-126-000 297.92 930-066-234-000 268.12 930-021-128-000 297.92 930-066-236-000 268.12 930-021-130-000 297.92 930-066-238-000 268.12 930-021-132-000 297.92 930-066-252-000 268.12 930-021-134-000 297.92 930-066-301-000 268.12 930-021-136-000 297.92 930-066-303-000 268.12 930-021-152-000 297.92 930-066-305-000 268.12 930-022-101-000 262.86 930-066-307-000 268.12 930-022-103-000 262.86 930-066-309-000 268.12 930-022-105-000 262.86 930-066-311-000 268.12 930-022-107-000 262.86 930-066-313-000 268.12 930-022-109-000 262.86 930-066-322-000 268.12 930-022-111-000 262.86 930-066-324-000 268.12 930-022-113-000 262.86 930-066-326-000 268.12 930-022-122-000 262.86 930-066-328-000 268.12 930-022-124-000 262.86 930-066-330-000 268.12 930-022-126-000 262.86 930-066-332-000 268.12 930-022-128-000 262.86 930-066-334-000 268.12 930-022-130-000 262.86 930-066-336-000 268.12 930-022-132-000 262.86 930-066-338-000 268.12 930-022-134-000 262.86 930-066-352-000 268.12 930-022-136-000 262.86 930-067-101-000 268.12 Willdan Financial Services Page 9 of 14 Page 422 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-022-138-000 262.86 930-067-103-000 268.12 930-022-152-000 262.86 930-067-107-000 268.12 930-023-101-000 279.30 930-067-109-000 268.12 930-023-103-000 279.30 930-067-111-000 268.12 930-023-105-000 279.30 930-067-113-000 268.12 930-023-107-000 279.30 930-067-122-000 268.12 930-023-109-000 279.30 930-067-124-000 268.12 930-023-113-000 279.30 930-067-126-000 268.12 930-023-122-000 279.30 930-067-128-000 268.12 930-023-124-000 279.30 930-067-130-000 268.12 930-023-126-000 279.30 930-067-132-000 268.12 930-023-128-000 279.30 930-067-134-000 268.12 930-023-130-000 279.30 930-067-136-000 268.12 930-023-132-000 279.30 930-067-138-000 268.12 930-023-134-000 279.30 930-067-152-000 268.12 930-023-136-000 279.30 930-067-201-000 268.12 930-023-138-000 279.30 930-067-203-000 268.12 930-023-152-000 279.30 930-067-205-000 268.12 930-024-101-000 279.30 930-067-207-000 268.12 930-024-103-000 279.30 930-067-209-000 268.12 930-024-105-000 279.30 930-067-211-000 268.12 930-024-107-000 279.30 930-067-213-000 268.12 930-024-109-000 279.30 930-067-222-000 268.12 930-024-111-000 279.30 930-067-224-000 268.12 930-024-122-000 279.30 930-067-226-000 268.12 930-024-124-000 279.30 930-067-228-000 268.12 930-024-126-000 279.30 930-067-230-000 268.12 930-024-128-000 279.30 930-067-232-000 268.12 930-024-130-000 279.30 930-067-234-000 268.12 930-024-132-000 279.30 930-067-236-000 268.12 930-024-134-000 279.30 930-067-238-000 268.12 930-024-136-000 279.30 930-067-252-000 268.12 930-024-138-000 279.30 930-067-301-000 268.12 930-024-152-000 279.30 930-067-303-000 268.12 930-025-101-000 297.92 930-067-305-000 268.12 930-025-103-000 297.92 930-067-307-000 268.12 930-025-107-000 297.92 930-067-309-000 268.12 930-025-111-000 297.92 930-067-311-000 268.12 930-025-113-000 297.92 930-067-313-000 268.12 930-025-122-000 297.92 930-067-322-000 268.12 930-025-124-000 297.92 930-067-324-000 268.12 930-025-126-000 297.92 930-067-326-000 268.12 930-025-128-000 297.92 930-067-328-000 268.12 930-025-130-000 297.92 930-067-330-000 268.12 930-025-132-000 297.92 930-067-332-000 268.12 930-025-134-000 297.92 930-067-334-000 268.12 Willdan Financial Services Page 10 of 14 Page 423 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-025-136-000 297.92 930-067-336-000 268.12 930-025-138-000 297.92 930-067-338-000 268.12 930-025-152-000 297.92 930-067-352-000 268.12 930-027-101-000 262.86 930-118-101-000 262.86 930-027-103-000 262.86 930-118-103-000 262.86 930-027-105-000 262.86 930-118-105-000 262.86 930-027-107-000 262.86 930-118-107-000 262.86 930-027-109-000 262.86 930-118-109-000 262.86 930-027-111-000 262.86 930-118-111-000 262.86 930-027-113-000 262.86 930-118-113-000 262.86 930-027-122-000 262.86 930-118-122-000 262.86 930-027-124-000 262.86 930-118-124-000 262.86 930-027-126-000 262.86 930-118-126-000 262.86 930-027-128-000 262.86 930-118-128-000 262.86 930-027-130-000 262.86 930-118-130-000 262.86 930-027-132-000 262.86 930-118-132-000 262.86 930-027-134-000 262.86 930-118-134-000 262.86 930-027-136-000 262.86 930-118-136-000 262.86 930-027-138-000 262.86 930-118-138-000 262.86 930-027-152-000 262.86 930-118-152-000 262.86 930-028-101-000 279.30 930-119-101-000 279.30 930-028-103-000 279.30 930-119-103-000 279.30 930-028-107-000 279.30 930-119-105-000 279.30 930-028-109-000 279.30 930-119-107-000 279.30 930-028-111-000 279.30 930-119-111-000 279.30 930-028-113-000 279.30 930-119-113-000 279.30 930-028-122-000 279.30 930-119-122-000 279.30 930-028-124-000 279.30 930-119-124-000 279.30 930-028-126-000 279.30 930-119-126-000 279.30 930-028-128-000 279.30 930-119-128-000 279.30 930-028-130-000 279.30 930-119-130-000 279.30 930-028-132-000 279.30 930-119-132-000 279.30 930-028-134-000 279.30 930-119-134-000 279.30 930-028-136-000 279.30 930-119-136-000 279.30 930-028-138-000 279.30 930-119-138-000 279.30 930-028-152-000 279.30 930-119-152-000 279.30 930-029-101-000 279.30 930-120-101-000 262.86 930-029-103-000 279.30 930-120-103-000 262.86 930-029-107-000 279.30 930-120-105-000 262.86 930-029-109-000 279.30 930-120-107-000 262.86 930-029-111-000 279.30 930-120-109-000 262.86 930-029-113-000 279.30 930-120-111-000 262.86 930-029-122-000 279.30 930-120-113-000 262.86 930-029-124-000 279.30 930-120-122-000 262.86 930-029-126-000 279.30 930-120-124-000 262.86 930-029-128-000 279.30 930-120-126-000 262.86 Willdan Financial Services Page 11 of 14 Page 424 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-029-130-000 279.30 930-120-128-000 262.86 930-029-132-000 279.30 930-120-130-000 262.86 930-029-134-000 279.30 930-120-132-000 262.86 930-029-136-000 279.30 930-120-134-000 262.86 930-029-138-000 279.30 930-120-136-000 262.86 930-029-152-000 279.30 930-120-138-000 262.86 930-030-101-000 262.86 930-120-152-000 262.86 930-030-103-000 262.86 930-121-103-000 297.92 930-030-105-000 262.86 930-121-105-000 297.92 930-030-107-000 262.86 930-121-107-000 297.92 930-030-109-000 262.86 930-121-109-000 297.92 930-030-111-000 262.86 930-121-111-000 297.92 930-030-113-000 262.86 930-121-113-000 297.92 930-030-122-000 262.86 930-121-122-000 297.92 930-030-124-000 262.86 930-121-124-000 297.92 930-030-126-000 262.86 930-121-126-000 297.92 930-030-128-000 262.86 930-121-128-000 297.92 930-030-130-000 262.86 930-121-130-000 297.92 930-030-132-000 262.86 930-121-132-000 297.92 930-030-134-000 262.86 930-121-134-000 297.92 930-030-136-000 262.86 930-121-136-000 297.92 930-030-138-000 262.86 930-121-152-000 297.92 930-030-152-000 262.86 930-124-101-000 262.86 930-033-103-000 279.30 930-124-103-000 262.86 930-033-105-000 279.30 930-124-105-000 262.86 930-033-107-000 279.30 930-124-107-000 262.86 930-033-109-000 279.30 930-124-109-000 262.86 930-033-111-000 279.30 930-124-111-000 262.86 930-033-113-000 279.30 930-124-113-000 262.86 930-033-122-000 279.30 930-124-122-000 262.86 930-033-124-000 279.30 930-124-124-000 262.86 930-033-126-000 279.30 930-124-126-000 262.86 930-033-128-000 279.30 930-124-128-000 262.86 930-033-130-000 279.30 930-124-130-000 262.86 930-033-132-000 279.30 930-124-132-000 262.86 930-033-134-000 279.30 930-124-134-000 262.86 930-033-136-000 279.30 930-124-136-000 262.86 930-033-138-000 279.30 930-124-138-000 262.86 930-033-152-000 279.30 930-124-152-000 262.86 930-034-101-000 262.86 930-127-103-000 279.30 930-034-103-000 262.86 930-127-105-000 279.30 930-034-105-000 262.86 930-127-107-000 279.30 930-034-107-000 262.86 930-127-109-000 279.30 930-034-109-000 262.86 930-127-111-000 279.30 930-034-111-000 262.86 930-127-113-000 279.30 930-034-113-000 262.86 930-127-122-000 279.30 Willdan Financial Services Page 12 of 14 Page 425 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-034-122-000 262.86 930-127-124-000 279.30 930-034-124-000 262.86 930-127-126-000 279.30 930-034-126-000 262.86 930-127-128-000 279.30 930-034-128-000 262.86 930-127-130-000 279.30 930-034-130-000 262.86 930-127-132-000 279.30 930-034-132-000 262.86 930-127-134-000 279.30 930-034-134-000 262.86 930-127-136-000 279.30 930-034-136-000 262.86 930-127-138-000 279.30 930-034-138-000 262.86 930-127-152-000 279.30 930-034-152-000 262.86 930-129-101-000 262.86 930-035-101-000 297.92 930-129-103-000 262.86 930-035-105-000 297.92 930-129-105-000 262.86 930-035-107-000 297.92 930-129-107-000 262.86 930-035-109-000 297.92 930-129-109-000 262.86 930-035-113-000 297.92 930-129-111-000 262.86 930-035-122-000 297.92 930-129-113-000 262.86 930-035-124-000 297.92 930-129-122-000 262.86 930-035-126-000 297.92 930-129-124-000 262.86 930-035-128-000 297.92 930-129-126-000 262.86 930-035-130-000 297.92 930-129-128-000 262.86 930-035-132-000 297.92 930-129-130-000 262.86 930-035-134-000 297.92 930-129-132-000 262.86 930-035-136-000 297.92 930-129-134-000 262.86 930-035-138-000 297.92 930-129-136-000 262.86 930-035-152-000 297.92 930-129-138-000 262.86 930-036-101-000 279.30 930-129-152-000 262.86 930-036-103-000 279.30 930-133-101-000 262.86 930-036-105-000 279.30 930-133-103-000 262.86 930-036-107-000 279.30 930-133-105-000 262.86 930-036-109-000 279.30 930-133-107-000 262.86 930-036-111-000 279.30 930-133-109-000 262.86 930-036-113-000 279.30 930-133-111-000 262.86 930-036-124-000 279.30 930-133-113-000 262.86 930-036-126-000 279.30 930-133-122-000 262.86 930-036-128-000 279.30 930-133-124-000 262.86 930-036-130-000 279.30 930-133-126-000 262.86 930-036-132-000 279.30 930-133-128-000 262.86 930-036-134-000 279.30 930-133-130-000 262.86 930-036-136-000 279.30 930-133-132-000 262.86 930-036-138-000 279.30 930-133-134-000 262.86 930-036-152-000 279.30 930-133-136-000 262.86 930-037-101-000 262.86 930-133-138-000 262.86 930-037-103-000 262.86 930-133-152-000 262.86 930-037-105-000 262.86 930-134-101-000 279.30 930-037-107-000 262.86 930-134-103-000 279.30 930-037-109-000 262.86 930-134-107-000 279.30 Willdan Financial Services Page 13 of 14 Page 426 of 563 Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) Fiscal Year 2026-27 Special Tax Levy Exhibit A APN FY26-27 Charge APN FY26-27 Charge 930-037-111-000 262.86 930-134-109-000 279.30 930-037-113-000 262.86 930-134-111-000 279.30 930-037-122-000 262.86 930-134-113-000 279.30 930-037-124-000 262.86 930-134-122-000 279.30 930-037-126-000 262.86 930-134-124-000 279.30 930-037-128-000 262.86 930-134-126-000 279.30 930-037-130-000 262.86 930-134-128-000 279.30 930-037-132-000 262.86 930-134-130-000 279.30 930-037-134-000 262.86 930-134-132-000 279.30 930-037-136-000 262.86 930-134-134-000 279.30 930-037-138-000 262.86 930-134-136-000 279.30 930-037-152-000 262.86 930-134-138-000 279.30 930-041-101-000 262.86 930-134-152-000 279.30 930-041-103-000 262.86 Total Fiscal Year 2026-2027 Special Tax Levy: $926,881.20 Total Parcel Count: 1,223 Willdan Financial Services Page 14 of 14 Page 427 of 563 TRUCKEE DONNER AGENDA ITEM #13 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Brian Wright, General Manager SUBJECT: Consideration of Appointing Brian Wright as Northern California Power Agency (NCPA) Commissioner Appointment r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Appoint Brian Wright, General Manager, as the District's designee for Northern California Power Agency (NCPA) Commissioner. BACKGROUND: Northern California Power Agency (NCPA), is a California Joint Action Agency. NCPA is a consortium of locally owned electric utilities to make joint investments and actions for the participating members. The District joined NCPA in 1989, to leverage the joint actions of locally owned electric utilities. As such, the District has held a seat on the commission since that time. ANALYSIS AND BODY: The District's partnership with NCPA has had great success. The areas of participation are: • Commission activity - The District votes on action items relating to District business and partnership activity; • The Utility Directors meet monthly to discuss public power issues and support common goals; • The Legislative and Regulatory group covers government affairs and mandates; • The Demand Site Management Working group deals with energy efficiency and solar; • The Transportation Electrification Working Group focuses on electric vehicles; and • The Member Services allows the District to leverage joint purchasing and partnerships. Overall, the District's membership and engagement with NCPA has yielded significant benefits while maintaining local control and promoting public power. Page 1 of 2 Page 428 of 563 GOALS AND OBJECTIVES: District Code 1.05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 5. Manage the District in an environmentally sound manner. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1.05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable, resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Take the best of private sector thinking to modernize the utility and add value to our communities. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this item. ATTACHMENTS: None Page 2 of 2 Page 429 of 563 TRUCKEE DON N ER AGENDA ITEM #14 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager Michael Salmon, Chief Financial Officer SUBJECT: Consideration to Accept the Audited Financial Report for FY25. APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Accept the Audited Financial Report for the fiscal year ending December 31, 2025 and direct staff to file the record. BACKGROUND: The District is required by the District Code and debt covenants to have its financial records audited by independent auditors each year. The Board is responsible for hiring auditors, and the auditors present their findings and report directly to the Board. On November 5, 2025, the Board approved awarding a contract with the independent auditing firm Baker Tilly to perform the District's audit for FY25, with the option to extend two years for FY26 and FY27 audits. Beginning in FY20, the District issues an Annual Comprehensive Financial Report (ACFR) in compliance with Governmental Financial Officers Association (GFOA) guidelines. The ACFR packages the standard financial statements with an expanded introductory section, and supports the standard financials with a robust statistical informational disclosure section. Baker Tilly does not audit nor make an opinion on the additional information in the ACFR, but does review the information to ensure it does not conflict with the audited standard financial statements, which are the core financial section of the ACFR. The District has received GFOA's Certificate of Achievement for Excellence in Financial Reporting for the ACFR for five consecutive years, FY20 through FY24. ANALYSIS AND BODY: Baker Tilly conducted the FY25 audit of the District's financial records and resulting financial statements. In December 2025, Baker Tilly conducted initial assessments of financial data and internal controls. In April and May 2026, Baker Tilly conducted field work and tested the financial statement balances and disclosures for the year 2025 and as of December 31, 2025. Page 1 of 2 Page 430 of 563 Baker Tilly is scheduled to present the FY25 audit results to the Board at this meeting and their communications information is provided as Attachment 1. The results of the audit are reported in an opinion letter from Baker Tilly. The opinion letter for 2025 from Baker Tilly is an "unmodified" or "clean" opinion on the financial statements, which is the highest level of assurance an auditor can provide relative to the fairness and accuracy of the financial statements being presented. The opinion letter and accompanying financial statements are presented herein as a component of Attachment 2, the FY25 ACFR. The FY25 ACFR will be submitted to GFOA for review and consideration for receiving a Certificate of Achievement for Excellence in Financial Reporting. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. FISCAL IMPACT: There is no direct financial impact by means of accepting this report. ATTACHMENTS: 1. TDPUD 2025 TCWG Final 2. 2025 ACFR TDPUD Page 2 of 2 Page 431 of 563 Communications with Those Charged with Governance Truckee Donner Public Utility District December 31,2025 C bakertitty Page 432 of 563 @G bakerti ll y Communications with Those Charged with Governance The Board of Directors Truckee Donner Public Utility District We have audited the consolidated financial statements of Truckee Donner Public Utility District (the District)as of and for the year ended December 31, 2025, and have issued our report thereon dated May 26, 2026. Professional standards require that we provide you with the following information related to our audit. Our Responsibility under Auditing Standards Generally Accepted in the United States of America As stated in our engagement letter dated October 20, 2025, we are responsible for forming and expressing an opinion about whether the financial statements that have been prepared by management, with your oversight, are prepared, in all material respects, in accordance with accounting principles generally accepted in the United States of America. Our audit of the consolidated financial statements does not relieve you or management of your responsibilities. We conducted our audit in accordance with auditing standards generally accepted in the United States of America (U.S. GAAS). As part of an audit conducted in accordance with U.S. GAAS, we exercise professional judgment and maintain professional skepticism throughout the audit. An audit of consolidated financial statements includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the District's internal control over financial reporting. Accordingly, we considered the District's internal control solely for the purposes of determining our audit procedures and not to provide assurance concerning such internal control. We are also responsible for communicating significant matters related to the consolidated financial statement audit that, in our professional judgment, are relevant to your responsibilities in overseeing the financial reporting process. However, we are not required to design procedures for the purpose of identifying other matters to communicate to you. The supplementary information was subject to certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the consolidated financial statements or to the consolidated financial statements themselves. Baker Tilly Advisory Group, LP and Baker Tilly US, LLP,trading as Baker Tilly,are members of the global network of Baker Tilly International Ltd.,the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm that provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their clients and are not licensed CPA firms. 1 Page 433 of 563 Other Information Included in the Annual Report Management is responsible for the other information included in the annual report. The other information comprises the introductory and statistical sections but does not include the consolidated financial statements and our auditor's report thereon. Our opinion on the consolidated financial statements does not cover the other information, and we do not express an opinion or any form of assurance thereon. Our responsibility is to read the other information and consider whether a material inconsistency exists between the other information and the audited consolidated financial statements. We have read the information, and nothing came to our attention that caused us to believe that such information is materially inconsistent with the consolidated financial statements. Planned Scope and Timing of the Audit We performed the audit according to the planned scope and timing previously communicated to you in our engagement letter dated October 20, 2025. Significant Audit Findings and Issues Qualitative Aspects ofAccounting Practices Management is responsible for the selection and use of appropriate accounting policies. The significant accounting policies used by the District are described in Note 1 to the consolidated financial statements. No new accounting policies were adopted during 2025, except for the adoption of GASB Statement No. 102, Certain Risk Disclosures, which did not have a material impact on the consolidated financial statements. There were no changes in the application of existing accounting policies during the year. We noted no transactions entered into by the District during the year for which there is a lack of authoritative guidance or consensus. Additionally, there are no significant transactions that have been recognized in the consolidated financial statements in a different period than when the transaction occurred. Significant Accounting Estimates Accounting estimates are an integral part of the consolidated financial statements prepared by management and are based on management's knowledge and experience about past and current events and assumptions about future events. Certain accounting estimates are particularly sensitive because of their significance to the consolidated financial statements and because of the possibility that future events affecting them may differ significantly from those expected. The most sensitive estimates affecting the consolidated financial statements were: Unbilled revenue— Unbilled revenue is a measure of revenue earned through the end of the reporting period that has yet to be billed. This generally represents accounts with billing cycles that start in the reporting year and end in the subsequent year. We have evaluated the key factors and assumptions used to develop unbilled revenue in determining that it is reasonable in relation to the consolidated financial statements taken as a whole. Allowance for doubtful accounts—The allowance for doubtful accounts represents an estimate of the amount of accounts receivable that will not be collected. We have evaluated the key factors and assumptions used to develop the allowance in determining that it is reasonable in relation to the consolidated financial statements taken as a whole. 2 Page 434 of 563 Recovery periods for the cost of plant—This represents the depreciation of plant assets. Management's estimate of the recovery periods for the cost of plant is based on regulatory- prescribed depreciation recovery periods. We have evaluated the key factors and assumptions used to develop the recovery periods in determining that they are reasonable in relation to the consolidated financial statements taken as a whole. Other post-employment benefit obligations—This represents the amount of annual expenses recognized for post-employment benefits. The amount is actuarially determined with management input. We have evaluated the key factors and assumptions used to develop the annual expenses in determining that it is reasonable in relation to the consolidated financial statements taken as a whole. Pension liability and related pension expense—This represents the amount of annual expense recognized for pensions and the related pension asset or liability. The amount is actuarially determined, with CalPERS management input. We have evaluated the key factors and assumptions used to develop the annual expense in determining that it is reasonable in relation to the consolidated financial statements taken as a whole. Valuation of investments—This represents management's estimate of the fair value of investments based on current market rates and conditions. We evaluated the key factors and assumptions used to develop the valuation of investments and determined that they are reasonable in relation to the consolidated financial statements taken as a whole. Financial Statement Disclosures The disclosures in the consolidated financial statements are consistent, clear, and understandable. Certain financial statement disclosures may be particularly sensitive because of their significance to financial statement users. We did not note any disclosures in the consolidated financial statements which we consider sensitive to potential users. Significant Unusual Transactions We encountered no significant unusual transactions during our audit of the District's consolidated financial statements. Significant Difficulties Encountered in Performing the Audit Professional standards require us to inform you of any significant difficulties encountered in performing the audit. No significant difficulties were encountered during our audit of the District's consolidated financial statements. Disagreements with Management For purposes of this letter, professional standards define a disagreement with management as a financial accounting, reporting, or auditing matter, whether or not resolved to our satisfaction, that could be significant to the consolidated financial statements or the auditor's report. No such disagreements arose during the course of our audit. 3 Page 435 of 563 Circumstances that Affect the Form and Content of the Auditor's Report There may be circumstances in which we would consider it necessary to include additional information in the auditor's report in accordance with auditing standards generally accepted in the United States of America. There were no circumstances that affected the form and content of the auditor's report. Corrected and Uncorrected Misstatements Professional standards require us to accumulate all factual and judgmental misstatements identified during the audit, other than those that are trivial, and communicate them to the appropriate level of management. No corrected or uncorrected misstatements were identified during the current year. Management Representations We have requested certain representations from management that are included in the management representation letter dated May 26, 2026. Management Consultation with Other Independent Accountants In some cases, management may decide to consult with other accountants about auditing and accounting matters, similar to obtaining a "second opinion"on certain situations. If a consultation involves application of an accounting principle to the District's consolidated financial statements or a determination of the type of auditor's opinion that may be expressed on those statements, our professional standards require the consulting accountant to check with us to determine that the consultant has all the relevant facts. To our knowledge, there were no such consultations with other accountants. Other Significant Audit Findings or Issues We are required to communicate to you other findings or issues arising from the audit that are, in our professional judgment, significant and relevant to your oversight of the financial reporting process. There were no such items identified. This information is intended solely for the use of the Board of Directors and management of the District, and is not intended to be, and should not be, used by anyone other than these specified parties. gw,OJL Portland, Oregon May 26, 2026 4 Page 436 of 563 Baker Tilly Advisory Group, LP and Baker Tilly US, LLP, trading as Baker Tilly, are members of the global network of Baker Tilly International Ltd., the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm that provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their clients and are not licensed CPA firms. Page 437 of 563 �i TRUCKEE DONNER PUBLI Pa.; TRUCKEE, CALIF A wo ANNUAL COMPREHENSIVE FIr NCIAL REPORT - R THE FISCAL YEAR ENDED�DEE sand 2024 �4 `7 y. � r "ill + iwiAv:. Av ' � .: ��F x �J ,�•� ter. �•����1�•i,Y ,'�' "' ice•- 1 A4 ♦c��!'!!ti= W jp. - - - �•�^ :717 EPA BY TH —� -OUNTJ.N-b A' FINANCE DEPARTMENt y TRUCKEE DONNER a Public Utility District TheMissionof the Truckee Donner Public is to provide reliable, high-quality utility and customer services while managing District resources in a safe, open, responsible, and environmentally sound manner at the lowest practical cost. M. 1 6; Truckee Donner Public Utility District's AL Safety — Safety is our way Safety is our first priority. We are committed to the health and safety of our employees, customers, and community through the continuous practice of prevention, education, and awareness. Communication — Send and receive Foster positive engagement by creating a strong communicative environment that includes; active listening, 1 n y, clear, concise, and timely transmission of e information, with empathy I ect. This also includes providing and receiving honest feedback. Integrity — Hon?(and ethica Highest quality service to the blic and employees, utilizing honesty and ethics as our base principles. Acco ntability — Own it A str erforming team wit he obligation and willingness to accept responsibility for our c ons aintaining a se of humility and inclusiveness. Time es Meet our goal d co itments A hig lye tive agency and spons ve organization meeting goals and expectations in a timely manne Mission and Values of District, as adopted by Board of Directors May 19, 2021 Page 12 Page 4 • of 563 Table of Contents Introductory Section Letterof Transmittal...............................................................................................5 Organization Chart, Board of Directors and Appointed Officials......................................10 GFOA Certificate of Achievement for Excellence in Financial Reporting..........................11 Financial Section Report of Independent Auditors...............................................................................14 Management's Discussion and Analysis...................................................................17 Financial Statements............................................................................................23 Consolidated Statements of Net Position.......................................................24 Consolidated Statements of Revenues, Expenses and Changes in Net Position....26 Consolidated Statements of Cash Flows........................................................27 Notes to Financial Statements ................................................................................29 Required Supplementary Information.......................................................................71 Cost Sharing Defined Benefit Pension Plans..................................................72 Schedule of Changes in Net OPEB Liability and Related Ratios.........................74 Supplementary Information.....................................................................................78 Consolidating Statement of Net Position........................................................79 Consolidating Statement of Revenues, Expenses and Changes in Net Position.....81 Consolidating Statement of Cash Flows .......................................................83 Statistical Section Statistical Section Objectives and Index....................................................................85 Financial Trends Consolidated Statements of Revenues, Expenses, and Changes in Net Position...87 Net Position by Component and Segment.......................................................88 Revenue Capacity Historical Customer Mix and Rates................................................................89 Average Residential Bill Comparison.............................................................90 Ten Largest Customers and Sales Mix......................................................... 91 Debt Capacity DebtCoverage..........................................................................................92 Total Long-Term Debt per Customer and Ratios.............................................93 Demographic and Economic Information Population, Income, Labor Force and Unemployment.......................................94 Principal employers....................................................................................95 Operating Information Number of Employees, Customers, Demand Volumes, and Capital Assets ...........96 Capital Assets by Function..........................................................................97 Base Heating and Cooling Degree Days ........................................................98 Page 13 Page 440 of 563 INTRODUCTORY SECTION Y '� � - _ -`—�i. __-^ems. - - ■ ..�.` �rtx-,w�r.�"'�"'�• ly4�F�'+�w� r'�+�"�'"!�+w+ .. �, "�"�� y„� L+�`,: '�+�f' s J. TRUCKEE DONNER ,10. _.. t PUBLIC UTILITY DISTRICT F Photo by Tim Erskine ©Erskine Creative Photography Page 4 Page 441 of 563 U;�'TRUCKEE DO -.,A Public Utility District General Manager Brian C.Wright May 26, 2026 Executive Dear Board of Directors and Customers of the District, Leadership Team The staff of Truckee Donner Public Utility District (District) is pleased to submit to you the Annual Scott Crow Assistant General Comprehensive Financial Report(Report)for the year ended December 31, 2025. The Report provides Manager/CIO an assessment of the District's financial condition, informs readers about the District's services, gives Chad J.Reed details of infrastructure replacement projects, discusses current issues and provides financial and Water Utility Director demographic trend information. We are proud to announce that the 2024 Report was awarded a Mike Swanson Certificate of Achievement of Excellence in Financial Reporting by the Government Finance Officers Director of Electric Association (GFOA). This is the 5th consecutive year for this award which is an excellent example of Engineering and financial transparency for the District. We will be submitting this 2025 Report for award evaluation. Operations The Report consists of management's representations of the finances and other information of and for Steven Poncelet the District.Consequently, management assumes full responsibility for the completeness and reliability PIO&Strategic Affairs of all the information presented in this report. To provide a reasonable basis for making these Director representations, management has established internal controls that are designed to protect the Michael Salmon District's assets from loss,theft,or misuse and to compile sufficient reliable information to prepare the Chief Financial Officer District's financial statements in conformity with Generally Accepted Accounting Principles(GAAP).The Jillian Steward cost of internal controls should not outweigh their benefits. Therefore, the District's comprehensive Director of Human framework of internal controls has been designed to provide reasonable rather than absolute assurance Resources and that the financial statements will be free from material misstatement. As management, we assert that Risk Management to the best of our knowledge and belief, this financial report is complete and reliable in all material Martina Rochefort aspects. District Clerk/ Executive Assistant The District's financial statements have been audited by Baker Tilly US LLP, an independent firm of Board of Directors licensed certified public accountants.The goal of the audit is to provide reasonable assurance that the Christa Finn financial statements of the District for the year ended December 31, 2025 are free of material Tony Laliotis misstatement. The independent auditor concluded based upon the audit that there was a reasonable Jeff Bender basis for rendering an unmodified or clean opinion that the District's financial statements are fairly Courtney Murrell presented in conformity with GAAP. The independent auditor's report is presented as the first Steve Randall component of the financial section of this Report. GAAP requires that management provide a narrative introduction,overview,and analysis to accompany the basic financial statements in the form of the Management's Discussion and Analysis (MD&A). This letter of transmittal is designed to complement the MD&A and should be read in conjunction with it. The District's MD&A can be found in the finance section immediately following the report of the independent auditors. District Overview In 1927,the District was formed by and continues to operate under the State of California Public Utility District Act. The District provides electric and water utility services with a service territory of45.5 square miles, beginning four miles from the northern border just beyond Alder Creek Road, south to Placer County, and 11 miles from just beyond the western shore of Donner Lake eastward to the rim of Boca Dam and the Hirschdale community.As of December 31, 2025,the District served 14,881 electric utility customer accounts and 13,768 water utility customer accounts. PWUC SPECIAL DISTRICT 11570 Donner Pass Road,Truckee,CA 96161 1 (530)587-3896 1 tdpud.org R""'ER °L LEADERSHIP FOUNDATION �« �"� Page 442 of 563 The District's service territory is predominately within the town borders of the Town of Truckee (Truckee). Truckee's historical downtown flourished as a railroad station town and gateway to Lake Tahoe. Truckee is generally considered a resort town or bed base for resort and outdoor recreation activities. Truckee's stated current population of 17,500 varies widely throughout the seasons of the year due to tourism and seasonal residences. Winter months are busy with alpine skiing and other winter activities, summer is robust with hiking, biking, boating and other summer activities, while the shoulder seasons are less busy with primary residents predominately. While Truckee's downtown base elevation is 5,817 feet (1,773 meters), the District's service territory elevations range from 5,745 feet (1,751 meters) to 7,370 (2,246 meters). This wide range of elevation creates utility service challenges, explained in detail later in this letter. The District is governed by five elected at-large, Board members. Each elected Board member serves four- year staggered terms. The five-member Board of Directors serve as the governing body with respect to policy and fiduciary responsibility. The General Manager reports to the Board of Directors and all other District employees report up through or directly to the General Manager. An organization chart is provided after this letter to provide additional insights. The District's electric utility (Electric) sold 160,458 MWh of energy to customers in 2025, down 4.8% to 2024. The decrease in MWh sold is attributed primarily to milder winter weather in 2025 compared to 2024. Electric's system is a transmission-dependent, non-energy producing, distribution electric utility. Electric services 14,900 accounts across 233 miles of distribution lines; 135 miles of overhead pole lines and 98 miles of underground lines. For energy sources, Electric has aggressively pursued renewable power sources and currently has approximately 60% renewable power procurement. The winter months can be harsh, with extreme cold and an average snowfall of over 400 inches. The summer months consist of high daytime heat, cool nighttime temperatures, low humidity, nominal precipitation and high winds, creating high fire danger. Despite these challenging conditions, Electric has a long history of reliable power and in March 2024 was awarded RP3 Platinum Level by the American Public Power Association's Reliable Public Power Provider program which recognizes utilities that demonstrate high proficiency in reliability, safety, workforce development, and system improvement. In 2025, the District's water utility produced approximately 1.3 billion gallons of potable water for its customers—a 14% decrease compared to 2024. In large part, this reduction reflects the community's successful adoption of water-efficiency programs and the District's investment in both capital replacement programs and Advanced Metering Infrastructure (AMI), which allows for real-time leak detection and more precise resource management. The District's water system is supplied entirely by high-quality groundwater drawn from the Martis Valley Aquifer. This pristine underground source requires minimal treatment, ensuring that the water delivered to customers consistently meets or exceeds all state and federal drinking water standards. To access this resource, the District operates 13 active wells with a total production capacity of 10,250 gallons per minute, or roughly 14.8 million gallons per day. Reliable water service is provided to 13,800 customer accounts through a complex infrastructure that includes 13 active wells, 35 storage tanks with a combined capacity of 13.1 million gallons, 25 pumping stations, 46 pressure zones, and 239 miles of distribution pipeline. The system spans a service area with a significant elevation range of 1,625 feet(495 meters), creating unique operational challenges—particularly in the harsh environmental conditions of the Sierra Nevada's. Maintaining the reliability and quality of the water supply is a top priority. The District's wells draw from an extensively studied and tested aquifer that has been confirmed to meet both current and future water demand projections. Importantly, this aquifer has shown resilience to drought conditions, making it a dependable long-term water source. Water quality is rigorously monitored, with over 1000 tests conducted annually to ensure compliance with all federal and state maximum contaminant levels (MCLs). The system has continued to meet or exceeds all regulatory standards. Page 16 Page 443 of 563 The District remains committed to transparency and public education regarding water supply and quality. An annual Consumer Confidence Report (CCR) is published to provide customers with key information about their drinking water. Current and past CCRs are available on the District's website at www.tdpud.org. In addition to core Electric and Water utilities,the District's blended component units include two Community Facilities Districts (CFD), Old Greenwood and Gray's Crossing. In order to finance various public improvements needed to develop property within the Town of Truckee, California, the District formed Community Facilities Districts (CFD), which issued Special Tax Bonds pursuant to the Mello-Roos Community Facilities Act of 1982, as amended. Accordingly, the Bonds are special obligations of the respective Community Facilities Districts and are payable solely from revenues derived from taxes levied on and collected from the owners of the taxable land within the respective Community Facilities Districts. These Special Tax Bonds are not general or special obligations of the District. The Board of Directors of the District is the legislative body of the Communities Facilities Districts and as such they approve the rates and method of apportionment of the special taxes. As improvements were completed, the infrastructure was donated in the form of a capital contribution to the Town of Truckee, the Truckee Sanitary District, Southwest Gas, and the District. Local Economic Conditions Truckee and the greater regional area known as Lake Tahoe, is a very popular summer and winter vacation destination, due in part to the proximity to the Bay Area region of Northern California. Truckee's location near Lake Tahoe causes Truckee to be a gateway bed base for the tourism economy but also has a small- town local economy with its population of approximately 17,500 residents. The District's Electric customers are categorized between primary residential of 40% and secondary (second home) residential of 60%. With the start of pandemic impacts in March 2020,while the tourism business essentially stopped, Truckee experienced a large increase in second homes utilization, a combination of both the owner of the second homes and short-term rentals of the second homes. The pandemic-driven increase in utilization has only moderately decreased post pandemic. Truckee residential and commercial real estate development tapered in 2025 compared to 2024. Truckee real estate as of March 2026 indicates a Median Listing Price of $939,000, down 10% year-over-year (source realtor.com). The March 2026 Zillow Home Value Index for Truckee region of$1,015,000 is down 1% year-over-year as compared to in March 2025 the index indicated values flat year-over-year. As California and the nation continue policy decisions regarding net zero carbon emissions and the potential resulting electrification of the state and country, the District is well positioned for the short-term to meet these service needs and has included these potential impacts in the District's long-term planning. District in 2025 Financial Information and Policies The Total Net Position of the District was $156.7 million as of December 31, 2025, increasing $15.1 million or 10.7% compared to December 31, 2024. Operating income of$9.5 million accounts for 63% of the Total Net Position increase. The FY 2025 operating income of $9.5 million represents a margin of 15.9% of operating revenues,which compares to a FY 2024 margin of 9.8%. For 2025 compared to 2024, operating revenues increased 8.2% and operating expenses increased 0.9%. Total non-operating revenue and expenses net to revenue of$4.2 million and contributed assets of$1.4 million account for the remainder of the Total Net Position increase. Total Cash, Cash Equivalents, and Investments was $63.5 million as of December 31, 2025, increasing $6.3 million or 11.1% compared to December 31, 2024. The increase was primarily driven by operating income of $7.8 million and $1.7 million for electric and water utilities, respectively. Refer to Financial Section's Consolidated Statements of Cash Flows and Note 2 of Notes to Financial Statements for additional information regarding components of cash, cash equivalents, and investments. The Management's Discussion and Analysis in the Financial Section provides additional information on the FY 2025 financial results and financial condition of the District. Page 17 Page 444 of 563 The District reviewed several new GAAP accounting pronouncements and the adoption of GASB Statement No. 102, Certain Risk Disclosures impacted disclosures in the financial statements. Refer to Financial Section, Note 1 & Note 17 of Notes to Financial Statements for additional information regarding all the key financial policies of the District and details on new accounting pronouncements. Budgetary Controls As a public agency, the Board and District embrace the fiduciary responsibility and stewardship of the District's financial resources. District staff works with the Board of Directors in workshop meetings and public hearing meetings to develop a biennial budget before Board adoption. The budget serves as a management tool to set appropriate service rates, allocate available resources, and includes a ten-year financial master plan. The legal level of budgetary control is maintained at the fund, department, and object account level. Key budgetary control is provided in District Code Title 3 Finance and Accounting, which includes extensive financial, budget, accounting, purchasing, reserves, investments, and other internal control policies. Board level budgetary controls include approval thresholds for expenditures and personnel additions, as well as Board semi-annual review of financial statements and monthly review of disbursements and reserve fund balances. Management budgetary controls include monthly financial statement and budget report review, as well as financial policies and procedures in accordance with aforementioned District Code. Long Term Financial Planning, Public Outreach and Initiatives 2025 was a strategic and operating execution year for the District's adopted Budget which includes the Water and Electric 10-year Capital Improvement Plans. These plans provide valuable short- and long- term information to assist with resource planning in the FY 2024 and FY 2025 biennial budget cycle, which includes a 10-year Financial Master Plan and was approved in fall of 2023. 2025 activity included the FY 2026 and FY 2027 biennial budget cycle preparation, review public workshops and public hearing and board approval. Comprehensive cost of service analysis report and resulting revenue requirements and customer rate changes were completed in 2025 for Water(2026 through 2030 rates) and for Electric (2026 through 2027 rates). The review of these analyses is held in open/noticed Board meetings, as well as, noticed Public Hearings. In May 2021, the District completed an extensive strategic planning process, which included significant community outreach. Community participation exceeded the District's expectations and provided valuable feedback for not only the strategic plan, but also perceptions and insights into the District as a whole as part of our community. An update to the strategic plan was completed in 2024. The District sincerely thanks the community for their valued engagement with the District. The Board adopted Strategic Plan includes the following four key initiatives: • Community Broadband • Service Reliability and Safety • Net Carbon Reduction • Local Watershed Stewardship More information on the strategic plan can be found on the District website (tdpud.org). Page 18 Page 445 of 563 The District conducts regular Board meetings, generally on the first Wednesday of each month, which are noticed and open to the public. The dates of upcoming meetings and an archive of past meetings can be found on the District's website (tdpud.org). Closing Comments We would like to thank the many staff involved in preparing this Report, a true team effort. Further, we would like to thank all our valued employees for their service and dedication to the District and the community during these unique and challenging times. Respectfully submitted, Brian C. Wright Michael R. Salmon General Manager Chief Financial Officer Page 9 Page 446 of 563 Truckee Donner Public Utility District Organization Chart for 2025 Customers/Community Electric(14,900 accounts) Water(13,800 accounts) Board of Directors Elected Officials(5) r......................................... Auditors I Legal Counsel ......................................... ;........................................: General Manager Employee Full Time Equivalents(FTE) 1 FTE 83.00 Total FTE for 2025 Budget District Clerk Electric Information Operations Dist.Clerk,Contracts,Records 4 FTE Technology (including Engineering) (including SCADA and GIS) 25 FTE Human Resources 7 FTE HR,Payroll,Risk Mtgt. 3 FTE Water Administrative Services(CFO) Legislative and Regulatory Operations (Finance,Facilities,Fleet, Affairs,and Public (including Engineering) Conservation,and Customer Service) Information Officer 18 FTE 23 FTE 2 FTE List of Elected and Appointed Officials Elected Officials FY'2024(Term) FY'2025(Term) Appointed Officials Board President Jeff Bender(2020-2024) Christa Finn(2022-2026) Treasurer Michael R.Salmon Board Vice President Christa Finn(2022-2026) Tony Laliotis(2022-2026) District Clerk Martina Rochefort Board of Director Tony Laliotis(2022-2026) Jeff Bender(2025-2028) General Manager Brian Wright Board of Director Joe Aguera(2020-2024) Courtney Murrell(2025-2028) Board of Director Kim Harris(2020-2024) Steve Randall(2025-2028) Terms for directors run December of starting year through December of even years, four year terms. Page 10 Page 447 of 563 GFOA Certificate of Achievement for Excellence in Financial Reporting The Government Finance Officers Association of the United States and Canada (GFOA) awarded a Certificate of Achievement for Excellence in Financial Reporting to Truckee Donner Public Utility District for its annual comprehensive financial report (ACFR)for the fiscal year ended December 31, 2024. This was the fifth year that the District has achieved this prestigious award. The Certificate of Achievement is a prestigious national award recognizing conformance with the highest standards for preparation of state and local government financial reports. In order to be awarded a Certificate of Achievement, a government must publish an easily readable and efficiently organized annual comprehensive financial report, whose contents conform to program standards. This report must satisfy both generally accepted accounting principles and applicable legal requirements. A Certificate of Achievement is valid for a period of one year only. We believe that this ACFR continues to meet the Certificate of Achievement Program's requirements and are submitting it to GFOA to determine its eligibility for certificate award. Government Finance Officers Association Certificate of Achievement for Excellence in Financial Reporting Presented to Truckee Donner Public Utility District California For its Annual Comprehensive Financial Report For the Fiscal Year Ended December 31.2024 o ..&P.,.. P- ;i .u.:c( Execum a Duector CEO Page 11 Page 448 of 563 FINANCIAL SECTION L � 7F r= �r k- - The American Public Power Association's Reliable Public Power Provider program recognizes utilities that demonstrate high proficiency in reliability, safety, workforce development, and system improvement. Truckee Donner Public Utility District received the Platinum level RP3 award designation in March 2024. This designation will last for three years. RELIABLE PLATINUM AWARD RECIPIENT MARCH 2O24 .. 111I.R. PROVIDER American Public Power Association Page 112 Page 449 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED FINANCIAL STATEMENTS Including Report of Independent Auditors December 31, 2025 and 2024 TABLE OF CONTENTS Report of Independent Auditors ..............................................................................................14 Management's Discussion and Analysis....................................................................................17 FinancialStatements.............................................................................................................23 Consolidated Statements of Net Position........................................................................24 Consolidated Statements of Revenues, Expenses and Changes in Net Position.....................26 Consolidated Statements of Cash Flows.........................................................................27 Notes to Financial Statements.................................................................................................29 Required Supplementary Information........................................................................................71 Cost Sharing Defined Benefit Pension Plans...................................................................72 Schedule of Changes in Net OPEB Liability and Related Ratios, OPEB Investment Returns, and OPEB Actuarial Assumptions.................................................................................74 Supplementary Information.....................................................................................................78 Consolidating Statement of Net Position.........................................................................79 Consolidating Statement of Revenues, Expenses and Changes in Net Position.......................81 Consolidating Statement of Cash Flows...........................................................................83 Page 113 Page 450 of 563 �G kri ba e t lly Report of Independent Auditors The Board of Directors Truckee Donner Public Utility District Report on the Audit of the Financial Statements Opinion We have audited the consolidated financial statements of Truckee Donner Public Utility District(the "District"), which comprise the consolidated statements of net position as of December 31, 2025 and 2024, and the related consolidated statements of revenues, expenses and changes in net position and cash flows for the years then ended, and the related notes to the consolidated financial statements. In our opinion, the accompanying consolidated financial statements present fairly, in all material respects, the financial position of the District as of December 31, 2025 and 2024, and the results of its operations and its cash flows for the years then ended in accordance with accounting principles generally accepted in the United States of America. Basis for Opinion We conducted our audits in accordance with auditing standards generally accepted in the United States of America (GAAS). Our responsibilities under those standards are further described in the Auditor's Responsibilities for the Audit of the Financial Statements section of our report. We are required to be independent of the District and to meet our other ethical responsibilities, in accordance with the relevant ethical requirements relating to our audits. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Responsibilities ofManagementfor the Financial Statements Management is responsible for the preparation and fair presentation of the consolidated financial statements in accordance with accounting principles generally accepted in the United States of America, and for the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error. In preparing the consolidated financial statements, management is required to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the District's ability to continue as a going concern for twelve months beyond the financial statement date, including any currently known information that may raise substantial doubt shortly thereafter. Baker Tilly Advisory Group, LP and Baker Tilly US, LLP,trading as Baker Tilly,are members of the global network of Baker Tilly International Ltd.,the members of which are separate and independent legal entities. Baker Tilly US, LLP is a licensed CPA firm that provides assurance services to its clients. Baker Tilly Advisory Group, LP and its subsidiary entities provide tax and consulting services to their clients and are not licensed CPA firms. 1 Page 451 of 563 Auditor's Responsibilities for the Audit of the Financial Statements Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor's report that includes our opinion. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is not a guarantee that an audit conducted in accordance with GAAS will always detect a material misstatement when it exists. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control. Misstatements are considered material if there is a substantial likelihood that, individually or in the aggregate, they would influence the judgment made by a reasonable user based on the consolidated financial statements. In performing an audit in accordance with GARS, we: Exercise professional judgment and maintain professional skepticism throughout the audit. Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, and design and perform audit procedures responsive to those risks. Such procedures include examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the District's internal control. Accordingly, no such opinion is expressed. Evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluate the overall presentation of the consolidated financial statements. Conclude whether, in our judgment, there are conditions or events, considered in the aggregate, that raise substantial doubt about the District's ability to continue as a going concern for a reasonable period of time. We are required to communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit, significant audit findings, and certain internal control—related matters that we identified during the audit. 2 Page 452 of 563 Other Matters Required Supplementary Information Accounting principles generally accepted in the United States of America require that the accompanying management's discussion and analysis, cost sharing defined benefit pension plan schedules, and schedules related to the District's OPEB liability and related ratios, investment returns, and actuarial assumptions be presented to supplement the basic financial statements. Such information is the responsibility of management and, although not a part of the basic financial statements, is required by the Governmental Accounting Standards Board who considers it to be an essential part of financial reporting for placing the basic financial statements in an appropriate operational, economic, or historical context. We have applied certain limited procedures to the required supplementary information in accordance with auditing standards generally accepted in the United States of America, which consisted of inquiries of management about the methods of preparing the information and comparing the information for consistency with management's responses to our inquiries, the basic financial statements, and other knowledge we obtained during our audit of the basic financial statements. We do not express an opinion or provide any assurance on the information because the limited procedures do not provide us with sufficient evidence to express an opinion or provide any assurance. Supplementary Information Our audit was conducted for the purpose of forming an opinion on the consolidated financial statements as a whole. The consolidating statements of net position, and the related consolidating statements of revenues, expenses and changes in net position and cash flows as of and for the year ended December 31, 2025, are presented for purposes of additional analysis and are not a required part of the consolidated financial statements. The information has been subjected to the auditing procedures applied in the audit of the consolidated financial statements and certain additional procedures, including comparing and reconciling such information directly to the underlying accounting and other records used to prepare the consolidated financial statements or to the consolidated financial statements themselves, and other additional procedures in accordance with auditing standards generally accepted in the United States of America. In our opinion, the information is fairly stated, in all material respects, in relation to the consolidated financial statements as a whole. Other Information Management is responsible for the other information included in the annual report. The other information comprises the introductory and statistical sections but does not include the basic financial statements and our auditor's report thereon. Our opinions on the basic financial statements do not cover the other information, and we do not express an opinion or any form of assurance thereon. In connection with our audit of the basic financial statements, our responsibility is to read the other information and consider whether a material inconsistency exists between the other information and the basic financial statements, or the other information otherwise appears to be materially misstated. If, based on the work performed, we conclude that an uncorrected material misstatement of the other information exists, we are required to describe it in our report. Av4m- Portland, Oregon May 26, 2026 3 Page 453 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 As financial management of the Truckee Donner Public Utility District (the District), we offer readers of these financial statements this narrative overview and analysis of the financial activities of the District for the years ended December 31, 2025 and 2024, with additional comparative data for 2023. This discussion and analysis are designed to assist the reader in focusing on the significant financial topics, provide an overview of the District's financial activity and identify changes in the District's financial position. We encourage readers to consider the information presented here in conjunction with that presented within the basic financial statements. The reader should take time to read and evaluate all sections of this report, including the footnotes and other supplementary information that is provided, in addition to this management discussion and analysis. OVERVIEW OF THE FINANCIAL STATEMENTS The financial statements of the District are designed to provide readers with a broad overview of the District's finances similar to a private-sector business. They have been prepared using the accrual basis of accounting in accordance with accounting principles generally accepted in the United States of America (GAAP). Under this basis of accounting, revenues are recognized in the period in which they are earned and expenses are recognized in the period in which they are incurred, regardless of the timing of related cash flows. These statements offer short-term and long-term financial information about the District's activities. The reporting entity consists of the primary government, which provides two utilities (electric utility and water utility), and the blended component units of two Community Facilities Districts (CFDs). Further details about the component units are provided in note 1(A)to the financial statements. The basic financial statements, presented on a comparative format for the years ended December 31, 2025 and 2024, consist of: • Consolidated Statement of Net Position: This statement presents information on all the District's assets, deferred outflows of resources and liabilities, and deferred inflows of resources and provides information about the nature and amounts of investments in resources (assets) and the obligations to District creditors (liabilities). It also provides the basis for computing rate of return, evaluating the capital structure of the District, and assessing the liquidity and financial flexibility of the District. These amounts are as of a point in time, the District's year ending December 31. • Consolidated Statements of Revenues, Expenses, and Changes in Net Position: This statement provides the revenues and expenses for each of the presented years. The statement provides a measurement of the District's operations over the presented years and can be used to determine whether the District has successfully recovered all its costs through its rates and other charges. • Consolidated Statement of Cash Flows: This statement provides relevant information about the District's cash receipts and cash payments during the reporting period.This statement reports cash receipts and cash payments resulting from operating, non-capital financing, capital and related financing, and investing activities. When used with related disclosures and information in the other financial statements, the statement of cash flows is an important indicator of the District's liquidity and financial condition. • Notes to the Financial Statements: The notes provide additional information that is essential to a full understanding of the data provided in the basic financial statements. This includes but is not limited to, significant accounting policies, significant financial statement balances and activities, material risks, commitments and obligations, and subsequent events, as applicable. The financial statements report also contains other supplementary information, the Report of Independent Auditors, and this Management Discussion and Analysis. Page 117 Page 454 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 CONDENSED COMPARATIVE FINANCIAL INFORMATION Provided below are select condensed financial statements for December 31, 2025, 2024, and 2023. Increase CONSOLIDATED STATEMENT OF NET POSITION (Decrease) ASSETS AND DEFERRED OUTFLOWS OF 2025 2024 2023 2025-2024 RESOURCES Current assets $ 85,190,209 $ 71,926,655 $ 64,901,779 $ 13,263,554 Non-current assets: Capital assets,net 160,177,774 155,187,643 148,670,662 4,990,131 Operating investments 1,395,831 2,938,555 3,804,247 (1,542,724) Designated investments 2,049,524 4,280,671 5,579,209 (2,231,147) Leases receivable,net ofcurrent portion 1,345,590 1,390,354 1,389,598 (44,764) Total Assets 250,158,928 235,723,878 224,345,495 14,435,050 Deferred outflows of resources 6,162,246 7,592,369 10,202,960 (1,430,123) TOTAL ASSETS AND DEFERRED OUTFLOWS OF RESOURCES $256,321,174 $243,316,247 $234,548,455 $ 13,004,927 LIABILITIES,DEFERRED INFLOWS OF RESOURCES AND NET POSITION Current liabilities $ 10,911,747 $ 10,294,106 $ 10,148,544 $ 617,641 Non-current Liabilities Long-term debt,net of current portion 54,814,433 58,233,888 61,433,844 (3,419,455) Subscription software liability,net of current portion 147,943 133,580 239,254 14,363 Compensated absences,net of current portion 1,610,355 1,398,664 1,181,026 211,691 Net pension liability 15,766,306 18,001,154 18,145,067 (2,234,848) Net OPEB liability 4,149,089 4,754,833 5,969,987 (605,744) Unearned revenues 6,840,642 5,422,681 5,314,499 1,417,961 Total Liabilities 94,240,515 98,238,906 102,432,221 (3,998,391) Deferred inflows of resources 5,370,565 3,497,773 2,305,338 1,872,792 NET POSITION Net investment in capital assets 101,544,508 100,719,586 91,507,787 824,922 Restricted for debt service 5,783,519 6,419,793 6,129,427 (636,274) Unrestricted 49,382,067 34,440,189 32,173,682 14,941,878 Total Net Position 156,710,094 141,579,568 129,810,896 15,130,526 TOTAL LIABILITIES,DEFERRED INFLOWS OF RESOURCES AND NET POSITION $256,321,174 $243,316,247 $234,548,455 $ 13,004,927 Increase CONSOLIDATED STATEMENTS OF REVENUES, (Decrease) EXPENSES AND CHANGES IN NET POSITION 2025 2024 2023 2025-2024 Sales to customers $ 58,278,849 $ 53,489,217 $ 50,221,144 $ 4,789,632 Other operating revenues 1,441,405 1,717,727 1,789,049 (276,322) Total Operating Revenues 59,720,254 55,206,944 52,010,193 4,513,310 Depreciation and amortization 8,933,649 8,486,970 8,004,903 446,679 Purchased power 12,802,795 13,164,111 14,068,454 (361,316) All other operating expenses 28,510,493 28,140,147 26,740,934 370,346 Total Operating Expenses 50,246,937 49,791,228 48,814,291 455,709 Operating income 9,473,317 5,415,716 3,195,902 4,057,601 Non-operating special tax revenues 4,346,351 4,089,573 3,818,572 256,778 Non-operating interest expense (2,862,592) (3,005,955) (3,154,114) 143,363 Non-operating other revenues 56,781 72,983 54,232 (16,202) Non-operating other expenses 2,648,997 2,725,988 2,764,444 (76,991) Income before capital contributions 13,662,854 9,298,305 6,679,036 4,364,549 Capital contributions,net 1,467,672 2,470,367 2,368,362 (1,002,695) Change in net position 15,130,526 11,768,672 9,047,398 3,361,854 Net Position,Beginning of Year 141,579,568 129,810,896 120,763,498 11,768,672 NET POSITION,END OF YEAR $156,710,094 $141,579,568 $ 129,810,896 $ 15,130,526 Page 18 Page 455 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 ANALYSIS OF OVERALL FINANCIAL POSITION AND RESULTS OF OPERATIONS 2025 as compared to 2024: The District's overall financial position improved in 2025 by$15.1 million or 10.7% as measured by total net position. In 2025, the total net position increased $9.5 million from operating activities, $4.2 million from non-operating activities, and $1.4 million from capital, debt and monetary contribution activities. Operating income in 2025 of$9.5 million increased $4.1 million or 74.9% compared to $5.4 million in 2024. The components of operating income summarize as follows. Total operating revenues in 2025 of $59.7 million were $4.5 million or 8.2% greater than 2024, driven primarily by electric and water effective rate increases for 2025 of 12%and 7%, respectively. Total operating expenses in 2025 of $50.2 million were $0.5 million or 0.9% greater than 2024. Variances can be summarized as follows: • ($2.0) million decrease in non-cash expense (credit) for the annual valuation of pension, other post-employment benefits, and compensated absences • ($0.4) million decrease in purchase power costs, less volume in 2025 • $0.5 million increase in non-cash depreciation expense • $2.4 million increase net, all other operating expenses, driven primarily by union personnel compensation increases Non-operating revenues (expenses), net in 2025 to $4.2 million and were$0.3 million or 7.9% above 2024 due primarily to $0.3 million increase in special tax revenues, $0.1 million decrease in interest expense, and $0.1 million increase in CFD related costs. Capital and other contributions of$1.5 million were down $1.0 million or 40.6% compared to 2024, driven by a decrease in construction activity and related project contributions to the District. The resulting change in Total Net Position in 2025 of$15.1 million was $3.3 million or 28.6% higher than the change in 2024. Year-end 2025 current assets of $85.2 million increased $13.3 million or 18.4% primarily due to less capital expenditures than anticipated due to timing of projects. Year-end 2025 total assets of $250.2 million increased $14.4 million or 6.1%, which includes a $5.0 million or 3% increase in net total capital assets. Year-end 2025 total liabilities of $94.2 million decreased $4.0 million or 4.1% primarily driven by a $3.2 million decrease in long-term debt (discussed further below), a $2.2 million decrease in net pension liability, and a $0.6 million decrease in net OPEB liability. Deferred inflows increased $1.9 million and deferred outflows decreased $1.4 million, both changes driven primarily by pension and OPEB deferred inflow and outflow changes. 2024 as compared to 2023: The District's overall financial position improved in 2024 by$11.8 million or 9.1% as measured by total net position. In 2024, the total net position increased $5.4 million from operating activities, $3.9 million from non-operating activities, and $2.5 million from capital, debt and monetary contribution activities. Operating income in 2024 of$5.4 million increased $2.2 million or 69.5% compared to $3.2 million in 2023. The components of operating income summarize as follows. Total operating revenues in 2024 of $55.2 million were $3.2 million or 6.1% greater than 2023, driven primarily by electric and water effective rate increases for 2024 of 12%and 8%, respectively. Page 119 Page 456 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 Total operating expenses in 2024 of$49.8 million were $1.0 million or 2.0% greater than 2023 This cost increase of$1.0 million can be summarized as follows: • $1.2 million increase for non-cash change in pension and other post-employment benefits liability valuation impact between years • ($0.9) million decrease in purchase power cost • $0.2 million increase net for rate of pay increases partially offset by position vacancies • $0.5 million increase in non-cash depreciation expense Non-operating revenues and expenses, net revenues in 2024 of $3.9 million were $0.4 million or 11.5% above 2023 due primarily to $0.3 million increase in special tax revenues, $0.1 million increase in investment income, $0.1 million decrease in interest expense, and $0.1 million increase in CFD administrative costs. Capital and other contributions of$2.5 million were up$0.1 million or 4.3% compared to 2023, driven by an increase in construction activity and related project contributions to the District. The resulting change in Total Net Position in 2024 of$11.8 million was $2.7 million or 30% higher than the change in 2023. Year-end 2024 current assets of$71.9 million increased $7.0 million or 10.8% primarily due to less capital expenditures than anticipated due to timing of projects. Year-end 2024 total assets of $235.7 million increased $11.4 million or 5.1%, which includes a $6.5 million or 4% increase in net total capital assets. Year-end 2024 total liabilities of$98.2 million decreased$4.2 million or 4.1% primarily driven by a $3.2 million decrease in long-term debt (discussed further below) and a $1.2 million decrease in net OPEB liability. Deferred inflows increased $1.2 million and deferred outflows decreased $2.6 million, both changes driven primarily by pension deferred inflow and outflow changes. ANALYSIS OF ELECTRIC UTILITY Electric total net position as of December 31, 2025 was $101.2 million and increased $10.2 million or 11% compared to December 31, 2024. Electric's total net position increased $7.8 million from operating activities, increased $1.6 million from non-operating activities, and increased $0.8 million from capital, debt and monetary contributions. Key components of this $10.2 million change in total net position are as follows. Electric operating income of$7.8 million increased $3.1 million or 66% compared to $4.7 million in 2024. The components of operating income are summarized as follows. Electric operating revenues of$41.0 million increased$3.3 million or 9% in 2025 compared to 2024. Electric's sales to customers increased 10.1% over 2024; comprised of a 12.5% effective rate increase, 0.4% customer growth, and a 2.8% kWh volume billed decrease. The 12.5% effective rate increase noted above is comprised of a 12.0% average rate increase to 2024 rates plus 0.5% lower power cost adjustment (PCA) net credit to customers compared to 2024. The PCA relates to wholesale power costs variances to budget and associated rate ordinance expectations. Cap and Invest revenues were down $0.2 million or 44% to 2024, driven by less renewable credits being sold at auction. Electric operating expenses of$33.2 million compared to 2024 reflect an increase of$0.2 million or 0.7% driven primarily by an increase of $1.3 million in labor related costs caused primarily by a 22.5% rate of pay increase in electric operations union positions and a 5.5% rate of pay increase in all other positions of District, a $0.4 million increase in various expenses, and a $0.3 million increase in depreciation expense, mostly offset by a decrease of$1.1 million in pension and OPEB actuarially determined liability adjustment (a non-cash expense charge change), a decrease in power costs of$0.4 million or 3%due primarily to the lower power kWh volume indicated previously above, and a net decrease in all other operating expenses of$0.4 million. Page 120 Page 457 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 Electric non-operating revenues (expenses) net of$1.6 million increased $0.1 million or 6% compared to $1.5 million in 2024. The increase is driven primarily by a $0.1 million increase in investment income. Electric contributions of$0.8 million decreased $0.6 million or 40% compared to $1.4 million in 2024. The decrease is driven primarily by a decrease in construction activity and related project contributions to the District. Electric has no significant restrictions, commitments, or other limitations that would affect the availability of resources for future use; other than $0.9 million in various restricted funds. ANALYSIS OF WATER UTILITY Water total net position as of December 31, 2025 was $73.4 million and increased $2.1 million or 3% compared to December 31, 2024. Water's total net position increased $1.6 million from operating activities, decreased $0.1 million from non-operating activities, and increased $0.6 million from capital, debt and monetary contributions. Key components of this $2.1 million change in total net position are as follows. Water operating income of$1.6 million increased $0.9 million or 137% compared to$0.7 million in 2024. The components of operating income summarize as follows. Water operating revenues in 2025 of$20.9 million increased $1.3 million or 7% compared to 2024. Water's sales to customers of$20.4 million increased 6.7% to 2024; comprised of a 6.9% average rate increase and 0.4% customer growth, partially offset by 0.6% less volume sold and other variables. Water gallons billed per account per day in 2025 decreased 1% compared to 2024 due to various factors. All other water operating revenues combined were flat to 2024. Water operating expenses in 2025 of $19.2 million increased $0.4 million or 2% to 2024 driven primarily by $0.9 million increase in labor related costs caused primarily by a 5.5% rate of pay increase in 2025, a $0.2 million increase in depreciation expense, $0.1 million increase in various expenses, partially offset by a decrease of$0.8 million in pension and OPEB actuarially determined liability adjustment(non-cash net expense charge). Water non-operating revenues (expenses) net of ($0.2) million increased ($40,000) or 34% compared to ($0.1) million in 2024. Notable variances to prior year include$75,000 decrease in investment income due to decrease in investable funds and a $40,000 decrease in interest expense. Water contributions of$0.6 million decreased $0.4 million or 41% compared to $1.0 million in 2024. The decrease is driven by timing of construction activity and related project's contributions to the District. Water has no significant restrictions, commitments, or other limitations that would affect the availability of resources for future use; other than $2.1 million in various restricted funds. CAPITAL ASSETS As of December 31, 2025, 2024, and 2023, the District had $160.2 million, $155.2 million, and $148.7 million, respectively, invested in a variety of capital assets, net of accumulated depreciation. The District's capital assets, net of accumulated depreciation, increased $5.0 million or 3.2% in 2025. In 2025, capital expenditures of$13.7 million outpaced depreciation and amortization expense of$8.9 million,with the year focused on capital execution of major projects ($8.6 million Electric and $5.1 million Water) in 2025, in accordance with the approved 10-year capital improvement plans for both electric and water utilities. In 2024, capital expenditures of $14.6 million ($7.8 million Electric and $6.8 million Water) outpaced depreciation and amortization expense of $8.5 million, with the year focused on execution of capital improvements plan and planning of certain projects. Electric utility capital expenditures in 2025 of$8.6 million included$3.5 million in substation modernization, $3.1 million in distribution system hardening and modernization replacements, $0.6 million in fleet replacements, $0.1 million in information technology, and $1.3 million in various other projects. Electric utility capital expenditures in 2024 of$7.8 million included $1.9 million in distribution system modernization Page 121 Page 458 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT MANAGEMENT'S DISCUSSION AND ANALYSIS December 31, 2025 and 2024 replacements, $1.1 million in transformers, $0.7 million in undergrounding projects, $0.7 million in facility improvements, $0.7 million in information technology, $0.5 million in system hardening, $0.4 million in fleet replacements, and $1.8 million in various other projects. Electric depreciation and amortization expense in 2025 of$3.6 million increased $0.25 million or 7% compared to 2024. Water utility capital expenditures in 2025 of$5.1 million included $3.0 million of pipeline replacement, $0.5 million in tank rehabilitation, $0.2 million in wells rehabilitation, $0.6 million in fleet replacements, $0.1 million in information technology, and $0.7 million in various other projects. Water utility capital expenditures in 2024 of $6.8 million included $0.6 million in new pipeline and pump station projects completion, $3.0 million of pipeline replacement, $0.6 million for new tank completion, $0.9 million for new tanks, $0.3 million in new meters, $0.3 million in fleet replacements, and $1.1 million in various other projects. Water depreciation and amortization expense in 2025 of$5.3 million increased $0.2 million or 4% compared to 2024. See Note 4 to the Financial Statements for further information regarding capital assets. LONG-TERM DEBT Long-term debt includes revenue bonds and installment loans.At December 31, 2025, 2024, and 2023, the District had $58.2 million, $61.3 million, and $64.3 million, respectively, in long-term debt outstanding. No new debt was issued in 2023 to 2025. See Note 6 to the Financial Statements for further information regarding long-term debt. ECONOMIC FACTORS AND NEXT YEARS BUDGETS AND RATES The District operates in Truckee, CA and the location near Lake Tahoe causes Truckee to be a gateway bed base for the tourism economy but also has a small-town local economy. Historically, the electric and water utilities have not been materially adversely affected by economic downturns. The District operates on a biennial budget cycle. The FY26 & FY27 Board approved budget includes an assumption for customer growth 0.5% per year, conservatively below recent 1% average for the District. Revenue projections for fiscal years 2026 and 2027 include average rate increases for Electric of 5% and 5% respectively and for Water 6.5% and 6.5% respectively. For 2026 and 2027, approved average rate increases are consistent with these budget expectations. Rates by rate class can be found on the District's website at www.tdpud.org. Operating expenditures for Electric budget year 2026 of$33.3 million increased over budget year 2025 by 3%,with a 7%decrease in wholesale purchased power budget(current forecasted power prices lower than expectations in prior budget cycle) offsetting a 13% increase in all other operating expenses driven by inflation and new in 2025 union memorandum of understanding increasing electric operations union personnel 22.5% in 2025 and 4.0% in 2026 and 4.0% in 2027. Operating expenditures for Water budget year 2026 of$14.3 million increased over budget year 2025 by 4%, driven by inflation and the new in 2025 union memorandum of understanding increasing personnel 5.5% in 2025 and 4.0% in 2026 and 4.0% in 2027. CONTACTING THE DISTRICT'S FINANCIAL MANAGEMENT The financial report is designed to provide readers with a general overview of the District's finances and to demonstrate the District's accountability for the money it receives. If you have questions about this report or need additional financial information, contact: Truckee Donner Public Utility District, Attn: Treasurer, 11570 Donner Pass Road, Truckee, CA 96161. Page 122 Page 459 of 563 FINANCIAL STATEMENTS Page 460 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF NET POSITION December 31, 2025 and 2024 ASSETS AND DEFERRED OUTFLOWS OF RESOURCES 2025 2024 CURRENT ASSETS Cash and cash equivalents Operating $ 15,614,264 $ 15,024,540 Designated 39,554,657 22,239,996 Restricted 4,873,352 12,675,995 Total cash and cash equivalents 60,042,273 49,940,531 Accounts receivable, net 2,987,303 3,908,603 Unbilled revenues 4,446,047 3,611,030 Special assessments receivable 11,014,502 10,046,812 Accrued interest receivable 292,957 318,612 Current portion of leases receivable 46,892 42,376 Materials and supplies 3,798,555 2,467,651 Prepaid expenses 2,409,839 1,442,635 Other 151,841 148,405 Total Current Assets 85,190,209 71,926,655 NON-CURRENT ASSETS Operating investments 1,395,831 2,938,555 Designated investments 2,049,524 4,280,671 Leases receivable, net of current portion 1,345,590 1,390,354 Capital Assets Utility plant 275,865,133 265,528,778 Accumulated depreciation and amortization (121,204,468) (114,039,041) Construction work in progress 5,517,109 3,697,906 Total Capital Assets 160,177,774 155,187,643 Total Non-Current Assets 164,968,719 163,797,223 TOTAL ASSETS 250,158,928 235,723,878 DEFERRED OUTFLOWS OF RESOURCES Pension 4,186,796 5,033,355 OPEB 1,661,088 2,211,850 Unamortized loss on refunding 314,362 347,164 Total Deferred Outflows of Resources 6,162,246 7,592,369 TOTAL ASSETS AND DEFERRED OUTFLOWS OF RESOURCES $ 256,321,174 $ 243,316,247 The accompanying notes are an integral part of these consolidated financial statements. Page 124 Page 461 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF NET POSITION December 31, 2025 and 2024 LIABILITIES, DEFERRED INFLOWS OF RESOURCES AND NET POSITION (Continued) 2025 2024 CURRENT LIABILITIES Other Liabilities Accounts payable $ 4,654,666 $ 3,864,167 Customer deposits 604,748 605,075 Subscription software liability, current portion 115,783 105,674 Compensated absences, current portion 836,459 788,824 Other 707,148 1,117,067 Total Other Liabilities 6,918,804 6,480,807 Current Liabilities Payable From Restricted Assets Current portion of long-term debt 3,340,600 3,121,100 Accrued interest payable 652,343 692,199 Total Current Liabilities Payable from Restricted Assets 3,992,943 3,813,299 Total Current Liabilities 10,911,747 10,294,106 NON-CURRENT LIABILITIES Long-term debt, net of discounts and premiums 54,814,433 58,233,888 Subscription software liability, net of current portion 147,943 133,580 Compensated absences, net of current portion 1,610,355 1,398,664 Net pension liability 15,766,306 18,001,154 Net OPEB liability 4,149,089 4,754,833 Unearned revenues 6,840,642 5,422,681 Total Non-Current Liabilities 83,328,768 87,944,800 Total Liabilities 94,240,515 98,238,906 DEFERRED INFLOWS OF RESOURCES Pension 2,268,636 200,229 OPEB 1,923,222 2,044,295 Leases receivable 1,178,707 1,253,249 Total Deferred Inflows of Resources 5,370,565 3,497,773 NET POSITION Net investment in capital assets 101,544,508 100,719,586 Restricted for debt service 5,783,519 6,419,793 Unrestricted 49,382,067 34,440,189 Total Net Position 156,710,094 141,579,568 LIABILITIES, DEFERRED INFLOWS OF RESOURCES AND NET POSITION $ 256,321,174 $ 243,316,247 The accompanying notes are an integral part of these consolidated financial statements. Page 125 Page 462 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF REVENUES, EXPENSES, AND CHANGES IN NET POSITION For the years ended December 31, 2025 and 2024 2025 2024 OPERATING REVENUES Sales to customers $ 58,278,849 $ 53,489,217 Standby fees 110,770 115,480 Cap and invest proceeds 291,328 518,027 Other 1,039,307 1,084,220 Total Operating Revenues 59,720,254 55,206,944 OPERATING EXPENSES Purchased power 12,802,795 13,164,111 Operations and maintenance 15,823,379 15,651,928 Consumer services 3,102,627 3,188,986 Administration and general 9,584,487 9,299,233 Depreciation and amortization 8,933,649 8,486,970 Total Operating Expenses 50,246,937 49,791,228 Operating Income 9,473,317 5,415,716 NON-OPERATING REVENUE(EXPENSES) Special tax revenue 4,346,351 4,089,573 Investment income 2,796,772 2,807,224 Interest expense (2,862,592) (3,005,955) Amortization credit 46,053 46,053 Other non-operating revenues 45,161 54,705 Other non-operating expenses (193,828) (127,289) Gain on disposition of assets 11,620 18,278 Total Non-Operating Revenue, Net 4,189,537 3,882,589 Income Before Contributions 13,662,854 9,298,305 CAPITAL &OTHER CONTRIBUTIONS 1,467,672 2,470,367 CHANGE IN NET POSITION 15,130,526 11,768,672 Net Position - Beginning of Year 141,579,568 129,810,896 NET POSITION - END OF YEAR $ 156,710,094 $141,579,568 The accompanying notes are an integral part of these consolidated financial statements. Page 26 Page 463 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF CASH FLOWS For the years ended December 31, 2025 and 2024 2025 2024 CASH FLOWS FROM OPERATING ACTIVITIES Received from customers $ 59,771,916 $ 56,743,600 Paid to suppliers for goods and services (30,089,637) (27,829,331) Paid to employees for services (12,143,874) (10,860,431) Net cash provided by operating activities 17,538,405 18,053,838 CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES Capital expenditures for utility plant (13,672,569) (14,550,193) Net proceeds from disposal of assets 7,718 10,223 Capital contributions, connection and facility fees 2,542,460 1,459,823 Special tax receipts 3,279,037 3,221,518 Principal payments on subscription liability (154,154) (185,199) Interest payments on subscription liability (20,246) (19,266) Principal payments on long-term debt (3,131,389) (2,915,590) Interest payments on long-term debt (2,880,383) (3,019,795) Net cash used by capital and related financing activities (14,029,526) (15,998,479) CASH FLOWS FROM INVESTING ACTIVITIES Proceeds from maturity of investments 4,000,000 2,500,000 Interest income received 2,490,156 2,233,614 Net cash provided by investing activities 6,490,156 4,733,614 Net increase (decrease) in cash and cash equivalents 9,999,035 6,788,973 CASH AND CASH EQUIVALENTS — Beginning of Year 49,949,964 43,160,991 CASH AND CASH EQUIVALENTS — END OF YEAR $ 59,948,999 $ 49,949,964 NONCASH CAPITAL AND RELATED FINANCING ACTIVITIES Developer and customer added capital assets $ 292,297 $ 910,996 Recognition of prior period unearned revenues $ 4,069,775 $ 3,941,517 Capital accounts payable and retention $ 528,869 $ 260,813 SBITA assets acquired through subscription based IT arrangements $ 175,574 $ -0- The accompanying notes are an integral part of these consolidated financial statements. Page 27 Page 464 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF CASH FLOWS For the years ended December 31, 2025 and 2024 (continued) 2025 2024 RECONCILIATION OF OPERATING INCOME TO NET CASH PROVIDED BY OPERATING ACTIVITIES Operating income $ 9,473,317 $ 5,415,716 Non-cash items included in operating income Depreciation and amortization 8,933,648 8,486,970 Depreciation charged to other accounts 491,668 465,293 Pension GASB 68 valuation 680,118 1,238,338 OPEB GASB 75 valuation (176,055) 1,203,908 Changes in assets and liabilities Accounts receivable and unbilled revenues 86,284 1,421,623 Materials and supplies (1,330,902) (303,974) Prepaid expenses (967,204) (109,396) Accounts payable 522,443 (401,540) Customer deposits (326) 149,993 Deferred inflow, leases amortization (74,542) (31,089) Leases receivable 40,248 (3,871) Other current liabilities and compensated absences (140,292) 521,867 NET CASH PROVIDED BY OPERATING ACTIVITES $ 17,538,405 $ 18,053,838 RECONCILIATION OF CASH AND CASH EQUIVALENTS TO THE BALANCE SHEET Operating $ 15,614,264 $ 15,024,540 Designated 39,554,657 22,239,996 Restricted funds -current 4,873,352 12,675,995 Operating Investments - non-current 1,395,831 2,938,555 Designated Investments - non-current 2,049,524 4,280,671 Total Cash and Investments 63,487,628 57,159,757 Less: Long-term investments (3,445,355) (7,219,226) Mark to market adjustments (93,274) 9,433 TOTAL CASH AND CASH EQUIVALENTS $ 59,948,999 $ 49,949,964 The accompanying notes are an integral part of these consolidated financial statements. Page 28 Page 465 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES A. ORGANIZATION The Truckee Donner Public Utility District (the District) was formed and operates under the State of California Public Utility District Act. The District is governed by a board of directors which consists of five elected members. The District provides electric and water service to portions of Nevada and Placer Counties described as Truckee. The electric and water service operations are separately maintained and operated. These financial statements reflect the combined electric and water operations of the District. All significant transactions between electric and water operations have been eliminated. These eliminations include power purchases and rent for shared facilities. The District's blended component units consist of organizations whose respective governing boards are comprised entirely of the members of the District's Board of Directors and management of the primary government has operational responsibility for each of the component units. These organizations are reported as if they are a part of the District's operations. The entities are legally separate, however, in the case of the Truckee Donner Public Utility District Financing Corporation,financial support has been pledged and financial and operational policies may be significantly influenced by the District. The following is a description of the District's blended component units: Truckee Donner Public Utility District Financing Corporation is a legal entity that was created to issue and administer Certificates of Participation on behalf of the District. (See note 6). Truckee Donner Public Utility District Community Facilities District No. 03-1 (Old Greenwood) is a legal entity created to issue special tax bonds to finance various public improvements needed to develop property located within Old Greenwood. (See note 10). Truckee Donner Public Utility District Community Facilities District No. 04-1 (Gray's Crossing) is a legal entity created to issue special tax bonds to finance various public improvements needed to develop property located within Gray's Crossing. (See note 10). Separate standalone financial statements are not available for the blended component units described above. Unless noted, disclosures relating to the component units are the same as for the District. B. ACCOUNTING POLICIES The financial statements of the District have been prepared in conformity with accounting principles generally accepted in the United States of America. The Governmental Accounting Standards Board (GASB) is the accepted standard setting body for establishing governmental accounting and financial reporting principles. The financial statements are reported using the economic resources measurement focus and the accrual basis of accounting. Under the accrual basis of accounting, revenues are recognized when earned and expenses are recorded when the liability is incurred or economic asset used. Revenues, expenses, gains, losses, assets and liabilities, that are a result of exchange and exchange like transactions, are recognized when the exchange takes place. Page 129 Page 466 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) C. USE OF ESTIMATES Preparation of financial statements in conformity with accounting principles generally accepted in the United States of America requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. D. CASH AND CASH EQUIVALENTS For the purpose of the accompanying statement of cash flows, the District considers all highly liquid instruments with original maturities of three months or less when purchased to be cash equivalents. E. INVESTMENTS The District pools cash and investments. The District's investment policy allows for investments in instruments permitted by the California Government Code and/or the investments permitted by the trust agreements on District financing. The District's investment policy contains provisions intended to limit the District's exposure to interest rate risk, credit risk, and concentration of credit risk. Investment income from pooled investments is allocated to all funds in the pool. Interest is allocated on the basis of month end cash amounts for each fund as a percentage of the total balance. The District categorizes the fair value measurements of its investments based on the hierarchy established by generally accepted accounting principles. The fair value hierarchy, which has three levels, is based on the valuation inputs used to measure an asset's fair value: Level 1 inputs are quoted prices in active markets for identical assets; Level 2 inputs are significant other observable inputs; Level 3 inputs are significant unobservable inputs. The District does not have any investments that are measured using Level 1 or Level 3 inputs. Changes in fair value that occur during a fiscal year are recognized as investment income (loss) reported for that fiscal year. Investment Income (loss) includes interest earnings, changes in fair value, and any realized gains or losses upon the sale of investments. F. DESIGNATED ASSETS The board has designated certain resources for future capital projects, replacements, and operational needs. G. RESTRICTED ASSETS Restricted assets are assets restricted by the covenants of long-term financial arrangements or other third- party legal restrictions. Restricted assets are used in accordance with their requirements and where both restricted and unrestricted resources are available for use, restricted resources are used first and then unrestricted as they are needed. Page 130 Page 467 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) H. ACCOUNTS RECEIVABLE AND ALLOWANCES FOR DOUBTFUL ACCOUNTS Accounts receivable are recorded at the invoiced amount and are reported net of allowances for doubtful accounts of$31,100 and $39,900 for 2025 and 2024, respectively. Receivables are considered past due after 30 days and routine collection efforts begin, while remaining consistent with regulatory mandates. District Code allows for the Treasurer to write off delinquent account balances up to 0.17% of the amounts billed. This write-off process occurs semi-annually. I. MATERIALS AND SUPPLIES Materials and supplies are recorded at average cost. J. DEBT PREMIUM, BOND ISSUANCE COSTS,AND DISCOUNTS Original issue and reacquired bond premiums and discounts relating to revenue bonds are amortized over the terms of the respective bond issues using the effective interest method. Debt issuance costs are expensed in the period incurred. K. SPECIAL ASSESSMENT RECEIVABLE Special assessment receivable represents special tax receivables related to community facilities districts. Refer to note 1T and note 10 for additional information. L. CAPITAL ASSETS Capital assets are generally defined by the District as assets with an initial, individual cost of more than $10,000 and an estimated useful life of at least two years. Capital assets of the District are stated at the lower of cost or the acquisition value at the time of contribution to the District. Major outlays for plant are capitalized as projects are constructed. Depreciation on capital assets is calculated using the straight-line method over the estimated useful lives of the assets, which are as follows: Distribution Plant Electric 23—35 years Water 15—40 years Computer software and hardware 3— 7 years Building and improvements 20—33 years Equipment and furniture 4— 10 years Subscription Based Information Technology Arrangements (SBITA) 3— 7 years Page 131 Page 468 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) M. COMPENSATED ABSENCES Under terms of employment, employees are granted sick leave and vacations in varying amounts. Leave that is accrued and more likely than not to be used or paid-out has been valued as a compensated absences liability as of year-end. The valuation is measured with year-end rates of pay and includes salary-related payments that are directly and incrementally associated with the accrued leave. The liability is liquidated from general operating revenues of the District. N. REVENUE RECOGNITION Unbilled revenues, representing estimated consumer usage for the period between the last meter reading and the end of the period, are accrued in the period of consumption. Water customers without meters are billed on a flat-rate basis, and revenues are recorded as billed. Revenues from connection fees are recognized upon completion of the connection. Income that the District has earned through investing its excess cash is reflected within income from investments when earned. O. REVENUE AND EXPENSE CLASSIFICATION The District distinguishes operating revenues and expenses from non-operating items in the preparation of its financial statements. Operating revenues and expenses generally result from providing electric and water services in connection with the District's principal ongoing operations. The principal operating revenues are sales to customers. The District's operating expenses include power purchases, labor, materials, services, and other expenses related to the delivery of electric and water services. All revenues and expenses not meeting this definition are reported as non-operating revenues and expenses, or capital contributions and other. P. POWER PURCHASES AND TRANSMISSION In 1999,the District entered into an agreement with Sierra Pacific Power Company dba NV Energy(SPPC), whereby SPPC will provide transmission services to the District through December 31, 2027. The District uses this transmission service to import energy over SPPC's transmission system to serve District load. In addition, the District purchases scheduling services from Utah Associated Municipal Power Systems (UAMPS) and the scheduling services are included in the monthly power billings from UAMPS. The purchase of transmission services from SPPC represented 8.2% and 3.3% of total purchased power costs in 2025 and 2024, respectively, including Energy Imbalance Market (EIM) cost and credits. Transmission services from SPPC, excluding EIM amounts, represented 5.5% and 5.2% of total purchased power costs in 2025 and 2024, respectively. In December of 2005, the District entered into an agreement with UAMPS. Subsequently, the District entered several pooling appendices for power capacity and energy that relate to various time periods from January 2008 through March 2028. Also in 2009, the District signed an agreement with UAMPS for approximately 5 MW of the Nebo natural gas generation plant capacity. In August 2012, the Horse Butte Wind project began commercial operation and the District owns approximately 15 MW of nameplate capacity that generates about 5 MW on average. The District has also invested in the Veyo Heat Recovery project that came online in mid-2016. The District receives about 1.7 MW of carbon-free generation from this resource. In September 2019 the District entered into 25-year Purchase Power Agreement with UAMPS for a 6MW share of the Red Mesa Solar Project. The Project was developed by UAMPS and the Navajo Tribal Utility Authority for use by UAMPS members and began providing power in April 2024. The Red Mesa Solar Project price for energy is among the lowest wholesale price paid by the District for any resource. It is estimated that a 6MW share equates to about 10 percent of total annual District energy requirements. Page 132 Page 469 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) Q. POWER PURCHASES AND TRANSMISSION(CONTINUED) In August of 2007, the District entered into an agreement with Western Area Power Administration (WAPA) for the delivery of Stampede Dam Hydroelectric generation. In accordance with this agreement,the District is entitled to a portion of the power generated by Stampede Dam. This generation is dependent upon the amount of water that is made available to the generator. This agreement's term was extended in 2024, with a new effective through date of December 31, 2044. In 2025 and 2024, the UAMPS contract, along with its appendices, and the WAPA contract for Stampede Dam Hydroelectric generation comprised the majority of a diversified power portfolio that balanced risk and costs for the District. R. CAP AND INVEST(formerly called CAP AND TRADE) PROGRAM PROCEEDS California Assembly Bill 32 (AB32) was an effort by the State of California to set a 2020 greenhouse gas (GHG) emissions reduction goal into law. AB32 required California to lower greenhouse gas emissions to 1990 levels by 2020 and program was called `cap and trade'. California Assembly Bill 1207 rebranded the program to `cap and invest' and extended the program through 2045. Central to this initiative, the program covers major sources of GHG emissions in the State including power plants. The program is designed to achieve cost-effective emissions reductions across the capped sectors. The program sets maximum statewide GHG emissions for all covered sectors each year ("cap") and allows covered entities to sell off allowances ("invest"). An allowance is a tradable permit that allows the emission of one metric ton of CO2. The California carbon price is driven by allowance trading.The District is subject to AB1207 and has excess allowances due to reducing carbon-based generation in its power portfolio. In 2025 and 2024, the District sold its excess allowances in the program auctions and the proceeds of $291,328 and $518,027 for the respective years were recorded as operating revenues. The auction proceeds are held in a restricted fund and are used to purchase qualified renewable power. (See note 2) S. INCOME TAXES As a government agency, the District is exempt from payment of federal and state income taxes. T. TAX REVENUES Beginning in 2004, the District levied ad valorem property tax on all the taxable property within the Old Greenwood District in an amount sufficient to pay the yearly principal and interest on the Special Assessment District Tax Bonds. (See notes 6 and 10). The District had revenues of$878,816 in 2025 and $856,587 in 2024. On January 28, 2014, refunding bonds were sold to a private investment firm and the proceeds were used to call the 2003 Old Greenwood bonds on March 1, 2014. The 2014 refunding bonds have the same rate and method of apportionment conditions on the Old Greenwood properties as the original 2003 bonds. Beginning in 2005, the District levied ad valorem property tax on all taxable property within the Gray's Crossing District in an amount sufficient to pay the yearly principal and interest on the Special Assessment District Tax Bonds. (See notes 6 and 10). The District had revenues of$3,467,535 in 2025 and $3,232,986 in 2024. Taxes are assessed based on the county tax year ending June 30, resulting in unearned revenues for each of the community facility districts. (See note 8). Page 133 Page 470 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) U. CONTRIBUTED CAPITAL ASSETS A portion of the District's capital assets have been obtained through amounts charged to developers for plant constructed by the District; direct contributions of capital assets from developers and other parties; as well as assessments of local property owners. These items are recognized within capital assets as construction is completed for plant constructed by the District based on the cost of the items,when received for contributed capital assets based on the actual or estimated fair value of the contributed items, or upon completion of the related project for development agreements.The District records amounts received within capital contributions when a legally enforceable claim is established. Until the District meets the criteria to record the amounts described above as capital contributions, any amounts received are recorded within unearned revenues on the Statement of Net Position. V. LEASES The District, as a lessee, recognizes a lease liability and an intangible right-to-use asset at the commencement of a lease, unless the lease is considered a short-term or transfers ownership of the underlying assets. Right-to-use lease assets are measured based on the net present value of the payments to be made over the term of the agreement, using District's incremental borrowing rate. Re-measurement of the lease liability occurs when there is a change in the lease term and/or other changes that are likely to have a significant impact on the lease liability. The incremental borrowing rate used in determining the present value of lease payments is based on U.S. Treasury rates, corresponding to the same term of lease contracts plus basis points (BSP), determined by the District's historical borrowing spread and similar entities in the utility industry. Amortization of the discount on the lease liability is reported as an outflow of resources. Payments are allocated first to the accrued interest liability and then to the lease liability. Variable lease payments based on the usage of the underlying assets are not included in the lease liability calculations and are recognized as outflows of resources in the periods in which the obligation for the payments is incurred. The District, as a lessor, recognizes a lease receivable and deferred inflows of resources at the commencement of the lease term. The lease receivable is measured using the present value of the lease payments expected to be received for the lease term, based on District's incremental borrowing rate, which approximates the discount rate the District charges the lessee. Leases with provisions for rent changes based on the consumer price index (CPI) or other market indexes, result in additional variable lease revenues that are not included in the measurement of the lease receivables. Deferred inflows of resources are measured at the value of the lease receivable in addition to any payments received at or before the commencement of the lease term related to future periods. Amortization of the discount on the lease receivable is reported as interest revenue for that period. Deferred inflows of resources are recognized as lease revenue on a straight-line basis over the term of the lease. Any initial direct costs are reported as an outflow of resources for that period. Re-measurement of lease receivable occurs when there are modifications, including but not limited to changes in the lease charges, lease term, and adding or removing an underlying asset to the lease agreements. In the case of partial or full lease termination, the District will reduce the carrying value of the lease receivable and the related deferred inflow of resources and include a gain or loss for the difference. Page 134 Page 471 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) W. LEASES(CONTINUED) Short-term leases are certain leases that, at the commencement of the lease term, have a maximum possible term under the lease contract of 12 months or less, including any options to extend, regardless of their probability of being exercised. Leases assessed by management as short-term, perpetual, or insignificant are recognized as outflows of resources (expenses) or inflows of resources (revenue) based on the payment provisions of the lease agreement. X. SUBSCRIPTION-BASED INFORMATION TECHNOL OG Y ARRANGEMENTS(SBITA) A SBITA is defined as a contractual agreement that conveys control of the right to use another party's (a SBITA vendor's) information technology (IT) software, alone or in combination with tangible capital assets (the underlying IT assets), as specified in the contract for a minimum contractual period of greater than one year, in an exchange or exchange-like transaction. The District uses various SBITA assets, such as software as a service. The related obligations are presented in amounts equal to the present value of subscription payments, payable during the remaining SBITA term. SBITA assets are reported with capital assets (see note 4) and SBITA liabilities are reported with liabilities on the statement of net position (see note 7). Y. PENSION For purposes of measuring the net pension liability and deferred outflows/inflows of resources related to pensions,and pension expense, information about the fiduciary net position of the District's California Public Employee's Retirement System (CaIPERS) plans (Plans) and the additions to/deductions from the Plans' fiduciary net position have been determined on the same basis as they are reported by CaIPERS. For this purpose, benefit payments (including refunds of employee contributions) are recognized when due and payable in accordance with the benefit terms. Investments are reported at fair value. Z. DEFERRED OUTFLOWS OF RESOURCES AND DEFERRED INFLOWS OF RESOURCES Deferred Outflows of Resources: This separate financial statement element represents consumption of net assets that applies to future periods and so will not be recognized until that time. Deferred Inflows of Resources: This separate financial statement element represents an acquisition of net assets that applies to future periods and so will not be recognized as an inflow of resources until that time. Page 135 Page 472 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 1 —ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (Continued) AA. UNAMORTIZED LOSS ON BOND REFUNDING For current and advanced refunding results in defeasance of debt, the difference between the reacquisition price and the net carrying amount of the old debt (gain or loss) is deferred and amortized as a component of interest expense over the remaining life of the old debt or the new debt, whichever is shorter. These amounts are reported as deferred outflow on the statements of net position. BB. COMPARATIVE INFORMATION Comparative data for the prior year has been presented in certain sections of the accompanying financial statements to provide an understanding of changes in the District's financial position and operations. Certain amounts presented in the prior year have been reclassified to be consistent with the current year's presentation. CC.RECENT ACCOUNTING PRONOUNCEMENTS IMPLEMENTED BY THE DISTRICT GASB Statement No. 102, Certain Risk Disclosures. The primary objective of this Statement is to provide users of government financial statements with essential information about risks related to a government's vulnerabilities due to certain concentrations or constraints.The requirements of this Statement are effective for fiscal years beginning after June 15, 2024, and all reporting periods thereafter. The District has implemented this statement. See Note 17 for more information. DD.ACCOUNTING PRONOUNCEMENTS TO BE IMPLEMENTED IN UPCOMING YEARS These statements are not effective until January 1, 2026 or later and may be applicable for the District. The District has not determined what impact, if any, these pronouncements will have on the financial statements. GASB Statement No. 103, Financial Reporting Model Improvements. The objective of this Statement is to improve key components of the financial reporting model to enhance its effectiveness in providing information that is essential for decision making and assessing a government's accountability. This Statement also addresses certain application issues. The requirements of this Statement are effective for fiscal years beginning after June 15, 2025, and all reporting periods thereafter. GASB Statement No. 104, Disclosure of Certain Capital Assets.The objective of this Statement is to provide users of government financial statements with essential information about certain types of capital assets. The requirements of this Statement are effective for fiscal years beginning after June 15, 2025, and all reporting periods thereafter. GASB Statement No. 105, Subsequent Events. The primary objective of this Statement is to improve the financial reporting requirements for subsequent events, thereby enhancing consistency in their application and better meeting the information needs of financial statement users. The requirements of this Statement are effective for fiscal years beginning after June 15, 2026, and all reporting periods thereafter. Page 136 Page 473 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS Cash, cash equivalents and investments are recorded in accounts as either restricted or unrestricted as required by the District's certificates of participation indentures or other third-party legal restrictions. Restricted assets represent funds that are restricted by certificates of participation covenants or third-party contractual agreements. Assets that are allocated by resolution of the Board of Directors are considered to be Board designated assets. Board designated assets are a component of unrestricted assets as their use may be redirected at any time by approval of the Board. Upon Board approval, assets from board designated accounts may be used to pay for selected capital projects.Such accounts have been designated by the Board for the following purposes: Electric Capital Replacement Starting in 2009,the Board set aside funds designated for future electric infrastructure replacement. Electric Vehicle Reserve Beginning in 2009, the Board set aside funds designated for future electric utility vehicle replacements. Electric Rate Reserve In compliance with Board rules, the District created an electric rate stabilization fund in anticipation of future costs. In 2024, there was $2.36 million utilization of these funds to offset increased power costs in 2023 and January 2024 (cash flow in 2024) in lieu of directly all-at-once raising electric rates. Recovery of this utilization is planned over four years and included in the current rates approved (2024 and 2025). There was no utilization of this reserve in 2023. Water Vehicle Reserve Beginning in 2009, the Board set aside funds designated for future water utility vehicle replacements. Water Capital Replacement Starting in 2021, the Board set aside funds designated for future water infrastructure replacement. Prepaid Connection Fees In compliance with Board rules, the District has set aside prepaid connection fees to cover installation costs of water services. Donner Lake Assessment District Surcharge Fund The District established a monthly water billing surcharge in the amount of $6.65 applicable to customers in the Donner Lake area to provide revenue to pay the remainder of the cost of reconstruction effective October 2006. Deferred Liabilities Reserve, Electric and Water Starting in 2017, the Board established a reserve to protect the District from volatility in pension, other post-employment benefits, and worker's compensation premiums. Page 137 Page 474 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS (Continued) As of December 31, Board designated accounts at fair value consisted of the following: 2025 2024 Electric capital replacement fund $ 22,341,903 $ 10,807,265 Electric vehicle reserve 2,369,280 1,932,621 Electric rate reserve 7,207,040 5,996,205 Electric deferred liabilities reserve 2,369,514 2,267,444 Water vehicle reserve 503,750 728,607 Water capital replacement 6,399,882 4,356,899 Prepaid connection fees 39,312 88,057 Donner Lake Assessment District surcharge fund 247,713 223,320 Water deferred liabilities reserve 125,787 120,249 Totals $ 41,604,181 $ 26,520,667 Certain assets have been restricted by bond covenants or third-party contractual agreements for the following purposes: Certificates of Participation Prepayments to the Trustee from the District for upcoming debt payments and unspent debt project proceeds of$0 and $7,039,834 on December 31, 2025 and 2024, respectively. Special Tax Bonds The terms of the special tax bonds issued for the Mello-Roos Community Facilities Districts (CFD) require reserve funds as security for each principal and interest payment as they come due. Reserve funds are set aside as prescribed in the loan documents. These reserve funds are held by Bank of New York Mellon Trust Company. Facilities Fees The District charges facilities fees to applicants for new service to cover the costs of infrastructure needed to meet their systems demand. The use of such funds is restricted by California state law. California Cap and Invest (formerly called Cap and Trade)Trade Auction Fund The District electric utility is identified as an "Electric Distribution Utility" under the Cap and Invest regulations and is therefore eligible to receive a direct allocation of allowances that can be sold in an auction. The proceeds from quarterly allowance auctions are held in this restricted fund and are used to purchase qualified renewable power. These funds are intended to mitigate the burden on the consumer without impacting a carbon price signal. Low Carbon Fuel Standard (LCFS) Credits Proceeds from credit sales are only allowed to be used towards efforts that promote and/or facilitate transportation electrification within the District's service territory. Other(Area Improvement Funds) The District received funds from the County of Nevada,which are to be used only for improvements to specific areas within the District's boundaries in Nevada County. These areas include various Nevada County assessment districts. Page 138 Page 475 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS (Continued) As of December 31, restricted cash and cash equivalents and investments at fair value consisted of the following: 2025 2024 Certificates of Participation $ 330,248 $ 7,356,094 Special tax bonds 1,889,715 1,972,161 Facilities fees 1,993,525 2,560,379 Cap and Invest Auction fund 341,584 481,113 Other(area improvement funds) 201,148 194,192 LCFS Credits 117,132 112,056 Total Restricted Cash and Cash Equivalents and Investments $ 4,873,352 $ 12,675,995 Cash and investments are comprised of the following cash and cash equivalents and investments as of December 31: 2025 2024 Cash and cash equivalents $ 60,042,273 $ 49,940,531 Investments—government bonds 3,445,355 7,219,226 Totals $ 63,487,628 $ 57,159,757 Cash equivalents substantially consist of deposits in the state pooled fund, Placer County pooled fund, money market funds and investments. Adjustments necessary to record investments at fair market value are recorded in the operating statement as increases or decreases in investment income. Fair values may have changed significantly after year end. FAIR VALUE MEASUREMENT The District applies the provisions of Governmental Accounting Standards Board (GASB) Statement No. 72, Fair Value Measurement and Application, which requires governmental entities, to report certain investments at fair value on the Statements of Net Position. Investments are valued at fair value at December 31. Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The District categorizes its fair value measurements within the fair value hierarchy established by generally accepted accounting principles. The hierarchy is based on the valuation inputs used to measure the fair value of the asset. Level 1 inputs are quoted prices for identical instruments in active markets. Level 2 inputs are quoted prices for similar instruments in active markets; quoted prices for identical or similar instruments in markets that are not active; and model derived valuations in which all significant inputs are observable. Level 3 inputs are valuations derived from valuation techniques in which significant inputs are unobservable. Page 139 Page 476 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS (Continued) FAIR VALUE MEASUREMENT(CONTINUED) The District classifies its fair value measurements within the fair value hierarchy established by generally accepted accounting principles. The District has the following fair value measurements as of December 31, 2025: • US Government bonds and agency securities are valued using observable inputs (Level 2 inputs). INVESTMENTS AUTHORIZED BY THE DISTRICT'S INVESTMENT POLICY The District adopted an investment policy in 2006 which allowed for investments in instruments permitted by the California Government Code and/or the investments permitted by the trust agreements on District financing, including investments in the local government investment fund pool administered by the State of California (LAIF), Placer County Treasurer's Investment Portfolio (PCTIP) pooled investment, Utah Public Treasurers' Investment Fund (UPTIF), and California Cooperative Liquid Assets Securities System (California CLASS). The District's investment policy contains provisions intended to limit the District's exposure to interest rate risk, credit risk, and concentration of credit risk. At December 31, 2025 and 2024 the District's deposits and investments at fair value were held as follows: 2025 2024 Cash on hand $ 2,400 $ 2,400 Deposits 2,298,397 2,484,475 LAIF 26,054,124 25,999,121 PCTIF 3,509,338 3,342,552 California CLASS 18,681,135 8,829,839 UPTIF 8,838,916 8,566,240 Money Market Funds 657,963 715,903 U.S. Government Agency Securities 2,460,968 6,256,663 U.S. Government Bonds 984,387 962,564 Totals $ 63,487,628 $ 57,159,757 DISCLOSURES RELATING TO INTEREST RATE RISK Interest rate risk is the risk that changes in the market interest rates will adversely affect the fair value of an investment. Generally, the longer the maturity of an investment,the greater is the sensitivity of its fair value to changes in market interest rates. Information about the sensitivity of the fair values of the District's investments to market interest rate fluctuations is provided by the following table that shows the District's investments by maturity for 2025 and 2024: Maturity as of December 31, Investments and Deposits 2025 2024 LAIF 3 months or less 3 months or less PCTIF 3 months or less 3 months or less California CLASS 3 months or less 3 months or less UPTIF 3 months or less 3 months or less Federated U.S. Treasury Cash Reserve 3 months or less 3 months or less Morgan Stanley Treasury 3 months or less 3 months or less Fidelity Money Market Government Portfolio 57 3 months or less 3 months or less Dreyfus Treasury Securities 3 months or less 3 months or less Federal U.S Treasury Bonds 9 months or less 1.0 to 1.5 years Federal Agencies Bonds 9 months or less 1.0 to 1.5 years Bank Certificates of Deposit(FDIC Insured) 9 months or less 1.0 to 1.5 years Page 40 Page 477 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS (Continued) DISCLOSURES RELATING TO CREDIT RISK Generally, credit risk is the risk that an issuer of an investment will not fulfill its obligation to the holder of the investment. This is measured by the assignment of a rating by a nationally recognized statistical rating organization. LAIF, PCTIP, UPTIF, and California CLASS do not have a rating provided by a nationally recognized statistical rating organization. The Morgan Stanley Treasury is rated AAAm by S&P and Aaa- mf by Moody's. The Federated U.S. Treasury Cash Reserve is rated AAAm by S&P and Aaa-mf by Moody's. Federal Farm Credit Banks is rated AA+ by S&P and Aaa by Moody's. The Dreyfus Treasury Securities is rated Aaa-mf by Moody's and AAAm by S&P. The Fidelity Money Market is rated AAA-mf by Moody's and AAAm by S&P. CUSTODIAL CREDIT RISK Custodial credit risk for deposits is the risk that, in the event of the failure of a depository financial institution, a government will not be able to recover its deposits or will not be able to recover collateral securities that are in the possession of an outside party. The District's investment policy does not contain legal or policy requirements that would limit the exposure to custodial credit risk for deposits. However, the California Government Code requires that a financial institution secure deposit made by state or local governmental units by pledging securities in an undivided collateral pool held by a depository regulated under state law (unless waived by the government unit). The fair value of pledged securities in the collateral pool must equal at least 110% of the total amount deposited by the public agencies. As of December 31, 2025 and 2024 bank deposits exceeded FDIC insurance coverage by$2,267,440 and $2,261,014 respectively. The custodial credit risk for investments is the risk that, in the event of the failure of the counterparty (e.g., broker/dealer) to a transaction, a government will not be able to recover the value of its investment or collateral securities that are in the possession of another party. The California Government Code and the District's investment policy do not contain legal or policy requirements that would limit the exposure to custodial credit risk for investments. With respect to investments, custodial credit risk generally applies only to direct investments in marketable securities. Custodial credit risk does not apply to a local government's indirect investment in securities using mutual funds or governmental investment pools (such as LAIF). DEPOSIT IN STATE INVESTMENT POOL The District is a voluntary participant in the Local Agency Investment Fund (LAIF). This investment fund has an equity interest in the State of California's(State's) Pooled Money Investment Account(PMIA). PMIA funds are on deposit with the State's Centralized Treasury System and are managed in compliance with the California Government Code according to a statement of investment policy which sets forth permitted investment vehicles, liquidity parameters, and maximum maturity of investments. The fair value of the District's investment in this pool is reported in the accompanying financial statements at amounts based upon the District's pro-rata share of the fair value provided by the LAIF for the entire LAIF portfolio (in relation to the amortized cost of the portfolio). The balance available for withdrawal is based on the accounting records maintained by the LAIF, which are recorded on an amortized cost basis. Page 141 Page 478 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 2—CASH, CASH EQUIVALENTS, AND INVESTMENTS (Continued) DEPOSIT IN PLACER COUNTY TREASURER INVESTMENT POOL The District is a voluntary participant in the Placer County Investment Portfolio (PCTIP). The District is eligible to participate in PCTIP because a portion of the District's service area is in Placer County. Investments are on deposit with the Placer County Treasurer and are managed in compliance with the California Government Code according to a statement of investment policy which sets forth permitted investment vehicles, liquidity parameters, and maximum maturity of investments. The fair value of the District's investment in this pool is reported in the accompanying financial statements at amounts based upon the District's pro-rata share of the fair value provided by Placer County Treasurer for the entire PCTIP (in relation to the amortized cost of the portfolio). The balance available for withdrawal is based on the accounting records maintained by the Placer County Treasurer, which are recorded on an amortized cost basis. DEPOSIT IN UTAH PUBLIC TREASURERS'INVESTMENT FUND The District is a voluntary participant in the Utah Public Treasurers' Investment Fund (UPTIF). The District is eligible to participate in UPTIF through its membership with Utah Associated Municipal Power Systems (UAMPS). Investments are on deposit with State of Utah public treasury and investments are restricted to those authorized by the Utah Money Management Act and rules of the Money Management Council of Utah. The fair value of the District's investments in this pool is reported in the accompanying financial statements at amounts based upon the District's pro-rata share of the fair value provided by UPTIF through UAMPS Member Retention Fund. DEPOSIT IN CALIFORNIA COOPERATIVE LIQUID ASSETS SECURITIES SYSTEM The District is a voluntary participant in the California Cooperative Liquid Assets Securities System (California CLASS). The District is eligible to participate through its membership in California CLASS, a Joint Powers Authority investment pool as set forth in Section 53601(p)of the California Government Code. California CLASS provides public agencies the opportunity to invest funds on a cooperative basis in rated pools that are managed in accordance with state law with the primary objectives of offering participants safety, daily and next-day liquidity, and optimized returns. The District participates in the Prime Fund of California Class which has an AAAm rating by S&P Global Ratings NOTE 3—TELECOMMUNICATION SERVICES In 1999, the District initiated a project to expand its basic service offerings to include internet access, cable television and voice delivered over fiber optic networks (the broadband project). The District completed the broadband design project and obtained the necessary regulatory approvals and franchises needed to construct and launch the broadband project. A local cable television service provider filed an objection in September 2004 with the Nevada County Local Agency Formation Commission (LAFCO), the entity responsible for providing regulatory approval for the broadband project. After denying the cable television provider's request for a reconsideration of their approval of the District's project, the cable television provider filed a lawsuit against LAFCO. The District was not named in the lawsuit. A ruling on the lawsuit was received in January 2006. LAFCO prevailed on all portions of the cable television provider's claim.The cable television provider filed an appeal; however, in June of 2007, the Court ruled in favor of LAFCO, upholding the initial ruling. Since 2009, the District has been exploring options to sell or lease the existing infrastructure to provide a return on investment in the project. Expenses incurred by the District to date on the broadband project total $2,834,079. In 2025 and 2024 there were no material expenditures for this project. In 2026, the District signed an updated Memorandum of Understanding with Plumas Sierra Telecommunications to offer services utilizing these four fibers from Reno to Sacramento in future years. Page 142 Page 479 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 4—CAPITAL ASSETS Capital assets consist of the following at December 31, 2025 and 2024: January 1, December 31, Plant Balances 2025 Additions Reductions 2025 Electric distribution $ 89,304,756 $ 4,875,808 $ (710,292) $ 93,470,272 Water distribution 153,218,962 5,090,387 (1,121,405) 157,187,944 General plant 22,377,460 2,144,528 (121,297) 24,400,691 SBITA 627,600 178,626 806,226 Total 265,528,778 12,289,349 (1,952,994) 275,865,133 Accumulated Depreciation and Amortization Electric distribution (29,381,810) (3,114,579) 1,025,417 $ (31,470,972) Water distribution (69,419,305) (5,193,283) 1,121,405 (73,491,183) General plant (14,891,329) (971,274) 109,169 (15,753,434) SBITA (346,597) (142,282) - (488,879) Total (114,039,041) (9,421,418) 2,255,991 (121,204,468) Plant Sub-Total Electric distribution 59,922,946 1,761,229 315,125 61,999,300 Water distribution 83,799,657 (102,896) - 83,696,761 General plant 7,486,131 1,173,254 (12,128) 8,647,257 SBITA 281,003 36,344 317,347 Total 151,489,737 2,867,931 302,997 154,660,665 Construction work in progress 3,697,906 17,107,999 (15,288,796) 5,517,109 Totals $155,187,643 $ 19,975,930 $ (14,985,799) $ 160,177,774 January 1, December 31, Plant Balances 2024 Additions Reductions 2024 Electric distribution $ 84,810,518 $ 5,080,508 $ (586,270) $ 89,304,756 Water distribution 142,310,579 11,418,635 (510,252) 153,218,962 General plant 20,978,206 1,565,135 (165,881) 22,377,460 SBITA 627,600 627,600 Total 248,726,903 18,064,278 (1,262,403) 265,528,778 Accumulated Depreciation and Amortization Electric distribution (27,377,063) (2,937,875) 933,128 (29,381,810) Water distribution (64,952,166) (4,977,391) 510,252 (69,419,305) General plant (14,223,620) (889,511) 149,294 (14,891,329) SBITA (134,658) (139,431) - (346,597) Total (106,687,507) (8,944,208) 1,592,674 (114,039,041) Plant Sub-Total Electric distribution 57,433,455 2,142,633 346,858 59,922,946 Water distribution 77,358,413 6,441,244 - 83,799,657 General plant 6,754,586 675,624 (16,587) 7,486,131 SBITA 492,942 (139,431) 281,003 Total 142,039,396 9,120,070 330,271 151,489,737 Construction work in progress 6,631,266 13,081,887 (16,015,247) 3,697,906 Totals $148,670,662 $ 22,201,957 $ (15,684,976) $ 155,187,643 In accordance with FERC guidelines for utility accounting, additional activity is reflected in the accumulated depreciation accounts for retirement costs related to upgrading capital investment projects and replacing electric distribution, metering and general assets. Accordingly, the retirement costs are reported as part of the change in accumulated depreciation. As of December 31, 2025 and 2024, the plant in service included land and land rights of$3,318,346 which are not being depreciated. A portion of the plant has been contributed to the District. When replacement is needed, the District replaces the contributed plant with District-financed plant. Page 143 Page 480 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 5— LEASES RECEIVABLE The District is reporting leases receivable of$1,392,482 (split between current amount$46,892 and non- current amount of$1,345,590)as of December 31, 2025. For 2025,the District reported lease revenue (as a component of other operating revenues) of $76,806 and interest income of $60,237 related to lease payments received. Comparatively, as of December 31, 2024, the District reported leases receivable of $1,432,730 (split between current amount of $42,376 and non-current amount of $1,390,354) and lease revenue (as a component of other operating revenues) of $73,695 and interest income of $61,129. The leases receivable are comprised of four cellular and or radio towers, each with five year initial terms, and include renewal increments of up to five, each with five year increments. The District is reasonably certain each of the lessees will renew respective lease for the available extensions. As of December 31, 2025, future minimum lease payments due to the District are as follows: Year Ending Amount 2026 $ 105,445 2027 108,265 2028 111,162 2029 96,867 2030 99,405 2031 - 2035 478,698 2036 -2040 460,856 2041 - 2045 521,415 2046 - 2047 133,821 Total Lease Payments 2,115,934 Less Interest (723,452) Present value of leases receivable $ 1,392,482 Page 44 Page 481 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 6— LONG-TERM DEBT Long-term debt consisted of the following at December 31, 2025: January 1, December 31, Due within 2025 Additions Reductions 2025 one year Special Tax Bonds—Mello Roos, CFD Old Greenwood,4.18%,due serially to2032 $ 6,357,300 $ $ (611,100) $ 5,746,200 $ 655,600 Special Tax Bonds—Mello Roos, CFD Grays Crossing,3.25%to, 5.7%,due seriallyto 2035(net of unamortized discounts of $45,258) 10,850,055 (615,313) 10,234,742 685,000 Special Tax Bonds—Mello Roos, CFD Grays Crossing,3.50%to 5.50%,due seriallyto 2035(net of unamortized discounts of $5,001) 13,114,481 (769,482) 12,344,999 840,000 Certificates of Participation— Water,2.00%to 4.00%, due seriallyto 2035 (net premiums of $258,915) 8,975,933 (737,018) 8,238,915 735,000 Certificates of Participation Water,4.00%to 5%,due semiannually to 2052,secured by real and personal property. (net premiums of $1,238,955) 15,640,708 (301,753) 15,338,955 265,000 Certificates of Participation Electric,4.00%to 5%,due semiannually to 2052,secured by real and personal property. (net premiums of $221,222) 6,416,511 (165,289) 6,251,222 160,000 Totals $ 61,354,988 $ $ (3,199,955) $ 58,155,033 $ 3,340,600 Page 145 Page 482 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 6— LONG-TERM DEBT (Continued) Long-term debt consisted of the following at December 31, 2024: January 1, December 31, Due within 2024 Additions Reductions 2024 one year Special Tax Bonds—Mello Roos, CFD Old Greenwood,4.18%,due serially to2032 $ 6,927,600 $ $ (570,300) $ 6,357,300 $ 611,100 Special Tax Bonds—Mello Roos, CFD Grays Crossing,3.25%to, 5.7%,due seriallyto 2035(net of unamortized discounts of $49,945) 11,405,368 (555,313) 10,850,055 620,000 Special Tax Bonds—Mello Roos, CFD Grays Crossing,3.50%to 5.50%,due seriallyto 2035(net of unamortized discounts of $5,519) 13,823,963 (709,482) 13,114,481 770,000 Certificates of Participation— Water,2.00%to 4.00%, due seriallyto 2035 (net premiums of $285,933) 9,682,951 (707,018) 8,975,933 710,000 Certificates of Participation Water,4.00%to 5%,due semiannuallyto 2052,secured by real and personal property. (net premiums of $1,285,708) 15,927,461 (286,753) 15,640,708 255,000 Certificates of Participation Electric,4.00%to 5%,due semiannuallyto 2052,secured by real and personal property. (net premiums of $231,511) 6,571,801 (155,290) 6,416,511 155,000 Totals $ 64,339,144 $ $ (2,984,156) $ 61,354,988 $ 3,121,100 Page 146 Page 483 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 6— LONG-TERM DEBT (Continued) During December 2003, the Old Greenwood Community Facilities District issued $12,445,000 of Special Tax Bonds, the net proceeds of which were utilized to finance various public improvements for property within Old Greenwood. (See note 10). The terms of the Special Tax Bonds call for debt service payments to be provided solely by taxes levied on and collected from the owners of the taxable land within Old Greenwood. The bonds are secured by land located within Old Greenwood. In January 2014, the original 2003 bonds issued for the Old Greenwood Community Facilities District were refunded (refinanced)by issuing 2014 bonds to a private investment firm at a lower rate, saving the property owners in Old Greenwood over $3 million over the term of the bonds. The 2014 bonds did not require a reserve fund. Therefore, the reserve fund of the 2003 bonds was utilized to reduce the principal. The 2014 bonds have similar terms and have the same rate and method of apportionment for the Old Greenwood parcel owners as the original 2003 bonds. During 2005 and 2004 respectively, the Gray's Crossing Community Facilities District issued $15,375,000 and $19,155,000 of Special Tax Bonds, the net proceeds of which were utilized to finance various public improvements for property within Gray's Crossing. (See note 10). The terms of the Special Tax Bonds call for debt service payments to be provided solely by taxes levied on and collected from the owners of the taxable land within Gray's Crossing. The bonds are secured by land located within Gray's Crossing. On October 12, 2006, through the Truckee Donner Public Utility District Financing Corporation on behalf of the District issued $26,570,000 of Certificates of Participation to refund 100% of the outstanding balance of Certificates issued in 1996, complete the funding of the Donner Lake Assessment District water system, and fund water system capital improvements.The refunding portion of the 2006 COP's,totaling$8,465,000, has an average interest rate of 4.10%. The refunded 1996 COP's had an average interest rate of 5.41%. The net proceeds of $7,500,557 (after payment of $63,733 in underwriting fees, insurance and other issuance costs)plus an additional$1,315,194 of reserve fund monies were used to prepay the outstanding debt service requirements on the 1996 COP's. The terms of the Certificates call for payments to be made only from the net revenues of the Water Division and the debt is secured by this revenue. These revenues are required to be at least equal to 125% of the debt service for each year. Donner Lake Assessment District property owners pay a monthly $6.65 water system upgrade surcharge throughout the 30-year term of the 2006 COP to reimburse the District for the $2.6 million cost incurred in excess of the 20-year tax assessment that ended in 2022. In 2015, a portion of the 2006 COP was refunded. Since a portion of the 2006 COP was used for advance refunding of previous COP, that portion could not be advance refunded at the time of the refunding. The new 2015 refunding did not require a reserve fund. The reserve fund was liquidated and applied towards reducing the debt principal. The estimated net present value savings were $1,600,000 or 10% over the remaining life of issuance. In 2016, the remaining portion of the 2006 COP was refunded. Due to the refunding an estimated net present value savings of$222,000 was achieved. In 2022, through the Truckee Donner Public Utility District Financing Corporation on behalf of the District, issued Water and Electric Certificates of Participation of $14,825,000 and $6,470,000, respectively, with average interest rate of 4.2% and 4.1% respectively. The purposes of the issuances were to fund capital improvement projects. Page 147 Page 484 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 6— LONG-TERM DEBT (Continued) Scheduled debt service payments by year by principal, interest, and total are: Year(s) Principal Interest Total 2026 $ 3,340,600 $ 2,740,540 $ 6,081,140 2027 3,583,700 2,578,999 6,162,699 2028 3,840,200 2,405,400 6,245,600 2029 4,084,800 2,224,936 6,309,736 2030 4,371,800 2,030,352 6,402,152 2031-2035 22,495,100 6,814,654 29,309,754 2036-2040 3,760,000 3,152,055 6,912,055 2041-2045 4,690,000 2,220,675 6,910,675 2046-2050 4,550,000 1,072,782 5,622,782 2051-2052 1,770,000 133,750 1,903,750 $ 56,486,200 $ 25,374,143 $ 81,860,343 Plus: Unamortized premiums 1,719,092 Less: Unamortized discounts (50,259) $ 58,155,033 Scheduled debt service payments by division are: CFD Gray's CFD Old Consolidated Year(s) Electric Water Crossing Greenwood Total 2026 $ 429,181 $ 1,984,438 $ 2,771,730 $ 895,791 $ 6,081,140 2027 431,181 1,986,788 2,823,243 921,487 6,162,699 2028 432,681 1,987,188 2,882,368 943,363 6,245,600 2029 428,681 1,981,600 2,933,268 966,187 6,309,736 2030 429,431 1,982,650 2,995,943 994,128 6,402,152 2031-2035 2,150,655 9,200,825 15,905,750 2,052,524 29,309,754 2036-2040 2,146,205 4,765,850 - - 6,912,055 2041-2045 2,149,175 4,761,500 - - 6,910,675 2046-2050 860,532 4,762,250 - - 5,622,782 2051-2052 - 1,903,750 - - 1,903,750 Totals $ 9,457,722 $ 35,316,839 $ 30,312,302 $ 6,773,480 $ 81,860,343 Page 148 Page 485 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 7-SUBSCRIPTION-BASED INFORMATION TECHNOLOGY ARRANGEMENTS A summary of subscription-based information technology arrangements (SBITA) transactions for the year ending December 31, 2025 and 2024 respectively, are as follows: Subscription Liability: January 1, December 31, 2025 Additions Reductions 2025 Security Software $ 28,630 $ - $ (28,630) $ - Microsoft Cloud Software 196,239 - (62,658) 133,581 GIS Software - 84,299 (29,300) 54,999 Call Center Software 14,385 52,200 (22,347) 44,238 Financial Reporting Software - 39,075 (8,167) 30,908 Totals $ 239,254 $ 175,574 $ (151,102) $ 263,726 January 1, December 31, 2024 Additions Reductions 2024 Security Software $ 56,071 $ - $ (27,441) $ 28,630 Microsoft Cloud Software 309,499 - (113,260) 196,239 GIS Software 26,118 - (26,118) - Call Center Software 32,765 - (18,380) 14,385 Totals $ 424,453 $ - $ (185,199) $ 239,254 The District has entered various SBITA contracts with subscription liability amounts indicated above. For all SBITA arrangements, the District has utilized an interest discount rate based on the estimated incremental borrowing rate of the District for similar asset types and terms. SBITA payment amounts vary by SBITA, some are annual and some are monthly. In 2025 and 2024, there were no variable payment outflows of resources not included in the subscription liability. The future subscription and interest subscription payments as of December 31, 2025 follows: For the Year Ended December 31 Principal Interest Total 2026 $ 115,783 $ 11,078 $ 126,861 2027 121,889 6,043 127,932 2028 17,551 833 18,384 2029 8,503 336 8,839 $ 263,726 $ 18,290 $ 282,016 Page 149 Page 486 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 8— UNEARNED REVENUES Transactions that have not yet met revenue recognition requirements are recorded as a non-current liability and reflected in the accompanying Statement of Net Position. As of December 31, 2025 and 2024, unearned revenues consist of unearned special assessment revenues, development agreement deposits, connection fees, and other deposits. Unearned revenues consisted of the following at December 31, 2025 and 2024: January 1, December 31, 2025 Additions Reductions 2025 Unearned tax revenues $ 2,148,654 $ 2,197,706 $ (2,148,663) $ 2,197,697 Development agreement deposits 1,854,568 1,815,332 (850,578) 2,819,322 Connection fees and other deposits 1,419,459 1,474,698 (1,070,534) 1,823,623 Totals $ 5,422,681 $ 5,487,736 $ (4,069,775) $ 6,840,642 January 1, December 31, 2024 Additions Reductions 2024 Unearned tax revenues $ 1,940,924 $ 2,148,662 $ (1,940,932) $ 2,148,654 Development agreement deposits 1,754,977 886,763 (787,172) 1,854,568 Connection fees and other deposits 1,618,598 1,014,274 (1,213,413) 1,419,459 Totals $ 5,314,499 $ 4,049,699 $ (3,941,517) $ 5,422,681 NOTE 9—COMPENSATED ABSENCES January 1, December 31, Due within 2025 Additions* Reductions* 2025 one year Electric $ 1,095,058 $ 207,758 $ 1,302,816 $ 464,022 Water 1,092,430 51,568 1,143,998 372,437 Total $ 2,187,488 $ 259,326 $ - $ 2,446,814 $ 836,459 January 1, December 31, Due within 2024 Additions* Reductions* 2024 one year Electric $ 966,587 $ 128,471 $ 1,095,058 $ 399,178 Water 1,049,631 42,799 1,092,430 389,646 Total $ 2,016,218 $ 171,270 $ - $ 2,187,488 $ 788,824 *The change in the compensated absences liability is presented as a net change. Page 50 Page 487 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 10—COMMUNITY FACILITIES DISTRICTS To finance various public improvements needed to develop property within the Town of Truckee, California, the District formed Community Facilities Districts (CFD), which issued Special Tax Bonds pursuant to the Mello-Roos Community Facilities Act of 1982, as amended. Accordingly, the Bonds are special obligations of the respective Community Facilities Districts and are payable solely from revenues derived from taxes levied on and collected from the owners of the taxable land within the respective Community Facilities Districts. These Special Tax Bonds are not general or special obligations of the District. The Board of Directors of the District is the legislative body of each of the CFD and as such they approve the rates and method of apportionment of the special taxes and management of the District has operational responsibility for each of the CFD. As improvements at each CFD were completed, the infrastructure was donated in the form of a capital contribution to the Town of Truckee, the Truckee Sanitary District, Southwest Gas, and the District. In December 2003, the Community Facilities District No. 03-1 (Old Greenwood) was formed and issued $12,445,000 in Special Tax Bonds (the 03-1 Bonds). In January 2014, the original 2003 bonds were refunded (refinanced)by issuing 2014 bonds to a private investment firm at a lower rate, saving the property owners in Old Greenwood over$3 million over the term of the bonds. The 2014 bonds have similar terms and have the same rate and method of apportionment for the Old Greenwood parcel owners as the original 2003 bonds. During 2025 and 2024 respectively, taxes of $893,506 and $864,116 were levied by Old Greenwood. Of these amounts, $446,764 and $432,052 relate to 2025 and 2024 respectively, and accordingly are included in tax revenues in the accompanying Statement of Revenues, Expenses, and Changes in Net Position. The remaining amount will be recognized in future periods and are included in unearned revenues on the accompanying Statement of Net Position. In September 2004, the Community Facilities District No. 04-1 (Gray's Crossing) was formed and issued $15,375,000 in Special Tax Bonds (the 04-1 Bonds). In 2005, an additional $19,155,000 (2005 Series) in Special Tax Bonds was issued for the Gray's Crossing CFD. During the county tax roll for 2025 and 2024, taxes of $3,501,871 and $3,433,207 respectively were levied by Gray's Crossing. Of this amount, $1,750,933 and $1,716,602 relate to 2025 and 2024 respectively, and accordingly, are included in tax revenues. The remaining levied amount through the county tax roll will be recognized in future periods and is included in unearned revenues on the accompanying Statement of Net Position. Due to consistently high tax levy payment delinquencies, Gray's Crossing made an unscheduled reserve fund draw to fund debt payments of $171,894 and $243,926, for 2025 and 2024 respectively. Gray's Crossing Reserve Fund balance as of year-end December 31 was $1,830,648 and $1,919,902 for 2025 and 2024 respectively. The official statements and continuing disclosures may be viewed on the web site of Electronic Municipal Market Access(EMMA)of the Municipal Securities Rulemaking Board (MSRB), http://emma.msrb.org/.The Committee on Uniform Securities Identification Procedures number(CUSIP)for these special tax bonds is CUSIP 897817. Page 151 Page 488 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS A. PENSION PLANS Plan Description —All qualified permanent and probationary employees are eligible to participate in the District's Miscellaneous Employee Pension Plans, cost-sharing multiple employer defined benefit pension plans administered by the California Public Employees' Retirement System (CalPERS). Benefit provisions under the Plans are established by State statute and Local Government resolution. CAPERS issues publicly available reports that include a full description of the pension plans regarding benefit provisions, assumptions and membership information that can be found on the CaIPERS website. Benefits Provided—CalPERS provides service retirement and disability benefits,annual costs of living adjustments and death benefits to plan members, who must be public employees and beneficiaries. Benefits are based on years of credited service, equal to one year of full-time employment. Members with five years of total service are eligible to retire at age 50 with statutorily reduced benefits. All members are eligible for non-duty disability benefits after 10 years of service. The death benefits are Optional Settlement 2W Death Benefit. The cost-of-living adjustments for each plan are applied as specified by the Public Employees' Retirement Law. The 2.7% at 55 Miscellaneous Plan is closed to new entrants. The plans' provisions and benefits in effect on December 31, 2025 are summarized as follows: Miscellaneous Prior to On or after Hire Date January 1, 2013 January 1, 2013 Benefit Formula 2.7% @ 55 2% @ 62 Benefit Vesting Schedule 5 years service 5 years service Benefit Payments monthly for life monthly for life Retirement Age 50 and Up 52 and Up Monthly Benefits, as a %of eligible compensation 2.0% -2.7% 1.0% to 2.5% Required Employee Contributions Rates 8.00% 7.75% Required Employer Contributions Rates 15.17% 7.68% Contributions — Section 208149(c) of the California Public Employee's Retirement Law requires that the employer contribution rates for all public employers be determined on an annual basis by the actuary and shall be effective on the July 1 following notice of a change in the rate. Funding contributions for both Plans are determined annually on an actuarial basis as of June 30 by CalPERS. The actuarially determined rate is the estimated amount necessary to finance the costs of benefits earned by employees during the year, with an additional amount to finance any unfunded accrued liability. The District is required to contribute the difference between the actuarially determined rate and the contribution rate of employees. Contributions shown below are for the fiscal year ending June 30, 2025 and 2024, respectively. Page 152 Page 489 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) A. PENSION PLANS (CONTINUED) Miscellaneous Hire Date Prior to On or after January 1, 2013 January 1, 2013 Combined Total Benefit Formula 2.7% @ 55 2% @ 62 2025 Employer Contributions $ 327,528 $ 322,131 $ 649,659 2024 Employer Contributions 1,630,771 229,800 1,860,571 Fiscal Year End 6/30/2025 Total 1,958,299 551,931 2,510,230 2024 Employer Contributions 304,403 272,420 576,823 2023 Employer Contributions 1,430,861 213,859 1,644,720 Fiscal Year End 6/30/2024 Total $ 1,735,264 $ 486,279 $ 2,221,543 B. PENSION LIABILITIES, PENSION EXPENSES AND DEFERRED OUTFLOWS/INFLOWS OF RESOURCES RELATED TO PENSIONS As of December 31, 2025, the District reported net pension liabilities for its proportionate shares of the net pension liability as follows: Proportionate Share of Net Pension Liability Fiscal Year Ending June 30, 2025 June 30, 2024 $15,766,306 $18,001,154 The District's net pension liability is measured as a proportionate share of the net pension liability. The net pension liability is measured as of June 30, 2025, and the total pension liability used to calculate the net pension liability was determined by an actuarial valuation as of June 30, 2024 rolled forward to June 30, 2025 using standard update procedures. The District's proportion of the net pension liability was based on a projection of the District's long-term share of contributions to the pension plans relative to the projected contributions of all participating employers, actuarially determined. The District's proportionate share of the net pension liability for the Plan for the measurement date of June 30, 2025 and June 30, 2024 is as follows: Percentage Share of Risk Pool Measurement Date June 30, 2025 June 30, 2024 Change Percentage of Plan NPL 0.39522% 0.37219% 0.02303% Page 153 Page 490 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) B. PENSION LIABILITIES, PENSION EXPENSES AND DEFERRED OUTFLOWS/INFLOWS OF RESOURCES RELATED TO PENSIONS(Continued) At December 31, 2025 and 2024 the District reported deferred outflows of resources and deferred inflows of resources related to pensions from the following sources: 2025 Deferred Outflows of Deferred Inflows of Resources Resources Differences between expected and actual experience $ 1,889,182 $Net differences between projected and actual investment earnings - 2,133,354 Differences between employer's contributions and 99,252 0 proportionate share of contributions Change in employer's proportion 36,299 135,282 Pension contributions made subsequent to the measurement 2,162,063 - date Total $ 4,186,796 $ 2,268,636 2024 Deferred Outflows of Deferred Inflows of Resources Resources Changes in assumptions $ 462,667 $ - Differences between expected and actual experience 1,556,365 60,728 Net differences between projected and actual investment earnings 1,036,304 - Differences between employer's contributions and 34,845 134,816 proportionate share of contributions Change in employer's proportion 82,555 4,685 Pension contributions made subsequent to the measurement 1,860,619 date Total $ 5,033,355 $ 200,229 Page 154 Page 491 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) B. PENSION LIABILITIES, PENSION EXPENSES AND DEFERRED OUTFLOWS/INFLOWS OF RESOURCES RELATED TO PENSIONS(Continued) For the December 31, 2025 and 2024 balances of deferred outflows and inflows of resources, $2,162,063 and $1,860,619 respectively, is reported as deferred outflows of resources related to contributions subsequent to the measurement date and will be recognized as a reduction of the net pension liability in the years ended December 31, 2025 and 2024 respectively. Other amounts reported as deferred outflows of resources and deferred inflows of resources related to pensions will be recognized as pension expense as follows: Reporting Period Reporting Period December 31, 2025 December 31, 2024 Year Ended Year Ended December 31 Amounts December 31 Amounts 2026 $ 1,976,827 2025 $ 966,240 2027 (468,125) 2026 2,333,178 2028 (938,215) 2027 28,219 2029 (814,390) 2028 (355,130) $ (243,903) $ 2,972,507 Actuarial Assumptions — The total pension liabilities in the June 30, 2025 actuarial valuations were determined using the following actuarial assumptions: Miscellaneous 2025 Valuation Date June 30, 2024 Measurement Date June 30, 2025 Actuarial Cost Method Entry-Age Normal Actuarial Assumptions: Discount Rate 6.90% Inflation 2.30% Salary Increase Varies by Entry Age and Service Mortality (1) Derived using CalPERS' Membership Data for all Funds (1) The mortality table used was developed based on CalPERS'specific data. The Table includes 15 years of mortality improvements using Society of Actuaries Scale MP-2021. For more details on this table, please refer to the 2025 experience study report. All underlying mortality assumptions and all other actuarial assumptions used in the June 30, 2024 valuation were based on results of the 2025 CalPERS Experience Study and Review of Actuarial Assumptions. Further details of the Experience Study can be found on the CaIPERS website. Page 155 Page 492 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) B. PENSION LIABILITIES, PENSION EXPENSES AND DEFERRED OUTFLOWS/INFLOWS OF RESOURCES RELATED TO PENSIONS (Continued) Discount Rate -The discount rate used to measure the total pension liability as of June 30, 2025 was 6.90%. To determine whether the municipal bond rate should be used in the calculation of a discount rate for each plan, CalPERS stress tested plans that would most likely result in a discount rate that would be different from the actuarially assumed discount rate. Based on the testing, none of the tested plans run out of assets. Therefore, the current 6.90% discount rate used is adequate and the use of the municipal bond rate calculation is not necessary. The long term expected discount rate of 6.90% will be applied to all plans in the Public Employees Retirement Fund (PERF). The stress test results are presented in a detailed report that can be obtained from the CalPERS website. The long-term expected rate of return on pension plan investments was determined using a building- block method in which best-estimate ranges of expected future real rate of return (expected returns, net of pension plan investment expense and inflation) are developed for each major asset class. In determining the long-term expected rate of return, CalPERS took into account both short-term and long-term market return expectations as well as the expected pension fund cash flows. Using historical returns of all the funds' asset classes, expected compound returns were calculated over the short-term (first 10 years) and the long term (11 + years) using a building-block approach. Using the expected nominal returns for both short-term and long-term,the present value of benefits was calculated for each fund. The expected rate of return was set by calculating the single equivalent expected return that arrived at the same present value of benefits for cash flows as the one calculated using both short-term and long-term returns. The expected rate of return was then set equivalent to the single equivalent rate calculated above and rounded down to the nearest one quarter of one percent. The table below reflects the long-term expected real rate of return by asset class. The rate of return was calculated using the capital market assumptions applied to determine the discount rate and asset allocation. The target allocation shown below is based on a plan policy adopted by CaIPERS' Board effective November 13, 2013. Long-Term Assumed Expected Real Asset Rates of Asset Class Allocation Return Public Equity 42.0% 4.34% Global Equity-Cap-weighted 30.0% 4.54% Global Equity- Factor-weighted 12.0% 3.84% Private Equity 13.0% 7.28% Income 30.0% 1.44% Treasury 5.0% 0.27% Mortgage-backed Securities 5.0% 0.50% Investment Grade Corporates 10.0% 1.56% High Yield 5.0% 2.27% Emerging Market Debt 5.0% 2.48% Private Debt 5.0% 3.57% Real Assets 15.0% 3.21% Strategic Leverage -5.0% -0.59% Tota 1 100.0% Page 56 Page 493 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) B. PENSION LIABILITIES, PENSION EXPENSES AND DEFERRED OUTFLOWS/INFLOWS OF RESOURCES RELATED TO PENSIONS (Continued) Sensitivity of the Proportionate Share of the Net Pension Liability to Changes in the Discount Rate-The following presents the District's proportionate share of the net pension liability for each Plan, calculated using the discount rate for each Plan, as well as what the District's proportionate share of the net pension liability would be if it were calculated using a discount rate that is 1% point lower or 1% point higher than the current rate; for current year and prior year measurement dates: Miscellaneous Measurement Date June 30, 2025 June 30, 2024 1%Decrease 5.90% 5.90% Net Pension Liability $26,344,381 $28,046,332 Current Discount Rate 6.90% 6.90% Net Pension Liability $15,766,306 $18,001,154 1%Increase 7.90% 7.90% Net Pension Liability $7,060,661 $9,732,494 Pension Plan Fiduciary Net Position— Detailed information about each pension plan's fiduciary net position is available in the separately issued CalPERS financial reports. C. PAYABLE TO THE PENSION PLAN At December 31, 2025 and 2024 respectively, the District did not report a payable for outstanding required contributions to the pension plan. D. DEFERRED COMPENSATION PLAN The District maintains two deferred compensation plans: a 401(a) and a 457 plan, (the Plans) for certain qualified employees. The District contributes a match of eligible PEPRA employee contributions with an effective match rate in 2025 and 2024 of 7.28%. The total amount of District match for 2025 and 2024 was $575,532 and $507,443, respectively. The District has no liability for losses under the Plans but does have the duty of due care that would be required of an ordinary prudent investor. The District has not reflected the Plans' assets and corresponding liabilities (if any) on the accompanying Statement of Net Position. E. OTHER POST EMPLOYMENT BENEFITS(OPEB) General Information — The District administers a single-employer defined-benefit post-employment healthcare plan and dependents are eligible to enroll. The District's retiree Benefits Plan (the Plan) recognizes benefit payments when due and payable in accordance with the benefit terms. The Plan's fiduciary net position has been determined on the same basis as is reported by the Plan in calculating the fiduciary net position (Net OPEB Liability), deferred outflows of resources and deferred inflows of resource and associated OPEB expense. Page 157 Page 494 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) E. OTHER POST EMPLOYMENT BENEFITS(OPEB) (Continued) Benefits Provided—Retirees are eligible for a District contribution towards premiums for the retiree health plan(s) if they have 10+ years of District service. The maximum District contribution is based on years of service. The Retiree is eligible for 50% of the following monthly maximums, with a minimum of 10 years of service, plus 5%for each year of service over 10 years: Monthly Maximum per person enrolled in the plan: not eligible for Medicare $600 eligible for Medicare $500 Employees Covered—At December 31, 2024 (the valuation date), the benefit terms covered the following employees: Category Count Active Employees 77 Inactive Employees, spouses, or beneficiaries currently receiving payment(s) (Retirees) 48 Inactive employees entitled to but not yet receiving benefit payment(s) - Total 125 Contributions — The District pays benefits as they come due and contributes additionally to the Trust annually. The District's annual contribution to the Trust as of December 31, 2025 and 2024 was $125,004 and $125,004, respectively. Net OPEB Liability — The District's net OPEB liability was measured as of December 31, 2024, and the total OPEB liability used to calculate the net OPEB liability was determined by an actuarial valuation as of December 31, 2023, with report date of December 31, 2025. Actuarial Assumptions The total OPEB Liability in the December 31, 2024 measurement was determined using the following actuarial assumptions, applied to all periods included in the measurement, unless otherwise specified: Inflation: 2.30% Salary Increases: Base salary increases in year one: 2.80%.Additional merit-based increases based on CalPERS. Investment Rate of Return: 6.40% Healthcare cost trend rates: 6.80% in the first year, trending down to 4.04% over 50 years Mortality Rates: Based on CalPERS tables Page 158 Page 495 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) E. OTHER POST EMPLOYMENT BENEFITS(OPEB) (Continued) The discount rate used to measure the total OPEB liability was 6.40%, up from 6.24% in the prior valuation. The projection of cash flows used to determine the discount rate assumed that the District contribution will be made at rates equal to the actuarially determined contribution rates. Based on those assumptions, the OPEB plan's fiduciary net position was projected to cover all future OPEB payments. Therefore, the discount rate was set equal to the long-term expected rate of return. Changes in the Net OPEB Liability—The changes in the net OPEB liability for the Plan are as follows: Increases (Decreases) Total OPEB Plan Fiduciary Net OPEB Liability Net Position Liability (a) (b) (c) = (a) -(b) Balance as of Report Date December 31, 2024 $ 8,537,167 $ 3,782,334 $ 4,754,833 Changes for the year: Service Cost 226,726 - 226,726 Interest 527,533 - 527,533 Differences between Expected and Actual Experience (164,383) - (164,383) Changes of Assumptions (114,429) (114,429) Contributions Employer- District's Contribution - 482,734 (482,734) Employer- Implicit Subsidy - 261,960 (261,960) Net Investment Income - 338,249 (338,249) Benefit Payments (357,730) (357,730) - Implicit Rate Subsidy Credit (261,960) (261,960) - Administrative Expenses - (1,752) 1,752 Net Changes (144,243) 461,501 (605,744) Balance as of Report Date December 31, 2025 $ 8,392,924 $ 4,243,835 $ 4,149,089 Page 159 Page 496 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) E. OTHER POST EMPLOYMENT BENEFITS(OPEB)(Continued) Increases (Decreases) Total OPEB Plan Fiduciary Net OPEB Liability Net Position Liability (a) (b) (c) = (a)-(b) Balance as of Report Date December 31, 2023 $ 9,168,737 $ 3,198,750 $ 5,969,987 Changes for the year: Service Cost 318,131 - 318,131 Interest 569,226 - 569,226 Changes of Benefit Terms 1,166,387 - 1,166,387 Differences between Expected and Actual Experience (1,796,719) - (1,796,719) Changes of Assumptions (130,113) (130,113) Contributions Employer- District's Contribution - 450,104 (450,104) Employer- Implicit Subsidy - 428,378 (428,378) Net Investment Income - 465,270 (465,270) Benefit Payments (330,104) (330,104) - Implicit Rate Subsidy Credit (428,378) (428,378) - Administrative Expenses - (1,686) 1,686 Net Changes (631,570) 583,584 (1,215,154) Balance as of Report Date December 31, 2024 $ 8,537,167 $ 3,782,334 $ 4,754,833 Sensitivity of the net OPEB liability to changes in the discount rate -The net OPEB liability of the District, as well as what the District's net OPEB liability would be if it were calculated using a discount rate that is one percentage point lower or one percentage point higher is as follows: Valuation Report 12/31/2024 Measured as of Date 12/31/2023 12/31/2025 Reporting Date 12/31/2024 Net OPEB Net OPEB Rate Liability Rate Liability 5.40% $ 4,907,224 1% Rate Decrease 5.24% $ 5,525,729 6.40% $ 4,149,089 Current Rate 6.24% $ 4,754,833 7.40% $ 3,486,858 1% Rate Increase 7.24% $ 4,082,987 Page 160 Page 497 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) E. OTHER POST EMPLOYMENT BENEFITS(OPEB)(Continued) Sensitivity of the net OPEB liability to changes in the healthcare cost trend rates -The net OPEB liability of the District, as well as what the District's net OPEB liability would be if it were calculated using healthcare cost trend rates that are one percentage point lower or one percentage point higher than current healthcare cost trend rates is as follows: Valuation Report 12/31/2024 Measured as of Date 12/31/2023 12/31/2025 Reporting Date 12/31/2024 Rate Rate Over 50 years, Net OPEB Over 51 years, Net OPEB Rate decreasing to Liability Rate decreasing to Liability 5.50% 3.04% $ 3,956,838 1%Rate Decrease 5.80% 3.04% $ 4,587,325 6.50% 4.04% $ 4,149,089 Current Rate 6.80% 4.04% $ 4,754,833 7.50% 5.04% $ 4,372,526 1%Rate Increase 7.80% 5.04% $ 4,948,518 OPEB Plan Fiduciary Net Position —California Employers' Retiree Benefit Trust (CERBT) Fund issues a publicly available financial report for the overall OPEB plan's fiduciary net position which may be obtained from CalPERS at PO Box 942709, Sacramento, CA, 94229-2709. OPEB Expense and Deferred Inflows and Outflows of Resources Related to OPEB —For the year ended December 31, 2025 and 2024, the District recognized an OPEB expense of$615,818 and $1,948,602 respectively. At December 31, 2025 and 2024, the District reported deferred outflows of resources and deferred inflows of resources related to OPEB from the follow sources: 2025 Deferred Outflows Deferred Inflows of Resources of Resources Differences between expected and actual experience $ 199,243 $ 1,641,443 Changes of assumptions 657,023 281,779 Net Difference between Projected and Actual Earnings on OPEB Plan Investments 12,949 - District contributions made subsequent to the measurement date 791,873 - Total $ 1,661,088 $ 1,923,222 Page 61 Page 498 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 11 — EMPLOYEE BENEFIT PLANS (Continued) E. OTHER POST EMPLOYMENT BENEFITS(OPEB)(Continued) 2024 Deferred Outflows Deferred Inflows of Resources of Resources Differences between expected and actual experience $ 483,885 $ 1,762,949 Changes of assumptions 830,371 281,346 Net Difference between Projected and Actual Earnings on OPEB Plan Investments 152,900 - District contributions made subsequent to the measurement date 744,694 - Total $ 2,211,850 $ 2,044,295 The$791,873 and$744,694 reported as deferred outflows of resources related to contributions subsequent to the December 31, 2024 and 2023 respective measurement dates for reporting as of December 31, 2025 and 2024 respectively, will be recognized as a reduction of the net OPEB liability during the fiscal year ending December 31, 2026 and 2025 respectively. Other amounts reported as deferred outflows of resources and deferred inflows of resources related to OPEB will be recognized in OPEB expense as follows: Reporting Period Reporting Period December 31, 2025 De ce m be r 31, 2024 Year Ended Year Ended December 31 Amount December 31 Amount 2026 $ 49,525 2025 $ 117,484 2027 (121,136) 2026 112,697 2028 (278,255) 2027 (57,964) 2029 (212,030) 2028 (215,083) 2030 (158,179) 2029 (148,859) thereafter (333,932) thereafter (385,414) $ (1,054,007) $ (577,139) NOTE 12—SELF FUNDED INSURANCE The District has a self-funded vision insurance program and claims were processed by and on behalf of the District. The District did not maintain a claim liability; rather claims were expensed as paid. The amount of claims paid for each of the past three years has not been material. Page 162 Page 499 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 13—SEGMENT DISCLOSURE The District has issued revenue bonds to finance electric and water distribution facilities. The District also issued special tax bonds secured by tax revenues from Mello-Roos Community Facilities Districts. Each project has an external requirement to be reported separately, and investors in the revenue bonds and special tax bonds rely solely on the revenue generated by the individual projects for repayment. Summary financial information for each project is presented on the following pages for the years ending December 31, 2025 and 2024. STATEMENTS OF NET POSITION December 31,2025 Gray's Old ASSETS AND DEFERRED OUTFLOWS OF RESOURCES Electric Water Crossing Greenwood Eliminations Grand Total Current assets $ 52,741,798 $ 19,275,225 $ 12,034,019 $ 1,139,167 $ $ 85,190,209 Non-current assets: Investments 2,049,524 1,395,831 - - - 3,445,355 Leases receivable - 1,345,590 - - - 1,345,590 Capital assets,net 73,754,260 86,423,514 - - - 160,177,774 Total Non-current Assets 75,803,784 89,164,935 164,968,719 Total Assets 128,545,582 108,440,160 12,034,019 1,139,167 - 250,158,928 Deferred outflows of resources Pension 2,512,078 1,674,718 - - 4,186,796 OPEB 996,653 664,435 1,661,088 Unamortized loss on refunding - 314,362 - - - 314,362 Total Deferred Outflows of Resources 3,508,731 2,653,515 - - - 6,162,246 TOTAL ASSETS AND DEFERRED OUTFLOWS $132,054,313 $111,093,675 $ 12,034,019 $ 1,139,167 $ $256,321,174 OF RESOURCES LIABILITIES, DEFERRED INFLOWS OF RESOURCES AND NET POSITION Current liabilities $ 5,965,338 $ 2,270,169 $ 1,940,577 $ 735,663 $ - $ 10,911,747 Non-current Liabilities Long-term debt,net ofcurrent portion 6,091,222 22,577,870 21,054,741 5,090,600 - 54,814,433 Subscription software liability,net of current portion 96,163 51,780 - - 147,943 Compensated absences,net of current portion 838,794 771,561 1,610,355 Net pension liability 9,459,784 6,306,522 15,766,306 OPEB liability 2,489,453 1,659,636 4,149,089 Unearned revenues 3,411,581 1,231,364 1,750,933 446,764 - 6,840,642 Total Non-current Liabilities 22,386,997 32,598,733 22,805,674 5,537,364 - 83,328,768 Total Liabilities 28,352,335 34,868,902 24,746,251 6,273,027 - 94,240,515 Deferred inflows of resources Pension 1,361,182 907,454 - - 2,268,636 OPEB 1,153,933 769,289 1,923,222 Leases receivable - 1,178,707 1,178,707 Total Deferred Inflows of Resources 2,515,115 2,855,450 - - - 5,370,565 Net Position Net investment in capital assets 66,922,355 62,948,094 (22,579,741) (5,746,200) - 101,544,508 Restricted for debt service 866,714 1,964,960 2,951,845 - 5,783,519 Unrestricted 33,397,794 8,456,269 6,915,664 612,340 49,382,067 Total Net Position 101,186,863 73,369,323 (12,712,232) (5,133,860) 156,710,094 TOTAL LIABILITIES,DEFERRED INFLOWS $132,054,313 $111,093,675 $ 12,034,019 $ 1,139,167 $ - $256,321,174 OF RESOURCES AND NET POSITION Page 163 Page 500 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 13 — SEGMENT DISCLOSURE (Continued) December 31,2024 Gray's Old ASSETS AND DEFERRED OUTFLOWS OF RESOURCES Electric Water Crossing Greenwood Eliminations Grand Total Current assets $ 43,838,963 $ 15,722,431 $ 11,235,434 $ 1,129,827 $ $ 71,926,655 Non-current assets: Investments 4,280,671 2,938,555 - - - 7,219,226 Leases receivable - 1,390,354 - - - 1,390,354 Capital assets,net 68,386,036 86,801,607 155,187,643 Total Noncurrent Assets 72,666,707 91,130,516 163,797,223 Total Assets 116,505,670 106,852,947 11,235,434 1,129,827 235,723,878 Deferred outflows of resources Pension 3,020,013 2,013,342 - - - 5,033,355 OPEB 1,327,110 884,740 - - - 2,211,850 Unamortized loss on refunding 347,164 347,164 Total Deferred outflows of resources 4,347,123 3,245,246 7,592,369 TOTAL ASSETS AND DEFERRED OUTFLOWS OF RESOURCES $120, 552,793 $110, 998,193 $ 11,235,434 $ 1, 229,827 $ $ 243,316,247 LIABILITIES, DEFERRED INFLOWS OF RESOURCES AND NET POSITION Current liabilities $ 5,403,373 $ 2,360,248 $ 1,830,806 $ 699,679 $ $ 10,294,106 Non-current Liabilities Long-term debt,net of current portion 6,261,511 23,651,641 22,574,536 5,746,200 - 58,233,888 Subscription software liability,net of current portion 86,827 46,753 - - - 133,580 Compensated absences,net of current portion 695,880 702,784 - - - 1,398,664 Net pension liability 10,800,692 7,200,462 - - - - 18,001,154 OPEB liability 2,852,900 1,901,933 - - - 4,754,833 Unearned revenues 2,454,463 819,564 1,716,602 432,052 5,422,681 Total Noncurrent Liabilities 23,152,273 34,323,137 24,291,138 6,178,252 87,944,800 Total Liabilities 28,555,646 36,683,385 26,121,944 6,877,931 98,238,906 Deferred inflows of resources Pension 120,137 80,092 - - - 200,229 OPEB 1,226,577 817,718 - - - 2,044,295 Leases receivable 1,253,249 1,253,249 Total Deferred Inflows of Resources 1,346,714 2,151,059 3,497,773 Net Position Net investment in capital assets 68,790,252 62,251,170 (23,964,536) (6,357,300) 100,719,586 Restricted for debt service 1,265,651 2,234,335 2,919,807 - - 6,419,793 Unrestricted 20,894,530 6,778,244 6,158,219 609,196 34,440,189 Total Net Position 90,950,433 71,263,749 (14,886,510) (5,748,104) 141,579,568 TOTAL LIABILITIES,DEFERRED INFLOWS $ 120,852,793 $ 110,098,193 $ 11,235,434 $ 1,129,827 $ $ 243,316,247 OF RESOURCES AND NET POSITION Page 164 Page 501 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 13 — SEGMENT DISCLOSURE (Continued) STATEMENTS OF REVENUES, EXPENSES, AND CHANGES IN NET POSITION Year ended December 31,2025 Gray's Old Electric Water Crossing Greenwood Eliminations Grand Total Operating Revenues Sales to consumers $ 37,871,146 $ 20,407,703 $ $ $ - $ 58,278,849 Other operating revenues 3,119,437 481,215 (2,159,247) 1,441,405 Operating expenses (29,556,439) (13,916,096) 2,159,247 (41,313,288) Depreciation (3,609,514) (5,324,135) - (8,933,649) Non-operating revenues(expenses) 1,558,996 (157,981) 2,174,278 614,244 4,189,537 Income before capital&other contributions 9,383,626 1,490,706 2,174,278 614,244 13,662,854 Capital contributions,net 852,804 614,868 1,467,672 CHANGE IN NET POSITION 10,236,430 2,105,574 2,174,278 614,244 15,130,526 Net Position,Beginning 90,950,433 71,263,749 (14,886,510) (5,748,104) 141,579,568 NET POSITION,ENDING $101,186,863 $ 73,369,323 $ (12,712,232) $ (5,133,860) $ $ 156,710,094 Year ended December 31,2024 Gray's Old Electric Water Crossing Greenwood Eliminations Grand Total Operating Revenues Sales to consumers $ 34,391,270 $ 19,097,947 $ $ $ - $ 53,489,217 Other operating revenues 3,269,872 481,374 (2,033,519) 1,717,727 Operating expenses (29,581,237) (13,756,540) 2,033,519 (41,304,258) Depreciation (3,358,962) (5,128,008) - (8,486,970) Non-operating revenues(expenses) 1,475,636 (118,259) 1,978,767 546,445 3,882,589 Income before capital&other contributions 6,196,579 576,514 1,978,767 546,445 9,298,305 Capital contributions,net 1,427,444 1,042,923 2,470,367 CHANGE IN NET POSITION 7,624,023 1,619,437 1,978,767 546,445 11,768,672 Net Position,Beginning 83,326,410 69,644,312 (16,865,277) (6,294,549) 129,810,896 NET POSITION,ENDING $ 90,950,433 $ 71,263,749 $ (14,886,510) $ (5,748,104) $ $ 141,579,568 Page 165 Page 502 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 13—SEGMENT DISCLOSURE (Continued) STATEMENTS OF CASH FLOWS Year ended December 31,2025 Gray's Old Electric Water Crossing Greenwood Eliminations Grand Total NET CASH PROVIDED BY(USED IN) Operating activities $ 10,112,320 $ 7,426,085 $ - $ - $ $ 17,538,405 Capital and related financing activities (7,513,308) (6,206,000) (259,229) (50,989) (14,029,526) nesting activities 4,043,052 2,298,097 126,784 22,223 6,490,156 Net increase(decrease)in cash and cash equivalents 6,642,064 3,518,182 (132,445) (28,766) 9,999,035 Cash and Cash Equivalents,Beginning 35,752,535 11,878,893 2,058,706 259,830 49,949,964 CASH AND CASH EQUIVALENTS,ENDING $ 42,394,599 $ 15,397,075 $ 1,926,261 $ 231,064 $ $ 59,948,999 Year ended December 31,2024 Gray's Old Electric Water Crossing Greenwood Eliminations Grand Total NET CASH PROVIDED BY(USED IN) Operating activities $ 11,181,346 $ 7,159,671 $ - $ - $ $ 18,341,017 Capital and related financing activities (7,385,896) (8,599,866) (227,122) (72,774) (16,285,658) Investing activities 2,851,292 1,717,415 135,498 29,409 4,733,614 Net increase(decrease)in cash and cash equivalents 6,646,742 277,220 (91,624) (43,365) 6,788,973 Cash and Cash Equivalents,Beginning 29,105,793 11,601,673 2,150,330 303,195 43,160,991 CASH AND CASH EQUIVALENTS,ENDING $ 35,752,535 $ 11,878,893 $ 2,058,706 $ 259,830 $ $ 49,949,964 NOTE 14— MARTIS VALLEY GROUNDWATER MANAGEMENT EFFORTS The Martis Valley aquifer underlies about 35,000 acres in both Placer and Nevada counties, near the Town of Truckee. It is the main groundwater supply for numerous public and private entities. This area has seen significant growth in the last few decades with more planned for the future. Maintaining an adequate water supply and protecting water quality are critical for the region's future. The Truckee Donner Public Utility District (TDPUD), Northstar Community Services District (NCSD) and Placer County Water Agency (PCWA) are the three primary public water agencies with jurisdiction in the Martis Valley Groundwater Basin (MVGB). Together, the TDPUD, NCSD and PCWA (Partnership Agencies)partnered to submit a Groundwater Management Plan and to help develop a groundwater model for the Martis Valley basin. The Martis Valley Groundwater Management Plan (GMP) was prepared in 2013 to reflect current water resources planning in the region and to incorporate the latest information and understanding of the underlying groundwater basin. This collaborative effort provided the guidance necessary to align groundwater policy. In addition to the GMP, a computer model of the groundwater basin was developed by the Desert Research Institute, which incorporated available data and enhanced understanding of the groundwater basin. A climate change modeling component out to the end of the century was part of the overall Federal study effort. Page 166 Page 503 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 14—MARTIS VALLEY GROUNDWATER MANAGEMENT EFFORTS (Continued) Partner agencies each adopted the GMP in February 2012 and the model and associated report was completed in 2015. The total cost of the project was approximately $1,000,000, which includes federal funding of approximately$500,000 from the U.S. Bureau of Reclamation and $250,000 from the Lawrence Livermore National Laboratory; and contributions of $150,000 from TDPUD and $100,000 from the other members of the Partnership Agencies. In mid-2016, the California Sustainable Groundwater Management Act of 2014 (SGMA) took effect for which the District was the submitting agency of a SGMA Alternate Submittal in December, 2016 on behalf of the Town of Truckee, Placer County, Nevada County, PCWA, and Northstar CSD (Local SGMA Agencies). The SGMA Alternative Submittal was intended to comply with the new regulations. There was an adopted MOA amongst the six local agencies for this compliance project which covers the time period for preparation of the SGMA Alternative Submittal, possible conditional acceptance of the plan by DWR, and submittal of a first-year annual report. DWR had two years by statute to review the SGMA Alternative Submittal. In 2018, DWR was required to undergo groundwater basin prioritization which is the basis for compliance obligation for SGMA. The MVGB had previously been prioritized as medium priority. DWR's final Determination was to re-prioritize MVGB to low priority. This was a significant act that resulted in a direct reduction in regulatory burden and future regulatory costs that would be required for groundwater management. To ensure continued stewardship and management of the MVGB, the District and its local partners have agreed to return to the 2013 GMP framework which was never fully implemented due to SGMA. There was a kick-off meeting for the GMP in 2019 and the three local water agencies have hired a hydrogeologic consultant to prepare the first annual report as required by the GMP. The consultant's report was presented to the GMP Stakeholder Working Group at the annual meeting in the summer of 2020. Subsequent annual reports were presented to the GMP Stakeholder Working Group covering each water year through 2024. The GMP Partnership Agencies completed a five-year update of the GMP in 2025. The groundwater basin management and stewardship efforts over the decades continue to document that the Martis Valley Groundwater Basin is operating well within the sustainable yield and is projected to remain well below the sustainable yield through the projected community buildout. NOTE 15—CLAIMS AND JUDGMENTS From time to time, the District is party to various pending claims and legal proceedings. Although the outcome of such matters cannot be forecasted with certainty, it is the opinion of management and the District's legal counsel that the likelihood is remote that any such claims or proceedings will have a material adverse effect on the District's financial position or results of operations. NOTE 16—RISK MANAGEMENT The District is exposed to various risks of loss related to torts; theft of, damage to, or destruction of assets; errors and omissions; workers compensation; and health care of its employees. These risks are covered through the purchase of commercial insurance,with minimal deductibles. Settled claims have not exceeded the commercial liability in any of the past three years. There were no significant reductions in coverage compared to the prior year. Page 167 Page 504 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 NOTE 17—CERTAIN RISK DISCLOSURES Vulnerability From Concentrations—Wildfire Risk The District operates within a region that is highly susceptible to seasonal wildfires. Several of the District's key facilities, including electric substations and distribution infrastructure and water well, tanks, pump stations and related distribution infrastructure, are located in or adjacent to areas designated as high fire- threat zones by state authorities. Extended drought conditions, forest health concerns, and increased fuel loads have elevated the probability and potential severity of wildfire events. A significant wildfire could disrupt essential operations and service delivery, damage utility assets, impair access to service areas, or result in substantial emergency response and recovery costs. While the District has a formal wildfire mitigation plan, invests annually in infrastructure hardening to mitigate wildfire risks and maintains insurance coverage for certain property damage and certain business interruptions, such policies will likely not fully cover all potential losses from a significant wildfire within the District.The potential impacts of future wildfire events cannot be reasonably estimated at this time. Vulnerability From Constraint—Drinking Water Contaminant Regulatory Risk The District relies primarily on local groundwater sources for its potable drinking water supply. Recent statewide and federal regulatory actions have focused on establishing new maximum contaminant levels (MCLs)for naturally occurring arsenic and non-natural per-and polyfluoroalkyl substances (PFAS) compounds. PFAS is a large group of thousands of man-made chemicals used since the 1940s. These chemicals are often called `forever chemicals' because they do not break down easily in the environment. While the District's existing sampling data indicates the presence of arsenic and PFAS at levels below currently enforceable standards, future regulatory thresholds may be more stringent and could require expanded monitoring, treatment upgrades, or operational modifications. At this time, the financial impact of potential regulatory changes cannot be reasonably estimated due to uncertainties regarding any final new MCLs, compliance timelines, treatment technology requirements, and the availability of external funding sources. The adoption of more restrictive arsenic standards, PFAS standards, or both standards could result in significant capital investment and higher ongoing operating costs to ensure continued compliance with the new drinking water quality regulations. Page 168 Page 505 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES TO FINANCIAL STATEMENTS December 31, 2025 and 2024 THIS PAGE IS INTENTIONALLY LEFT BLANK Page 169 Page 506 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NOTES • FINANCIAL STATEMENTS December1 and 2024 VF • l M ask I* •• IrisA. r � � f P. Photo: 2025 Tree Trimming Page Page 507of • REQUIRED SUPPLEMENTARY INFORMATION Page 508 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REQUIRED SUPPLEMENTARY INFORMATION December 31, 2025 and 2024 COST SHARING DEFINED BENEFIT PENSION PLANS Schedule of the District's Proportionate Share of the Net Pension Liability Cost Sharing Defined Benefit Plans As of June 30 Last Ten Years 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Portion of Net Pension Liability 0.39522% 0.37219% 0.36287% 0.35867% 0.40467% 0.33245% 0.32145% 0.31157% 0.30379% 0.29837% Proportionate Share of the Net Pension Liability $ 15,766,306 $ 18,001,154 $ 18,145,067 $ 16,783,065 $ 7,683,937 $ 14,023,172 $ 12,872,646 $ 11,742,137 $ 11,975,655 $ 10,250,329 Coxered Payroll $ 10,623,206 $ 9,889,930 $ 9,853,784 $ 7,872,221 $ 7,762,131 $ 7,619,022 $ 7,602,120 $ 7,375,933 $ 7,108,563 $ 6,670,248 Proportionate Share of the Net Pension Liability as a Percentage of Coeered Payroll 148.41% 182.01% 184.14% 213.19% 98.99% 184.05% 169.33% 159.20% 168.47% 153.67% Proportionate Share of Plan's Fiduciary Net Position $ 62,620,158 $ 56,440,440 $ 51,700,409 $ 49,619,385 $ 53,485,582 $ 43,589,560 $ 40,367,745 $ 29,308,590 $ 27,244,095 $ 30,950,578 Plan Fiduciary Net Position as a percentage of the Total Pension Liability 79.89% 75.82% 74.02% 74.73% 87.44% 75.66% 75.82% 75.26% 73.31% 75.12% Page 172 Page 509 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REQUIRED SUPPLEMENTARY INFORMATION December 31, 2025 and 2024 COST SHARING DEFINED BENEFIT PENSION PLANS-CONTINUED Schedule of Contributions Cost Sharing Defined Benefit Plans December 31 Last Ten Years 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Contractually Required Contribution(Actuarially Determined) $ 2,572,299 $ 2,437,394 $ 2,129,727 $ 2,080,863 $ 1,844,808 $ 1,746,709 $ 1,872,297 $ 1,890,102 $ 1,670,256 $ 1,478,700 Contributions in Relation to the Actuarially Determined Contributions 2,572,299 2,437,394 2,129,727 2,080,863 1,844,808 1,746,709 1,872,297 1,890,102 1,670,256 1,478,700 Contribution deficiency (excess) - - - - - - - - - - Covered Payroll $ 11,636,180 $ 10,376,230 $ 10,063,947 $ 8,871,369 $ 7,704,033 $ 7,889,154 $ 7,494,347 $ 7,358,842 $ 6,940,748 $ 6,663,230 Contributions as a percentage of Covered Payroll 22% 23% 21% 23% 24% 22% 25% 26% 24% 22 Page 173 Page 510 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REQUIRED SUPPLEMENTARY INFORMATION December 31, 2025 and 2024 Schedule of Changes in The District's Net OPEB Liability and Related Ratios Measurement Date: December 31, 2024 2023 2022 2021 2020 2019 2018 2017 Report Date: December 31, 2025 2024 2023 2022 2021 2020 2019 2018 Total OPEB Liability SerNce Cost $ 226,726 $ 318,131 $ 240,361 $ 201,835 $ 206,271 $ 168,811 $ 178,856 $ 170,473 Interest 527,533 569,226 612,305 629,595 621,983 476,373 457,563 448,374 Changes in Benefit Terms - 1,166,387 - - - - - - Differences Between Expected and Actual Experience (164,383) (1,796,719) (5,797) (271,987) (28,016) 1,814,336 (29,828) - ChangesofAssumptions (114,429) (130,113) 1,007,593 (73,387) (187,044) 306,886 (233,084) - Beneft Payments (357,730) (330,104) (360,962) (268,688) (281,328) (276,678) (244,700) (214,280) Implicit Rate Subsidy Credit (261,960) (428,378) (475,203) (545,407) (546,439) (270,562) (270,061) (254,930) Net Change in Total OPEB Liability $ (144,243) $ (631,570) $ 1,018,297 $ (328,039) $ (214,573) $ 2,219,166 $ (141,254) $ 149,637 Total OPEB Liability-Beginning of Year 8,537,167 9,168,737 8,150,440 8,478,479 8,693,052 6,473,886 6,615,140 6,465,503 Total OPEB Liability-End of Year(a) $ 8,392,924 $ 8,537,167 $ 9,168,737 $ 8,150,440 $ 8,478,479 $ 8,693,052 $ 6,473,886 $ 6,615,140 Plan Fiduciary Net Position Net Investment Income $ 338,249 $ 465,270 $ (675,758) $ 444,083 $ 378,904 $ 473,144 $ (110,318) $ 167,459 Contributions Employer-District's Contribution 482,734 450,104 475,962 381,988 391,334 376,674 294,698 256,280 Employer-Implicit Subsidy 261,960 428,378 475,203 545,407 546,439 270,562 270,061 254,930 Benefit Payments,Including Refunds of Employee Contributions (357,730) (330,104) (360,962) (268,688) (281,328) (276,678) (244,700) (214,280) Implicit Rate Subsidy Fulfilled (261,960) (428,378) (475,203) (545,407) (546,439) (270,562) (270,061) (254,930) AdministratiNe Expense (1,752) (1,686) (1,638) (1,259) (1,353) (1,209) (557) (519) Net Change in Plan Fiduciary Net Position $ 461,501 $ 583,584 $ (562,396) $ 556,124 $ 487,557 $ 571,931 $ (60,877) $ 208,940 Plan Fiduciary Net Position-Beginning of Year 3,782,334 3,198,750 3,761,146 3,205,022 2,717,465 2,145,534 2,206,411 1,997,471 Plan Fiduciary Net Position-End of Year $ 4,243,835 $ 3,782,334 $ 3,198,750 $ 3,761,146 $ 3,205,022 $ 2,717,465 $ 2,145,534 $ 2,206,411 District's Net OPEB liability-End of Year=(a)-(b) $ 4,149,089 $ 4,754,833 $ 5,969,987 $ 4,389,294 $ 5,273,457 $ 5,975,587 $ 4,328,352 $ 4,408,729 Plan Fiduciary Net Position as a Percentage of the Total OPEB Liability 50.6% 44.3% 34.9% 46.1% 37.8% 31.3% 33.1% 33.4% Covered-Employee Payroll $ 10,815,818 $ 10,089,758 $ 7,722,728 $ 7,331,605 $ 7,149,490 $ 7,604,103 $ 7,400,587 $ 7,202,518 District's Net OPEB Liability as a Percentage of Covered-Employee Payroll 38.4% 47.1% 77.3% 59.9% 73.8% 78.6% 58.5% 61.2% Notes to Schedule:The District adopted GASB 75 for the fiscal Year Ending December 31,2018 Page 174 Page 511 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REQUIRED SUPPLEMENTARY INFORMATION December 31, 2025 and 2024 Other Post Employment Benefits-Schedule of Investment Returns Measurement Date: December 31, 2024 2023 2022 2021 2020 2019 2018 2017 2016 Report Date: December3l, 2025 2024 2023 2022 2021 2020 2019 2018 2017 Annual Money-Weighted Rate of Return,Net of Imestment Expense 8.80% 14.28% -17.70% 13.62% 13.67% 21.56% 4.94% 8.30% Not Available The annual money-weighted rate of return,net of investment expenses,is the net investment income for the year divided by the average net position for the year(less investment expenses). Notes to Schedule:The District adopted GASB 75 for the fiscal Year Ending December 31,2018 Other Post Employment Benefits-Schedule of Contributions Measurement Date: December3l, 2024 2023 2022 2021 2020 2019 2018 2017 2016 Report Date: December3l, 2025 2024 2023 2022 2021 2020 2019 2018 2017 Actuarially Determined Contribution $ 748,689 $ 962,408 $ 703,649 $ 836,165 $ 814,095 $ 827,767 $ 647,240 $ 614,761 $ 569,210 Less:Actual Contributions 791,873 744,694 878,482 951,165 927,395 937,773 647,236 564,759 511,210 Contribution Deficiency(Excess) $ (43,184) $ 217,714 $ (174,833) $ (115,000) $ (113,300) $ (110,006) $ 4 $ 50,002 $ 58,000 Covered-Employee Payroll $11,541,878 $10,815,818 $1Q,089,758 $ 7,722,728 $ 7,331,605 $ 7,149,490 $ 7,604,103 $ 7,400,587 $ 7,202,518 Contributions as a Percentage of Covered-Employee Payroll 6.86% 6.89% 8.71% 12.32% 12.65% 13.12% 8.51% 7.63% 7.10% Notes to Schedule:The District adopted GASB 75 for the fiscal Year Ending December 31,2018 Page 175 Page 512 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT REQUIRED SUPPLEMENTARY INFORMATION December 31, 2025 and 2024 Other Post Employment Benefits -Actuarial Assumptions Actuarial methods and assumptions used to set the actuarially determined contributions for fiscal year 2025 were from the December 31, 2024 valuation. Methods and assumptions used to determine contributions: Assumptions and Methods Actuarial Cost Method Entry age normal, level percent of pay Amortization Method Closed period, level percent of pay Amortization Period 11 years Inflation 2.30% Assumed Payroll Growth Year 1 2.80% Healthcare Trend Rates 6.50%, trending down to 4.04% over 50 years Rate of Return on Assets 6.40% Discount Rate used to measure total OPEB liability 6.40% Mortality Rate CalPERS Rates utilizing the decrement table Mort and Disb Rates—PA Misc from the CalPERS OPEB assumption model revised November 17, 2021. Retirement Rates Rates based on CaIPERS assumption model revised November 17, 2021. Page 176 Page 513 of 563 iW all IF AAA s 00 AAA Photo: Town of Truckee Block.Party 2025 Page 514 of 563 SUPPLEMENTARY INFORMATION Page 515 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUPPLEMENTARY INFORMATION December 31, 2025 CONSOLIDATING STATEMENT OF NET POSITION —PAGE 1 OF 2 CONSOLIDATING STATEMENT OF NET POSITION As of December 31,2025 Component Units 9ectric Operations Water Operations Gray's Grossing Old Greenwood Dirrinations Totals ASSETS AND DEFERRED OUTFLOWS OF RESOURCES CURRENT ASSETS Cash and cash equivalents Operating $ 9,319,622 $ 6,027,032 $ 36,546 $ 231,064 $ $ 15,614,264 Designated 32,238,213 7,316,444 - - 39,554,657 Restricted 901,097 2,082,540 1,889,715 4,873,352 Total cash and cash equivalents 42,458,932 15,426,016 1,926,261 231,064 60,042,273 Accounts receivable,net 2,104,546 882,757 - - 2,987,303 Unbilled revenues 3,053,931 1,392,116 - - 4,446,047 Special assessments receivable - 4,798 10,102,442 907,262 11,014,502 Accrued interest receivable 167,808 118,992 5,316 841 292,957 Leases receivable current portion - 46,892 - - 46,892 Materials and supplies 3,460,768 337,787 3,798,555 Repaid expenses 1,422,090 987,749 2,409,839 Other 73,723 78,118 - 151,841 Total Current Assets 52,741,798 19,275,225 12,034,019 1,139,167 85,190,209 NON-CURRENT ASSETS Operating Investments - 1,395,831 - - 1,395,831 Designated Investments 2,049,524 - 2,049,524 Leases receivable,net of current portion - 1,345,590 1,345,590 Capital Assets Utility plant 112,866,655 162,998,478 275,865,133 Accumulated depreciation and amortization (44,133,681) (77,070,787) (121,204,468) Construction work in progress 5,021,286 495,823 5,517,109 Total capital assets 73,754,260 86,423,514 160,177,774 Total Non-Current Assets 75,803,784 89,164,935 164,968,719 TOTAL ASSETS 128,545,582 108,440,160 12,034,019 1,139,167 250,158,928 DEFERRED OUTFLOWS OF RESOURCES Pension 2,512,078 1,674,718 - - 4,186,796 OPEB 996,653 664,435 1,661,088 Unamortized loss on refunding - 314,362 314,362 Total deferred outflows of resources 3,508,731 2,653,515 - 6,162,246 TOTAL ASSETS AND DEFERRED OUTFLOWS OF RESOURCES $ 132,054,313 $ 111,093,675 $ 12,034,019 $ 1,139,167 $ $ 256,321,174 Page 179 Page 516 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUPPLEMENTARY INFORMATION December 31, 2025 CONSOLIDATING STATEMENT OF NET POSITION -PAGE 2 OF 2 As of Decem be 31,2025 Component Units Dectric Operations Water Operations Gray's Crossing Old Greenwood Dininations Totals LIABILITIES,DEFERRED INFLOWS OF RESOURCES AND NET POSITION CURRENT LIABILITIES Other liabilities Accounts payable $ 4,077,637 $ 577,029 $ $ $ $ 4,654,666 Customer deposits 457,538 147,210 604,748 Subscription software liability,current portion 75,259 40,524 115,783 Compensated absences,current portion 464,022 372,437 836,459 Other 697,234 9,914 707,148 Total other liabilities 5,771,690 1,147,114 6,918,804 Current liabilities payable from restricted assets: Current portion of long-term debt 160,000 1,000,000 1,525,000 655,600 3,340,600 Accrued interest payable 33,648 123,055 415,577 80,063 652,343 Total Current Liabilities Payable from Restricted Assets 193,648 1,123,055 1,940,577 735,663 3,992,943 Total Current Liabilities 5,965,338 2,270,169 1,940,577 735,663 10,911,747 NON-CURRENT LIABILITIES Long-term debt,net of discounts and premiums 6,091,222 22,577,870 21,054,741 5,090,600 54,814,433 Subsrciption software liability,net of current portion 96,163 51,780 - - 147,943 Compensated absences,net of current portion 838,794 771,561 1,610,355 Net pension liability 9,459,784 6,306,522 15,766,306 OPEB liability 2,489,453 1,659,636 - - 4,149,089 Unearned revenues 3,411,581 1,231,364 1,750,933 446,764 6,840,642 Total non-current liabilities 22,386,997 32,598,733 22,805,674 5,537,364 83,328,768 Total Liabilities 28,352,335 34,868,902 24,746,251 6,273,027 94,240,515 DEFERRED INFLOWS OF RESOURCES Pension 1,361,182 907,454 - - 2,268,636 OPEB 1,153,933 769,289 1,923,222 Leases receivable - 1,178,707 1,178,707 Total deferred inflows of resources 2,515,115 2,855,450 5,370,565 NET POSITION Net investment in capital assets 66,922,355 62,948,094 (22,579,741) (5,746,200) 101,544,508 Restricted for debt service 866,714 1,964,960 2,951,845 - 5,783,519 Unrestricted 33,397,794 8,456,269 6,915,664 612,340 49,382,067 Total Net Position 101,186,863 73,369,323 (12,712,232) (5,133,860) 156,710,094 TOTAL LIABILITIES, DEFERRED INFLOWS OF RESOURCES AND NET POSITION $ 132,054,313 $ 111,093,675 $ 12,034,019 $ 1,139,167 $ $ 256,321,174 Page 180 Page 517 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUPPLEMENTARY INFORMATION December 31, 2025 CONSOLIDATING STATEMENT OF REVENUES, EXPENSES, AND CHANGES IN NET POSITION For the Year Ended December 31,2025 Component Units Electric Operations Water Operations Gray's Crossing Old Greenwood Biminations Totals OPERATING REVENUES Sales to customers $ 37,871,146 20,407,703 $ $ $ $ 58,278,849 Interdepartmental sales 1,547,947 3,800 (1,551,747) - Standby fees 15,650 95,120 110,770 Cap and invest proceeds 291,328 - 291,328 Other 1,264,512 382,295 (607,500) 1,039,307 Total Operating Revenues 40,990,583 20,888,918 (2,159,247) 59,720,254 OPERATING EXPENSES Purchased power 12,802,795 - 12,802,795 Operations and maintenance 8,704,681 8,670,445 (1,551,747) 15,823,379 Consumer services 2,024,074 1,078,553 3,102,627 Administration and general 6,024,889 4,167,098 (607,500) 9,584,487 Depreciation and amortization 3,609,514 5,324,135 8,933,649 Total Operating Expenses 33,165,953 19,240,231 (2,159,247) 50,246,937 Operating Income 7,824,630 1,648,687 9,473,317 NON-OPERATING REVENUE(D(PENSES) Special tax revenue - - 3,467,535 878,816 4,346,351 Investment income(loss) 1,827,198 819,121 127,779 22,674 2,796,772 Interest expense (283,617) (1,024,565) (1,297,190) (257,220) (2,862,592) Amortization credit(expense) 10,289 40,969 (5,205) - 46,053 Other non-operating revenues - - 37,988 7,173 45,161 Other non-operating expenses - - (156,629) (37,199) (193,828) Gain on disposition of assets 5,126 6,494 11,620 Total Non-Operating Revenue(Expenses) 1,558,996 (157,981) 2,174,278 614,244 4,189,537 Income Before Contributions 9,383,626 1,490,706 2,174,278 614,244 13,662,854 CAPITAL CONTRIBUTIONS 852,804 614,868 - 1,467,672 CHANGE IN NET POSITION 10,236,430 2,105,574 2,174,278 614,244 15,130,526 NET POSITION-Beginning of Year 90,950,433 71,263,749 (14,886,510) (5,748,104) 141,579,568 NET POSITION-END OF YEAR $ 101,186,863 $ 73,369,323 $ (12,712,232) $ (5,133,860) $ $ 156,710,094 Page 181 Page 518 of 563 THIS PAGE IS INTENTIONALLY LEFT BLANK Page 519 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUPPLEMENTARY INFORMATION December 31, 2025 CONSOLIDATING STATEMENT OF CASH FLOWS—PAGE 1 OF 2 For the Year Ended Decem be 31,2025 Component Units Electric Operations Water Operations Gray's Crossing Old Greenwood Biminations Total CASH FLOWS FROM OPERATING ACTIVITIES Received from customers $ 40,950,326 $ 20,980,837 $ $ $ (2,159,247) $ 59,771,916 Paid to suppliers for goods and services (22,962,403) (9,286,481) 2,159,247 (30,089,637) Paid to employees for services (7,875,603) (4,268,271) - (12,143,874) Net cash provided by operating activities 10,112,320 7,426,085 17,538,405 CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES Capital expenditures for utility plant (8,601,238) (5,071,331) (13,672,569) Net proceeds(cost)from disposal of assets 5,126 2,592 7,718 Capital contributions,connection and facility fees 1,628,094 914,366 2,542,460 Special tax receipts - - 2,453,191 825,846 3,279,037 Principal payments on subscription liability (100,200) (53,954) - - (154,154) Interest payments on subscription liability (13,160) (7,086) (20,246) Principal payments on long-term debt (165,289) (965,000) (1,390,000) (611,100) (3,131,389) Interest payments on long-term debt (266,641) (1,025,587) (1,322,420) (265,735) (2,880,383) Net cash used by capital and related financing activities (7,513,308) (6,206,000) (259,229) (50,989) (14,029,526) CASH FLOWS FROM INVESTING ACTIVITIES Purchases of investments Maturity of non-cash investment 2,400,000 1,600,000 - - 4,000,000 Interest income received 1,643,052 698,097 126,784 22,223 2,490,156 Net cash provided by investing activities 4,043,052 2,298,097 126,784 22,223 6,490,156 Net increase(decrease)in cash and cash equivalents 6,642,064 3,518,182 (132,445) (28,766) 9,999,035 CASH AND CASH EQUIVALENTS—Beginning of Year 35,752,535 11,878,893 2,058,706 259,830 49,949,964 CASH AND CASH EQUIVALENTS—END OF YEAR $ 42,394,599 $ 15,397,075 $ 1,926,261 $ 231,064 $ $ 59,948,999 Page 183 Page 520 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT SUPPLEMENTARY INFORMATION December 31, 2025 CONSOLIDATING STATEMENT OF CASH FLOWS—PAGE 2 OF 2 For the Year Ended December 31,2025 Component Units Electric Operations Water Operations Gray's Crossing Old Greenwood Eliminations Total RECONCILIATION OF OPERATING INCOME TO NET CASH PROVIDED BY OPERATING ACTIVITIES Operating income $ 7,824,630 $ 1,648,687 $ $ $ $ 9,473,317 Noncash items included in operating income Depreciation and amortization 3,609,514 5,324,134 8,933,648 Depreciation charged to other accounts 265,272 226,396 491,668 Pension GASB 68 valuation 408,072 272,046 680,118 OPEB GASB 75 valuation (105,634) (70,421) (176,055) Accounts receivable (34,424) 120,708 86,284 Materials and supplies (1,358,650) 27,748 (1,330,902) Prepaid expenses (852,403) (114,801) (967,204) Accounts payable 560,463 (38,020) 522,443 Customer deposits (5,833) 5,507 (326) Deferred inflow,leases amortization (74,542) (74,542) Leases receivable - 40,248 40,248 Other current liabilities (198,687) 58,395 (140,292) NET CASH PROVIDED BY OPERATING ACTIVITIES $ 10,112,320 $ 7,426,085 $ $ $ $ 17,538,405 RECONCILIATION OF CASH AND CASH EQUIVALENTS TO THE BALANCE SHEET Operating 9,319,622 6,027,032 36,546 231,064 $ $ 15,614,264 Designated 32,238,213 7,316,444 - - 39,554,657 Restricted bond funds-current 901,097 2,082,540 1,889,715 4,873,352 Operating investments-non-current - 1,395,831 - 1,395,831 Designated investments-non-current 2,049,524 - - - 2,049,524 Total Cash and Investments 44,508,456 16,821,847 1,926,261 231,064 63,487,628 Less: Long-term investments (2,049,524) (1,395,831) - - (3,445,355) Mark to market adjustment (64,333) (28,941) (93,274) TOTAL CASH AND CASH EQUIVALENTS $ 42,394,599 $ 15,397,075 $ 1,926,261 $ 231,064 $ $ 59,948,999 Page 184 Page 521 of 563 STATISTICAL SECTION AMA j: y • Photo: Pole Top Change Out 2025 Page 85 Page 522 of 563 STATISTICAL SECTION INTRODUCTION AND CONTENTS INDEX This part of the District's comprehensive annual financial report presents detailed information as a context for understanding what the information in the financial statements, note disclosures, and required supplementary information says about the District's overall financial health. Contents Page Range Financial Trends 87- 88 Information trends to help the reader understand how the District's financial performance and condition have changed over time. Revenue Capacity 89- 91 Information trends to help the reader understand the District's revenue sources. Debt Capacity 92 - 93 Current and past trends regarding the level of debt existing and the Debt capacity of the District. Demographic and Economic Information 94- 95 These schedules help the reader understand the environment within which the District's financial activities occur. Operating Information 96- 98 Service and infrastructure information to help the reader understand the District's customers and operational impacts on financial information. Page 86 Page 523 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT CONSOLIDATED STATEMENTS OF REVENUES, EXPENSES AND CHANGES IN NET POSITION 10-Years Ended December 31, 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 OPERATING REVENUES Sales to customers $ 58,278,849 $ 53,489,217 $ 50,221,144 $ 46,272,358 $ 41,835,534 $ 38,988,024 $ 37,029,653 $ 35,486,412 $ 34,462,146 $ 33,026,587 Standby fees 110,770 115,480 116,041 122,811 124,130 133,470 137,580 143,320 154,970 160,670 Cap and invest proceeds 291,328 518,027 401,879 514,604 847,185 1,444,498 1,503,495 1,186,320 1,140,372 1,172,306 Other 1,039,307 1,084,220 1,271,129 1,118,386 693,618 1,176,035 662,843 868,965 2,577,865 1,244,146 Total Operating Revenues 59,720,254 55,206,944 52,010,193 48,028,159 43,500,467 41,742,027 39,333,571 37,685,017 38,335,353 35,603,709 OPERATING EXPENSES Purchased power 12,802,795 13,164,111 14,068,454 16,823,869 13,560,417 11,285,537 10,754,898 11,001,858 11,327,300 11,511,308 Operations and maintenance 15,823,379 15,651,928 15,596,569 12,037,231 12,464,186 11,340,451 9,768,460 9,056,263 10,241,955 6,951,273 Consumer services 3,102,627 3,188,986 2,751,310 2,370,280 2,255,853 2,080,714 2,667,957 2,152,817 2,593,005 2,130,422 Administration and general 9,584,487 9,299,233 8,393,055 6,541,824 6,366,879 6,165,611 5,772,396 5,002,288 5,008,231 4,331,827 Pension expense(1) 1,220,591 OPEB expense(1) 719,218 Depreciation 8,933,649 8,486,970 8,004,903 7,712,381 7,917,950 7,974,868 7,420,251 6,878,860 6,531,640 6,237,033 Total Operating Expenses 50,246,937 49,791,228 48,814,291 45,485,585 42,565,285 38,847,181 36,383,962 34,092,086 35,702,131 33,101,672 Operating Income 9,473,317 5,415,716 3,195,902 2,542,574 935,182 2,894,846 2,949,609 3,592,931 2,633,222 2,502,037 NON-OPERATING REVENUE(EXPENSES) Special tax revenue 4,346,351 4,089,573 3,818,572 3,655,524 3,431,174 3,375,327 3,352,289 3,268,849 3,342,077 3,290,186 Investment income 2,796,772 2,807,224 2,728,794 (747,522) (185,269) 573,668 1,038,582 694,432 420,490 390,310 Interest expense (2,862,592) (3,005,955) (3,154,114) (2,727,946) (2,369,633) (2,530,616) (2,647,817) (2,753,906) (2,868,084) (3,060,079) Amortization 46,053 46,053 46,053 3,901 (38,250) (38,250) (38,250) (38,250) (38,250) (17,804) Other non-operating revenues 45,161 54,705 23,967 1,726,783 83,524 41,766 48,096 21,332 42,057 63,008 Other non-operating expenses (193,828) (127,289) (10,403) (690,460) (79,025) (238,590) (38,160) (31,691) (26,377) (150,000) Gain(loss)on disposition of assets 11,620 18,278 30,265 48,087 48,339 238,885 13,748 1,284 7,538 (1,514) Total Non-Operating Revenue,Net 4,189,537 3,882,589 3,483,134 1,268,367 890,860 1,422,190 1,728,488 1,162,050 879,451 514,107 Income Before Contributions 13,662,854 9,298,305 6,679,036 3,810,941 1,826,042 4,317,036 4,678,097 4,754,981 3,512,673 3,016,144 CAPITAL&OTHER CONTRIBUTIONS 1,467,672 2,470,367 2,368,362 3,221,872 6,351,674 2,043,795 4,683,099 4,652,720 2,096,828 1,699,110 CHANGE IN NET POSITION 15,130,526 11,768,672 9,047,398 7,032,813 8,177,716 6,360,831 9,361,196 9,407,701 5,609,501 4,715,254 Net Position-Beginning of Year,before adjustment 141,579,568 129,810,896 121,846,435 114,813,622 106,635,906 100,275,075 90,913,879 84,857,643 79,248,142 74,532,888 Less: Restatement for change in - - (1,082,937) - - - (3,351,465) - accounting principal(2)(3) Net Position-Beginning of Year,as adjusted 141,579,568 129,810,896 120,763,498 114,813,622 106,635,906 100,275,075 90,913,879 81,506,178 79,248,142 74,532,888 NET POSITION-END OF YEAR $156,710,094 $141,579,568 $129,810,896 $121,846,435 $114,813,622 $106,635,906 $100,275,075 $ 90,913,879 $ 84,857,643 $ 79,248,142 (1)Pension and OPEB costs separately stated in 2015 and 2016. For all other years,these costs are included Operations and maintenance,Consumer services,and Administration and general categories,as applicable. (2)In 2018,the District adopted GASB Statement No 75,Accounting and Financial Reporting for Postemployment Benefits other than Pensions. The beginning of year net position was adjusted for this change. (3)In 2023,the District adopted GASB Statement No 101,Compensated Absences. The beginning of year net position was adjusted for this change. Page 187 Page 524 of 563 TRUCKEE DONNER PUBLIC UTILITY DISTRICT NET POSITION BY COMPONENT AND SEGMENT 10-Years as of December 31, 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 NET POSITION by COMPONENT,as of December 31, Net investment in capital assets $ 101,544,508 $100,719,586 $ 92,055,779 $ 88,640,941 $ 86,889,607 $ 79,111,738 $ 74,841,974 $ 66,843,642 $ 55,267,086 $ 52,052,148 Restricted 5,783,519 6,419,793 6,129,427 6,896,168 7,248,976 11,439,913 11,052,666 9,742,741 9,288,950 8,773,009 Unrestricted 49,382,067 34,440,189 31,625,690 26,309,326 20,675,039 16,084,255 14,380,435 14,327,496 20,301,607 18,422,985 Net Position,Total $ 156,710,094 $141,579,568 $ 129,810,896 $ 121,846,435 $114,813,622 $106,635,906 $100,275,075 $ 90,913,879 $ 84,857,643 $ 79,248,142 CHANGE IN NET POSITION to PRIOR YEAR,Amount Net investment in capital assets $ 824,922 $ 8,663,807 $ 3,414,838 $ 1,751,334 $ 7,777,869 $ 4,269,764 $ 7,998,332 $ 11,576,556 $ 3,214,938 $ 5,008,831 Restricted (636,274) 290,366 (766,741) (352,808) (4,190,937) 387,247 1,309,925 453,791 515,941 203,308 Unrestricted 14,941,878 2,814,498 5,316,364 5,634,287 4,590,784 1,703,820 52,939 (5,974,111) 1,878,622 (496,885) Total Change in Net Position from Prior Year $ 15,130,526 $ 11,768,671 $ 7,964,461 $ 7,032,813 $ 8,177,716 $ 6,360,831 $ 9,361,196 $ 6,056,236 $ 5,609,501 $ 4,715,254 CHANGE IN NET POSITION to PRIOR YEAR,Percentage Net investment in capital assets 0.8% 9.4% 3.9% 2.0% 9.8% 5.7% 12.0% 20.9% 6.2% 10.6% Restricted -9.9% 4.7% -11.1% 4.9% -36.6% 3.5% 13.4% 4.9% 5.9% 2.4% Unrestricted 43.4% 8.9% 20.2% 27.3% 28.5% 11.8% 0.4% -29.4% 10.2% -2.6% Total Change in Net Position from Prior Year 10.7% 9.1% 6.5% 6.1% 7.7% 6.3% 10.3% 7.1% 7.1% 6.3% For more information on the change in Net Position;refer to prior page for 10 Years of CONSOLIDATED STATEMENTS OF REVENUES,EXPENSES AND CHANGES IN NET POSITION NET POSITION,BY COMPONENT,BY SEGMENT,as of December 31 Net investment in capital assets Electric Operations $ 66,922,355 $ 68,790,252 $ 63,576,397 $ 60,810,337 $ 61,480,384 $ 59,467,730 $ 56,177,123 $ 50,048,040 $ 43,501,844 $ 42,500,995 Water Operations 62,948,094 62,251,170 60,636,313 61,705,531 60,813,445 56,437,825 56,721,963 56,123,709 52,216,044 50,920,550 Gray's Crossing CFD (22,579,741) (23,964,536) (25,229,331) (26,419,127) (27,463,922) (28,408,717) (29,263,512) (30,163,307) (30,948,102) (31,557,897) Old Greenwood CFD (5,746,200) (6,357,300) (6,927,600) (7,455,800) (7,940,300) (8,385,100) (8,793,600) (9,164,800) (9,502,700) (9,811,500) Net investment in capital assets,total $ 101,544,508 $100,719,586 $ 92,055,779 $ 88,640,941 $ 86,889,607 $ 79,111,738 $ 74,841,974 $ 66,843,642 $ 55,267,086 $ 52,052,148 Restricted Electric Operations $ 866,714 $ 1,265,651 $ 902,528 $ 872,435 $ 1,068,491 $ 2,354,515 $ 2,455,342 $ 1,777,693 $ 1,842,553 $ 1,316,355 Water Operations 1,964,960 2,234,335 2,331,910 2,932,265 3,351,806 6,273,747 5,803,021 5,114,785 4,576,780 4,695,114 Gray's Crossing CFD 2,951,845 2,919,807 2,894,989 3,091,468 2,828,679 2,811,651 2,794,303 2,850,263 2,869,617 2,761,540 Old Greenwood CFD - - - - - - Restricted,total $ 5,783,519 $ 6,419,793 $ 6,129,427 $ 6,896,168 $ 7,248,976 $ 11,439,913 $ 11,052,666 $ 9,742,741 $ 9,288,950 $ 8,773,009 Unrestricted Electric Operations $ 33,397,794 $ 20,894,530 $ 18,847,485 $ 16,701,721 $ 13,651,321 $ 10,294,409 $ 8,653,888 $ 8,594,312 $ 10,762,466 $ 7,920,940 Water Operations 8,456,269 6,778,244 6,676,089 4,198,202 1,687,142 600,254 519,901 734,026 4,682,775 5,875,984 Gray's Crossing CFD 6,915,664 6,158,219 5,469,065 4,803,982 4,749,096 4,635,070 4,670,778 4,442,898 4,256,091 3,976,683 Old Greenwood CFD 612,340 609,196 633,051 605,421 587,480 554,522 535,868 556,260 600,275 649,378 Unrestricted,total $ 49,382,067 $ 34,440,189 $ 31,625,690 $ 26,309,326 $ 20,675,039 $ 16,084,255 $ 14,380,435 $ 14,327,496 $ 20,301,607 $ 18,422,985 Page 88 Page 525 of 563 Truckee Donner Public Utility District Electric and Water-Account Type Mix and Rates Last 11 Years Electric Utility Average Number of Accounts Typical Residential Avera a Monthly Bill Average Residential Residential Non- Rate Year Primary Secondary Residential Total Residential I Primary Secondary Primary Secondary Increase Non-Residential @ 500 KwH @ 500 KwH @ 785 KwH @ 420 KwH Prim.i Secon. (1) (1) (2) Mix (3) (3) (4) (4) (5) 2025 5,207 7,969 1,683 14,859 89%111% $123.97 $136.77 $177.09 $119.81 12.0%112.0% 2024 5,189 7,929 1,680 14,798 89%i11% $110.67 $122.12 $158.09 $106.98 12.0%112.0% 2023 5,160 7,868 1,654 14,682 89%111% $98.83 $109.03 $141.18 $95.51 6.5%16.7% 2022 5,129 7,812 1,661 14,602 89%i 11% $92.18 $102.48 $132.56 $89.50 8.3%1 9.0% 2021 4,971 7,789 1,656 14,416 89%i 11% $84.70 $94.20 $122.41 $82.10 2.0%1 3.0% 2020 4,898 7,659 1,619 14,176 89%111% $82.33 $91.83 $120.04 $79.73 1.8%12 7% 2019 4,810 7,565 1,585 13,960 89%i11% $80.25 $89.75 $117.96 $77.65 2.4%13.7% 2018 4,798 7,462 1,558 13,818 89%111% $77.50 $87.00 $115.20 $74.89 1.9%13.0% 2017 4,784 7,389 1,535 13,708 89%111% $75.35 $84.85 $113.05 $72.74 1.7%12 6% 2016 4,738 7,303 1,527 13,568 89%i 11% $73.51 $83.01 $111.21 $70.90 0.0%1 0.0% 2015 4,642 7,235 1,512 13,389 89%111% $73.51 $83.01 $111.21 $70.90 0.0%10.0% (A): 5yrCAGR 1.2% 0.8% 0.8% 0.9% N/A 8.5% 8.3% 8.1% 8.5% N/A 10yrCAGR 1.2% 1.0% 1.1% 1.0% N/A 5.4% 5.1% 4.8% 5.4% N/A Water Utility Average Number of Accounts Typical Residential Average Monthly Bill-5000 Gallons of Use column Non- Excluding Including column column Annual Year Residential not used Residential Total Residential I PumpZone PumpZone not used not used Increase Non-Residential Charge Charge(PZC) Including (6) (2) Mix (7) (7) PZC 2025 12,949 791 13,740 94%1 6% $109.73 $118.15 6.9% 2024 12,907 782 13,689 94%1 6% $102.59 $110.53 9.7% 2023 12,845 764 13,609 94%1 6% $94.96 $100.76 6.3% 2022 12,754 772 13,526 94%1 6% $87.95 $94.80 9.0% 2021 12,635 765 13,400 94%1 6% $80.69 $86.97 10.7% 2020 12,505 748 13,253 94%1 6% $73.56 $78.58 3.3% 2019 12,261 865 13,126 93%1 7% $71.44 $76.05 3.5% 2018 12,317 709 13,026 95%1 5% $69.32 $73.51 3.4% 2017 12,218 706 12,924 95%1 5% $67.30 $71.07 5.3% 2016 12,121 706 12,827 94%1 6% $64.12 $67.47 5.8% 2015 12,012 704 12,716 94%1 6% $60.78 $63.75 4.8% (A) 5yr CAGR 0.7% 1.1% 0.7% N/A 8.3% 8.5% N/A 10yr CAGR 0.8% 1.2% 0.8% N/A 6.1% 6.4% N/A Source: Truckee Donner Public Utility District records Notes: (1) Two main residential rate categories;Primary(P)and Secondary(S);with mix currently 40%P and 60%S from 10 years ago 40%P and 60%S. Also see(6). (2) Non-Residential account type includes commercial businesses and governmental agencies. Commercial average monthly bills are not presented,as commercial accounts monthly bills vary widely by account based on meter size and usage. (3) Average for Primary and Secondary residential,at same KwH usage. Amounts for(3)and(4)include Public Benefit and Solar California mandates. (4) Average for Primary and Secondary residential,at 3 year average KwH usage for the account type P and S. Also see 2nd half of note(3). (5) Average annual rate increase for P I S based on(4)usage averages. (6) The average number of accounts is annual average for the year,the number of accounts each month varies. (7) Residential average includes Monthly Service Fee,Usage Fee based on Volume,and Pump Zone charge based on elevation zone. Pump Zone 1 charge is zero. Accounts are in 1 of 7 pump zones of District,based on elevation. The Including Pump Zone average is weighted average based on number of accounts per zone. (A) Compounded Annual Growth Rate(CAGR)metrics for 2025 compared to respective number of years(yr)prior Page 89 Page 526 of 563 Truckee Donner Public Utility District (TDPUD) Electric and Water Utilities - FY 2025 Regional Average Monthly Residential Bill Comparison Electric-Typical Monthly Bill* Water-Typical Monthly Bill SDG&E* $231.97 PG&E* $204.82 Alpine Springs CWD $152.91 SCE* $191.64 Liberty(Secondary) $151.61 Olympic Valley PSD $134.76 LADW P* $144.79 Liberty(Primary) $141.65 Tahoe City PUD $125.27 TDPUD Secondary(2) $136.77 Pasadena* $134.77 TDPUD Inc Pump(5) $118.08 TDPUD Blended(3) $131.65 Plumas-Sierra* $130.44 Donner Summit PUD $117.65 Modesto ID* $125.94 Shasta Lake* $125.55 Northstar CSD $112.11 TDPUD Primary(1) $123.97 SMUD* $115.34 TDPUD Exc Pump(4) $109.73 Redding $115.25 Imperial ID* $114.14 San Francisco PUC $102.83 Riverside* $111.28 Palo Alto* $110.87 North Tahoe PUD $99.57 Lod i* $108.36 Roseville $107.29 South Tahoe PUD - $77.21 Azusa $106.87 Merced I D* $101.30 Anaheim $99.35 Nevada Irrigation District $63.26 Turlock ID* $90.32 Sacramento SWD $59.99 Santa Clara $87.02 I I $0 $50 $100 $150 $200 $250 $0 $20 $40 $60 $80 $100 $120 $140 $160 $180 TDPUD compiled this information from a review of each respective District's website for applicable ordinances/rates information.Monthly bills assume a typical customer consumption of 500 kWh per month in electricity and 5,000 gallons per month in water. (1)Primary residence accounts 40% (4)Excluding Pump Zone charge (2)Second home residence accounts 60% (5)Including Pump Zone charge,the weighted average (3)Weighted average of(1)and(2) of the 7 pump zones. Note-Second homes average KwH usage is historically 54%of Primary homes KwH average usage Pump zone charges are based on water elevation zones of "Weighted average for utilities with Summer and Winter rates service territory. Page 90 Page 527 of 563 Truckee Donner Public Utility District Ten Largest Customers and Sales Mix Current Year and Nine Years Ago Electric Utility 2025 2016 Customer %of Total Customer %of Total Customer(1)(2) Revenue Rank Revenue Revenue Rank Revenue Tahoe Forest Hospital $ 1,504,192 1 4.0% $ 838,071 2 3.9% Tahoe Truckee Sanitation Agency 1,300,355 2 3.4% 886,945 1 4.1% Private Company,A 1,221,661 3 3.2% 0.0% Tahoe Truckee Unified School District 697,466 4 1.8% 377,912 3 1.7% Private Company, B 380,743 5 1.0% 270,781 5 1.2% Private Company, C 378,606 6 1.0% 263,220 6 1.2% Private Company, D 374,568 7 1.0% 222,596 9 1.0% Town of Truckee 347,848 8 0.9% 233,791 8 1.1% Truckee Donner Recreation and Park District 337,652 9 0.9% 0.0% Private Company, E 319,600 10 0.8% 253,119 7 1.2% Private Company, F 365,561 4 Private Company, G 193,030 10 Total,Top 10 Customers $ 6,862,689 18.1% $ 3,905,025 18.0% Total Sales to Customers $ 37,871,146 100.0% $ 21,713,614 100.0% Residential $ 21,392,776 56.5% $ 12,556,528 57.8% Sales Mix Commercial $ 11,453,340 30.2% $ 6,082,512 28.0% Public Authorities $ 5,025,031 13.3% $ 3,074,574 14.2% Water Utility 2025 2016 Customer %of Total Customer %of Total Customer(1) Revenue Rank Revenue Revenue Rank Revenue Private Company, B $ 251,102 1 1.2% $ 146,974 1 1.3% Private Company, C 192,823 2 0.9% 129,333 2 1.1% Private Company, H 80,335 3 0.4% 44,755 5 0.4% Truckee Donner Recreation and Park District 73,790 4 0.4% 51,810 3 0.5% Tahoe Forest Hospital 70,886 5 0.3% 44,296 6 0.4% Town of Truckee 62,185 6 0.3% 0.0% Private Company, 1 57,246 7 0.3% 31,483 7 0.3% Tahoe Truckee Unified School District 56,444 8 0.3% 45,619 4 0.4% Private Company,J 52,550 9 0.3% 31,982 8 0.3% Donner Memorial State Park 45,803 10 0.2% 0.0% Private Company, K 30,079 9 0.3% Private Company, L 25,650 10 0.2% Total,Top 10 Customers $ 943,164 4.6% $ 581,981 5.1% Total Sales to Customers $ 20,407,701 100.0% $ 11,312,973 100.0% Residential Potable $ 18,064,886 88.5% $ 9,890,205 87.4% Sales Mix Non-Residential Potable $ 2,073,679 10.2% $ 1,267,214 11.2% Non-potable $ 269,137 1.3% $ 155,555 1.4% (1)To preserve confidentiality, private company customer names are not disclosed. (2)Electric Utility table excludes internal customer,Water Utility,with Revenue of$1.5 million in 2025 and 1.1 million in 2016.The Electric Utility revenue from Water Utility is eliminated on a Consolidated Financial Statement basis. Source: Truckee Donner Public Utility District Customer Service Department Page 91 Page 528 of 563 Truckee Donner Public Utility District Debt Coverage Last 10 Years Dollars in Thousands except for Coverage Ratio Electric Utility A B A -B = C D CID Total Total Net Revenues Debt Year Revenues Expenses Available For Service Coverage (1) (2) Debt Service Requirement(3) Ratio 2025 43,309 29,556 13,753 432 31.84 2024 40,064 29,581 10,483 429 24.42 2023 37,991 29,911 8,079 431 18.74 2022 33,539 29,439 4,101 655 6.26 2021 30,916 26,720 4,197 1,072 3.92 2020 30,409 23,010 7,399 1,058 6.99 2019 29,258 21,093 8,165 1,000 8.16 2018 27,782 20,237 7,545 1,429 5.28 2017 28,336 22,108 6,228 468 13.32 2016 25,628 20,223 5,405 1,000 5.40 Water Utility A B A -B = C D CID Total Total Net Revenues Debt Year Revenues Expenses Available For Service Coverage (1) (2) Debt Service Requirement(3) Ratio 2025 22,023 13,916 8,107 1,991 4.07 2024 20,831 13,757 7,074 1,984 3.56 2023 19,377 12,822 6,555 1,987 3.27 2022 17,986 10,137 7,849 1,305 6.01 2021 16,981 9,736 7,245 2,046 3.54 2020 15,107 9,599 5,508 2,024 2.72 2019 14,419 9,552 4,867 2,018 2.41 2018 13,769 8,662 5,107 2,016 2.53 2017 12,909 8,775 4,134 2,341 1.77 2016 12,908 8,171 4,737 2,389 1.98 (1) Includes interest income, facilities fees, and connection fees; Water excludes Donner Lake Assessment District special tax (assessment) revenues (2) Excludes depreciation, interest and amortization expense (3) Includes principal and interest of bond (certificates of participation, and other types)debt, parity and subordinate; Water excludes Donner Lake Assessment District SRF loan debt; includes credit offset for interest on parity debt reserve funds; excludes refunding activities. Page 192 Page 529 of 563 Truckee Donner Public Utility District Total Long-Term Debt per Account and Ratios Last 10 Years As of year ended December31, 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Electric Utility Total Debt($000s) (1) $6,423 $6,572 $6,848 $6,722 $552 $ 1,603 $2,604 $3,524 $4,804 $5,218 Number of Accounts 14,859 14,798 14,682 14,602 14,416 14,176 13,960 13,818 13,708 13,568 Debt per Account $432 $444 $466 $460 $38 $ 113 $ 187 $255 $350 $385 Debt to Total Revenue 19% 20% 20% 20% 2% 5% 9% 13% 17% 20% Debt to Net Capital 10% 10% 11% 11% 1% ° ° ° ° ° Assets 3/° 4/° 7/° 10/° 11/° Water Utility Total Debt($000s) (2) $23,670 $24,700 $25,759 $26,569 $ 11,022 $ 16,579 $ 18,845 $21,058 $23,217 $25,631 Number of Accounts 13,740 13,689 13,609 13,526 13,400 13,253 13,126 13,026 12,924 12,827 Debt per Account $ 1,723 $ 1,804 $ 1,893 $ 1,964 $823 $ 1,251 $ 1,436 $ 1,617 $ 1,796 $ 1,998 Debt to Total Revenue(2) 126% 131% 137% 141% 62% 104% 124% 145% 169% 187% Debt to Net Capital 28% 29% 30% 35% 15% 23% 25% 27% 31% 34% Assets Gray's Crosssing CFD Total Debt($000s) (3) $22,580 $23,965 $25,229 $26,419 $27,464 $28,409 $29,263 $30,163 $30,948 $31,558 Number of Parcels (5) 425 425 425 426 407 407 408 413 413 415 Debt per Parcel $53,129 $56,387 $59,363 $62,017 $67,479 $69,800 $71,724 $73,035 $74,935 $76,043 Old Greenwood CFD Total Debt($000s) (4) $5,746 $6,357 $6,928 $7,456 $7,940 $8,385 $8,794 $9,165 $9,503 $9,811 Number of Parcels (5) 1,223 1,262 1,262 1,262 1,254 1,254 1,238 1,238 1,231 1,231 Debt per Parcel $4,698 $5,037 $5,489 $5,908 $6,332 $6,687 $7,103 $7,403 $7,719 $7,970 ($000s) Total Utility Debt $30,093 $31,272 $32,607 $33,291 $ 11,574 $ 18,182 $21,449 $24,582 $28,021 $30,849 Total CFD Debt $28,326 $30,322 $32,157 $33,875 $35,404 $36,794 $38,057 $39,328 $40,451 $41,369 Total Debt, Consolidated L58 419 Lgil 594 LgL4 664 67 666 46 778 L5L4 776 L5L9 506 L63 110 L68 472 LZ2 218 (1)Electric Total Debt includes Pension Obligation Bonds, Installment Loan, SBITA debt, and Certificates of Participation debt. (2)Water Total Debt includes Certificates of Participation debt, CA Dept. of Water Resources loan, Installment loans, SBITA and Donner Lake Assessment District(DLAD)related State Re\rolving Fund (SRF)loan. Total Revenue for this report's Water Debt to Total Revenue includes DLAD tax assessment proceeds which applies the DLAD's SRF loan debt service of$800,852 for each year presented. (3)Gray's Crossing Community Facilities District (CFD)Debt is Special Tax Bonds-Mello Roos. (4)Old Greenwood Community Facilities District (CFD)Debt is Special Tax Bonds-Mello Roos. (5)Number of parcels subject to CFD Special Tax Mello Roos Bonds varies by year due to full pre-payments and parcel splits, and represents special tax assessment parcels. Page 193 Page 530 of 563 Truckee Donner Public Utility District Demographic and Economic Information Last 11 Years Town of Truckee(1) Per Capita TTUSD Labor Personal Personal School Year Force Unemployment Population Income Income Enrollment (2) (2) (3) (4) (5) (6) 2025 9,820 5.7% 16,928 $77,791 $1,316,846,048 4,175 2024 9,600 5.5% 16,923 $73,455 $1,243,078,965 4,135 2023 9,500 4.1% 16,702 $63,792 $1,065,453,984 4,176 2022 9,420 3.6% 16,693 $59,141 $987,240,713 4,165 2021 9,220 5.9% 16,213 $51,955 $842,346,415 4,159 2020 9,160 5.8% 16,735 $46,295 $774,746,825 4,193 2019 9,880 1.3% 16,434 $46,280 $760,565,520 4,168 2018 10,370 2.6% 16,309 $45,706 $745,419,154 4,133 2017 10,490 3.0% 16,277 $43,898 $714,527,746 4,153 2016 10,110 3.9% 16,231 $42,439 $688,827,409 4,010 2015 10,070 5.3% 16,184 $40,414 $654,060,176 3,978 (A) : 5yr CAGR 1.4% -0.3% 0.2% 10.9% 11.2% -0.1% 10yr CAGR -0.3% 0.7% 0.5% 6.8% 7.2% 0.5% Sources and Legend: (1) The Town of Truckee boundaries comprise approximately 95%of the District's service territory. (2) California Employment Development Department (3) California Department of Finance Projections for Town of Truckee (4) United States Census Data adjusted for inflation and Town of Truckee (5) Personal Income calculated as Population (3)multiplied by Per Capital Income(4) (6) California Ed-Data Partnership; Tahoe-Truckee Unified School District(TTUSD), Census Day Enrollment for school district's fiscal year (A) Compounded Annual Growth Rate (CAGR) metrics for 2025 compared to respective number of years(yr)prior Page 194 Page 531 of 563 Truckee Donner Public Utility District Principal Employers Current Year and Seven Years Ago 2025 2019 Percent Percent Number of of Total Number of of Total Employer Name Employees Employment Employees Employment Tahoe Forest Hospital District 865 8.8% 577 5.8% Tahoe-Truckee Unified School District* 632 6.4% 238 2.4% Town of Truckee 159 1.6% 128 1.3% Safeway* 117 1.2% 150 1.5% Mountain Hardware &Truckee Rents 97 1.0% Tahoe Donner Association 96 1.0% Truckee Donner Public Utility District 84 0.9% 70 0.7% Truckee Fire Protection District 70 0.7% Truckee-Donner Recreation & Park District 56 0.6% 31 0.3% Save Mart 35 0.4% 42 0.4% Mark Tanner Construction 65 0.7% Northstar Lodge (Welk Resorts) 180 1.8% Bar of America 22 0.2% Top 10 Employers, total 2,211 22.5% 1,503 15.2% Labor Force 9,820 100.0% 9,880 100.0% Sources and Comments: Source of Top 10 Employers is Town of Truckee's 2024/25 and 2018/19 Annual Comprehensive Financial Reports, and 2019 was the first year information provided and is based on direct inquiries to employers. Other than above from Town of Truckee, specific employer information is not publicly available to the District. Labor Force is from prior page. * Includes full & part-time employees Page 195 Page 532 of 563 Truckee Donner Public Utility District Operating Information Last 11 Years Electric Utility Water Utility Water IRS Number of KwH Capital Number of Production Capital Year W-2s FTEs Accounts Billed Assets, Net Accounts in Millions Assets, Net (1) (2) (Average) (000s) ($000s) (3) (Average) of Gallons ($000s) (3) 2025 89 84 14,859 160,458 $73,754 13,740 1,522 $86,424 2024 92 83 14,798 168,497 $68,386 13,689 1,614 $86,802 2023 90 80 14,682 166,385 $63,688 13,609 1,497 $84,983 2022 89 77 14,602 167,155 $60,988 13,526 1,556 $75,982 2021 90 70 14,416 163,176 $61,493 13,400 1,715 $71,390 2020 82 68 14,176 159,134 $59,493 13,253 1,713 $72,539 2019 89 73 13,960 156,714 $58,756 13,126 1,503 $75,056 2018 86 72 13,818 151,944 $53,535 13,026 1,579 $76,638 2017 77 74 13,708 156,562 $48,258 12,924 1,487 $74,857 2016 78 72 13,568 151,527 $47,660 12,827 1,460 $75,942 2015 83 73 13,389 140,819 $47,079 12,716 1,381 $75,338 (A) : 5yr CAGR 1.7% 4.3% 0.9% 0.2% 4.4% 0.7% -2.3% 3.6% 10yr CAGR 0.7% 1.5% 1.0% 1.3% 4.6% 0.8% 1.0% 1.4% Sources and Legend: (1) Number of Internal Revenue Service payroll W-2 forms issued for calendar/tax year (2) Full Time Equivalents (FTEs)calculated as payroll paid hours (work regular and overtime, vacation, sick, other)for year divided by 2080 (3) Capital Assets, Net as of year end is comprised of Gross Fixed Assets, less Accumulated Depreciation, plus Construction Work in Progress, presented as dollars in thousands ($000s) (A) Compounded Annual Growth Rate (CAGR) metrics for 2025 compared to respective number of years(yr) prior Page 196 Page 533 of 563 Truckee Donner Public Utility District Capital Assets by Function Last 10 Years Balance as of December 31, 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Plant Balances Electric distribution $ 93,470,272 $ 89,304,756 $ 84,810,518 $ 80,851,917 $ 76,021,243 $ 71,894,379 $ 67,692,719 $ 64,204,691 $ 60,416,920 $ 58,345,690 Water distribution 157,187,944 153,218,962 142,310,579 132,306,303 124,052,449 121,483,082 120,131,130 116,378,593 112,596,747 108,860,825 General plant 24,400,691 22,377,460 20,978,206 20,857,928 19,827,303 19,316,644 18,450,143 16,513,295 15,782,620 15,062,278 SBITA 806,226 627,600 627,600 Total 275,865,133 265,528,778 248,726,903 234,016,148 219,900,995 212,694,105 206,273,992 197,096,579 188,796,288 182,268,793 Accumulated Depreciation and Amortization Electric distribution (31,470,972) (29,381,810) (27,377,063) (25,615,227) (23,396,600) (21,385,441) (19,454,296) (19,488,505) (18,789,114) (17,045,716) Water distribution (73,491,183) (69,419,305) (64,952,166) (60,888,418) (56,654,194) (52,339,068) (48,269,854) (44,232,073) (40,260,086) (37,643,873) General plant (15,753,434) (14,891,329) (14,223,620) (13,519,645) (12,700,105) (11,522,788) (10,851,669) (10,372,265) (9,514,034) (8,683,151) SBITA (488,879) (346,597) (134,658) Total (121,204,468) (114,039,041) (106,687,507) (100,023,290) (92,750,899) (85,247,297) (78,575,819) (74,092,843) (68,563,235) (63,372,739) Plant Sub-Total Electric distribution 61,999,300 59,922,946 57,433,455 55,236,690 52,624,643 50,508,938 48,238,423 44,716,186 41,627,806 41,299,974 Water distribution 83,696,761 83,799,657 77,358,413 71,417,885 67,398,255 69,144,014 71,861,276 72,146,520 72,336,661 71,216,952 General plant 8,647,257 7,486,131 6,754,586 7,338,283 7,127,198 7,793,856 7,598,474 6,141,030 6,268,586 6,379,127 SBITA 317,347 281,003 492,942 Total 154,660,665 151,489,737 142,039,396 133,992,858 127,150,096 127,446,808 127,698,173 123,003,736 120,233,053 118,896,054 Construction work in progress 5,517,109 3,697,906 6,631,266 3,604,888 5,732,900 4,584,711 6,114,079 7,169,814 2,881,021 4,706,276 TOTALS $ 160,177,774 $ 155,187,643 $ 148,670,662 $ 137,597,746 $ 132,882,996 $132,031,519 $ 133,812,252 $ 130,173,550 $ 123,114,074 $ 123,602,330 Change to Prior Year 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Change in Plant Electric distribution $ 4,165,516 $ 4,494,238 $ 3,958,601 $ 4,830,674 $ 4,126,864 $ 7,689,688 $ 7,275,799 $ 3,787,771 $ 2,071,230 $ 3,624,075 Water distribution 3,968,982 10,908,383 10,004,276 8,253,854 2,569,367 5,104,489 7,534,383 3,781,846 3,735,922 1,855,247 General plant 2,023,231 1,399,254 1,399,254 1,030,625 510,659 2,803,349 2,667,523 730,675 720,342 1,174,397 SBITA 178,626 Total 10,336,355 16,801,875 14,710,755 14,115,153 7,206,890 15,597,526 17,477,704 8,300,291 6,527,495 6,653,719 Change in Accumulated Depreciation and Amortization Electric distribution (2,089,162) (2,004,747) (1,761,836) (2,218,627) (2,011,159) (1,896,936) (665,182) (699,391) (1,743,399) (1,069,787) Water distribution (4,071,878) (4,467,139) (4,063,748) (4,234,224) (4,315,126) (8,106,995) (8,009,768) (3,971,987) (2,616,213) (3,395,304) General plant (862,105) (667,709) (703,975) (819,540) (1,177,317) (1,150,523) (1,337,635) (858,231) (830,884) (865,200) SBITA (142,282) (211,939) (134,658) Total (7,165,427) (7,351,534) (6,664,217) (7,272,391) (7,503,602) (11,154,454) (10,012,584) (5,529,608) (5,190,496) (5,330,291) Change in Plant Sub-Total Electric distribution 2,076,354 2,489,491 2,196,765 2,612,047 2,115,705 5,792,752 6,610,617 3,088,380 327,831 2,554,288 Water distribution (102,896) 6,441,244 5,940,528 4,019,630 (1,745,759) (3,002,506) (475,385) (190,141) 1,119,709 (1,540,057) General plant 1,161,126 731,545 (583,697) 211,085 (666,658) 1,652,826 1,329,888 (127,556) (110,542) 309,197 SBITA 36,344 (211,939) 492,942 Total 3,170,928 9,450,341 8,046,538 6,842,762 (296,712) 4,443,072 7,465,120 2,770,683 1,336,999 1,323,428 Change in Construction work in progress 1,819,203 (2,933,360) 3,026,378 (2,128,012) 1,148,189 (2,585,103) 3,233,058 4,288,793 (1,825,255) (137,766) Change in Total Capital Assets $ 4,990,131 $ 6,516,981 $ 11,072,916 $ 4,714,750 $ 851,477 $ 1,857,969 $ 10,698,178 $ 7,059,475 $ (488,256) $ 1,185,662 Capital Expenditures from Cash Flow Statements 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 Electric (8,601,238) (7,787,320) (5,126,471) (2,684,787) (3,712,667) (3,754,601) (7,832,201) (7,397,001) (3,042,889) (3,086,341) Water (5,071,331) (6,762,873) (13,611,907) (8,292,286) (2,654,630) (2,553,607) (1,757,297) (4,212,526) (2,339,061) (4,334,811) Total (13,672,569) (14,550,193) (18,738,378) (10,977,073) (6,367,297) (6,308,208) (9,589,498) (11,609,527) (5,381,950) (7,421,152) Page 97 Page 534 of 563 Truckee Donner Public Utility District Base, Heating and Cooling Degree Days Electricity Imports by Year Separated into estimated load components 68, 66%I j 68% 67% 67% 67% 66% 67% 67% 71% Ln L 100,000- 7 O— ra (0 a N 28% 29% 27 0 Jg' 28% 26% 26% 50,000- 26% 24% 23% ro — c c Q 7% 6 6% 5% 6% 4% 6% 5% 01 2026 2027 2628 2019 2020 2022 2022 2023 2024 2025 ■ Cooling Loads e Heating Loads e Base Loads Degree Days Below history plot of all days last six years, provides the basis for degree day estimated balance point of 52 degrees. Weather Sensitivity in TDPUD Loads Analyzing System Balance Point(Data spans 2016-YTD 2026) 700 �' • '•� ' lb 600- !«y • • Balance Point=52 Deg F Ln .. • .•�' . w . Vl . ••i:4 � lt�� L 500- . ••' '�• : • 0) ti�' f - . 300 0 20 40 60 80 Mean Daily Drybulb Temp [F] Page 198 Page 535 of 563 END OF REPORT THANK YOU FOR READING TRUCKEE DONNER Public Utility District OFF a a -.A Truckee Donner Public Utility District 11570 Donner Pass Road Truckee, CA 96161 Phone (530) 587-3896 Website TDPUD.ORG T ~3 i ` • �. Page 199 Page 536 of 563 i; TRUCKEE DONNER Public Utility District PUBLIC UTILITY DISTRICT La� I •z PREPRRED --i f—i e-- f 4� r �'rt TRUCKEE DONNER AGENDA ITEM #15 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Chad Reed, Water Utility Director TJ Dwyer, Water Operations Manager SUBJECT: Consideration to Approve the District's 2025 Water Utility Annual Consumer Confidence Reports r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Review the Truckee Donner Public Utility District's Main System and Hirschdale System's 2025 Water Quality Consumer Confidence Reports and provide feedback to staff and direct staff to file with the State Water Resource Control Boards. BACKGROUND: The District's mission is to "provide reliable, high-quality utility and customer services while managing District resources in a safe, open, responsible, and environmentally sound manner at the lowest practical cost." A key component of this mission, and a goal of the District's Strategic Plan, is to engage with customers in a welcoming and transparent way. The 1996 amendment to the U.S. Environmental Protection Agency's Safe Drinking Water Act (SDWA) requires urban water systems to deliver an annual water quality report, known as the Consumer Confidence Report (CCR). This report provides a summary of key water information, including the source of the water, levels of any detected contaminants, and compliance with regulatory standards. Each year, the District prepares separate CCRs for the Truckee Main System and the Hirschdale System. The State Water Resources Control Board (SWRCB) requires the District to deliver these reports to customers by July 1 st. Since 2012, the SWRCB has allowed the District to provide notification via "one-click" web link to the CCR on the District's website as an alternative to mailing printed copies. This transition to online access to the CCR has resulted in significant cost savings and reductions in printed paper notifications. ANALYSIS AND BODY: Page 1 of 2 Page 538 of 563 The District's Water Department staff have prepared the 2025 Consumer Confidence Reports for the Truckee-Main System (Attachment 1) and the Hirschdale System (Attachment 2). These reports provide a verified snapshot of the high-quality water delivered to TDPUD customers during the 2025 calendar year. The Truckee community continues to benefit from a reliable and sustainable high- quality water supply. The Truckee-Main System is sourced from 10 deep groundwater wells, while the Hirschdale System is served by a single well. Both systems produce potable water with no reportable violations over the Maximum Contaminant Level (MCL) as established by State and Federal regulatory agencies. To ensure transparency and customer awareness, notifications regarding the availability of the 2025 CCRs will be included in May/June water bills via a "one-click" URL on the bill or electronic notification. Customers will be directed to access the reports via a "one-click" link on the District's homepage, and printed copies will remain available upon request at the District office. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 2. Environmental Stewardship: Create a sustainable resilient environment for all our communities. 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. FISCAL IMPACT: There is no direct fiscal impact with this item. However, associated costs with preparing and distributing the 2025 Consumer Confidence Reports are accounted for in the Board-approved Fiscal Year 2026 (FY26) Water Operations Budget. ATTACHMENTS: 1. Main 2025 CCR 2 2. Hirschdale 2025 CCR Final Page 2 of 2 Page 539 of 563 4 TRUCKEE DONNER Public Utility District 2025 WATER QUALITY REPORT Truckee Main System PWS# 2910003 Customer Views Are Welcome 0���i�%��®'0 For more information about The Truckee Donner Public Utility District encourages community partici- us, please visit our website pation in the public process. If you are interested in participating in the at www.tdpud.org . TDPUD's decision-making process, you are welcome to attend Board % 0 0 0 0 0 04411R*041110" Meetings. The Board of Directors meets at 6:00 PM on the first Wednesday of each month in the TDPUD Board room, located at 11570 Donner Pass Road, In This Document Truckee, California. Agendas for upcoming meetings may be obtained on our website or from the Deputy District Clerk's office, (530)582-3980. . Water Quality General Information For More Information: . Source Water Assessment 0 For additional information about this report or the water treatment pro- . Where Our Water Comes cess, contact Truckee Donner Public Utility District's Senior Water From Quality Technician, Clay Walker at (530)582-3926. . Lead In Home Plumbing 0 Water conservation and efficiency, the TDPUD has water conserva- tion programs that will help customers save water and save money. Radon Information can be found on our website or by calling (530)587-3896. . Definitions slow* - jA ._ , iUs F t' 1•:ii 6 If i 1UtW-1lllii-il'fiFi iift Ir Irmill ufwi Yf.11141"ii€fJ IFM -`�'�`' � _.'. . L�lilll llii�li']filif�-1iCffl-iifkll Ilifil iii�it a�a�� iu+ii�u�ri3rmeGnatgt�Jrr }�� ' .fig`• �J � Este informe contiene informacion muy importante sobre su agua potable. Traduzcalo o hable con alguien que to entienda bien. Pa e 40 of 563 Water Quality Truckee Donner Public Utility District takes pride in delivering the highest quality of water to its customers. The water quality staffs goal is to exceed State and USEPA water quality standards. Staff takes 520 routine bac-t samples annually AO"I along with Title 22 monitoring samples.All samples are examined by a certified ELAP laboratory using a methodology required by State and Federal laws.The data in this brochure is a snapshot of the quality of water provided to TDPUD customers for the 2025 calendar year. This report includes details about your local water resources,water quality monitoring data,and how it compares to State and USEPA standards. Truckee Donner Public Utility District is committed to providing you with information about your water supply because customers who are well informed are key to the collaborative process in identifying improvements that are neces- sary to maintain the highest drinking water standards. It is important to note, that while the TDPUD strives to meet all State and Federal Source Water drinking water standards, some people may be more vulnerable to contaminants Assessment in drinking water than the general population. Immuno-compromised persons such as persons with cancer undergoing chemotherapy, people who have undergone A source water assessment was prepared in organ transplants, people with HIV/AIDS or other immune system disorders, some 2002 for the wells serving the Truckee area. elderly individuals, and infants can be particularly at risk from infections. These The wells are located throughout the town of people should seek advice about drinking water from their health care providers. Truckee and Glenshire.The District owns USEPA/Centers for Disease Control (CDC)guidelines on appropriate means to and operates 10 wells varying in depth from lessen the risk of infection by Cryptosporidium and other microbiological contam- 120ft to 850ft. The complete source water inants are available from the Safe Drinking Water Hotline at(800)426-4791 or assessment and known vulnerabilities may https://www.epa.gov/ground-water-and-drinking-water/safe-drinking-water-hotline. be viewed at the Truckee Donner Public Utility District office, located at 11570 Donner Pass Road, Truckee, California, or by calling Lead in Residential Plumbing Chad Reed at(530)582-3984. If present, elevated levels of lead can cause serious health problems, especially for pregnant women and young children. In circumstances where lead is detected in drinking water, it is primarily derived from materials and components associated with service lines and residential plumbing.TDPUD is responsible for providing high quality water, but cannot control the variety of materials used in plumbing components within private property. If your water has been sitting for a prolonged period of time,you can minimize the potential for lead exposure by flushing your tap for 30 seconds to 2 minutes before using water for drinking or cooking.We conduct routine sampling for lead every three years.The last sampling was per- formed in 2025,where all sites tested below the Federal action level for lead.The next round of lead sampling is scheduled for the summer of 2028. More infor- mation about lead in drinking water,testing methods, and steps you can take to minimize exposure can be found at www.epa.gov/lead. Where Our Water Comes From Drinking water served to Truckee Donner Public Utility District customers in the Truckee system is groundwater that comes from 10 deep wells. Because of natu- Lead Line Service ral filtration,the groundwater aquifer is protected from surface water contamina- tion, giving us a high quality of drinking water. Inventory A lead service line material inventory was Cryptosporidium and Giardia conducted and prepared in 2024 . There are no lead lines in the distribution system. A Recognizing that our potable water sources are exclusively deep groundwater detailed inventory is available here. wells,the presence of microscopic organisms such as Cryptosporidium and Giar- https://www.tdpud.org/departments/water/ dia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can water-quality cause diarrhea,fever, and other gastrointestinal symptoms. Page 541 of 563 Arsenic Arsenic is a naturally occurring element found in rocks, sedi- ments and minerals. Arsenic can be released into groundwa- ter aquifers through arsenic-bearing rocks and minerals. Low level traces of arsenic are often detected in granite and vol- canic geology and the District closely monitors these levels in z~ our local groundwater wells to ensure our water meets all fed- r -A� eral and state regulatory standards. In 2001 the United States �- Environmental Protection Agency (USEPA) adopted newf standards for arsenic in drinking water. They lowered the maximum contaminant level from 50 parts per billion (ppb), down to 10 ppb. Since most people are not familiar with ppb, One part per billion would be equivalent to 1 second in 32 years so this an extremely small number. The drinking water -� from Truckee Donner Public Utility District meets the current Federal and State standards for arsenic. Water Source Blending: The TDPUD operates the Glen- shire Drive Well, Prosser Village Well and Old Greenwood Water Hardness Well under a SWRCB approved blending permit. The blend- Occasionally, a water user will need to adjust an ing permit ensures lower detectable concentrations of arsenic appliance, such as a dishwasher or water sof- in drinking water prior to being conveyed into the distribution system. The arsenic monitoring sample results from the tener, to a particular setting based upon the blending point ranged from a low of 1.6 ppb to a high of hardness of the water served to their home or 9.5 ppb with an average of 7.5 ppb. The MCL for arsenic is business. 10 ppb. Radon Please use the information provided below to help with water hardness questions. Radon is a radioactive gas that you cannot see, taste, or smell. It is found throughout the United States. Radon can move up through the ground and into a home through cracks and holes in structural foundations. Radon can ac- cumulate in all types of homes. Radon can also get into in- Water Softener /Appliance Setting door air when released from tap water from showering, washing dishes, and other household activities. Compared In 2025 testing, TDPUD had an average hard- to radon entering the home through ground sources, radon ness result of 78.0 mg/L. That translates to an exposure through water sources are typically far less com- average of 4.5 grains per gallon. One grain per mon and much smaller in magnitude. Radon is a known hu- gallon equals 17.1 mg/L. man carcinogen. Exposure to air containing radon has been known to lead to lung cancer. Drinking water containing ra- don may also cause increased risk of stomach cancer. If you are concerned about radon levels in your home, testing is Degree of Hardness Grains per Gallon ppm (or mg/ recommended. Testing can be relatively inexpensive and (gpg) Q easy. Radon mitigation and removal for your home is rec- ommended for detectable concentrations in excess of 4 pico- curies per liter of air (pCi/L). There are often simple ways Soft < 1.0 < 17.0 to fix a radon problem that are not too costly. For additional information, call your State radon program (1-800-745- Slightly Hard 1.0- 3.5 17.1-60 7236), the USEPA Safe Drinking Water Hotline (1-800-426- Moderately Hard 3.5 - 7.0 60- 120 4791), or the National Safety Council Radon Hotline (1- 800-SOS-RADON). Hard 7.0- 10.5 120- 180 Very Hard > 10.5 > 180 age 542 of 56 Substances That Could Be In Water Definitions The sources of drinking water (both tap and Maximum Contaminant Level (MCL): The highest bottled water) include rivers, lakes, streams, level of a contaminant that is allowed in drinking wa- ponds, reservoirs, springs, and wells. As wa- ter. Primary MCLs are set as close to the PHGs (or ter travels over the surface of the land or MCLGs) as is economically and technologically fea- through the ground, it dissolves naturally- sible. Secondary MCLs are set to protect the odor, occurring minerals and, in some cases, radio- taste, and appearance of drinking water. active material, and can pick up substances L resulting from the presence of animals or Maximum Contaminant Level Goal (MCLG): The from human activity. N level of a contaminant in drinking water below which there is no known or expected risk to health. MCLGs In order to ensure that tap water is safe to y #. are set by the U.S. Environmental Protection Agency drink, the U.S. Environmental Protection (USEPA). Agency (USEPA) and the State Water Resources Control Board (State Board) Public Health Goal (PHG): The level of a contami- prescribe regulations that limit the amount of certain contaminants in water nant in drinking water below which there is no known provided by public water systems. USEPA regulations also establish limits for or expected risk to health. PHGs are set by the Cali- contaminants in bottled water that provide the same protection for public fornia Environmental Protection Agency. health. Drinking water, including bottled water, may reasonably be expected to contain at least small amounts of some contaminants. The presence of Maximum Residual Disinfectant Level (MRDL): contaminants does not necessarily indicate that water poses a health risk. The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of Contaminants that may be present in source water include: a disinfectant is necessary for control of microbial contaminants. Microbial Contaminants, such as viruses and bacteria, that may come from sewage treatment plants, septic systems, agricultural livestock operations, and Maximum Residual Disinfectant Level Goal wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the rally occurring or can result from urban stormwater runoff, industrial or domes- use of disinfectants to control microbial contami- tic wastewater discharges, oil and gas production, mining, or farming; nants. Pesticides and Herbicides, that may come from a variety of sources such as Primary Drinking Water Standards (PDWS): MCLs agriculture, urban stormwater runoff, and residential uses; and MRDLs for contaminants that affect health along Organic Chemical Contaminants, including synthetic and volatile organic with their monitoring and reporting requirements, and water treatment requirements. chemicals, which are by-products of industrial processes and petroleum production, and which can also come from gas stations, urban stormwater Secondary Drinking Water Standards (SDWS): runoff, agricultural applications, and septic systems; MCLs for contaminants that affect taste, odor, or appearance of the drinking water. Contaminants with Radioactive Contaminants, that can be naturally occurring or can be the re- SDWSs do not affect the health at the MCL levels. sult of oil and gas production and mining activities. Regulatory Action Level (AL):The concentration of More information about contaminants and potential health effects can be a contaminant which, if exceeded, triggers treatment obtained by calling the USEPA's Safe Drinking Water Hotline at(800)426-4791. or other requirements that a water system must fol- low. Table Kev N/A: not applicable N/D: not detectable at testing limit ppm: parts per million or milligrams per liter(mg/L) ppb: parts per billion or micrograms per liter(pg/1) ppt: parts per trillion or nanograms per liter(ng/L) pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter Page 543 of 563 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drink- ing water regulations. Some data may be more than one year old. Based upon Federal and State requirements, the moni- toring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annual- ly, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1 - SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Highest No. Microbiological Contam- No. of months in viola- inants of Detec- tion MCL MCLG Typical Source of Bacteria tions More than 5%of Naturally present in the envi- Total Coliform Bacteria 0 0 samples in a month 0 ronment with a detection TABLE 2 -DISINFECTION BYPRODUCTS #Samples, Average MCLG Typical Source of Contami- Contaminant Frequency Level Range MCL(MDRL) (MDRLG) nant 40-50 per Drinking water disinfectant Chlorine Residual(ppm) month 0.45 .37-.56 4 4 added for treatment By-product of drinking water Haloacetic Acids(ppb) 2 on 8/5/25 2.3 2.3-2.4 60 N/A disinfection Total Trihalomethanes By-product of drinking water (ppb) 2 on 8/5/25 8.9 5.8-12 80 N/A disinfection TABLE 3 -DISTRIBUTION CUSTOMER TAP SAMPLING FOR LEAD AND COPPER No. of sam- 90th No. sites Date Last percentile Typical Source of Contami- Lead and Copper Sampled Ples collect- level de- exceeding AL PHG nant ed tected AL Internal corrosion of household Lead(ppm) August 30 .006 0 .015 0.2 plumbing systems; discharges 2025 from industrial manufac- tures,erosion of natural deposits Internal corrosion of household Copper(ppm) August 30 .08 0 1.3 0.3 plumbing systems; erosion of 2025 natural deposits; leaching from wood preservatives Page 544 of 563 TABLE 4- LEAD SAMPLING FOR SCHOOL DISTRICT No. of Schools Re- No. sites Contaminant Dated questing Range exceeding AL PHG Typical Source of Contami- pleLead Sam- AL nant pling Internal corrosion of household Lead(ppb) Dec-18 8 <0.2 0 15.0 0.2 plumbing systems; erosion of natural deposits; leaching from wood preservatives TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Average Level Range of Detec- PHG Typical Source of Contami- (reporting units) Sampled Detected tions MCL (MCLG) nant Alkalinity(as CaCO3) 2025 80 70-91 N/A N/A Naturally present in water (ppm) Bicarbonate Alkalinity(as 2025 80 70-91 N/A N/A Naturally present in water HCO3) (ppm) Calcium(ppm) 2025 15 10-31 N/A N/A Naturally occurring Potassium(ppm) 2025 2.7 2.4-8.4 N/A N/A Leaching of natural depo TABLE 6 -DETECTION OF CONTAMINANTS PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Average Level Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled Detected tions (MCLG) nant Arsenic (ppb) 2025 4.5 N/D - 10 10 0.004 Erosion of natural deposits Barium(ppb) 2025 15 6.4-38 1000 2000 Erosion of natural deposits Chromium, Total(ppb) 2025 1.0 N/D - 1.5 100 100 Erosion of natural deposits Chromium,Hexavalent 2023 .8 .29-1.4 10 .1 Erosion of natural deposits (ppb) Fluoride(ppm) 2025 0.02 N/D-0.73 2 1 Erosion of natural deposits Runoff and leaching from ferti- Nitrate as N(ppm) 2025 0.30 N/D-0.69 10 10 lizer use; leaching from septic tanks and sewage; erosion of natural deposits Turbidity(NTU) 2025 0.9 N/D-9.9 5 5 Soil runoff Gross Alpha Particle 2007-2018 0.7 N/D-4.6 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2004 90.8 N/D-560 N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon.The EPA has an advisory MCL of 4000 pCi/L for Radon. Page 545 of 563 TABLE 7 —DETECTION OF CONTAMINANTS SECONDARY DRINKING WATER STAND- ARD Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant Chloride(ppm) 2025 11.5 .62-64 250 N/A Leaching of natural deposits Odor-Threshold(TON) 2025 0.2 N/D- 1 3 N/A Naturally-occurring organic materials pH 2O25 8.1 8-8.2 6.5 - 8.5 6.5 - 8.5 Leaching of natural deposits Specific Conductance 2025 210 160-390 1600 N/A Substances that form ions when (µS/cm) in water. Total Dissolved Solids 2025 128 110-220 500 N/A Leaching of natural deposits (ppm) TABLE 8 — Fifth Unregualted Contaminant Monitoring Rule (UCMR 5) Chemical or Constituent Date Last Level Detected Range of Detec- MCL PHG Typical Source of Contami- (reporting units) Sampled tions (MCLG) nant PFHxA 2023 .0006 N/D-.0044 N/A .003 Leaching of anthropogenic sub- stance PFPeA 2023 .0007 N/D-.0046 N/A .003 Leaching of anthropogenic sub- stance PFNA 2023 .0004 N/D-.0046 N/A .004 Leaching of anthropogenic sub- stance Lithium 2023 7.7 N/D-32 N/A 9 Naturally-occurring elements Page 546 of 563 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A. The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of water quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. age of 563 ' TRUCKEE DONNER Public Utility District 994 W6TW3 QW8WIFY 13F=PQBT Hirschdale Water System PWS# 2910010 Customer Views Are Welcome The Truckee Donner Public Utility District encourages community partici- pation in the public process. If you are interested in participating in the TDPUD's decision-making process, you are welcome to attend Board Meetings. _ d ':✓`fR�Y �`Q The TDPUD Board of Directors meets at 6:00 PM on the first WednesdayAN of each month in the TDPUD Board room, located at 11570 Donner Pass rRA Road, Truckee, California. Agendas for upcoming meetings may be ob- tained on our website or from the Deputy District Clerk's office, (530)582 3980. way ror Ivlore Information: 0 For additional about this report or the water treatment process, con- tact Truckee Donner Public Utility District's Senior Water Quality 1 01 or Technician, Clay Walker at (530)582-3926. information abou , us, please visit our 0 Water conservation and efficiency, the TDPUD has water conserva- website at tion programs that will help customers save water and save money. www.tdpud.org Information can be found on our website or by calling (530)587-3896. HIRSCHDALE WATER SYSTEM In This Document . Water Quality General Information • Source Water Assessment R- ��' . Where Our Water Comes From ■ ,� -- • Lead In Drinking Water ■ Definitions s i •� �'',l'{' Sampling Results . . bien. Page 548 of 563 W-for (li iality r �r Truckee Donner Public Utility District (TDPUD) is committed to delivering high — E quality drinking water to its customers. Our water quality team strives to exceed 7, is State and U.S. Environmental Protection Agency(USEPA)standards by conducting 12 routine bacteriological samples annually, along with additional monitoring re- quired under Title 22.All samples are analyzed by a certified Environmental Labora- tory Accreditation Program (ELAP) laboratory using methodologies mandated by State and Federal regulations. This report provides a snapshot of the water quality °' =,-_,� • _ delivered to TDPUD customers in 2025. It includes details about local water - sources, annual water quality sampling data, and how our water compares to State and USEPA standards. We believe that well-informed customers play a crucial role in maintaining high drinking water standards. That's why TDPUD is dedicated to transparency and communication about your water supply. It is important to note that while TDPUD meets all State and Federal drinking water standards, some indi- viduals may be more vulnerable to contaminants than the general population.Those at higher risk include immunocompromised individuals—such as cancer patients undergoing chemotherapy, organ transplant recipients, people with HIV/AIDS or Source Water other immune disorders, some elderly individuals, and infants. These individuals Assessment should consult their healthcare providers for guidance on drinking water safety. A source water assessment has been For more information on reducing the risk of infection from Cryptosporidium and completed for the well serving the other microbiological contaminants, refer to guidelines from the USEPA and the Hirschdale area. The well is located in the Centers for Disease Control (CDC). You can access this information by calling the town of Hirschdale. The District owns and Safe Drinking Water Hotline at (800) 426-4791 or visiting https://www.epa.gov/ operates the single well which is 270ft in ground-water-and-drinking-water/safe-drinking-water-hotline. depth. A copy of the complete assessment may be viewed at the Truckee Donner Public Utility District office, located at 11570 Lead in Residential P l u m b i n a Donner Pass Road, Truckee, California, or by calling Chad Reed at(530)582-3984. Elevated levels of lead in drinking water can pose serious health risks, particularly for pregnant women and young children. When lead is detected, it typically origi- nates from service lines and residential plumbing materials, rather than from the water source itself. While Truckee Donner Public Utility District (TDPUD) provides high-quality water, we cannot control the plumbing materials used in private proper- ties. If water has been sitting in your pipes for an extended period, you can reduce • Mow { potential lead exposure by flushing your tap for 30 seconds to 2 minutes before I _ ! f . using it for drinking or cooking. TDPUD conducts lead testing every three years.The most recent sampling, performed in 2022, confirmed that all tested sites were �. ' i • f below the Federal action level for lead. For more information on lead in drinking water, testing methods, and ways to minimize exposure,visitwww.epa.gov/lead. .. Where Our Water Comes From ;;;;„+/r,,;,,.;,F,,; The drinking water supplied to our Hirschdale customers comes from a deep aquifer Lead Line Service well. Before reaching your home, this water is filtered to remove iron, manganese, and arsenic, ensuring its safety and quality.Thanks to natural filtration,the ground- Inventory water aquifer is well-protected from surface water contamination, providing a high- quality drinking water supply. A lead service line material inventory was onducted and prepared in 2024 . There are lead lines in the distribution system. A �ryptospormium ano Giardia detailed inventory is available here. Recognizing that our potable water sources are exclusively drawn from a deep groundwater well, the presence of microscopic organisms such as Cryptosporidium kt and Giardia in our water is highly unlikely. If ingested, Cryptosporidium and Giardia can cause diarrhea,fever, and other gastrointestinal symptoms. IPage 549 of 563 Arsenl^ Arsenic is a naturally occurring element found in rocks, sedi- ments and minerals. Arsenic can be released into groundwa- ter aquifers through arsenic-bearing rocks and minerals. Low level traces of arsenic are often detected in granite and vol- ` canic geology and the District closely monitors these levels in C. our local groundwater wells to ensure our water meets all fed- , eral and state regulatory standards. In 2001 the United States ` Environmental Protection Agency (USEPA) adopted new standards for arsenic in drinking water. They lowered the maximum contaminant level from 50 parts per billion (ppb), _ down to 10 ppb. Since most people are not familiar with ppb, One part per billion would be equivalent to 1 second in 32 years so this an extremely small number. With this being con- = — sidered, the drinking water from Truckee Donner Public Utility District meets the current Federal and State standards for ar- senic. Water Hardness Water Source Blending: The TDPUD operates the Glen- Occasionally, a water user will need to adjust an shire Drive Well, Prosser Village Well and Old Greenwood appliance, such as a dishwasher or water sof- Well under a SWRCB approved blending permit. The blend- ing permit ensures lower detectable concentrations of arsenic tener, to a particular setting based upon the in drinking water prior to being conveyed into the distribution hardness of the water served to their home or system. The arsenic monitoring sample results from the business. blending point ranged from a low of 4.6 ppb to a high of 9.4 ppb with an average of 7.1 ppb. The MCL for arsenic is Please use the information provided below to 10 ppb. help with water hardness questions. Rador Radon is a radioactive gas that you cannot see, taste, or smell. It is found throughout the United States. Radon can Water Softener /Appliance Setting move up through the ground and into a home through In 2022 testing, TDPUD had an average hard- cracks and holes in structural foundations. Radon can ac- ness result of 71.0 mg/L. That translates to cumulate in all types of homes. Radon can also get into in- ian average of 4.1 grains per gallon. One grain door air when released from tap water from showering, per gallon equals 17.1 mg/L. washing dishes, and other household activities. Compared to radon entering the home through ground sources, radon exposure through water sources are typically far less com- mon and much smaller in magnitude. Radon is a known hu- man carcinogen. Exposure to air containing radon has been known to lead to lung cancer. Drinking water containing ra- don may also cause increased risk of stomach cancer. If you Degree of Hard- Grains per Gallon ppm (or are concerned about radon levels in your home, testing is ness (gpg) mg/L) recommended. Testing can be relatively inexpensive and easy. Radon mitigation and removal for your home is rec- ommended for detectable concentrations in excess of 4 pico- curies per liter of air (pCi/L). There are often simple ways Soft < 1.0 < 17.0 to fix a radon problem that are not too costly. For additional Slightly Hard 1.0 - 3.5 17.1 - 60 information, call your State radon program (1-800-745- Moderate) Hard 3.5 - 7.0 60 - 120 7236), the USEPA Safe Drinking Water Hotline (1-800-426- Hard 7.0 - 10.5 120 - 180 4791), or the National Safety Council Radon Hotline (1- Very Hard > 10.5 > 180 800-SOS-RADON). Page 550 of 563 $iihcf,nnrQc Th,nf Mm, Ro Pound In Water Definitions Drinking water sources—both tap and bot- (MCL): The highest tled—include rivers, lakes, streams, ponds, level of a contaminant that is allowed in drinking water. reservoirs, springs, and wells. As water Primary MCLs are set as close to the PHGs (or MCLGs) moves over land or through the ground, it as is economically and technologically feasible. dissolves naturally occurring minerals and, in Secondary MCLs are set to protect the odor, taste, and some cases, radioactive materials, and can appearance of drinking water. also pick up substances from animals or hu- man activities. Maximum Contaminant Level Goa (MCLG): The level N of a contaminant in drinking water below which there is To ensure the safety of tap water, the U.S. �; no known or expected risk to health. MCLGs are set by Environmental Protection Agency (USEPA) 4 ° the U.S. Environmental Protection Agency(USEPA). and the State Water Resources Control Board (State Board) establish regulations ;:y• : F ,'" Public Health Goal (PHG): The level of a contaminant that limit the amount of certain contaminants in drinking water below which there is no known or in water provided by public systems. While drinking water, including bottled expected risk to health. PHGs are set by the California water, may contain small amounts of some contaminants, the presence of Environmental Protection Agency. many contaminants does not necessarily mean the water poses a health risk. '13ximum Kesiauai Disinfectant ue� (MRDL): The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of a Examples of contaminants that may be present in source water include: disinfectant is necessary for control of microbial contaminants. Microbial Contaminants, such as viruses and bacteria, that may come from stormwater or wastewater, septic systems, agricultural livestock operations, Maxim„, and wildlife; (MRDLG): The level of a drinking water disinfectant below which there is no known or expected risk to Inorganic Contaminants, such as salts and metals, that can be natu- health. MRDLGs do not reflect the benefits of the use of rally occurring or can result from erosion, urban stormwater runoff, industrial or disinfectants to control microbial contaminants. domestic wastewater discharges, oil and gas production, mining, or farming; Primary Drinking Water Standards (PDWS): MCLs Pesticides and Herbicides, that may come from a variety of sources such as and MRDLs for contaminants that affect health along agriculture, urban stormwater runoff, and residential uses; with their monitoring and reporting requirements, and Organic Chemical Contaminants, including synthetic and volatile organic water treatment requirements. ■ chemicals, which are by-products of industrial processes and petroleum Secondary Drinking Water Standi. (SDWS): MCLs production, and which can also come from gas stations, urban stormwater for contaminants that affect taste, odor, or appearance runoff, agricultural applications, and septic systems; of the drinking water. Contaminants with SDWSs do notl Radioactive Contaminants, that can be naturally occurring or can be the affect the health at the MCL levels. result of oil and gas production and mining activities. (AL): The concentration of a. More information about contaminants and potential health effects can be contaminant which, if exceeded, triggers treatment or obtained by calling the U.S. EPA's Safe Drinking Water Hotline at (800) 426- other requirements that a water system must follow. 4791. Table Key N/A: not applicable N/D: not detectable at testing limit ppm: parts per million or milligrams per liter(mg/L) ppb: parts per billion or micrograms per liter(pg/L) ppt: parts per trillion or nanograms per liter(ng/L) pCi/L: picocuries per liter(a measure of radiation) (pS/cm): micro Siemens per centimeter (NTU): nephelometric turbidity unit(measures water cloudiness) 63 The data in the following tables is from the most recent monitoring done in compliance with Federal and California drinking water regulations. Some data may be more than one year old. Based upon Federal and State requirements,the monitoring interval for each constituent varies, and can be any one of the following: weekly, monthly, semi-annually, annually, biennially, or once every three, six, or nine years, or as deemed necessary by regulatory agencies. TABLE 1—SAMPLING RESULTS SHOWING THE DETECTION OF COLIFORM BACTERIA Microbiological Contami- Highest No. No.of months in nants of Detec- violation MCL MCLG Typical Source of Bacteria tions More than 5%of samples Total Coliform Bacteria 0 0 in a month with a detec- 0 Naturally present in the environment tion TABLE 2—DISINFECTION BY-PRODUCTS C #Samples, Average MCLG CLMRDL)Frequency Level ( (MRDLG) Chlorine Residual(ppm) 1 per month 0.58 .29-.74 4 4 Drinking water disinfectant added for treatment Total Trihalomethanes 1 on 17 N/A 80 N/A By-product of drinking water (ppb) 8/l/25 disinfection Haloacectic Acids(ppb) 1 on 0 N/A 60 N/A By-product of drinking water 8/l/25 disinfection TABLE 3—DISTRIBUTION SYSTEM CUSTOMER TAP SAMPLING FOR LEAD AND COPPER 90th per- No.of No.sites Date Last centile Lead and Copper Sampled samples level de- exceeding AL PHG Typical Source of Contaminant collected tected AL Internal corrosion of household water Lead(ppb) 8/1/25 5 0 0 15 0.2 plumbing systems;discharges from industrial manufacturers;erosion of natural deposits Internal corrosion of household Copper(ppm) 8/l/25 5 0.31 0 1.3 0.3 plumbing systems;erosion of natu- ral deposits;leaching from wood preservatives TABLE 4—SAMPLING RESULTS FOR SODIUM AND HARDNESS Chemical or Constituent Date Last Level De- PHG kh (reporting units) Sampled tected Range of Detections MCL (MCLG) Typical Source of Contaminant Sodium(ppm) 2025 38 N/A N/A N/A Salt present in the water and is general- ly naturally occurring Sum of polyvalent cations present Hardness(as CaCO3)(ppm) 2025 88 N/A N/A N/A in the water,generally magnesium and calcium,and are usually natu- rally occurring TABLE 5- UNREGULATED COMPOUNDS Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MCLG) Typical Source of Contaminant Alkalinity(as CaCO3)(ppm) 2025 160 N/A N/A N/A Erosion of natural deposits Bicarbonate Alkalinity(as 2025 160 N/A N/A N/A Leaching of natural deposits HCO3)(ppm) Calcium(ppm) 2025 15 N/A N/A N/A Erosion of natural deposits Magnesium(ppm) 2025 12 N/A N/A N/A Erosion of natural deposits Potassium(ppm) 2025 6.7 N/A N/A N/A Erosion of natural deposits Page 552 of 563 TABLE 6—DETECTION OF CONTAMINANTS WITH A PRIMARY DRINKING WATER STANDARD Chemical or Constituent Date Last Range of Dete7mc7L PHG (reporting units) Sampled Level Detected tions (MCLG) Typical Source of Contaminant Inorganic Contaminants Arsenic(ppb) 2025 0 N/D 10 0.004 Erosion of natural deposits Barium(ppm) 2025 98 N/A 1000 2000 Erosion of natural deposits Fluoride(ppm) 2025 0.1 N/A 2 1 Erosion of natural deposits Turbidity(NTU) 2025 3 N/A 5 5 Soil runoff Ra Gross Alpha Particle 2018 N/D 3 15 0 Erosion of natural deposits Activity(pCi/L) Radon(pCi/L) 2005 570 N/A N/A* N/A* Erosion of natural deposits *Note The State of California does not have an MCL for Radon. The EPA has an advisory MCL of 4000 pCi/L for Radon. TABLE 7—DETECTION OF CONTAMINANTS WITH A SECONDARY DRINKING WATER STANDARD Chemical or Constituent Date Last Range of Detec- PHG (reporting units) Sampled Level Detected tions MCL (MC Typical Source of Contaminant Chloride(ppm) 2025 7.6 N/A 250 N/A Leaching of natural deposits Iron(ppb) 2025 0 N/A 300 N/A Leaching of natural deposits Manganese(ppb) 2025 0 N/A 50 N/A Leaching of natural deposits pH 2O25 7.8 7.7 - 8.0 6.5 - 8.5 N/A Erosion of natural deposits Specific)Conductance 2025 350 N/A 1600 N/A Substances that form ions when in (µS/cm Sulfate 2025 14 N/A 250 N/A Leaching of natural deposits Total Dissolved Solids 2025 240 N/A 500 N/A Leaching of natural deposits (ppm) Page 553 of 563 FREQUENTLY ASKED QUESTIONS Q. Why does my water smell and taste like chlorine? A. Chlorine is regularly injected into the water at the source as a disinfectant that aids in eliminat- ing potentially harmful bacteria present in water. In high demand summer month's chlorine taste may be more noticeable because the water is "fresh" or "newer" and has not had time to dissipate through the system. Chlorine can also gas off in warm/hot water which produces a smell stronger than normal. Some people are more sensitive than others to the taste and smell of chlorine and may become aware of occasional changes. This is normal and safe. Chlorine levels are continually moni- tored. Q. Why does my water taste like metal? A.The source water is ground water, which has a mineral content that might give off a metal taste some are not used too. Sometimes plumbing can cause a metal taste, especially if water has been sitting in pipes for several hours. It's best to flush the lines for of couple minutes if water has sat in pipes for an extending period of time, however, this does not indicate a higher or lower degree of wa- ter quality. Q. Why is there white crust on my shower head? A. The minerals in water may leave white spots on glasses, coffeepots, shower heads and shower doors. These spots are calcium deposits and are not harmful to health. Q. Why is there a black ring around my toilet? A. This black ring some may find after returning home when water has sat in the bowl for extend- ing period of time is mold. Mold will grow in dark, wet, cool places making the toilet bowl a perfect place for that. If this accrues adding bleach to the bowl and letting it sit works best. To avoid this, leave a small amount of bleach in the bowl before leaving for more than a couple days. Q. What clauses cloudy water? A. Cloudy or milky water is usually caused by trapped air picked up from an air pocket in the water main or internal plumbing. Sometimes flows or water cascading within the aqueduct can also trap air, similar to a waterfall. If water sits in a glass or pitcher for a few minutes the air will dissipate and be- come clear. Page 554 of 563 TRUCKEE DONNER AGENDA ITEM #16 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Melanie Rives, Finance & Accounting Manager Michael Salmon, Chief Financial Officer SUBJECT: Consideration of Approval of a 2026 Q1 Power Cost Adjustment of $0.0019 charge per kWh Billed in June 2026, July 2026, and August 2026. r APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Approve the Power Cost Adjustment for 2026 Q1 of$0.0019 charge per kWh billed in June 2026, July 2026 and August 2026. BACKGROUND: Electric Rate Ordinance 2023-01 established a Power Cost Adjustment (PCA) to be reviewed and calculated quarterly. The PCA is calculated by comparing the budget versus actual wholesale costs of purchased power. To the extent the cost difference is less than budget, a credit PCA is applied to customer billings. To the extent the cost difference is greater than budget, a PCA charge is applied to customer billings. If the cost difference is more than 15%, the rate reserve fund will be included in the assessment of PCA determination. ANALYSIS AND BODY: Staff analyzed actual wholesale purchased power costs for Quarter 1 of 2026 as it compared to budget expectations. Further, staff factored Q4 2025 items that were estimated or changed into this Q1 2026 PCA calculation. The detailed analysis is provided as Attachment 1 to this report. Results of the Q1 2026 analysis can be summarized as follows: $75.45 cost per MWh, Budget $76.98 cost per MWh, Actual $ 1.53 cost per MWh variance, over-budget 2.0% x 48,860.249 MWh volume purchased = $74,756 cost variance impacts Q1, unfavorable/over-budget (3,777) adjust for less billed kWh than estimated for Q4 PCA calculation = $70,979 net debit/charge Q1 PCA The $70,979 Q1 PCA amount and a 38,130,240 kWh estimate (June 2026, July 2026 Page 1 of 3 Page 555 of 563 and August 2026 billing cycles) results in a PCA customer charge of$0.0019 per kWh PCA for Q1 2026. This PCA debit/charge will be applied to customer accounts for the June 2026 -August 2026 billing cycles. For the 2026 Q1 billings, the District customers' effective average retail cost per kWh was $0.2574 pre-PCAs. The PCA for Q1 equates to a bill charge of 0.7% ($0.0019 / $0.2574) and $0.2593 post-charge cost per kWh. The 0.7% charge is estimated to increase the average residential monthly bill by $0.86 (454 kWh 3yr average) for June 2026, July 2026, and August 2026. The unfavorable cost per MHh of $1.53 or 2.0% variance for Q1 was driven primarily a 9.1% reduction in purchased power volume as compared to budget, wherein the various fixed cost components (example NEBO debt service) of purchased power were spread over less absolute volume of MWh than budgeted. The MHh volume for Q1 2026 was 5.7% less than Q1 2025. Further, the purchase power budget was reestablished as part of the FY26 and FY27 budget cycle in fall of 2025, and the resulting budget dollar amounts and cost per MWh are based on 3-year averages and inflation costs, both of which are lower than in the previous budget cycle for FY24 and FY25. Included in the Q1 PCA is a credit adjustment of$3,777 for true-up for the Q4 2025 PCA, due to billings of kWh to apply the PCA credit was less than estimated in the Q4 calculation due to milder weather, particularly in March 2026. PCA History: 2024 Q1 - ($.0088) Credit 2024 Q2 - $.0012 Charge 2024 Q3 - ($.0096) Credit 2024 Q4 - ($.0337) Credit 2025 Q1 - ($.0093) Credit and $194,329 transfer to Rate Reserve 2025 Q2 - ($.0099) Credit 2025 Q3 - ($.0105) Credit and $237,900 transfer to Rate Reserve 2025 Q4 - ($.0001) Credit 2026 Q1 - $.0019 Charge (recommendation) GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public 6. Manage the District in an effective, efficient and fiscally responsible manner District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities 4. Modernize the utility and add value to our communities through collaboration and innovation Page 2 of 3 Page 556 of 563 FISCAL IMPACT: The net effect of the PCA debit/charge of $70,979 for Q1 is to equalize the purchase power cost per MWh fluctuation. The extent to which MWh volume varies, purchase power cost will continue to vary to budget. ATTACHMENTS: 1. PCA 2026Q1 Page 3 of 3 Page 557 of 563 TDPUD POWER COST ADJUSTMENT(PCA) 2026 Q1 prepared 511412026 BUDGET ACTUAL VARIANCE Jan-26 Feb-26 Mar-26 Q1 2026 Jan-26 Feb-26 Mar-26 012026 Q1 2026 Total Energy Purchased MWh 19,110.000 17,208.000 17,448.000 53,766.000 18,685.854 16,128.881 14,045.514 48,860.249 4,905.751 9.1% Total Costs By Vendor- Energy Supply-UAMPS(533)(v10584) $ 1,473,400 $ 1,064,400 $ 1,067,200 $ 3,605,000 $ 1,327,923 $ 1,069,816 $ 991,565 $ 3,389,304 $ (215,696) -6% Energy Supply-TCID(536) (0183) 0 0 0 0 0 0 0 0 0 #DIV/0! Energy Supply-STAMPEDE(539) (v712 0 57,100 57,100 114,200 4,693 26,504 32,334 63,530 (50,670) -44% Transmission -SPPC NVE(534) (v6402) 74,300 80,100 86,800 241,200 80,131 76,966 55,274 212,371 (28,829) -12% EIM -NVEnergy(534) (v6403) 20,700 22,300 24,200 67,200 (15,901) 23,950 44,592 52,641 (14,559) -22% Enviro Compli/Regulty Other(588) 9,700 9,700 9,700 29,100 15,473 18,004 9,973 43,449 14,349 49% Total Power Costs $ 1,578,100 $ 1,233,600 $ 1,245,000 $ 4,056,700 $ 1,412,319 $ 1,215,239 $ 1,133,737 $ 3,761,295 $ (295,405) -7% Total Power Cost$/MWh $82.58 $71.69 $71.35 $75.45 $75.58 $75.35 $80.72 $76.98 $1.53 2.0% account1..555 $ 1,578,100 $ 1,176,500 $ 1,187,900 $ 3,942,500 $ 1,407,626 $ 1,188,736 $ 1,101,403 $ 3,697,765 account1.4.908.05.768 $ - $ 57,100 $ 57,100 $ 114,200 $ 4,693 $ 26,504 $ 32,334 $ 63,530 VARIANCE Jan-26 Feb-26 Mar-26 Q1 2026 Total Energy Purchased MWh (424.146) (1,079.119) (3,402.486) (4,905.751) -9.1% Total Costs By Vendor- -2.2% -6.3% -19.5% -9.1% per MW Variance 39,719 Budget MW Jun'26-Aug'26 Energy Supply-UAMPS(533) (145,477) 5,416 (75,635) (215,696: -6% 96.0% retail factor Energy Supply-TCID(536) 0 0 0 0 #DIV/0! $ 1.49 38,130 MWh billed estimated Energy Supply-STAMPEDE(539) 4,693 (30,596) (24,766) (50,670 -44% B 38,130,240 in KWh,billed estimate Transmission -NVEnergy(534) 5,831 (3,134) (31,526) (28,829) -12% (0.14) EIM -NVEnergy(534) (36,601) 1,650 20,392 (14,559) -22% (0.17) Q4 $ 74,756 Q1 PCA Enviro Compli/Regulty Other(588) 5,773 8,304 273 14,349 49% 0.35 Q4TU (3,777)Q1 PCA true-up prior PCAs Total Power Costs $ (165,781) $ (18,361) $ (111,263) $ (295,405) -7.3% A 70,979 Q1 PCA Amount Total Power Cost$/MWh ($7.00) $3.66 $9.36 $1.53 2.0% $ 1.53 A/B $ 0.0019 PCA per KWh 01 2026 to be applied to Jun'26,Jul'26&Aug'26 billings Quarter Variance $ (295,405)-7.3% Price $ 74,756 2.0% Volume $ (370,161)-9.3% Budget Cost per Actual Cost per at Actual Vol. at Actual Vol. PCA Estimate True-up items: $ 75.45 $ 76.98 per MWh Cost-Budget/Actual PCA Billed KWh variance> (3,777) 48,860.249 48,860.249 Actual Purchased MWh Q1.2026 less kWh billed than estimated $ 3,686,506 $ 3,761,262 PP Cost-B$/(a)A Volume/A$/(a)A Volume 2.0% $ 74,756 Q1 Power Cost per MWh Variance 0.0% $ - less to Rate Reserve,per Ordinance PCA true-up (Q4TU) $ (3,777) 2.0% $ 74,756 Net to PCA Page 558 of 563 TRUCKEE DON N ER AGENDA ITEM #17 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Scott Crow, Assistant General Manager/CIO SUBJECT: Consideration of a Multi-Year Support Contract for Firewalls with ePlus APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Authorize the General Manager to execute a 3-year support contract and associated documents for District firewalls with ePlus using a joint purchasing agreement in the amount of$261,651.44. BACKGROUND: In today's rapidly evolving digital landscape, the importance of robust cybersecurity measures cannot be overstated. Network firewalls serve as a fundamental component of our cybersecurity strategy, acting as the first line of defense against unauthorized access, cyber threats, and data breaches. By effectively monitoring and controlling incoming and outgoing network traffic, firewalls help protect the District's sensitive information and maintain the integrity of our digital operations. As the District continues to innovate and expand our digital footprint, it is imperative that we prioritize and invest in advanced firewall technologies to safeguard our assets and ensure the continuity of our business operations. ANALYSIS AND BODY: Annual support for District firewalls was approved for FY26 during annual procurements at the December 3rd 2025 Board meeting in the amount of$120,000. This renewal would begin in November 2026. While engaging with our vendor on exact pricing, staff was able to obtain significantly better pricing and contractual value, but only if the District transitioned from a one-year contract to a three-year contract commitment. Moving to a multi-year agreement reduces overall costs, minimizes annual administrative and procurement workload for staff, stabilizes budgeting by locking in rates, and protects the District from future price increases. This approach strengthens operational continuity while delivering meaningful financial and administrative benefits to the organization. The newly negotiated pricing for a 3-year support contract is $261,651.44, which equates to an annual cost of$87,217.15, nearly $33,000 less per year than the currently approved one-year contract. This equals a savings over the 3-year period of$98,348.55. The renewal covers the period from November 2026 through November 2029. Page 1 of 3 Page 559 of 563 Section 3.08.060 of District Code allows the District to "purchase materials, equipment, supplies, information technology products and services through the State of California procurement program and jointly with other public agencies in accordance with the following procedures." ePlus is a value-added IT reseller (VAR) providing software, hardware, consulting, and professional services. ePlus competitively bids these purchases as part of the California Multiple Award Schedule (CMAS) and other State Leveraged Procurement Agreements (LPA) that are found at the California eProcure government website. CMAS and other LPAs are administered by the California Department of General Services and offer a wide variety of commodities, non-IT services, and IT products and services at prices which have been assessed to be fair, reasonable, and competitive. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 2. Provide a healthy and safe work environment for all District employees. 3. Provide reliable and high quality water supply and distribution system to meet current and future needs. 4. Provide reliable and high quality electric supply and distribution system to meet current and future needs. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 1. Manage for Financial Stability and Resiliency. 4. Modernize the utility and add value to our communities through collaboration and innovation. FISCAL IMPACT: The District's budget anticipated this item to be an annual operating expense of $120,000, with 65% to Electric Utility 1.9.920.483 and 35% to Water Utility 2.9.920.483. This equates to $360,000 in total for three years. Although the FY28 budget (year 3 of 3) is not established, this can be assumed for analysis purposes. However, with the District entering into a three-year commitment and detailed review of the procurement, this transaction qualifies as a Subscription-Based Information Technology Arrangement (SBITA). SBITAs are subject to Generally Accepted Accounting Principals (GAAP) under Governmental Accounting Standards Series Statement No. 96 of the Governmental Accounting Standards Board adopted by the District in 2023. GAAP dictates a SBITA to be capitalized to fixed assets (plant) and then amortize the investment over the life of the agreement. The financial impact of this SBITA item for each utility is as follows: Page 2 of 3 Page 560 of 563 Electric Utility $170,073 capital expenditure, SBITA fixed asset (65%) $ 56,691 annual amortization expense, SBITA (for 3 years) $ 78,000 annual operating expense in budget, GL 1.9.920.483, not incurred Water Utility $ 91,578 capital expenditure, SBITA fixed asset (35%) $ 30,526 annual amortization expense, SBITA (for 3 years) $ 42,000 annual operating expense in budget, GL 2.9.920.483, not incurred As of April 30, 2026, reserve balances are as follows: Electric Utility Water Utility Operating Reserve $11.4 million $8.9 million Capital Reserve $22.7 million $6.5 million For each utility, this item was budgeted as an annual operating expense, not a capital expenditure. Each utility has sufficient operating reserve to pay for their respective three years in advance as a capital expenditure. The $261,651 total equates to $87,217 per year, with two years or $174,434 paid in advance and $87,217 paid one year in advance. The advance payments amount to approximately $10,500 in lost investment income (4% investment yield assumption). While this SBITA capitalization treatment was not anticipated in the budget, the net cash flow outlay over the three years is less than the amount budget anticipated. A cash flow analysis provides the following comparison to the budget over the three years. $ (261,651) SBITA $ 360,000 Budget $ (10,500) Investment Income impact $ 87,849 Net savings ATTACHMENTS: None Page 3 of 3 Page 561 of 563 TRUCKEE DON N ER AGENDA ITEM #18 PUBLIC UTILITY DISTRICT MEETING DATE: June 3, 2026 TO: Board of Directors FROM: Alex Spychalsky, Communications Program Manager Steven Poncelet, Public Information Officer/Strategic Affairs Director SUBJECT: Presentation of the District New Website Design APPROVED BY: Brian C. Wright, General Manager RECOMMENDATION: Receive this report and provide input and direction to staff. BACKGROUND: The District's website (www.tdpud.org) is a critical tool in the District's transparency, communications and outreach efforts, along with satisfying regulatory compliance related to public accessibility. The website also touches on almost every aspect of District utility operations, including: • Customer engagement and transactions • Outage communications and customer alerts • Public education and postings • Public bids and proposals • Personnel and hiring • Board meetings and public record archives • News and events While District staff have worked diligently to optimize the performance of the current District website, there are opportunities to improve both the public-facing website experience and the staff resources needed to keep the website current and up-to-date. In general, the website navigation and layout can be greatly improved. Additionally, website platforms have improved to maintain compliance with the Americans with Disabilities Act (ADA), search engine optimization, translation capabilities, and compatibility with digital devices. The District issued a Request for Proposals (RFP) for the Truckee Donner PUD 2025 Website Project on August 6, 2025, and it was advertised in the Sierra Sun. Based on the requirements of the RFP, scoring criteria, and proposals received, staff determined that Streamline's proposal was the most advantageous to the District. Streamline specializes in government Content Management System (CMS) websites for Page 1 of 2 Page 562 of 563 government agencies and has a strong track record of working with local governments, such as South Tahoe Public Utility District. Streamline's pricing was based on a nominal initial migration fee plus a monthly subscription fee to cover the initial website design, future website updates, and ongoing support. Streamline was also the strongest vendor in regard to their services for ADA compliance, and works closely with the California Special District Association and others. At the September 17, 2025 Board meeting, the Board awarded a contract to Streamline for the District's new website. ANALYSIS AND BODY: District Communications staff created an internal web team from a cross-section of departments to work on creating the new website. The first major task was to review and simplify the website navigation, and organize information from the public's point of view. During this stage, there was also a focus on reformatting the homepage, where the team explored the best way to display the information that is most sought out and useful to customers. The team then did an audit of every page of the current website, to see where changes could be made to the content and layout of these pages, as well as identify opportunities to combine or eliminate pages that were outdated or no longer useful. The team is still in the process of editing the current content and mapping it to the new website navigation. While the website is not fully complete and in draft form, the project is nearing completion and the timing is right to share the new draft website with the Board and the public to receive feedback. A presentation of the new website design and navigation will be presented at the meeting on June 3, 2026. Staff will collect and consider feedback during the final revision process prior to formal launch. GOALS AND OBJECTIVES: District Code 1 .05.020 Objectives: 1. Responsibly serve the public. 6. Manage the District in an effective, efficient and fiscally responsible manner. District Code 1 .05.030 Goals: 3. Engage with our customers and communities in a welcoming and transparent way to identify opportunities. 4. Modernize the utility and add value to our communities through collaboration and innovation. 5. Developing an inclusive culture drives organizational integration and success. FISCAL IMPACT: There is no direct fiscal impact associated with this workshop item. ATTACHMENTS: None Page 2 of 2 Page 563 of 563